Control method and device of water-light-storage multi-energy complementary system

By automatically adjusting the output according to the grid load ratio and state of charge in the hydro-solar multi-energy complementary system, the problem of being unable to adjust the output during peak shaving and valley filling is solved, achieving safe and stable operation of the system and balancing the grid load, and reducing Line overloads and grid surges.

CN118763750APending Publication Date: 2024-10-11HUANENG LANCANG RIVER HYDROPOWER CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410743197.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-11
Publication Date
2024-10-11

AI Technical Summary

Technical Problem

The existing hydro-solar multi-energy complementary system cannot automatically adjust its output according to changes in grid load during peak shaving and valley filling, which affects the safe and stable operation of the system, and the access of high-power power sources or loads may have a greater impact on the grid.

Method used

By obtaining the load ratio of the distribution network, the hydropower units and energy storage devices are controlled to automatically adjust the output according to the preset total output and state-of-charge thresholds to provide active power support, avoid step impacts during peak clipping, and fill in the Electric energy is stored in the energy storage device during off-peak hours to balance the load curve.

Benefits of technology

It avoids step impacts on the power grid during peak shaving, ensuring safe and stable operation of the system. By flexibly regulating electric energy, it reduces line overload, improves power supply reliability and new energy consumption, and reduces the impact on the system and power grid.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118763750A_ABST
    Figure CN118763750A_ABST
Patent Text Reader

Abstract

The invention provides a control method and device for a water-light-storage multi-energy complementary system, and relates to the technical field of power grids. The method comprises the following steps: acquiring a load ratio of a power distribution network; when the load ratio of the power distribution network is greater than a first load ratio threshold value, controlling a photovoltaic power generation device to provide active power support for the power distribution network according to photovoltaic power generation output; according to the load ratio and a preset mapping relation between total output and the load ratio, the hydroelectric generating set and / or the energy storage device are / is controlled to provide active power support for the power distribution network according to the total output, and the total output is the sum of the output of the hydroelectric generating set and the output of the energy storage device. According to the invention, when the load ratio of the power distribution network is greater than the first load ratio threshold, the water-light-storage multi-energy complementary system enters the peak clipping mode, and the active power is input to the power distribution network according to the load ratio of the power distribution network, so that the step impact on the power grid during peak clipping is avoided, and the safe and stable operation of the system is ensured.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present disclosure relates to the field of power grid technology, and in particular to a control method and device for a water-solar-storage multi-energy complementary system. Background Art

[0002] As the regional tourism economy shows an explosive growth trend, the arrival of the tourism boom will lead to disordered electricity demand in tourist areas, unlimited access, and the inability to scientifically and rationally predict loads. The power system shows the characteristics of increasing load peak-to-valley differences. In order to cope with the challenges brought by the increase in peak-to-valley differences to the distribution network, the capacity is expanded only from the perspective of line equipment, which results in low equipment utilization and huge investment.

[0003] Taking into account the characteristics of abundant small hydropower and light resources in some areas, a multi-port energy router can be used as an electric energy conversion device, and a multi-energy complementary system containing water and solar storage can be used to access the distribution network for peak shaving and valley filling, so as to reduce line overload and improve power supply reliability, while also having a certain degree of economy.

[0004] In the related technology, the water-solar-storage multi-energy complementary system can be used to perform peak shaving and valley filling in the distribution network through a constant power coordinated control strategy. The constant power coordinated control strategy means that at any time when the multi-energy complementary system is operating in peak shaving or valley filling, the power value flowing between the power grid and the multi-energy complementary system is constant. When the constant power coordinated control strategy is used to operate in the three modes of peak shaving, valley filling or idle, each port in the water-solar-storage multi-energy complementary system only needs to output according to the set maximum value, and the output of each port does not change during operation, and the coordination between ports is simple. However, the constant power coordinated control strategy cannot automatically adjust the output according to the changes in the grid load, and the access of high-power power sources or loads may bring a large impact to the grid, affecting the safe and stable operation of the system. Summary of the invention

[0005] The present disclosure aims to solve one of the technical problems in the related art at least to some extent.

[0006] To this end, the first embodiment of the present disclosure proposes a control method for a water-photovoltaic storage multi-energy complementary system, wherein the water-photovoltaic storage multi-energy complementary system is connected to a distribution network, and the water-photovoltaic storage multi-energy complementary system comprises: a hydropower unit, an energy storage device and a photovoltaic power generation device; the method comprises:

[0007] Obtaining a load ratio of the distribution network; the load ratio is a ratio of the power grid load to the daily average load of the power grid;

[0008] When the load ratio of the distribution network is greater than a first load ratio threshold, controlling the photovoltaic power generation device to provide active power support for the distribution network according to the photovoltaic power generation output;

[0009] According to the mapping relationship between the load ratio and the preset total output and the load ratio, the hydropower unit and / or the energy storage device are controlled to provide active power support for the distribution network according to the total output, and the total output is the sum of the output of the hydropower unit and the output of the energy storage device.

