Environmental test box system

By integrating the environmental test chamber system, using DCDC modules and fast wiring through the box, combined with water cooling technology, the existing equipment has solved the problems of large space occupation, complicated wiring and high energy consumption, achieving efficient power utilization and aesthetic improvement.

CN118763764APending Publication Date: 2024-10-11JIANGSU TUOMILUO ENVIRONMENTAL TEST EQUIP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410839297.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-26
Publication Date
2024-10-11

AI Technical Summary

Technical Problem

Existing environmental testing equipment has problems such as large space occupation, cumbersome wiring, high energy consumption, high noise, low power utilization efficiency, and non-interactive control.

Method used

Design an integrated environmental test chamber system, including a charge and discharge unit and an environmental chamber. The charge and discharge unit includes a DCDC module and a quick connection through the box. The controller is used to control the charging and discharging process and environmental test parameters. It adopts water cooling method and quick connection through the box. The wiring is compatible with batteries of different capacities, reducing manual operations and power consumption.

Benefits of technology

It reduces the system's floor space, improves space utilization and aesthetics, reduces power consumption, achieves efficient use of power and cooling effects, and simplifies the operation process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118763764A_ABST
    Figure CN118763764A_ABST
Patent Text Reader

Abstract

The invention discloses an environmental test box system comprising an environmental test box which comprises a charging and discharging unit and an environmental box; the charging and discharging unit comprises a plurality of DCDC modules and a box-penetrating quick connecting wire, the first end of each DCDC module is connected with the direct current bus, and the second end of each DCDC module is connected with a power supply wiring end of the box-penetrating quick connecting wire; the box-penetrating quick connecting wire further comprises a first battery terminal and a second battery terminal, and one of the first battery terminal and the second battery terminal is selected to be connected with a battery to be tested in the environment box. The first battery terminal is used for being connected with a to-be-tested battery, and the second terminal is used for being connected with a plurality of to-be-tested batteries in parallel at the same time; the system further comprises a controller. The controller is configured to control the charging and discharging process of the charging and discharging unit and control environment test parameters of the environment box.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The embodiments of the present invention relate to the field of testing technology, and in particular to an environmental test chamber system. Background Art

[0002] At present, the temperature control in the market adopts independent environmental test equipment, and the charging and discharging adopts traditional cabinets, which conduct the charging and discharging test through an independent AC module and an independent DC module. The shortcomings and defects are as follows:

[0003] The space occupies a large area, and the wiring is messy and affects the appearance. (The charging and discharging equipment and the environmental test chamber equipment are placed independently in the laboratory. There are many channel lines and signal lines between the environmental test chamber and the charging and discharging equipment, and the length is too long, which affects the appearance of the laboratory); the wiring method between the battery and the charging and discharging equipment is cumbersome and occupies a lot of labor costs (each time the battery is replaced, the wiring and wiring actions need to be repeated); the equipment operation energy consumption is large (each tested battery needs to pass through an independent AC module and an independent DC module during the charging and discharging test, and the power conversion efficiency is low and the loss is large); the excess electric energy generated by the battery discharge test is not collected and utilized (currently, 380V high-voltage circulation is used to feedback to the main circuit for electric energy reuse, which is inefficient and has high losses, and most of the energy is converted into heat and lost); traditional charging and discharging equipment uses air cooling, which is noisy, and a large amount of heat is dissipated to the laboratory, which increases the configuration of the laboratory air conditioner; the charging and discharging equipment and the environmental chamber are independently controlled in terms of control, and there is no control interaction. Summary of the invention

[0004] The present invention provides an environmental test chamber system to achieve the purpose of solving at least one problem existing in the prior art.

