Production scheduling management and control system and method based on joint control operation

By introducing the production scheduling management and control system of joint control operations into workshop production, and using virtual simulation models and early warning mechanisms, the error-prone problems of traditional manual scheduling are solved, the accuracy and timeliness of production scheduling are improved, and the efficiency of workshop production is ensured. run.

CN118760090AInactive Publication Date: 2024-10-11NANTONG YUNXINGQIAN TECH CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202410965272.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-18
Publication Date
2024-10-11
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

Traditional workshop production scheduling mainly relies on manual real-time scheduling, which makes the production process error-prone and affects production efficiency. Especially when the workshop production speed is fast, a single scheduling error may cause problems in the entire production process.

Method used

Design a production scheduling management and control system based on joint control operations, including monitoring units, scheduling units, linkage units and virtual units. It monitors and schedules workshop production data in real time through network connections, and uses virtual simulation models to provide early warning and fine-tune production scheduling to avoid errors. Improve the accuracy and timeliness of production scheduling.

Benefits of technology

Use the virtual simulation model to determine whether production scheduling is normal, provide early warning and make fine-tuning to avoid production scheduling errors, improve the accuracy and timeliness of workshop production scheduling, and reduce the waste of system resources and chaotic scheduling information.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118760090A_ABST
    Figure CN118760090A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of production scheduling management and control, in particular to a production scheduling management and control system and method based on joint control operation, and the system comprises a monitoring unit, a scheduling unit, a linkage unit and a virtual unit, and the scheduling unit is in communication connection with the monitoring unit and the linkage unit through a network; when workshop production scheduling is managed and controlled, a virtual simulation model can be constructed according to previous production data of a workshop, then the production data can be input into the virtual simulation model, whether workshop production scheduling is normal or not can be judged by operating the virtual simulation model, and when the simulation model operates abnormally, the early warning module sends early warning information to the scheduling unit, so that the workshop production scheduling is controlled. The scheduling unit sends scheduling information to the node module through the scheduling module, the node module controls corresponding workshop production equipment to operate according to data, fine adjustment is performed on workshop production scheduling, errors in the workshop production scheduling process are avoided, the influence on the workshop production efficiency is avoided, and the accuracy and timeliness of workshop production scheduling management and control can be greatly improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of production scheduling and control, and in particular to a production scheduling and control system and method based on joint control operations. Background Art

[0002] Production scheduling is the work of organizing and executing the production schedule. After the production plan and production operation plan are compiled, they are still just things on paper. To organize the implementation of the plan and turn the paper plan into a real product for sale, a department is needed to organize and realize this task, which is production scheduling. Production scheduling is based on the production schedule, and the production schedule must be implemented through production scheduling. The necessity of production scheduling is determined by the nature of the production activities of industrial enterprises. Modern industrial enterprises have many production links, complex cooperative relationships, strong production continuity, and fast-changing situations. If a local failure occurs or a measure is not implemented on schedule, it will often affect the operation of the entire production system.

[0003] For example, a business process control system and control method based on air cargo with authorization announcement number CN202010946453.9 and authorization announcement date 20240227, the control system includes a task node configuration module, an interface module, a task decomposition module, a task distribution module, a job execution module, and a task monitoring and scheduling module. The task node configuration module is used for the configuration and storage of task nodes; the interface module is used to obtain the flight plan information of the flight system; the task decomposition module automatically decomposes the list tasks of each business link; the task distribution module distributes the production tasks to each execution post, and the operators of each post complete the job execution through the job execution module; the task monitoring and scheduling module monitors the execution process, and dynamically organizes and schedules resources according to the execution situation. The present invention realizes the precise control of the cargo station operation process, makes the cargo station operation process flexible and configurable, the operation tasks quantifiable, and the execution process monitorable, thereby improving the operation efficiency of the cargo station.

[0004] For example, the authorization announcement number is CN201510024503.7, and the authorization announcement date is 20170725. A production control system and method for rapid switching of multiple styles applies the internal circulation multi-track material separation device and method to the clothing and home textile hanging production lines to solve the problems of job scheduling, thread color, etc. caused by the simultaneous online production of multiple styles or the alternating production of new and old styles. Under the premise of ensuring the processing cycle of each style, the storage station cache hanger is used to realize flexible scheduling of job tasks, avoid the generation of bottleneck workstations, and improve the efficiency of the production line.