[0010] In some embodiments of the present disclosure, according to the load ratio and a preset mapping relationship between the total output of the hydropower unit and the energy storage device and the load ratio, controlling the hydropower unit and / or the energy storage device to provide active power support for the distribution network according to the total output includes:

[0011] When the state of charge of the energy storage device is greater than or equal to a first state of charge threshold, controlling the hydroelectric generator set and the energy storage device to provide active power support for the distribution network according to the total output and the allocation ratio parameter;

[0012] or,

[0013] When the state of charge of the energy storage device is less than the first state of charge threshold, the hydropower unit is controlled to provide active power support for the distribution network according to the total output.

[0014] In some embodiments of the present disclosure, the method further includes:

[0015] When the load ratio of the distribution network is less than a second load ratio threshold and the state of charge of the energy storage device is less than or equal to a second state of charge threshold, and the grid load of the distribution network is greater than a first threshold and less than a valley filling threshold of the distribution network, the electric energy of the distribution network is stored in the energy storage device according to the difference between the valley filling threshold and the grid load;

[0016] or,

[0017] When the load ratio of the distribution network is less than a second load ratio threshold and the state of charge of the energy storage device is less than or equal to the second state of charge threshold, and the grid load is less than or equal to the first threshold, storing the electric energy of the distribution network in the energy storage device according to the port power limit of the energy storage device;

[0018] The first threshold is the difference between the valley filling threshold of the distribution network and the port power limit of the energy storage device, and the second load ratio threshold is less than the first load ratio threshold.

[0019] In some embodiments of the present disclosure, the method further includes:

[0020] When the load ratio of the distribution network is less than or equal to the first load ratio threshold and greater than or equal to the second load ratio threshold, and the state of charge of the energy storage device is less than or equal to a third state of charge threshold, the electricity generated by the photovoltaic power generation device is stored in the energy storage device.

[0021] The second aspect of the present disclosure provides a control device for a water-photovoltaic-storage multi-energy complementary system, wherein the water-photovoltaic-storage multi-energy complementary system is connected to a distribution network, and the water-photovoltaic-storage multi-energy complementary system comprises: a hydroelectric generator set, an energy storage device and a photovoltaic power generation device; the device comprises:

[0022] An acquisition module, used to acquire a load ratio of the distribution network; the load ratio is a ratio of the power grid load to the daily average load of the power grid;

[0023] A first control module, configured to control the photovoltaic power generation device to provide active power support for the distribution network according to the photovoltaic power generation output when the load ratio of the distribution network is greater than a first load ratio threshold;

[0024] The second control module is used to control the hydropower unit and / or the energy storage device to provide active power support for the distribution network according to the total output based on the load ratio and a mapping relationship between the preset total output and the load ratio, and the total output is the sum of the output of the hydropower unit and the output of the energy storage device.

[0025] In some embodiments of the present disclosure, the second control module is specifically used to:

[0026] When the state of charge of the energy storage device is greater than or equal to a first state of charge threshold, controlling the hydroelectric generator set and the energy storage device to provide active power support for the distribution network according to the total output and the allocation ratio parameter;

[0027] or,

[0028] When the state of charge of the energy storage device is less than the first state of charge threshold, the hydroelectric generator set is controlled to provide active power support for the distribution network according to the total output.

[0029] In some embodiments of the present disclosure, a third control module is further included; wherein the third control module is used to:

[0030] When the load ratio of the distribution network is less than a second load ratio threshold and the state of charge of the energy storage device is less than or equal to a second state of charge threshold, and the grid load of the distribution network is greater than a first threshold and less than a valley filling threshold of the distribution network, the electric energy of the distribution network is stored in the energy storage device according to the difference between the valley filling threshold and the grid load;

[0031] or,

[0032] When the load ratio of the distribution network is less than a second load ratio threshold and the state of charge of the energy storage device is less than or equal to the second state of charge threshold, and the grid load is less than or equal to the first threshold, storing the electric energy of the distribution network in the energy storage device according to the port power limit of the energy storage device;

[0033] The first threshold is the difference between the valley filling threshold of the distribution network and the port power limit of the energy storage device, and the second load ratio threshold is less than the first load ratio threshold.

[0034] In some embodiments of the present disclosure, a fourth control module is further included; wherein the fourth control module is used to:

[0035] When the load ratio of the distribution network is less than or equal to the first load ratio threshold and greater than or equal to the second load ratio threshold, and the state of charge of the energy storage device is less than or equal to a third state of charge threshold, the electricity generated by the photovoltaic power generation device is stored in the energy storage device.

[0036] A third aspect of the present application provides an electronic device, comprising: a processor, and a memory communicatively connected to the processor;

[0037] The memory stores computer-executable instructions;

[0038] The processor executes the computer-executable instructions stored in the memory to implement the method described in the first aspect.

[0039] The fourth aspect of the present application provides a computer-readable storage medium, characterized in that the computer-readable storage medium stores computer execution instructions, and the computer execution instructions are used to implement the method described in the first aspect when executed by a processor.

