Intelligent diagnosis system and method for enterprise digital transformation

By comparing the data of transformed enterprises and successfully transformed enterprises, matching factors are generated for abnormality judgment, which solves the problem of low accuracy of digital transformation diagnostic systems in the existing technology and achieves more accurate anomaly detection.

CN118761733APending Publication Date: 2024-10-11ANHUI EASYUNION MANAGEMENT CONSULTING
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410879829.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-02
Publication Date
2024-10-11

AI Technical Summary

Technical Problem

The existing digital transformation diagnostic system is difficult to conduct targeted analysis of each enterprise's digital transformation, resulting in low anomaly detection accuracy.

Method used

By comparing the original type, conversion type, and number of employees of enterprises that are undergoing transformation with those that have successfully undergone digital transformation, matching factor one and matching factor two are generated, which are used to determine whether there are problems in the enterprise that is undergoing transformation, and provide early warning signals. Exception judgment.

Benefits of technology

The accuracy of abnormality judgment is improved, making the abnormality detection in the process of enterprise digital transformation more accurate.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118761733A_ABST
    Figure CN118761733A_ABST
Patent Text Reader

Abstract

The invention discloses an intelligent diagnosis system and method for enterprise digital transformation, relates to the technical field of big data, and solves the technical problem that the existing digital transformation diagnosis system is difficult to carry out targeted analysis on each enterprise during digital transformation, resulting in low anomaly detection accuracy. The central processing module is used for acquiring enterprise data of successfully transformed enterprises; grouping the enterprise data to obtain a plurality of enterprise data groups; generating a transformation curve group corresponding to each enterprise data group according to the enterprise transformation data; generating a matching factor I according to the enterprise data of the enterprise being transformed and the transformation curve group; generating a matching factor 2 according to the transformation data and the basic data in the enterprise data of the enterprise being transformed; generating an early warning signal according to the matching factor I and the matching factor II; performing early warning according to the early warning signal; corresponding comparison enterprises can be selected according to different conditions of different enterprises, so that the abnormality judgment result obtained through comparison is more accurate.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application belongs to the field of big data and relates to big data technology, specifically an intelligent diagnosis system and method for enterprise digital transformation. Background Art

[0002] Enterprise digital transformation refers to the process of achieving enterprise transformation, upgrading and development by changing the business model, operation mode, organizational structure, culture and values ​​of an enterprise through the application of digital technology and innovation. Enterprise digital transformation usually digitizes the business processes in the production and operation process through automation technology and information technology, such as using hardware such as sensors to obtain data in the production process, and using software information technology to integrate production data and business processes, so that operators can intuitively see the full process data of the enterprise and improve production and operation efficiency. Digital transformation aims to make enterprises more agile, efficient and innovative to adapt to the ever-changing market and customer needs, and to improve the business value and competitiveness of enterprises. This transformation may involve various digital technologies, including cloud computing, big data analysis, artificial intelligence, the Internet of Things, blockchain, digital manufacturing, and so on.

[0003] Existing digital transformation diagnostic systems usually compare companies in the process of transformation with similar companies that have completed digital transformation to determine whether there are any abnormalities in the transformation process. Due to differences in the number of employees, business volume, etc. among various companies, differences will arise between companies during digital transformation, which will reduce the accuracy of abnormality judgments in the transformation process.

[0004] Therefore, there is a need for an intelligent diagnosis system and method for enterprise digital transformation. Summary of the invention

[0005] The present application aims to solve at least one of the technical problems existing in the prior art; to this end, the present application proposes an intelligent diagnosis system and method for enterprise digital transformation, which is used to solve the technical problem that the existing digital transformation diagnosis system is difficult to conduct targeted analysis of each enterprise during digital transformation, resulting in low accuracy of anomaly detection. The present application solves the above problem by continuing to compare enterprises that have successfully undergone digital transformation and have the same original type, conversion type, and roughly the same number of employees, to determine whether there are problems with the transforming enterprises.