[0005] Traditional workshop production scheduling is mostly done manually in real time. Due to the high production speed of the workshop, once an error occurs in a scheduling process, it will cause problems in the entire production process of the workshop, affecting the production efficiency of the workshop. Therefore, it is urgent to design a production scheduling and control system and method based on joint control operations to solve the above problems. Summary of the invention

[0006] The purpose of the present invention is to provide a production scheduling and control system and method based on joint control operations to solve the above-mentioned deficiencies in the prior art.

[0007] In order to achieve the above object, the present invention provides the following technical solutions:

[0008] A production scheduling and control system based on joint control operation includes a monitoring unit, a scheduling unit, a linkage unit and a virtual unit, wherein the scheduling unit is respectively connected to the monitoring unit and the linkage unit through a network, and the virtual unit is respectively connected to the monitoring unit, the scheduling unit and the linkage unit through a network;

[0009] The monitoring unit is used to monitor the production process of the workshop. The monitoring unit includes a workshop camera module, a production detection module and a process tracking module. The workshop camera module is arranged in the workshop building and is used to monitor the production situation of the workshop in real time. The production detection module is arranged on each production equipment in the workshop and can detect the operating status parameters and processing speed of the workshop production equipment. The process tracking module is arranged on the workshop freight equipment and can track the real-time location and transportation speed of the workshop production products.

[0010] The virtual unit builds a virtual model based on the production parameter data of the previous workshop, and the virtual unit is used to simulate the workshop production process;

[0011] The linkage unit is used to connect the monitoring unit and the scheduling unit together in real time, and the linkage unit is used to process the data generated by the monitoring unit and the virtual unit, and the linkage unit will transmit the processed data to the scheduling unit; the linkage unit includes a transmission module and a judgment module, the transmission module is a multi-channel industrial computer, the transmission module is used to connect the scheduling unit and the monitoring unit together, and the judgment module is used to identify whether the data transmitted by the scheduling unit, the monitoring unit and the virtual unit is real-time data;

[0012] The virtual unit includes a simulation module, a processing module and an early warning module. The simulation module uses finite element analysis simulation processing software. The processing module can input the data actually collected by the monitoring unit into the virtual model constructed by the simulation module and compare them. The early warning module issues an early warning to the dispatch unit according to the comparison result of the processing module. The early warning module issues early warning information through short messages and voice calls. The percentage difference formula is used for comparison in the processing module, and the percentage difference formula is as follows:

[0013]

[0014] Among them, P is the percentage difference between the production speed simulated by the virtual unit in a certain period of time and the production speed actually collected by the monitoring unit, S2 is the production speed actually collected by the monitoring unit in a certain period of time, S1 is the production speed simulated by the virtual unit in a certain period of time, P = 0, normal production, P > 0, the actual production is too fast, and production needs to be scheduled to reduce the production speed, P < 0, the actual production is too slow, and production needs to be scheduled to speed up the production speed. The production speed simulated by the virtual unit and the production speed actually collected by the monitoring unit are composed of the transportation speed of the freight equipment and the processing speed of the production equipment;

[0015] The scheduling unit controls the operation of the workshop production equipment and production scheduling equipment through the prediction results of the virtual unit and the data collected in real time by the monitoring unit; the scheduling unit includes an access module, a discrimination module, a scheduling module, a node module and a sorting module. The access module is a network transmission interface, and the access module is used to receive data transmitted by the monitoring unit and the virtual unit; the discrimination module is used to discriminate the data accessed by the access module to determine whether it is data transmitted by the monitoring unit or early warning data transmitted by the virtual unit; the node module is composed of multiple node controllers, and the sorting module is used to screen the data discriminated by the discrimination module to determine whether the data matches the workshop equipment. The scheduling module transmits the data discriminated by the discrimination module to the node module according to the screening results of the sorting module, and the node module controls the operation of the corresponding workshop production equipment and production scheduling equipment according to the data.

