Method for erecting transport structure
Through the combination of the lower structure formed by piers and girders and multiple transportation paths, the hyperloop technology can be easily erected and assembled in rugged terrain and complex environments, solving the difficulties of transportation and installation of huge pipe sections, and improving energy supply and Flexibility in electrical certification.
Patent Information
- Application Number
- CN202280092718.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2022-02-28
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2042-02-28
AI Technical Summary
Existing hyperloop technology faces difficulties in transporting and installing huge tube sections in rugged terrain and far away from existing roads, as well as energy supply and electrical certification issues.
Using a lower structure formed by piers and girders, the girders and pipe sections are alternately transported and positioned through multiple transport paths, and vehicles are used to circulate along preset paths for assembly, ensuring that the pipe sections are transported without air friction under low air pressure. march.
It realizes the convenient erection and assembly of hyperloop structures in rugged terrain and complex geographical environments, reduces the difficulty of transportation and installation, and improves the flexibility of energy supply and the convenience of electrical certification.
Smart Images

Figure CN118765247A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a method for erecting a transport structure comprising two assemblies formed of tube sections, each of which can be placed under low air pressure and through which a cabin can travel substantially without air friction. Such a transport system is generally referred to as hyperloop technology. The invention also relates to a corresponding transport structure. Background Art
[0002] Hyperloop technology is a high-speed transportation system proposed for both passenger and freight transport. The high-speed transportation system is basically a sealed tube system with low air pressure, and the cabin can travel through the sealed tube system without air resistance or air friction. The high-speed transportation system has three main components: tube, cabin and station. The tube is a large sealed low-pressure system that can be built above the ground, below the ground or on the ground. The high-speed transportation system includes the necessary infrastructure to ensure suspension / suspension, propulsion, braking, etc. The vehicle runs inside this controlled environment and is generally referred to as a cabin. The cabin adopts electric suspension (electromagnetic suspension or electric suspension) or aerodynamic suspension (using air bearing gliding device) and electromagnetic propulsion or aerodynamic propulsion to slide along fixed rails. The station is the following facility: at this facility, the cabin can be started or stopped, and at this facility, passengers can get on / off, and cargo can be loaded / unloaded. Stations are positioned at each end of the sealed tube system.
[0003] In an artist's concept, above-ground hyperloop structures are often represented in the form of tube segments, the ends of which simply rest on regularly spaced piers. This design is very attractive, but it does not provide a full understanding of the important challenges during the installation step. One of these challenges is that the tube segments are huge pieces that cannot be easily transported to the construction site, especially when the terrain is steep or difficult to access or when the hyperloop route is far from existing roads. In order to avoid the transportation of tube segments, it is particularly known from US9517901 to use a movable tube production machine (such as Fig. 9 A) is used to manufacture and assemble the pipe on land, where the pipe production machine is operable to move on land and be guided along the construction route. Alternatively, a mobile in-situ manufacturing system (such as Fig. 9B) can be located at a single location to manufacture multiple pipe segments (e.g., fifty pipe segments) and then subsequently moved to a new location. In both cases, the hyperloop route can only be built if a mobile production machine or mobile manufacturing system can access the construction site. Furthermore, among other disadvantages, it is worth mentioning that energy supply can be tricky when moving along the construction route, and new electrical certifications may have to be obtained each time the machine / system is moved. Summary of the invention
[0004] The object of the present invention is therefore to remedy the drawbacks of the methods and structures of the prior art by providing a method for erecting an above-ground transport structure which is compatible with rough terrain and for which the transport of the different elements of the structure and their assembly are facilitated.
[0005] To this end, a first subject of the invention comprises a method for erecting a portion of a transport structure, the portion comprising a first assembly formed of pipe segments and a second assembly formed of pipe segments, both assemblies being capable of being exposed to low air pressure and through which a cabin can travel substantially without air friction, the method comprising:
[0006] -(a) erecting a substructure, the substructure comprising: a plurality of piers; a first plurality of girders formed of girders, the first plurality of girders being positioned on at least some of the piers and forming a first transport path extending from a first end portion to a second end portion of the substructure; and a second plurality of girders formed of girders, the second plurality of girders being positioned on at least some of the piers and forming a second transport path extending from the first end portion to the second end portion of the substructure beside the first transport path, the erection step comprising: using a vehicle to transport girders of the first plurality of girders and the second plurality of girders along the first transport path formed by girders of the first plurality of girders previously positioned; alternately positioning the girders at their use positions at the second end portion of the first transport path and at the second end portion of the second transport path; and returning the vehicle to the first end portion of the substructure along the second transport path formed by girders of the second plurality of girders previously positioned,
[0007] (b) using a vehicle to transport the pipe segments to a use position of each pipe segment along only one of the first transport path and the second transport path; alternately positioning each pipe segment on the first plurality of girders and the second plurality of girders at its use position, and returning the vehicle along the other of the first transport path and the second transport path.
[0008] The method according to the invention may also have the optional features listed below, considered individually or in combination:
[0009] - the substructure does not include any platforms forming service paths,
[0010] - The erection step a) comprises a first sub-step of erecting the pier,
[0011] - erection step a) comprises an additional sub-step of erecting a first section of the substructure at the reserve point, the first section comprising at least one pier, at least one girder of the first plurality of girders and at least one girder of the second plurality of girders,
[0012] - in step a), the vehicle is equipped with a beam at a first end portion of the substructure,
[0013] - the girders are positioned with the aid of a girder applicator crane supported by the substructure itself,
[0014] - girders of the first plurality of girders are positioned behind girders of the first transport path forming a second end portion of the substructure, and girders of the second plurality of girders are positioned behind girders of the first transport path forming a second end portion of the substructure,
[0015] - in step b), the vehicle is equipped with a pipe segment at a first end portion of the substructure,
[0016] In step b), the pipe segments are first positioned at the second end portion of the substructure and then positioned one after the other in the direction of the first end portion of the substructure.