[0040] The present invention provides a control method for a water-solar-storage multi-energy complementary system. When the load ratio of the distribution network is greater than a first load ratio threshold, the water-solar-storage multi-energy complementary system enters a peak shaving mode, and inputs active power into the distribution network according to the load ratio of the distribution network, so as to avoid step shocks to the power grid during peak shaving, thereby ensuring safe and stable operation of the system.

[0041] Additional aspects and advantages of the present disclosure will be given in part in the following description and in part will be obvious from the following description or learned through practice of the present disclosure. BRIEF DESCRIPTION OF THE DRAWINGS

[0042] The above and / or additional aspects and advantages of the present disclosure will become apparent and easily understood from the following description of the embodiments in conjunction with the accompanying drawings, in which:

[0043] Figure 1A schematic flow chart of a control method for a water-photovoltaic-storage multi-energy complementary system provided by an embodiment of the present disclosure;

[0044] Figure 2 A flow chart of another control method of a water-photovoltaic-storage multi-energy complementary system provided by an embodiment of the present disclosure;

[0045] Figure 3 A schematic diagram of the operation of a water-solar-storage multi-energy complementary system in different modes provided by an embodiment of the present disclosure;

[0046] Figure 4 A control flow chart of a control method for a water-photovoltaic-storage multi-energy complementary system provided by an embodiment of the present disclosure;

[0047] Figure 5 The overall control block diagram of a water-photovoltaic-storage multi-energy complementary system provided by the embodiment of the present disclosure;

[0048] Figure 6 A schematic diagram of a control device for a water-photovoltaic-storage multi-energy complementary system provided in an embodiment of the present disclosure. DETAILED DESCRIPTION

[0049] Embodiments of the present disclosure are described in detail below, examples of which are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are intended to be used to explain the present disclosure, and should not be construed as limiting the present disclosure.

[0050] The present disclosure considers the access of various distributed power sources, selects an MPC-based energy router as the topology of the multi-energy complementary system by analogy with the DC microgrid architecture, and proposes a control method and device for a water-solar-storage multi-energy complementary system. The peak load of the distribution network is shaving through a power differential control strategy to avoid step shocks to the power grid during peak shaving and valley filling, thereby ensuring safe and stable operation of the system. Among them, the water-solar-storage multi-energy complementary system is connected to the distribution network, and the water-solar-storage multi-energy complementary system includes: a hydropower unit, an energy storage device, and a photovoltaic power generation device. Specifically, the control method and device for the water-solar-storage multi-energy complementary system of the present disclosure are described below with reference to the accompanying drawings.

[0051] Figure 1 The following is a flow chart of a control method of a water-solar-storage multi-energy complementary system provided by an embodiment of the present disclosure. Figure 1 As shown, the control method of the water-photovoltaic-storage multi-energy complementary system may include the following steps:

[0052] Step 101, obtaining a load ratio of the distribution network, wherein the load ratio is the ratio of the power grid load to the daily average load of the power grid.

[0053] The grid load can be the load P of the distribution network at the current time t. t .

[0054] Step 102: When the load ratio of the distribution network is greater than a first load ratio threshold, the photovoltaic power generation device is controlled to provide active power support for the distribution network according to the photovoltaic power generation output.

[0055] The first load ratio threshold can be understood as the load ratio for entering the peak shaving mode. For example, if the first load ratio threshold is 1.2, it means that the load ratio is 1.2 times the average daily load of the power grid. When the load ratio of the distribution network is greater than the first load ratio threshold, the water-solar-storage multi-energy complementary system enters the peak shaving mode, and the distribution network load needs to be shaving. The photovoltaic power generation device is controlled according to the photovoltaic power generation output P PV Provide active power support for the distribution network.

[0056] Step 103, according to the mapping relationship between the load ratio and the preset total output and the load ratio, control the hydropower unit and / or the energy storage device to provide active power support for the distribution network according to the total output, and the total output is the sum of the output of the hydropower unit and the output of the energy storage device.

[0057] In some embodiments of the present disclosure, the mapping relationship between the preset total output and the load ratio may be that the total output of the hydropower unit and the energy storage device is proportional to the load ratio, and as the load ratio increases, more active support is invested in the total output. In one implementation, when the load ratio of the distribution network is greater than the first load ratio threshold, the load ratio of the distribution network may be graded and divided into multiple levels. Active power is invested in the distribution network according to the load ratio of the distribution network, and each increase in the load ratio of the distribution network by one level increases a portion of the total output.

