Track planning method and device for unmanned loader operation and storage medium
Effective trajectories are generated through pose freedom parameters and fitting technology, which solves the problem of unreasonable shovel loading trajectory planning of unmanned loaders, improves shovel loading efficiency and adaptability, adapts to different processes and pile shapes, and realizes shovel loading Effect optimization.
Patent Information
- Application Number
- CN202410818666.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-21
- Publication Date
- 2024-10-11
AI Technical Summary
The unreasonable shoveling trajectory planning of unmanned loaders in bulk earthmoving projects results in low shoveling efficiency, poor bucket filling rate, and changes in the shape of the pile affect the stability of the operation, and lacks environmental adaptability and process scalability.
The pose freedom parameters are used to describe the current and target poses of the bucket end. Segmented trajectories are generated through various fitting methods, and validity checks and adaptability evaluations are performed to output the effective trajectories with the lowest cost to achieve adaptive shovel loading. Operation trajectory planning.
It improves the scene adaptability and shoveling efficiency of the unmanned loader, ensures the optimization and stability of the shoveling effect, and adapts to different process requirements and pile shapes.
Smart Images

Figure CN118760158A_ABST
Abstract
Description
Technical Field
[0001] The present disclosure relates to the fields of bulk earthwork engineering and intelligent driving technology, and in particular to an unmanned loader operation trajectory planning system and method thereof. Background Art
[0002] Loaders are the main operating equipment in bulk earthwork scenarios. They are responsible for loading, unloading and transporting materials. They are mainly used to shovel bulk materials such as soil, sand, lime, coal, etc. Loaders have the advantages of fast operation speed and high efficiency, which can greatly improve work efficiency and save labor costs. Loaders have good mobility and can operate flexibly in different working environments. They have a wide range of applications and can adapt to different working environments and needs.
[0003] Loaders are often used in harsh working conditions, which are highly dangerous. Manual operation of loaders is labor-intensive and has low operating efficiency. However, unmanned loaders can operate continuously for 24 hours without labor costs, avoiding direct contact with dangerous environments, and can adapt to different operating scenarios. Summary of the invention
[0004] The present application proposes a trajectory planning method, system and storage medium for unmanned loader operations.
[0005] According to a first aspect of an embodiment of the present disclosure, a trajectory planning method for unmanned loader operation is provided, including: obtaining the posture of the bucket end of the unmanned loader, and describing the current posture and target posture of the bucket end based on the posture freedom parameters of the bucket end; planning multiple predicted trajectories of the bucket end based on the current posture and target posture, wherein the operation time is discretized to obtain multiple target times, and for each target time, the posture change process of the bucket end between the operation start time and the target time is segmented, and multiple fitting methods are used to generate segmented trajectories, and the segmented trajectories are spliced to obtain multiple predicted trajectories; performing a validity check on each predicted trajectory to exclude invalid trajectories, thereby obtaining a valid trajectory; and performing an adaptability evaluation on each valid trajectory to output the valid trajectory with the lowest cost as the planned trajectory.
[0006] In some embodiments, the posture degrees of freedom parameters include the height and inclination of the bucket tip.
[0007] In some embodiments, the unmanned loader has a two-link structure, wherein the two links have a first length and a second length, respectively, and form a first joint and a second joint relative to the origin of the unmanned loader, respectively, wherein the joint freedom parameters of the first joint include a first angle of rotation, and the joint freedom parameters of the second joint include a second angle of rotation.
[0008] In some embodiments, the posture degree of freedom parameter is calculated based on the first length, the second length, the first rotation angle, and the second rotation angle.
[0009] In some embodiments, planning multiple predicted trajectories of the bucket end based on the current posture and the target posture also includes: for the first target time, the operation start time and the first target time are respectively time-shifted, and the posture change process is segmented to include at least one of the following: segmentation from the operation start time to the first target time shifted forward, and segmentation from the first target time shifted forward to the first target time; and segmentation from the operation start time to the operation start time shifted backward, and segmentation from the operation start time shifted backward to the first target time.
[0010] In some embodiments, the fitting method adopted in the posture change process within the time offset is to keep the posture of the bucket end unchanged.
[0011] In some embodiments, the fitting method used in the posture change process in the segment from the operation start time to the first target time shifted forward or in the segment from the operation start time shifted backward to the first target time is a quintic polynomial.
[0012] In some embodiments, the segmented trajectory fitted by the quintic polynomial makes the bucket end satisfy the following constraints: the height at the start time of the operation is the height of the bucket end in the current posture; the height at the first target time is the height of the bucket end in the target posture; the speed at the start time of the operation is 0; the acceleration at the start time of the operation is 0; the speed at the first target time is 0; and the acceleration at the first target time is 0.
[0013] In some embodiments, checking the validity of each predicted trajectory includes at least one of the following: checking whether the bucket end collides with the ground in the posture corresponding to each predicted trajectory; and checking whether the target posture corresponding to each predicted trajectory is reachable for the bucket end.
[0014] In some embodiments, performing validity check on each predicted trajectory includes inversely solving the first length and the second length based on the posture degree of freedom parameters of each predicted trajectory to check whether the inversely solved first length and second length are within a valid range.
[0015] In some embodiments, performing adaptive evaluation on each valid trajectory includes: generating a data set of target time and posture degree of freedom parameters for each valid trajectory; and calculating a combined cost of the data set according to the time weight and the degree of freedom weight.