[0006] To achieve the above-mentioned purpose, the first aspect of the present application provides an intelligent diagnosis system for enterprise digital transformation, including: a data acquisition module, a central processing module, an abnormal warning module and a database;

[0007] Data collection module: used to obtain enterprise data of enterprises undergoing transformation; enterprise data includes basic data, transformation type, original type and transformation data; basic data includes number of employees, total output and total capital flow; transformation data includes record items, project parameters and record time;

[0008] Central processing module: used to obtain enterprise data of several successfully transformed enterprises through a database connected thereto; group the enterprise data based on basic data, transformation type and original type in the enterprise data of the successfully transformed enterprises to obtain several enterprise data groups; generate a transformation curve group based on the transformation data in each enterprise data group; and,

[0009] Generate matching factor 1 based on the enterprise data and the transformation curve group of the enterprise undergoing transformation; generate matching factor 2 based on the transformation data and basic data in the enterprise data of the enterprise undergoing transformation; generate an early warning signal based on matching factor 1 and matching factor 2;

[0010] The abnormal warning module is used to obtain warning signals and issue warnings based on the warning signals.

[0011] This application obtains enterprise data that have successfully completed digital transformation, divides each enterprise according to the conversion type and original type in the enterprise data, and the basic data of each enterprise to obtain several enterprise data groups; generates a transformation curve group corresponding to each enterprise data group according to the enterprise transformation data; obtains enterprise data of enterprises undergoing transformation; generates matching factor one according to the enterprise data and the transformation curve group; generates matching factor two according to the transformation data and the basic data; generates an early warning signal according to matching factor one and matching factor two; continues to compare with enterprises that have successfully completed digital transformation with the same original type, the same conversion type, and roughly the same number of employees as the enterprise undergoing transformation, to determine whether there are problems with the enterprise undergoing transformation; at the same time, compares the various project goals during the conversion with those before the conversion, to determine whether the corresponding enterprise has met the conversion standards; selects corresponding comparison enterprises according to the different situations of different enterprises, and judges the anomalies of the digital transformation of the enterprise; makes the judgment results of the anomalies more accurate.

[0012] Preferably, the enterprise data is grouped based on the basic data, transformation type and original type in the enterprise data to obtain a plurality of enterprise data groups, including:

[0013] The enterprise data with the same transformation type and original type are divided into the same transformation data group to obtain several transformation data groups;

[0014] Extract the basic data in the transformation data group and mark the number of employees as YS, the total output as CL, and the total capital flow as ZJ;

[0015] The comprehensive scoring coefficient ZX of the corresponding enterprise is calculated by the formula ZX=α1×YS / BY+α2×CL / BC+α3×ZJ / BZ; among which α1, α1, α3 and α4 are weight factors, BY is the standard number of employees, BC is the standard total output, and BZ is the standard total capital flow;

[0016] Set a number of intervals; divide the enterprise data into a number of intervals according to their corresponding comprehensive scoring coefficients to obtain a number of enterprise data groups.

[0017] It should be noted that the interval is set by technical experts in this field.

[0018] Preferably, generating the transformation curve group based on the transformation data in each enterprise data group includes:

[0019] Extracting several groups of record items, item parameters and record time in the transformation data; the item parameters are the values ​​of the corresponding record items;

[0020] Fitting the project parameters in the order of recording time to obtain a change curve corresponding to the recorded project;

[0021] Integrate the various change curves within the enterprise data group to generate a transformation curve group.

[0022] Preferably, the recorded items are recorded data corresponding to items for which the difference between corresponding parameters at the beginning of enterprise transformation and at the completion of transformation is greater than a preset difference threshold corresponding to the parameter.

[0023] Preferably, generating the matching factor 1 based on the enterprise data and the transformation curve group includes:

[0024] Match the corresponding enterprise data group according to the transformation type and original type in the enterprise data;

[0025] Extract basic data from enterprise data, calculate corresponding comprehensive scoring coefficients based on the number of employees, total output and total capital flow in the basic data; match corresponding conversion data groups based on the comprehensive scoring coefficients;

[0026] Extracting several groups of recorded items, item parameters and recorded time from the transformation data, fitting the item parameters in the order of recorded time to obtain the corresponding real-time change curve;

[0027] Acquire a number of change curves in the conversion data group that are identical to the recorded item; acquire similarities between the real-time change curve and each of the change curves; and mark the similarity with the largest value among the similarities as the item similarity of the recorded item;

[0028] The project similarity mark corresponding to each record project is obtained as BXi; the matching factor PX1 of the enterprise undergoing transformation is calculated by the formula PX1=∑(βi×BXi); wherein, i is the number of the changed project data, and i=1, 2,…, n, n is the total number of changed projects; βi is the weight coefficient corresponding to the changed project data numbered i.

