Beam formwork supporting device

By designing the sliding connection and air pressure adjustment device of the end fixing frame, the starting fixing frame and the cross bar, the problems of low installation efficiency and inconvenient movement of the beam formwork support device in the existing technology are solved, and fast and convenient beam formwork support and Adaptable installation.

CN118774385APending Publication Date: 2024-10-15SHANXI INSTALLATION GRP CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410978370.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-22
Publication Date
2024-10-15

AI Technical Summary

Technical Problem

When installing the existing beam formwork support device, due to the different widths and lengths of the beam formwork, it is necessary to use a ruler to measure the distance between the support poles, which wastes manpower and time, and the support poles are heavy and inconvenient to move.

Method used

A beam formwork support device including an end bracket, a starting bracket and a crossbar is designed. Through the sliding connection and positioning components of the struts, the function of installation without measurement is realized, and the length of the struts is adjusted through the air pressure device. Adapt to beam formwork of different heights.

Benefits of technology

It improves installation efficiency, saves manpower and time, simplifies the movement and installation process of support poles, and is suitable for beam formwork of different sizes and shapes.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118774385A_ABST
    Figure CN118774385A_ABST
Patent Text Reader

Abstract

The invention belongs to the technical field of buildings, and particularly relates to a beam formwork supporting device which comprises a terminal fixing frame and a starting fixing frame, transverse rods are symmetrically arranged between the terminal fixing frame and the starting fixing frame, supporting rods are slidably connected to the outer walls of the two transverse rods, a housing is fixedly mounted at the bottom of each supporting rod, and the supporting rods are slidably connected to the outer walls of the terminal fixing frame and the starting fixing frame. A rod moving assembly is arranged in the housing, and the rod moving assembly is used for better moving the supporting rod when the supporting rod moves, so that the assembling speed of an operator can be increased; the inner wall of the supporting rod extrudes the rod clamping blocks to move downwards in the transverse rod, when the rod clamping blocks move to a certain position, the rod clamping blocks return upwards under the action of the elastic force of the block return springs, one ends of the rod clamping blocks can be clamped into the supporting rod to be fixed, the multiple rod clamping blocks are arranged on the transverse rod, and the spraying area of each rod clamping block is sprayed with a size mark, so that the spraying efficiency is improved. And the cross rod can be segmented by one distance, so that an operator can conveniently observe the distance during mounting, and the mounting operation is facilitated.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of construction, in particular to a beam formwork supporting device. Background Art

[0002] Beam formwork support refers to the technology of using temporary support structures to support the shape and position of concrete beams and slabs during construction. This support system usually includes components such as vertical poles, horizontal beams, and longitudinal beams, which together form a stable structural system to withstand the weight of concrete and loads during construction.

[0003] In the current existing technology, due to the different width and length dimensions of the beam template, a ruler must be used to measure the distance between the two support poles before installation, which is extremely wasteful of manpower and time. In addition, due to the excessive weight of the support poles, it is also extremely troublesome to move them.

[0004] To this end, the present invention provides a beam template supporting device. Summary of the invention

[0005] In order to make up for the deficiencies of the prior art, at least one technical problem raised in the background technology is solved.

[0006] The technical solution adopted by the present invention to solve its technical problems is as follows: a beam formwork support device described in the present invention comprises an end fixing frame and a start fixing frame, a cross bar is symmetrically arranged between the end fixing frame and the start fixing frame, the outer walls of the two cross bars are slidably connected with a strut, a cover shell is fixedly installed at the bottom of the strut, a shifting rod assembly is arranged inside the cover shell, the shifting rod assembly is used for moving the strut, the shifting rod assembly can better move the strut, the speed of tightening and assembling by the operator can be accelerated, it is more conducive to the operation, and it plays a role in facilitating the movement of the strut, a plurality of positioning assemblies are arranged inside the cover shell, the positioning assemblies are used to limit the distance between the struts, so that the operator does not need to use a ruler to measure the distance between the two struts before installing, which can better save manpower and time and play a role in displaying the size;

[0007] By supporting the starting fixed frame on one side of the bottom of the beam template, and then connecting the cross bar to the starting fixed frame, when the two are connected, the support rod is passed through the cross bar. When the support rod passes through the cross bar, the moving rod assembly in the bottom cover of the support rod can better move the support rod, which can speed up the speed of the operator's tightening and assembly, be more conducive to the operation, and play a role in facilitating the movement of the support rod. When the support rod passes through the cross bar, the distance between the support rods is limited by the positioning assembly set on the cross bar, so that the operator does not need to use a ruler to measure the distance between the two support rods before installation. It can save manpower and time better and play the role of displaying size. Through the connection of the support rod on the cross bar, when the support rod is placed on the cross bar to a certain extent, stop installing it and fix the other end of the cross bar to the terminal fixed frame. At this time, multiple support rods on the cross bar can support the beam formwork. The setting of the positioning component and the rod shifting component can solve the above-mentioned problem that due to the different width and length dimensions of the beam formwork, a ruler must be used to measure the distance between the two supporting uprights before installation, which is extremely wasteful of manpower and time. In addition, due to the excessive weight of the supporting uprights, it is also extremely troublesome to move them.

[0008] Preferably, a screw is symmetrically fixed on the inner side of the starting fixing frame, and a placement port is symmetrically opened on the inner wall of the terminating fixing frame, and a connecting rod opening and a connecting rod thread are respectively opened at both ends of the cross bar, and the connecting rod opening and the screw thread are connected, and the connecting rod thread is slidably connected to the inner wall of the placement port, and the connecting rod thread on the cross bar can be fixed in the placement port by a nut. During installation and connection, the connecting rod opening at one end of the cross bar is screwed into the screw on the inner side of the starting fixing frame. When a certain number of support rods on the cross bar are installed, the connecting rod thread at one end of the cross bar is placed in the placement port in the terminating fixing frame, and then the connecting rod thread is fixed to the inner wall of the terminating fixing frame by a nut in the placement port. Through the connecting rod threads and connecting rod openings at both ends of the cross bar, when the length of the cross bar is not enough, two or more cross bars can be connected, which is convenient for adapting to beam templates of different lengths.