[0005] An embodiment of the present invention provides an environmental test chamber system, comprising: an environmental test chamber, the environmental test chamber comprising a charging and discharging unit and an environmental chamber;

[0006] The charging and discharging unit includes a plurality of DCDC modules and a box-penetrating fast connection, wherein a first end of the DCDC module is connected to a DC bus, and a second end of the DCDC module is connected to a power connection terminal of the box-penetrating fast connection;

[0007] The box-penetrating quick connection also includes a first battery terminal and a second battery terminal, and one of the first battery terminal and the second battery terminal is connected to the battery to be tested in the environmental chamber;

[0008] The first battery terminal is used to connect to one of the batteries to be tested, and the second terminal is used to connect to a plurality of the batteries to be tested in parallel at the same time;

[0009] Also includes a controller;

[0010] The controller is configured to control the charging and discharging process of the charging and discharging unit, and control the environmental test parameters of the environmental box.

[0011] Optionally, it also includes ACDC module and confluence module;

[0012] The ACDC module is used to connect to the AC power grid, and the ACDC module is connected to the DCDC module through the bus module;

[0013] The controller is configured to control the AC power grid to charge the battery to be tested, control the battery to be tested to discharge to the AC power grid, and control the battery to be tested to perform charge and discharge interaction through the DCDC module.

[0014] Optionally, the environmental test chamber is further configured with a water cooling unit, and the water cooling unit is used to cool the charging and discharging unit and the environmental chamber.

[0015] Optionally, the power terminal of the box-penetrating quick connection is placed outside the environmental box, and the first battery terminal and the second battery terminal are placed inside the environmental box.

[0016] Optionally, the box-penetrating quick connection further includes a silicone heating sheet, and the silicone heating sheet is used to heat the epoxy tube of the box-penetrating quick connection;

[0017] The epoxy tube is used for sealing and protecting the conductive copper rod of the box-penetrating quick connection.

[0018] Optionally, one of the DCDC modules is configured with a circuit breaker.

[0019] Optionally, the box-penetrating quick wiring is configured to support two specifications of batteries to be tested: 5V600A and 5V300A.

[0020] Optionally, a switch is further included, and the controller is communicatively connected with the DCDC module via the switch.

[0021] Optionally, the ACDC module includes an ACDC submodule, a first DCDC submodule, and a second DCDC submodule;

[0022] The AC power grid is connected to the ACDC submodule, the ACDC submodule is connected to the first DCDC submodule, and the first DCDC submodule is connected to the second DCDC submodule;

[0023] The second DCDC submodule is connected to the DCDC module.

[0024] Optionally, it also includes a production information management system, which is connected to the controller.

[0025] Compared with the prior art, the beneficial effects of the present invention include: the present invention proposes an environmental test chamber system, which includes an integrated charging and discharging unit and an environmental chamber. The integration of the charging and discharging unit and the environmental chamber can reduce the system's footprint and increase space utilization. The charging and discharging unit includes a DCDC module and a box-penetrating quick wiring. Based on the box-penetrating quick wiring, the charging and discharging cables are arranged inside the environmental chamber, and the charging and discharging cables are not visible from the outside of the system, thereby improving the appearance. At the same time, the charging and discharging cables are shorter and have less line loss, thereby reducing the loss of electric energy. The box-penetrating quick wiring includes a variety of battery terminals, which can be compatible with batteries of different capacities. When replacing the battery, the battery is directly connected to the box-penetrating quick wiring without the need for wire removal and wiring, thereby reducing manual operations. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] Figure 1 is a block diagram of the environmental test chamber system in the embodiment;

[0027] Figure 2 is another environmental test chamber system structure block diagram in the embodiment;

[0028] Figure 3 This is an exploded view of the box-penetrating quick connection in the embodiment;

[0029] Figure 4 1. It is a schematic diagram of the box-penetrating quick wiring structure in the embodiment;

[0030] Figure 5 ACDC module structure diagram in the embodiment

[0031] Figure 6 It is another structural block diagram of an environmental test chamber system in the embodiment;

[0032] Figure 7 Schematic diagram of the application of the environmental test chamber system in the embodiment. DETAILED DESCRIPTION

[0033] The present invention will be further described in detail below in conjunction with the accompanying drawings and embodiments. It is to be understood that the specific embodiments described herein are only used to explain the present invention, rather than to limit the present invention. It should also be noted that, for ease of description, only parts related to the present invention, rather than all structures, are shown in the accompanying drawings.