[0017] A second subject of the invention comprises parts of a transport structure for enabling a cabin to travel substantially without air friction in an assembly formed by tube segments placed under low air pressure, the part of the transport infrastructure comprising:
[0018] - a substructure, the substructure comprising: a plurality of piers; a first plurality of girders formed by girders, the first plurality of girders being positioned on at least some of the piers and forming a first transport path extending from a first end portion to a second end portion of the substructure; a second plurality of girders formed by girders, the second plurality of girders being positioned on at least some of the piers and forming a second transport path extending from the first end portion to the second end portion of the substructure alongside the first transport path,
[0019] - an upper structure, the upper structure comprising a first assembly formed by tube segments positioned on a first transport path and a second assembly formed by tube segments positioned on a second transport path, each assembly formed by tube segments being capable of being placed under low air pressure and capable of allowing the cabin to circulate in the tube segments substantially without air friction.
[0020] The parts of the transport structure according to the invention may also have the optional features listed below, considered individually or in combination:
[0021] - the substructure does not include any platforms forming service paths,
[0022] - a first end of the girder rests on a given pier and a second end of the girder rests on an adjacent pier along the longitudinal axis X of the section of the transport structure,
[0023] - all girders of the first plurality of girders are positioned one after another successively and continuously along the longitudinal axis X of the portion of the transport structure, and all girders of the first plurality of girders are positioned one after another successively and continuously along the longitudinal axis X of the portion of the transport structure,
[0024] - each of the first transport path and the second transport path comprises two continuous rails formed by girders, the two continuous rails extending parallel to each other,
[0025] The superstructure comprises a third assembly formed of pipe segments positioned on the first assembly formed of pipe segments and / or a fourth assembly formed of pipe segments positioned on the second assembly formed of pipe segments.
[0026] It is evident that the invention is based on the construction of a substructure formed by piers and beams, which can withstand the transport of heavy components like beams or tube sections and which is able to support the superstructure formed by tube sections once it is positioned on the substructure. The substructure comprises a circulation loop so that, starting from a reserve point, vehicles circulating on the part of the substructure already in place can transport each additional element of the transport structure to its position at the construction point and back to the reserve point without hindering other vehicles transporting the next element to the construction point. Thus, the transport structure can be easily constructed, whatever the terrain.
[0027] Other features and advantages of the present invention will be described in more detail in the following description. BRIEF DESCRIPTION OF THE DRAWINGS
[0028] The present invention will be better understood by reading the following description, which is provided for illustrative purposes only and is not intended to be limiting in any way, with reference to the following drawings:
[0029] - Figure 1 is a view of a portion of a transport structure according to a first variant of the invention,
[0030] - Figure 2 is a view of a portion of a transport structure according to a second variant of the invention,
[0031] - Figure 3 yes Figure 2 A longitudinal section view of a portion of a transport structure,
[0032] - Figure 4 is a detailed view of a portion of a transport structure according to a third variant of the invention,
[0033] - Figure 5 The diagram shows the erection of the piers for the transport structure section.
[0034] - Figure 6 The diagram shows the erection of a first section of the substructure of a portion of the transport structure,
[0035] - Figure 7 The diagram illustrates loading of girders at a storage point onto a vehicle positioned on a first section of a substructure of a portion of a transport structure,
[0036] - Figure 8 The diagram shows the transport of the girders to the construction site along one of the transport routes of the substructure.
[0037] - Fig. 9 Illustration of positioning the girder at the construction point.
[0038] - Fig.10 The diagram shows a vehicle returning to a reserve point along another transport route.
[0039] - Fig.11 The diagram illustrates the loading of pipe segments at a storage point onto a vehicle positioned on a first section of a substructure of a portion of a transport structure,
[0040] - Fig.12 The diagram shows the transport of the first pipe section to the construction site along one of the transport paths of the substructure,
[0041] - Fig.13 The diagram illustrates positioning the first pipe section at the construction point,
[0042] - Fig.14 The diagram shows the transport of the second pipe section to the construction site along one of the transport paths of the substructure,
[0043] - Fig.15 The diagram shows positioning of the second pipe section at the construction point,
[0044] - Fig.16 An overall view of the section of the transport structure under construction. DETAILED DESCRIPTION
[0045] It should be noted that spatially relative terms such as "lower", "below", "interior", "inward", "exterior", "outward", etc. used in this application refer to the position and orientation of different elements of the transport structure portion when the transport structure has been erected. "Upstream" and "downstream" used in this application refer to the direction of assembly starting from the storage point.
[0046] Reference Figures 1 to 4 , the part 1 of the transport structure according to the present invention first includes a lower structure 2, which includes: a plurality of piers 3; a first plurality of girders 4 formed by girders 6, the first plurality of girders 4 are positioned on at least a portion of the piers (i.e., positioned on at least some of the piers), and form a first transport path 7 extending from a first end portion to a second end portion of the lower structure; and a second plurality of girders 5 formed by girders 6, the second plurality of girders 5 are positioned on at least a portion of the piers (i.e., positioned on at least some of the piers), and form a second transport path 10 extending from the first end portion to the second end portion of the lower structure next to the first transport path 7.
[0047] The section of the transport structure comprises a plurality of segments, preferably at least 3 segments. The segments are defined by the length of the girders. The segments preferably match the distance between two consecutive piers along the longitudinal axis X of the section of the transport structure.
[0048] The pier 3 is an upright support for a structure or superstructure, such as an arch or a bridge. The pier 3 supports the superstructure and transfers the load of the superstructure to the foundation. The shape of the piers according to the present invention is not particularly limited as long as the piers can support the first transport path and the second transport path mentioned above.
[0049] according to Figure 1 In the illustrated first variant, the pier is V-shaped. The V-shaped pier extends substantially in a plane perpendicular to the route, i.e. perpendicular to the length of the girder. The pier comprises two outwardly extending inclined arms. Each arm can support one of the first transport path and the second transport path. The pier according to this second variant can also include a pier cap in the form of a horizontal beam connecting the two arms. Such a pier cap provides an additional base for the girder and better distributes the load from the girder to the pier.
[0050] according to Figure 2 In the second variant illustrated, the pier is a bent pile pier, ie a pier consisting of two or more columns supporting a pier cap. The pier extends substantially in a plane perpendicular to the course, ie perpendicular to the length of the girder.
[0051] Alternatively, the plurality of piers may be divided into a first plurality of piers and a second plurality of piers. The first plurality of piers supports the first plurality of girders, and the second plurality of piers supports the second plurality of girders. An advantage of this design is that the space between the first transport path and the second transport path and / or the height of the first transport path and the second transport path can be easily adjusted according to the topography of the land.
