Power distribution network operation optimization method based on FID
By building the power supply and load network topology in the distribution network, combining power generation and load prediction, and using FID equipment to optimize the power distribution plan, the problems of high grid loss and low efficiency caused by distributed power supply access are solved, and a more efficient power grid is achieved. run.
Patent Information
- Application Number
- CN202410886785.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-03
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2044-07-03
AI Technical Summary
Due to the large-scale access of distributed power sources and the low level of distribution network automation, problems such as large power grid losses and low operating efficiency have resulted.
Build a regional power supply network topology by collecting power supply characteristic data in the target area, cluster load points based on load characteristics to build a load network topology, combine power generation prediction and load prediction, and use FID equipment to build a power distribution optimization model to minimize grid losses. The goal is to optimize the power distribution plan and achieve optimal control of the distribution network.
It improves the scientificity and rationality of the power distribution plan, reduces power grid losses, and improves power distribution operation efficiency.
Smart Images

Figure CN118763722A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of power systems, and in particular to a distribution network operation optimization method based on FID. Background Art
[0002] With the development of science and technology, the distribution network is undergoing a digital transformation process, including the application of Internet of Things technology, big data analysis, and the integration of artificial intelligence technology to improve the operation efficiency and management level of the distribution network. With the rapid development of distributed renewable energy (such as solar energy, wind energy) and new energy vehicles, the role of the distribution network has changed from a simple power distribution network to a multi-energy complementary configuration platform. This requires the distribution network to effectively integrate and manage these distributed resources to achieve more efficient and sustainable energy use. The new power system requires the distribution network to have higher flexibility and reliability to adapt to the changing energy demand and supply mode. At present, the large-scale access of distributed power sources brings more uncertainty and randomness to the distribution system, especially distributed power sources based on renewable energy, such as solar energy and wind energy, which are greatly affected by weather conditions and have strong randomness, affecting the voltage stability and frequency stability of the power grid.
[0003] In summary, the existing technology has technical problems such as large grid losses and low operating efficiency due to large-scale access of distributed power sources and low level of automation in distribution networks. Summary of the invention
[0004] The purpose of this application is to provide a distribution network operation optimization method based on FID to solve the technical problems in the prior art that large power grid losses and low operating efficiency are caused by large-scale access of distributed power sources and low level of distribution network automation.
[0005] In view of the above problems, the present application provides a distribution network operation optimization method based on FID, wherein the distribution network operation optimization method based on FID includes: collecting power supply characteristic data of the target area and building a regional power supply network topology; clustering multiple load points in the target area based on load characteristics to obtain multiple load sub-areas, and building a regional load network topology according to the multiple load sub-areas; based on the regional power supply network topology, predicting new energy power generation within a predetermined window through a power generation prediction channel to obtain multiple predicted powers; based on the regional load network topology, predicting the load within a preset window through load monitoring data and a load database, and determining multiple predicted loads; using FID equipment, the regional power supply network topology and the regional load network topology to integrate and construct a distribution optimization model, in the distribution optimization model, minimizing power grid loss is used as the optimization index, and the distribution scheme is optimized according to the multiple predicted powers and the multiple predicted loads, and the optimal distribution scheme is output; through the FID equipment, distribution optimization control within the predetermined window is performed according to the optimal distribution scheme.
[0006] One or more technical solutions provided in this application have at least the following technical effects or advantages:
[0007] By collecting the power supply characteristic data of the target area, a regional power supply network topology is constructed; based on the load characteristics, multiple load points in the target area are clustered to obtain multiple load sub-areas, and a regional load network topology is constructed according to the multiple load sub-areas; based on the regional power supply network topology, a new energy power generation prediction within a predetermined window is performed through the power generation prediction channel to obtain multiple predicted powers; based on the regional load network topology, a load prediction within a preset window is performed through load monitoring data and a load database to determine multiple predicted loads; a distribution optimization model is constructed by integrating the FID device, the regional power supply network topology and the regional load network topology, and in the distribution optimization model, the power distribution scheme is optimized according to the multiple predicted powers and the multiple predicted loads with minimizing the power grid loss as the optimization index, and the optimal distribution scheme is output; through the FID device, the power distribution optimization control within the predetermined window is performed according to the optimal distribution scheme. In other words, by accurately matching the regional power load and the new energy power generation status, the scientificity and rationality of the regional distribution scheme setting can be improved, thereby achieving the technical effect of reducing the regional power grid loss and improving the distribution operation efficiency.
[0008] The above description is only an overview of the technical solution of the present application. In order to more clearly understand the technical means of the present application, it can be implemented according to the contents of the specification, and in order to make the above and other purposes, features and advantages of the present application more obvious and easy to understand, the specific implementation methods of the present application are specifically cited below. It should be understood that the content described in this section is not intended to identify the key or important features of the embodiments of the present application, nor is it intended to limit the scope of the present application. Other features of the present application will become easy to understand through the following description. BRIEF DESCRIPTION OF THE DRAWINGS
[0009] In order to more clearly illustrate the technical solutions in the present application or the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings in the following description are only exemplary, and for ordinary technicians in this field, other drawings can be obtained based on the provided drawings without paying any creative work.
[0010] Figure 1 A flow chart of a method for optimizing distribution network operation based on FID is provided for this application;
[0011] Figure 2 A schematic diagram of a flow chart of determining multiple predicted loads in a distribution network operation optimization method based on FID in the present application. DETAILED DESCRIPTION
[0012] This application provides a distribution network operation optimization method based on FID, which solves the technical problems in the prior art that large power grid losses and low operating efficiency are caused by large-scale access of distributed power sources and low level of distribution network automation. By accurately matching regional power loads and new energy power generation status, the scientificity and rationality of regional power distribution plan settings can be improved, thereby achieving the technical effect of reducing regional power grid losses and improving distribution operation efficiency.
