Resource allocation method, device, equipment, medium and computer program product
By performing data cleaning and weight assignment on the three-level indicators of the multi-level indicator database for computing power construction resources, the problem of unrealistic resource allocation data is solved, the balance and rationality of resource allocation are achieved, and the scientific nature of the resource allocation plan is ensured. .
Patent Information
- Application Number
- CN202410760829.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-13
- Publication Date
- 2024-10-11
AI Technical Summary
The allocation basis data for computing power construction resources in the existing technology is untrue, resulting in irregular and unreasonable resource allocation plans and affecting the balance of resource allocation.
Through data cleaning, indicator screening and standardization processing of the three-level indicators in the multi-level indicator database of computing power construction resources, the skewness weight and target weight of the three-level indicators are determined, the quantitative comprehensive weight is calculated step by step, and finally each evaluated The regional computing power construction resources are allocated based on the comprehensive score.
It improves the standardization and rationality of resource allocation, enhances the balance of resource allocation, and ensures the scientificity and accuracy of resource allocation plans.
Smart Images

Figure CN118761576A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of resource management technology, and in particular to a resource allocation method, device, equipment, medium and computer program product. Background Art
[0002] Computing power construction resources are new computing power resources that are intensively constructed with intelligent computing power such as GPUs and AI accelerator cards as the core. They mainly carry services such as model training, intelligent computing center reasoning, and multimedia rendering, and are used to support the digital transformation and upgrading of various industries. At present, the allocation of computing power construction resources is affected by the resource data acquisition or screening methods, resulting in untrue data on which resource allocation is based, which in turn affects the standardization and rationality of the resource allocation plan, and thus affects the balance of resource allocation. Summary of the invention
[0003] The present invention provides a resource allocation method, device, equipment, medium and computer program product, which are used to solve the defects in the prior art that the data based on which resource allocation is based is not true, resulting in an irregular and unreasonable resource allocation scheme, and to improve the balance of resource allocation.
[0004] The present invention provides a resource allocation method, comprising the following steps.
[0005] The three-level indicators in the constructed multi-level indicator library of computing power construction resources are sequentially cleaned, screened and standardized to obtain the three-level indicator scores; Determine the skewness weight and target weight of the third-level indicator based on the third-level indicator score; Based on the skewness weight and the target weight, determine the quantitative comprehensive weight of the third-level indicator, the quantitative comprehensive weight of the second-level indicator, and the quantitative comprehensive weight of the first-level indicator; Based on the scores of indicators at all levels and the quantitative comprehensive weights of indicators at all levels, the comprehensive score of computing power construction resources for each evaluated area is determined; the comprehensive score of computing power construction resources for each evaluated area is used for computing power construction resource allocation.
[0006] According to a resource allocation method provided by the present invention, the step of determining the skewness weight and target weight of the third-level indicator based on the third-level indicator score includes: Determine the number of evaluated areas, and determine the deviation coefficient and information entropy value of each of the three-level indicators based on the number of evaluated areas and the score of each of the three-level indicators of each evaluated area; Performing the standardization process on the deviation coefficient to obtain the skewness weight of each of the three-level indicators; The target weight of each of the three-level indicators is determined based on the information utility value; the information utility value is determined based on the information entropy value.
[0007] According to a resource allocation method provided by the present invention, the determining of the information entropy value of each of the three-level indicators based on the number of the evaluated areas and the score of each of the three-level indicators of each evaluated area includes: Based on the number of evaluated areas and the score of each of the three-level indicators in each evaluated area, a data weight matrix is constructed; based on the number of evaluated areas and the proportion of each of the three-level indicators in the data weight matrix, the information entropy value of each of the three-level indicators is determined.
[0008] According to a resource allocation method provided by the present invention, the determining the quantitative comprehensive weight of the third-level indicator, the quantitative comprehensive weight of the second-level indicator and the quantitative comprehensive weight of the first-level indicator based on the skewness weight and the target weight includes: determining the quantitative comprehensive weight of the third-level indicator based on the skewness weight and the target weight; Determine the secondary indicator scores and the quantitative comprehensive weights of the secondary indicators based on the third-level indicator scores and the quantitative comprehensive weights of the third-level indicators; Based on the secondary indicator scores and the quantitative comprehensive weights of the secondary indicators, the primary indicator scores and the quantitative comprehensive weights of the primary indicators are determined.