[0034] Figure 1 is a block diagram of the environmental test chamber system in the embodiment, refer to Figure 1 , the environmental test chamber system includes: an environmental test chamber, the environmental test chamber includes a charge and discharge unit 100 and an environmental chamber 200;

[0035] In this solution, the charge and discharge unit 100 includes a plurality of DCDC modules and a box fast connection, a first end of the DCDC module is connected to the DC bus, and a second end of the DCDC module is connected to a power connection terminal of the box fast connection;

[0036] The box-penetrating quick wiring also includes a first battery terminal and a second battery terminal, and one of the first battery terminal and the second battery terminal is connected to the battery to be tested in the environmental box;

[0037] The first battery terminal is used to connect to a battery to be tested, and the second terminal is used to connect to multiple batteries to be tested in parallel at the same time;

[0038] Also includes a controller 300;

[0039] The controller 300 is configured to control the charge and discharge process of the charge and discharge unit 100 , and control environmental test parameters of the environmental chamber 200 .

[0040] In this solution, there is no limitation on the functions that the environmental chamber 200 can achieve. The environmental chamber 200 is set to at least provide a preset ambient temperature for the battery charge and discharge test. In addition, the environmental chamber 200 can also be set to adjust the pressure and humidity during the charge and discharge test.

[0041] In this solution, the charge and discharge unit 100 includes a plurality of DCDC modules and box fast connections, wherein the DCDC module is integrated with the environmental box 200, for example, the DCDC module can be fixedly arranged outside the environmental box 200;

[0042] In this solution, the box-penetrating fast wiring is used to connect the DCDC module and the battery to be tested, wherein the box-penetrating fast wiring is set in the environmental box 200 or the box-penetrating fast wiring is set to pass through the environmental box 200, that is, part of the box-penetrating fast wiring is located in the environmental box 200;

[0043] In this solution, the box-penetrating quick wiring is provided with a first battery terminal and a second battery terminal. Based on the two terminals, the box-penetrating quick wiring can be compatible with batteries of different capacities to be tested;

[0044] The voltage level of the battery to be tested connected to the first terminal is set to the first voltage, and the current level is set to the first current; the voltage level of the battery to be tested connected to the second terminal is set to the second voltage, and the current level is set to the second current;

[0045] The first voltage is set to have the same value as the second voltage, and the first current is set to have the same value as the sum of a plurality of second currents (the number of which is the same as the number of second battery terminals of a fast connection).

[0046] In this solution, there is no limitation on the device connected to the input end of the DCDC module. For example, a DC grid can be configured to be connected to the DCDC module, or an AC grid can be configured to be connected to the DCDC module through an ACDC module.

[0047] In this solution, the structure of the DCDC module is not limited. According to actual needs, the external sheet metal shell of the DCDC module can be retained or cancelled. When the external sheet metal shell is cancelled, cost reduction can be achieved.

[0048] In this solution, the power terminal of the box-penetrating quick wiring is fixedly connected to the DCDC module in the environmental test chamber, and the battery terminal (first battery terminal or second battery terminal) of the box-penetrating quick wiring is detachably connected to the battery to be tested in the environmental chamber 200;

[0049] In this solution, when the first battery terminal is used, the battery to be tested is directly connected to the first battery terminal, and when the second battery terminal is used, the battery to be tested is connected in parallel and then connected to the second battery terminal.

[0050] In this solution, the controller 300 is configured to control the charging and discharging process of the charging and discharging unit 100. Specifically, one DCDC module may be configured to correspond to one charging and discharging control branch;

[0051] In this solution, the controller 300 may be configured to independently control each charge and discharge control branch, and the charge and discharge processes of different charge and discharge control branches may be the same or different.