[0013] Below, the technical solutions in the present application will be clearly and completely described with reference to the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present application, rather than all of the embodiments of the present application. It should be understood that the present application is not limited to the example embodiments described herein. Based on the embodiments of the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present application. It should also be noted that, for the convenience of description, only the parts related to the present application are shown in the accompanying drawings, rather than all of them.
[0014] For examples, please see the attached Figure 1 The present application provides a distribution network operation optimization method based on FID, wherein the distribution network operation optimization method based on FID specifically includes the following steps:
[0015] Step 1: Collect power supply characteristic data of the target area and build the regional power supply network topology.
[0016] Specifically, the power supply characteristic data in the target area is collected, such as power supply equipment, equipment location coordinates and distribution line characteristics. Power supply equipment refers to all power supply points in the area, including traditional thermal power plants and new energy power generation equipment, such as wind power generation and solar power generation equipment. Equipment location coordinates record the exact location of these power supply equipment in physical space. Distribution line characteristics are a key part of the power supply characteristic data, including the resistivity, cross-sectional area and length of the line. The resistivity is calculated based on parameters such as the material and cross-sectional area of the line, which determines the loss of electric energy during transmission. The cross-sectional area and length of the line affect the transmission capacity of the line. A larger cross-sectional area and a shorter length help reduce energy loss and improve transmission efficiency. With power supply equipment as graph nodes and distribution lines as graph edges, the position of the node in the topology is determined according to the equipment location coordinates, and an intuitive regional power supply network topology is generated. By building an accurate power supply network topology, we can better understand the operating status of the power grid.
[0017] Step 2: Cluster multiple load points in the target area based on load characteristics to obtain multiple load sub-areas, and construct a regional load network topology based on the multiple load sub-areas.
[0018] Specifically, the load characteristics of each load point in the target area are collected, including load access point, load size, load type (such as residential, commercial, industrial), load usage pattern (such as daytime peak, nighttime low peak), load volatility (such as seasonal changes, sudden peak) and load continuity. Clustering algorithms, such as K-means algorithm, are used to analyze the collected load characteristic data, cluster similar load points together, and generate multiple load sub-areas. After clustering, the load points in each sub-area have similar power consumption characteristics. For example, in an urban area, the characteristics of load points in residential areas, commercial areas and industrial areas can be analyzed to classify them into different load sub-areas, such as dividing factories with peak power consumption during the day into one sub-area and dividing residential areas with peak power consumption at night into another sub-area. Then, the load network topology is constructed based on the load sub-areas, and each load sub-area is regarded as a node, and the power lines connecting these nodes are used as edges. Using graph computing methods, a regional load network topology map is constructed based on the geographical location information of the load points. This topology map shows the connection relationship between different load sub-areas and how they interact with the power grid. Through cluster analysis, the load demand of each load sub-area can be predicted more accurately, thereby improving the accuracy of load forecasting.
[0019] Step 3: Based on the regional power supply network topology, a new energy power generation forecast is performed within a predetermined window through a power generation forecast channel to obtain multiple predicted powers.
[0020] Specifically, the attribute information of each device in the regional power supply network topology is collected, a device is randomly selected, and homologous information is retrieved in the power big data to obtain a sample data set. The sample data set is divided into N equal parts, and the method of sampling with replacement is adopted to select N data each time to generate the first training set. This process is repeated N times to obtain N different training sets. The BP neural network is supervised and trained using the N training sets, using the sample power generation factor set as input and the sample power generation power as the supervisory signal. Cross-validation is performed to ensure the generalization ability of the model, and N converged power generation prediction units are obtained. Based on the N converged power generation prediction units, the first power generation prediction model is built in parallel, and the average value of the output results of the N prediction units is output to reduce the prediction error. A mapping relationship between the first power supply device and the first power generation prediction model is established, and a power generation prediction channel is constructed using the mapping relationship according to the classification decision principle. The power generation prediction channel includes multiple power generation prediction units, which correspond to the new energy power supply devices one by one. Each new energy power supply device has a corresponding power generation prediction unit, which is predicted according to the attributes of the device (such as type, specification, working principle, etc.). Through these prediction units, the expected power generation of each new energy power supply device in the future period can be obtained. Based on these forecasts, multiple predicted power values can be obtained. These predicted power values represent the electric power that each renewable energy power generation device is expected to generate in the future. Since there may be multiple renewable energy power generation devices in the power grid, multiple predicted power values will be obtained. By knowing the expected power of renewable energy power generation in advance, power grid operators can better respond to load changes.
[0021] Step 4: Based on the regional load network topology, load forecasting within a preset window is performed through load monitoring data and a load database to determine multiple forecast loads.
[0022] Specifically, in the regional load network topology, the first load sub-area is randomly selected, and the load database is called with the preset window and the first load sub-area as constraints. The historical starting point load set and the historical load set are retrieved, and the mean and deviation calculations are performed. According to the predetermined deviation threshold, the unreliable data greater than the threshold is eliminated, and the remaining data is used as sample data, namely the sample starting point load set and the sample load set. The weights are gradually reduced according to the time series feature configuration. As time goes by, the contribution of the sample load data to the load prediction at the current moment gradually decreases. The sample starting point load set and the sample load set are weighted fused to obtain the standard starting point load and the standard load.
