Large-size tool measurement field envelope body design method based on target precision
By constructing a large-size measurement field envelope model, the problem of difficulty in quantifying the measurement accuracy of tooling over 10m is solved, high-precision measurement field design is achieved, and the assembly accuracy of aircraft products is ensured.
Patent Information
- Application Number
- CN202410899485.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-05
- Publication Date
- 2024-10-11
AI Technical Summary
For aircraft tooling of more than 10m, there is a lack of standard rules for setting measurement reference points, which results in the inability to quantitatively evaluate the measurement accuracy and affects assembly accuracy. Moreover, existing methods cannot effectively meet the high-precision measurement requirements of large-size tooling.
Using a large-scale measurement field envelope design method based on target accuracy, by obtaining the tooling structure model and aircraft product model, determining the measurement station and measurement points, and constructing the envelope model, including fitting the original envelope patch, station location Envelope patches, fused envelope patches, hemisphere groups and cutting surfaces form the final measurement field envelope. Combined with laser measurement accuracy and target accuracy analysis, adjustment coefficients and environmental factors are optimized.
It realizes the design of high-precision measurement field envelope for large-size tooling, ensuring that the measurement accuracy meets the assembly requirements, and provides a quantitative evaluation tool to guide the final assembly accuracy of aircraft products.
Smart Images

Figure CN118761111A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of aircraft process equipment manufacturing, and specifically to a method for designing a large-scale tooling measurement field envelope based on target accuracy. Background Art
[0002] Aircraft tooling is an important basis for aircraft product manufacturing. According to the aviation manufacturing engineering manual, national military standards, aviation industry standards, etc., the accuracy of positioning components and positioning holes on the tooling is generally selected according to 1 / 3 to 1 / 5 of the aircraft product manufacturing accuracy. When manufacturing each tooling, a measurement field containing multiple measurement reference points and multiple measurement stations must be established.
[0003] The envelope structure formed by the measuring reference point and the measured object is the envelope of the measuring field. Different shapes and ranges of the envelope have different effects on the measuring accuracy of the measuring reference point and the measured object. In particular, when the accuracy of the measured object on the tooling is close to or exceeds the range of the measuring equipment's ranging accuracy, the range and ratio of the envelope's sinking, protruding, and will have a critical impact on it.
[0004] After long-term measurement practice, for tooling below 10m, no matter how the measurement points are set, the envelope formed has little effect on the accuracy of the measured object. However, for tooling above 10m, the different envelopes formed by the setting of the measurement reference points have a great impact on the accuracy of the measured object, and may even exceed the assembly accuracy requirements. Because there is no standard setting rule for the setting of measurement points, it is impossible to quantify the impact of various tooling above 10 meters on the accuracy of the measured object, and thus it is impossible to infer its impact on the final assembly accuracy of the aircraft product.
[0005] There is an urgent need for a clear design method for the tooling measurement field envelope. The operator arranges the measurement reference points according to the envelope formed by this method so that they can meet the tooling measurement accuracy requirements. Summary of the invention
[0006] The purpose of this application is to provide a large-scale measurement field envelope design method based on target accuracy. The method is suitable for setting relevant measurement reference points of high-precision measurement systems for large-scale assembly tooling exceeding 10m, and is suitable for the construction and evaluation of the envelope model of the reference points.
