Method, device and equipment for determining amount of incoming slag in reservoir area of hydropower station and medium
By obtaining and analyzing the environmental parameters of the hydropower station reservoir area, dividing and calculating the sludge volume and ratio in each area, the problem of difficulty in accurately measuring the amount of unexpected slag in the hydropower station reservoir area is solved, and the accurate measurement of accidental slag and economic losses are achieved. reduce.
Patent Information
- Application Number
- CN202410879265.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-02
- Publication Date
- 2024-10-11
AI Technical Summary
It is difficult to accurately determine the amount of unexpected slag in the reservoir area of a hydropower station in a low-lying valley with high mountain slopes and deep valleys, resulting in economic losses and unstable production operations.
By obtaining the environmental parameters of the hydropower station reservoir area, we divide the natural slag storage area, unnatural slag storage area and mixed area, determine the sludge volume and sludge ratio in each area, and calculate the total unnatural slag volume. Achieve accurate measurement of unexpected slag.
It improves the accuracy of unexpected slag in the reservoir area of the hydropower station, reduces economic losses, and enhances the stability of production and operation in the reservoir area.
Smart Images

Figure CN118761548A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of slag amount calculation, and in particular to a method, device, equipment and medium for determining the slag amount in a reservoir area of a hydropower station. Background Art
[0002] For the reservoir area of a hydropower station located in a low-lying river valley with high mountains, steep slopes and deep valleys, the surrounding geological conditions are relatively fragile due to its relatively low-lying topography. During the production and operation of a hydropower station, when the surrounding environment is damaged by human engineering activities, if there is heavy rainfall or single-point rainstorm, the mountain erosion landforms around the reservoir area are very susceptible to erosion and scouring by rainwater, forming natural disasters such as landslides and mud-rock flows, causing surrounding silt to flow into the reservoir area, thereby affecting the normal production and operation of the reservoir area, causing conflicts and disputes or generating economic losses.
[0003] For the unexpected slag in the reservoir area of a hydropower station located in a low-lying river valley with high mountains, steep slopes and deep valleys. First of all, in the design, construction and production operation of the hydropower station reservoir area, more consideration is given to the natural slag gathering in the reservoir area, and the unexpected slag is not considered; secondly, the surveying and measurement work in the hydropower station reservoir area requires more instruments and equipment than land measurement, the surveying and mapping technology requirements are more stringent, and the surveying and mapping difficulty is greater. Therefore, the update frequency of drawings and data is low, and the reservoir area often lacks accurate measured drawings and data before the unexpected slag; the unexpected slag in the hydropower station reservoir area is accidental and difficult to predict. When encountering extreme weather, natural slag and unexpected slag are usually collected in the reservoir area together; finally, during the production and operation of the hydropower station reservoir area, the current status of the reservoir area is measured and mapped, and the difference between the current storage capacity and the designed storage capacity of the reservoir area is often calculated. In view of this, how to accurately determine the unexpected slag in the reservoir area of a hydropower station in a low-lying river valley with high mountains, steep slopes and deep valleys to avoid causing greater economic losses is an urgent problem to be solved. Summary of the invention
[0004] The embodiments of the present application solve the technical problem in the prior art that it is difficult to accurately determine the unexpected slag in the reservoir by providing a method, device, equipment and medium for determining the amount of slag in the reservoir area of a hydropower station, and achieve the technical effect of more accurately determining the unexpected slag.
[0005] In a first aspect, the present application provides a method for determining the amount of slag in a reservoir area of a hydropower station, the method comprising:
[0006] Obtain environmental parameters of the target hydropower station reservoir area;
[0007] According to the environmental parameters of the target hydropower station reservoir area, the target hydropower station reservoir area is divided into natural slag stacking area, non-natural slag stacking area and mixed area;
[0008] Determine the volume of sludge in the natural sludge dumping area, the volume of sludge in the non-natural sludge dumping area and the volume of sludge in the mixed area respectively;
[0009] Determine the sludge ratio of the natural slag storage area according to the sludge volume and area of the natural slag storage area;
[0010] The total volume of non-natural slag in the reservoir area of the target hydropower station is determined based on the volume of sludge in the non-natural slag dumping area, the area of the non-natural slag dumping area, the volume of sludge in the mixed area, the area of the mixed area and the sludge ratio in the natural slag dumping area.