[0052] This embodiment proposes an environmental test chamber system, which includes an integrated charging and discharging unit and an environmental chamber. The integration of the charging and discharging unit and the environmental chamber can reduce the system's footprint and increase space utilization. The charging and discharging unit includes a DCDC module and a box-penetrating quick wiring. Based on the box-penetrating quick wiring, the charging and discharging cables are arranged inside the environmental chamber, and the charging and discharging cables are not visible from the outside of the system, thereby improving the appearance. At the same time, the charging and discharging cables are shorter and have less line loss, thereby reducing the loss of electric energy. The box-penetrating quick wiring includes a variety of battery terminals, which can be compatible with batteries of different capacities. When replacing the battery, the battery is directly connected to the box-penetrating quick wiring without removing and wiring, thereby reducing manual operations.

[0053] Figure 2 This is another environmental test chamber system structure diagram in the embodiment, refer to Figure 2 ,exist Figure 1 Based on the scheme shown, in one possible implementation scheme, the system further includes an ACDC module 11 and a confluence module 21;

[0054] The ACDC module 11 is used to connect to the AC power grid, and the ACDC module 11 is connected to the DCDC module through the confluence module 21;

[0055] The controller is configured to control the AC grid to charge the battery under test, control the battery under test to discharge to the AC grid, and control the battery under test to perform charge and discharge interaction through the DCDC module.

[0056] In this solution, the ACDC module 11 is set as a bidirectional ACDC module, and the DCDC module is set as a bidirectional DCDC module;

[0057] During charging, the ACDC module 11 is used to convert the AC power of the AC grid into DC power. The DC power enters the bus module after passing through the DC bus, enters each DCDC module through the bus module, and then charges the corresponding battery through the DCDC module;

[0058] In addition, based on the DC bus, a DC micro (electric) grid can be formed between each DCDC module, and the electric energy of the discharged battery can be used to charge other rechargeable batteries, thereby forming an energy cycle between the batteries to be tested based on the DC micro grid;

[0059] The discharged battery can also be converted into high-voltage AC power through the ACDC module 11, and used by other equipment in the area through the AC power grid, realizing the power cycle from low voltage (battery) to high voltage (AC power grid), thereby achieving full utilization of electric energy.

[0060] In this solution, distributed DC bus technology is used to convert AC into high-voltage DC through a bidirectional ACDC module. The high-voltage to low-voltage DCDC bidirectional inverter provides energy for each battery's charging and discharging channel. Each channel can form a DC microgrid through the DC bus, which can improve the conversion efficiency of electric energy and achieve the goals of energy saving, maintenance reduction and floor space reduction.

[0061] In this solution, the specific structure of the ACDC module is not limited. The ACDC module may include one or more ACDC sub-modules, and may further include multiple DCDC sub-modules;

[0062] Among them, the ACDC submodule is used to realize the conversion of AC to DC, and the DCDC submodule is used to realize the conversion of DC into DC of a specified voltage level.

[0063] Exemplarily, in one possible implementation, the ACDC module includes an ACDC submodule, a first DCDC submodule, and a second DCDC submodule;

[0064] The AC power grid is connected to the ACDC submodule, the ACDC submodule is connected to the first DCDC submodule, and the first DCDC submodule is connected to the second DCDC submodule;

[0065] The second DCDC submodule is connected to the DCDC module.

[0066] In this solution, the ACDC submodule is set to realize the conversion of 380V AC to 750V DC, the first DCDC submodule is used to realize the conversion of 750V DC to 380V DC, the second DCDC submodule is used to realize the conversion of 380V DC to 15V DC, and the DCDC module is used to realize the conversion of 15V DC to 5V DC.