[0009] Preferably, one end of the terminating fixed frame and the starting fixed frame are fixedly installed with a receiving frame block, and the other ends of the terminating fixed frame and the starting fixed frame are provided with a block receiving opening, and a shaft rod is slidably arranged inside the block receiving opening, and a pull-out handle is fixedly installed at one end of the shaft rod, and a disk box is fixedly installed on the outer wall of the terminating fixed frame and the starting fixed frame, and the other end of the shaft rod is placed in the disk box. During installation, when the width of the beam template is too long, since the two ends of the starting fixed frame are respectively installed with the receiving frame block and the block receiving opening, the shaft rod can be rotated out of the disk box by lifting the pull-out handle. Pull it out, then insert the connecting block on the other starting fixed frame into the receiving block mouth, then pass the shaft rod through the inner wall of the starting fixed frame and the inner wall of the connecting block at one end of the other starting fixed frame, and press and turn the pull-out handle to clamp one end of the shaft rod back into the disc box, and fix the two starting fixed frames by pulling the pull-out handle to drive the shaft rod. Compared with the traditional connection method of fixing with bolts and nuts, this installation method is more convenient during installation, can effectively improve work efficiency, and can facilitate installation and disassembly. The same applies to installing the final fixed frame.

[0010] Preferably, a plurality of protrusions are provided inside the disk box, and pressure springs are provided between the plurality of protrusions and the inner wall of the disk box, and one end of the plurality of protrusions can be engaged with the slots on the outer circumference of the shaft rod. When one end of the shaft rod is inserted into the disk box, the one end of the shaft rod is moved in the disk box by pushing the pull-out handle. When the shaft rod moves, one end of the shaft rod squeezes and pushes the protrusion to squeeze the pressure spring to move backward in the disk box. When one end of the shaft rod moves to a certain extent, it cannot move, and the shaft rod is rotated at this time. When the shaft rod is rotated to a certain extent, the protrusion loses the squeezing thrust of the shaft rod, and under the action of the elastic force of the pressure spring, one end of the protrusion will be stuck into the shaft rod for limiting and fixing, thereby playing a role of fixing.

[0011] Preferably, the shift rod assembly includes a rectangular plate, the rectangular plate is fixedly mounted on the bottom of the support rod, the inner wall of the rectangular plate is symmetrically slidably connected with a rotating wheel group, a lifting frame is symmetrically fixedly mounted between the two rotating wheel groups, a limiting block is symmetrically fixedly mounted on the outer wall of the support rod, a clamping block is arranged between the two limiting blocks, the outer wall of the clamping block is slidably connected with the inner wall of the support rod, a fixing frame spring is arranged between the clamping block and the inner wall of the support rod, and the top of the lifting frame is placed between the clamping block and the limiting block. When the support rod is moved, two rotating wheel groups are arranged in the rectangular plate at the bottom of the support rod, so that it can be moved more conveniently. By pushing the support rod, when When the support rod moves to a certain position on the cross bar, the lifting frame is pulled to pull the rotating wheel group upward from the rectangular plate. At the same time, the lifting frame is pushed through the top of the lifting frame to squeeze the frame spring in the support rod to retract, and the lifting frame will move from the top of the lower limit block to the bottom of the upper limit block. At this time, the frame block loses the thrust of the lifting frame, and under the action of the elastic force of the frame spring, the frame block will slide out from the inside of the support rod, and then cooperate with the upper limit block, the top of the lifting frame will be fixed between the two. At this time, the rotating wheel group will slide up to a certain position in the rectangular plate, so that the roller in the rotating wheel group is off the ground, which is convenient for the support rod to support the beam formwork.

[0012] Preferably, a pad is slidably provided at the bottom of the rectangular plate, a return spring is provided between the top of the pad and the bottom of the rectangular plate, a block box is fixedly installed on the outer wall of the rotating wheel group, a clamping block is slidably provided on the inner wall of the block box, a push block spring is fixedly installed between one side of the clamping block and the inner wall of the block box, one end of the clamping block is slidably connected to the outer wall of one side of the pad, when the rotating wheel group moves up in the rectangular plate, the rotating wheel group drives the inner block box to move up, and when the block box moves up, the clamping block in the block box When the wheel group moves to a certain extent, the pad block slides out of the rectangular plate due to the pressing of the pressing block, and the wheel group moves upward in the rectangular plate, so that the pad block slides out of the rectangular plate, which just fills the space gap between the two, so that the support rod can better support the beam formwork.

[0013] Preferably, a rectangular bar is provided at the top of the support rod, an air receiving area is provided inside the support rod, the rectangular bar is placed on the top of the air receiving area, an air pressure inlet is provided on the outer wall of the support rod, and a plate connecting port is provided on the inner wall of the rectangular bar. When supporting the beam formwork, after all components are fully assembled, air pressure is introduced into the air receiving area in the support rod through the air pressure inlet by an air compressor, and then the air pressure pushes the rectangular bar at the top of the support rod to slide upward and close to the beam formwork, so that the support rod supports the beam formwork. The air pressure pushes the rectangular bar to move inside the support rod close to the beam formwork, so that the length of the support rod can be adjusted, so that the support rod can be suitable for beam formworks of different heights when supporting the beam formwork.

[0014] Preferably, a rectangular support plate or an arc-shaped support plate is provided on the top of the support rod, and a screw shaft is fixedly installed on the bottom of the rectangular support plate and the arc-shaped support plate, and the two screw shafts are threadedly connected to the connecting plate opening. During installation, the screw shafts at the bottom of the rectangular support plate or the arc-shaped support plate are connected to the connecting plate opening in the moment rod, and the two can form a complete support beam plate. Through the two outer shape designs of the rectangular support plate and the arc-shaped support plate, the support rod can support the rectangular or arc-shaped beam formwork when supporting the beam formwork. By designing different support beam plate shapes, the device can be adapted to support beam plates of different shapes.