[0011] Furthermore, the volume of sludge in the natural sludge storage area, the volume of sludge in the non-natural sludge storage area, and the volume of sludge in the mixed area are determined respectively, including:
[0012] The target hydropower station reservoir area is divided according to the preset division rules to obtain several sections;
[0013] Determine the sludge volume in the natural sludge deposit area, the sludge volume in the non-natural sludge deposit area, and the sludge volume in the mixed area under two adjacent sections respectively;
[0014] Determine the sludge volume of the natural slag storage area according to the sludge volume of the natural slag storage area under two adjacent sections;
[0015] Determine the sludge volume of the non-natural slag storage area according to the sludge volume of the non-natural slag storage area under two adjacent sections;
[0016] The sludge volume in the mixing zone is determined based on the sludge sub-volumes in the mixing zone under two adjacent sections.
[0017] Furthermore, the volume of sludge in the natural slag storage area under two adjacent sections is determined, including:
[0018] The volume of sludge in the natural slag storage area is determined based on the areas occupied by the natural slag storage area in two adjacent sections and the distance between the two adjacent sections.
[0019] Furthermore, the formula for determining the volume of sludge in the natural slag storage area includes:
[0020]
[0021] Among them, V is the volume of sludge in the natural slag stacking area, D is the distance between two adjacent sections, A1 is the area occupied by the natural slag stacking area in the first section, A2 is the area occupied by the natural slag stacking area in the second section, and the first section is adjacent to the second section.
[0022] Furthermore, according to the sludge volume of the non-natural slag storage area, the area of the non-natural slag storage area, the sludge volume of the mixed area, the area of the mixed area and the sludge ratio of the natural slag storage area, the total volume of non-natural slag in the target hydropower station reservoir area is determined, including:
[0023] Determine the volume of non-natural slag in the non-natural slag dump area according to the volume of sludge in the non-natural slag dump area, the area of the non-natural slag dump area and the sludge-sludge ratio of the natural slag dump area;
[0024] Determine the volume of non-natural slag in the mixing area based on the volume of sludge in the mixing area, the area of the mixing area, and the sludge ratio of the natural slag storage area;
[0025] The total volume of non-natural slag in the reservoir area of the target hydropower station is determined based on the volume of non-natural slag in the mixing area and the volume of non-natural slag in the non-natural slag stacking area.
[0026] Furthermore, the preset division rules include:
[0027] According to the length of the target hydropower station reservoir, the target hydropower station reservoir is divided into equal intervals, where the distance between two adjacent sections is 10m.
[0028] Furthermore, environmental parameters include:
[0029] Water flow rate, reservoir capacity, underwater topography, reservoir topography, reservoir size and reservoir morphology.
[0030] In a second aspect, the present application provides a device for determining the amount of slag in a reservoir area of a hydropower station, the device comprising:
[0031] An acquisition module is used to obtain environmental parameters of the target hydropower station reservoir area;
[0032] A division module is used to divide the target hydropower station reservoir area according to the environmental parameters of the target hydropower station reservoir area to obtain a natural slag stacking area, an unnatural slag stacking area and a mixed area;
[0033] A sludge volume determination module is used to respectively determine the sludge volume in the natural sludge storage area, the sludge volume in the non-natural sludge storage area, and the sludge volume in the mixed area;
[0034] A sludge-slag ratio determination module is used to determine the sludge-slag ratio of the natural slag stacking area according to the sludge volume and the area of the natural slag stacking area;
[0035] The non-natural slag module is used to determine the total volume of non-natural slag in the reservoir area of the target hydropower station based on the volume of slag in the non-natural slag storage area, the area of the non-natural slag storage area, the volume of slag in the mixed area, the area of the mixed area and the slag ratio in the natural slag storage area.
[0036] In a third aspect, the present application provides an electronic device, including:
[0037] processor;
[0038] a memory for storing processor-executable instructions;
[0039] Wherein, the processor is configured to execute to implement a method for determining the amount of slag coming into a reservoir area of a hydropower station as provided in the first aspect.
[0040] In a fourth aspect, the present application provides a non-temporary computer-readable storage medium. When the instructions in the storage medium are executed by a processor of an electronic device, the electronic device is enabled to implement a method for determining the amount of slag in a hydropower station reservoir as provided in the first aspect.