[0058] As an example, taking the multi-energy complementary system capacity as 500kVA and the average daily load of the power grid as 1174kW, the first load ratio threshold can be set to 1.2. t When it is greater than 1.2, the photovoltaic power generation device will generate electricity according to the photovoltaic power output P PV Provide active power support for the distribution network. Set the first load ratio threshold to the maximum load ratio of 1.74 (to leave a certain margin, the total output P hydbat The power difference between the maximum output 450kW) is divided into 18 levels, with a total output of P hydbat Ratio to load K t The mapping relationship between them can be set as the load ratio value K t For every 0.03 increase (i.e., every 35kW increase in grid load), the combined output of the hydropower unit and energy storage device P hydbat Increase 25kW, 1.2<K t ≤1.23, Phydbat =25kW; 1.23<K t ≤1.26, P hydbat =50kW......K t >1.74, P hydbat =450kW. t ≥1.74, the water-solar-storage multi-energy complementary system reaches its maximum output P exc =450+P PV If the grid load continues to increase, the multi-energy complementary system will not be able to increase its active support to the grid.

[0059] In some embodiments of the present disclosure, when controlling the hydropower units and / or energy storage devices to provide active support for the distribution network based on the total output, the charge state of the energy storage device must also be considered to determine how much output the hydropower units and / or energy storage devices each provide.

[0060] In one implementation, when the state of charge of the energy storage device is greater than or equal to the first state of charge threshold, the hydropower unit and the energy storage device are controlled to provide active power support for the distribution network according to the total output and the allocation ratio parameter:

[0061] P bat =P hydbat α

[0062] P hyd =P hydbat -P bat

[0063] When the state of charge of the energy storage device is less than the first state of charge threshold, the hydropower unit is controlled to provide active power support for the distribution network according to the total output, that is, the hydropower unit alone provides active power support according to the total output:

[0064] P bat =0

[0065] P hyd =P hydbat

[0066] The system provides active power to the grid: P exc =P PV +P bat +P hyd .

[0067] Among them, P bat is the output of the energy storage device, P hydbat is the total output, α is the parameter for the allocation ratio of hydropower and energy storage, which generally remains unchanged and can be adjusted according to the economic efficiency of hydropower and energy storage. hydFor the output of the hydropower unit, the first state of charge threshold can be set to 20% (the recognized power protection value in the energy storage field, SOC ≥ 20% is good for battery life). By setting the mapping relationship between the total output and the load ratio, the hydro-solar-storage multi-energy complementary system is not affected by the weather during peak shaving, and peak shaving can guarantee a certain output at any time.

[0068] By implementing the embodiments of the present disclosure, when the load ratio of the distribution network is greater than the first load ratio threshold, the hydro-solar-storage multi-energy complementary system enters the peak shaving mode, and inputs active power into the distribution network according to the load ratio of the distribution network to avoid step shocks to the power grid during peak shaving, thereby ensuring safe and stable operation of the system.

[0069] Figure 2 This is a flow chart of another control method of a water-solar-storage multi-energy complementary system provided by an embodiment of the present disclosure. Figure 2 As shown, the control method of the water-photovoltaic-storage multi-energy complementary system may include the following steps:

[0070] Step 201, obtaining a load ratio of the distribution network, wherein the load ratio is the ratio of the power grid load to the daily average load of the power grid.

[0071] Step 202: When the load ratio of the distribution network is greater than a first load ratio threshold, the photovoltaic power generation device is controlled to provide active power support for the distribution network according to the photovoltaic power generation output.

[0072] Step 203, based on the load ratio and the mapping relationship between the preset total output and the load ratio, control the hydropower unit and / or the energy storage device to provide active power support for the distribution network according to the total output, where the total output is the sum of the output of the hydropower unit and the output of the energy storage device.

[0073] Step 204: when the load ratio of the distribution network is less than the second load ratio threshold and the state of charge of the energy storage device is less than or equal to the second state of charge threshold, and the grid load of the distribution network is greater than the first threshold and less than the valley filling threshold of the distribution network, the electric energy of the distribution network is stored in the energy storage device according to the difference between the valley filling threshold and the grid load; or, when the load ratio of the distribution network is less than the second load ratio threshold and the state of charge of the energy storage device is less than or equal to the second state of charge threshold, and the grid load is less than or equal to the first threshold, the electric energy of the distribution network is stored in the energy storage device according to the port power limit of the energy storage device.

[0074] Among them, the second load ratio threshold can be understood as the load ratio for entering the valley filling mode. For example, the second load ratio threshold is 0.6, which means that the load ratio is 0.6 times the average daily load of the power grid. When the load ratio of the distribution network is less than the second load ratio threshold, the hydro-solar-storage multi-energy complementary system enters the valley filling mode, and the distribution network load needs to be valley filled. The second state of charge threshold can be used to determine whether the energy storage device can be connected to the power grid as a dynamic load, and the threshold for storing excess electric energy in the power grid in the energy storage device. The second load ratio threshold is less than the first load ratio threshold. When the state of charge of the energy storage device is less than or equal to the second state of charge threshold, it means that the energy storage device can be connected to the power grid as a dynamic load. Optionally, the second state of charge threshold can be set to 90%. The first threshold is the difference between the valley filling threshold of the distribution network (the second state of charge threshold * the average daily load of the power grid) and the port power limit of the energy storage device.