[0052] Other shapes such as Y-shaped piers, X-shaped piers, H-shaped piers, hammerhead piers, cantilever piers, trestle piers, solid piers, and simple columns are also possible.
[0053] The piers are preferably substantially regularly spaced along the longitudinal axis X of the transport structure section.
[0054] The substructure 2 of the part 1 of the transport structure according to the invention further comprises a first plurality of girders 4 formed by girders 6 which are positioned on at least some of the piers 3 and form a first transport path 7 extending from a first end portion to a second end portion of the substructure.
[0055] The girder 6 is a supporting beam used in construction. The girder may be made of steel or concrete, or it may be a composite structure. The girder may be in the form of an I-beam cross section formed by two load-bearing flanges separated by a stabilizing web. The girder may be in the form of a plurality of longitudinal members connected by transverse members. Figures 1 to 4 In the variant shown, the girder is a box girder, ie a girder forming a closed tube with a plurality of walls. A significant advantage of a box girder is that the electrical wires can be positioned inside.
[0056] Preferably, each girder 6 extends from one pier to an adjacent pier. In particular, a first end of the girder rests on a given pier and a second end of the girder rests on an adjacent pier along the longitudinal axis X of the transport route or part of the transport structure. Thus, the girder can be easily installed by simply positioning the girder on the piers. Alternatively, the girder may extend over more than two piers.
[0057] A first plurality of girders 4 formed by girders 6 is positioned along the longitudinal axis of a transport route or part of a transport structure so as to form a first transport path 7. By transport path is meant at least one continuous track designed to withstand the transport of heavy components like girders or tube sections with vehicles and designed to support the superstructure once it has been positioned on the transport path. For the sake of clarity, the transport path is a temporary path; it allows the transport of elements only during the erection phase. Once the assembly of tube sections has been positioned on the transport path, the latter no longer serves as a path. The transport path extends from a first longitudinal end portion of the substructure to a second longitudinal end portion of the substructure, whatever the length of the substructure.
[0058] according to Figures 1 to 3 In a first variant of the transport path illustrated, the first transport path 7 is constituted by a single continuous track formed by girders. In other words, all girders 6 of the first plurality of girders 4 are positioned one after the other successively and continuously along the longitudinal axis X of the part of the transport structure. In this case, the girders are large enough to allow vehicles to circulate on them. The transport path may be a substantially flat metal or concrete surface, preferably the upper surface of the girders. The transport path may also be a railway line as part of the upper surface of the girders.
[0059] according to Figure 4 In a second variant of the illustrated first transport path 7, the transport path is constituted by two continuous tracks formed by girders 6, which extend parallel to each other. In other words, half of the girders 6 of the first plurality of girders 4 are positioned one after another successively and continuously along the longitudinal axis of the portion of the transport structure, and half of the girders 6 of the first plurality of girders 4 are positioned one after another successively and continuously and parallel to the first half of the girders. In this case, the girders are not large enough to allow vehicles to circulate on the girders, but the two continuous tracks are spaced apart from each other so that the vehicles can circulate in such a way that their inner wheels are located on the inner track and their outer wheels are located on the outer track. The track beams may be part of the upper surface of the girders, so that the two continuous tracks form a railway line.
[0060] The substructure 2 of the part 1 of the transport structure according to the invention further comprises a second plurality of girders 5 formed by girders 6, which are positioned on at least a part of the piers and form a second transport path 10 extending from a first end portion to a second end portion of the substructure beside the first transport path 7. The limitations and variants detailed with respect to the first transport path apply here. The limitations and variants detailed with respect to the first plurality of girders apply here. The girders of the first plurality of girders and the girders of the second plurality of girders may be identical to facilitate logistics.
[0061] The second transport path 10 extends beside the first transport path 7. Beside means that the two transport paths are substantially parallel to each other and extend adjacent to each other. The transport paths are not limited to those located at the same height and / or strictly parallel. The space between the first transport path and the second transport path and / or the height of the first transport path and the second transport path can be adjusted according to the topography of the land.
[0062] like Figures 1 to 4As illustrated in the variation of , the first plurality of girders 4 and the second plurality of girders 5 formed by the girders 6 may each be positioned on all piers. Generally, when each pier extends transversely enough to support both the first plurality of girders and the second plurality of girders, the first plurality of girders 4 and the second plurality of girders 5 formed by the girders 6 are each positioned on all piers. Alternatively, the first plurality of girders 4 and the second plurality of girders 5 formed by the girders 6 are each positioned on only a portion of the piers, such as in the case where the piers are in the form of columns, wherein half of the piers support the first plurality of girders and the other half of the piers support the second plurality of girders.
[0063] Optionally, supports are positioned between the piers and the girders. Supports are devices that support the girders and transfer loads and motion from the girders and superstructure to the substructure and foundation. Supports allow controlled motion and reduce the stresses involved.
[0064] During the construction phase, thanks to the first plurality of girders 4 formed by the girders 6 and the second plurality of girders 5 formed by the girders 6, a vehicle circulating over the already in place components of the substructure can easily transport each additional element of a portion of the transport structure along a roof-type transport path to the location of each additional element, and can return to the reserve point along another roof-type transport path. There is no longer a need to enter and exit the ground along the construction route. This advantage will be further detailed when describing the erection method. During operation, the first plurality of girders and the second plurality of girders support the tube segments and contribute to the straightness of the assemblies formed by the tube segments. This straightness is very important for the smooth travel of the cabin in the tube. In addition, the combination of girders and tube segments acts as a beam, which significantly increases the lateral torsional buckling of the structure.
[0065] Optionally, the substructure 2 of the part 1 of the transport structure according to the present invention does not include any platform positioned on the pier or connected to the beams of the first transport path or the second transport path. The platform is defined as a lightweight structure suitable for vehicle traffic. The platform is preferably made of steel. The platform preferably includes a traffic deck, i.e. a surface suitable for vehicle traffic, which may be reinforced below by longitudinal reinforcements and / or transverse reinforcements. These reinforcements increase the structural rigidity of the traffic deck. For safety reasons, the traffic deck may also include safety rails along the longitudinal edges of the traffic deck. The traffic deck, reinforcements and safety rails are preferably made of steel. The traffic deck is preferably a perforated surface, such as a perforated steel plate or a metal grille.