[0041] One or more technical solutions provided in the embodiments of the present application have at least the following technical effects or advantages:
[0042] The present application provides a method for determining the amount of slag in a hydropower station reservoir, comprising: obtaining environmental parameters of a target hydropower station reservoir; dividing the target hydropower station reservoir according to the environmental parameters of the target hydropower station reservoir to obtain a natural slag stacking area, a non-natural slag stacking area and a mixed area; respectively determining the slag volume of the natural slag stacking area, the slag volume of the non-natural slag stacking area and the slag volume of the mixed area; determining the slag ratio of the natural slag stacking area according to the slag volume of the natural slag stacking area and the area of the natural slag stacking area; determining the total volume of non-natural slag in the target hydropower station reservoir according to the slag volume of the non-natural slag stacking area, the area of the non-natural slag stacking area, the slag volume of the mixed area, the area of the mixed area and the slag ratio of the natural slag stacking area. By dividing the reservoir area of the hydropower station, the present application can obtain the sludge sub-cubic volume of each area in turn, and further obtain the sludge cubic volume of each area. Through the sludge ratio of the natural sludge stacking area, the sludge cubic volume of each area and the area of each area, the non-natural sludge discharge in the reservoir area of the target hydropower station can be more accurately estimated. BRIEF DESCRIPTION OF THE DRAWINGS
[0043] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the following briefly introduces the drawings required for use in the description of the embodiments. Obviously, the drawings described below are some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0044] Figure 1 A schematic diagram of a flow chart of a method for determining the amount of slag in a reservoir area of a hydropower station provided in this application;
[0045] Figure 2 A schematic diagram of the shape of a hydropower station reservoir area provided for this application;
[0046] Figure 3 for Figure 2 Schematic diagram of the cross section at A and B in FIG.
[0047] Figure 4 A schematic diagram of the structure of a device for determining the amount of slag coming into a reservoir area of a hydropower station provided in this application;
[0048] Figure 5 A schematic diagram of the structure of an electronic device provided in this application. DETAILED DESCRIPTION
[0049] The embodiment of the present application solves the technical problem in the prior art that it is difficult to accurately determine the unexpected slag inflow to the reservoir by providing a method for determining the slag inflow to a hydropower station reservoir area.
[0050] The technical solution of the embodiment of the present application is to solve the above technical problems, and the overall idea is as follows:
[0051] A method for determining the amount of slag in a hydropower station reservoir area, the method comprising: obtaining environmental parameters of a target hydropower station reservoir area; dividing the target hydropower station reservoir area according to the environmental parameters of the target hydropower station reservoir area to obtain a natural slag stacking area, a non-natural slag stacking area and a mixed area; respectively determining the slag volume of the natural slag stacking area, the slag volume of the non-natural slag stacking area and the slag volume of the mixed area; determining the slag ratio of the natural slag stacking area according to the slag volume of the natural slag stacking area and the area of the natural slag stacking area; determining the total volume of non-natural slag in the target hydropower station reservoir area according to the slag volume of the non-natural slag stacking area, the area of the non-natural slag stacking area, the slag volume of the mixed area, the area of the mixed area and the slag ratio of the natural slag stacking area.
[0052] In order to better understand the above technical solution, the above technical solution will be described in detail below in conjunction with the accompanying drawings and specific implementation methods.
[0053] First of all, the term "and / or" in this article is only a description of the association relationship of the associated objects, indicating that there can be three relationships. For example, A and / or B can mean: A exists alone, A and B exist at the same time, and B exists alone. In addition, the character " / " in this article generally indicates that the associated objects before and after are in an "or" relationship.
[0054] This application provides Figure 1 A method for determining the amount of slag in a reservoir area of a hydropower station is shown, comprising steps S11-S15.
[0055] Step S11, obtaining environmental parameters of the target hydropower station reservoir area.
[0056] Step S12, dividing the target hydropower station reservoir area according to the environmental parameters of the target hydropower station reservoir area to obtain a natural slag stacking area, an unnatural slag stacking area and a mixed area.
[0057] Step S13, respectively determining the volume of sludge in the natural sludge storage area, the volume of sludge in the non-natural sludge storage area, and the volume of sludge in the mixed area.
[0058] Step S14, determining the sludge ratio of the natural slag stacking area according to the sludge volume and the area of the natural slag stacking area.
[0059] Step S15, determining the total volume of non-natural slag in the target hydropower station reservoir area according to the volume of sludge in the non-natural slag storage area, the area of the non-natural slag storage area, the volume of sludge in the mixed area, the area of the mixed area and the sludge ratio of the natural slag storage area.