[0075] When the load ratio of the distribution network is less than the second load ratio threshold and the state of charge of the energy storage device is less than or equal to the second state of charge threshold, and the grid load of the distribution network is greater than the first threshold and less than the valley filling threshold of the distribution network, it indicates that the hydro-solar-storage multi-energy complementary system enters the valley filling mode, and the electric energy of the distribution network can be stored in the energy storage device, and the difference between the valley filling threshold and the grid load is used as the charging power to store the electric energy of the distribution network in the energy storage device. By storing the electric energy of the distribution network in the energy storage device, the load curve is pulled up to the first threshold, thereby achieving peak shaving.

[0076] When the load ratio of the distribution network is less than the second load ratio threshold and the state of charge of the energy storage device is less than or equal to the second state of charge threshold, and the grid load is less than or equal to the first threshold, it indicates that the hydro-solar-storage multi-energy complementary system enters the valley filling mode, and the electric energy of the distribution network is stored in the energy storage device according to the port power limit of the energy storage device, and the electric energy of the distribution network can be stored in the energy storage device. Since the grid load is less than or equal to the first threshold, it is limited by the energy storage port and the electric energy of the distribution network is stored in the energy storage device using the port power limit of the energy storage device as the charging power.

[0077] As an example, the second load ratio threshold can be set to 0.6, the second state of charge threshold to 90%, the port power limit of the energy storage device to 100kW, the average daily load of the power grid to 1174kW, and the valley filling threshold to 704kW (the value is only exemplary). t <0.6, the state of charge SOC of the energy storage device ≤ 90%, the charging power P of the energy storage device during peak shaving bat_p as follows:

[0078]

[0079] Among them, when the grid load is 704, the corresponding load ratio is 0.6, and when the grid load is 604, the corresponding load ratio is 0.52. When the load ratio of the distribution network is less than the second load ratio threshold and the state of charge of the energy storage device is greater than the second state of charge threshold, the energy storage device does not take action and does not participate in valley filling.

[0080] Step 205, when the load ratio of the distribution network is less than or equal to the first load ratio threshold and greater than or equal to the second load ratio threshold, and the state of charge of the energy storage device is less than or equal to the third state of charge threshold, the electricity generated by the photovoltaic power generation device is stored in the energy storage device.

[0081] When the load ratio of the distribution network is less than or equal to the first load ratio threshold and greater than or equal to the second load ratio threshold, it indicates that the water-photovoltaic-storage multi-energy complementary system enters idle mode. The third state of charge threshold can be used to determine whether the electricity generated by the photovoltaic power generation device can be stored in the energy storage device. When the state of charge of the energy storage device is less than or equal to the third state of charge threshold, the electricity generated by the photovoltaic power generation device can be stored in the energy storage device. Optionally, the third state of charge threshold may be consistent with the second state of charge threshold and set to 90%. When the load ratio of the distribution network is less than or equal to the first load ratio threshold and greater than or equal to the second load ratio threshold, and the state of charge of the energy storage device is less than or equal to the third state of charge threshold, the electricity generated by the photovoltaic power generation device is stored in the energy storage device, and the charging power P of the photovoltaic power generation device to charge the energy storage device bat_i as follows:

[0082] P bat _ i =-P PV

[0083] If the load ratio of the distribution network is less than or equal to the first load ratio threshold and greater than or equal to the second load ratio threshold, and the state of charge of the energy storage device is greater than the third state of charge threshold, it means that the electricity generated by the photovoltaic power generation device cannot be stored in the energy storage device in the valley filling mode, that is, the photovoltaic array abandons light, and neither the photovoltaic power generation device nor the energy storage device operates.

[0084] Through this embodiment, for the energy storage device, after switching operation in three modes in one cycle, the state of charge SOC can remain unchanged, that is, the energy storage charge amount is equal to the discharge amount. The following formula constraints are satisfied:

[0085]

[0086] In the formula, Δt p , Δt V , Δt i It is the time period of the energy storage unit in the three modes of peak shaving, valley filling and idleness. is the average power under the three modes. In addition, the water-solar-storage multi-energy complementary system is evaluated from load curve indicators such as peak-to-valley difference rate and load fluctuation standard deviation, as well as economic indicators such as time-of-use electricity price difference and power auxiliary service income. The evaluation results verify the effectiveness and economy of the power difference hierarchical control strategy proposed in this disclosure.

[0087] It should be noted that the control method of the water-photovoltaic-storage multi-energy complementary system involved in the embodiment of the present disclosure may include at least one of steps 201-203, step 204 and step 205. For example, steps 201-203 can be implemented as independent embodiments, step 204 can be implemented as an independent embodiment, step 205 can be implemented as an independent embodiment, steps 201-203 and step 204 can be implemented as independent embodiments, steps 201-203 and step 205 can be implemented as independent embodiments, and steps 204 and step 205 can be implemented as independent embodiments.