[0007] In order to achieve the above objectives, this application adopts the following technical solutions:
[0008] The large-scale measurement field envelope design method based on target accuracy includes the following processes:
[0009] (a) Obtaining a tooling structure model, an aircraft product model, a measuring station and its corresponding measuring points, a required tooling accuracy σ, and a bottom plane, and using the bottom plane of the tooling model as a reference plane. The measuring points include shape measuring points for measuring the product profile on the tooling and intersection measuring points for the joints;
[0010] (b) vertically projecting the maximum outer contours of the tooling structure model and the aircraft product model with positioning characteristics onto the reference plane, selecting the points with the largest envelope range in the projected outer contour lines as positioning control points for connecting lines, and fitting the lines and their internal areas to form an original envelope surface patch;
[0011] (c) Select one of the measurement stations and the corresponding measurement points, connect the measurement station and the corresponding multiple measurement points to form a distance measurement line, and obtain a first line segment group. The length of the first line segment is L 1 i , i=1…n;
[0012] (d) Select multiple measurement points corresponding to the measurement station, project them onto the reference plane, form projection points on the reference plane, connect each measurement point with the projection point to form a perpendicular line to the measurement point, and obtain a second line segment group. The length of the second line segment group is L 2 i , i=1…n;
[0013] (e) the L i Project to the reference plane, and extend the projection line segment to intersect with the outer contour of the original envelope surface. Select the intersection point where the measurement station points to the measurement point in the projection direction of the reference plane as the extension direction control point, connect the measurement station and the extension control point to form a pointer intersection line, and obtain the third line segment group. The length of the third line segment is L 3 i , i=1…n;
[0014] (f) Starting from the survey station and pointing in the direction of the extended control point, L 4 i is the line length, the third line segment is extended forward to form a plane extension line, and the fourth line segment group is obtained. The length of the fourth line segment group is L 4 i =L 3 i (1+ρ*k i ), i = 1…n; where k i is the ranging adjustment coefficient, ρ is the environmental adjustment coefficient;
[0015] (g) Obtain all outer end points of the plane extension line away from the measuring station in the fourth line segment group, connect the points with the largest envelope range among the outer end points, and fit the station envelope surface patch Z through the connection line and its internal area; and calculate the station envelope surface patch Z of each measuring station in turn i , i=1…m;
[0016] (h) Divide the tooling structure into multiple areas along the length of the reference plane, select two reference points in each area that are farthest from each other in the width direction and closest in the length direction, use one of the reference points to draw a perpendicular line to the reference plane; use the perpendicular line and the other reference point to construct a width section, and then form a width section group K i , i=1…m 2 ;
[0017] (i) Using the wide section group K i , i=1…m 2 The widthwise sections and the station envelope surface, i.e., Z i , i=1…m intersect to form the intersection of the section and the patch; connect the points with the largest envelope range among the intersections of the section and the patch, fill the inside of the connection with a curved surface to form a fused envelope patch;
[0018] (j) All measuring points in the tooling structure, namely C i As the reference, that is, the measurement point in this embodiment, the length L of the second line segment group 2 i Extend outward in equal proportion to construct a height extension line, and set the endpoint of the height extension line away from the reference plane as the extension endpoint to form the fifth line segment group. The length of the fifth line segment group is L 5 i , i=1…n 1 ;
[0019] (k) The measurement point is C i The projection point on the reference plane is the center of the sphere, with L 6 i With radius as the hemisphere, a hemisphere is constructed on the reference plane to obtain a hemisphere group Q i , i=1…n 1 ;
[0020] (l) Through the width section group K i The intersection points of the sections and the facets at each widthwise section position in the middle are connected in sequence from one end to the other, and the section lines are constructed to form the sixth line segment group L 6 i , i=1…m 1 ;
[0021] (m) using the sixth line segment group as the cross-section line and the outer contour line of the fused envelope surface patch as the boundary guide line, fitting to form a curved surface patch above the reference plane, merging the curved surface patch with the fused envelope surface patch to form an envelope curved surface, and filling the envelope curved surface to obtain a first envelope volume;
[0022] (n) Group the hemispheres Q i Superimposing and summing with the first envelope to form a second envelope;
[0023] (o) taking the outer contour line of the fused envelope surface as the stretching section line, and stretching it upward perpendicularly to the reference plane to form a cutting surface;
[0024] (p) After the portion of the second envelope protruding from the cutting surface is cut off, the third envelope is obtained, and the construction of the measurement field envelope is completed.