[0016] The key idea of ​​the above technical solution is: when controlling the workshop production scheduling, a virtual simulation model can be built based on the previous production data of the workshop, and then the production data can be input into the virtual simulation model. The virtual simulation model can be run to determine whether the workshop production scheduling is normal. When the simulation model does not run normally, the early warning module sends an early warning message to the scheduling unit, and the scheduling unit sends the scheduling information to the node module through the scheduling module. The node module controls the operation of the corresponding workshop production equipment according to the data, and fine-tunes the workshop production scheduling to avoid errors in the workshop production scheduling process, which affects the workshop production efficiency and can greatly improve the accuracy and timeliness of the workshop production scheduling control.

[0017] A production scheduling and control method based on joint control operation includes the following steps:

[0018] S1. Constructing a simulation model: Collecting previous workshop production data and inputting it into a virtual unit. Then, the simulation module in the virtual unit constructs a virtual simulation model of the workshop through finite element analysis and simulation processing software.

[0019] S2. Data collection and data calculation: The monitoring unit collects workshop production data in real time. The workshop camera module is used to monitor the workshop production situation in real time. The production detection module is set on each production equipment in the workshop to detect the operation status parameters and processing speed of the workshop production equipment. At the same time, the process tracking module is arranged on the workshop freight equipment to track the real-time location and transportation speed of the workshop production products. Then, the above collected data is processed to obtain the actual production speed collected by the monitoring unit within a certain period of time;

[0020] S3. Virtual prediction and production scheduling: After the above steps are completed, the simulation model can be started to simulate the production process, so as to obtain the production speed simulated by the virtual unit in the same time period. Then, by comparing the actual production speed collected by the monitoring unit with the production speed simulated by the virtual unit, it can be judged whether the workshop production scheduling is normal;

[0021] S3. Early warning and production scheduling: When the comparison results are equal, the production is normal, and the early warning module does not send an early warning message to the scheduling unit. When the comparison results are significantly different, the actual production is too fast, and the early warning module sends an early warning message to the scheduling unit, requiring production to be scheduled and reducing the production speed. When the comparison results are negative, the actual production is too slow, requiring production to be scheduled and speeding up the production speed. When the early warning module issues an early warning, the scheduling unit will compare the real-time data collected by the monitoring unit with the virtual data of the virtual unit. After comparing the two and finding an abnormality, the scheduling unit will send scheduling information to the node module through the scheduling module, and the node module will control the operation of the corresponding workshop production equipment according to the data.

[0022] In the above technical solution, the present invention provides a production scheduling control system and method based on joint control operation, which has the following beneficial effects:

[0023] (1) The virtual unit designed by the present invention can build a virtual simulation model based on the previous production data of the workshop when controlling the workshop production scheduling, and then the production data can be input into the virtual simulation model. After running the virtual simulation model, it can be determined whether the workshop production scheduling is normal. When the simulation model does not run normally, the early warning module sends an early warning message to the scheduling unit, and the scheduling unit sends the scheduling information to the node module through the scheduling module. The node module controls the operation of the corresponding workshop production equipment according to the data, and fine-tunes the workshop production scheduling to avoid errors in the workshop production scheduling process and affect the workshop production efficiency. It can greatly improve the accuracy and timeliness of the workshop production scheduling control.

[0024] (2) The node module designed by the present invention is composed of multiple node controllers, which can control the operation of corresponding workshop production equipment and production scheduling equipment according to the data sent by the scheduling module, so that the workshop production equipment, production scheduling equipment and the system are designed with a distributed architecture, which can reduce the problem of disordered scheduling information when the system controls the workshop production equipment and production scheduling equipment at the same time, and reduce the waste of system resources.

[0025] (3) The linkage unit designed in the present invention can connect the monitoring unit and the scheduling unit together in real time, so that the scheduling unit can control the operation of the workshop production equipment and the production scheduling equipment according to the data simulated by the virtual unit and the data collected by the monitoring unit, thereby improving the synchronization of the workshop production equipment and the production scheduling equipment and improving the degree of linkage control of the workshop production scheduling management. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments recorded in the present invention. For ordinary technicians in this field, other drawings can also be obtained based on these drawings.

[0027] Figure 1 A system flow diagram of an embodiment of a production scheduling and control system and method based on joint control operations provided by the present invention.

[0028] Figure 2 A monitoring unit flow chart is provided for an embodiment of a production scheduling and control system and method based on joint control operations of the present invention.