[0066] Therefore, for this reason, the substructure 2 of the part 1 of the transport structure according to the invention does not comprise any service path formed by a plurality of platforms positioned along the longitudinal axis X. A service path is understood to mean at least one continuous track designed to withstand vehicle traffic. A service path differs from a transport path in that a service path is not designed to withstand the transport of heavy components like girders or pipe sections and in that a service path is not designed to support a superstructure.
[0067] Reference Figures 1 to 4 The transport structure according to the invention further comprises a superstructure 11, which comprises a first assembly 12 formed by a tube section 14 positioned on a first transport path, which can be placed under low air pressure and can allow the cabin to circulate in the tube section substantially without air friction. "Low air pressure" refers to an air pressure lower than atmospheric pressure, preferably lower than or equal to 10 kPa, more preferably between 10 Pa and 10 kPa.
[0068] The design of the pipe section 14 is not limited, as long as the pipe section 14 can be directly or indirectly connected to each other along the longitudinal axis by its longitudinal end to form an assembly as described above. In particular, the cross section of the pipe is not limited. The cross section of the pipe can be a circular cross section or a polygonal cross section in particular. In fact, the ability of the assembly placed under low air pressure is given by the characteristics of the pipe section wall, the characteristics of the connection between the pipe section and the pumping device. In particular, the pipe section wall must be airtight. The different ways to make the pipe wall airtight are well known, and those skilled in the art will know how to select the characteristics of the wall in each specific case. For example, the pipe can be a metal pipe made of a welded plate or a metal structure covered by an airtight film. In addition, the connection between the two pipe sections must be airtight. The airtightness of the connection can be provided in particular by welding, by adding a component such as an elastomer between the pipe sections that are bolted or clamped, or by means of an expansion joint. Those skilled in the art know how to make the connection airtight, and will make the connection suitable for each specific case. Furthermore, the pumping equipment must be appropriately dimensioned so that low air pressures can be reached and maintained in the assembly of pipe sections, taking into account air leaks in operation. A person skilled in the art knows how to do this and will adapt the pumping equipment to each specific case.
[0069] In practice, the ability of the assembly to allow the capsule to circulate in the tube segment substantially without air friction is conferred by infrastructures positioned inside the tube segment and which in particular provide levitation / suspension, propulsion, braking, etc. Such infrastructures are already well known and a person skilled in the art will know how to adapt the infrastructures to each specific case.
[0070] Preferably, the pipe segment comprises legs distributed along the length of the segment and adapted to allow the pipe segment to stand independently on its legs on the substructure. The number of legs and their position on the pipe segment can be optimized during the structural design phase.
[0071] The pipe sections are preferably made of steel. Steel has the advantages of being lightweight, easily vacuum-tight and recyclable.
[0072] The pipe section may be connected to external components and / or internal components along its length and / or at its ends. These components may be very diverse. To name a few of these components, these components may be reinforcements, photovoltaic panels, sensors, etc.
[0073] Reference Figures 1 to 4 The superstructure 11 according to the present invention further comprises a second assembly 13 formed by a pipe section 14 positioned on a second transport path, which can be placed under low air pressure and can allow the cabin to circulate in the pipe section substantially without air friction. The features and modifications of the pipe section in the first assembly detailed above also apply to the pipe section in the second assembly. The pipe section in the first assembly and the pipe section in the second assembly can be identical to facilitate logistics.
[0074] According to a variant, the superstructure 11 according to the invention also comprises a third assembly formed of tube segments 14 positioned on the first assembly formed of tube segments 12 and / or a fourth assembly formed of tube segments 14 positioned on the second assembly formed of tube segments 13. In particular, each tube segment in the third assembly formed of tube segments is positioned on a tube segment in the first assembly formed of tube segments and / or each tube segment in the fourth assembly formed of tube segments is positioned on a tube segment in the second assembly formed of tube segments. This positioning limits the footprint of the transport structure. This positioning also reduces the amount of switches and facilitates surface use, in particular surface use biased towards stations. Optionally, each tube segment in the first assembly formed of tube segments is connected to a tube segment in the third assembly formed of tube segments before being transported to the construction site. Similarly, each tube segment in the second assembly formed of tube segments is connected to a tube segment in the fourth assembly formed of tube segments before being transported to the construction site. The connection can be completed using a transverse connector and / or a structure surrounding the two tube segments. In this case, the assembly formed by the tube sections is transported along a first transport path 7 or a second transport path 10, as will be described in further detail when describing the erection method. This speeds up the transport of the elements to the construction site and thus shortens the erection phase. According to this variant, the transport path can consist of a plurality of girders 6 arranged indifferently in one single continuous track formed by girders or in two continuous tracks formed by girders 6, the two continuous tracks extending parallel to each other.
[0075] Reference Figures 5 to 16 , a method for erecting a portion 1 of a transport structure according to the invention will now be described. In general, the method comprises a first step of erecting a substructure 2 and a second step of erecting a superstructure 11. First the step of erecting the substructure is described.
[0076] In a first step of erecting the substructure 2, the piers 3 of the part 1 of the transport structure are erected. These piers can be erected using any suitable method, such as using, for example, panel formwork. The method of erecting the piers comprises erecting pier foundations according to the requirements of the ground properties. This step can be carried out before the step of positioning the girders 6, or at least partially simultaneously with the step of positioning the girders. In other words, the piers can be erected before the girder positioning starts, for example a few weeks before. This provides time in particular for concrete drying and soil compaction. Alternatively, when the girder positioning starts on the first erected pier, some piers are still being erected.
[0077] Since the floor space for erecting the piers is limited and only light vehicles (bulldozers, concrete mixer trucks) are required, the piers are preferably erected by ground access to the construction point of each pier.
[0078] In a second step of erecting the substructure 2, the girders 6 of the part 1 of the transport structure are erected.
[0079] As mentioned above, the erection of the girders starts from a reserve point 15, where at least some of the elements of the transport structure are stored. Depending on the ease of transporting the elements to the reserve point, some elements can be manufactured in a manufacturing facility at the reserve point. For example, this may be the case for girders and / or pipe sections that are large pieces. Manufacturing some elements at the reserve point minimizes the erection time at the construction site and allows better control of the quality of the manufactured elements.