[0009] According to a resource allocation method provided by the present invention, the step of determining the secondary indicator score and the quantitative comprehensive weight of the secondary indicator based on the third-level indicator score and the quantitative comprehensive weight of the third-level indicator includes: Determine the secondary indicator score of each of the assessed areas based on the score and quantitative comprehensive weight of each of the third-level indicators of each of the assessed areas; Determine the skewness weight and target weight of each secondary indicator based on the number of the assessed areas and the score of each secondary indicator of each assessed area; Based on the skewness weight and target weight of each of the secondary indicators, the quantitative comprehensive weight of the secondary indicators is determined.
[0010] According to a resource allocation method provided by the present invention, the resource allocation method further comprises: Determine the comprehensive score of computing power construction resources for each of the assessed areas based on the first-level indicator scores and the quantitative comprehensive weights of the first-level indicators; Computing power construction resources are allocated based on the score ratio of each of the evaluated areas; the score ratio is determined based on the comprehensive score of the computing power construction resources.
[0011] The present invention also provides a resource allocation device, comprising the following modules: The third-level indicator scoring determination module is used to perform data cleaning, indicator screening and standardization on the third-level indicators in the constructed multi-level indicator library of computing power construction resources in turn to obtain the third-level indicator scores; A combined weight determination module, used to determine the skewness weight and target weight of the third-level indicator based on the third-level indicator score; a quantitative comprehensive weight determination module, used to determine the quantitative comprehensive weight of the third-level indicator, the quantitative comprehensive weight of the second-level indicator and the quantitative comprehensive weight of the first-level indicator based on the skewness weight and the target weight; The resource allocation module is used to determine the comprehensive score of computing power construction resources for each evaluated area based on the scores of indicators at all levels and the quantitative comprehensive weights of indicators at all levels; the comprehensive score of computing power construction resources for each evaluated area is used for computing power construction resource allocation.
[0012] The present invention also provides an electronic device, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein when the processor executes the program, any one of the resource allocation methods described above is implemented.
[0013] The present invention also provides a non-transitory computer-readable storage medium on which a computer program is stored. When the computer program is executed by a processor, the resource allocation method described in any one of the above is implemented.
[0014] The present invention also provides a computer program product, comprising a computer program, wherein when the computer program is executed by a processor, the computer program implements any of the resource allocation methods described above.
[0015] The resource allocation method, device, equipment, medium and computer program product provided by the present invention firstly perform data cleaning, index screening and standardization processing on the three-level indicators in the multi-level indicators of the acquired computing power construction resources in turn to obtain the three-level indicator scores, and then process the three-level indicator scores by the weighting method proposed by the present invention to obtain the skewness weights and target weights of the three-level indicators. On the basis of the skewness weights and target weights, the quantitative comprehensive weights of the three-level to the first-level indicators are further determined, and finally, on the basis of the scores of the indicators at all levels and the quantitative comprehensive weights of the indicators at all levels, the comprehensive score of the computing power construction resources of each evaluated area is determined, and the comprehensive score of the computing power construction resources is used as the basis for the allocation of computing power construction resources for each evaluated area. The resource allocation scheme determined by the detailed classification of computing power construction resources and the standardized and rigorous calculation of the weights of resource indicators at all levels has stronger standardization and rationality, and can improve the balance of resource allocation. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] In order to more clearly illustrate the technical solutions in the present invention or the prior art, the following briefly introduces the drawings required for use in the embodiments or the description of the prior art. Obviously, the drawings described below are some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0017] Figure 1 This is one of the flow charts of the resource allocation method provided by the present invention.
[0018] Figure 2 This is the second flow chart of the resource allocation method provided by the present invention.
[0019] Figure 3 It is a structural schematic diagram of the resource allocation device provided by the present invention.
[0020] Figure 4 It is a structural schematic diagram of the electronic device provided by the present invention. DETAILED DESCRIPTION
[0021] In order to make the purpose, technical solution and advantages of the present invention clearer, the technical solution of the present invention will be clearly and completely described below in conjunction with the drawings of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0022] Combine the following Figure 1-Figure 4 The resource allocation method, apparatus, device, medium and computer program product of the present invention are described.
[0023] Figure 1 It is one of the flow charts of the resource allocation method provided by the present invention, such as Figure 1 As shown, the method includes the following: Step 100, data cleaning, indicator screening and standardization are performed on the three-level indicators in the constructed multi-level indicator library of computing power construction resources in turn to obtain the three-level indicator scores; The construction process of the multi-level indicator library of computing power construction resources is as follows: The multi-level indicator library for computing power construction resources mainly includes three levels: supporting infrastructure, artificial intelligence research and development needs, and artificial intelligence application needs. When the indicator level is three levels, the indicators at these three levels can be called first-level indicators or third-level indicators. In the resource allocation method provided by the present invention, the indicators at the above three levels are called first-level indicators.