[0067] Based on any of the above solutions, in one possible implementation scheme, the environmental test chamber is further configured with a water cooling unit, and the water cooling unit is used to cool the charging and discharging unit and the environmental chamber.

[0068] In this solution, water cooling is used to cool the environmental chamber and the charging and discharging unit. No condensing fan is provided in the environmental test chamber system, which can reduce the noise of the environmental test chamber system to the laboratory.

[0069] In addition, since the heat is taken away by the water cooling unit, there is no need to increase the laboratory air conditioning configuration. The cooling effect is better for the environmental chamber itself, and there is no fan running, which is more energy-efficient.

[0070] Based on any of the foregoing solutions, in one feasible implementation scheme, the power terminal of the box-penetrating quick connection is placed outside the environmental chamber, and the first battery terminal and the second battery terminal are placed inside the environmental chamber.

[0071] In this solution, the box-penetrating quick wiring is arranged inside the environmental test chamber, the box-penetrating quick wiring passes through the environmental chamber, and then the cable connecting the box-penetrating quick wiring and the battery is arranged inside the environmental chamber, the cable can be shorter and the appearance is neat.

[0072] Based on any of the above-mentioned solutions in which the box-penetrating quick wiring part is arranged in the environmental chamber, in one possible implementation scheme, the box-penetrating quick wiring further includes a silicone heating sheet, and the silicone heating sheet is used to heat the epoxy tube of the box-penetrating quick wiring;

[0073] Epoxy tubes are used to seal and protect conductive copper rods for quick connection through boxes.

[0074] In this solution, since the part of the box fast connection is set in the environmental chamber, when the low-temperature charge and discharge test is carried out, there will be a large temperature difference between the part of the box fast connection located in the environmental chamber and the part located outside the environmental chamber;

[0075] By setting up a silicone heating sheet, the main part of the box-penetrating quick connection can be heated during low-temperature charge and discharge tests, thereby avoiding condensation due to large temperature differences between different parts of the connection.

[0076] Figure 3 This is an exploded view of the box-penetrating quick connection in the embodiment. Figure 4 This is a schematic diagram of the box-penetrating quick wiring structure in the embodiment, refer to Figure 3 and Figure 4 In one possible implementation scheme, the box-penetrating quick connection includes:

[0077] Outer wall sealing plate 1, set screw 2, inner wall sealing plate 3, copper plate fixing plate 4, partition plate 5, copper plate 6, pressure plate 7, top plate 8, plug screw 9, copper nut 10, compression spring 11, epoxy tube 12, silicone heating plate 13, copper rod 14, clamp 15, wire clamp 16, first terminal 18, second terminal 17;

[0078] The wire clamp 16 is used to fix the power wire, and the power wire is used to connect with the DCDC module;

[0079] The outer wall sealing plate 1, the inner wall sealing plate 3, the clamping plate 15 and the set screw 2 are used to achieve the sealing of the copper rod 14 on the outer part of the epoxy tube 12;

[0080] The copper plate fixing plate 4, the inner wall sealing plate 3 and the epoxy tube 12 are used to achieve the sealing of the copper rod 14 in the inner part of the epoxy tube 12;

[0081] The copper plate 6 is used to be fixedly connected to the copper plate fixing plate 4, and the partition plate 5 is used to achieve isolation between (four) different copper plates 6;

[0082] The first terminal 18 is fixedly connected to two of the copper plates 6, and the second terminal 17 is fixedly connected to the other two copper plates 6;

[0083] The pressure plate 7 , the top plate 8 , the plug screw 9 , the copper nut 10 , and the compression spring 11 are used to compress the first terminal 18 , the second terminal 17 and the corresponding copper plate 6 .

[0084] In this solution, the heat-insulating seal is achieved by epoxy tube, glue, and silicone heating sheet, and the first terminal and the second terminal adopt a quick compression structure, wherein the second terminal parallel line adopts a forked L-shaped terminal to simultaneously connect two conductors of the same polarity;

[0085] In this solution, the box-penetrating quick wiring can be compatible with batteries of different capacities (such as 5V600A and 5V300A at the same time). There is no need to remove wires and connect wires when replacing batteries, reducing manual operations.

