Fabricated lattice beam pile-supported embankment
By adopting a prefabricated grid-beam pile-supported embankment in the embankment, and utilizing the design of staggered lattice strips and separated connecting beams, the problem of insufficient horizontal restraint of traditional embankments on soft soil foundations is solved, and the stability and stability of the embankment are improved. service life and improved water dripping and water drainage effects.
Patent Information
- Application Number
- CN202411115198.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-14
- Publication Date
- 2024-10-15
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
Traditional pile-supported embankments have insufficient horizontal restraint on soft soil foundations, resulting in lateral displacement of the embankment slope and easy damage of side piles. In addition, the geogrid has insufficient friction and poor assembly results.
The prefabricated grid beam pile-supported embankment is used, including a support part, a connection layer and a geogrid layer. The support part is composed of the first and second support columns. The connection strength is improved through connection components and reinforced shells. The grid of the grid layer The strips are interlaced and woven with large circular, small circular and rectangular protrusions to increase friction, and the connecting beams are divided into multiple sections and equipped with springs to prevent structural expansion caused by high temperatures.
It effectively increases the horizontal restraint strength of the embankment slope, extends the service life of the support columns, prevents structural deformation caused by high temperatures in summer, and improves the drainage of water droplets and accumulated water by strengthening the design of the shell and grille strips.
Smart Images

Figure CN118773973A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of civil engineering, and in particular to an assembled lattice beam pile-supported embankment. Background Art
[0002] At present, China's economy is developing rapidly, and more and more projects such as roads and slopes need to be built under unfavorable geological conditions that were previously considered unsuitable for construction. For example, during the construction of expressways in the eastern coastal areas, the foundation soil is often soft soil with poor mechanical and physical properties such as silt and silty clay. Pile-supported embankment technology is needed to treat such soft soil foundations. Traditional pile-supported embankments mainly use vertical bearing piles to bear the vertical load in the foundation, and use geogrid layers to constrain the horizontal tension in the embankment slope.
[0003] However, the horizontal constraint of the geogrid layer on the embankment is often insufficient, which may cause the embankment slope to undergo horizontal lateral displacement, which in turn causes the side piles of the embankment slope to be subjected to a large lateral bending moment, making the side piles more susceptible to damage than other vertical load-bearing piles and easily deformed due to high temperature. In addition, the friction of the geogrid is insufficient, and the assembly effect with the cushion layer is poor. Summary of the invention
[0004] The object of the present invention is to provide a prefabricated lattice beam pile-supported embankment to solve the problems mentioned in the background technology.
[0005] In order to solve the above-mentioned technical problems, the present invention provides the following technical solutions: an assembled lattice beam pile-supported embankment, comprising a supporting part, a connecting layer and a geogrid layer, the supporting part comprising a first supporting column and a second supporting column, a connecting assembly is arranged between the first supporting column and the second supporting column, the connecting layer comprises a support and a connecting beam, the support is clamped with the connecting beam, a reinforcing shell is sleeved on the connecting beam, the geogrid layer comprises grid bars, the grid bars are woven by interlacing horizontal grid bars and vertical grid bars, and large circular protrusions, small circular protrusions and rectangular protrusions are arranged on the grid bars.
[0006] In a preferred embodiment, a cushion layer is laid on the top of the geogrid layer, and a road embankment layer is laid on the cushion layer. The cushion layer is laid on the geogrid layer. The fill of the cushion layer is well-graded gravel, sandstone or artificial crushed concrete. For environmental protection, construction waste stones can be used. The thickness should be not less than 300mm, and the maximum particle size of the filled particles should not be greater than 20mm. The road surface can be further paved on the embankment layer. The filler of the embankment layer is determined by the actual engineering environmental conditions. The embankment layer can be multi-layer fill, and the filler is selected according to the actual engineering conditions and filled layer by layer.
[0007] In a preferred embodiment, the connecting assembly includes a support ring arranged on the first support column and the second support column, and two partition plates are fixedly arranged on the inner side of the support ring, and the two partition plates divide the support ring into four cavities. Each of the partition plates is provided with a through hole, and concrete is poured into the interior of the support ring. The poured support ring and the internal structure are used to realize the connection between the first support column and the second support column, which can minimize the damage to the support column structure caused by external pressure, thereby extending the service life.