[0029] Preferably, generating the second matching factor based on the transformation data and basic data in the enterprise data includes:

[0030] Extract several target projects and their corresponding target project data from the transformation data, as well as the original project data corresponding to the target projects from the basic data; input the target project data and their corresponding original project data into the satisfaction scoring model to obtain the satisfaction score corresponding to the target project, and mark it as MPj; the satisfaction scoring model is obtained through artificial intelligence model training;

[0031] The matching factor PX2 of the enterprise undergoing transformation is calculated by the formula PX2=∑(γj×MPj), where j is the number of the target project, and j=1, 2,…, m, where m is the total number of target projects; γj is the weight coefficient corresponding to the target project data numbered j.

[0032] Preferably, the satisfaction rating model is obtained by training an artificial intelligence model, including:

[0033] Obtaining a number of target project data and their corresponding original project data, as well as corresponding satisfaction scores through a database; the satisfaction score is an average value of scores given by multiple experts to the target project data based on the original project data;

[0034] Integrate several groups of target project data, original project data and satisfaction scores into several groups of training data and test data;

[0035] The artificial intelligence model is trained using training data, and is tested using test data, ultimately obtaining a satisfaction rating model whose input is the target project data and the original project data, and whose output is a satisfaction rating; wherein the artificial intelligence model includes a BP neural network model or an RBF neural network model.

[0036] Preferably, generating the warning signal according to the matching factor 1 and the matching factor 2 includes:

[0037] Get matching factor one and matching factor two;

[0038] Determine whether the matching factor one is greater than the matching factor threshold one;

[0039] If yes, a digital abnormal signal is generated;

[0040] No, when matching factor two is greater than matching factor threshold two, an effect abnormality signal is generated; the warning signal includes a digital abnormality signal and an effect abnormality signal; matching factor threshold one and matching factor threshold two are both set based on experience; the digital abnormality signal is an abnormality that occurs during the digital transformation of the enterprise; the effect abnormality signal is the effect achieved by the enterprise's digitalization, which fails to achieve the expected conversion effect.

[0041] A second aspect of the present application provides an intelligent diagnosis method for enterprise digital transformation, comprising the following steps:

[0042] Step 1: Obtain enterprise data of several successfully transformed enterprises; the enterprise data includes basic data, transformation type, original type and transformation data;

[0043] Step 2: Grouping the enterprise data according to the basic data, transformation type and original type in the enterprise data to obtain a number of enterprise data groups;

[0044] Step 3: Generate a transformation curve group corresponding to each enterprise data group based on the transformation data;

[0045] Step 4: Obtain enterprise data of enterprises undergoing transformation;

[0046] Step 5: Generate matching factor 1 according to the enterprise data and the transformation curve group;

[0047] Step 6: Generate matching factor 2 according to the transformation data and basic data in the enterprise data;

[0048] Step 7: Generate a warning signal based on matching factor 1 and matching factor 2; and issue a warning based on the warning signal.

[0049] Compared with the prior art, the beneficial effects of this application are:

[0050] 1. This application determines whether problems occur in the transforming enterprise by continuing to compare it with the enterprises that have successfully undergone digital transformation and have the same original type and conversion type as the transforming enterprise, and have roughly the same number of employees, etc.; at the same time, it compares the various project goals during the conversion with those before the conversion to determine whether the corresponding enterprise has met the transformation standards; it selects corresponding comparison enterprises according to the different situations of different enterprises, and judges the anomalies in the digital transformation of the enterprise; so that the judgment results of the anomalies are more accurate. BRIEF DESCRIPTION OF THE DRAWINGS

[0051] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0052] Figure 1 This is a schematic diagram of the principle of this application;

[0053] Figure 2 This is a step diagram of the application method. DETAILED DESCRIPTION

[0054] The technical solution of the present application will be described clearly and completely below in conjunction with the embodiments. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in the field without creative work are within the scope of protection of the present application.

