Method and device for pulling out tubing hanger under pressure from coiled tubing gas production pipe column
By identifying sand burial conditions, blocking and replacing large-diameter gate valves, and combining gas balance and liquid throttling to assist in unstuck methods, the problem of excessive unstuck load on the salvage tubing hanger during the pressure lifting process of the coiled tubing gas production string was solved. problems, improving the success rate and safety of operations.
Patent Information
- Application Number
- CN202310347629.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2023-04-03
- Publication Date
- 2024-10-15
AI Technical Summary
In the existing technology, the process of extracting the coiled tubing gas production string under pressure lacks specific operational details, especially the salvage tubing hanger link, which results in excessive unloading load and affects the success rate and safety of the operation.
A set of procedures including sand-buried well condition identification and analysis, coiled pipe internal plugging and sealing verification, replacement of large diameter gate valves and gas balance pressure method, gas balance pressure method shock-assisted jamming salvage and liquid throttling pressure difference-assisted jamming release was designed. The specific steps of the advance salvage method include analyzing the sand burial situation, sealing in the pipe, verifying the sealing success, replacing the gate valve, installing the salvage tool string, trial salvage with the gas balance pressure method, and shock or liquid throttling to assist in unblocking, until it is successfully lifted. Take out the coiled tube.
It provides a complete set of operating methods, improves the feasibility and success rate of the pressure extraction process of coiled tubing gas production strings, reduces comprehensive operating costs, avoids the difficulty of unsealing and salvaging small-diameter gate valves at the wellhead, and improves equipment and well control safety.
Smart Images

Figure CN118774652A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of pulling out a coiled tubing under wellhead pressure conditions, and in particular to a method and a device for pulling out an oil pipe hanger under pressure from a coiled tubing gas production pipe string. Background Art
[0002] Tight shale gas is the main resource for natural gas development. Its production faces two common problems: high pressure and high yield in the early stage of production, rapid decline in production and rapid increase in water content, and the need for long-term drainage and gas production in the middle and late stages of production. The tubing hanger at the original gas production wellhead is used to hang 2″ continuous tubing to replace conventional tubing for gas well new well completion (hereinafter referred to as continuous tubing gas production string), and combined with multi-functional downhole tools, it has been used in more than 500 wells in the oil field, and the number is increasing year by year. It has well solved the problem of low-cost completion of tight gas wells and conversion of production processes without moving the tubing string during production, and achieved low-cost and rapid completion of gas wells and effective drainage and production throughout the life cycle.
[0003] During the service of the coiled tubing gas production string, there are also problems such as pipe corrosion evaluation, complex wellbore repair, and pipe reuse, all of which require the coiled tubing to be pulled out under pressure. The existing patents that can be retrieved for the coiled tubing completion process using a tubing hanger to hang the coiled tubing only give a general process flow, lacking the necessary operational details, and are difficult to directly guide field applications. In particular, as one of the key steps in the pressurized pull-out of the coiled tubing string, the existing patents do not mention specific measures. Since the coiled tubing gas production string uses the original wellhead tubing hanger to hang the coiled tubing, the seal with the tubing head generally adopts a combined sealing structure of metal + sealant tube + O-ring. The seal on the tubing hanger undergoes plastic deformation under the long-term heavy load of the lower coiled tubing. In addition, the dirt in the well is deposited in the gap of the tubing hanger. As a result, when the tubing hanger is salvaged during the later process of lifting the coiled tubing gas production string under pressure, the static friction and viscosity between the tubing hanger and the tubing head far exceed the dead weight of the coiled tubing in the well. The unstuck load required by the tubing hanger is too large, even exceeding the safe lifting load allowed by the coiled tubing operation machine or the pipe, resulting in the failure of salvaging the tubing hanger and the entire lifting operation. Therefore, it is necessary to carry out targeted research to form a complete set of coiled tubing gas production string under pressure lifting technology, especially the specific operation method of salvaging the tubing hanger, which is one of the core links of under pressure lifting, to solve the problem of imperfect supporting under pressure lifting technology for the coiled tubing gas production string. Summary of the invention
[0004] The technical problem to be solved by the present invention is to provide a method and a device for lifting a production pipe hanger under pressure on a coiled tubing gas production pipe string in view of the deficiencies in the prior art.