[0015] Preferably, the positioning assembly includes a card rod block, the card rod block is carded with the inner wall of the support rod, the bottom of the card rod block is fixedly installed with an axis block, a return block spring is arranged between the axis block and the inner wall of the cross bar, a pull shaft is fixedly installed on the outer wall of the axis block, the outer wall of the pull shaft is slidably connected with the inner wall of the cross bar, and a pull block ring is fixedly installed on one end of the pull shaft. When the support rod moves on the cross bar, the inner wall of the support rod squeezes the card rod block to move downward in the cross bar. When the inner wall of the support rod moves to a certain position, the card rod block loses the squeezing force of the support rod, and the card rod block will be moved under the elastic force of the return block spring. The clamping block will slide out from the inside of the strut, and then the strut can be removed from the cross bar by pushing the strut, which can facilitate installation and disassembly while positioning.

[0016] Preferably, the outer wall of the support rod is provided with a plurality of spraying areas, and the spraying areas are used for spraying size marks. By spraying size marks in the spraying areas near each clamping rod block on the cross bar, the operators can conveniently observe the distance during installation, thereby facilitating the installation operation.

[0017] The beneficial effects of the present invention are as follows:

[0018] 1. The beam formwork supporting device described in the present invention squeezes the rod block through the inner wall of the support rod to move downward in the cross bar. When it moves to a certain position, the rod block returns upward under the elastic force of the return block spring, and one end of the rod block is inserted into the support rod for fixation. By arranging multiple rod blocks on the cross bar and spraying size marks in the spraying area at each rod block, the cross bar can be divided into distance segments, so that the operator can easily observe the distance during installation, which is convenient for installation work.

[0019] 2. The beam formwork supporting device described in the present invention has two rotating wheel groups arranged in the rectangular plate at the bottom of the support rod, so that it can be more convenient to move. By pulling the lifting frame, the top of the lifting frame pushes the frame block to retract in the support rod. When the frame block loses the thrust of the lifting frame, the fixing frame spring pushes the frame block to slide out from the inside of the support rod. Cooperating with the limiting block above, the lifting frame will be fixed between the two, and the roller in the rotating wheel group will leave the ground. At the same time, the pressing block is extended by the elastic force of the pushing block spring, and the pressing pad moves downward, moves up in the rectangular plate through the rotating wheel group, and the pad slides out of the rectangular plate, just filling up a space gap between the two, so that the support rod can better support the beam formwork.

[0020] 3. The beam formwork supporting device described in the present invention can form a complete beam support plate by connecting the screw shaft at the bottom of the rectangular support plate or the arc-shaped support plate with the connecting plate opening in the moment rod. Through the shape design of the rectangular support plate and the arc-shaped support plate, the support rod can support the rectangular or arc-shaped beam formwork when supporting the beam formwork. By designing different shapes of the beam support plates, the device can be adapted to beam support plates of different shapes.

[0021] 4. The beam formwork supporting device described in the present invention introduces air pressure into the air holding area in the support rod through the air pressure filling port by means of an air compression device. Subsequently, the air pressure pushes the moment rod at the top of the support rod to slide upward and approach the beam formwork, so that the support rod supports the beam formwork. The air pressure pushes the moment rod to move inside the support rod and approach the beam formwork, thereby adjusting the length of the support rod, so that the support rod can be suitable for beam formworks of different heights when supporting the beam formwork.

[0022] 5. The beam formwork support device described in the present invention, through the design of the various components, is more convenient to install during installation than the traditional connection method of fixing with bolts and nuts, and can effectively improve work efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] The present invention will be further described below in conjunction with the accompanying drawings.

[0024] Figure 1 It is an overall diagram of the present invention;

[0025] Figure 2 It is the main figure of the present invention;

[0026] Figure 3 It is a schematic diagram of the structure of the support rod in the present invention;

[0027] Figure 4 It is a structural schematic diagram of the moment rod in the present invention;

[0028] Figure 5 It is a schematic diagram of the structure of the limit block in the present invention;

[0029] Figure 6 It is a structural schematic diagram of the cushion block in the present invention;

[0030] Figure 7 It is a structural schematic diagram of the card frame block in the present invention;

[0031] Figure 8 It is a schematic diagram of the structure of the spraying area in the present invention;

[0032] Fig. 9 It is a structural schematic diagram of the pull block ring in the present invention;

[0033] Fig.10 It is a structural schematic diagram of the screw in the present invention;

[0034] Fig.11 It is a structural schematic diagram of the central axis of the present invention;

[0035] Fig.12 It is a structural schematic diagram of the disk box in the present invention;

[0036] Fig.13 It is a schematic diagram of the structure of the convex block in the present invention;

[0037] Fig.14 It is a schematic diagram of the structure of the central port of the present invention;

[0038] Fig.15 It is a structural schematic diagram of the screw shaft in the present invention.

[0039] In the figure: 1, support rod; 2, cross bar; 3, end frame; 4, start frame; 5, cover; 6, rectangular support plate; 7, spraying area; 8, air pressure filling port; 9, moment rod; 10, moment plate; 11, lifting frame; 12, rotating wheel group; 13, cushion block; 14, bracket block; 15, limit block; 16, reset spring; 17, clamping block; 18, connecting rod port; 19, connecting rod thread; 20, clamping rod block; 2 1. Pull block ring; 22. Pull shaft; 23. Return block spring; 24. Shaft block; 25. Pull handle; 26. Frame block; 27. Block receiving opening; 28. Shaft rod; 29. ​​Disc box; 30. Bump; 31. Pressure spring; 32. Arc support plate; 33. Block receiving box; 34. Push block spring; 35. Frame fixing spring; 36. Screw rod; 37. Port opening; 38. Plate connecting opening; 39. Screw shaft; 40. Air receiving area. DETAILED DESCRIPTION

[0040] In order to make the technical means, creative features, objectives and effects achieved by the present invention easy to understand, the present invention is further explained below in conjunction with specific implementation methods.