[0086] Based on any of the foregoing solutions, in one possible implementation scheme, one DCDC module is configured with one circuit breaker.

[0087] In this solution, the circuit breaker can be set in the confluence module, and each DCDC module in the confluence module is configured with a separate circuit breaker, so that one DCDC can be disconnected individually when a fault occurs, so that the discharge power can be redistributed to the AC grid end, thereby achieving maximum power saving.

[0088] Based on any of the foregoing solutions, in one possible implementation scheme, the environmental test chamber system further includes a switch, and the controller is communicatively connected to the DCDC module via the switch.

[0089] In this solution, the configuration controller is connected to the DCDC module through Ethernet and a switch, and the configuration controller sends charging and discharging control instructions to the DCDC module through the switch.

[0090] Based on any of the above solutions, in one possible implementation scheme, the environmental test chamber system further includes a manufacturing execution system (MES), and the manufacturing execution system is connected to the controller.

[0091] In this solution, the production information management system can be used to realize fault feedback, parameter adjustment, record storage and export of charge and discharge test curves for the environmental test chamber system, and generate automatic reports for charge and discharge tests.

[0092] Figure 5 : is a schematic diagram of the ACDC module structure in the embodiment, Figure 6 This is another environmental test chamber system structure diagram in the embodiment, refer to Figure 5 and Figure 6 Based on any of the above solutions, in one possible implementation scheme, the environmental test chamber system includes:

[0093] Charge and discharge unit 100, environmental chamber 200, ACDC submodule 111, combiner box 21, controller 300, switch 301, production information management system 302;

[0094] The controller 300 is connected to the production information management system 302 and the environmental chamber 200 through Ethernet, and the controller is connected to the switch 301 through Ethernet, and the switch 301 is connected to the charge and discharge unit 100;

[0095] The controller 300 is configured to control the charging and discharging process of the charging and discharging unit 100 and control the parameter adjustment of the environmental box 200. The production information management system 302 is used for storing and processing charging and discharging test data.

[0096] In this solution, the ACDC submodule 111 may include one or more ACDC converters. The ACDC submodule 111 is used to connect to a 380V AC power grid to convert 380V AC power into 750V DC power.

[0097] In this solution, the charge and discharge unit 100 includes a first DCDC submodule 101, a second DCDC submodule 102, and a DCDC module 103. The first DCDC submodule 101 is connected to a 750V DC bus, the first DCDC submodule 101 is connected to the second DCDC submodule 102, the second DCDC submodule 102 is connected to the DCDC module 103, and the DCDC module 103 is connected to the battery 1000;

[0098] The first DCDC submodule 101 is used to convert 750V DC power into 380V DC power, the second DCDC submodule 102 is used to convert 380V DC power into 15V DC power, and the DCDC module is used to convert 15V DC power into 5V DC power.

[0099] In this solution, the charge and discharge unit 100 is integrated with the environmental box 200. Specifically, the charge and discharge unit 100 is integrated at the rear of the environmental box 200, and the metal shells of the DCDC submodule and the DCDC module are removed during integration.

[0100] In this solution, the environmental test chamber also includes a fast-connection through the box, and the fast-connection through the box is arranged in the environmental chamber 200. Figure 3 and Figure 4 The scheme shown is the same and the specific content will not be described in detail.