[0060] It should be noted that the method provided in this application can be used for hydropower station reservoirs in low-lying river valleys with steep slopes and deep valleys, in other words, high mountain reservoirs. High mountain reservoirs are usually located between two mountains, and the shape of high mountain reservoirs is usually long and narrow. When designing high mountain reservoirs, it is usually necessary to make the high mountain reservoirs meet certain flow rates, storage capacities, and water level regulation functions according to the functions of the mountains.
[0061] Regarding step S11, the environmental parameters of the target hydropower station reservoir area are obtained.
[0062] The target hydropower station reservoir area refers to the hydropower station reservoir area in the low-lying river valley with high slopes, steep valleys and deep valleys where the amount of non-natural slag needs to be estimated. The environmental parameters of the target hydropower station reservoir area can be obtained in a variety of ways. Specifically, the environmental parameters include: water flow velocity, reservoir capacity, underwater topography, reservoir topography, reservoir size and reservoir morphology.
[0063] For example, drones can be used to obtain the current terrain around the reservoir and the current morphology of the reservoir in the target hydropower station reservoir area, and a variety of measuring instruments can be used to obtain water flow rate, storage capacity and reservoir size, where the reservoir size includes the length, width and depth of the reservoir. The underwater terrain and reservoir topography of the target hydropower station reservoir area can be obtained by underwater robots.
[0064] For example Figure 2 The figure is a schematic diagram of the shape of a target hydropower station reservoir area, where the length of the target hydropower station reservoir area is about 704m, the terrain centerline slope of the target hydropower station reservoir area is 2°, and the elevation increases by 0.28m every 10m.
[0065] Regarding step S12, the target hydropower station reservoir area is divided according to the environmental parameters of the target hydropower station reservoir area to obtain a natural slag stacking area, an unnatural slag stacking area and a mixed area.
[0066] According to the environmental parameters of the target hydropower station reservoir area, the target hydropower station reservoir area can be divided according to the underwater topography, reservoir topography and reservoir morphology.
[0067] It is understandable that most of the water sources in the target hydropower station reservoir area come from natural rivers. The natural rivers carry mud and slag, and the water flow slows down in the tail area of the reservoir area. The mud and slag carried by the natural rivers are concentrated at the tail of the reservoir, forming a natural slag stacking area in the target hydropower station reservoir area. The natural slag stacking area in the target hydropower station reservoir area can be determined by combining the underwater topography, reservoir topography and reservoir morphology. For example, Figure 2 The M1 area in the figure is the natural slag storage area of the target hydropower station reservoir.
[0068] When the surrounding environment is damaged by human engineering activities, if there is heavy rainfall or single-point rainstorm, the mountain erosion landforms around the reservoir area are very susceptible to erosion and scouring by rainwater, forming natural disasters such as landslides and mud-rock flows, which usually cause the surrounding sediment to flow from the waist of the target hydropower station reservoir area (that is, Figure 2 The left and right sides of the center) flow into the target hydropower station reservoir area, forming a fan-shaped impact-shaped non-natural slag stacking area, for example, Figure 2 The M2 area in the figure is the non-natural slag storage area in the reservoir area of the target hydropower station.
[0069] The mixed zone refers to the area where the non-natural slag in the middle of the target hydropower station reservoir is carried into the lower part of the target hydropower station reservoir by the canal water and natural river water. The unsettled mud and slag from the natural river are carried along the natural water and flow into the mixed zone at the bottom of the reservoir, for example, Figure 2 M3 in the figure is the mixed area of the target hydropower station reservoir.
[0070] The natural slag dumping area, unnatural slag dumping area and mixed area can be divided according to the underwater topography, reservoir topography and reservoir morphology of the target hydropower station reservoir area.
[0071] Regarding step S13, the volume of sludge in the natural sludge storage area, the volume of sludge in the non-natural sludge storage area, and the volume of sludge in the mixed area are determined respectively.
[0072] The method comprises the following steps: determining the sludge volume in the natural slag dumping area, the sludge volume in the non-natural slag dumping area and the sludge volume in the mixed area respectively, comprising: dividing the reservoir area of the target hydropower station according to a preset division rule to obtain a plurality of sections; determining the sludge sub-cubic volume in the natural slag dumping area, the sludge sub-cubic volume in the non-natural slag dumping area and the sludge sub-cubic volume in the mixed area respectively under two adjacent sections; determining the sludge volume in the natural slag dumping area according to the sludge sub-cubic volume in the natural slag dumping area under two adjacent sections; determining the sludge volume in the non-natural slag dumping area according to the sludge sub-cubic volume in the non-natural slag dumping area under two adjacent sections; and determining the sludge volume in the mixed area according to the sludge sub-cubic volume in the mixed area under two adjacent sections.