[0025] Furthermore, the environmental adjustment coefficient ρ is adjusted according to the unbalanced temperature error T within the station during the measurement time. If T < 2 °C, ρ = 1; 2 °C <T<5℃,ρ=1.1;5℃<T<10℃,ρ=1.2;
[0026] Furthermore, the unbalanced temperature error T selects different measurement ranges and time spans according to different tooling structure forms. When the tooling structure is less than or equal to 5m thick, the selected temperature measurement points are not less than 4 points, and the measurement time span is less than 2 hours; when the tooling structure is more than 5m thick, the selected temperature measurement points are not less than 8 points, and the measurement time span is less than 4 hours; the temperature measurement includes at least two measurement start and end times in one measurement cycle; T = Max (T 1 , …, T i )-Min(T 1 , …, T i ), i=1…n, i is the number of temperature measurement points;.
[0027] Furthermore, the distance adjustment coefficient k i , calculated based on the ranging accuracy of the measuring device and the ranging of the measuring point; according to the ranging accuracy formula of the measuring device: ranging accuracy = constant + coefficient * ranging, calculate the L i The distance measurement accuracy μ i = constant + coefficient * L 1 i , i = 1...n; tooling required accuracy σ = constant + coefficient * maximum distance measurement, according to the required accuracy and distance measurement accuracy μ i The ratio relationship between them is used to calculate the adjustment coefficient k i =(σ-μ i ) / σ, i=1…n;
[0028] Furthermore, the second line segment group extends outward in equal proportions.i ≥0, the extended formula is based on L 5 i =L 2 i (1+ρ*k i +q i ), q i is the high compensation coefficient, i=1…n, when k i <0, the extended formula is based on L 5 i =L 2 i (1+q i ).
[0029] Furthermore, the height compensation coefficient q i , the length of the second line segment group at the contour measurement point is L 2 i When extending outward, q i =1 / 30; the length of the second line segment group L at the intersection measurement point 2 i When extending outward, q i =1 / 50.
[0030] Furthermore, the upward stretching dimension of the cutting curved surface is larger than the maximum dimension of the tooling positioning structure from the reference surface, and should also be larger than the length L of all line segments of the fifth line segment group. 5 i .
[0031] This application deeply combines the laser measurement accuracy and the tooling target accuracy analysis method. Through the ratio relationship between the required accuracy and the ranging accuracy, according to the envelope mathematical relationship between the measurement reference point, the measurement station, and the measured object, the tooling measurement field envelope construction process and detailed method are constructed. According to the process of the original envelope surface, the station envelope surface, the fused envelope surface, the hemisphere group, and the first to third envelopes, the measurement field envelope is constructed. This method clearly defines the detailed process of envelope construction, has guiding significance for the design of the aircraft assembly tooling measurement field envelope, and has universal applicability to the construction of large-scale tooling measurement fields.
[0032] The present application is further described in detail below in conjunction with the accompanying drawings and embodiments. BRIEF DESCRIPTION OF THE DRAWINGS
[0033] Figure 1 Schematic diagram of the structure of the tooling scenario for the measurement field application;
[0034] Figure 2 Schematic diagram of the single-station envelope patch construction process;
[0035] Figure 3 Schematic diagram of the multi-station envelope patch construction process;
[0036] Figure 4 Schematic diagram of the fusion envelope patch construction process;
[0037] Figure 5 Schematic diagram of the construction process of the hemispherical group;
[0038] Figure 6 Schematic diagram of the first envelope construction process;
[0039] Figure 7 Schematic diagram of the construction process of the second envelope;
[0040] Figure 8 Schematic diagram of the envelope cutting boundary construction process;
[0041] Fig. 9 Schematic diagram of the third envelope structure.