[0024] Supporting infrastructure as the foundation for computing power construction can include five modules: data center, computing power, transportation capacity, storage capacity and energy reserve; AI R&D demand as the core capability can include two modules: scientific enterprise strength and innovation capability; AI application demand as the industry pull can include two modules: application environment and industry application. The above multiple modules are referred to as secondary indicators in the resource allocation method provided by the present invention.
[0025] Each secondary indicator has at least one corresponding tertiary indicator, and each tertiary indicator has a corresponding indicator description. For example, the secondary indicator of scientific and technological enterprise strength corresponds to the tertiary indicator "university R&D intensity", and the indicator description of the tertiary indicator of university R&D intensity can be "the number of universities that have established artificial intelligence majors". Taking this as an example, a three-level computing power construction resource indicator library can be constructed.
[0026] Then, the constructed three-level computing power construction resource indicator library is sequentially cleaned, indicator screened, and standardized. During the data acquisition process, some indicators only have data from the top N evaluated areas, and the missing data needs to be supplemented. It can be supplemented with the minimum value (the data of the N-ranked evaluated area) or the average value. The number of evaluated areas is m.
[0027] The process of index screening is as follows: the deviation between the index data and the theoretical value of normal distribution is compared by Shapiro-Wilk test to determine whether the data conforms to normal distribution. When the asymptotic significance is greater than 0.05, the data conforms to normal distribution. When the asymptotic significance is less than 0.05, the data is non-normal. The greater the asymptotic significance, the better the normality. According to the normality test results of each index data, the mature index with asymptotic significance greater than 0.05 and representativeness is screened.
[0028] The process of standardization is as follows: data is standardized by the "maximum and minimum value normalization method", that is, the highest score is 100, the lowest score is 0, and the intermediate linear score is obtained to obtain the standardized score of the indicator. For positive indicators with higher values, the higher scores, the standardization process is shown in formula 1; for negative indicators with higher values, the lower scores, the standardization process is shown in formula 2.
[0029]
[0030]
[0031] Among them, x ij is the normalized processing result of the jth indicator of the i-th evaluated area, i = 1, 2, 3...m; j = 1, 2, 3...n; rd ij It is the data cleaning result of the jth indicator of the i-th evaluated area.
[0032] Step 200: Determine the skewness weight and target weight of the third-level indicator based on the third-level indicator score; The resource allocation method provided by the present invention constructs a combined weighting method for the indicator system based on the normal distribution characteristics of the data, and proposes a new quantitative weighting method of the skewness method, and calculates the quantitative comprehensive weights of indicators at all levels by weighted summation of the skewness method and other weighting methods (such as the entropy weight method). Among them, the basic idea of the skewness method proposed by the present invention is as follows: skewness is a statistic used to measure the degree of asymmetry in a probability distribution or a data set, and describes which side of the mean the tail of the data distribution is heavier or longer. If the data skewness is greater than 0, the data set is distributed on the left side of the mean, indicating that the difficulty of completing the indicator is greater, and a greater weight should be given to the indicator; if the data skewness is less than 0, the data set is distributed on the right side of the mean, indicating that the difficulty of completing the indicator is less, and the weight given to the indicator should be appropriately reduced.
[0033] This embodiment takes the combination of skewness method and entropy weight method as an example to illustrate that the skewness weight and entropy weight of the three-level index (i.e., the target weight in this embodiment) are calculated first in a bottom-up order. The data basis for calculating the skewness weight and target weight of the three-level index is the three-level index score obtained above, i.e., the result of standardization of the three-level index.
[0034] Step 300: Based on the skewness weight and the target weight, determine the quantitative comprehensive weight of the third-level indicator, the quantitative comprehensive weight of the second-level indicator, and the quantitative comprehensive weight of the first-level indicator; The process of calculating the weights of indicators at each level (skewness weight and target weight) step by step through the skewness method and the entropy weight method is as follows: the weights of multiple levels of indicators are calculated separately through a bottom-up method. First, the skewness weight and target weight of the third-level indicators are calculated through the entropy weight method and the skewness method; then, the secondary indicator scores are calculated based on the obtained third-level indicator weights and the standardized scores of the third-level indicator data, and then the secondary indicator weights are calculated based on the secondary indicator scores through the entropy weight method and the skewness method; finally, the first-level indicator scores are calculated based on the obtained second-level indicator weights and the second-level indicator data scores, and the first-level indicator weights are calculated based on the first-level indicator scores through the entropy weight method and the skewness method.