[0041] like Figures 1 to 15 As shown, a beam formwork supporting device according to an embodiment of the present invention comprises an end fixing frame 3 and a start fixing frame 4, a cross bar 2 is symmetrically arranged between the end fixing frame 3 and the start fixing frame 4, the outer walls of the two cross bars 2 are slidably connected with a strut 1, a cover shell 5 is fixedly installed at the bottom of the strut 1, a shifting rod assembly is arranged inside the cover shell 5, the shifting rod assembly is used for moving the strut 1, the shifting rod assembly can better move the strut 1, the speed of tightening and assembling by the operator can be accelerated, it is more conducive to the operation, and it plays a role in facilitating the movement of the strut 1, a plurality of positioning assemblies are arranged inside the cover shell 5, the positioning assemblies are used for limiting the distance between the struts 1, so that the operator does not need to use a ruler to measure the distance between the two struts 1 before installing, which can better save manpower and time and play a role in displaying the size;

[0042] In the current existing technology, due to the different width and length dimensions of the beam template, it is necessary to use a ruler to measure the distance between the two support poles before installation, which is extremely wasteful of manpower and time. In addition, due to the heavy weight of the support poles, it is also extremely troublesome to move them.

[0043] By supporting the starting fixing frame 4 on one side of the bottom of the beam template, and then connecting the cross bar 2 with the starting fixing frame 4, when the two are connected, the support rod 1 is passed through the cross bar 2. When the support rod 1 passes through the cross bar 2, the moving rod assembly in the bottom cover 5 of the support rod 1 can better move the support rod 1, which can speed up the speed of the operator's tightening and assembly, and is more conducive to the operation, and plays a role in facilitating the movement of the support rod 1. When the support rod 1 passes through the cross bar 2, the distance between the support rods 1 is limited by the positioning assembly set on the cross bar 2, so that the operator does not need to use a ruler to measure the distance between the two support rods 1 before installing, which can better save manpower and time, and play a role in displaying the size. Through the movable connection of the support rod 1 on the cross bar 2, when a certain number of support rods 1 are placed on the cross bar 2, stop further installation and fix the other end of the cross bar 2 to the terminal fixing frame 3. At this time, multiple support rods 1 on the cross bar 2 can support the beam formwork. The setting of the positioning component and the rod shifting component can solve the above-mentioned problem that due to the different width and length dimensions of the beam formwork, a ruler needs to be used to measure the distance between the two supporting uprights before installation, which is extremely wasteful of manpower and time. Moreover, due to the excessive weight of the supporting uprights, it is also extremely troublesome to move them. It should be noted here that the symmetrical installation form can provide better stability and support for the device when supporting the beam formwork.

[0044] like Figures 1 to 14 As shown, a screw rod 36 is symmetrically fixedly installed on the inner side of the starting fixed frame 4, and a placement port 37 is symmetrically opened on the inner wall of the ending fixed frame 3. A connecting rod opening 18 and a connecting rod thread 19 are respectively opened at both ends of the cross bar 2. The connecting rod opening 18 and the screw rod 36 are threadedly connected, and the connecting rod thread 19 is slidably connected with the inner wall of the placement port 37. The connecting rod thread 19 on the cross bar 2 can be fixed in the placement port 37 by a nut.

[0045] During installation and connection, the connecting rod opening 18 at one end of the cross bar 2 is screwed into the screw 36 on the inner side of the starting fixing frame 4 for connection. When a certain number of struts 1 on the cross bar 2 are installed, the connecting rod thread 19 at one end of the cross bar 2 is placed in the placement port 37 in the terminal fixing frame 3, and then the connecting rod thread 19 is fixed to the inner wall of the terminal fixing frame 3 by a nut in the placement port 37. Through the connecting rod threads 19 and connecting rod openings 18 opened at both ends of the cross bar 2, when the length of the cross bar 2 is not enough, two or more cross bars 2 can be connected to facilitate adaptation to beam formworks of different lengths. It should be noted here that the connecting rod openings 18 and connecting rod threads 19 at both ends of the cross bar 2 are compatible.

[0046] like Figure 10 to Figure 11As shown, one end of the final fixed frame 3 and the starting fixed frame 4 is fixedly installed with a frame receiving block 26, and the other end of the final fixed frame 3 and the starting fixed frame 4 is provided with a block receiving opening 27, and the inside of the block receiving opening 27 is slidably provided with a shaft rod 28, and one end of the shaft rod 28 is fixedly installed with a handle 25, and the outer wall of the final fixed frame 3 and the starting fixed frame 4 is fixedly installed with a disk box 29, and the other end of the shaft rod 28 is respectively placed in the disk box 29;

[0047] During installation, when the width of the beam template is too long, since the two ends of the starting fixed frame 4 are respectively equipped with a frame block 26 and a block receiving opening 27, the shaft rod 28 is rotated and pulled out from the disc box 29 by lifting the pull-out handle 25, and then the frame block 26 on the other starting fixed frame 4 is inserted into the block receiving opening 27, and then the shaft rod 28 passes through the inner wall of the starting fixed frame 4 and the inner wall of the frame block 26 at one end of the other starting fixed frame 4, and one end of the shaft rod 28 is clamped back into the disc box 29 by pressing and rotating the pull-out handle 25. The two starting fixed frames 4 are fixed by driving the shaft rod 28 by pulling the pull-out handle 25. Compared with the traditional connection method of fixing with bolts and nuts, this installation method is more convenient during installation, can effectively improve the working efficiency, and can facilitate installation and disassembly. When installing the final fixed frame 3, similarly, it should be noted here that the inner diameter hole size of the frame block 26 should be the same as the outer diameter length of the shaft rod 28.