[0016] In some embodiments, performing adaptability evaluation on each valid trajectory further includes: calculating the inclination of the stockpile according to the slope fitted to the working stockpile cross section; and calculating the adaptability cost of the data set relative to the inclination of the stockpile within a specified range of the free end parameters of the posture.
[0017] In some embodiments, the sum of the combined cost and the adaptability cost is taken as the total trajectory cost, and the valid trajectory with the lowest total trajectory cost is selected as the output planning trajectory.
[0018] According to a second aspect of an embodiment of the present disclosure, a trajectory planning device for unmanned loader operation is provided, comprising: a posture data acquisition unit, configured to obtain the posture of the bucket end of the unmanned loader, and describe the current posture and target posture of the bucket end based on the posture freedom parameters of the bucket end; a trajectory prediction unit, configured to plan multiple predicted trajectories of the bucket end based on the current posture and the target posture, wherein the operation time is discretized to obtain multiple target times, and for each target time, the posture change process of the bucket end between the operation start time and the target time is segmented, and multiple fitting methods are used to generate segmented trajectories, and the segmented trajectories are spliced to obtain multiple predicted trajectories; a trajectory validity check unit, configured to perform a validity check on each predicted trajectory to exclude invalid trajectories, thereby obtaining a valid trajectory; and a trajectory adaptability evaluation unit, configured to perform adaptability evaluation on each valid trajectory to output a valid trajectory with the lowest cost as the planned trajectory.
[0019] According to a third aspect of an embodiment of the present disclosure, a trajectory planning device for unmanned loader operations is provided, comprising: a processor; and a memory storing computer executable instructions, which, when executed by the processor, enables the processor to execute the trajectory planning method for unmanned loader operations described in the first aspect of an embodiment of the present disclosure.
[0020] According to the fourth aspect of an embodiment of the present disclosure, a non-transitory computer-readable storage medium storing computer-executable instructions is provided, which, when executed by a processor, enables the processor to implement the trajectory planning method for unmanned loader operations according to the first aspect of an embodiment of the present disclosure.
[0021] According to a fifth aspect of an embodiment of the present disclosure, a computer program product is provided, comprising computer program instructions, which, when executed by a processor, implement the trajectory planning method for unmanned loader operation according to the first aspect of an embodiment of the present disclosure.
[0022] The advantages of the embodiments disclosed herein are that by directly planning the trajectories of the bucket angle and the lifting height, different shoveling process requirements can be adapted; by discretizing time and planning the target degrees of freedom separately, the operating trajectory between any postures in the feasible space can be obtained; and by adapting the shape of the material pile and adaptively evaluating the trajectory, it can adapt to different material pile shapes and obtain the optimal shoveling effect.
[0023] It should be appreciated that the above advantages do not need to be all realized in one or some specific embodiments, but may be partially dispersed in different embodiments according to the present disclosure. The embodiments according to the present disclosure may have one or some of the above advantages, or may have other advantages alternatively or additionally. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] The foregoing and other features and advantages of the present disclosure will become apparent from the following description of the embodiments of the present disclosure in conjunction with the accompanying drawings. The accompanying drawings are incorporated herein and form a part of the specification, and are further used to explain the principles of the present disclosure and enable those skilled in the art to make and use the present disclosure. Among them:
[0025] Figure 1 A schematic diagram of an operating mechanism of an unmanned loader according to an embodiment of the present disclosure is shown;
[0026] Figure 2 A schematic block diagram of a trajectory planning device for unmanned loader operation according to an embodiment of the present disclosure is shown;
[0027] FIG. 3A to FIG. 3C A schematic diagram of degree of freedom parameter planning in a trajectory planning method for unmanned loader operation according to an embodiment of the present disclosure is shown;
[0028] Figure 4 A schematic diagram of trajectory adaptability evaluation in a trajectory planning method for unmanned loader operation according to an embodiment of the present disclosure is shown;
[0029] Figure 5 A flow chart of a trajectory planning method for unmanned loader operation according to an embodiment of the present disclosure is shown;
[0030] Figure 6 An exemplary configuration of a computing device that can implement an embodiment according to the present disclosure is shown.
[0031] Note that in the embodiments described below, sometimes the same reference numerals are used in common between different drawings to represent the same parts or parts with the same functions, and their repeated descriptions are omitted. In some cases, similar numbers and letters are used to represent similar items, so once an item is defined in one drawing, it does not need to be further discussed in subsequent drawings.
[0032] For ease of understanding, the position, size, range, etc. of each structure shown in the drawings and the like may not represent the actual position, size, range, etc. Therefore, the present disclosure is not limited to the position, size, range, etc. disclosed in the drawings and the like. DETAILED DESCRIPTION
[0033] Various exemplary embodiments of the present disclosure will be described in detail below with reference to the accompanying drawings. It should be noted that unless otherwise specifically stated, the relative arrangement of components and steps, numerical expressions and numerical values set forth in these embodiments do not limit the scope of the present disclosure.