[0023] The load prediction within the preset window is performed through load monitoring data and load database. Load monitoring data refers to the real-time monitored power grid load data, while the load database contains historical and real-time load data, which reflect the power demand of the load sub-area at different time points. By combining these data, the load demand in the future period can be predicted. In order to improve the accuracy of load prediction, the first real-time starting load of the first load sub-area is obtained by a non-invasive power load monitoring method, and then the first starting load deviation between the first real-time starting load and the standard starting load is calculated, and the first fluctuation coefficient is determined based on this deviation analysis. Finally, the standard load is compensated according to the first fluctuation coefficient to obtain the first predicted load. It is added to multiple predicted loads to obtain a more comprehensive load prediction result. Combining real-time load data and historical load data, the load demand at each time point within the preset window can be more accurately predicted.
[0024] Step 5: Use the FID device, the regional power supply network topology and the regional load network topology to integrate and build a distribution optimization model. In the distribution optimization model, minimize the power grid loss as the optimization index, optimize the distribution plan according to the multiple predicted powers and the multiple predicted loads, and output the optimal distribution plan.
[0025] Specifically, the FID device is a device used to monitor the frequency changes of the power grid. By installing the FID device in the power grid, the frequency changes of the power grid are monitored in real time, so as to understand the operation status and load conditions of the power grid. The regional power supply network topology reflects the connection relationship between the various power supply devices in the power grid, while the regional load network topology reflects the connection relationship between the various load sub-areas in the power grid. These two topological diagrams are the basis for distribution optimization because they provide the structure and load distribution of the power grid. In the distribution optimization model, one or more distribution schemes are found to have the minimum power grid loss while meeting the predicted load. The distribution scheme is optimized according to multiple predicted powers and multiple predicted loads, and different distribution schemes are simulated and evaluated to find the optimal scheme. The optimal distribution scheme is the one with the least loss, which can improve the operation efficiency and stability of the power grid while meeting the predicted load. By finding a distribution scheme that meets the predicted load and has the minimum power grid loss, the power grid resources can be allocated more efficiently and the operation efficiency of the power grid can be improved.
[0026] Step 6: Through the FID device, the power distribution optimization control within the predetermined window is performed according to the optimal power distribution plan.
[0027] Specifically, first, in the distribution optimization model, by simulating and evaluating different distribution schemes, the scheme with the lowest loss, the highest efficiency and the best reliability is selected. For example, in the distribution optimization model, different equipment operation modes, load distribution strategies, etc. can be considered to generate multiple initial distribution schemes, and then the optimal scheme is selected through the optimization algorithm. Next, the frequency data of the power grid is obtained in real time through the FID device, and the power grid is controlled according to the optimal distribution scheme. For example, in an urban area, assuming that the optimal distribution scheme is determined by the distribution optimization model, the frequency data of the power grid is monitored in real time through the FID device installed in the power grid. According to the optimal distribution scheme, the operating state of the power grid is adjusted, such as adjusting the transformer settings, switchgear, etc., to achieve distribution optimization control within the predetermined window. By controlling according to the optimal distribution scheme, the power grid resources can be allocated more efficiently and the operating efficiency of the power grid can be improved.
[0028] Furthermore, step one of this application includes:
[0029] Collect power supply characteristic data of the target area, wherein the power supply characteristic data includes power supply equipment, equipment location coordinates and distribution line characteristics, and the distribution line characteristics include line resistivity, line cross-sectional area and line length; based on graph calculation, with power supply equipment as graph nodes and distribution lines as graph edges, generate the regional power supply network topology according to the equipment location coordinates.
[0030] Specifically, information on all key equipment in the power supply network in the target area is collected, including thermal power plants and multiple new energy power generation equipment (such as wind power generation, solar power generation, etc.), substations, distribution stations, etc. For each power supply equipment, its location coordinates are recorded through geographic information system data. Distribution line characteristics are another key part of the power supply characteristic data, including line resistivity, line cross-sectional area and line length. Among them, line resistivity is an important parameter, which is determined based on indicators such as line materials and interface agents, affecting the loss of electric energy during transmission. Different materials (such as copper, aluminum) and cross-sectional area sizes will affect resistivity. The line cross-sectional area and line length determine the power transmission capacity of the line. A larger cross-sectional area and a shorter length help reduce energy loss and improve power transmission efficiency. Collecting this data usually requires the use of advanced data acquisition technology and equipment. For example, sensors carried by drones are used to collect equipment location coordinates and line characteristic data, or smart meters and monitoring equipment are used to monitor the operating status of power supply equipment in real time.
[0031] After collecting the power supply characteristic data, the regional power supply network topology is constructed using graph computing methods. In this topology, the power supply equipment is used as a graph node. Each power supply equipment has a unique identifier and occupies a position in the graph. The distribution line is used as the edge of the graph. Each edge connects two power supply equipment, indicating that the power flows from the source equipment to the target equipment. The device location coordinates determine the position of the node in the graph, thereby reflecting the structure of the actual power grid. The shortest path, minimum spanning tree, etc. between the nodes in the graph are calculated to find the best path for power transmission. Through such a topological structure, various analysis and optimization operations of the power grid can be performed. For example, the connectivity of the power grid can be analyzed to identify potential power supply bottlenecks and weak links. It is also possible to perform power flow analysis based on this topology to predict the operating status of the power grid under different load conditions, thereby providing a basis for optimizing the operation of the power grid. The accuracy of power grid analysis is improved through precise data collection and advanced graph computing technology.
[0032] Further, step 2 of this application includes:
[0033] Collect load characteristics of multiple load points in the target area to obtain multiple load feature sets, wherein the load characteristics at least include load access points, load size, load type, load usage mode, load volatility and load continuity; based on the K-means algorithm, cluster the multiple load points according to the multiple load feature sets to generate multiple load sub-areas; based on graph calculation, use the load sub-areas as graph nodes and the power lines as graph edges, and generate the regional load network topology according to the load location coordinates.