[0029] Figure 3 A schematic diagram of a scheduling unit flow chart provided for an embodiment of a production scheduling and control system and method based on joint control operations of the present invention.

[0030] Figure 4 A schematic diagram of a linkage unit flow chart provided for an embodiment of a production scheduling and control system and method based on joint control operations of the present invention.

[0031] Figure 5 A virtual unit flow diagram is provided for an embodiment of a production scheduling and control system and method based on joint control operations of the present invention.

[0032] Figure 6 A method flow chart is provided for an embodiment of a production scheduling and control system and method based on joint control operations of the present invention. DETAILED DESCRIPTION

[0033] In order to enable those skilled in the art to better understand the technical solution of the present invention, the present invention will be further described in detail below with reference to the accompanying drawings.

[0034] like Figure 1-5 As shown, a production scheduling and control system based on joint control operation provided by an embodiment of the present invention includes a monitoring unit, a scheduling unit, a linkage unit and a virtual unit. The scheduling unit is respectively connected to the monitoring unit and the linkage unit through a network, and the virtual unit is respectively connected to the monitoring unit, the scheduling unit and the linkage unit through a network.

[0035] The monitoring unit is used to monitor the production process in the workshop;

[0036] The virtual unit builds a virtual model based on the production parameter data of the previous workshop, and the virtual unit is used to simulate the workshop production process;

[0037] The linkage unit is used to connect the monitoring unit and the scheduling unit in real time, and the linkage unit is used to process the data generated by the monitoring unit and the virtual unit, and the linkage unit will transmit the processed data to the scheduling unit;

[0038] The virtual unit includes a simulation module, a processing module and an early warning module. The simulation module uses finite element analysis simulation processing software. The processing module can input the data actually collected by the monitoring unit into the virtual model constructed by the simulation module and compare them. The early warning module issues an early warning to the dispatching unit based on the comparison results of the processing module.

[0039] The scheduling unit controls the operation of workshop production equipment and production scheduling equipment through the prediction results of the virtual unit and the data collected in real time by the monitoring unit.

[0040] Specifically, in this embodiment, a monitoring unit, a scheduling unit, a linkage unit and a virtual unit are included. The scheduling unit is respectively connected to the monitoring unit and the linkage unit through a network, and the virtual unit is respectively connected to the monitoring unit, the scheduling unit and the linkage unit through a network.

[0041] The monitoring unit is used to monitor the production process of the workshop. The monitoring unit includes a workshop camera module, a production detection module and a process tracking module. The workshop camera module is arranged in the workshop building and is used to monitor the production situation of the workshop in real time. The production detection module is arranged on each production equipment in the workshop and can detect the operating status parameters and processing speed of the workshop production equipment. The process tracking module is arranged on the workshop freight equipment and can track the real-time location and transportation speed of the workshop production products.

[0042] The virtual unit builds a virtual model based on the production parameter data of the previous workshop, and the virtual unit is used to simulate the workshop production process;

[0043] The linkage unit is used to connect the monitoring unit and the scheduling unit together in real time, and the linkage unit is used to process the data generated by the monitoring unit and the virtual unit, and the linkage unit will transmit the processed data to the scheduling unit; the linkage unit includes a transmission module and a judgment module, the transmission module is a multi-channel industrial computer, the transmission module is used to connect the scheduling unit and the monitoring unit together, and the judgment module is used to identify whether the data transmitted by the scheduling unit, the monitoring unit and the virtual unit is real-time data;

[0044] The virtual unit includes a simulation module, a processing module and an early warning module. The simulation module uses finite element analysis simulation processing software. The processing module can input the data actually collected by the monitoring unit into the virtual model constructed by the simulation module and compare them. The early warning module issues an early warning to the dispatch unit according to the comparison result of the processing module. The early warning module issues early warning information through short messages and voice calls. The percentage difference formula is used for comparison in the processing module, and the percentage difference formula is as follows:

[0045]

[0046] Among them, P is the percentage difference between the production speed simulated by the virtual unit in a certain period of time and the production speed actually collected by the monitoring unit, S2 is the production speed actually collected by the monitoring unit in a certain period of time, S1 is the production speed simulated by the virtual unit in a certain period of time, P = 0, normal production, P > 0, the actual production is too fast, and production needs to be scheduled to reduce the production speed, P < 0, the actual production is too slow, and production needs to be scheduled to speed up the production speed. The production speed simulated by the virtual unit and the production speed actually collected by the monitoring unit are composed of the transportation speed of the freight equipment and the processing speed of the production equipment;