[0042] Explanation of numbers in the figure: 1. bottom plane; 2. tooling structure; 3. measuring point; 4. measuring station; 5. extension direction control point; 6. original envelope patch; 7. distance measurement line; 8. perpendicular line of measuring point; 9. pointer intersection line; 10. extension control point; 11. plane extension line; 12. station envelope patch; 13. width section; 14. intersection of section and patch; 15. fused envelope patch; 16. height extension line; 17. extension endpoint; 18. center of sphere; 19. hemisphere; 20. section line; 21. first envelope; 22. second envelope; 23. cutting boundary; 24. third envelope; 25. aircraft product; 26. positioning control point; 27. reference point. DETAILED DESCRIPTION
[0043] See also Figures 1 to 5 During the implementation process, the large-scale measurement field envelope design method based on target accuracy is mainly used for the design of the measurement field envelope of large-scale and high-precision aircraft process equipment. Its main structural elements include bottom plane 1, tooling structure 2, measuring point 3, measuring station 4, aircraft product 25, reference point 27, etc. The tooling structure 2 is set on the surface of the bottom plane 1, and the reference point 3 is arranged on the main structure of the tooling structure 2 or the surface of the bottom plane 1. The measuring point 3 is mainly the object measurement point of the tooling structure 2 and the aircraft positioning product 25. The measuring station 4 is arranged at a position where the ranging accuracy meets the required accuracy and can see the reference point 27 and the measuring point 3 at the same time. The reference point 27 is arranged on the bottom plane 1 and the tooling structure 2.
[0044] In the detailed implementation process, taking an assembly tool with two measuring stations and six measuring points as an example, a large-scale measurement field envelope design method based on target accuracy is characterized in that the measurement field envelope construction includes the following processes:
[0045] Obtain a tooling structure 2 model, an aircraft product 25 model, a measuring station 4 and its corresponding measuring points 3, a tooling required accuracy σ=0.1 mm, and a bottom plane 1, and use the bottom plane 1 of the tooling model as a reference plane. The measuring points include an outer shape measuring point for measuring a product profile on the tooling and an intersection measuring point for a joint;
[0046] The maximum outer contours of the tooling structure 2 model and the aircraft product 25 model with positioning characteristics are vertically projected onto the reference plane, and the points with the largest envelope range in the projected outer contour lines are selected as positioning control points 26 for connection, and the original envelope surface piece 6 is formed by fitting through the line and its internal area;
[0047] Select one of the four measuring points corresponding to the measuring station 4, connect it with the multiple measuring points 3 corresponding to the measuring station 4, form a distance measuring line 7, and obtain the first line segment group. The length of the first line segment is L 1 i , i = 1…n; according to the model measured L 1 1 =9.92m, L 1 2 =11.65m, L 1 3 =9.96m, L 1 4 =12.68m;
[0048] Select multiple measuring points 3 corresponding to the measuring station 4, project them onto the reference plane, form projection points on the reference plane, connect each measuring point 3 with the projection point, form a measuring point perpendicular line 8, and obtain a second line segment group. The length of the second line segment group is L 2 i , i = 1…n; according to the model measured L 2 1 =L 2 2 =L 2 3 =L 2 4 =4.8m;
[0049] The L i Project to the reference plane, and extend the projection line segment to intersect with the outer contour of the original envelope surface. Select the intersection point where the measurement station 4 points to the measurement point 3 in the projection direction of the reference plane as the extension direction control point 5, connect the measurement station and the extension control point 10 to form a pointer intersection line 9, and obtain the third line segment group. The length of the third line segment is L 3 i , i = 1…n; according to the model measured L 3 1 =11.5m, L3 2 = 12.71 m, L 3 3 = 10.84 m, L 3 3 = 14.38 m;
[0050] The described large - size measurement field envelope design method based on target accuracy is characterized in that the environmental adjustment coefficient ρ is adjusted according to the uneven temperature error T within the measurement time. When T < 2°C, ρ = 1; when 2°C < T < 5°C, ρ = 1.1; when 5°C < T < 10°C, ρ = 1.2;
[0051] The described large - size measurement field envelope design method based on target accuracy is characterized in that the uneven temperature error T varies in measurement range and time span according to different tooling structure forms. When the tooling structure has a thickness less than or equal to 5 m, the number of temperature measurement points is not less than 4, and the measurement time span should be less than 2 hours; when the tooling structure has a thickness greater than 5 m, the number of temperature measurement points is not less than 8, and the measurement time span should be less than 4 hours; the temperature measurement should include at least 2 times at the start and end within one measurement cycle; T = Max(T 1 , …, T i ) - Min(T 1 , …, T i ), where i = 1…n and i is the number of temperature measurement points; in this embodiment, the height direction is 4.8 m < 5 m, and according to the plane tooling for temperature measurement, only four - corner measurements are carried out, that is, in this embodiment, the four - corner temperatures of the up, down, left, and right within the plane range of the tooling structure on the reference plane are detected at 4 points, once t 1 = 26.5, t 2 = 23.9, t 1 = 25.3, t 1 = 27.1, twice t 5 = 26.3, t 6 = 24.1, t 7 = 25.5, t 8 = 26.8, the temperature measurement time is controlled to be completed within 0.5 hours, less than 4 hours, taking the maximum difference T = max(t i , i = 1…m 1 ) - min(t i , i = 1…m 1 ) = 3.2°C, 2°C < T < 5°C, according to the foregoing rule ρ = 1.1..