[0008] In a preferred embodiment, the connecting assembly also includes a bolt rod embedded in the interior of the first support column and the second support column, and one end of the bolt rod located inside the first support column and the second support column is arranged in a J-shaped structure, and a gasket and a nut are arranged on one side of the bolt rod located at the outer end of the first support column and the second support column, and a J-shaped structure is arranged on the bolt rod, which increases the tightness of the connection between the connecting assembly and the first support column and the second support column.
[0009] In a preferred embodiment, a plurality of clamping holes are provided on the support, and a clamping block matching the clamping holes is fixedly provided on the connecting beam. Both the clamping holes and the clamping blocks are arranged in a conical structure, and the connection between the support and the connecting beam is achieved by using the clamping holes and buckles, which is convenient for installation, disassembly and transportation.
[0010] In a preferred embodiment, an end cover is provided on one side of the support, and the end cover is connected to the support by bolts, and the end cover can limit the connection beam that has been clamped.
[0011] In a preferred embodiment, the reinforced shell is made of stainless steel material, the reinforced shell divides the connecting beam into two sections, a partition is arranged inside the reinforced shell, and springs are arranged at both ends of the partition, which can effectively prevent the high temperature in summer from causing structural expansion or lateral force from causing structural deformation or damage.
[0012] In a preferred embodiment, two reinforcing ribs are fixedly provided on the grille bar, and gaps for draining accumulated water are provided between the small circular protrusions and the rectangular protrusions and between the small circular protrusions.
[0013] Compared with the prior art, the beneficial effects achieved by the present invention are:
[0014] 1. The support column and the connecting beam of the present invention are connected by means of a clamping hole and a buckle, which is convenient for installation and disassembly of the equipment and for transportation;
[0015] 2. The present invention provides large circular protrusions, small circular protrusions and rectangular protrusions on the grid bars of the geogrid layer, which can increase the friction between the geogrid layer and the cushion layer and the connecting layer, and at the same time facilitate the dripping of water droplets. The gaps between the small circular protrusions and the rectangular protrusions are conducive to the discharge of accumulated water;
[0016] 3. The present invention sets the support part as a first support column, a second support column and a connecting assembly. The connecting assembly is composed of a support ring, a partition, a bolt rod and concrete. The bolt rod is embedded in the support part and poured with concrete, so that the pressure area around the support column is uniform, which can avoid the damage of the support column structure caused by external pressure as much as possible, thereby extending the service life;
[0017] 4. The present invention divides the connecting beam into multiple sections by providing a reinforcing shell, and utilizes the spring inside the reinforcing shell to achieve the connection between the connecting beam and the reinforcing shell, which can effectively prevent the high temperature in summer from causing structural expansion or lateral force from causing structural deformation or damage. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings:
[0019] Figure 1 It is a schematic diagram of the overall structure of the present invention;
[0020] Figure 2 is a schematic diagram of the structure of the connection assembly of the present invention;
[0021] Figure 3 is a schematic cross-sectional structure diagram of a connection assembly of the present invention;
[0022] Figure 4 It is a schematic structural diagram of the connecting layer of the present invention;
[0023] Figure 5 It is a schematic diagram of the internal structure of the reinforced housing of the present invention;
[0024] Figure 6 It is a structural schematic diagram of the geogrid layer of the present invention.
[0025] In the figure: 1. support part; 11. first support column; 12. second support column; 13. connection assembly; 131. support ring; 132. partition plate; 133. through hole; 134. bolt rod; 135. gasket; 136. nut; 2. connection layer; 21. support; 22. connection beam; 23. reinforcement shell; 24. clamping hole; 25. clamping block; 26. end cover; 27. bolt; 28. partition; 29. spring; 3. geogrid layer; 31. grid bar; 32. large circular protrusion; 33. small circular protrusion; 34. rectangular protrusion; 35. reinforcement rib; 4. cushion layer; 5. road embankment layer. DETAILED DESCRIPTION
[0026] See also Figure 1-Figure 6 The present invention provides an assembled lattice beam pile-supported embankment, comprising a support portion 1, a connection layer 2 and a geogrid layer 3, wherein the support portion 1 comprises a first support column 11 and a second support column 12, wherein a connection assembly 13 is arranged between the first support column 11 and the second support column 12, wherein the connection layer 2 comprises a support 21 and a connection beam 22, wherein the support 21 is clamped with the connection beam 22, wherein a reinforcing shell 23 is sleeved on the connection beam 22, wherein the geogrid layer 3 comprises grid bars 31, wherein the grid bars 31 are formed by interlacing horizontal grid bars and vertical grid bars, wherein large circular protrusions 32, small circular protrusions 33 and rectangular protrusions 34 are arranged on the grid bars 31.