[0055] See also Figure 1-Figure 2 , the first aspect of the present application provides an intelligent diagnosis system and method for enterprise digital transformation, including: a data acquisition module, a central processing module, an abnormal warning module and a database;

[0056] Data collection module: obtain enterprise data of enterprises undergoing transformation through the Internet or the enterprise's own information database; among them, enterprise data includes basic data, transformation type, original type and transformation data; basic data refers to various historical data before the enterprise's transformation, including the number of employees, total output, total capital flow, and original project data; total output and total capital flow are the total values ​​of the corresponding data within a set time period; transformation type refers to the type of digital transformation of the corresponding enterprise, including data digitization, automatic digitization and management digitization; original type refers to the original type of the corresponding enterprise before digital transformation; conversion data of the transforming enterprise refers to the corresponding data collected in real time during the conversion process, including record items, project parameters, record time, target items and target project data; record items include at least one or more of personnel enthusiasm, total work efficiency, personnel turnover, customer changes, total customer quality, capital flow, total product output and total profit.

[0057] Central processing module: used to obtain enterprise data of several successfully transformed enterprises through a database connected thereto; group the enterprise data based on basic data, transformation type and original type in the enterprise data of the successfully transformed enterprises to obtain several enterprise data groups; generate a transformation curve group based on the transformation data in each enterprise data group; and,

[0058] Generate matching factor 1 based on the enterprise data and the transformation curve group of the enterprise undergoing transformation; generate matching factor 2 based on the transformation data and basic data in the enterprise data of the enterprise undergoing transformation; generate an early warning signal based on matching factor 1 and matching factor 2;

[0059] Abnormal warning module: obtain warning signals and issue warnings based on the warning signals.

[0060] This application obtains enterprise data that have successfully completed digital transformation, divides each enterprise according to the conversion type and original type in the enterprise data, and the basic data of each enterprise to obtain several enterprise data groups; generates a transformation curve group corresponding to each enterprise data group according to the enterprise transformation data; obtains enterprise data of enterprises undergoing transformation; generates matching factor one according to the enterprise data and the transformation curve group; generates matching factor two according to the transformation data and the basic data; generates an early warning signal according to matching factor one and matching factor two; continues to compare with enterprises that have successfully completed digital transformation with the same original type, the same conversion type, and roughly the same number of employees as the enterprise undergoing transformation, to determine whether there are problems with the enterprise undergoing transformation; at the same time, compares the various project goals during the conversion with those before the conversion, to determine whether the corresponding enterprise has met the conversion standards; selects corresponding comparison enterprises according to the different situations of different enterprises, and judges the anomalies of the digital transformation of the enterprise; makes the judgment results of the anomalies more accurate.

[0061] The enterprise data is grouped based on the basic data, transformation type and original type in the enterprise data to obtain a plurality of enterprise data groups, including:

[0062] The enterprise data with the same transformation type and original type are divided into the same transformation data group to obtain several transformation data groups;

[0063] Extract the basic data in the transformation data group and mark the number of employees as YS, the total output as CL, and the total capital flow as ZJ;

[0064] The comprehensive scoring coefficient ZX of the corresponding enterprise is calculated by the formula ZX=α1×YS / BY+α2×CL / BC+α3×ZJ / BZ; among them, α1, α1, α3 and α4 are weight factors, BY is the standard number of employees, BC is the standard total output, and BZ is the standard total capital flow; the weight factors, standard number of employees, standard total output and standard total capital flow are all set according to experience;

[0065] The above formula integrates the number of employees, total output and total capital flow into a comprehensive scoring coefficient. When the number of employees of the corresponding enterprise is smaller, the corresponding comprehensive score is smaller; when the total output is lower, the corresponding comprehensive score is smaller; when the total capital flow is lower, the corresponding comprehensive score is smaller;

[0066] Set a number of intervals; divide the enterprise data into a number of intervals according to their corresponding comprehensive scoring coefficients to obtain a number of enterprise data groups; in this embodiment, each enterprise is divided according to the comprehensive scoring coefficient to obtain 5 enterprise data groups; specifically, the largest comprehensive scoring coefficient and the smallest comprehensive scoring coefficient are obtained, and the comprehensive scoring coefficient between the largest comprehensive scoring coefficient and the smallest comprehensive scoring coefficient is equally divided into 5 intervals; the enterprise data in each interval is integrated into a data group, and the data groups corresponding to each area from small to large are micro-enterprises, small enterprises, medium-sized enterprises, large enterprises and super-large enterprises respectively; it can be understood that the more intervals are divided, the more detailed the division of enterprises will be, which will make the comparison enterprises corresponding to the transforming enterprises more similar to the transforming enterprises, making the analysis results more accurate.