[0034] Specifically, through smart meters, historical electricity consumption data, user surveys, etc., detailed information of each load point in the target area is collected, including but not limited to load access point, load size, load type, load usage pattern, load volatility and load duration. The load access point refers to the specific location where the load is connected to the power grid; the load size reflects the power demand of the load, which can be fixed or variable, depending on the load type and usage pattern; the load type refers to the type of load, such as residential load, commercial load, industrial load, etc. Different types of loads have different power characteristics and needs; the load usage pattern describes the usage pattern of the load in a day or a week, such as peak hours, valley hours, etc.; load volatility refers to the large changes in the load in a short period of time, such as seasonal changes, sudden peaks, etc. Highly volatile loads may affect the stability of the power grid and require special attention; load duration describes the duration of the load. Some loads are short-term, such as household appliances, while some loads are long-term, such as lighting systems. Through these load characteristics, a detailed load feature set is constructed to reflect the power consumption behavior and demand of the load.
[0035] Using the K-means algorithm, load points with similar characteristics in multiple load feature sets are divided into a sub-region to generate multiple load sub-regions. The K-means algorithm is a commonly used clustering analysis algorithm, which aims to classify load points with similar characteristics into one category, so as to better understand the load characteristics of the power grid. Through clustering, different load patterns can be identified, and multiple load points are clustered according to the load feature set. Each sub-region contains load points with similar characteristics, and these load points have similar power consumption behaviors and demands. For example, data from various load points in a city, including residential areas, shopping malls, factories, etc., are collected. The load in residential areas has peaks in the morning and evening, commercial areas have peaks during the day and at night, and industrial areas have peaks during the day. Each load sub-region is regarded as a graph node, which represents a set of load points with similar characteristics. The power lines are used as edges connecting these nodes, and the weights of the edges can represent the capacity, resistance and other characteristics of the lines. The position of the node on the way is determined according to the load position coordinates, reflecting the load structure of the actual power grid and generating the regional load network topology. The load characteristics of multiple load points in the target area are collected, cluster analysis is performed based on the K-means algorithm, multiple load sub-areas are generated, and finally the regional load network topology is constructed, which can clearly display the load structure of the power grid and more accurately predict power demand and supply.
[0036] Further, step three of this application includes:
[0037] Collect attribute information of multiple power supply devices in the regional power supply network topology to obtain multiple device attribute information, randomly select a first power supply device, and obtain the first device attribute information of the first power supply device; use the first device attribute information as a constraint, perform homologous information retrieval based on power big data, and obtain a sample data set, wherein the sample data set includes a sample power generation factor set and a sample power generation power; divide the sample data set into N equal parts, and select N times with replacement to generate a first training set, and iterate and select N times to obtain N training sets; use the sample power generation factor set as input, the sample power generation power as supervision, and use the N training sets to perform supervised training and cross-validation on the BP neural network to obtain N convergent power generation prediction units, and build a first power generation prediction model in parallel based on the N convergent power generation prediction units, wherein the output of the first power generation prediction model is the mean of the output results of the N convergent power generation prediction units; establish a first mapping relationship between the first power supply device and the first power generation prediction model, and construct the power generation prediction channel according to the first mapping relationship based on the classification decision principle.
[0038] Specifically, a comprehensive survey and record of all power supply equipment in the regional power supply network topology is conducted, such as equipment type, equipment specifications, working principle, operating parameters, etc. For different power supply equipment, such as photovoltaic power generation equipment, wind power generation equipment and other new energy equipment, these attribute information reflects their working characteristics, performance parameters and operating status. For example, the attribute information of photovoltaic power generation equipment includes battery panel type, conversion efficiency, maximum power point tracking technology, etc.; the attribute information of wind power generation equipment includes wind turbine type, blade length, wind speed requirements, etc. A device is selected as the first power supply device using a random sampling method to obtain its specific information. Using the attribute information of the first power supply device as a constraint condition, homologous information retrieval is performed in the power big data. Power big data contains a large amount of power system operation data, such as power generation, load demand, grid parameters, etc. By retrieving these data, information related to specific device attributes can be obtained, thereby constructing a sample data set.
[0039] The sample data set includes a sample power generation factor set and a sample power generation power. The sample power generation factor set is a set of factors related to power generation, which affect the power generation performance of the equipment. For photovoltaic power generation equipment, these factors include light intensity, light angle, temperature, humidity, etc., which have a direct impact on the power generation efficiency of photovoltaic panels. For wind power generation equipment, these factors include wind speed, wind direction, air density, etc. The sample power generation power refers to the amount of power generated by the equipment under specific conditions. The sample data set is divided into N parts on average, each of which contains a subset of the sample data set and a certain number of samples, ensuring that each training set can represent the characteristics and distribution of the entire data set. Selection with replacement is performed. After each sampling, the sample is put back into the original data set so that it may be selected again in the next sampling, ensuring that each sampling is independent, thereby increasing the diversity of the training set. Repeat the above sampling process with replacement, and a new training set will be generated for each sampling. Through multiple iterative sampling, multiple different training sets can be obtained, which may differ in data distribution and characteristics.
[0040] The BP neural network is supervised and trained using N training sets. The input layer of the network is connected to the sample power generation factor set, and the output layer is connected to the sample power generation. Through the back propagation algorithm, the network adjusts the internal weights to minimize the difference between the actual output and the target output. The BP neural network is a feedforward artificial neural network that can make predictions by learning the relationship between the features in the sample data and the target variable. To ensure the generalization ability of the model and avoid overfitting problems, cross-validation is used for the model. The data set is divided into a training set and a validation set. The model is trained using the training set, and the performance of the model is evaluated using the validation set. Through multiple training and cross-validation, N convergent power generation prediction units are obtained. Each prediction unit is trained on a different training set, so they may have different weights and prediction capabilities.