[0052] The described large - size measurement field envelope design method based on target accuracy is characterized in that the ranging adjustment coefficient k i, calculated based on the ranging accuracy of the measuring device and the ranging of the measuring point 3; according to the ranging accuracy formula of the measuring device: ranging accuracy = constant + coefficient * ranging, calculate the L i The distance measurement accuracy μ i = constant + coefficient * L 1 i , i = 1...n; according to the laser tracker ranging accuracy of 15μm+6μm*L 1 i It can be seen that μ 1 =0.0745mm, μ 2 =0.0849mm, μ 3 =0.0748mm, μ 4 = 0.0911mm; tooling required accuracy σ = constant + coefficient * maximum distance measurement, according to the required accuracy and distance measurement accuracy μ i The ratio relationship between them is used to calculate the adjustment coefficient k i =(σ-μ i ) / σ, i=1…n; k 1 =(0.1-0.0745) / 0.1=0.255,k 2 =(0.1-0.0849) / 0.1=0.151,k 3 =(0.1-0.0748) / 0.1=0.252,k 4 =(0.1-0.0911) / 0.1=0.089;
[0053] Taking the measuring station 4 as the starting point and pointing to the direction of the extended control point 10, L 4 i The third line segment is extended forward to form a plane extension line 11, and the fourth line segment group is obtained. The length of the fourth line segment group is L 4 i =L 3 i (1+ρ*k i ), i = 1…n; where k i is the ranging adjustment coefficient, ρ is the environmental adjustment coefficient; L 4 1 =L 3 1 (1+ρ*k 1 )=11.5(1+1.1*0.255)=14.7m, L 4 2 =L 3 2 (1+ρ*k 2 )=12.71(1+1.1*0.151)=14.8m, L 4 3=L 3 3 (1+ρ*k 3 )=10.84(1+1.1*0.252)=13.84m,L 4 4 =L 3 1 (1+ρ*k 4 )=14.38(1+1.1*0.089)=15.78m; that is, L 4 1 =14.7m, L 4 2 =14.8m, L 4 3 =13.84m, L 4 4 =15.78m;
[0054] Obtain all outer end points of the plane extension line 11 away from the measuring station in the fourth line segment group, connect the points with the largest envelope range among the outer end points, and fit the station envelope surface 12, i.e., Z, through the connection line and its internal area; and calculate the station envelope surface 12, i.e., Z, of each measuring station in turn i , i = 1 ... m; In this embodiment, there are two measuring stations, that is, two station envelopes 12 are formed, namely, Z 1 , Z 2 .