[0035] X ij =aE ij +(1-a)S ij ; (3)
[0036] The quantitative comprehensive weights of indicators at all levels are calculated using Formula 3, where X ij is the quantitative comprehensive weight of the jth indicator of the i-th level; a is the weight of the entropy weight method result; E ij is the entropy weight of the jth indicator at the i-th level; S ij is the skewness weight of the j-th indicator at the i-th level.
[0037] Step 400: Based on the scores of indicators at all levels and the quantitative comprehensive weights of indicators at all levels, determine the comprehensive score of computing power construction resources for each evaluated area; the comprehensive score of computing power construction resources for each evaluated area is used for computing power construction resource allocation.
[0038] After obtaining the quantitative comprehensive weights of each indicator at each level, it is necessary to correct the quantitative comprehensive weights in combination with the expert evaluation method, and the correction result can be called the expert qualitative weight. The quantitative comprehensive weights of the indicators at all levels in the content of this embodiment "determining the comprehensive score of the computing power construction resources of each evaluated area based on the scores of indicators at all levels and the quantitative comprehensive weights of indicators at all levels" can be expert qualitative weights. In the absence of correction, the quantitative comprehensive weights of indicators at all levels are the quantitative comprehensive weights obtained by the above formula 3.
[0039] Similar to the step-by-step calculation of the weights of indicators at each level, the scores of indicators at each level in this embodiment are also calculated step by step. After obtaining the first-level indicator scores, the comprehensive score of the computing power construction resources of each evaluated area is determined by calculating the quantitative comprehensive weight of each first-level indicator score and its corresponding first-level indicator. The proportion of the comprehensive score of the computing power construction resources of each evaluated area is used as a reference for the allocation ratio of computing power construction resources.
[0040] In the resource allocation method provided in this embodiment, first, the three-level indicators in the multi-level indicators of the acquired computing power construction resources are sequentially subjected to data cleaning, indicator screening and standardization processing to obtain the three-level indicator scores, and then the three-level indicator scores are processed by the weighting method proposed in the present invention to obtain the skewness weights and target weights of the three-level indicators. On the basis of the skewness weights and target weights, the quantitative comprehensive weights of the three-level to the first-level indicators are further determined, and finally, on the basis of the scores of the indicators at all levels and the quantitative comprehensive weights of the indicators at all levels, the comprehensive score of the computing power construction resources of each evaluated area is determined, and the comprehensive score of the computing power construction resources is used as the basis for the allocation of computing power construction resources for each evaluated area. The resource allocation scheme determined by the detailed classification of computing power construction resources and the standardized and rigorous calculation of the weights of resource indicators at all levels has stronger standardization and rationality, and can improve the balance of resource allocation.
[0041] In one embodiment, the resource allocation method provided in the embodiment of the present application may further include: Step 210: determine the number of evaluated areas, and determine the deviation coefficient and information entropy value of each of the three-level indicators based on the number of evaluated areas and the score of each of the three-level indicators of each evaluated area; Step 220: performing the standardization process on the deviation coefficient to obtain the skewness weight of each of the three-level indicators; Step 230: determine the target weight of each of the three-level indicators based on the information utility value; the information utility value is determined based on the information entropy value.
[0042] The calculation process of the skewness weights of indicators at all levels is as follows: According to formula 4, the deviation coefficient sk of each level of indicators is calculated j , where x ij is the standardized score or weighted calculated score of the jth indicator of the i-th assessed area; is the average value of the standardized score or the average value of the weighted score of the jth indicator; N is the number of evaluated areas; σ j is the standard deviation of the j-th indicator score.
[0043]
[0044]
[0045]
[0046] According to formula 5, the deviation coefficient sk j Perform standardization and obtain the standardized processing result sk j To avoid the situation where the indicator weight is 0, the standardized processing result sk j The minimum value of is calculated according to the second-to-last minimum value. The skewness weight S of the indicator is calculated according to formula 6 j .
[0047] The target weights of indicators at all levels are calculated based on the information utility value, which is calculated based on the information entropy value of indicators at all levels, and the information entropy value of indicators at all levels is calculated based on the scores of indicators at all levels.
[0048] This embodiment calculates the skewness weight and target weight of indicators at all levels by scoring indicators at all levels, laying a data foundation for calculating the quantitative comprehensive weight of indicators at all levels.
[0049] In one embodiment, the resource allocation method provided in the embodiment of the present application may further include: Step 211: construct a data weight matrix based on the number of the evaluated areas and the score of each of the three-level indicators of each evaluated area; Step 212: Determine the information entropy value of each of the third-level indicators based on the number of the evaluated areas and the proportion of each of the third-level indicators in the data weight matrix.