[0041] The N convergent power generation prediction units are combined in parallel to construct a first power generation prediction model. The output of the model is the average value of the output results of these prediction units, which reduces the prediction error of a single model and improves the overall prediction accuracy. The first power supply device is matched with the first power generation prediction model to establish a first mapping relationship. The mapping relationship can be determined by the identifier or location information of the device. For example, a specific photovoltaic power generation device can correspond to a specific power generation prediction model. Based on the classification decision principle, according to the established mapping relationship, the real-time data of the power supply device is input into the corresponding power generation prediction model to obtain the predicted power generation. The classification decision principle is a commonly used machine learning method that assigns an observation value (or a group of observation values) to different predefined categories to achieve data prediction and decision-making. For example, in a photovoltaic power generation system, a mapping relationship between each photovoltaic power generation device and the corresponding power generation prediction model is first established. Then, based on the classification decision principle, the real-time data of each photovoltaic power generation device is input into the corresponding power generation prediction model to obtain the predicted power generation. Building a power generation prediction channel can achieve real-time prediction and optimization of power grid operation and improve the operation efficiency and power supply quality of the power grid.
[0042] Further, if Figure 2 As shown, step 4 of this application includes:
[0043] Based on the regional load network topology, a first load sub-area is randomly selected; with the preset window and the first load sub-area as constraints, the load database is called to retrieve and obtain a sample starting load set and a sample load set, wherein the sample starting load and the sample load correspond one to one and are marked with a timing feature; based on the timing feature, a gradually decreasing weight is configured, wherein the weight is negatively correlated with the timing feature; according to the gradually decreasing weight, the sample starting load set and the sample load set are weightedly fused to obtain a standard starting load and a standard load; based on the standard starting load and the standard load, a first predicted load is generated and added to the multiple predicted loads.
[0044] Specifically, the regional load network topology reflects the connection relationship between various load sub-areas in the power grid. In this topology, each load sub-area is regarded as a node, and the lines connecting these areas are regarded as edges. A random selection is made from all load sub-areas as the research object to ensure that the studied load sub-area is representative, so as to better reflect the characteristics of different load sub-areas in the power grid. For example, in an urban area, by conducting a comprehensive survey and recording of all load sub-areas in the power grid, their load characteristics such as load type, load size, and load volatility were obtained. Then, a load sub-area in a residential area was randomly selected, and its load characteristics were deeply analyzed. Through analysis, it was found that the load in this area was mainly caused by household appliances, and the load volatility was large.
[0045] Determine a preset window, which is used to determine the time range for prediction and analysis. The preset window refers to a specific time period in the future, such as the next few hours or days. Based on the first load sub-area, call the load database, which contains historical and real-time load data, reflecting the power demand of the load sub-area at different time points. By calling the load database, load data related to the first load sub-area can be obtained. Retrieve the historical starting point load set and the historical load set, average the load data at each time point, and determine the historical starting point mean load and the historical mean load. Compare the load data at each time point with the corresponding historical starting point mean load or historical mean load, and calculate the difference between them. According to the predetermined deviation threshold, remove unreliable data greater than the threshold, and use the remaining data as sample data, that is, the sample starting point load set and the sample load set. The sample starting point load set refers to the starting load data at the same historical moment in the preset window, that is, the load data at the historical moment corresponding to the current prediction moment, and the sample load set includes the average load data at each time point in the historical preset window. These sample load data correspond one-to-one with the sample starting point load data, and identify the specific time point, that is, they have time series characteristics. The time series feature refers to the time interval between the sample starting load and the sample load. The shorter the interval, the closer the current load situation is to the historical data, so the higher the credibility and the greater the weight. On the contrary, the longer the time interval, the greater the difference between the current load situation and the historical data, so its impact on the prediction result is smaller and the weight is lower. For example, if the current load is very close to the load at the same time point in the past hour, then the weight of this sample starting load will be very high.
[0046] Based on the time series feature configuration, the weight is gradually reduced. As time goes by, the contribution of the sample load data to the load forecast at the current moment gradually decreases. For example, if the time interval between the current moment and the historical load data of the past hour is the shortest, then the weight of this sample load is the highest; if the time interval between the current moment and the historical load data of the past six hours is the longest, then the weight of this sample load is the lowest. Perform weighted fusion on the sample starting load set and the sample load set. Weighted fusion means weighted averaging of historical load data according to the configured weights to obtain a more accurate prediction value. In this process, the load data at each time point will be weighted according to its corresponding weight to obtain the standard starting load and standard load. The standard starting load reflects the load situation at the start of the preset window, while the standard load is the average load situation at each time point in the preset window.
[0047] The first real-time starting load of the first load sub-area is obtained by a non-intrusive power load monitoring method, and the deviation from the standard starting load, that is, the first starting load deviation, is calculated, and the first fluctuation coefficient is determined by analysis. If the first starting load deviation is large, it means that the load volatility is strong, and the first fluctuation coefficient is large. The first predicted load is obtained by compensating the standard load according to the first fluctuation coefficient. The first predicted load is positively correlated with the first fluctuation coefficient, that is, the larger the first fluctuation coefficient, the larger the first predicted load. The first predicted load is added to multiple predicted loads, and the multiple predicted loads refer to the predicted load data at various time points within a preset window. By adding the first predicted load to these predicted loads, a more comprehensive load prediction result can be obtained. This result contains information about the first predicted load, as well as information about other predicted loads that have been generated before. By configuring gradually decreasing weights and performing weighted fusion, the load demand at various time points within the preset window can be more accurately predicted, which helps to formulate more effective power supply plans and resource allocation strategies.