[0073] The preset division rules include: dividing the target hydropower station reservoir area into equal intervals according to the length of the target hydropower station reservoir area, wherein the distance between two adjacent sections is 10m.
[0074] For example, Figure 2 The length of the target hydropower station reservoir is about 700m, and 70 sections can be obtained by dividing it into equal intervals of 10m. The shape of each section is determined by the underwater topography of the target hydropower station reservoir at that location. For example, Figure 3 for Figure 2 The schematic diagram of the A and B sections in the figure, where the shapes of the A and B sections are determined by the underwater topography of the target hydropower station reservoir at locations A and B, respectively.
[0075] It can be understood that after a number of sections are obtained through division, the natural slag deposit area, the non-natural slag deposit area or the mixed area may exist in the same section.
[0076] For example, there are non-natural slag accumulation areas and mixed areas in profiles A and B. The areas occupied by the non-natural slag accumulation areas, the mixed areas and the natural slag accumulation in each profile can be determined respectively.
[0077] After respectively determining the areas occupied by the non-natural slag stacking area, the mixed area and the natural slag stacking in each section, the sludge volume of the non-natural slag stacking area between two adjacent sections can be determined according to the areas occupied by the non-natural slag stacking areas of the two adjacent sections and the distance between the two adjacent sections;
[0078] The sludge volume of the natural slag storage area between the two adjacent sections can be determined according to the area occupied by the natural slag storage area of the two adjacent sections and the distance between the two adjacent sections.
[0079] The amount of sludge in the mixing zone between two adjacent sections can be determined based on the area occupied by the mixing zone of the two adjacent sections and the distance between the two adjacent sections.
[0080] Take the determination of the sludge volume in the natural slag storage area as an example:
[0081] The formula for determining the volume of sludge in the natural slag storage area includes:
[0082]
[0083] Among them, V is the volume of sludge in the natural slag stacking area, D is the distance between two adjacent sections, A1 is the area occupied by the natural slag stacking area in the first section, A2 is the area occupied by the natural slag stacking area in the second section, and the first section is adjacent to the second section.
[0084] Figure 3 In the figure, sections A and B are adjacent, the area of the natural slag dumping area in section A is 15 square meters, the area of the natural slag dumping area in section B is 20 square meters, and the distance between A and B is 10m. According to the above formula, the volume of sludge in the natural slag dumping area between sections AB can be obtained.
[0085] It can be understood that whether it is determining the sludge sub-cubic volume in the non-natural slag storage area between the two sections or the sludge sub-cubic volume in the mixed area between the two sections, it can be determined in a manner similar to the above-mentioned "determining the sludge sub-cubic volume in the natural slag storage area", which will not be elaborated here.
[0086] After obtaining the sludge sub-cubic volume of the natural slag storage area between the several sections, the sludge sub-cubic volume of the natural slag storage area between the several sections is added together to obtain the sludge volume of the natural slag storage area;
[0087] After obtaining the sludge sub-cubic volume of the non-natural sludge storage area between the plurality of sections, the sludge sub-cubic volume of the non-natural sludge storage area between the plurality of sections is added together to obtain the sludge cubic volume of the non-natural sludge storage area;
[0088] After obtaining the sludge sub-cubic volume of the mixing zone between several sections, the sludge sub-cubic volume of the mixing zone between several sections is added together to obtain the sludge cubic volume of the natural slag stacking area.
[0089] Regarding step S14, the sludge ratio of the natural slag storage area is determined according to the sludge volume and the area of the natural slag storage area.
[0090] After determining the sludge volume in the natural slag dumping area, the sludge volume in the non-natural slag dumping area and the sludge volume in the mixed area, the sludge ratio in the natural slag dumping area can be determined based on the sludge volume in the natural slag dumping area and the area of the natural slag dumping area.
[0091] For example, Figure 2According to the surface area of M1 region and the volume of sludge corresponding to M1 region, determine M1 region ( Figure 2 The sludge ratio of the natural sludge storage area in a target hydropower station reservoir area. Specifically, the sludge ratio = sludge volume: area.