[0034] The following description of at least one exemplary embodiment is in fact merely illustrative and is in no way intended to limit the present disclosure and its application or use. That is, the structures and methods herein are shown in an exemplary manner to illustrate different embodiments of the structures and methods in the present disclosure. However, those skilled in the art will appreciate that they merely illustrate exemplary ways of the present disclosure that can be implemented, rather than exhaustive ways. In addition, the drawings need not be drawn to scale, and some features may be enlarged to illustrate the details of specific components.
[0035] Technologies, methods, and apparatus known to ordinary technicians in the relevant field may not be discussed in detail, but where appropriate, such technologies, methods, and apparatus should be considered part of the authorization specification.
[0036] In the scenario of bulk earthwork engineering, the quality of the unmanned loader's shoveling trajectory will directly affect the shoveling efficiency and full bucket rate. At the same time, changes in the shape of the pile of materials will also cause irregular fluctuations during the operation, thereby affecting the shoveling effect. In summary, the technical solution disclosed in the present invention mainly addresses the problems of unreasonable shoveling trajectories generated during the shoveling operation of unmanned loaders, poor scalability of shoveling tasks under different process requirements, and poor environmental adaptability. An adaptive shoveling operation trajectory planning device and method for unmanned loaders are proposed. Specifically, through joint data collection, combined trajectory planning, trajectory validity check, and trajectory adaptability evaluation, trajectory calculation between arbitrary postures in the feasible space is realized, and adaptive adjustments are made according to process requirements and the shape of the pile of materials, thereby improving the scene adaptability and shoveling efficiency of the unmanned loader.
[0037] The trajectory planning method and device for unmanned loader operation according to various embodiments of the present disclosure will be described in detail below in conjunction with the accompanying drawings. It is understood that the actual trajectory planning method for unmanned loader operation may also include other steps, but in order to avoid blurring the main points of the present disclosure, this article does not discuss these other steps and the accompanying drawings do not show these other steps. In addition, for reference purposes only, the "first", "second", "third", "fourth" and other similar terms used in this article are used to distinguish multiple subjects and are not intended to be limited. For example, unless the context clearly indicates, the words "first", "second", "third", "fourth" and other such numerical words referring to structures or elements do not imply an order or sequence.
[0038] First reference Figure 1 , Figure 1The schematic diagram of the operating mechanism of the unmanned loader according to the embodiment of the present disclosure is shown. Generally speaking, the operating process of the unmanned loader requires real-time attention to the posture of the bucket end, and the posture freedom parameters of the bucket end can be used to describe the state of its posture. A common unmanned loader has a two-link structure, and its operating mechanism is as follows: Figure 1 As shown, the rocker arm and the boom are simplified to the connecting rods 1010 and 1020, which are respectively controlled by the rocker arm driving rod 110 and the boom driving rod 120, and the bucket 113 is carried on the connecting rod 1020. As a result, the connecting rods 1010 and 1020 form two joints that affect the posture of the bucket end O2 relative to the origin of the unmanned loader, which are recorded as the first joint O0 and the second joint O1. The first joint O0 rotates in the plane (x0, y0), and the second joint O1 rotates in the plane (x1, y1), and the joint freedom parameters are used to describe the rotation angle. Specifically, the lengths of the connecting rods 1010 and 1020 are respectively the first length a1 and the second length a2, the joint freedom parameters of the first joint O0 and the second joint O1 are respectively the first rotation angle θ1 and the second rotation angle θ2, and the posture freedom parameters of the bucket end O2 include its height y and inclination angle θ; then the transformation model between the posture of the bucket end O2 and the parameters of the two joints satisfies the following formula (1):
[0039]
[0040] The inverse solution of this model is the following formula (2):
[0041]
[0042] In a non-limiting embodiment, the unmanned loader is provided with joint sensors at each joint (such as the first joint O0 and the second joint O1), and the joint sensors obtain the rotation angles of each joint (such as the first rotation angle θ1 and the second rotation angle θ2). start and end time t end For example, the current position (y start ,θ start ) and target pose (y end ,θ end ). Based on this, the trajectory planning method of the embodiment of the present disclosure provides how to plan the motion trajectory of the bucket end from the current posture to the target posture.
[0043] Please refer to the following Figure 2 , Figure 2 A schematic block diagram of a trajectory planning device for unmanned loader operation according to an embodiment of the present disclosure is shown.
[0044] In some embodiments, the trajectory planning method for unmanned loader operation can be implemented by a trajectory planning device 2000, which may include a processor 2100. The processor 2100 of the device 2000 can provide various functions of the trajectory planning device 2000. The processor may refer to various implementations of a digital circuit system, an analog circuit system, or a mixed signal (a combination of analog and digital) circuit system that performs functions in a computing system. The processing circuit may include, for example, circuits such as an integrated circuit (IC), an application specific integrated circuit (ASIC), a portion or circuit of a separate processor core, an entire processor core, a separate processor, a programmable hardware device such as a field programmable gate array (FPGA), and / or a system including multiple processors.
[0045] In some embodiments, the trajectory planning device 2000 for unmanned loader operation may also include a memory (not shown in the figure). The memory of the device 2000 can store information generated by the processor 2100 and programs and data for processor operation. The memory can be a volatile memory and / or a non-volatile memory. For example, the memory may include, but is not limited to, a random access memory (RAM), a dynamic random access memory (DRAM), a static random access memory (SRAM), a read-only memory (ROM), and a flash memory. Generally, the processor can be configured to execute instructions stored on the memory to implement the trajectory planning method for unmanned loader operation as described above.