[0055] The tooling structure 2 is divided into a plurality of regions along the length of the reference plane, and two reference points in each region are selected, the two points having the longest distance between the two ends in the width direction and the shortest distance in the length direction. A perpendicular line is drawn from one of the reference points to the reference plane; a width section 13 is constructed using the perpendicular line and the other reference point, and then a group K of width sections 13 is formed. i , i=1…m 2 In this embodiment, the six measuring points are concentrated in the six tooling structures in the three-column area. According to the principle of distinguishing the width section, the upper and lower two measuring points in the three-column area and the vertical line of any point can be selected to construct the K 2 ~K 3 .
[0056] Use wide section 13 groups K i , i=1…m 2 , that is, K 2 ~K 3 Each width section and the station envelope surface 12, namely Z i , i = 1…m, that is, Z 1 , Z 2 Intersect to form the intersection of the section and the patch 14; connect the points with the largest envelope range among the intersections of the section and the patch, and fill the interior of the connection with a curved surface to form a fused envelope patch 15;
[0057] All measuring points 3 in tooling structure 2, namely C i As a reference, that is, the six measurement points in this embodiment, the length L of the second line segment group 2 i Extend outward in equal proportion to construct a height extension line 16, and set the end point of the height extension line 16 away from the reference plane as the extension end point 17 to form a fifth line segment group. The length of the fifth line segment group is L 5 i , i=1…n 1 Due to the numerical inheritance relationship, this embodiment only shows the station envelope surface 12, namely Z 1 4 measuring points in the area.
[0058] The height compensation coefficient q i , the length of the second line segment group at the contour measurement point is L 2 i When extending outward, q i =1 / 30; the length of the second line segment group L at the intersection measurement point 2 i When extending outward, q i =1 / 50. According to the actual situation of the tooling, L 2 1 , L 2 3 The measuring point is the tooling shape measurement, then q 1 =q 3 =1 / 30=0.033, L 2 2 , L 2 4 The measurement point is the intersection measurement, then q 2 =q 4 =1 / 50=0.02.
[0059] The second line segment group extends outward in equal proportions. i ≥0, the extended formula is based on L 5 i =L 2 i (1+ρ*k i +q i ), q i is the high compensation coefficient, i=1…n, when k i <0, the extended formula is based on L 5 i =L 2 i (1+q i ). According to the above ρ=1.1, k 1 =0.255>0,k2 =0.151>0,k 3 =0.252>0,k 4 =0.089>0,L 2 1 =L 2 2 =L 2 3 =L 2 4 =4.8m, then L 5 1 =L 2 1 (1+ρ*k 1 +q 1 )=4.8(1+1.1*0.255+0.033)=6.3m, L 5 2 =L 2 2 (1+ρ*k 2 +q 2 )=4.8(1+1.1*0.151+0.02)=5.69m, L 5 3 =L 2 3 (1+ρ*k 3 +q 3 )=4.8(1+1.1*0.252+0.033)=6.28m, L 5 4 =L 2 4 (1+ρ*k 4 +q 4 )=4.8(1+1.1*0.089+0.02)=5.36m, L 5 1 =6.3m, L 5 2 =5.69m, L 5 3 =6.28m, L 5 4 =5.36m.
[0060] Take measuring point 3, i.e. C i The projection point on the reference plane is the sphere center 18, with L 6 i As radius, a hemisphere 19 is constructed above the reference plane, and a group Q of hemisphere 19 is obtained. i , i=1…n 1 According to the present embodiment, there are 6 measuring points, forming 19 groups of hemispherical bodies Q 1 ~Q 6 .