[0088] In order to better understand the control method of the water-photovoltaic-storage multi-energy complementary system provided in the embodiment of the present application, taking the above data as an example, Figure 3 A schematic diagram of the operation of a water-solar-storage multi-energy complementary system in different modes provided by an embodiment of the present disclosure (with the first load ratio threshold being 1.2, the second load ratio threshold being 0.6, the first state of charge threshold being 20%, the second state of charge threshold being 90%, and the valley filling threshold being 705kW). Figure 4 A control flow chart of a control method for a water-photovoltaic-storage multi-energy complementary system provided by an embodiment of the present disclosure, Figure 5 This is an overall control block diagram of a water-photovoltaic-storage multi-energy complementary system provided in an embodiment of the present disclosure.

[0089] In some embodiments of the present disclosure, Figure 5 As shown in the figure, hierarchical coordinated control is used to divide the system into an energy management layer and a bottom control layer: the energy management layer is responsible for receiving dispatch information, monitoring the real-time load of the power grid, collecting local port status information, judging the system operation mode and allocating power to each port. The system automatically operates in peak shaving, valley filling or idle mode according to the difference between the power grid load and the set threshold, and automatically inputs active power in stages according to the load change trend and the size of the difference to reduce the impact between the system and the power grid. In the peak shaving mode, the hydropower, photovoltaic and storage coordinate output to transmit energy to the power grid, in the idle mode, the energy storage absorbs the photovoltaic output to absorb new energy, and in the valley filling mode, the energy storage stores the energy of the power grid to increase the load valley. The bottom control layer is responsible for receiving instructions from the upper layer to drive the switch tube to control the flow and size of energy, and maintain the stability of the DC bus voltage.

[0090] In the embodiments of the present disclosure, steps 201 to 203 may be implemented in any manner in the embodiments of the present disclosure, respectively, and are not specifically limited to the present disclosure and will not be described in detail.

[0091] By implementing the embodiments of the present disclosure, it is determined whether the distribution network is operating in peak shaving, valley filling or idle mode based on the load ratio of the distribution network, and the water-solar-storage multi-energy complementary system is automatically adjusted to adjust the power according to the load ratio of the distribution network, so as to shave the peak and fill the valley of the distribution network. The present disclosure fully considers the characteristics of the energy of each port, realizes the flexible regulation of energy between the power grid and the distributed power source, reduces line overload, improves power supply reliability and new energy consumption, reduces the impact on the system and the power grid, and maintains the stability of the DC bus voltage, ensuring that the system and the power grid can operate safely and stably.

[0092] The present disclosure also proposes a control device for a water-photovoltaic-storage multi-energy complementary system. Figure 6 This is a schematic diagram of a control device for a water-solar-storage multi-energy complementary system provided by an embodiment of the present disclosure. Figure 6 As shown, the control device of the water-solar-storage multi-energy complementary system includes: an acquisition module 601, a first control module 602 and a second control module 603.

[0093] The acquisition module 601 is used to acquire the load ratio of the distribution network. The load ratio is the ratio of the power grid load to the daily average load of the power grid.

[0094] The first control module 602 is used to control the photovoltaic power generation device to provide active power support for the distribution network according to the photovoltaic power generation output when the load ratio of the distribution network is greater than a first load ratio threshold.

[0095] The second control module 603 is used to control the hydropower unit and / or the energy storage device to provide active power support for the distribution network according to the total output based on the load ratio and the pre-set mapping relationship between the total output and the load ratio. The total output is the sum of the output of the hydropower unit and the output of the energy storage device.

[0096] In some embodiments of the present disclosure, the second control module 603 is specifically used to: when the state of charge of the energy storage device is greater than or equal to the first state of charge threshold, control the hydropower unit and the energy storage device to provide active power support for the distribution network according to the total output and the allocation ratio parameter; or, when the state of charge of the energy storage device is less than the first state of charge threshold, control the hydropower unit to provide active power support for the distribution network according to the total output.

[0097] In some embodiments of the present disclosure, the control device of the water-photovoltaic-storage multi-energy complementary system is as follows: Figure 6On the basis of the embodiment, a third control module may also be included; wherein the third control module is used for: when the load ratio of the distribution network is less than the second load ratio threshold and the state of charge of the energy storage device is less than or equal to the second state of charge threshold, and the grid load of the distribution network is greater than the first threshold and less than the valley filling threshold of the distribution network, the electric energy of the distribution network is stored in the energy storage device according to the difference between the valley filling threshold and the grid load; or, when the load ratio of the distribution network is less than the second load ratio threshold and the state of charge of the energy storage device is less than or equal to the second state of charge threshold, and the grid load is less than or equal to the first threshold, the electric energy of the distribution network is stored in the energy storage device according to the port power limit of the energy storage device; wherein the first threshold is the difference between the valley filling threshold of the distribution network and the port power limit of the energy storage device, and the second load ratio threshold is less than the first load ratio threshold.

[0098] In some embodiments of the present disclosure, the control device of the water-photovoltaic-storage multi-energy complementary system is as follows: Figure 6 On the basis of the embodiment, a fourth control module may also be included; wherein the fourth control module is used for: when the load ratio of the distribution network is less than or equal to the first load ratio threshold and greater than or equal to the second load ratio threshold, and the charge state of the energy storage device is less than or equal to the third charge state threshold, storing the electricity generated by the photovoltaic power generation device in the energy storage device.