[0101] refer to Figure 5 ,In this solution, the distributed DC bus technology is used to convert the AC power into high voltage DC power through an ,external bidirectional ACDC (ACDC submodule);

[0102] Through high-voltage to low-voltage DCDC bidirectional inversion, a charging and discharging channel is provided for each battery, wherein each charging and discharging channel can form a DC microgrid through a 750V DC bus;

[0103] Based on the DC microgrid, the electric energy released by the discharged battery is used first for charging tests of other batteries to complete the electric energy cycle between the low voltage 15VDC. Other excess electric energy can also be converted into 380VDC high voltage electricity and used for the environmental chamber and / or other designated equipment;

[0104] Based on the above three charge and discharge cycles, the low-voltage to high-voltage electric energy cycle can be realized, so that the excess electric energy generated by the battery discharge test can be fully collected and utilized, so as to improve the conversion efficiency, achieve energy saving, reduce maintenance and floor space, etc.

[0105] In this solution, the environmental chamber is integrated with the charging and discharging unit to reduce the footprint of the environmental test chamber system and increase space utilization;

[0106] Among them, the charge and discharge unit provides the specified charge and discharge conditions for the battery to be charged and discharged, and the environmental chamber provides the corresponding temperature conditions for the battery test;

[0107] The charging and discharging unit is integrated with the environmental chamber. After integration, the metal shell of the charging and discharging unit is removed and integrated into the rear part of the environmental chamber. The DC small modules of multiple batteries are merged into a unified DC large module, which has a strong overall sense and is more compact.

[0108] In this solution, after the environmental chamber is integrated with the charging and discharging unit, water cooling is used for both the environmental chamber and the charging and discharging unit. Since there is no condensing fan, the noise to the laboratory can be reduced, and the heat is taken away by water, so there is no need to increase the laboratory air-conditioning configuration. The cooling effect is better for the environmental chamber itself, and without the operation of the condensing fan, it is more energy-efficient.

[0109] refer to Figure 6 ,In this solution, a controller is used to simultaneously control the ,charge and discharge unit and the environmental chamber, and accordingly, a set of ,control programs is configured to simultaneously control the charge and discharge unit and the environmental chamber;

[0110] The configuration control software can control the temperature rise, temperature drop, fault feedback, parameter adjustment of the environmental chamber, record, export and store curves, control the charging and discharging energy utilization of the charging and discharging unit and store, record and export parameters;

[0111] The control software can also be configured to obtain sensor data during battery charge and discharge tests, detect battery surface temperature and voltage changes through the sensor data, and control the fire-fighting components in the environmental chamber to operate when the battery surface temperature or voltage changes abnormally.

[0112] In this solution, the control software can also be configured to control the power released by the battery to be transmitted to the battery that needs to be charged first when part of the battery is discharging and part of the battery is charging. The 15V low-voltage cycle is realized based on the DCDC module. If there is any remaining power, the low-voltage 15V to high-voltage 380V cycle is performed, which can be used for practical purposes such as incubators to reduce discharge power loss, reasonably allocate the charging and discharging power of the entire batch of equipment, and achieve higher utilization rate.

[0113] In this solution, by integrating the environmental chamber and the charging and discharging unit, and connecting the charging and discharging unit and the battery through the box-penetrating quick wiring, the length of the cable required for charging and discharging is shortened, the line loss is reduced, and the loss of electric energy is reduced. The main line of the environmental chamber and the cable of the charging and discharging unit are unified, and the labor and material costs of external wiring are reduced.

[0114] Environmental test chamber systems are all water-cooled, which reduces the power consumption of fans and air conditioners, and reduces the energy consumption of the equipment itself.

[0115] When the environmental chamber and the charge-discharge unit are integrated, the external sheet metal shell of the charge-discharge unit is eliminated to reduce costs. Multiple environmental chamber systems share one ACDC submodule. After ACDC is shared, the overall price of the system is reduced.

[0116] The environmental chamber is integrated with the control components and control software of the charging and discharging unit, which makes the control simple, easy to operate, has fewer parts, and the system occupies a small area, which makes the site utilization higher. The charging and discharging cables are set in the environmental chamber and cannot be seen from the outside, which improves the appearance.