[0067] This application classifies enterprises of the same original type and the same transformation type into the same transformation data group, and then divides the enterprises in the same transformation data group into several enterprise data groups based on the basic data of each enterprise, so as to facilitate finding enterprises corresponding to the enterprises undergoing transformation, and make the analysis results more accurate when conducting analysis on the enterprises undergoing transformation.

[0068] The transformation curve group is generated based on the transformation data in each enterprise data group, including: extracting several groups of record items, project parameters and recording time in the transformation data; the project parameters are the numerical values ​​of the corresponding record items; the record items corresponding to each enterprise include at least one or more of personnel enthusiasm, total work efficiency, personnel turnover, customer change, total customer quality, capital flow, total product output and total profit; for enterprises that undergo automatic digital transformation, the total work efficiency will be greatly improved after successful transformation; the corresponding enterprise change item is the total work efficiency, and the corresponding change item data is the total work efficiency data.

[0069] The project parameters are fitted in the order of recording time to obtain the change curve corresponding to the recorded project; the recording time includes the time within a set time period from the start of the transformation to the completion of the transformation; and each change curve in the enterprise data group is integrated to generate a transformation curve group.

[0070] The recorded items are recorded data corresponding to items whose difference between corresponding parameters at the beginning of enterprise transformation and at the completion of transformation is greater than the preset difference threshold corresponding to the parameters.

[0071] This application fits the record parameters of the record items corresponding to each enterprise into a transformation curve, so that the change trends corresponding to the important items of each enterprise during the transformation process can be intuitively displayed through the curve.

[0072] Generating the matching factor one based on the enterprise data and the transformation curve group includes: matching the corresponding enterprise data group according to the transformation type and the original type in the enterprise data;

[0073] Extract basic data from enterprise data, calculate corresponding comprehensive scoring coefficients based on the number of employees, total output and total capital flow in the basic data; match corresponding conversion data groups based on the comprehensive scoring coefficients;

[0074] Extracting several groups of recorded items, item parameters and recorded time from the transformation data, fitting the item parameters in the order of recorded time to obtain the corresponding real-time change curve;

[0075] Acquire several change curves identical to the recorded item in the conversion data group; acquire the similarity between the real-time change curve and each of the change curves; mark the similarity with the largest value in the similarity as the item similarity of the recorded item; the similarity between the real-time change curve and each of the change curves may be acquired by using methods such as Euclidean distance, Pearson correlation coefficient and dynamic time warping; mark the similarity with the largest value in the display degree as the similarity of the corresponding change data item;

[0076] The project similarity corresponding to each record item is obtained and marked as BXi; the matching factor PX1 of the enterprise undergoing transformation is calculated by the formula PX1=∑(βi×BXi); wherein, i is the number of the change project data, and i=1, 2,…, n, n is the total number of change projects; βi is the weight coefficient corresponding to the change project data numbered i; according to the experience setting, the more important the change project data corresponding to the similarity is, the greater the corresponding weight value is.

[0077] In this embodiment, the above formula is used to perform weighted summation of the similarities between the change curves corresponding to each record item of the enterprise undergoing transformation and the change curves corresponding to the enterprises that have successfully transformed to obtain a matching factor of one. The larger the matching factor of one, the higher the similarity between the change curves corresponding to the enterprise undergoing transformation and the change curves corresponding to the enterprises that have successfully transformed. It also indicates that there is no abnormality in the change trend of each change parameter of the enterprise undergoing transformation, or the abnormality is relatively subtle; otherwise, it indicates that the enterprise undergoing transformation has an abnormality in its transformation.