[0048] Furthermore, the present application also includes the following steps:
[0049] Retrieve and obtain a historical starting point load set and a historical load set, perform mean calculation on the historical starting point load set and the historical load set respectively, and determine a historical starting point mean load and a historical mean load; based on the historical starting point mean load and the historical mean load, perform deviation calculation on the historical starting point load set and the historical load set respectively, and obtain a historical starting point load deviation set and a historical load deviation set; filter the historical starting point load deviation set and the historical load deviation set according to a predetermined deviation threshold, and map to obtain a sample starting point load set and a sample load set.
[0050] Specifically, the historical starting load set refers to the starting load data at each time point in the past period of time, while the historical load set includes the load data at each time point in the past period of time. These data are usually stored in the load database and can be obtained by calling the load database. Mean calculation refers to averaging the load data at each time point to obtain the average load level over a period of time. The historical starting average load refers to the average value of the starting load data at each time point in the past period of time, while the historical average load refers to the average value of the load data at each time point in the past period of time. Deviation calculation refers to comparing the load data at each time point with the corresponding historical starting average load or historical average load, and calculating the difference between them. For the historical starting load deviation set, the difference between the load data at each time point and the corresponding historical starting average load is calculated; for the historical load deviation set, the difference between the load data at each time point and the corresponding historical average load is calculated.
[0051] According to the actual situation and needs, a deviation threshold is set in advance to determine whether the load data deviation is within an acceptable range. According to the predetermined deviation threshold, the historical starting load deviation set and the historical load deviation set are screened. The load deviation at each time point is compared with the predetermined deviation threshold to determine whether it is within an acceptable range. If the absolute value of the load deviation is greater than the predetermined deviation threshold, it is considered that the data point has little impact on the current load forecast and can be screened out; if the absolute value of the load deviation is less than or equal to the predetermined deviation threshold, it is considered that the data point has a greater impact on the current load forecast and should be retained. The filtered data sets are called sample starting load sets and sample load sets, which contain load data with deviations within the predetermined threshold and can be used for subsequent load analysis and forecasting. Based on the filtered load data, power production and distribution can be planned more reasonably to cope with load fluctuations.
[0052] Furthermore, the present application also includes the following steps:
[0053] A first real-time starting load of the first load sub-area is obtained by a non-intrusive power load monitoring method; a first starting load deviation between the first real-time starting load and the standard starting load is calculated, and a first fluctuation coefficient is determined based on the first starting load deviation analysis; the standard load is compensated according to the first fluctuation coefficient to obtain the first predicted load, wherein the first predicted load is positively correlated with the first fluctuation coefficient.
[0054] Specifically, non-intrusive power load monitoring is a monitoring technology that does not require direct contact with the load or change the load. It can be used to monitor the operating status of the load in the power grid without affecting the load. This method is usually implemented using technologies such as smart meters, power line communication technology (PLC), and wireless sensor networks. It is directly installed in the power grid and does not require direct access to the load device. The first load sub-area is randomly selected in the regional load network topology. The first real-time starting load refers to the total load of all load points in the first load sub-area at a specific moment. The standard starting load refers to the starting load data at the same historical moment at the start of the preset window. The first real-time starting load is compared with the standard starting load, and the deviation between them is calculated, that is, the first starting load deviation. The first fluctuation coefficient is determined based on the first starting load deviation analysis. The first fluctuation coefficient refers to the measure of the amplitude and frequency of load fluctuations, reflecting the volatility and change trend of the load. The first fluctuation coefficient can be determined by analyzing the first starting load deviation. For example, if the first starting load deviation is large, it means that the load volatility is strong, and the first fluctuation coefficient is large; if the first starting load deviation is small, it means that the load volatility is weak, and the first fluctuation coefficient is small. In order to more accurately determine the first fluctuation coefficient, a decision tree algorithm can be used. Decision tree is a commonly used machine learning algorithm that can classify and predict based on input data (first starting point load deviation). Specifically, a deviation-coefficient matching table can be constructed based on multiple sample data, which contains the first fluctuation coefficients corresponding to different deviation values. Through the decision tree algorithm, the first fluctuation coefficient can be obtained based on the first starting point load deviation matching.
[0055] The standard load is compensated according to the first fluctuation coefficient, and the fluctuation of the load is compensated by increasing or decreasing the value of the standard load. Compensation means adjusting the standard load according to the first fluctuation coefficient to reflect the fluctuation of the load. For example, if the first fluctuation coefficient is large, it means that the load fluctuation is strong, so the value of the standard load can be increased to compensate for this fluctuation; if the first fluctuation coefficient is small, it means that the load fluctuation is weak, so the value of the standard load can be reduced to compensate for this fluctuation. The first predicted load is obtained according to the compensated standard load, taking into account the fluctuation of the load. The first predicted load is positively correlated with the first fluctuation coefficient, that is, the larger the first fluctuation coefficient, the larger the first predicted load; the smaller the first fluctuation coefficient, the smaller the first predicted load. Through the first real-time starting point load, the first starting point load deviation is calculated, the first fluctuation coefficient is analyzed and determined, and finally the standard load is compensated according to the first fluctuation coefficient to obtain the first predicted load, which can provide a deeper understanding of the fluctuation and change trend of the power grid load.
[0056] Further, step five of this application includes:
[0057] In the power distribution optimization model, based on the regional power supply network topology and the regional load network topology, with the satisfaction of the multiple predicted loads as a constraint, a power distribution plan simulation is performed according to the multiple predicted powers to generate multiple initial power distribution plans; according to the power grid loss evaluation function, the multiple initial power distribution plans are respectively evaluated for loss, and the initial power distribution plan corresponding to the minimum loss coefficient is set as the optimal power distribution plan.