[0080] The reserve point 15 is preferably located at a future point of a station, in particular a passenger and / or freight station. This limits the floor space required during the construction phase. This also limits the civil works. In particular, the civil works completed for the establishment of the reserve point and its optional manufacturing facilities can be used to erect the station. The reserve point is preferably located at ground level.
[0081] like Figure 6As shown, the first sub-step of erecting the girders 6 is performed at the reserve point 15. This sub-step includes erecting a first section of the substructure at the reserve point, the first section including at least one pier 3, at least one girder 6 of the first plurality of girders and at least one girder 6 of the second plurality of girders. Specifically, this sub-step includes positioning the girders of the first plurality of girders on at least one pier and positioning the girders of the first plurality of girders on at least one pier. More specifically, the girders of the first plurality of girders and the girders of the second plurality of girders are positioned on the same at least one pier. This positioning is preferably done using a crane 16 that can pick up elements on the reserve point and move them to the pier.
[0082] According to a first variant, the first section of the substructure comprises a single pier. This is particularly the case when the reserve point is positioned on higher ground. Then, the first end portion of a first beam of the first plurality of beams can rest on higher ground, while its second end portion can rest on the pier positioned downward. Similarly, the first end portion of a first beam of the second plurality of beams can rest on high ground, while its second end portion can rest on the pier positioned downward. In this case, the first sub-step comprises positioning a beam of the first plurality of beams between the higher ground and the pier, and positioning a beam of the second plurality of beams between the higher ground and the pier.
[0083] according to Figure 6 In the second variant illustrated above, the first section of the substructure comprises two piers. This is particularly the case when the reserve point is located on substantially flat ground. Then, the first end portion of a first beam of the first plurality of beams can rest on the first pier, while its second end portion can rest on the second pier. Similarly, the first end portion of a first beam of the second plurality of beams can rest on the first pier, while its second end portion can rest on the second pier. In this case, the first sub-step comprises positioning a beam of the first plurality of beams on two piers and positioning a beam of the second plurality of beams on two piers.
[0084] This first sub-step may comprise erecting further sections of the substructure at the reserve point. The number of sections erected at the reserve point is limited by the ability of the crane to position the elements on the pier from the reserve point.
[0085] Once the first section of the substructure has been erected, the first section comprises a first end portion adjacent to the reserve point and a second end portion located at the opposite end of the first end portion. The first end portion of the first section corresponds to the first end portion of the substructure of the portion of the transport structure erected according to the invention. Therefore, the position of the first end portion of the substructure of the portion of the transport structure erected according to the invention will not change over time during the erection of the portion of the transport structure. As for the second end portion of the first section, this second end portion corresponds to the second end portion of the substructure under construction, as long as no other sections of the substructure are erected downstream of the first section. In other words, each time a new section is erected downstream of an already erected section of the transport structure, the position of the second end portion of the substructure under construction will change over time.
[0086] Since the elements constitute the erected substructure, the vehicle 17 can circulate on a first transport path 7 formed by at least one girder 6 of the first plurality of girders 4, and on a second transport path 10 formed by at least one girder 6 of the second plurality of girders 5. In particular, the vehicle that moves the elements to be positioned along the construction route can circulate on the first transport path, i.e., starting from the first end portion of the substructure under construction and up to the second end portion. Once the element has reached its place of use, the vehicle can return to the first end portion via the second transport path.
[0087] Therefore, in the second sub-step of erecting the girder 6, another section of the substructure can be erected as described in detail below. For simplicity, this section is referred to as the "second section" below, assuming that only the first section has been erected at the storage point.
[0088] The second section of the substructure comprises at least one girder 6 of the first plurality of girders 4, at least one girder 6 of the second plurality of girders 5 and at least one pier 3 of the substructure.
[0089] As explained above with regard to the pier erection, at least one additional pier is erected downstream of the first section of the substructure.
[0090] A vehicle 17 suitable for transporting heavy elements is positioned on a first section of the substructure, specifically on a first transport path 7, more specifically on a first beam 6 of the first plurality of beams 4. The vehicle can be lifted by a crane 16, or it can also reach its location with the aid of an access ramp or any other suitable device. The type of vehicle is not limited. The type of vehicle can be a wheeled vehicle, such as a truck or a locomotive. Depending on the type of vehicle, the elements to be transported can be loaded on one vehicle or on several vehicles at the same time, or the vehicle can simply be connected to the elements, as can be the case in the case of a locomotive for transporting elements equipped with railway wheels. In this specification, the terms "assembly" and "pairing" are used to equally represent the loading of a vehicle with an element and the connection of a vehicle with an element. The term "disengagement" is used to equally represent the unloading of an element from a vehicle and the disconnection of a vehicle from an element.
[0091] Some vehicles are equipped with beams of the second section of the substructure. Specifically, the vehicle is equipped with at least one beam 6 of the first plurality of beams 4 and the vehicle is equipped with at least one beam 6 of the second plurality of beams 5. The elements can be delivered from a stock point on the first section of the substructure or can be lifted from a stock point by a crane up to the first section of the substructure. In the first case, the elements can be delivered by the vehicle itself. In the second case, the vehicle can be positioned and then assembled.
[0092] Then, the beam is transported by a vehicle along the first transport path 7 from the first end portion of the substructure under construction to the second end portion adjacent to the use position of the beam. Specifically:
[0093] - transporting at least one girder 6 of the first plurality of girders 4 along a first transport path 7 formed by girders of the first plurality of girders positioned on a first section of the substructure,
[0094] - at least one girder 6 of the second plurality of girders 5 is transported along a first transport path 7, ie along the same transport path as at least one girder 6 of the first plurality of girders.
[0095] The order in which the beams are paired with the vehicle and transported to the second end portion is not limited. In addition, some components can be transported to the second end portion while other components are still assembled on the vehicle. If the beams in the first plurality of beams 4 and the beams in the second plurality of beams 5 are different in design, it is preferred that the beams are transported to the second end portion alternately to facilitate the positioning of the beams.