[0027] In a preferred embodiment, a cushion layer 4 is laid on the top of the geogrid layer 3, and a road embankment layer 5 is laid on the top of the cushion layer 4. The fill of the cushion layer 4 is well-graded crushed stone, sandstone or artificial crushed concrete. For environmental protection, construction waste stones can be used. The thickness should be not less than 300 mm, and the maximum particle size of the filled particles should not be greater than 20 mm. The road surface can be further paved on the embankment layer 5. The filler of the embankment layer 5 is determined by the actual engineering environmental conditions. The embankment layer 5 can be a multi-layer fill. The filler is selected according to the actual engineering situation and filled layer by layer. The cushion layer 4 and the geogrid layer 3 together form a bottom reinforced cushion structure, which has a locking effect on the soil, so that the shear strength of the soil is fully exerted, thereby restricting the lateral displacement of the soil; at the same time, the reinforced cushion structure can transfer part of the vertical load to the grid beam, evenly distribute the horizontal pressure to the vertical support part 1, improve the force of the side piles, save the number of side piles, and thus achieve a better effect of restricting lateral displacement.
[0028] In a preferred embodiment, the connecting assembly 13 includes a support ring 131 arranged on the first support column 11 and the second support column 12, and two partition plates 132 are fixedly arranged on the inner side of the support ring 131, and the two partition plates 132 divide the support ring 131 into four cavities, and each of the partition plates 132 is provided with a through hole 133. The connecting assembly 13 also includes a bolt rod 134 embedded in the first support column 11 and the second support column 12, and one end of the bolt rod 134 located inside the first support column 11 and the second support column 12 is a J-shaped structure, and a gasket 135 and a nut 136 are provided on one side of the bolt rod 134 located at the outer end of the first support column 11 and the second support column 12.
[0029] During specific use, the bolt rod 134 is respectively embedded into the first support column 11 and the second support column 12, and then the bolt rod 134 is fixed using the gasket 135 and the nut 136. Then the support ring 131 is first fixed to the first support column 11, and concrete is poured into the support ring 131. After the pouring is completed, the upper end of the support ring 131 is fixed to the second support column 12.
[0030] In a preferred embodiment, a plurality of clamping holes 24 are provided on the support 21, and a clamping block 25 matching the clamping hole 24 is fixedly provided on the connecting beam 22. The clamping hole 24 and the clamping block 25 are both arranged in a conical structure. An end cover 26 is provided on one side of the support 21, and the end cover 26 is connected to the support 21 by bolts 27. During installation, the clamping block 25 at one end of the connecting beam 22 is inserted into the clamping hole 24 on the support 21. After all the clamping blocks 25 are inserted into the support 21, the end cover 26 is covered on the support 21 by bolts 27 to realize the installation of the support 21 and the connecting beam 22.
[0031] In a preferred embodiment, the reinforced shell 23 is made of stainless steel material, and the reinforced shell 23 divides the connecting beam 23 into two sections. A partition 28 is arranged inside the reinforced shell 23, and springs 29 are arranged at both ends of the partition 28, which can effectively prevent the high temperature in summer from causing structural expansion or lateral force from causing structural deformation or damage.
[0032] In a preferred embodiment, two reinforcing ribs 35 are fixedly provided on the grid bar 31, and gaps for draining accumulated water are provided between the small circular protrusions 33 and the rectangular protrusions 34 and between the small circular protrusions 33 and the small circular protrusions 33. The geogrid layer 3 is laid horizontally to ensure its continuity without breakage, bending, twisting, wrinkling, or loosening, while avoiding excessive stretching.