[0058] Specifically, FID equipment is used to monitor the frequency changes of the power grid and understand the operating status of the power grid in real time. Based on the regional power supply network topology and the regional load network topology, a structure and load distribution model of the power grid is established. Meeting multiple predicted load demands as constraints, the power distribution scheme is simulated according to multiple predicted powers, and multiple distribution schemes are randomly generated. Different power distribution schemes are simulated using the structural information of the power grid and the predicted load and power data. For example, in an urban area, different power supply schemes can be simulated according to the topology of the power supply network and the predicted load demand, including different power supply paths and equipment operating states. Consider different power supply equipment operating states and load distribution strategies to generate multiple possible distribution schemes. For example, different equipment operating modes, load distribution strategies, etc. can be considered to generate multiple initial distribution schemes.
[0059] The constructed power grid loss evaluation function is used to evaluate the performance of each initial power distribution scheme. Each initial power distribution scheme may lead to different current distribution, resistivity, cross-sectional area and length combinations, thus affecting the total power grid loss. For each initial power distribution scheme, the loss is calculated for each load point, and the losses of all load points are summed up to calculate the loss coefficient of each initial power distribution scheme. The loss coefficients of all initial power distribution schemes are compared, and the power distribution scheme with the smallest loss coefficient is selected as the optimal scheme. This scheme will theoretically provide the lowest power grid loss, thereby improving the operating efficiency and power supply quality of the power grid. In this way, one or more initial power distribution schemes can be found that have the lowest power grid loss while meeting the predicted load.
[0060] Furthermore, the present application also includes the following steps:
[0061] The expression of the power grid loss evaluation function is: Where S is the loss coefficient, M is the predicted load quantity, I m is the load current of the mth predicted load, P m is the power line resistivity of the mth predicted load, A m is the cross-sectional area of the power line for the mth predicted load, L m is the length of the power line for the mth predicted load.
[0062] Specifically, the expression of the power grid loss evaluation function is: Among them, S is the loss coefficient, which represents the overall level of power grid loss; M is the number of predicted loads, which indicates the total number of load points that need to be considered; I m is the load current of the mth predicted load; P m A is the resistivity of the power line of the mth predicted load, which determines the degree of loss during power transmission; m is the cross-sectional area of the power line of the mth predicted load, which affects the efficiency of power transmission; L m The length of the power line for the mth predicted load directly affects the loss during power transmission. The current, resistivity, cross-sectional area and length of each load point are comprehensively considered, and the total loss of the entire power grid is calculated by multiplication and summation. The loss factor S is an adjustment of the overall loss level to meet specific evaluation standards or ranges.
[0063] In summary, the FID-based distribution network operation optimization method provided in this application has the following technical effects:
[0064] By collecting the power supply characteristic data of the target area, a regional power supply network topology is constructed; based on the load characteristics, multiple load points in the target area are clustered to obtain multiple load sub-areas, and a regional load network topology is constructed according to the multiple load sub-areas; based on the regional power supply network topology, a new energy power generation prediction within a predetermined window is performed through the power generation prediction channel to obtain multiple predicted powers; based on the regional load network topology, a load prediction within a preset window is performed through load monitoring data and a load database to determine multiple predicted loads; a distribution optimization model is constructed by integrating the FID device, the regional power supply network topology and the regional load network topology, and in the distribution optimization model, the power distribution scheme is optimized according to the multiple predicted powers and the multiple predicted loads with minimizing the power grid loss as the optimization index, and the optimal distribution scheme is output; through the FID device, the power distribution optimization control within the predetermined window is performed according to the optimal distribution scheme. In other words, by accurately matching the regional power load and the new energy power generation status, the scientificity and rationality of the regional distribution scheme setting can be improved, thereby achieving the technical effect of reducing the regional power grid loss and improving the distribution operation efficiency.
[0065] The above description of the disclosed embodiments enables those skilled in the art to implement or use the present application. Various modifications to these embodiments will be apparent to those skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present application. Therefore, the present application will not be limited to the embodiments shown herein, but will conform to the widest scope consistent with the principles and novel features disclosed herein.
[0066] Obviously, those skilled in the art can make various changes and modifications to the present application without departing from the spirit and scope of the present application. Thus, if these modifications and variations of the present application belong to the scope of the present application and its equivalent technology, the present application is also intended to include these modifications and variations.
Claims
1. A distribution network operation optimization method based on FID, characterized in that: include: Collect power supply characteristic data of the target area and build the regional power supply network topology; Clustering multiple load points in the target area based on load characteristics to obtain multiple load sub-areas, and constructing a regional load network topology according to the multiple load sub-areas; Based on the regional power supply network topology, a new energy power generation forecast is performed within a predetermined window through a power generation forecast channel to obtain multiple predicted powers; Based on the regional load network topology, load forecasting within a preset window is performed through load monitoring data and a load database to determine a plurality of forecast loads; A power distribution optimization model is constructed by integrating the FID device, the regional power supply network topology and the regional load network topology. In the power distribution optimization model, minimizing power grid loss is used as an optimization index, and a power distribution plan is optimized according to the multiple predicted powers and the multiple predicted loads, and an optimal power distribution plan is output; The FID device is used to optimize power distribution control within the predetermined window according to the optimal power distribution plan.