[0048] like Figure 12 to Figure 13 As shown, a plurality of protrusions 30 are disposed inside the disk box 29, and pressure springs 31 are disposed between the plurality of protrusions 30 and the inner wall of the disk box 29, and one end of the plurality of protrusions 30 can be engaged with the card slots on the outer periphery of the shaft 28;

[0049] When one end of the shaft 28 is inserted into the disk box 29, the pull-out handle 25 is pushed to move the one end of the shaft 28 in the disk box 29. When the shaft 28 moves, one end of the shaft 28 squeezes and pushes the protrusion 30 to squeeze the pressure spring 31 to move backward in the disk box 29. When one end of the shaft 28 moves to a certain extent and cannot move, the shaft 28 is rotated. When the shaft 28 is rotated to align the slot with the protrusion 30, the protrusion 30 loses the squeezing thrust of the shaft 28. Under the action of the elastic force of the pressure spring 31, one end of the protrusion 30 will be stuck in the shaft 28, which plays a role of limiting and fixing. When disassembling it, the opposite operation can be performed. It should be noted here that the length of the shaft 28 needs to be actually measured and calculated.

[0050] like Figures 1 to 7As shown, the shifting rod assembly includes a rectangular plate 10, which is fixedly mounted on the bottom of the support rod 1, and the inner wall of the rectangular plate 10 is symmetrically slidably connected with a rotating wheel group 12, and a lifting frame 11 is symmetrically fixedly mounted between the two rotating wheel groups 12, and a limit block 15 is symmetrically fixedly mounted on the outer wall of the support rod 1, and a bracket block 14 is arranged between the two limit blocks 15, and the outer wall of the bracket block 14 is slidably connected with the inner wall of the support rod 1, and a fixing frame spring 35 is arranged between the bracket block 14 and the inner wall of the support rod 1, and the top of the lifting frame 11 is placed between the bracket block 14 and the limit block 15;

[0051] When the support rod 1 is moved, since two rotating wheel groups 12 are arranged in the rectangular plate 10 at the bottom of the support rod 1, it is more convenient to move. By pushing the support rod 1, when the support rod 1 moves to a certain position on the cross bar 2, the rotating wheel group 12 is pulled upward from the rectangular plate 10 by pulling the lifting frame 11. At the same time, the card frame block 14 is pushed through the top of the lifting frame 11 to squeeze the fixed frame spring 35 in the support rod 1 to retract, and the lifting frame 11 will move from the top of the lower limit block 15 to the bottom of the upper limit block 15. At this time, the card frame block 14 loses the thrust of the lifting frame 11 and is pressed by the fixed frame spring 35. 5, the bracket block 14 will slide out from the inside of the support rod 1, and then cooperate with the upper limit block 15, the top of the lifting frame 11 will be fixed between the two. At this time, the rotating wheel group 12 will slide up to a certain position in the rectangular plate 10, so that the rollers in the rotating wheel group 12 are off the ground, which is convenient for the support of the beam template by the support rod 1. When the rollers need to be extended, the opposite operation can be performed. It should be noted that the distance that the rotating wheel group 12 moves up in the rectangular plate 10 is the same as the distance between the two limit blocks 15 and the bracket block 14, and the distance that the rotating wheel group 12 moves up in the rectangular plate 10 needs to be actually measured and calculated.

[0052] like Figure 5 to Figure 6 As shown, a cushion block 13 is slidably provided at the bottom of the rectangular plate 10, a return spring 16 is provided between the top of the cushion block 13 and the bottom of the rectangular plate 10, a block receiving box 33 is fixedly installed on the outer wall of the rotating wheel group 12, a clamping block 17 is slidably provided on the inner wall of the block receiving box 33, a push block spring 34 is fixedly installed between one side of the clamping block 17 and the inner wall of the block receiving box 33, and one end of the clamping block 17 is slidably connected to the outer wall of one side of the cushion block 13;

[0053] When the rotating wheel group 12 moves upward in the rectangular plate 10, the rotating wheel group 12 drives the inner block box 33 to move upward. When the block box 33 moves upward, the pressing block 17 in the block box 33 slides with the outer wall of the cushion block 13. When the rotating wheel group 12 moves and drives the block box 33 to move to a certain position, the pressing block 17 will be extended by the elastic force of the push block spring 34. When the pressing block 17 is extended, one end of the pressing block 17 presses the cushion block 13 on the inner wall of the rectangular plate 10 to pull the reset spring 16 downward. Therefore, when the rotating wheel group 12 moves to a certain extent, the cushion block 13 is pressed by the pressing block 17 and slides out of the rectangular plate 10, and the rotating wheel group 12 is in the rectangular plate 10. Move upward, the pad 13 slides out from the rectangular plate 10, just compensating for the loss of the overall supporting height after the rotating wheel group 12 leaves the ground, thereby realizing the effective support of the beam formwork by the strut 1. It should be noted here that the size and width of the pad 13 and its setting position in the rectangular plate 10 need to be actually measured and calculated. The bottom of the pad 13 should be higher than the roller position of the rotating wheel group 12 in the initial state. The thickness of the clamping block 17 needs to be actually measured and calculated. The thickness of the clamping block 17 should be the same as the downward movement distance of the pad 13. One end of the clamping block 17 is adapted to the edge shape corresponding to the pad 13, and the elastic force of the push block spring 34 should be greater than the tension of the reset spring 16.