[0092] Regarding step S15, the total volume of non-natural slag in the reservoir area of the target hydropower station is determined based on the volume of sludge in the non-natural slag storage area, the area of the non-natural slag storage area, the volume of sludge in the mixed area, the area of the mixed area and the sludge ratio of the natural slag storage area.
[0093] Specifically, they include:
[0094] According to the sludge volume of the non-natural slag storage area, the area of the non-natural slag storage area and the sludge ratio of the natural slag storage area, the non-natural slag storage area is determined. (The sludge in the mixed area and the non-natural slag storage area is affected by natural and accidental slag, and the sludge ratio is relatively large. The situation in the natural slag storage area is intuitively visible, so the sludge ratio of the natural slag storage area is used as the calculation basis)
[0095] The volume of natural sludge in the non-natural slag dumping area is determined according to the product of the area of the non-natural slag dumping area and the sludge ratio of the natural slag dumping area. The volume of unnatural slag in the unnatural slag dumping area is determined according to the difference between the volume of sludge in the non-natural slag dumping area and the volume of natural sludge in the non-natural slag dumping area.
[0096] The volume of non-natural slag in the mixing zone is determined based on the volume of sludge in the mixing zone, the area of the mixing zone and the sludge ratio in the natural slag storage area.
[0097] The natural sludge volume in the mixing zone is determined based on the product of the area of the mixing zone and the sludge ratio of the mixing zone. The unnatural sludge volume in the mixing zone is determined based on the difference between the sludge volume in the mixing zone and the natural sludge volume in the mixing zone.
[0098] The total volume of non-natural slag in the reservoir area of the target hydropower station is determined based on the volume of non-natural slag in the mixing area and the volume of non-natural slag in the non-natural slag stacking area. Specific embodiment:
[0100] In calculating the reservoir area P of a target hydropower station, the measured data of the reservoir area is used as the basis, combined with the on-site inspection situation, the length of the reservoir area P of the target hydropower station is about 700m, and a section is divided every 10m. The slope of the terrain centerline of the reservoir area P of the target hydropower station is 2°, and the elevation increases by 0.28m every 10m, and a total of 70 sections are obtained. The terrain elevation of the reservoir area P of the target hydropower station ranges from the elevation of the discharge port of the reservoir area P of the target hydropower station (1198m) to the elevation of the reservoir tail (1217.6m). The details of the sections are shown in Table 1.
[0101] Table 1
[0102] According to the above method, the sludge volume in the natural sludge storage area, the sludge volume in the non-natural sludge storage area and the sludge volume in the mixed area of the target hydropower station reservoir area P are determined respectively. Details are shown in Table 2, Table 3 and Table 4.
[0103] Table 2
[0104]
[0105]
[0106] Table 3
[0107]
[0108] Table 4
[0109]
[0110]
[0111] The sludge ratio of the natural slag storage area = volume / area = 10064.95 / 6764.17 = 1.488.
[0112] The volume of non-natural slag in the non-natural slag storage area is: 34704.75-(7388.32×1.488)=23710.93m 3
[0113] The volume of non-natural slag in the mixed area is: 61211.79-(4486.68×1.488)=24775.61m 3 The total volume of non-natural slag in the target hydropower station reservoir area P is 23710.93+24775.61=48486.54m 3
[0114] In summary, the present application provides a method for determining the amount of slag in a hydropower station reservoir, comprising: obtaining environmental parameters of a target hydropower station reservoir; dividing the target hydropower station reservoir according to the environmental parameters of the target hydropower station reservoir to obtain a natural slag stacking area, a non-natural slag stacking area and a mixed area; respectively determining the slag volume of the natural slag stacking area, the slag volume of the non-natural slag stacking area and the slag volume of the mixed area; determining the slag ratio of the natural slag stacking area according to the slag volume of the natural slag stacking area and the area of the natural slag stacking area; determining the total volume of non-natural slag in the target hydropower station reservoir according to the slag volume of the non-natural slag stacking area, the area of the non-natural slag stacking area, the slag volume of the mixed area, the area of the mixed area and the slag ratio of the natural slag stacking area. By dividing the reservoir area of the hydropower station, the present application can obtain the sludge sub-cubic volume of each area in turn, and further obtain the sludge cubic volume of each area. Through the sludge ratio of the natural sludge stacking area, the sludge cubic volume of each area and the area of each area, the non-natural sludge discharge in the reservoir area of the target hydropower station can be more accurately estimated.