[0096] Once the girder has been delivered to the second end portion of the substructure under construction, the element is positioned in its use position, ie its service position in the substructure. Specifically:
[0097] - At least one girder 6 of the first plurality of girders 4 is positioned downstream of the first transport path 7. In particular, the at least one girder 6 is positioned after the girder of the first transport path forming the second end portion of the substructure under construction. More particularly, the at least one girder 6 is positioned in line with the girder 4 of the first transport path 7 forming the second end portion along the longitudinal axis X. Even more particularly, the at least one girder 6 is positioned so that a first end of the girder rests on a pier forming the second end portion of the first section of the substructure and a second end of the girder rests on at least one additional pier erected downstream of the first section of the substructure. At least one girder of the first plurality of girders is preferably positioned with a crane 18, more preferably with a girder applicator crane supported by the substructure itself.
[0098] - Furthermore, at least one girder 6 of the second plurality of girders 5 is positioned downstream of the second transport path 10. In particular, the at least one girder 6 is positioned behind the girders of the second transport path forming the second end portion of the substructure under construction. More particularly, the at least one girder 6 is positioned in line with the girders of the second transport path forming the second end portion along the longitudinal axis. Even more particularly, the at least one girder 6 is positioned such that a first end of the girder rests on a pier forming the second end portion of the first section of the substructure and a second end of the girder rests on an additional pier erected downstream of the first section of the substructure. At least one girder of the second plurality of girders is preferably positioned by means of a crane 18, more preferably by means of a girder applicator crane.
[0099] The use of a crane 18 supported by a substructure is beneficial. This crane 18 further limits the footprint of the erection by eliminating the need for ground access and crane ground preparation at the construction site. This also makes the erection method further independent of the roughness of the topography and terrain.
[0100] The girders are alternately positioned downstream of the first transport path 7 and downstream of the second transport path 10, more preferably alternately positioned downstream of the first transport path 7 and downstream of the second transport path 10 by means of a girder applicator crane. The order in which the girders are alternately positioned is not limited. In addition, some girders may be positioned while other girders are still being paired with a vehicle or being transported to the second terminal portion.
[0101] Once the beam has been positioned, the corresponding detached vehicle can return to the first end portion of the substructure along the second transport path 10. Specifically:
[0102] - The vehicle 17 detached from at least one beam 6 of the first plurality of beams 4 is moved from the first transport path 7 to the second transport path 10. The vehicle may be lifted by a crane and placed on the second transport path. The vehicle is preferably lifted by a beam applicator crane.
[0103] - The vehicle 17 detached from at least one beam 6 of the second plurality of beams 5 is moved from the first transport path 7 to the second transport path 10. The vehicle may be lifted by a crane and placed on the second transport path. The vehicle is preferably lifted by a beam applicator crane.
[0104] Once the second section of the substructure has been erected as detailed above, the further sections of the substructure may be erected one after the other according to a similar process and as detailed below with respect to the erection of the xth section of the substructure.
[0105] The xth section of the substructure comprises: at least the nth girder 6 of the first plurality of girders 4, at least the nth girder of the second plurality of girders 5 and at least the zth pier 3 of the substructure. By default, x, z and n are different. In the case where each section of the substructure comprises a single girder of the first plurality of girders and a single girder of the second plurality of girders, x is equal to n. In this case, the nth girder of the first plurality of girders is also the xth girder and the nth girder of the second plurality of girders is also the xth girder. In the case where the first section comprises 2 piers and the two transport paths consist of a single continuous track formed by the girders and each section of the substructure except the first section comprises a single pier, z is equal to n+1.
[0106] At least the z-th pier 3 has first been erected downstream of the (x-1)-th first section.
[0107] like Figure 7 As shown, the vehicle 17 returning to the first end of the substructure after being disengaged from the beams of the previous section of the substructure is equipped with the beams of the x-th section of the substructure. Specifically, the vehicle is equipped with the n-th beam of the first plurality of beams, and the vehicle is equipped with the n-th beam of the second plurality of beams. If the x-th section includes an additional beam, the additional beam is paired with the vehicle in a similar manner.
[0108] like Figure 8 As shown, starting from the first end of the substructure, a vehicle is used to transport the beam 6 of the xth section of the substructure from the first end of the substructure under construction to the second end adjacent to the use position of the beam 6 along the first transport path 7. Specifically:
[0109] - The nth girder 6 of the first plurality of girders 4 is transported along the first transport path 7 formed by the previously positioned girders of the first plurality of girders. Specifically, the nth girder 6 of the first plurality of girders 4 is transported along the first transport path 7 formed by the previously positioned (n-1)th girder of the first plurality of girders.
[0110] The nth girder 6 of the second plurality of girders 5 is transported along a first transport path 7, ie along the same transport path as the nth girder of the first plurality of girders.
[0111] If the x-th section includes additional beams, the additional beams are transported in a similar manner. The order in which the beams are paired with the vehicle and transported to the second end portion is not limited. In addition, some beams can be transported to the second end portion while other beams are still paired with the vehicle. If the beams of the first plurality of beams 4 and the beams of the second plurality of beams 5 are different in design, it is preferred that the beams are transported to the second end portion alternately to facilitate the positioning of the beams.
[0112] like Fig. 9 and Fig.10 As shown, once the girder has been delivered to the second end portion of the substructure under construction, the element is positioned in its use position. Specifically:
[0113] - The nth girder 6 of the first plurality of girders is positioned downstream of the first transport path 7. Specifically, the nth girder 6 is positioned after the girder of the first transport path forming the second terminal portion of the substructure under construction. More specifically, the nth girder 6 is positioned in line with the (n-1)th girder of the first transport path along the longitudinal axis. Even more specifically, the nth girder 6 is positioned so that the first end of the nth girder rests on the pier forming the second terminal portion (the (z-1)th pier) and the second end of the nth girder rests on the zth pier erected downstream of the substructure. The nth girder of the first plurality of girders is preferably positioned by means of a crane 18, more preferably by means of a girder applicator crane supported by the substructure itself,
[0114] - Furthermore, the nth girder 6 of the second plurality of girders 5 is positioned downstream of the second transport path 10. Specifically, the nth girder 6 of the second plurality of girders 5 is positioned behind the girder forming the second terminal portion of the substructure under construction of the second transport path. More specifically, the nth girder 6 of the second plurality of girders 5 is positioned in line with the (n-1)th girder of the second transport path along the longitudinal axis. Even more specifically, the nth girder 6 of the second plurality of girders 5 is positioned so that the first end of the nth girder rests on the pier (the (z-1)th pier) forming the second terminal portion, and the second end of the nth girder rests on the zth pier erected downstream of the substructure. In other words, the nth girder 6 of the second plurality of girders 5 is positioned beside the nth girder of the first plurality of girders. The nth girder of the second plurality of girders is preferably positioned by means of a crane 18, more preferably by means of a girder applicator crane.