[0050] The calculation process of the entropy weight method weights of indicators at all levels is as follows: According to formula 7, establish the data weight m×n matrix P ij, where P ij represents the proportion of the j-th indicator score of the i-th evaluated area in the total score of the j-th indicator of the m evaluated areas; x ij It is the standardized score or weighted calculated score of the jth indicator of the i-th assessed area.
[0051]
[0052]
[0053]
[0054] According to formula 8, calculate the information entropy value e and information utility value d, d j =1-e j , where e j is the information entropy value of the jth indicator; d j is the information utility value of the j-th indicator; ln is the natural logarithm.
[0055] Calculate the entropy weight E of the indicator according to formula 9 j .
[0056] This embodiment lays a data foundation for calculating the quantitative comprehensive weights of indicators at all levels by calculating the entropy weight method weights of indicators at all levels.
[0057] Figure 2 This is the second flow chart of the resource allocation method provided by the present invention, such as Figure 2 As shown, the method may also include: Step 310: Determine the quantitative comprehensive weight of the three-level indicators based on the skewness weight and the target weight; Step 320: Determine the secondary indicator scores and the quantitative comprehensive weights of the secondary indicators based on the third-level indicator scores and the quantitative comprehensive weights of the third-level indicators; Step 330: Based on the secondary indicator scores and the quantitative comprehensive weights of the secondary indicators, determine the primary indicator scores and the quantitative comprehensive weights of the primary indicators.
[0058] According to the above process of calculating the skewness weight and target weight of each level of indicators step by step through the skewness method and the entropy weight method, it can be known that the third-level indicator score is obtained by sequentially cleaning the data, screening the indicators and standardizing the third-level indicators, and the quantitative comprehensive weight of the third-level indicators is calculated based on the third-level indicator score; the second-level indicator score is calculated based on the third-level indicator score and the quantitative comprehensive weight of the third-level indicator, and the quantitative comprehensive weight of the second-level indicator is calculated by the entropy weight method and the skewness method for the second-level indicator score; the first-level indicator score is calculated based on the second-level indicator score and the quantitative comprehensive weight of the second-level indicator, and the quantitative comprehensive weight of the first-level indicator is calculated by the entropy weight method and the skewness method for the first-level indicator score. By calculating the scores and quantitative comprehensive weights of indicators at each level step by step, a more standardized and reasonable basis is provided for the final allocation of computing power construction resources.
[0059] This embodiment calculates the scores and quantitative comprehensive weights of indicators at each level step by step, providing a more standardized and reasonable basis for the final allocation of computing power construction resources, thereby improving the balance of resource allocation.
[0060] In one embodiment, the resource allocation method provided in the embodiment of the present application may further include: Step 321: Determine the secondary indicator score of each of the assessed areas based on the score and quantitative comprehensive weight of each of the third-level indicators of each of the assessed areas; Step 322: Determine the skewness weight and target weight of each secondary indicator based on the number of the evaluated areas and the score of each secondary indicator of each evaluated area; Step 323: Determine the quantitative comprehensive weight of the secondary indicator based on the skewness weight and target weight of each secondary indicator.
[0061] The process of calculating the scores of each level of indicators for each assessed area is as follows: The secondary indicator score is calculated according to formula 10, where: is the score of the jth secondary indicator of the ith assessment area; D′ 3j is the quantitative comprehensive weight of the jth third-level indicator; x ij It is the third-level indicator score of the jth indicator of the ith assessed area.
[0062]
[0063]
[0064]
[0065] The first-level indicator score is calculated according to formula 11, where: is the score of the jth primary indicator of the i-th assessed area; D′ 2jis the quantitative comprehensive weight of the j-th secondary indicator.
[0066] The comprehensive score is calculated according to formula 12, where R i Score the comprehensive index of computing power construction resources of the i-th evaluated area; D′ 1j is the quantitative comprehensive weight of the j-th first-level indicator.
[0067] This embodiment calculates the scores of indicators at each level step by step to obtain a comprehensive score for each evaluated area, thereby providing a standardized, reasonable and more balanced allocation plan for computing power construction resource allocation.
[0068] In one embodiment, the resource allocation method provided in the embodiment of the present application may further include: Step 500: Determine the comprehensive score of computing power construction resources of each of the evaluated areas based on the first-level indicator score and the quantitative comprehensive weight of the first-level indicator; Step 600: Allocate computing power construction resources based on the score ratio of each of the evaluated areas; the score ratio is determined based on the comprehensive score of the computing power construction resources.