[0115] Based on the same inventive concept, the present application provides Figure 4 A device for determining the amount of slag in a reservoir area of a hydropower station is shown, the device comprising:
[0116] An acquisition module 41 is used to acquire environmental parameters of a target hydropower station reservoir area;
[0117] A division module 42 is used to divide the target hydropower station reservoir area according to the environmental parameters of the target hydropower station reservoir area to obtain a natural slag stacking area, an unnatural slag stacking area and a mixed area;
[0118] The sludge volume determination module 43 is used to respectively determine the sludge volume of the natural sludge storage area, the sludge volume of the non-natural sludge storage area and the sludge volume of the mixed area;
[0119] The sludge ratio determination module 44 is used to determine the sludge ratio of the natural slag stacking area according to the sludge volume and the area of the natural slag stacking area;
[0120] The non-natural slag module 45 is used to determine the total volume of non-natural slag in the target hydropower station reservoir area based on the volume of slag in the non-natural slag storage area, the area of the non-natural slag storage area, the volume of slag in the mixed area, the area of the mixed area and the slag ratio of the natural slag storage area.
[0121] Based on the same inventive concept, the present application also provides Figure 5 An electronic device as shown includes:
[0122] Processor 51;
[0123] A memory 52 for storing instructions executable by the processor 51;
[0124] The processor 51 is configured to execute to implement a method for determining the amount of slag entering a reservoir area of a hydropower station as provided above.
[0125] Based on the same inventive concept, the present application also provides a non-temporary computer-readable storage medium. When the instructions in the storage medium are executed by the processor 51 of the electronic device, the electronic device can execute a method for determining the amount of slag in the reservoir area of a hydropower station as provided above.
[0126] Since the electronic device introduced in this embodiment is an electronic device used to implement the information processing method in the embodiment of the present application, based on the information processing method introduced in the embodiment of the present application, a person skilled in the art can understand the specific implementation of the electronic device of the present embodiment and its various variations, so how the electronic device implements the method in the embodiment of the present application is not described in detail here. As long as a person skilled in the art implements the electronic device used by the information processing method in the embodiment of the present application, it belongs to the scope of protection of this application.
[0127] Those skilled in the art will appreciate that embodiments of the present invention may be provided as methods, systems, or computer program products. Therefore, the present invention may take the form of a complete hardware embodiment, a complete software embodiment, or an embodiment combining software and hardware. Moreover, the present invention may take the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program code.
[0128] The present invention is described with reference to flowcharts and / or block diagrams of methods, devices (systems), and computer program products according to embodiments of the present invention. It should be understood that each process and / or block in the flowchart and / or block diagram, as well as the combination of processes and / or blocks in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to produce a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.
[0129] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1A function specified in one or more boxes.
[0130] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 A step that specifies a function in one or more boxes.
[0131] Although the preferred embodiments of the present invention have been described, those skilled in the art may make other changes and modifications to these embodiments once they have learned the basic creative concept. Therefore, the appended claims are intended to be interpreted as including the preferred embodiments and all changes and modifications that fall within the scope of the present invention.
[0132] Obviously, those skilled in the art can make various changes and modifications to the present invention without departing from the spirit and scope of the present invention. Thus, if these modifications and variations of the present invention fall within the scope of the claims of the present invention and their equivalents, the present invention is also intended to include these modifications and variations.
Claims
1. A method for determining the amount of slag in a hydropower station reservoir, characterized in that: The method comprises: Obtain environmental parameters of the target hydropower station reservoir area; According to the environmental parameters of the target hydropower station reservoir area, the target hydropower station reservoir area is divided into a natural slag stacking area, an unnatural slag stacking area and a mixed area; Respectively determining the sludge volume in the natural sludge storage area, the sludge volume in the non-natural sludge storage area, and the sludge volume in the mixed area; Determining a sludge ratio of the natural slag stacking area according to the sludge volume of the natural slag stacking area and the area of the natural slag stacking area; The total volume of non-natural slag in the reservoir area of the target hydropower station is determined based on the volume of sludge in the non-natural slag storage area, the area of the non-natural slag storage area, the volume of sludge in the mixed area, the area of the mixed area and the sludge ratio of the natural slag storage area.