[0054] like Figure 3 to Figure 4 As shown, a rectangular rod 9 is provided at the top of the support rod 1, an air receiving area 40 is provided inside the support rod 1, the rectangular rod 9 is placed at the top of the air receiving area 40, an air pressure filling port 8 is provided on the outer wall of the support rod 1, and a connecting plate port 38 is provided on the inner wall of the rectangular rod 9;

[0055] When supporting the beam formwork, after all the components are fully assembled, air pressure is introduced into the air-holding area 40 in the strut 1 through the air pressure inlet 8 by the air pressure device, and then the air pressure pushes the moment rod 9 at the top of the strut 1 to slide upward and approach the beam formwork, so that the strut 1 supports the beam formwork. The air pressure pushes the moment rod 9 to move inside the strut 1 and approach the beam formwork, so that the length of the strut 1 can be adjusted, so that the strut 1 can be suitable for beam formworks of different heights when supporting the beam formwork. It should be noted here that a sealing ring is provided at the position where the bottom of the moment rod 9 contacts the air-holding area 40, and the air-holding area 40 can be introduced with a gas or liquid with pressure-bearing capacity such as air pressure or hydraulic oil, and a certain amount of pressurized gas or liquid should exist inside the air-holding area 40 in the initial state.

[0056] like Figures 4 to 15 As shown, a rectangular support plate 6 or an arc-shaped support plate 32 is provided on the top of the support rod 1, and screw shafts 39 are fixedly installed on the bottom of the rectangular support plate 6 and the arc-shaped support plate 32, and the two screw shafts 39 are threadedly connected to the connecting plate opening 38;

[0057] During installation, by connecting the screw shaft 39 at the bottom of the rectangular support plate 6 or the arc-shaped support plate 32 with the connecting plate opening 38 in the moment rod 9, the two can form a complete support beam plate. Through the two external design of the rectangular support plate 6 and the arc-shaped support plate 32, the support rod 1 can support the rectangular or arc-shaped beam formwork when supporting the beam formwork. By designing different support beam plate shapes, the device can be adapted to support beam plates of different shapes. It should be noted here that the screw shaft 39 at the bottom of the rectangular support plate 6 and the arc-shaped support plate 32 should be compatible with the connecting plate opening 38 in the moment rod 9.

[0058] like Figures 7 to 9 As shown, the positioning assembly includes a card rod block 20, the card rod block 20 is carded with the inner wall of the cross bar 2, a shaft block 24 is fixedly installed at the bottom of the card rod block 20, a return block spring 23 is arranged between the shaft block 24 and the inner wall of the cross bar 2, a pull shaft 22 is fixedly installed on the outer wall of the shaft block 24, the outer wall of the pull shaft 22 is slidably connected with the inner wall of the cross bar 2, and a pull block ring 21 is fixedly installed at one end of the pull shaft 22;

[0059] When the support rod 1 moves on the cross bar 2, the inner wall of the support rod 1 squeezes the clamping rod block 20 to move downward in the cross bar 2. When the inner wall of the support rod 1 moves to a certain position, the clamping rod block 20 loses the squeezing force of the support rod 1, and the clamping rod block 20 will return upward under the elastic force of the return block spring 23. One end of the clamping rod block 20 will be inserted into the support rod 1 for fixation. By setting a plurality of clamping rod blocks 20 on the cross bar 2, the cross bar 2 can be divided into a distance segment, which is more convenient during installation and there is no need to use a ruler to measure. The distance between the two struts 1 on the cross bar 2 is, during disassembly, by pulling the pull block ring 21, the pull block ring 21 drives the shaft block 24 to move downward through the pull shaft 22. During the downward movement of the shaft block 24, the shaft block 24 drives the clamping rod block 20 to squeeze the return block spring 23 to retract in the cross bar 2, and the clamping rod block 20 will slide out from the inside of the strut 1. Then, the strut 1 can be removed from the cross bar 2 by pushing the strut 1. The positioning can also facilitate installation and disassembly. It should be noted here that the position distance between the two clamping rod blocks 20 needs to be actually measured.

[0060] like Figures 7 to 9 As shown, the outer wall of the support rod 1 is provided with a plurality of spraying areas 7, and the spraying areas 7 are used for spraying size markings;

[0061] During operation, by spraying size marks in the spraying area 7 near each clamping rod block 20 on the cross bar 2, the operators can conveniently observe the distance during installation, which facilitates the installation work. It should be noted here that the size marks sprayed in the spraying area 7 need to be actually measured.

[0062] Working principle: The starting frame 4 is supported on one side of the bottom of the beam template, and then the cross bar 2 is connected to the starting frame 4. When the two are connected, the support rod 1 is passed through the cross bar 2. When the support rod 1 passes through the cross bar 2, the rod moving assembly in the bottom cover 5 of the support rod 1 can better move the support rod 1, which can speed up the speed of the operator's tightening and assembly, and is more conducive to the operation, and plays a role in facilitating the movement of the support rod 1. When the support rod 1 passes through the cross bar 2, the distance between the support rods 1 is limited by the positioning assembly set on the cross bar 2, so that the operator does not need to use a ruler to measure the distance between the two support rods 1 during installation. The installation can save manpower and time, and play a role in showing the size. Through the connection of the support rod 1 on the cross bar 2, when the support rod 1 is placed on the cross bar 2 to a certain extent, the installation is stopped, and the other end of the cross bar 2 is fixedly connected to the terminal fixing frame 3. At this time, the multiple support rods 1 on the cross bar 2 can support the beam template. The setting of the positioning component and the rod moving component can solve the problem that due to the different width and length dimensions of the beam template, a ruler is needed to be used to measure the distance between the two supporting poles before installation, which is extremely wasteful of manpower and time. In addition, due to the excessive weight of the supporting pole, it is also extremely troublesome to move it.