[0099] Regarding the device in the above embodiment, the specific manner in which each module performs operations has been described in detail in the embodiment of the method, and will not be elaborated here.

[0100] In order to implement the above embodiments, the present disclosure also proposes an electronic device, including: a processor, and a memory communicatively connected to the processor; the memory stores computer-executable instructions; the processor executes the computer-executable instructions stored in the memory to implement the method provided by the above embodiments.

[0101] In order to implement the above embodiments, the present disclosure further proposes a computer-readable storage medium, in which computer-executable instructions are stored. When the computer-executable instructions are executed by a processor, they are used to implement the methods provided by the above embodiments.

[0102] In order to implement the above embodiments, the present disclosure also proposes a computer program product, including a computer program, which implements the methods provided by the above embodiments when executed by a processor.

[0103] In the description of the aforementioned embodiments, the description with reference to the terms "one embodiment", "some embodiments", "example", "specific example", or "some examples" etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present disclosure. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine the different embodiments or examples described in this specification and the features of the different embodiments or examples, unless they are contradictory.

[0104] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Thus, a feature defined as "first" or "second" may explicitly or implicitly include at least one of the features. In the description of the present disclosure, "plurality" means at least two, such as two, three, etc., unless otherwise clearly and specifically defined.

[0105] Any process or method description in a flowchart or otherwise described herein may be understood to represent a module, segment or portion of code that includes one or more executable instructions for implementing the steps of a custom logical function or process, and the scope of the preferred embodiments of the present disclosure includes additional implementations in which functions may not be performed in the order shown or discussed, including performing functions in a substantially simultaneous manner or in reverse order depending on the functions involved, which should be understood by technicians in the technical field to which the embodiments of the present disclosure belong.

[0106] The logic and / or steps represented in the flowchart or otherwise described herein, for example, can be considered as an ordered list of executable instructions for implementing logical functions, and can be embodied in any computer-readable medium for use by an instruction execution system, device or apparatus (such as a computer-based system, a system including a processor, or other system that can fetch instructions from an instruction execution system, device or apparatus and execute the instructions), or in combination with these instruction execution systems, devices or apparatuses. For the purpose of this specification, "computer-readable medium" can be any device that can contain, store, communicate, propagate or transmit a program for use by an instruction execution system, device or apparatus, or in combination with these instruction execution systems, devices or apparatuses. More specific examples of computer-readable media (a non-exhaustive list) include the following: an electrical connection with one or more wires (electronic device), a portable computer disk box (magnetic device), a random access memory (RAM), a read-only memory (ROM), an erasable and programmable read-only memory (EPROM or flash memory), a fiber optic device, and a portable compact disk read-only memory (CDROM). In addition, the computer-readable medium may even be paper or other suitable medium on which the program is printed, since the program may be obtained electronically, for example, by optically scanning the paper or other medium and then editing, interpreting or processing in other suitable ways if necessary, and then stored in a computer memory.

[0107] It should be understood that the various parts of the present disclosure can be implemented in hardware, software, firmware or a combination thereof. In the above-mentioned embodiments, multiple steps or methods can be implemented in software or firmware stored in a memory and executed by a suitable instruction execution system. For example, if implemented in hardware, as in another embodiment, any one of the following technologies known in the art or a combination thereof can be used to implement: a discrete logic circuit having a logic gate circuit for implementing a logic function for a data signal, a dedicated integrated circuit having a suitable combination of logic gate circuits, a programmable gate array (PGA), a field programmable gate array (FPGA), etc.

[0108] A person skilled in the art may understand that all or part of the steps in the method for implementing the above-mentioned embodiment may be completed by instructing related hardware through a program, and the program may be stored in a computer-readable storage medium, which, when executed, includes one or a combination of the steps of the method embodiment.

[0109] In addition, each functional unit in each embodiment of the present disclosure may be integrated into a processing module, or each unit may exist physically separately, or two or more units may be integrated into one module. The above-mentioned integrated module may be implemented in the form of hardware or in the form of a software functional module. If the integrated module is implemented in the form of a software functional module and sold or used as an independent product, it may also be stored in a computer-readable storage medium.

[0110] The storage medium mentioned above may be a read-only memory, a disk or an optical disk, etc. Although the embodiments of the present disclosure have been shown and described above, it can be understood that the above embodiments are exemplary and cannot be understood as limitations of the present disclosure. A person of ordinary skill in the art may change, modify, replace and modify the above embodiments within the scope of the present disclosure.

Claims

1. A control method for a water-solar-storage multi-energy complementary system, characterized in that: The water-photovoltaic-storage multi-energy complementary system is connected to a distribution network, and the water-photovoltaic-storage multi-energy complementary system comprises: a hydroelectric generator set, an energy storage device and a photovoltaic power generation device; the method comprises the following steps: Obtaining a load ratio of the distribution network; the load ratio is a ratio of the power grid load to the daily average load of the power grid; When the load ratio of the distribution network is greater than a first load ratio threshold, controlling the photovoltaic power generation device to provide active power support for the distribution network according to the photovoltaic power generation output; According to the mapping relationship between the load ratio and the preset total output and the load ratio, the hydropower unit and / or the energy storage device are controlled to provide active power support for the distribution network according to the total output, and the total output is the sum of the output of the hydropower unit and the output of the energy storage device.