2. A method for determining the amount of slag in a hydropower station reservoir as claimed in claim 1, characterized in that: The method of respectively determining the sludge volume in the natural sludge storage area, the sludge volume in the non-natural sludge storage area, and the sludge volume in the mixed area comprises: Dividing the target hydropower station reservoir area according to a preset division rule to obtain a plurality of sections; Respectively determining the sludge sub-cubic volume of the natural sludge stacking area, the sludge sub-cubic volume of the non-natural sludge stacking area, and the sludge sub-cubic volume of the mixed area under two adjacent sections; Determining the sludge volume of the natural slag stacking area according to the sludge volume of the natural slag stacking area in two adjacent sections; Determining the sludge volume of the non-natural sludge storage area according to the sludge volume of the non-natural sludge storage area in two adjacent sections; The sludge volume of the mixing zone is determined based on the sludge sub-volumes of the mixing zone under two adjacent sections.
3. A method for determining the amount of slag in a hydropower station reservoir as claimed in claim 2, characterized in that: Determining the volume of sludge in the natural slag storage area under two adjacent sections includes: The volume of the sludge sub-cubic meter of the natural slag stacking area is determined according to the areas respectively occupied by the natural slag stacking area in two adjacent sections and the distance between the two adjacent sections.
4. A method for determining the amount of slag in a hydropower station reservoir as claimed in claim 3, characterized in that: The formula for determining the volume of sludge in the natural slag dump area includes: Among them, V is the volume of sludge in the natural slag stacking area, D is the distance between two adjacent sections, A1 is the area occupied by the natural slag stacking area in the first section, A2 is the area occupied by the natural slag stacking area in the second section, and the first section is adjacent to the second section.
5. A method for determining the amount of slag in a hydropower station reservoir as claimed in claim 1, characterized in that: Determining the total volume of non-natural slag in the target hydropower station reservoir area according to the sludge volume of the non-natural slag storage area, the area of the non-natural slag storage area, the sludge volume of the mixed area, the area of the mixed area and the sludge ratio of the natural slag storage area includes: Determining the volume of non-natural slag in the non-natural slag storage area according to the volume of sludge in the non-natural slag storage area, the area of the non-natural slag storage area, and the sludge ratio of the natural slag storage area; Determining the volume of non-natural slag in the mixing zone according to the volume of sludge in the mixing zone, the area of the mixing zone, and the sludge ratio of the natural slag storage area; The total volume of non-natural slag in the target hydropower station reservoir area is determined according to the volume of non-natural slag in the mixing area and the volume of non-natural slag in the non-natural slag stacking area.
6. A method for determining the amount of slag in a hydropower station reservoir as claimed in claim 2, characterized in that: Preset partitioning rules, including: According to the length of the target hydropower station reservoir area, the target hydropower station reservoir area is divided into equal intervals, wherein the distance between two adjacent sections is 10m.
7. A method for determining the amount of slag in a hydropower station reservoir as claimed in claim 1, characterized in that: The environmental parameters include: Water flow rate, reservoir capacity, underwater topography, reservoir topography, reservoir size and reservoir morphology.
8. A device for determining the amount of slag coming into a hydropower station reservoir, characterized in that: The device comprises: An acquisition module is used to obtain environmental parameters of the target hydropower station reservoir area; A division module, used for dividing the target hydropower station reservoir area according to the environmental parameters of the target hydropower station reservoir area to obtain a natural slag stacking area, an unnatural slag stacking area and a mixed area; A sludge volume determination module, used to respectively determine the sludge volume of the natural sludge stacking area, the sludge volume of the non-natural sludge stacking area, and the sludge volume of the mixed area; A sludge-slag ratio determination module, used to determine the sludge-slag ratio of the natural slag stacking area according to the sludge volume of the natural slag stacking area and the area of the natural slag stacking area; The non-natural slag module is used to determine the total volume of non-natural slag in the reservoir area of the target hydropower station based on the volume of sludge in the non-natural slag storage area, the area of the non-natural slag storage area, the volume of sludge in the mixed area, the area of the mixed area and the sludge ratio of the natural slag storage area.
9. An electronic device, characterized in that: include: processor; a memory for storing instructions executable by the processor; Wherein, the processor is configured to execute to implement a method for determining the amount of slag coming into a reservoir area of a hydropower station as described in any one of claims 1 to 7.
10. A non-temporary computer-readable storage medium, when the instructions in the storage medium are executed by a processor of an electronic device, enables the electronic device to implement a method for determining the amount of slag coming into a reservoir area of a hydropower station as described in any one of claims 1 to 7.