[0078] The second matching factor is generated based on the transformation data and basic data in the enterprise data, including:

[0079] Extract several target projects and their corresponding target project data from the transformation data. The target project is the purpose of digital transformation, corresponding to the transformation type. For example, if the transformation type is automatic digitalization and its purpose is to improve production efficiency, then its corresponding target project is total work efficiency, and the target project data is total work efficiency data; extract the original project data corresponding to the target project from the basic data; input each target project data and the original project data into the satisfaction scoring model to obtain the satisfaction score corresponding to the target project, and mark it as MPj; the satisfaction scoring model is obtained through artificial intelligence model training;

[0080] The matching factor PX2 of the enterprise undergoing transformation is calculated by the formula PX2=∑(γj×MPj), where j is the number of the target project, and j=1, 2,…, m, m is the total number of target projects; γj is the weight coefficient corresponding to the target project data numbered j; it is set based on experience.

[0081] In this embodiment, the satisfaction scores of each target project are weighted and summed up through the above formula to obtain matching factor 2; the larger the matching factor 2, the higher the satisfaction of the corresponding enterprise's transformation process; the smaller the matching factor 2, the lower the satisfaction of the corresponding enterprise's transformation process, which may be due to anomalies in the transformation process. The data before the enterprise's transformation is matched to make the subsequent anomaly analysis results more accurate.

[0082] The satisfaction rating model is obtained through artificial intelligence model training, including:

[0083] Obtaining a number of target project data and their corresponding original project data, as well as corresponding satisfaction scores through a database; the satisfaction score is the average value of scores given by multiple experts to the target project data based on the original project data;

[0084] Integrate several groups of target project data, original project data and satisfaction scores into several groups of training data and test data; a group of training data or a group of test data includes a group of target project data, original project data and satisfaction scores; a group of target project data, original project data and satisfaction scores includes the target project data and the original project data of the same target project, and the corresponding satisfaction scores;

[0085] The artificial intelligence model is trained using the training data, and the trained artificial intelligence model is tested using the test data; specifically, the artificial intelligence model is trained using the training data, the target project data and the original project data in the test data are extracted, and the trained artificial intelligence model is input to obtain an output satisfaction score, and it is determined whether the difference between the satisfaction score and the corresponding satisfaction score in the test data is less than a difference threshold; if yes, the next set of test data is tested; if not, the relevant parameters of the artificial intelligence are adjusted, and the test data of this set is continued to be tested until the relevant requirements are met; finally, a satisfaction score model is obtained with the target project data and the original project data as input and the satisfaction score as output; wherein the artificial intelligence model includes a BP neural network model or an RBF neural network model.

[0086] Generate early warning signals based on matching factor 1 and matching factor 2, including:

[0087] Get matching factor one and matching factor two;

[0088] Determine whether the matching factor one is greater than the matching factor threshold one;

[0089] If yes, a digital abnormal signal is generated;

[0090] No, when matching factor two is greater than matching factor threshold two, an effect abnormality signal is generated; the early warning signal includes a digital abnormality signal and an effect abnormality signal; matching factor threshold one and matching factor threshold two are both set based on experience; the digital abnormality signal is an abnormality that occurs during the digital transformation of the enterprise; the effect abnormality signal is the effect achieved by the enterprise's digitalization, which fails to achieve the expected conversion effect.

[0091] This embodiment determines whether matching factor one exceeds matching factor threshold one, that is, determines whether there is an abnormality in the digitalization process of the enterprise; if an abnormality occurs, a digital abnormality signal is generated; if an abnormality occurs, it determines whether matching factor two is greater than matching factor threshold two, that is, determines whether the digitalization process of the enterprise meets the corresponding standards; if an abnormality occurs, an effect abnormality signal is generated; and reminds relevant personnel to perform relevant operations; it can be understood that the process can be the process of completing the end of digital transformation, or the process of each stage in the digital transformation process.

[0092] A second aspect of the present application provides an intelligent diagnosis method for enterprise digital transformation, comprising the following steps:

[0093] Step 1: Obtain enterprise data of several successfully transformed enterprises; the enterprise data includes basic data, transformation type, original type and transformation data;

[0094] Step 2: Grouping the enterprise data according to the basic data, transformation type and original type in the enterprise data to obtain a number of enterprise data groups;

[0095] Step 3: Generate a transformation curve group corresponding to each enterprise data group based on the transformation data;

[0096] Step 4: Obtain enterprise data of enterprises undergoing transformation;

[0097] Step 5: Generate matching factor 1 according to the enterprise data and the transformation curve group;

[0098] Step 6: Generate matching factor 2 according to the transformation data and basic data in the enterprise data;

[0099] Step 7: Generate a warning signal based on matching factor 1 and matching factor 2; and issue a warning based on the warning signal.