[0061] Through the width section 13 group K i The intersection points 14 and the extended endpoints 17 of the sections at each widthwise section position are sequentially connected from one end to the other to construct section lines 20, forming a sixth line segment group L 6 i , i=1…m 1 According to the position of the three width sections in this embodiment, the three line segments L of the six line segment group are obtained. 6 1 ~L 6 3 ;
[0062] Using the sixth line segment group as the cross-section line and the outer contour line of the fused envelope surface patch 15 as the boundary guide line, a curved surface patch is formed by fitting above the reference plane, the curved surface patch is combined with the fused envelope surface patch 15 to form an envelope curved surface, and the envelope curved surface is filled to obtain a first envelope body 21;
[0063] Set the hemisphere 19 group Q i Superimposed and summed with the first envelope 21 to form a second envelope 22;
[0064] The outer contour line of the fused envelope surface piece 15 is used as a stretching section line, and is stretched upward perpendicularly to the reference plane to form a stretching surface, thereby obtaining a cutting boundary 23;
[0065] The method for designing a large-scale measurement field envelope based on target accuracy is characterized in that the upward stretching size of the cutting boundary should be larger than the maximum size of the positioning structure from the reference plane in the tooling structure 2. Since the measuring point in this embodiment is at the highest position of the tooling structure, the stretching size should be larger than the length L of all line segments of the fifth line segment group. 5 i , i=1…n 1 , according to the above L 5 1 =6.3m, L 5 2 =5.69m, L 5 3 =6.28m, L 5 4 =5.36m, the stretched dimension is max(L 5 i , i=1…n 1 )=6.3m.
[0066] The portion of the second envelope 22 protruding from the cutting boundary is cut off to obtain the third envelope 24, thus completing the construction of the measurement field envelope.
[0067] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A large-scale measurement field envelope design method based on target accuracy, characterized by The process includes: (a) Obtaining a tooling structure model, an aircraft product model, a measuring station and its corresponding measuring points, a required tooling accuracy σ, and a bottom plane, and using the bottom plane of the tooling model as a reference plane. The measuring points include shape measuring points for measuring the product profile on the tooling and intersection measuring points for the joints; (b) vertically projecting the maximum outer contours of the tooling structure model and the aircraft product model with positioning characteristics onto the reference plane, selecting the points with the largest envelope range in the projected outer contour lines as positioning control points for connecting lines, and fitting the lines and their internal areas to form an original envelope surface patch; (c) Select one of the measurement stations and the corresponding measurement points, connect the measurement station and the corresponding multiple measurement points to form a distance measurement line, and obtain the first line segment group. The length of the first line segment is L1 i , i=1…n; (d) Select multiple measurement points corresponding to the measurement station, project them onto the reference plane, form projection points on the reference plane, connect each measurement point with the projection point to form a perpendicular line to the measurement point, and obtain a second line segment group. The length of the second line segment group is L2 i , i=1…n; (e) the L i Project to the reference plane, extend the projection line segment to intersect with the outer contour of the original envelope surface, select the intersection point where the measurement station points to the measurement point in the projection direction of the reference plane as the extension direction control point, connect the measurement station and the extension control point to form a pointer intersection line, and obtain the third line segment group. The length of the third line segment is L3 i , i=1…n; (f) Starting from the survey station and pointing in the direction of the extended control point, L4 i The third line segment is extended forward to form a plane extension line, and the fourth line segment group is obtained. The length of the fourth line segment group is L4 i =L3 i (1+ρ*k i ), i = 1…n; where k i is the ranging adjustment coefficient, ρ is the environmental adjustment coefficient; (g) Obtain all outer end points of the plane extension line away from the measuring station in the fourth line segment group, connect the points with the largest envelope range among the outer end points, and fit the station envelope surface patch Z through the connection line and its internal area; and calculate the station envelope surface patch Z of each measuring station in turn i , i=1…m; (h) Divide the tooling structure into multiple areas along the length of the reference plane, select two reference points in each area that are farthest from each other in the width direction and closest in the length direction, use one of the reference points to draw a perpendicular line to the reference plane; use the perpendicular line and the other reference point to construct a width section, and