[0047] The scheduling unit controls the operation of the workshop production equipment and production scheduling equipment through the prediction results of the virtual unit and the data collected in real time by the monitoring unit; the scheduling unit includes an access module, a discrimination module, a scheduling module, a node module and a sorting module. The access module is a network transmission interface, and the access module is used to receive data transmitted by the monitoring unit and the virtual unit; the discrimination module is used to discriminate the data accessed by the access module to determine whether it is data transmitted by the monitoring unit or early warning data transmitted by the virtual unit; the node module is composed of multiple node controllers, and the sorting module is used to screen the data discriminated by the discrimination module to determine whether the data matches the workshop equipment. The scheduling module transmits the data discriminated by the discrimination module to the node module according to the screening results of the sorting module, and the node module controls the operation of the corresponding workshop production equipment and production scheduling equipment according to the data.

[0048] The present invention provides a production scheduling and control system based on joint control operations. When scheduling and controlling workshop production, a virtual simulation model is constructed according to the previous production data of the workshop, and then the production data can be input into the virtual simulation model. After running the virtual simulation model, it can be judged whether the workshop production scheduling is normal. When the simulation model does not run normally, the early warning module sends an early warning message to the scheduling unit, and the scheduling unit sends the scheduling information to the node module through the scheduling module. The node module controls the operation of the corresponding workshop production equipment according to the data, and fine-tunes the workshop production scheduling to avoid errors in the workshop production scheduling process, which affects the workshop production efficiency, and can greatly improve the accuracy and timeliness of the workshop production scheduling and control.

[0049] In one embodiment provided by the present invention, Figure 2 As shown, the monitoring unit includes a workshop camera module, a production detection module and a process tracking module. The workshop camera module is arranged in the workshop building. The workshop camera module is used to monitor the workshop production situation in real time. The production detection module is arranged on each production equipment in the workshop. The production detection module can detect the operating status parameters and processing speed of the workshop production equipment. The process tracking module is arranged on the workshop freight equipment. The process tracking module can track the real-time location and transportation speed of the workshop production products.

[0050] In another embodiment provided by the present invention, Figure 4 As shown, the linkage unit includes a transmission module and a judgment module. The transmission module is a multi-channel industrial computer. The transmission module is used to connect the scheduling unit and the monitoring unit together. The judgment module is used to identify whether the data transmitted by the scheduling unit, the monitoring unit and the virtual unit is real-time data.

[0051] In another embodiment provided by the present invention, Figure 3 As shown, the scheduling unit includes an access module, a discrimination module, a scheduling module, a node module and a sorting module. The access module is a network transmission interface. The access module is used to receive data transmitted from the monitoring unit and the virtual unit. The discrimination module is used to discriminate the data accessed by the access module to determine whether it is data transmitted by the monitoring unit or warning data transmitted from the virtual unit. The node module is composed of multiple node controllers. The sorting module is used to screen the data discriminated by the discrimination module to determine whether the data matches the workshop equipment. The scheduling module transmits the data discriminated by the discrimination module to the node module according to the screening results of the sorting module. The node module controls the operation of the corresponding workshop production equipment and the operation of the production scheduling equipment according to the data.

[0052] A production scheduling and control method based on joint control operations, such as Figure 6 As shown, the following steps are included:

[0053] S1. Constructing a simulation model: Collecting previous workshop production data and inputting it into a virtual unit. Then, the simulation module in the virtual unit constructs a virtual simulation model of the workshop through finite element analysis and simulation processing software.