[0115] The girders are alternately positioned downstream of the first transport path 7 and downstream of the second transport path 10, more preferably alternately positioned downstream of the first transport path 7 and downstream of the second transport path 10 by means of a girder applicator crane. The order in which the girders of the x-th section are alternately positioned is not limited. In addition, some girders of the x-th section may be positioned, while other girders of the x-th section or subsequent sections are paired with a vehicle or transported to the second terminal portion.
[0116] like Fig. 9 and Fig.10 As shown, once the beams of the x-th section of the substructure have been positioned, the corresponding disengaged vehicle can return to the first end portion of the substructure along the second transport path 10. Specifically:
[0117] - the vehicle detached from the nth girder of the first plurality of girders moves from the first transport path 7 to the second transport path 10,
[0118] The vehicle detached from the nth girder of the second plurality of girders moves from the first transport path 7 to the second transport path 10 .
[0119] The vehicle can be lifted by a crane and placed on the second transport path 10. The vehicle is preferably lifted by a beam applicator crane.
[0120] If the xth section comprises an additional beam, the additional beam may be positioned in a similar manner and the corresponding vehicle returned to the first end portion in a similar manner.
[0121] At the end of the step of erecting the substructure, the last beam of the first plurality of beams and the last beam of the second plurality of beams are positioned on the last pier of the substructure. These piers may be adjacent to or shared with a second portion of the transport structure, which is erected or is being erected as an extension of the relevant portion of the transport structure along the longitudinal axis of the transport route. This second portion of the transport structure is erected from a second reserve point at a future station that may be located downstream of the relevant portion. This second portion of the transport structure is built by erecting the substructure of the second portion after the erection of the substructure of the relevant portion. In other words, each portion is built from a reserve point in the direction of the other reserve point, and at a certain point, the two portions are connected. Thus, the last beam of the first plurality of beams of the relevant portion is adjacent to the last beam of the first plurality of beams of the second portion, so that there is continuity in the first transport path. Similarly, the last beam of the second plurality of beams of the relevant portion is adjacent to the last beam of the second plurality of beams of the second portion, so that there is continuity in the second transport path.
[0122] As soon as all segments of the substructure of the part of the transport structure are assembled one after the other, the superstructure can be erected.
[0123] In general, and as Figures 11 to 16 As shown, the assembly of the upper structure is accomplished by: using a vehicle to transport the tube segments 14 to the use position of each tube segment along only one selected one of the first transport path 7 and the second transport path 10; positioning each tube segment alternately on the first plurality of girders and the second plurality of girders so that the first assembly 12 formed by the tube segments and the second assembly 13 formed by the tube segments are built; and returning the vehicle along the other of the first transport path and the second transport path. In other words, the first transport path and the second transport path form a loop on which the vehicle can circulate clockwise or counterclockwise. The circulatory travel can be performed in the same manner as the assembly of the lower structure (i.e., transport along the first transport path and return along the second transport path), or in another manner (i.e., transport along the second transport path and return along the first transport path). The positioning of the tube segments is alternated between the first plurality of girders and the second plurality of girders so that the remaining portions of the first transport path and the second transport path always have similar lengths while maintaining the loop.
[0124] Since the tube segments are positioned on the substructure and block the transport path, the assembly of the superstructure is performed in reverse compared to the assembly of the substructure. In other words, the tube segments are first positioned at the second end portion of the substructure, and then one tube segment is positioned in front of the other tube segment, i.e. one tube segment is positioned upstream of the other tube segment, in the direction of the first end portion of the substructure while alternating between the first plurality of girders and the second plurality of girders.
[0125] Specifically, in Figures 11 to 13 In the illustrated first step, a first pipe section 14 is transported along a first transport path 7 to the second end of the substructure 2 using a vehicle 17, which is its use position. The vehicle is detached from the first pipe section and can return along the second transport path 10. The first pipe section 14 is positioned on the last girder 6 of the first or second transport path, which forms the second end of the substructure. Disengaging the vehicle from the pipe section and positioning the pipe section can be done using a crane, which may be a girder applicator crane. In the case where the second part of the transport structure is adjacent to the last girder of the substructure, the first pipe section can be connected to the pipe section of the second part, preferably in a gas-tight connection.
[0126] exist Fig.14 and Fig.15In the illustrated second step, the second pipe section 14 is transported along the first transport path 7 to the second end of the substructure 2, which is its use position, using a vehicle 17. The vehicle is detached from the second pipe section and can return along the second transport path 10. The second pipe section (compared to the first pipe section) is positioned on another transport path at the second end of the substructure and to one side of the first pipe section.
[0127] A third pipe section, which is transported along the same transport path as the first pipe section and the second pipe section, can be positioned adjacent to the first pipe section on the same transport path as the first pipe section and upstream along the longitudinal axis X. The first section and the third section can then be connected to each other, preferably in a gas-tight manner. Alternatively, the third pipe section can be positioned adjacent to the second pipe section on the same transport path as the second pipe section and upstream along the longitudinal axis X. The second section and the third section can then be connected to each other, preferably in a gas-tight manner.
[0128] The next pipe section is transported and positioned in a similar manner until the last pipe section is positioned at the first end portion of the substructure.
[0129] Preferably, the pipe segments are only stored at the storage point 15 and transported from the storage point. In this case, the vehicle is equipped with the pipe segment at the first end of the substructure and the vehicle transports the pipe segment from the first end to the use location of the pipe segment. Once detached, the vehicle returns to the first end.