[0005] The technical solution of the present invention to solve the above technical problems is as follows: A method for lifting a production tubing hanger under pressure in a coiled tubing gas production string, comprising:
[0006] S1. Analyze whether the coiled tubing gas production string is buried in sand;
[0007] S2. When the coiled tubing gas production string is not buried in sand, the coiled tubing gas production string is plugged inside the tube;
[0008] S3, verifying whether the plugging inside the coiled tubing gas production string is successful;
[0009] S4. When the plugging of the coiled tubing gas production string is successful, the first gate valve and the collection tree above the tubing head are removed, a fishing neck nipple is installed on the tubing hanger, a second gate valve is installed above the tubing head to facilitate the passage of the tubing hanger, and the second gate valve is closed;
[0010] S5, installing a blowout preventer, a blowout preventer, an injection head and a pipe body above the second gate valve, installing a fishing tool string at the lower end of the pipe body, grasping the fishing neck nipple by the fishing tool string, and lifting the pipe body by the injection head, so that the tubing hanger is separated from the tubing head and moves upward until the tubing hanger enters the blowout preventer, and closing the blowout preventer;
[0011] S6, applying pressure to the tubular body, controlling the salvage tool string to separate from the salvage neck nipple, cutting the tubular body below the tubing hanger and above the salvage tool string, and connecting the coiled tubing in the well to the tubular body through a first connector;
[0012] S7, lift up and pull out the coiled tubing in the well until the tail end of the coiled tubing in the well is located above the second gate valve, close the second gate valve, drain the pressure and fluid of the blowout preventer, the blowout preventer, the injection head, the pipe body and the coiled tubing in the well, remove the blowout preventer, the blowout preventer, the injection head and the pipe body, install the collection tree on the second gate valve, and complete the pulling out work.
[0013] The beneficial effects of adopting the above further technical scheme are: designing process steps and specific operating methods such as sand-buried well condition identification and analysis, plugging and sealing verification in coiled tubing, and replacing large-diameter gate valves, providing a complete set of process flows and operating methods for the pressure-lifting operation of the coiled tubing completion method with the tubing hanger hanging, which is more operable, feasible and has a higher success rate. In view of the imperfect process methods for lifting the 2″ coiled tubing gas production string, the lack of specific and necessary operating methods in the key core links, the ability and means to prevent accidents in the coiled tubing gas production string and effectively lift the string are established, and the comprehensive operating cost of lifting the coiled tubing gas production string under pressure is reduced. Under the condition of wellhead pressure, the first gate valve with a small diameter at the wellhead is replaced with a second gate valve with a large diameter, which solves the problem of the need for a large-diameter channel for the unsealing and salvaging of the large-diameter tubing hanger.
[0014] Furthermore, the salvage tool string includes: a second connector, a release handle, a one-way valve and a GS salvage spear.
[0015] Step S5 includes:
[0016] S51, installing a blowout preventer, a blowout preventer, an injection head and a pipe body above the second gate valve, and sequentially installing a second connector, a release handle, a one-way valve and a GS salvage spear at the lower end of the pipe body to form a salvage tool string, and grasping the salvage neck short section through the GS salvage spear;
[0017] S52, introducing casing pressure into the second gate valve, the blowout preventer, the blowout preventer, the injection head and the tubing body, attempting to lift the tubing body through the injection head, and determining whether the tubing hanger is separated from the tubing head and moves upward;
[0018] S53, when the tubing hanger is separated from the tubing head and moves upward, the tubing body is continuously lifted up by the injection head until the tubing hanger enters the blowout preventer, and the blowout preventer is closed.
[0019] The beneficial effect of adopting the above further technical solution is: designing a gas balance pressure method to test the salvage method, at this time, the lifting load of the salvage tool string = the weight of the coiled tubing + the viscous resistance of the tubing hanger and the tubing head. The GS salvage spear with a salvage claw can be used to quickly grab the tubing hanger with the salvage tool string dedicated to the tubing hanger, and the pressure control can be quickly released when it is necessary to release it.
[0020] Further, step S52 includes:
[0021] S521, when the tubing hanger is not separated from the tubing head and moves upward, an accelerator and a jar are installed between the one-way valve and the GS salvage spear to form a jarring salvage tool string;
[0022] S522, introducing casing pressure into the second gate valve, the blowout preventer, the blowout preventer, the injection head and the tubing body, stimulating the upward impact load at least 5 times by the jar, attempting to lift the tubing body by the injection head, and determining whether the tubing hanger is separated from the tubing head and moved upward;
[0023] S523. When the tubing hanger is separated from the tubing head and moves upward, execute step S53.
[0024] The beneficial effect of adopting the above further technical solution is: by designing a gas balance pressure method jarring-assisted unstuck salvage method, the lifting load is not less than the deadweight of the coiled tubing in the well, so that the jar is fired to generate a large instantaneous impact load, and the jarring operation is repeated for not less than 5 times, so that the tubing hanger and the tubing head produce axial slippage, reducing the viscous resistance between them, and then the tubing hanger is tried to be lifted. At this time, the lifting load of the salvage tool string = the deadweight of the coiled tubing + the reduced viscous resistance between the tubing hanger and the tubing head.
[0025] Further, step S522 includes:
[0026] S5221, when the tubing hanger is not separated from the tubing head and moves upward, the second gate valve, the blowout preventer, the blowout preventer, the injection head and the pipe body are filled with clean water, and the second gate valve, the blowout preventer, the blowout preventer, the injection head and the pipe body are connected to atmospheric pressure through a throttling device;
[0027] S5222, stimulating the upward impact load at least 5 times by the jar, attempting to lift the tubing body by the injection head, and determining whether the tubing hanger is separated from the tubing head and moves upward;
[0028] S5223. When the tubing hanger is separated from the tubing head and moves upward, execute step S53.