[0033] Working principle of the present invention:
[0034] 1. The support column and the connecting beam of the present invention are connected by means of a clamping hole and a buckle, which is convenient for installation and disassembly of the equipment and for transportation;
[0035] 2. The present invention provides large circular protrusions, small circular protrusions and rectangular protrusions on the grid bars of the geogrid layer, which can increase the friction between the geogrid layer and the cushion layer and the connecting layer, and at the same time facilitate the dripping of water droplets. The gaps between the small circular protrusions and the rectangular protrusions are conducive to the discharge of accumulated water;
[0036] 3. The present invention sets the support part as a first support column, a second support column and a connecting assembly. The connecting assembly is composed of a support ring, a partition, a bolt rod and concrete. The bolt rod is embedded in the support part and poured with concrete, so that the pressure area around the support column is uniform, which can avoid the damage of the support column structure caused by external pressure as much as possible, thereby extending the service life;
[0037] 4. The present invention divides the connecting beam into multiple sections by providing a reinforcing shell, and utilizes the spring inside the reinforcing shell to achieve the connection between the connecting beam and the reinforcing shell, which can effectively prevent the high temperature in summer from causing structural expansion or lateral force from causing structural deformation or damage.
[0038] Finally, it should be noted that the above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art can still modify the technical solutions described in the aforementioned embodiments or replace some of the technical features therein by equivalents. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
Claims
1. An assembled lattice beam pile-supported embankment, characterized in that: The invention comprises a support part (1), a connection layer (2) and a geogrid layer (3), wherein the support part (1) comprises a first support column (11) and a second support column (12), a connection assembly (13) is arranged between the first support column (11) and the second support column (12), the connection layer (2) comprises a support (21) and a connection beam (22), the support (21) is clamped with the connection beam (22), a reinforcing shell (23) is sleeved on the connection beam (22), and the geogrid layer (3) comprises grid bars (31), the grid bars (31) are formed by interlacing transverse grid bars and vertical grid bars, and the grid bars (31) are provided with large circular protrusions (32), small circular protrusions (33) and rectangular protrusions (34).
2. The assembled lattice beam pile-supported embankment according to claim 1, characterized in that: A cushion layer (4) is laid on the top of the geogrid layer (3), and a road support layer (5) is laid on the top of the cushion layer (4).
3. The assembled lattice beam pile-supported embankment according to claim 1, characterized in that: The connection assembly (13) comprises a support ring (131) arranged on a first support column (11) and a second support column (12); two partition plates (132) are fixedly arranged on the inner side of the support ring (131); the two partition plates (132) divide the support ring (131) into four cavities; and each of the partition plates (132) is provided with a through hole (133).
4. The assembled lattice beam pile-supported embankment according to claim 3, characterized in that: The connection assembly (13) further comprises a bolt rod (134) embedded in the first support column (11) and the second support column (12); one end of the bolt rod (134) located inside the first support column (11) and the second support column (12) is arranged in a J-shaped structure; and a gasket (135) and a nut (136) are arranged on one side of the bolt rod (134) located at the outer end of the first support column (11) and the second support column (12).
5. The assembled lattice beam pile-supported embankment according to claim 1, characterized in that: The support (21) is provided with a plurality of clamping holes (24), and a clamping block (25) matching the clamping holes (24) is fixedly provided on the connecting beam (22), and both the clamping holes (24) and the clamping block (25) are arranged in a conical structure.
6. The assembled lattice beam pile-supported embankment according to claim 5, characterized in that: An end cover (26) is provided on one side of the support (21), and the end cover (26) is connected to the support (21) by means of bolts (27).
7. The assembled lattice beam pile-supported embankment according to claim 5, characterized in that: The reinforced shell (23) is made of stainless steel material. The reinforced shell (23) divides the connecting beam (23) into two sections. A partition (28) is arranged inside the reinforced shell (23). Springs (29) are arranged at both ends of the partition (28).
8. The assembled lattice beam pile-supported embankment according to claim 1, characterized in that: Two reinforcing ribs (35) are fixedly arranged on the grille bar (31), and gaps for draining accumulated water are provided between the small circular protrusions (33) and the rectangular protrusions (34) and between the small circular protrusions (33).