[0069] The proportion of the comprehensive score of each evaluated area obtained above is used as the reference ratio for the allocation of computing power construction resources, as shown in Formula 13, where ICR i The computing power construction resource allocation ratio of the i-th evaluated area.
[0070]
[0071] This embodiment provides a reference ratio for the allocation of computing power construction resources by using the proportion of the comprehensive score of each evaluated area, and provides a standardized, reasonable and more balanced computing power construction resource allocation plan.
[0072] The resource allocation device provided by the present invention is described below. The resource allocation device described below and the resource allocation method described above can be referenced to each other.
[0073] Please refer to Figure 3 The present invention also provides a resource allocation device, comprising: The third-level indicator score determination module 301 is used to sequentially perform data cleaning, indicator screening and standardization processing on the third-level indicators in the constructed multi-level indicator library of computing power construction resources to obtain the third-level indicator scores; A combined weight determination module 302 is used to determine the skewness weight and target weight of the three-level indicator based on the three-level indicator score; A quantitative comprehensive weight determination module 303 is used to determine the quantitative comprehensive weight of the third-level indicator, the quantitative comprehensive weight of the second-level indicator and the quantitative comprehensive weight of the first-level indicator based on the skewness weight and the target weight; The resource allocation module 304 is used to determine the comprehensive score of computing power construction resources for each evaluated area based on the scores of indicators at each level and the quantitative comprehensive weights of indicators at each level; the comprehensive score of computing power construction resources for each evaluated area is used for computing power construction resource allocation.
[0074] Optionally, the combination weight determination module includes: A deviation coefficient and information entropy value determination unit, used to determine the number of evaluated areas, and based on the number of evaluated areas and the score of each of the three-level indicators of each evaluated area, determine the deviation coefficient and information entropy value of each of the three-level indicators; a standardization processing unit, used to perform the standardization processing on the deviation coefficient to obtain the skewness weight of each of the three-level indicators; A target weight determination unit is used to determine the target weight of each of the three-level indicators based on the information utility value; the information utility value is determined based on the information entropy value.
[0075] Optionally, the deviation coefficient and information entropy value determination unit includes: A data weight matrix construction unit, used to construct a data weight matrix based on the number of the evaluated areas and the score of each of the three-level indicators of each evaluated area; An information entropy value determination unit is used to determine the information entropy value of each of the three-level indicators based on the number of evaluated areas and the proportion of each of the three-level indicators in the data weight matrix.
[0076] Optionally, the quantitative comprehensive weight determination module includes: A quantitative comprehensive weight determination unit for the third-level indicators, used to determine the quantitative comprehensive weight of the third-level indicators based on the skewness weight and the target weight; A quantitative comprehensive weight determination unit for the secondary indicators, used to determine the secondary indicator scores and the quantitative comprehensive weights of the secondary indicators based on the third-level indicator scores and the quantitative comprehensive weights of the third-level indicators; The quantitative comprehensive weight determination unit of the primary indicator is used to determine the primary indicator score and the quantitative comprehensive weight of the primary indicator based on the secondary indicator score and the quantitative comprehensive weight of the secondary indicator.
[0077] Optionally, the quantitative comprehensive weight determination unit of the secondary indicator includes: A secondary indicator score determination unit, used to determine the secondary indicator score of each of the assessed areas based on the score and quantitative comprehensive weight of each of the third-level indicators of each of the assessed areas; A secondary indicator weight determination unit, used to determine the skewness weight and target weight of each secondary indicator based on the number of the evaluated areas and the score of each secondary indicator of each evaluated area; The secondary quantitative comprehensive weight determination unit is used to determine the quantitative comprehensive weight of the secondary indicator based on the skewness weight and target weight of each of the secondary indicators.
[0078] Optionally, the resource allocation method further comprises: A computing power construction resource comprehensive score determination module, used to determine the computing power construction resource comprehensive score of each of the evaluated areas based on the first-level indicator score and the quantitative comprehensive weight of the first-level indicator; The scoring ratio determination module is used to allocate computing power construction resources based on the scoring ratio of each of the evaluated areas; the scoring ratio is determined based on the comprehensive score of the computing power construction resources.