2. The method according to claim 1, characterized in that According to the load ratio and a preset mapping relationship between the total output of the hydropower unit and the energy storage device and the load ratio, controlling the hydropower unit and / or the energy storage device to provide active power support for the distribution network according to the total output includes: When the state of charge of the energy storage device is greater than or equal to a first state of charge threshold, controlling the hydroelectric generator set and the energy storage device to provide active power support for the distribution network according to the total output and the allocation ratio parameter; or, When the state of charge of the energy storage device is less than the first state of charge threshold, the hydropower unit is controlled to provide active power support for the distribution network according to the total output.

3. The method according to claim 1, characterized in that The method further comprises: When the load ratio of the distribution network is less than a second load ratio threshold and the state of charge of the energy storage device is less than or equal to a second state of charge threshold, and the grid load of the distribution network is greater than a first threshold and less than a valley filling threshold of the distribution network, the electric energy of the distribution network is stored in the energy storage device according to the difference between the valley filling threshold and the grid load; or, When the load ratio of the distribution network is less than a second load ratio threshold and the state of charge of the energy storage device is less than or equal to the second state of charge threshold, and the grid load is less than or equal to the first threshold, storing the electric energy of the distribution network in the energy storage device according to the port power limit of the energy storage device; The first threshold is the difference between the valley filling threshold of the distribution network and the port power limit of the energy storage device, and the second load ratio threshold is less than the first load ratio threshold.

4. The method according to claim 1, characterized in that: The method further comprises: When the load ratio of the distribution network is less than or equal to the first load ratio threshold and greater than or equal to the second load ratio threshold, and the state of charge of the energy storage device is less than or equal to a third state of charge threshold, the electricity generated by the photovoltaic power generation device is stored in the energy storage device.

5. A control device for a water-solar-storage multi-energy complementary system, characterized in that: The water-photovoltaic-storage multi-energy complementary system is connected to the distribution network, and the water-photovoltaic-storage multi-energy complementary system includes: a hydroelectric unit, an energy storage device and a photovoltaic power generation device; the device includes: An acquisition module, used to acquire a load ratio of the distribution network; the load ratio is a ratio of the power grid load to the daily average load of the power grid; A first control module, configured to control the photovoltaic power generation device to provide active power support for the distribution network according to the photovoltaic power generation output when the load ratio of the distribution network is greater than a first load ratio threshold; The second control module is used to control the hydropower unit and / or the energy storage device to provide active power support for the distribution network according to the total output based on the load ratio and a mapping relationship between the preset total output and the load ratio, and the total output is the sum of the output of the hydropower unit and the output of the energy storage device.

6. The device according to claim 5, characterized in that The second control module is specifically used for: When the state of charge of the energy storage device is greater than or equal to a first state of charge threshold, controlling the hydroelectric generator set and the energy storage device to provide active power support for the distribution network according to the total output and the allocation ratio parameter; or, When the state of charge of the energy storage device is less than the first state of charge threshold, the hydroelectric generator set is controlled to provide active power support for the distribution network according to the total output.

7. The device according to claim 5, characterized in that Also includes a third control module; wherein the third control module is used to: When the load ratio of the distribution network is less than a second load ratio threshold and the state of charge of the energy storage device is less than or equal to a second state of charge threshold, and the grid load of the distribution network is greater than a first threshold and less than a valley filling threshold of the distribution network, the electric energy of the distribution network is stored in the energy storage device according to the difference between the valley filling threshold and the grid load; or, When the load ratio of the distribution network is less than a second load ratio threshold and the state of charge of the energy storage device is less than or equal to the second state of charge threshold, and the grid load is less than or equal to the first threshold, storing the electric energy of the distribution network in the energy storage device according to the port power limit of the energy storage device; The first threshold is the difference between the valley filling threshold of the distribution network and the port power limit of the energy storage device, and the second load ratio threshold is less than the first load ratio threshold.

8. The device according to claim 5, characterized in that Also includes a fourth control module; wherein the fourth control module is used to: When the load ratio of the distribution network is less than or equal to the first load ratio threshold and greater than or equal to the second load ratio threshold, and the state of charge of the energy storage device is less than or equal to a third state of charge threshold, the electricity generated by the photovoltaic power generation device is stored in the energy storage device.

9. An electronic device, characterized in that: include: A processor, and a memory communicatively connected to the processor; The memory stores computer-executable instructions; The processor executes the computer-executable instructions stored in the memory to implement the method according to any one of claims 1 to 4.

10. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores computer-executable instructions, which are used to implement the method according to any one of claims 1 to 4 when executed by a processor.