[0054] S2. Data collection and data calculation: The monitoring unit collects workshop production data in real time. The workshop camera module is used to monitor the workshop production situation in real time. The production detection module is set on each production equipment in the workshop to detect the operation status parameters and processing speed of the workshop production equipment. At the same time, the process tracking module is arranged on the workshop freight equipment to track the real-time location and transportation speed of the workshop production products. Then, the above collected data is processed to obtain the actual production speed collected by the monitoring unit within a certain period of time;

[0055] S3. Virtual prediction and production scheduling: After the above steps are completed, the simulation model can be started to simulate the production process, so as to obtain the production speed simulated by the virtual unit in the same time period. Then, by comparing the actual production speed collected by the monitoring unit with the production speed simulated by the virtual unit, it can be judged whether the workshop production scheduling is normal;

[0056] S3. Early warning and production scheduling: When the comparison results are equal, the production is normal, and the early warning module does not send an early warning message to the scheduling unit. When the comparison results are significantly different, the actual production is too fast, and the early warning module sends an early warning message to the scheduling unit, requiring production to be scheduled and reducing the production speed. When the comparison results are negative, the actual production is too slow, requiring production to be scheduled and speeding up the production speed. When the early warning module issues an early warning, the scheduling unit will compare the real-time data collected by the monitoring unit with the virtual data of the virtual unit. After comparing the two and finding an abnormality, the scheduling unit will send scheduling information to the node module through the scheduling module, and the node module will control the operation of the corresponding workshop production equipment according to the data.

[0057] Working principle: collect previous workshop production data, and then input it into the simulation module. The simulation module constructs a virtual simulation model of the workshop through finite element analysis and simulation processing software; then collect workshop production data in real time through the monitoring unit, and then transmit the production data to the constructed simulation model, then operate the simulation model to start calculation, simulate the production process, and then judge whether the workshop production scheduling is normal by whether the simulation model runs normally; when the simulation model runs abnormally, the early warning module sends an early warning message to the scheduling unit, and the access module will receive the early warning information from the early warning module. At the same time, the access module can receive the data transmitted by the monitoring unit, and then the identification module can identify the data accessed by the access module. To determine whether it is data transmitted by the monitoring unit or early warning data from the virtual unit, the subsequent sorting module is used to screen and compare the data identified by the identification module to determine whether the data matches the workshop equipment, so that the node module can correctly issue commands to the corresponding workshop production equipment and production scheduling equipment. After that, the scheduling module transmits the data identified by the identification module to the node module according to the screening results of the sorting module. The node module will control the operation of the corresponding workshop production equipment and the operation of the production scheduling equipment according to the data. After comparing the two and finding abnormalities, the scheduling unit will send scheduling information to the node module through the scheduling module, and the node module will control the operation of the corresponding workshop production equipment according to the data.

[0058] The above description is only by way of illustration of certain exemplary embodiments of the present invention. It is undoubted that those skilled in the art can modify the described embodiments in various ways without departing from the spirit and scope of the present invention. Therefore, the above drawings and descriptions are illustrative in nature and should not be construed as limiting the scope of protection of the claims of the present invention.

Claims

1. A production scheduling and control system based on joint control operation, including a monitoring unit, a scheduling unit, a linkage unit and a virtual unit, Features: The scheduling unit is connected to the monitoring unit and the linkage unit through a network, and the virtual unit is connected to the monitoring unit, the scheduling unit and the linkage unit through a network. The monitoring unit is used to monitor the production process of the workshop; The virtual unit constructs a virtual model based on the production parameter data of the previous workshop, and the virtual unit is used to simulate the production process of the workshop; The linkage unit is used to connect the monitoring unit and the scheduling unit in real time, and the linkage unit is used to process the data generated by the monitoring unit and the virtual unit, and the linkage unit will transmit the processed data to the scheduling unit; The virtual unit includes a simulation module, a processing module and an early warning module. The simulation module uses finite element analysis simulation processing software. The processing module can input the data actually collected by the monitoring unit into the virtual model constructed by the simulation module and compare them. The early warning module issues an early warning to the dispatching unit according to the comparison result of the processing module. The early warning module issues early warning information through short messages and voice calls. The processing module uses a percentage difference formula when comparing, and the percentage difference formula is as follows: Where P is the percentage difference between the production speed simulated by the virtual unit and the production speed actually collected by the monitoring unit during a certain period of time, S 2 is the actual production speed collected by the monitoring unit within a certain period of time, S 1 The production speed simulated by the virtual unit in a certain period of time, P = 0, normal production, P > 0, the actual production is too fast, and production needs to be scheduled to reduce the production speed, P < 0, the actual production is too slow, and production needs to be scheduled to speed up the production speed; The scheduling unit controls the operation of workshop production equipment and production scheduling equipment through the results predicted by the virtual unit and the data collected in real time by the monitoring unit.