[0046] Specifically, Figure 2 As shown, in some embodiments, the trajectory planning device 2000 for unmanned loader operation according to the embodiment of the present disclosure may include a posture data acquisition unit 2010, a trajectory prediction unit 2020, a trajectory validity check unit 2030 and a trajectory adaptability evaluation unit 2040. It should be understood that Figure 2 The various functional units of the trajectory planning device for unmanned loader operation shown are only logical modules divided according to the specific functions implemented by them, and are not used to limit the specific implementation method. In actual implementation, the above modules can be implemented as independent physical entities, or can also be implemented by a single entity (for example, a processor (CPU or DSP, etc.), an integrated circuit, etc.).
[0047] In some embodiments, the posture data acquisition unit 2010 is configured to obtain the posture of the bucket end O2 of the unmanned loader, and describe the current posture (y, θ) of the bucket end O2 based on the posture freedom parameters (y, θ) of the bucket end O2. start ,θ start ) and target pose (y end ,θ end ). Figure 1As shown in formula (1), the position and posture of the bucket end O2 can be obtained based on the lengths a1 and a2 of the connecting rods and the measured values θ1 and θ2 of the joint angles.
[0048] In some embodiments, the trajectory prediction unit 2020 is configured to plan multiple predicted trajectories of the bucket end based on the current posture and the target posture. Figure 3A and Figure 3B , which shows several results for the pose degree of freedom parameters when planning a trajectory between the current pose and the target pose, Figure 3A It shows the time from the start start The variation curve of the inclination angle θ between the two end times t0 and t1, Figure 3B It shows that from the start time t start The change curve of height y between the two end times t0 and t1 respectively.
[0049] Specifically, the trajectory prediction unit 2020 first discretizes the operation time to obtain multiple target times, such as the start time t start and end time t end Divided into n target times t i ={t0,t1,…t n-1}. Then, for each target time t i , move the bucket end at the start time t start To the target time t i The posture change process between the two is segmented, and multiple fitting methods are used to generate segmented trajectories. The fitting can use linear regression or nonlinear regression, and the functions used include but are not limited to polynomials, exponentials or other possible curve functions. Then, these segmented trajectories are spliced to obtain multiple predicted trajectories.
[0050] In some embodiments, the segmentation of the bucket end posture change process by the trajectory prediction unit 2020 includes the segmentation of the starting time t start To target time t i Take a fixed i as an example, for the first target time t i , respectively for the starting time t start and the first target time t i Perform time shift. Figure 3C As shown, the time offset includes changing the starting time t start Shift backward by Δt, and set the first target time t i Shift forward by Δt. Thus, for the entire period t start →t i The segmentation method may include at least one of the following: from the operation start time to the first target time t start →ti -Δt and from the first target time shifted forward to the first target time t i -Δt→t i ; and the job start time t shifted backward from the job start time start →t start +Δt and from the job start time shifted backward to the first target time t start +Δt→t i Based on this, the posture change process of the bucket end in each time segment is fitted, that is, the posture freedom parameters are planned, so as to obtain (t start ,θ start )→(t i ,θ end ) and (t start ,y start )→(t i ,y end )’s multiple prediction trajectories.
[0051] In the planning of the predicted trajectory, the posture change process can be fitted in a manner that keeps the posture of the bucket end unchanged within the time offset. That is, in a non-limiting embodiment, t i -Δt→t i within and / or and t start →t start Within +Δt and / or Furthermore, the fitting method used in the part of the posture change process other than the time offset can be a quintic polynomial. That is, in another non-limiting embodiment, t start →t i -Δt and t start +Δt→t i The posture freedom parameters can be expressed as a curve as shown in formula (3):
[0052] x(t)=a0+a1t+a2t 2 +a3t 3 +a4t 4 ……(3)
[0053] And add constraints so that the segmented trajectory satisfies: the end of the bucket is at the start time t start The posture freedom parameter x(t start ) is the posture freedom parameter x of the bucket end in the current posture start ; At the first target time t i The posture freedom parameter x(t i ) is the posture freedom parameter x of the bucket end in the target postureend ; At the start time t start The speed is 0; at the start time t start The acceleration is 0; at the first target time t i The speed is 0; and at the first target time t i The acceleration is 0. That is, the constraint is expressed as the following formula (4):
[0054]
[0055] Furthermore, by splicing the two fitted segmented trajectories mentioned above, we can get the posture change process at t start →t i The complete prediction trajectory within . Figure 3C The curve for t is shown in start →t i Directly fit the curve x with a fifth-order polynomial i0 , and t start →t i -Δt is the predicted trajectory x of the combination of the curve fitted by the fifth-order polynomial and the straight line within the time offset Δt i1 and t start +Δt→t i The predicted trajectory x of the combination of the curve fitted by the fifth-order polynomial and the straight line within the time offset Δt i2 Additionally, the first target time t i t i ,θ) and (t i ,y) can be further combined in pairs to obtain the corresponding i t i ,y,θ) trajectory.
[0056] In some embodiments, the trajectory validity check unit 2030 is configured to perform a validity check on each predicted trajectory to exclude invalid trajectories, thereby obtaining a valid trajectory. Specifically, the checking of the aforementioned generated trajectory includes at least one of the following: traversing each trajectory to check whether the bucket end collides with the ground under the posture corresponding to each predicted trajectory (collision check); and traversing each trajectory to check whether the target posture corresponding to each predicted trajectory is reachable for the bucket end (reachability check).