[0079] Figure 4 An example of a physical structure diagram of an electronic device is shown in FIG. Figure 4 As shown, the electronic device may include: a processor 410, a communication interface 420, a memory 430 and a communication bus 440, wherein the processor 410, the communication interface 420 and the memory 430 communicate with each other through the communication bus 440. The processor 410 may call the logic instructions in the memory 430 to execute the resource allocation method, which includes: sequentially performing data cleaning, index screening and standardization on the three-level indicators in the constructed multi-level index library of computing power construction resources to obtain the three-level index score; determining the skewness weight and target weight of the three-level indicator based on the three-level index score; determining the quantitative comprehensive weight of the three-level indicator, the quantitative comprehensive weight of the secondary indicator and the quantitative comprehensive weight of the primary indicator based on the skewness weight and the target weight; determining the comprehensive score of the computing power construction resources of each evaluated area based on the index scores at each level and the quantitative comprehensive weight of the indicators at each level; the comprehensive score of the computing power construction resources of each evaluated area is used for computing power construction resource allocation.
[0080] In addition, the logic instructions in the above-mentioned memory 430 can be implemented in the form of a software functional unit and can be stored in a computer-readable storage medium when it is sold or used as an independent product. Based on such an understanding, the technical solution of the present invention, in essence, or the part that contributes to the prior art or the part of the technical solution, can be embodied in the form of a software product, and the computer software product is stored in a storage medium, including a number of instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) to perform all or part of the steps of the method described in each embodiment of the present invention. The aforementioned storage medium includes: U disk, mobile hard disk, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), disk or optical disk and other media that can store program codes.
[0081] On the other hand, the present invention also provides a computer program product, which includes a computer program. The computer program can be stored on a non-transitory computer-readable storage medium. When the computer program is executed by a processor, the computer can execute the resource allocation method provided by the above methods, which method includes: performing data cleaning, indicator screening and standardization processing on the three-level indicators in the constructed multi-level indicator library of computing power construction resources in turn to obtain the three-level indicator score; determining the skewness weight and target weight of the three-level indicator based on the three-level indicator score; determining the quantitative comprehensive weight of the three-level indicator, the quantitative comprehensive weight of the secondary indicator and the quantitative comprehensive weight of the primary indicator based on the skewness weight and the target weight; determining the comprehensive score of computing power construction resources for each evaluated area based on the indicator scores at each level and the quantitative comprehensive weights of the indicators at each level; the comprehensive score of computing power construction resources for each of the evaluated areas is used for computing power construction resource allocation.
[0082] On the other hand, the present invention also provides a non-transitory computer-readable storage medium having a computer program stored thereon, which, when executed by a processor, is implemented to execute the resource allocation method provided by the above-mentioned methods, the method comprising: performing data cleaning, indicator screening and standardization processing on the three-level indicators in the constructed multi-level indicator library of computing power construction resources in turn to obtain a three-level indicator score; determining the skewness weight and target weight of the three-level indicator based on the three-level indicator score; determining the quantitative comprehensive weight of the three-level indicator, the quantitative comprehensive weight of the secondary indicator and the quantitative comprehensive weight of the primary indicator based on the skewness weight and the target weight; determining the comprehensive score of computing power construction resources for each evaluated area based on the indicator scores at each level and the quantitative comprehensive weights of the indicators at each level; the comprehensive score of computing power construction resources for each of the evaluated areas is used for computing power construction resource allocation.
[0083] The device embodiments described above are merely illustrative, wherein the units described as separate components may or may not be physically separated, and the components displayed as units may or may not be physical units, that is, they may be located in one place, or they may be distributed on multiple network units. Some or all of the modules may be selected according to actual needs to achieve the purpose of the scheme of this embodiment. Ordinary technicians in this field can understand and implement it without paying creative labor.
[0084] Through the description of the above implementation methods, those skilled in the art can clearly understand that each implementation method can be implemented by means of software plus a necessary general hardware platform, and of course, it can also be implemented by hardware. Based on this understanding, the above technical solution is essentially or the part that contributes to the prior art can be embodied in the form of a software product, and the computer software product can be stored in a computer-readable storage medium, such as ROM / RAM, a disk, an optical disk, etc., including a number of instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) to execute the methods described in each embodiment or some parts of the embodiments.
[0085] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.
Claims
1. A resource allocation method, characterized in that: include: The three-level indicators in the constructed multi-level indicator library of computing power construction resources are sequentially cleaned, screened and standardized to obtain the three-level indicator scores; Determine the skewness weight and target weight of the third-level indicator based on the third-level indicator score; Based on the skewness weight and the target weight, determine the quantitative comprehensive weight of the third-level indicator, the quantitative comprehensive weight of the second-level indicator, and the quantitative comprehensive weight of the first-level indicator; Based on the scores of indicators at all levels and the quantitative comprehensive weights of indicators at all levels, the comprehensive score of computing power construction resources for each evaluated area is determined; the comprehensive score of computing power construction resources for each evaluated area is used for computing power construction resource allocation.