then form a width section group K i , i=1…m2; (i) Using the wide section group K i , i = 1…m2 each width section and the station envelope surface Z i , i = 1…m intersect to form the intersection of the cut surface and the patch; Connect the points with the largest envelope range among the intersection points of the cut surface and the patch, and fill the interior of the connection line with a curved surface to form a fused envelope patch; (j) All measuring points in the tooling structure, namely C i As a reference, that is, the measurement point in this embodiment, the length L2 of the second line segment group i Extend outward in equal proportion to construct a height extension line, and set the endpoint of the height extension line away from the reference plane as the extension endpoint to form the fifth line segment group. The length of the fifth line segment group is L5 i , i=1…n1; (k) The measurement point is C i The projection point on the reference plane is the center of the sphere, with L6 i As the radius, a hemisphere is constructed above the reference plane to obtain a hemisphere group Q i , i=1…n1; (l) Through the width section group K i The intersection points of the sections and the facets at each widthwise section position in the middle are connected in sequence from one end to the other, and the section lines are constructed to form the sixth line segment group L6. i , i=1…m1; (m) using the sixth line segment group as the cross-section line and the outer contour line of the fused envelope surface patch as the boundary guide line, fitting to form a curved surface patch above the reference plane, merging the curved surface patch with the fused envelope surface patch to form an envelope curved surface, and filling the envelope curved surface to obtain a first envelope volume; (n) Group the hemispheres Q i Superimposing and summing with the first envelope to form a second envelope; (o) taking the outer contour line of the fused envelope surface as the stretching section line, and stretching it upward perpendicularly to the reference plane to form a cutting surface; (p) After the portion of the second envelope protruding from the cutting surface is cut off, the third envelope is obtained, and the construction of the measurement field envelope is completed.
2. The method for designing a large-scale measurement field envelope based on target accuracy according to claim 1 is characterized in that Environmental adjustment coefficient ρ, adjusted according to the uneven temperature error T at the station during the measurement period, T<2℃, ρ=1; 2℃ <T<5℃,ρ=1.1;5℃<T<10℃,ρ=1.2。 3. The method for designing a large-scale measurement field envelope based on target accuracy according to claim 2 is characterized in that The unbalanced temperature error T selects different measurement ranges and time spans according to different tooling structures. When the tooling structure is less than or equal to 5m thick, the selected temperature measurement points are not less than 4 points, and the measurement time span is less than 2 hours; when the tooling structure is thicker than 5m, the selected temperature measurement points are not less than 8 points, and the measurement time span is less than 4 hours; the temperature measurement includes at least 2 times of measurement start and end in one measurement cycle; T = Max (T1, ..., T i )-Min(T1,…,T i ), i=1…n, i is the number of temperature measurement points.
4. The method for designing a large-scale measurement field envelope based on target accuracy according to claim 1 is characterized in that The distance adjustment coefficient k i , calculated based on the ranging accuracy of the measuring device and the ranging of the measuring point; according to the ranging accuracy formula of the measuring device: ranging accuracy = constant + coefficient * ranging, calculate the L i The distance measurement accuracy μ i = constant + coefficient * L1 i , i = 1...n; tooling required accuracy σ = constant + coefficient * maximum distance measurement, according to the required accuracy and distance measurement accuracy μ i The ratio relationship between them is used to calculate the adjustment coefficient k i =(σ-μ i ) / σ, i=1…n.
5. The method for designing a large-scale measurement field envelope based on target accuracy according to claim 1 is characterized in that The second line segment group extends outward in equal proportions. i ≥0, the extended formula is based on L5 i =L2 i (1+ρ*k i +q i ), q i is the high compensation coefficient, i=1…n, when k i <0, the extension formula is based on L5 i =L2 i (1+q i ).
6. The method for designing a large-scale measurement field envelope based on target accuracy according to claim 5 is characterized in that The height compensation coefficient q i , the length of the second line segment group at the contour measurement point is L2 i When extending outward, q i =1 / 30; the length of the second line segment group L2 at the intersection measurement point i When extending outward, q i =1 / 50.
7. The method for designing a large-scale measurement field envelope based on target accuracy according to claim 1 is characterized in that The upward stretching dimension of the cutting curved surface is larger than the maximum dimension of the tooling positioning structure from the reference surface, and should also be larger than the length L5 of all line segments of the fifth line segment group. i .