[0130] In the case where the superstructure includes a third assembly formed by pipe segments 14 positioned on the first assembly and / or a fourth assembly formed by pipe segments 14 positioned on the second assembly, the pipe segments in all assemblies can be transported separately along a single transport path as described above in different embodiments. At the use position of the pipe segments, the pipe segments in the first assembly are first positioned on the first transport path 7, and then the pipe segments in the third assembly are positioned on the pipe segments in the first assembly. Similarly, the pipe segments in the second assembly are first positioned on the second transport path 10, and then the pipe segments in the fourth assembly are positioned on the pipe segments in the second assembly. Alternatively, each pipe segment in the first assembly formed by pipe segments is connected to the pipe segment in the second assembly formed by pipe segments at the storage position, and then the connected segments are transported along a single transport path, as described above in different embodiments. Similarly, each pipe segment in the second assembly formed by pipe segments is connected to the pipe segment in the fourth assembly formed by pipe segments at the storage position, and then the connected pipe segments are transported along a single transport path. The pipe sections of all modules can be identical to facilitate logistics.
Claims
1. A method for erecting a portion (1) of a transport structure, the portion (1) comprising a first assembly (12) formed of tube segments (14) and a second assembly (13) formed of tube segments (14), both assemblies being capable of being placed under low air pressure and through which a cabin can travel substantially without air friction, the method comprising: -(a) erecting a substructure (2), the substructure (2) comprising: a plurality of piers (3); a first plurality of girders (4) formed by girders (6), the first plurality of girders (4) being positioned on at least some of the piers and forming a first transport path (7) extending from a first end portion to a second end portion of the substructure; and a second plurality of girders (5) formed by girders (6), the second plurality of girders (5) being positioned on at least some of the piers and forming a first transport path (7) extending from the first end portion to the second end portion of the substructure beside the first transport path. a second transport path (10), the erection step comprising: transporting the first plurality of girders and girders (6) of the second plurality of girders using a vehicle (17) along the first transport path (7) formed by girders of the first plurality of girders previously positioned; positioning the girders at their use positions alternately at the second end portion of the first transport path and at the second end portion of the second transport path; and returning the vehicle to the first end portion of the substructure along the second transport path (10) formed by the girders of the second plurality of girders previously positioned, (b) using a vehicle (17) to transport the pipe segments (14) to a use position of each pipe segment along only one of the first transport path (7) and the second transport path (10), positioning each pipe segment alternately on the first plurality of girders and on the second plurality of girders at its use position, and returning the vehicle along the other of the first transport path (7) and the second transport path (10).
2. The method according to claim 1, wherein: The substructure (2) does not include any platform forming a service path.
3. A method according to any one of the preceding claims, wherein: The erection step a) comprises a first sub-step of erecting the pier (3).
4. A method according to any one of the preceding claims, wherein: The erection step a) comprises an additional sub-step, in which a first section of the substructure is erected at a reserve point (15), the first section comprising at least one pier (3), at least one girder (6) of the first plurality of girders (4) and at least one girder (6) of the second plurality of girders (5).
5. A method according to any one of the preceding claims, wherein: In step a), the vehicle (17) is equipped with the beam (6) at the first end portion of the substructure.
6. A method according to any one of the preceding claims, wherein: The girder (6) is positioned by means of a girder applicator crane (18) supported by the substructure (2) itself.
7. A method according to any one of the preceding claims, wherein: The beam (6) of the first plurality of beams (4) is positioned behind the beam of the first transport path (7) forming the second end portion of the lower structure, and the beam (6) of the second plurality of beams (5) is positioned behind the beam of the first transport path (7) forming the second end portion of the lower structure.
8. A method according to any one of the preceding claims, wherein: In step b), the vehicle (17) is equipped with the pipe section (14) at the first end portion of the substructure.
9. A method according to any one of the preceding claims, wherein: In step b), the pipe segments (14) are first positioned at the second end portion of the substructure and then positioned one after the other in the direction of the first end portion of the substructure.
10. A portion (1) of a transport structure for enabling a capsule to travel substantially without air friction in an assembly formed by tube segments placed under low air pressure, the portion of transport infrastructure comprising: - a substructure (2), the substructure (2) comprising: a plurality of piers (3); a first plurality of girders (4) formed by girders (6), the first plurality of girders (4) being positioned on at least some of the piers and forming a first transport path (7) extending from a first end portion to a second end portion of the substructure; a second plurality of girders (5) formed by girders (6), the second plurality of girders (5) being positioned on at least some of the piers and forming a second transport path (10) extending from the first end portion to the second end portion of the substructure beside the first transport path, - an upper structure (11), said upper structure (11) comprising a first assembly (12) formed by tube segments (14) positioned on said first transport path and a second assembly (13) formed by tube segments (14) positioned on said second transport path, each assembly formed by tube segments being capable of being placed under low air pressure and of allowing the cabin to circulate in said tube segments substantially without air friction.
11. The portion of a transport structure according to claim 10, wherein: The substructure (2) does not include any platform forming a service path.
12. The portion of a transport structure according to any one of claims 10 or 11, wherein: The first end of the girder rests on a given pier and the second end of the girder rests on an adjacent pier along the longitudinal axis X of the portion of the transport structure.
13. The portion of a transport structure according to any one of claims 10 to 12, wherein: All the girders (6) of the first plurality of girders (4) are positioned one after another successively and continuously along the longitudinal axis X of the portion of the transport structure, and all the girders (6) of the + plurality of girders (5) are positioned one after another successively and continuously along the longitudinal axis X of the portion of the transport structure.
14. The portion of a transport structure according to any one of claims 10 to 12, wherein: Each of the first transport path and the second transport path comprises two continuous rails formed by beams (6), the two continuous rails extending parallel to each other.
15. The portion of a transport structure according to any one of claims 10 to 14, wherein: The superstructure comprises a third assembly formed of pipe segments (14) positioned on the first assembly (12) formed of pipe segments and / or a fourth assembly formed of pipe segments (14) positioned on the second assembly (13) formed of pipe segments.
Citation Information
Patent Citations
Magnetic attraction walking robot used for vacuum pipeline inspection and maintenance
CN109807908A
Beam pi-type track beam applied to large span high-speed maglev line
CN110258203A
Rail holding type maglev rail traffic bridge
CN204282185U
Construction method for girder in bridge, crane for pulling up girder, vehicle for carring girder, and girder used for the same
US20080301889A1
Transportation system
US20160230350A1