[0100] Part of the data in the above formula is calculated by removing the dimension and taking its numerical value. The formula is a formula closest to the actual situation obtained by software simulation of a large amount of collected data; the preset parameters and preset thresholds in the formula are set by technical personnel in this field according to actual conditions or obtained through simulation of a large amount of data.

[0101] How this application works:

[0102] The present application obtains enterprise data of several successfully transformed enterprises; groups the enterprise data according to basic data, transformation type and original type in the enterprise data to obtain several enterprise data groups; generates transformation curve groups corresponding to each enterprise data group according to the transformation data; obtains enterprise data of enterprises undergoing transformation; generates matching factor one according to the enterprise data and the transformation curve group; generates matching factor two according to the transformation data and basic data in the enterprise data; generates early warning signals according to matching factor one and matching factor two; and issues early warnings according to the early warning signals; determines whether problems occur in the transforming enterprise by comparing it with similar successfully transformed enterprises undergoing transformation; at the same time, compares the various project goals during the transformation with those before the transformation to determine whether the corresponding enterprise meets the transformation standards; selects corresponding comparison enterprises according to the different situations of different enterprises, and determines the anomalies of the digital transformation of the enterprise; and makes the determination results of the anomalies more accurate.

[0103] The above embodiments are only used to illustrate the technical method of the present application and are not intended to limit it. Although the present application has been described in detail with reference to the preferred embodiments, a person of ordinary skill in the art should understand that the technical method of the present application may be modified or replaced by equivalents without departing from the spirit and scope of the technical method of the present application.

Claims

1. An intelligent diagnosis system for enterprise digital transformation, comprising: Data acquisition module, central processing module, abnormal warning module and database; characterized in that, Data collection module: used to obtain enterprise data of enterprises undergoing transformation; enterprise data includes basic data, transformation type, original type and transformation data; basic data includes number of employees, total output and total capital flow; transformation data includes recording items, project parameters and recording time; recording items include at least one or more of staff enthusiasm, total work efficiency, staff turnover, customer change, total customer quality, capital flow, total product output and total profit; Central processing module: used to obtain enterprise data of several successfully transformed enterprises through a database connected thereto; group the enterprise data based on basic data, transformation type and original type in the enterprise data of the successfully transformed enterprises to obtain several enterprise data groups; generate a transformation curve group based on the transformation data in each enterprise data group; and, A matching factor one is generated based on the enterprise data and the transformation curve group of the enterprise undergoing transformation; a matching factor two is generated based on the transformation data and basic data in the enterprise data of the enterprise undergoing transformation; and a warning signal is generated based on the matching factor one and the matching factor two.

2. The intelligent diagnosis system for enterprise digital transformation according to claim 1, characterized in that: The enterprise data is grouped based on the basic data, transformation type and original type in the enterprise data to obtain a plurality of enterprise data groups, including: The enterprise data with the same transformation type and original type are divided into the same transformation data group to obtain several transformation data groups; Extract the basic data in the transformation data group and mark the number of employees as YS, the total output as CL, and the total capital flow as ZJ; The comprehensive scoring coefficient ZX of the corresponding enterprise is calculated by the formula ZX=α1×YS / BY+α2×CL / BC+α3×ZJ / BZ; among which α1, α1, α3 and α4 are weight factors, BY is the standard number of employees, BC is the standard total output, and BZ is the standard total capital flow; Set a number of intervals; divide the enterprise data into a number of intervals according to their corresponding comprehensive scoring coefficients to obtain a number of enterprise data groups.

3. The intelligent diagnosis system for enterprise digital transformation according to claim 2 is characterized in that: Generating the transformation curve group based on the transformation data in each enterprise data group includes: Extracting several groups of record items, item parameters and record time in the transformation data; the item parameters are the values ​​of the corresponding record items; Fitting the project parameters in the order of recording time to obtain a change curve corresponding to the recorded project; Integrate the various change curves within the enterprise data group to generate a transformation curve group.