[0057] Specifically, a non-limiting implementation of the collision check is such as performing a collision check on the obtained (t i ,y,θ) trajectory, it is determined that the predicted trajectory containing the point with height y of 0 is invalid. The reachability check is often used in situations where the motion trajectory of the bucket end is affected by the motion of multiple joints (such as Figure 1The trajectory planning of the bucket end is limited by factors such as the joint degrees of freedom and / or size of each joint. Figure 1 A two-link mechanism, a non-restrictive implementation is to inversely solve the values of the first angle and the second angle according to formula (2) based on the posture freedom parameters of each predicted trajectory, and then obtain the first length and the second length of the connecting rod, to check whether the inversely solved first length and second length are within the valid range, such as whether they meet the length restrictions of the two connecting rods; and / or check whether the inversely solved first angle and second angle meet the rotation restrictions at the two joints. Alternatively, another non-restrictive implementation is to calculate the reachable posture range of the bucket end based on the length restrictions of a1 and a2 and the rotation restrictions of θ1 and θ2, so as to determine that the predicted trajectory containing posture freedom parameters exceeding the reachable posture range is invalid.
[0058] In some embodiments, the trajectory adaptability evaluation unit 2040 is configured to perform adaptability evaluation on each valid trajectory to output the valid trajectory with the lowest cost as the planned trajectory. Specifically, after the trajectory validity check unit 2030 performs validity constraint check on the predicted trajectory planned by the trajectory prediction unit 2020, the selected valid trajectories generate the target time t of each valid trajectory. i有效 The data set of posture freedom parameters (t i有效 ,y,θ), and set the adaptability evaluation rules for this data group.
[0059] In a non-limiting embodiment, the trajectory adaptability evaluation unit 2040 calculates the combined cost of the data set according to the time weight and the degree of freedom weight, that is, the adaptability evaluation rule at least includes the shortest time consumption principle, the minimum trajectory speed principle and the minimum acceleration principle, which correspond to weights w t 、w v and a , then the combined cost cost comb It can be expressed as the following formula (5):
[0060]
[0061] That is, according to the time weight w t and the degree of freedom weight w v and w a , calculate the data set corresponding to each valid trajectory (t i有效 ,y,θ) comb And take the minimum value to determine the effective trajectory with the lowest cost. The trajectory can comprehensively achieve the effect of shortening the operation time as much as possible and making the trajectory speed and acceleration of the posture freedom as small as possible. That is, it is mainly used to evaluate whether the trajectory makes the bucket end move as smoothly as possible while controlling the operation time.
[0062] Furthermore, it is also necessary to check the adaptability relationship between the motion trajectory of the bucket end and the working pile. The trajectory adaptability evaluation unit 2040 is further configured to calculate the inclination angle of the pile according to the slope fitted to the working pile section; and calculate the adaptability cost of the data group of the aforementioned effective trajectory relative to the inclination angle of the pile within the specified interval of the free end parameter of the posture.
[0063] Please refer to Figure 4 , Figure 4 A schematic diagram of trajectory adaptability evaluation in a trajectory planning method for unmanned loader operation according to an embodiment of the present disclosure is shown. A fitting slope 420 is obtained by fitting the pile section 410, and the pile inclination angle θ between the pile section 410 and the ground 400 is calculated based on the fitting slope 420 ref . Thus, the aforementioned effective trajectory is evaluated according to the shape of the pile. In a non-limiting embodiment, according to the requirements of the shoveling process, the corresponding lifting height interval when the bucket angle is maintained during the shoveling operation can be defined, and the posture freedom parameter y is used to describe it as the specified interval [y0, y1]. At this time, the traversal trajectory (t i有效 ,y,θ), calculate the adaptive cost of the trajectory points in the interval [y0,y1]. When the cost weight is set to w Δθ When the adaptive cost adapt It can be expressed as the following formula (6):
[0064]
[0065] That is, the data set (t i有效 ,y,θ) is the adaptive cost adapt The minimum value is taken to determine the effective trajectory with the lowest cost. This trajectory can achieve the effect of making the inclination angle of the motion trajectory of the bucket end as close as possible to the inclination angle of the pile while meeting the shovel loading process requirements.
[0066] Furthermore, the trajectory adaptability evaluation unit 2040 takes the sum of the combined cost and the adaptability cost as the total trajectory cost, and selects the valid trajectory with the lowest total trajectory cost as the output planning trajectory. That is, the final trajectory cost cost final It can be expressed as the following formula (7):
[0067] cost final =cost comb +cost adapt ……(7)
[0068] The total cost of the trajectories is sorted according to the calculation results, so that the trajectory with the lowest cost is selected as the output planning trajectory, that is, the trajectory that will not collide, the postures of all points are reachable, the shoveling operation is smooth and stable, and is adapted to the shape of the pile is screened out from multiple predicted trajectories.