2. According to claim 1, a production scheduling and control system based on joint control operations, It is characterized in that The monitoring unit includes a workshop camera module, a production detection module and a process tracking module. The workshop camera module is arranged in the workshop building and is used to monitor the workshop production situation in real time.

3. According to claim 2, a production scheduling and control system based on joint control operations, It is characterized in that The production detection module is arranged on each production equipment in the workshop, and the production detection module can detect the operation status parameters and processing speed of the production equipment in the workshop.

4. A production scheduling and control system based on joint control operations according to claim 3, It is characterized in that The process tracking module is arranged on the workshop freight equipment, and the process tracking module can track the real-time location and transportation speed of the products produced in the workshop.

5. A production scheduling and control system based on joint control operations according to claim 4, It is characterized in that The production speed simulated by the virtual unit and the production speed actually collected by the monitoring unit are composed of the transportation speed of the freight equipment and the processing speed of the production equipment.

6. A production scheduling and control system based on joint control operations according to claim 5, It is characterized in that The linkage unit includes a transmission module and a judgment module. The transmission module is a multi-channel industrial computer. The transmission module is used to connect the scheduling unit and the monitoring unit together. The judgment module is used to identify whether the data transmitted by the scheduling unit, the monitoring unit and the virtual unit is real-time data.

7. A production scheduling and control system based on joint control operations according to claim 1, It is characterized in that The scheduling unit includes an access module, a screening module, a scheduling module, a node module and a sorting module. The access module is a network transmission interface, and the access module is used to receive data transmitted from the monitoring unit and the virtual unit.

8. A production scheduling and control system based on joint control operations according to claim 7, It is characterized in that The identification module is used to identify the data accessed by the access module to determine whether it is data transmitted by the monitoring unit or warning data transmitted by the virtual unit. The identification formula is as follows.

9. A production scheduling and control system based on joint control operations according to claim 7, It is characterized in that The node module is composed of multiple node controllers. The sorting module is used to screen the data identified by the identification module and determine whether the data matches the workshop equipment. The scheduling module transmits the data identified by the identification module to the node module according to the screening results of the sorting module. The node module controls the operation of the corresponding workshop production equipment and the operation of the production scheduling equipment according to the data.

10. A production scheduling and control method based on joint control operations, using a production scheduling and control system based on joint control operations as described in any one of claims 1 to 9, It is characterized in that The following steps are involved: S1. Constructing a simulation model: Collecting previous workshop production data and inputting it into a virtual unit. Then, the simulation module in the virtual unit constructs a virtual simulation model of the workshop through finite element analysis and simulation processing software. S2. Data collection and data calculation: The monitoring unit collects workshop production data in real time. The workshop camera module is used to monitor the workshop production situation in real time. The production detection module is set on each production equipment in the workshop to detect the operation status parameters and processing speed of the workshop production equipment. At the same time, the process tracking module is arranged on the workshop freight equipment to track the real-time location and transportation speed of the workshop production products. Then, the above collected data is processed to obtain the actual production speed collected by the monitoring unit within a certain period of time; S3. Virtual prediction and production scheduling: After the above steps are completed, the simulation model can be started to simulate the production process, so as to obtain the production speed simulated by the virtual unit in the same time period. Then, by comparing the actual production speed collected by the monitoring unit with the production speed simulated by the virtual unit, it can be judged whether the workshop production scheduling is normal; S3. Early warning and production scheduling: When the comparison results are equal, the production is normal, and the early warning module does not send an early warning message to the scheduling unit. When the comparison results are significantly different, the actual production is too fast, and the early warning module sends an early warning message to the scheduling unit, requiring production to be scheduled and reducing the production speed. When the comparison results are negative, the actual production is too slow, requiring production to be scheduled and speeding up the production speed. When the early warning module issues an early warning, the scheduling unit will compare the real-time data collected by the monitoring unit with the virtual data of the virtual unit. After comparing the two and finding an abnormality, the scheduling unit will send scheduling information to the node module through the scheduling module, and the node module will control the operation of the corresponding workshop production equipment according to the data.

Citation Information

Patent Citations

  • Production management and control system and method for multi-style quick switching

    CN104635700A

  • Service process management and control system and management and control method based on air freight

    CN112053135A