[0117] Figure 7 is a schematic diagram of the environmental test chamber system application in the embodiment, refer to Figure 7 , multiple environmental test chamber systems can share one ACDC submodule 111 and one controller 300;

[0118] The ACDC submodule 111 is connected to the charge and discharge unit via the concentrator module 21, and the controller 300 is connected to the charge and discharge unit via the hub;

[0119] Among them, the discharge power can pass through the confluence module 21 (the DCDC module corresponding to each environmental box on the confluence module has a separate circuit breaker, which can be disconnected separately when one line fails), and the discharge power can be redistributed by the controller 300 to the AC power grid end, thereby saving electricity to the greatest extent.

[0120] Note that the above are only preferred embodiments of the present invention and the technical principles used. Those skilled in the art will understand that the present invention is not limited to the specific embodiments described herein, and that various obvious changes, readjustments and substitutions can be made by those skilled in the art without departing from the scope of protection of the present invention. Therefore, although the present invention has been described in more detail through the above embodiments, the present invention is not limited to the above embodiments, and may include more other equivalent embodiments without departing from the concept of the present invention, and the scope of the present invention is determined by the scope of the appended claims.

Claims

1. An environmental test chamber system, characterized in that: include: An environmental test chamber, the environmental test chamber comprising a charge and discharge unit and an environmental chamber; The charging and discharging unit includes a plurality of DCDC modules and a box-penetrating fast connection, wherein a first end of the DCDC module is connected to a DC bus, and a second end of the DCDC module is connected to a power connection terminal of the box-penetrating fast connection; The box-penetrating quick connection also includes a first battery terminal and a second battery terminal, and one of the first battery terminal and the second battery terminal is connected to the battery to be tested in the environmental chamber; The first battery terminal is used to connect to one of the batteries to be tested, and the second terminal is used to connect to a plurality of the batteries to be tested in parallel at the same time; Also includes a controller; The controller is configured to control the charging and discharging process of the charging and discharging unit, and control the environmental test parameters of the environmental box.

2. The environmental test chamber system according to claim 1, characterized in that: It also includes ACDC module and confluence module; The ACDC module is used to connect to the AC power grid, and the ACDC module is connected to the DCDC module through the bus module; The controller is configured to control the AC power grid to charge the battery to be tested, control the battery to be tested to discharge to the AC power grid, and control the battery to be tested to perform charge and discharge interaction through the DCDC module.

3. The environmental test chamber system according to claim 1, characterized in that: The environmental test box is also equipped with a water cooling unit, which is used to cool the charging and discharging unit and the environmental box.

4. The environmental test chamber system according to claim 1, characterized in that: The power connection terminal of the box-penetrating quick connection is placed outside the environmental box, and the first battery connection terminal and the second battery connection terminal are placed inside the environmental box.

5. The environmental test chamber system according to claim 4, characterized in that: The box-penetrating quick connection also includes a silicone heating sheet, and the silicone heating sheet is used to heat the epoxy tube of the box-penetrating quick connection; The epoxy tube is used for sealing and protecting the conductive copper rod of the box-penetrating quick connection.

6. The environmental test chamber system according to claim 1, characterized in that: One of the DCDC modules is configured with one circuit breaker.

7. The environmental test chamber system according to claim 1, characterized in that: The box-penetrating quick wiring is configured to support two specifications of batteries to be tested: 5V600A and 5V300A.

8. The environmental test chamber system according to claim 1, characterized in that: A switch is also included, and the controller is communicatively connected with the DCDC module through the switch.

9. The environmental test chamber system according to claim 2, characterized in that: The ACDC module includes an ACDC submodule, a first DCDC submodule, and a second DCDC submodule; The AC power grid is connected to the ACDC submodule, the ACDC submodule is connected to the first DCDC submodule, and the first DCDC submodule is connected to the second DCDC submodule; The second DCDC submodule is connected to the DCDC module.

10. The environmental test chamber system according to claim 1, wherein: It also includes a production information management system, which is connected to the controller.