[0069] Additionally, the trajectory planning device 2000 for unmanned loader operation can also have built-in or external input units and output units (not shown in the figure). The input unit may include devices for inputting various data or instructions by users or managers, operating devices such as buttons, touch pads, keyboards, microphones, switches, and other devices that can receive inputs by methods such as sound and action. In addition, for example, the input unit can be a remote control device with infrared light or other radio waves, or can be a mobile device suitable for operation of the trajectory planning device 2000. Based on data or instructions input by the user, for example, the input unit generates an input signal and supplies the input signal to other functional units in the trajectory planning device 2000.
[0070] The output unit includes a device that can output visual information or auditory information to the user or manager of the trajectory planning device 2000. For example, the output unit includes a display screen, a speaker, a buzzer, a projector, a lamp, etc. The display device included in the output unit can be a device with a normal display, or a device that displays visual information to other systems, etc. Based on this, the trajectory planning device 2000 can display the pose calculation results, various types of trajectory data generated, etc. as visual information such as graphic data or auditory information such as voice prompts, so that the user or manager can obtain the corresponding information or adjust the corresponding operation.
[0071] Please refer to the following Figure 5 , Figure 5 A flow chart of a trajectory planning method 5000 for unmanned loader operation according to an embodiment of the present disclosure is shown. In step S501, the posture of the bucket end of the unmanned loader is obtained, and the current posture and target posture of the bucket end are described based on the posture freedom parameters of the bucket end. In step S502, multiple predicted trajectories of the bucket end are planned based on the current posture and the target posture. Specifically, planning the predicted trajectory may include discretizing the operation time to obtain multiple target times; for each target time, segmenting the posture change process of the bucket end between the operation start time and the target time, and using multiple fitting methods to generate segmented trajectories; and splicing the segmented trajectories to obtain multiple predicted trajectories. Then in step S503, each predicted trajectory is checked for validity to exclude invalid trajectories, thereby obtaining a valid trajectory. In step S504, each valid trajectory is evaluated for adaptability to output the lowest cost valid trajectory as the planned trajectory.
[0072] It should be understood that Figure 5 The division of each step in the figure is only for illustration and not for limitation of the embodiments of the present application. These steps can be completed by each of the illustrated subjects individually, by two or more of them together, or by an external system not shown in cooperation with the illustrated subject, and are not limited to the illustrated distribution method, and can be completed in sequence according to the illustrated order or in parallel in accordance with the data flow direction and system operation rules, and can be completed in steps or in combination.
[0073] The present disclosure also provides a trajectory planning device for unmanned loader operations, which may include a processor and a memory storing computer executable instructions, which, when executed by the processor, causes the processor to execute the trajectory planning method for unmanned loader operations described in any of the aforementioned embodiments of the present disclosure. The processor may be a central processing unit (CPU) of the trajectory planning device, which may be any type of general-purpose processor, or may be a processor specifically designed for trajectory planning for unmanned loader operations, such as an application-specific integrated circuit ("ASIC"). The memory may include various computer-readable media accessible by the processor.
[0074] The present disclosure also provides a non-transitory computer-readable storage medium storing computer-executable instructions, which, when executed by a processor, enables the processor to implement a trajectory planning method for unmanned loader operations according to any of the aforementioned embodiments of the present disclosure.
[0075] The present disclosure also provides a computer program product, including computer executable instructions, which, when executed by a processor, enable the processor to implement the trajectory planning method for unmanned loader operations according to any of the aforementioned embodiments of the present disclosure.
[0076] Figure 6 An exemplary configuration of a computing device that can implement an embodiment of the present disclosure is shown. The computing device includes one or more processors 601, an input / output interface 605 connected to the processor 601 via a bus 604, and memories 602 and 603 connected to the bus 604. In some embodiments, the memory 602 may be a read-only memory (ROM), and the memory 603 may be a random access memory (RAM).
[0077] Processor 601 may be any kind of processor, and may include, but is not limited to, one or more general-purpose processors or special-purpose processors (such as special-purpose processing chips). Memories 602 and 603 may be any non-transitory storage device that can implement data storage, and may include, but is not limited to, disk drives, optical storage devices, solid-state memories, floppy disks, flexible disks, hard disks, tapes or any other magnetic media, compressed disks or any other optical media, cache memories and / or any other storage chips or modules, and / or any other media from which a computer can read data, instructions and / or codes.
[0078] The bus 604 may include, but is not limited to, an Industry Standard Architecture (ISA) bus, a Micro Channel Architecture (MCA) bus, an Enhanced ISA (EISA) bus, a Video Electronics Standards Association (VESA) local bus, and a Peripheral Component Interconnect (PCI) bus.
[0079] In some embodiments, the input / output interface 605 is connected to an input unit 606 configured by an input device such as a keyboard and a mouse for a user to input an operation command, an output unit 607 that outputs a processing operation screen and an image of a processing result to a display device, a storage unit 608 including a hard disk drive and the like for storing programs and various data, and a communication unit 609 including a local area network (LAN) adapter and the like and performing communication processing via a network represented by the Internet. In addition, a drive 610 that reads and writes data from and on a removable storage medium 611 is connected.
[0080] Various aspects, embodiments, implementations or features of the foregoing embodiments may be used alone or in any combination. Various aspects of the foregoing embodiments may be implemented by software, hardware or a combination of hardware and software.