[0063] During installation and connection, the connecting rod opening 18 at one end of the cross bar 2 is screwed into the screw 36 on the inner side of the starting fixing frame 4. When a certain number of the struts 1 on the cross bar 2 are installed, the connecting rod thread 19 at one end of the cross bar 2 is placed in the placement port 37 in the ending fixing frame 3, and then the connecting rod thread 19 is fixed to the inner wall of the ending fixing frame 3 by a nut in the placement port 37. Through the connecting rod threads 19 and the connecting rod openings 18 opened at both ends of the cross bar 2, when the length of the cross bar 2 is not enough, two or more cross bars 2 can be connected to facilitate adaptation to beam templates of different lengths;

[0064] During installation, when the width of the beam template is too long, since the two ends of the starting fixed frame 4 are respectively equipped with a frame receiving block 26 and a block receiving opening 27, the shaft rod 28 is rotated and pulled out from the disc box 29 by lifting the pull-out handle 25, and then the frame receiving block 26 on the other starting fixed frame 4 is inserted into the block receiving opening 27, and then the shaft rod 28 passes through the inner wall of the starting fixed frame 4 and the inner wall of the frame receiving block 26 at one end of the other starting fixed frame 4, and one end of the shaft rod 28 is clamped back into the disc box 29 by pressing and rotating the pull-out handle 25. The two starting fixed frames 4 are fixed by the shaft rod 28 driven by pulling the pull-out handle 25. Compared with the traditional connection method of fixing with bolts and nuts, this installation method is more convenient during installation, can effectively improve the working efficiency, and can facilitate installation and disassembly. The same is true when installing the final fixed frame 3;

[0065] When one end of the shaft 28 is inserted into the disk box 29, the handle 25 is pushed to move the one end of the shaft 28 in the disk box 29. When the shaft 28 moves, one end of the shaft 28 squeezes the protrusion 30 to squeeze the pressure spring 31 to move backward in the disk box 29. When one end of the shaft 28 moves to a certain extent and cannot move, the shaft 28 is rotated. When the shaft 28 is rotated to align the slot with the protrusion 30, the protrusion 30 loses the squeezing thrust of the shaft 28. Under the action of the elastic force of the pressure spring 31, one end of the protrusion 30 is stuck in the shaft 28, which plays a role of limiting and fixing. When removing it, the opposite operation can be performed.

[0066] When the support rod 1 is moved, since two rotating wheel groups 12 are arranged in the rectangular plate 10 at the bottom of the support rod 1, it is more convenient to move. By pushing the support rod 1, when the support rod 1 moves to a certain position on the cross bar 2, the rotating wheel group 12 is pulled upward from the rectangular plate 10 by pulling the lifting frame 11. At the same time, the card frame block 14 is pushed through the top of the lifting frame 11 to squeeze the fixed frame spring 35 in the support rod 1 to retract, and the lifting frame 11 will be pulled from the lower limit block 1 5 moves to the bottom of the upper limit block 15. At this time, the bracket block 14 loses the thrust of the lifting frame 11. Under the action of the elastic force of the fixing spring 35, the bracket block 14 will slide out from the inside of the support rod 1, and then cooperate with the upper limit block 15. The top of the lifting frame 11 will be fixed between the two. At this time, the rotating wheel group 12 will slide up to a certain position in the rectangular plate 10, so that the roller in the rotating wheel group 12 is off the ground, which is convenient for the support rod 1 to support the beam template;

[0067] When the rotating wheel group 12 moves upward in the rectangular plate 10, the rotating wheel group 12 drives the inner block box 33 to move upward. When the block box 33 moves upward, the clamping block 17 in the block box 33 slides with the outer wall of the cushion block 13. When the rotating wheel group 12 moves and drives the block box 33 to move to a certain position, the clamping block 17 will be extended by the elastic force of the push block spring 34. When the clamping block 17 is extended, one end of the clamping block 17 clamps the cushion block 13 on the inner wall of the rectangular plate 10 to pull the return spring 16 to move downward. Therefore, when the rotating wheel group 12 moves to a certain extent, the cushion block 13 is pressed by the clamping block 17 and slides out of the rectangular plate 10. By moving the rotating wheel group 12 upward in the rectangular plate 10, the cushion block 13 slides out of the rectangular plate 10, which just compensates for the loss of the overall supporting height after the rotating wheel group 12 leaves the ground, thereby realizing the effective support of the beam formwork by the support rod 1;

[0068] When supporting the beam formwork, after all parts are fully assembled, air pressure is introduced into the air area 40 in the support rod 1 through the air pressure inlet 8 by the air pressure device, and then the air pressure pushes the moment rod 9 at the top of the support rod 1 to slide upward and approach the beam formwork, so that the support rod 1 supports the beam formwork, and the air pressure pushes the moment rod 9 to move in the support rod 1 and approach the beam formwork, so that the length of the support rod 1 can be adjusted, so that the support rod 1 can be applied to beam formworks of different heights when supporting the beam formwork;

[0069] During installation, by connecting the screw shaft 39 at the bottom of the rectangular support plate 6 or the arc support plate 32 with the plate connection opening 38 in the moment rod 9, the two can form a complete beam support plate. By designing the two shapes of the rectangular support plate 6 and the arc support plate 32, the support rod 1 can support the rectangular or arc-shaped beam template when supporting the beam template. By designing different shapes of the beam support plates, the device can be adapted to beam support plates of different shapes.

[0070] When the support rod 1 moves on the cross bar 2, the inner wall of the support rod 1 squeezes the clamping rod block 20 to move downward in the cross bar 2. When the inner wall of the support rod 1 moves to a certain position, the clamping rod block 20 loses the squeezing force of the support rod 1, and the clamping rod block 20 will return upward under the elastic force of the return block spring 23. One end of the clamping rod block 20 will be inserted into the support rod 1 for fixing. By setting a plurality of clamping rod blocks 20 on the support rod 1, the cross bar 2 can be divided into a distance segment. It is more convenient when disassembling, and there is no need to use a ruler to measure the distance between the two struts 1 on the cross bar 2. When disassembling, by pulling the pull block ring 21, the pull block ring 21 drives the shaft block 24 to move downward through the pull shaft 22. During the downward movement of the shaft block 24, the shaft block 24 drives the clamping rod block 20 to squeeze the return block spring 23 to retract in the cross bar 2, and the clamping rod block 20 will slide out from the inside of the strut 1. Then, the strut 1 can be removed from the cross bar 2 by pushing the strut 1, which can facilitate installation and disassembly while positioning;

[0071] During operation, by spraying size marks in the spraying area 7 near each clamping rod block 20 on the cross bar 2, operators can conveniently view the distance during installation, which is convenient for installation.