4. The intelligent diagnosis system for enterprise digital transformation according to claim 3 is characterized in that: The recorded items are recorded data corresponding to items for which the difference between corresponding parameters at the beginning of enterprise transformation and at the completion of transformation is greater than the preset difference threshold corresponding to the parameters.

5. The intelligent diagnosis system for enterprise digital transformation according to claim 4 is characterized in that: The matching factor 1 is generated based on the enterprise data and the transformation curve group, including: Match the corresponding enterprise data group according to the transformation type and original type in the enterprise data; Extract basic data from enterprise data, calculate corresponding comprehensive scoring coefficients based on the number of employees, total output and total capital flow in the basic data; match corresponding conversion data groups based on the comprehensive scoring coefficients; Extracting several groups of recorded items, item parameters and recorded time from the transformation data, fitting the item parameters in the order of recorded time to obtain the corresponding real-time change curve; Acquire a number of change curves in the conversion data group that are identical to the recorded item; acquire similarities between the real-time change curve and each of the change curves; and mark the similarity with the largest value among the similarities as the item similarity of the recorded item; The project similarity mark corresponding to each record project is obtained as BXi; the matching factor PX1 of the enterprise undergoing transformation is calculated by the formula PX1=∑(βi×BXi); wherein, i is the number of the changed project data, and i=1, 2,…, n, n is the total number of changed projects; βi is the weight coefficient corresponding to the changed project data numbered i.

6. The intelligent diagnosis system for enterprise digital transformation according to claim 4, characterized in that: The second matching factor is generated based on the transformation data and basic data in the enterprise data, including: Extract several target projects and their corresponding target project data from the transformation data, as well as the original project data corresponding to the target projects from the basic data; input the target project data and their corresponding original project data into the satisfaction scoring model to obtain the satisfaction score corresponding to the target project, and mark it as MPj; the satisfaction scoring model is obtained through artificial intelligence model training; The matching factor PX2 of the enterprise undergoing transformation is calculated by the formula PX2=∑(γj×MPj), where j is the number of the target project, and j=1, 2,…, m, where m is the total number of target projects; γj is the weight coefficient corresponding to the target project data numbered j.

7. The intelligent diagnosis system for enterprise digital transformation according to claim 6 is characterized in that: The satisfaction rating model is obtained through artificial intelligence model training, including: Obtaining a number of target project data and their corresponding original project data, as well as corresponding satisfaction scores through a database; the satisfaction score is an average value of scores given by multiple experts to the target project data based on the original project data; Integrate several groups of target project data, original project data and satisfaction scores into several groups of training data and test data; The artificial intelligence model is trained using training data, and is tested using test data, ultimately obtaining a satisfaction rating model whose input is the target project data and the original project data, and whose output is a satisfaction rating; wherein the artificial intelligence model includes a BP neural network model or an RBF neural network model.

8. The intelligent diagnosis system for enterprise digital transformation according to claim 1 is characterized in that: Generating the warning signal according to the matching factor 1 and the matching factor 2 includes: Get matching factor one and matching factor two; Determine whether the matching factor one is greater than the matching factor threshold one; If yes, a digital abnormal signal is generated; If not, when the matching factor 2 is greater than the matching factor threshold 2, an abnormal effect signal is generated; the warning signal includes a digitization abnormal signal and an abnormal effect signal.

9. An intelligent diagnosis method for enterprise digital transformation, based on the operation of any one of claims 1 to 8 of the intelligent diagnosis system for enterprise digital transformation, characterized in that: The following steps are involved: Step 1: Obtain enterprise data of several successfully transformed enterprises; the enterprise data includes basic data, transformation type, original type and transformation data; Step 2: Grouping the enterprise data according to the basic data, transformation type and original type in the enterprise data to obtain a number of enterprise data groups; Step 3: Generate a transformation curve group corresponding to each enterprise data group based on the transformation data; Step 4: Obtain enterprise data of enterprises undergoing transformation; Step 5: Generate matching factor 1 according to the enterprise data and the transformation curve group; Step 6: Generate matching factor 2 according to the transformation data and basic data in the enterprise data; Step 7: Generate a warning signal based on matching factor 1 and matching factor 2; and issue a warning based on the warning signal.