2. The resource allocation method according to claim 1, characterized in that: Determining the skewness weight and target weight of the third-level indicator based on the third-level indicator score includes: Determine the number of evaluated areas, and determine the deviation coefficient and information entropy value of each of the three-level indicators based on the number of evaluated areas and the score of each of the three-level indicators of each evaluated area; Performing the standardization process on the deviation coefficient to obtain the skewness weight of each of the three-level indicators; The target weight of each of the three-level indicators is determined based on the information utility value; the information utility value is determined based on the information entropy value.
3. The resource allocation method according to claim 2, characterized in that: Determining the information entropy value of each of the three-level indicators based on the number of the evaluated areas and the score of each of the three-level indicators of each evaluated area includes: Based on the number of evaluated areas and the score of each of the three-level indicators in each evaluated area, a data weight matrix is constructed; based on the number of evaluated areas and the proportion of each of the three-level indicators in the data weight matrix, the information entropy value of each of the three-level indicators is determined.
4. The resource allocation method according to claim 2, characterized in that: The step of determining the quantitative comprehensive weight of the third-level indicator, the quantitative comprehensive weight of the second-level indicator, and the quantitative comprehensive weight of the first-level indicator based on the skewness weight and the target weight includes: Determining the quantitative comprehensive weight of the three-level indicators based on the skewness weight and the target weight; Determine the secondary indicator scores and the quantitative comprehensive weights of the secondary indicators based on the third-level indicator scores and the quantitative comprehensive weights of the third-level indicators; Based on the secondary indicator scores and the quantitative comprehensive weights of the secondary indicators, the primary indicator scores and the quantitative comprehensive weights of the primary indicators are determined.
5. The resource allocation method according to claim 4, characterized in that: The step of determining the secondary indicator scores and the quantitative comprehensive weights of the secondary indicators based on the third-level indicator scores and the quantitative comprehensive weights of the third-level indicators includes: Determine the secondary indicator score of each of the assessed areas based on the score and quantitative comprehensive weight of each of the third-level indicators of each of the assessed areas; Determine the skewness weight and target weight of each secondary indicator based on the number of the assessed areas and the score of each secondary indicator of each assessed area; Based on the skewness weight and target weight of each of the secondary indicators, the quantitative comprehensive weight of the secondary indicators is determined.
6. The resource allocation method according to claim 5, characterized in that: The resource allocation method further comprises: Determine the comprehensive score of computing power construction resources for each of the assessed areas based on the first-level indicator scores and the quantitative comprehensive weights of the first-level indicators; Allocate computing power construction resources based on the score ratio of each of the evaluated areas; The score ratio is determined based on the comprehensive score of the computing power construction resources.
7. A resource allocation device, characterized in that: include: The third-level indicator scoring determination module is used to perform data cleaning, indicator screening and standardization on the third-level indicators in the constructed multi-level indicator library of computing power construction resources in turn to obtain the third-level indicator scores; A combined weight determination module, used to determine the skewness weight and target weight of the three-level indicator based on the three-level indicator score; A quantitative comprehensive weight determination module, used to determine the quantitative comprehensive weight of the third-level indicator, the quantitative comprehensive weight of the second-level indicator and the quantitative comprehensive weight of the first-level indicator based on the skewness weight and the target weight; The resource allocation module is used to determine the comprehensive score of computing power construction resources for each evaluated area based on the scores of indicators at all levels and the quantitative comprehensive weights of indicators at all levels; the comprehensive score of computing power construction resources for each evaluated area is used for computing power construction resource allocation.
8. An electronic device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein: When the processor executes the program, the resource allocation method according to any one of claims 1 to 6 is implemented.
9. A non-transitory computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the resource allocation method according to any one of claims 1 to 6 is implemented.
10. A computer program product, comprising a computer program, characterized in that When the computer program is executed by a processor, the resource allocation method according to any one of claims 1 to 6 is implemented.
Citation Information
Patent Citations
Method for simultaneously determining 19 sun-screening agents in cosmetics
CN108802231A
Fall detection method based on human acceleration multi-feature fusion and KNN
CN109171738A
Distributed data center computing power and energy flow fused comprehensive energy system optimization scheduling method
CN112232984A
Power distribution network comprehensive benefit evaluation method and system
CN115481861A
Dynamic balance computing power scoring system for large-scale camera video monitoring environment
CN117440134A