2. According to the FID-based distribution network operation optimization method of claim 1, it is characterized in that: Build a regional power supply network topology, including: Collecting power supply characteristic data of the target area, wherein the power supply characteristic data includes power supply equipment, equipment location coordinates and distribution line characteristics, and the distribution line characteristics include line resistivity, line cross-sectional area and line length; Based on graph computing, the power supply equipment is used as the graph node, the distribution lines are used as the graph edges, and the regional power supply network topology is generated according to the equipment location coordinates.
3. According to the FID-based distribution network operation optimization method of claim 1, it is characterized in that: Build a regional load network topology, including: Collecting load characteristics of multiple load points in the target area to obtain multiple load characteristic sets, wherein the load characteristics at least include load access points, load size, load type, load usage mode, load volatility and load continuity; Based on the K-means algorithm, clustering the multiple load points according to the multiple load feature sets to generate multiple load sub-areas; Based on graph calculation, the load sub-areas are taken as graph nodes, the power lines are taken as graph edges, and the regional load network topology is generated according to the load position coordinates.
4. The method for optimizing the operation of a distribution network based on FID according to claim 1, characterized in that: Construct a power generation prediction channel, including: Collecting attribute information of multiple power supply devices in the regional power supply network topology to obtain multiple device attribute information, randomly selecting a first power supply device, and obtaining first device attribute information of the first power supply device; Taking the first device attribute information as a constraint, performing homologous information retrieval based on power big data to obtain a sample data set, wherein the sample data set includes a sample power generation factor set and a sample power generation power; Divide the sample data set into N equal parts, select N parts with replacement, generate a first training set, and iterate and select N parts N times to obtain N training sets; Taking the sample power generation factor set as input and the sample power generation as supervision, the BP neural network is supervised and cross-validated using the N training sets to obtain N convergent power generation prediction units, and a first power generation prediction model is built in parallel based on the N convergent power generation prediction units, wherein the output of the first power generation prediction model is the average of the output results of the N convergent power generation prediction units; A first mapping relationship between the first power supply device and the first power generation prediction model is established, and based on a classification decision principle, the power generation prediction channel is constructed according to the first mapping relationship.
5. The method for optimizing distribution network operation based on FID according to claim 1, characterized in that: Determine multiple forecast loads, including: Based on the regional load network topology, randomly selecting a first load sub-region; Taking the preset window and the first load sub-area as constraints, calling the load database, retrieving and acquiring a sample starting load set and a sample load set, wherein the sample starting load and the sample load correspond one to one and are marked with a time series feature; Configuring a gradually decreasing weight based on the time series feature, wherein the weight is negatively correlated with the time series feature; According to the step-by-step decreasing weights, weighted fusion is performed on the sample starting point load set and the sample load set to obtain a standard starting point load and a standard load; A first predicted load is generated based on the standard starting load and the standard load, and is added to the plurality of predicted loads.
6. A distribution network operation optimization method based on FID according to claim 5, characterized in that: Get a sample starting load set and a sample load set, including: Retrieve and obtain a historical starting point load set and a historical load set, perform mean calculations on the historical starting point load set and the historical load set respectively, and determine a historical starting point mean load and a historical mean load; Taking the historical starting point mean load and the historical mean load as references, respectively performing deviation calculations on the historical starting point load set and the historical load set to obtain a historical starting point load deviation set and a historical load deviation set; The historical starting point load deviation set and the historical load deviation set are screened according to a predetermined deviation threshold, and a sample starting point load set and a sample load set are obtained by mapping.
7. The method for optimizing the operation of a distribution network based on FID according to claim 5, characterized in that: Generating a first predicted load based on the standard starting load and the standard load includes: Acquiring a first real-time starting point load of the first load sub-area by a non-intrusive power load monitoring method; Calculating a first starting point load deviation between the first real-time starting point load and the standard starting point load, and determining a first fluctuation coefficient based on the first starting point load deviation analysis; The standard load is compensated according to the first fluctuation coefficient to obtain the first predicted load, wherein the first predicted load is positively correlated with the first fluctuation coefficient.
8. The method for optimizing distribution network operation based on FID according to claim 1, characterized in that: Output optimal power distribution solution, including: In the power distribution optimization model, based on the regional power supply network topology and the regional load network topology, with the plurality of predicted loads as a constraint, a power distribution scheme simulation is performed according to the plurality of predicted powers to generate a plurality of initial power distribution schemes; According to the power grid loss evaluation function, the multiple initial power distribution plans are evaluated for loss respectively, and the initial power distribution plan corresponding to the minimum loss coefficient is set as the optimal power distribution plan.
9. A distribution network operation optimization method based on FID according to claim 8, characterized in that: Construct a power grid loss evaluation function, including: The expression of the power grid loss evaluation function is: Where S is the loss coefficient, M is the predicted load quantity, I m is the load current of the mth predicted load, P m is the power line resistivity of the mth predicted load, A m is the cross-sectional area of the power line for the mth predicted load, L m is the length of the power line for the mth predicted load.
Citation Information
Patent Citations
Flexible interconnection device optimization preparation method and system based on DG power prediction
CN114513002A
Power distribution network double-layer optimization scheduling method based on deep reinforcement learning
CN115986845A
Cloud edge collaborative optimization method and device for fault recovery of flexible interconnected power distribution network
CN116706914A
Low-voltage flexible interconnection collaborative planning method in high-permeability renewable energy power distribution network
CN117674278A
Interconnected power distribution network fault recovery cloud edge collaborative optimization method based on preposed pre-calculation
CN118100126A
Cited By
Power generation dispatching system based on cloud computing
CN119051026A
Power generation dispatching system based on cloud computing
CN119051026B
Energy distribution management method based on regional resources
CN119228078A
Power terminal equipment energy efficiency optimization method and device for smart power grid
CN119441822A
Electric power communication system modeling method and system and terminal equipment
CN119996211A