[0072] The above shows and describes the basic principles, main features and advantages of the present invention. It should be understood by those skilled in the art that the present invention is not limited to the above embodiments. The above embodiments and descriptions are only for explaining the principles of the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, which fall within the scope of the present invention. The scope of protection of the present invention is defined by the attached claims and their equivalents.

Claims

1. A beam formwork support device, Features: The invention comprises an end fixing frame (3) and a start fixing frame (4), wherein a cross bar (2) is symmetrically arranged between the end fixing frame (3) and the start fixing frame (4), the outer walls of the two cross bars (2) are slidably connected with a support rod (1), a cover shell (5) is fixedly installed at the bottom of the support rod (1), and a shifting rod assembly is arranged inside the cover shell (5). The shifting rod assembly is used for moving the support rod (1). The shifting rod assembly can better move the support rod (1), speed up the tightening and assembling speed of the operator, and is more conducive to the operation, playing the role of facilitating the movement of the support rod (1). A plurality of positioning assemblies are arranged inside the cover shell (5), and the positioning assemblies are used for marking the size of the cross bar (2), so that the operator does not need to use a ruler to measure the distance between the two support rods (1) before installing, which can better save manpower and time and play the role of displaying the size.

2. A beam formwork support device according to claim 1, Features: A screw rod (36) is symmetrically fixedly installed on the inner side of the starting fixed frame (4), and a placement port (37) is symmetrically opened on the inner wall of the ending fixed frame (3). A connecting rod opening (18) and a connecting rod thread (19) are respectively opened at both ends of the cross bar (2). The connecting rod opening (18) and the screw rod (36) are threadedly connected, and the connecting rod thread (19) is slidably connected to the inner wall of the placement port (37). The connecting rod thread (19) on the cross bar (2) can be fixed in the placement port (37) by a nut.

3. A beam formwork support device according to claim 2, Features: One end of the terminating fixed frame (3) and the starting fixed frame (4) is fixedly mounted with a frame block (26), the other end of the terminating fixed frame (3) and the starting fixed frame (4) is provided with a block receiving opening (27), the interior of the block receiving opening (27) is slidably provided with an axle rod (28), one end of the axle rod (28) is fixedly mounted with a pull-out handle (25), the outer wall of the terminating fixed frame (3) and the starting fixed frame (4) is fixedly mounted with a disk box (29), the other end of the axle rod (28) is placed in the disk box (29).

4. A beam formwork support device according to claim 3, Features: A plurality of protrusions (30) are arranged inside the disk box (29), and pressure springs (31) are arranged between the plurality of protrusions (30) and the inner wall of the disk box (29), and one end of the plurality of protrusions (30) can be engaged with the card slots on the outer periphery of the shaft rod (28).

5. A beam formwork support device according to claim 4, Features: The shifting rod assembly comprises a rectangular plate (10), wherein the rectangular plate (10) is fixedly mounted on the bottom of the support rod (1), the inner wall of the rectangular plate (10) is symmetrically slidably connected with a rotating wheel group (12), a lifting frame (11) is symmetrically fixedly mounted between the two rotating wheel groups (12), a limiting block (15) is symmetrically fixedly mounted on the outer wall of the support rod (1), a bracket block (14) is arranged between the two limiting blocks (15), the outer wall of the bracket block (14) is slidably connected with the inner wall of the support rod (1), a fixing frame spring (35) is arranged between the bracket block (14) and the inner wall of the support rod (1), and the top of the lifting frame (11) is placed between the bracket block (14) and the limiting block (15).

6. A beam formwork support device according to claim 5, Features: A cushion block (13) is slidably arranged at the bottom of the rectangular plate (10), a return spring (16) is arranged between the top of the cushion block (13) and the bottom of the rectangular plate (10), a block receiving box (33) is fixedly installed on the outer wall of the rotating wheel group (12), a clamping block (17) is slidably arranged on the inner wall of the block receiving box (33), a push block spring (34) is fixedly installed between one side of the clamping block (17) and the inner wall of the block receiving box (33), and one end of the clamping block (17) is slidably connected to the outer wall of one side of the cushion block (13).

7. A beam formwork support device according to claim 6, Features: A rectangular rod (9) is arranged at the top of the support rod (1), an air receiving area (40) is provided inside the support rod (1), the rectangular rod (9) is placed at the top of the air receiving area (40), an air pressure filling port (8) is provided on the outer wall of the support rod (1), and a plate connection port (38) is provided on the inner wall of the rectangular rod (9).

8. A beam formwork support device according to claim 7, Features: A rectangular support plate (6) or an arc-shaped support plate (32) is arranged on the top of the support rod (1), and screw shafts (39) are fixedly installed on the bottoms of the rectangular support plate (6) and the arc-shaped support plate (32), and the two screw shafts (39) are threadedly connected to the connecting plate opening (38).

9. A beam formwork support device according to claim 1, Features: The positioning assembly includes a rod block (20), which is engaged with the inner wall of the support rod (1); a shaft block (24) is fixedly installed at the bottom of the rod block (20); a return block spring (23) is arranged between the shaft block (24) and the inner wall of the cross bar (2); a pull shaft (22) is fixedly installed on the outer wall of the shaft block (24); the outer wall of the pull shaft (22) is slidably connected to the inner wall of the cross bar (2); and a pull block ring (21) is fixedly installed on one end of the pull shaft (22).

10. A beam formwork support device according to claim 9, Features: The outer wall of the support rod (1) is provided with a plurality of spraying areas (7), and the spraying areas (7) are used for spraying size markings.