[0081] For example, the foregoing embodiments may be embodied as computer readable code on a computer readable medium. A computer readable medium is any data storage device that can store data that can thereafter be read by a computer system. Examples of computer readable media include read-only memory, random access memory, CD-ROM, DVD, magnetic tape, hard drive, solid state drive, and optical data storage device. The computer readable medium may also be distributed in a network coupled computer system so that the computer readable code is stored and executed in a distributed manner.
[0082] For example, the aforementioned embodiments may be in the form of hardware circuits. The hardware circuits may include any combination of combinational logic circuits, clock storage devices (such as floppy disks, flip-flops, latches, etc.), finite state machines, memories such as static random access memories or embedded dynamic random access memories, custom designed circuits, programmable logic arrays, etc.
[0083] In one embodiment, hardware circuits according to the present disclosure may be implemented by coding and designing one or more integrated circuits using a hardware description language (HDL) such as Verilog or VHDL, or in combination using discrete circuits.
[0084] The terms used herein are only for describing specific exemplary embodiments and are not intended to limit the present disclosure. Unless the context clearly indicates otherwise, the singular forms of "one" and "the" used herein are intended to include plural forms as well. It should also be understood that when the word "including" is used in this article, it indicates the existence of the indicated features, wholes, steps, operations, units and / or components, but does not exclude the existence or increase of one or more other features, wholes, steps, operations, units and / or components and / or their combinations. In addition, in the description of the present disclosure, the terms "first", "second", etc. are only used for descriptive purposes and cannot be understood as indicating or implying relative importance or order. In addition, in the description of the present disclosure, unless otherwise specified, the meaning of "multiple" is two or more.
[0085] References to "embodiments" or similar expressions in this specification refer to specific features, structures, or characteristics described in conjunction with the embodiment as being included in at least one specific embodiment of the present disclosure. Therefore, the appearance of "in an embodiment of the present disclosure" and similar expressions in this specification does not necessarily refer to the same embodiment.
[0086] Those skilled in the art will appreciate that the present disclosure may be implemented in various forms, such as a complete hardware embodiment, a complete software embodiment (including firmware, resident software, microprogram code, etc.), or a combination of software and hardware, which will be referred to below as a "circuit," "module," "unit," or "system." In addition, the present disclosure may also be implemented in any tangible media form as a computer program product having a computer-usable program code stored thereon.
[0087] The relevant description of the present disclosure is described with reference to the flowchart and / or block diagram of the system, device, method and computer program product according to the specific embodiment of the present disclosure. It can be understood that each block in each flowchart and / or block diagram, and any combination of blocks in the flowchart and / or block diagram, can be implemented using computer program instructions. These computer program instructions can be executed by a machine composed of a processor of a general-purpose computer or a special computer or other programmable data processing device, and the instructions are processed by a computer or other programmable data processing device to implement the functions or operations described in the flowchart and / or block diagram.
[0088] The accompanying drawings show the flow charts and block diagrams of the architecture, functions and operations that can be implemented by the systems, devices, methods and computer program products according to various embodiments of the present disclosure. Therefore, each block in the flow chart or block diagram can represent a module, segment, or part of the program code, which includes one or more executable instructions to implement the specified logical function. It should also be noted that in some other embodiments, the functions described in the blocks may not be performed in the order shown in the figure. For example, two blocks connected to each other in the figure can actually be executed simultaneously, or in some cases according to the functions involved, they can also be executed in the opposite order of the icons. It should also be noted that each block diagram and / or flow chart block, as well as the combination of blocks in the block diagram and / or flow chart, can be implemented by a system based on special hardware, or by a combination of special hardware and computer instructions to perform specific functions or operations.
[0089] The embodiments of the present disclosure have been described above, and the above description is exemplary, not exhaustive, and is not limited to the disclosed embodiments. Many modifications and variations will be apparent to those of ordinary skill in the art without departing from the scope and spirit of the described embodiments. The selection of terms used herein is intended to best explain the principles of the embodiments, practical applications, or technical improvements to market technologies, or to enable other persons of ordinary skill in the art to understand the embodiments disclosed herein.
Claims
1. A trajectory planning method for unmanned loader operation, comprising: Acquire the posture of the bucket end of the unmanned loader, and describe the current posture and target posture of the bucket end based on the posture freedom parameters of the bucket end; Based on the current posture and the target posture, multiple predicted trajectories of the bucket end are planned, wherein Discretize the operation time to obtain multiple target times. For each target time, the posture change process of the bucket end between the start time of the operation and the target time is segmented, and multiple fitting methods are used to generate segmented trajectories, and splicing the segmented trajectories to obtain a plurality of predicted trajectories; Perform validity check on each predicted trajectory to exclude invalid trajectories and thus obtain valid trajectories; as well as The adaptability of each valid trajectory is evaluated to output the valid trajectory with the lowest cost as the planning trajectory.
2. The trajectory planning method according to claim 1, wherein: The posture freedom parameters include the height and inclination angle of the bucket end.
3. The trajectory planning method according to claim 2, wherein: The unmanned loader has a two-link structure, wherein the two links have a first length and a second length respectively, and form a first joint and a second joint respectively relative to the origin of the unmanned loader, wherein the joint freedom parameters of the first joint include a first rotation angle, and the joint freedom parameters of the second joint include a second rotation angle.
4. The trajectory planning method according to claim 3, wherein: The first rotation angle and the second rotation angle are acquired by the joint sensor of the unmanned loader.
5. The trajectory planning method according to claim 3 or 4, wherein: The posture degree of freedom parameter is calculated based on the first length, the second length, the first rotation angle, and the second rotation angle.
6. The trajectory planning method according to claim 1, wherein: The planning of multiple predicted trajectories of the bucket end based on the current posture and the target posture also includes: For the first target time, the operation start time and the first target time are respectively time-shifted, and the posture change process is segmented to include at least one of the following: The segment from the operation start time to the first target time shifted forward, and from the first target time shifted forward to the first target time; and The segmentation from the job start time to the job start time shifted backward, and from the job start time shifted backward to the first target time.
7. The trajectory planning method according to claim 6, wherein: The fitting method adopted in the posture change process within the time offset is to keep the posture of the bucket end unchanged.
8. The trajectory planning method according to claim 6 or 7, wherein: The fitting method used in the posture change process in the segment from the operation start time to the first target time shifted forward or in the segment from the operation start time shifted backward to the first target time is a quintic polynomial.
9. The trajectory planning method according to claim 8, wherein: The segmented trajectory of the fifth-order polynomial fitting makes the bucket end meet the following constraints: The posture freedom parameters at the start time of the operation are the posture freedom parameters of the bucket end in the current posture; The posture freedom parameters at the first target time are the posture freedom parameters of the bucket end at the target posture; The speed at the start time of the operation is 0; The acceleration at the start time of the operation is 0; The speed at the first target time is 0; and The acceleration at the first target time is 0.
10. The trajectory planning method according to claim 1, wherein: The validity check of each predicted trajectory includes at least one of the following: Check whether the bucket tip collides with the ground at the position corresponding to each predicted trajectory; and Check whether the target pose corresponding to each predicted trajectory is reachable for the bucket end.
11. The trajectory method according to claim 5, wherein: The validity check on each predicted trajectory includes inversely solving a first length and a second length based on the posture degree of freedom parameters of each predicted trajectory to check whether the inversely solved first length and second length are within a valid range.
12. The trajectory method according to claim 1, wherein: The adaptability evaluation of each valid trajectory includes: Generate a data set of target time and posture freedom degree parameters for each valid trajectory; and The combined cost of the data set is calculated according to the time weight and the degree of freedom weight.
13. The trajectory method according to claim 12, wherein: The adaptability evaluation of each valid trajectory further includes: Calculate the stockpile inclination angle based on the slope fitted to the working stockpile cross section; and The adaptability cost of the data set relative to the inclination angle of the pile is calculated within a specified interval of the free end parameter of the posture.
14. The trajectory method according to claim 13, wherein: The sum of the combined cost and the adaptability cost is taken as the total trajectory cost, and the effective trajectory with the lowest total trajectory cost is selected as the output planning trajectory.
15. A trajectory planning device for unmanned loader operation, comprising: A posture data acquisition unit is configured to obtain the posture of the bucket end of the unmanned loader, and describe the current posture and target posture of the bucket end based on the posture freedom parameters of the bucket end; A trajectory prediction unit is configured to plan multiple predicted trajectories of the bucket end based on the current posture and the target posture, wherein Discretize the operation time to obtain multiple target times. For each target time, the posture change process of the bucket end between the start time of the operation and the target time is segmented, and multiple fitting methods are used to generate segmented trajectories, and splicing the segmented trajectories to obtain a plurality of predicted trajectories; a trajectory validity check unit, configured to perform a validity check on each predicted trajectory to exclude invalid trajectories, thereby obtaining valid trajectories; as well as The trajectory adaptability evaluation unit is configured to perform adaptability evaluation on each valid trajectory to output the valid trajectory with the lowest cost as the planned trajectory.
16. The trajectory planning device according to claim 15, wherein the trajectory prediction unit is further configured to: For the first target time, the operation start time and the first target time are respectively time-shifted, so that the posture change process is segmented in at least one of the following ways: The segment from the operation start time to the first target time shifted forward, and from the first target time shifted forward to the first target time; and The segmentation from the job start time to the job start time shifted backward, and from the job start time shifted backward to the first target time.
17. The trajectory planning device according to claim 15, wherein the trajectory adaptability evaluation unit is further configured to: Generate a data set of the target time and the posture degree of freedom parameters of each valid trajectory, and calculate the combined cost of the data set according to the time weight and the degree of freedom weight; Calculating the inclination angle of the stockpile according to the slope fitted to the working stockpile cross section, and calculating the adaptability cost of the data group relative to the inclination angle of the stockpile within a specified interval of the free end parameter of the posture; and The sum of the combined cost and the adaptability cost is taken as the total trajectory cost, and the effective trajectory with the lowest total trajectory cost is selected as the output planning trajectory.
18. A trajectory planning device for unmanned loader operation, comprising: processor; as well as A memory storing computer executable instructions, wherein when the computer executable instructions are executed by the processor, the processor executes the trajectory planning method for unmanned loader operation according to any one of claims 1 to 14.
19. A non-transitory computer-readable storage medium storing computer-executable instructions, wherein when the computer-executable instructions are executed by a processor, the processor implements the trajectory planning method for unmanned loader operation according to any one of claims 1 to 14.
20. A computer program product, comprising computer executable instructions, which, when executed by a processor, enable the processor to implement the trajectory planning method for unmanned loader operation according to any one of claims 1 to 14.