[0029] The beneficial effect of adopting the above further technical solution is: by designing a liquid throttling pressure difference assisted unstuck salvage method, the lifting load is not less than the deadweight of the coiled tubing in the well, so that the jar is fired to generate a large instantaneous impact load, and the jar operation is repeated for not less than 5 times, so that the tubing hanger and the tubing head produce axial slippage, reducing the viscous resistance between them. At this time, the lifting load of the salvage tool string = the deadweight of the coiled tubing + the reduced viscous resistance between the tubing hanger and the tubing head - the upward force generated by the upper and lower pressure differences of the tubing hanger. The tubing hanger is salvaged by filling the operating wellhead above the tubing hanger with clean water and connecting it to atmospheric pressure under supporting throttling measures. On the one hand, the uplift force generated by the wellhead pressure difference can be effectively utilized to reduce the lifting load of the coiled tubing injection head, leaving a larger safety margin for the lifting load on the injection head. At the same time, due to the incompressibility of water and throttling measures, it can play a good buffering role, preventing the tubing hanger from having too large a pressure difference between the upper and lower parts at the moment of unsealing and unstuck, and preventing the tubing string from suddenly and quickly rising with a large stroke to damage the salvage tool string and the coiled tubing, thereby improving the safety of operating equipment and well control. Aiming at the problem of excessive load on the tubing hanger to release the tubing hanger, which is one of the key steps in the pressurized lifting of the coiled tubing gas production string, a set of progressive salvage methods, including trial salvage using gas balanced pressure method, salvage using gas balanced pressure method shock-assisted release, and liquid throttling pressure difference-assisted release, are proposed to improve the feasibility and success rate of the process operation of lifting the coiled tubing gas production string under pressure, reduce the construction risk of salvaging the tubing hanger, form a set of pressurized lifting technology for coiled tubing gas production string with optimized process flow and high feasibility, establish the ability and means to prevent accidents of coiled tubing gas production string and effectively lift the string, reduce the comprehensive operation cost of lifting the coiled tubing gas production string under pressure, and solve the worries about the development of coiled tubing gas production string technology.
[0030] Further, step S5222 includes:
[0031] The jar is used to stimulate the upper impact load at least five times, and the nitrogen generator is used to replenish the pressure to the second gate valve, the blowout preventer, the blowout preventer, the injection head and the pipe body;
[0032] The tubing body is tried to be lifted up by the injection head, and it is determined whether the tubing hanger is separated from the tubing head and moved upward.
[0033] The beneficial effect of adopting the above further technical solution is: in the process of using the liquid throttling pressure difference to assist the unstuck fishing method, if necessary, the pressure can be gradually supplemented through the tubing head four-way into the casing. Specifically, if the wellhead pressure is too low and the pressure difference acting on the tubing hanger is too small, the nitrogen generator can be used to supplement the pressure through the tubing head four-way into the casing. Increase the pressure difference between the upper and lower parts of the tubing hanger, and then try to lift the tubing hanger. Aiming at the problem of excessive load on the tubing hanger to release the tubing hanger, which is one of the key steps in the pressurized lifting of the coiled tubing gas production string, a set of progressive salvage methods, including trial salvage using gas balanced pressure method, salvage using gas balanced pressure method shock-assisted release, and liquid throttling pressure difference-assisted release, are proposed to improve the feasibility and success rate of the process operation of lifting the coiled tubing gas production string under pressure, reduce the construction risk of salvaging the tubing hanger, form a set of pressurized lifting technology for coiled tubing gas production string with optimized process flow and high feasibility, establish the ability and means to prevent accidents of coiled tubing gas production string and effectively lift the string, reduce the comprehensive operation cost of lifting the coiled tubing gas production string under pressure, and solve the worries about the development of coiled tubing gas production string technology. By adopting balanced pressure, shock, pressure difference assisted unstuck and various combined measures, the problem that the unstuck load of the tubing hanger far exceeds the weight of the tubing itself and the salvage cannot be effectively unstuck and salvaged by simply lifting the injection head is solved. This improves the success rate of salvaging tubing hangers with large viscous resistance and ensures the normal implementation of subsequent tubing lifting operations.
[0034] Further, step S1 includes:
[0035] S11, reduce the casing pressure by 0.5-1MPa and close the wellhead;
[0036] S12. Within 15-30 minutes after closing the wellhead, determine whether the casing pressure has returned to the original wellhead pressure;
[0037] S13. When the casing pressure returns to the original wellhead pressure, the coiled tubing gas production string is not buried in sand.
[0038] The beneficial effect of adopting the above-mentioned further technical scheme is: by implementing sand buried well condition identification and analysis measures, the sand buried situation of the coiled tubing can be predicted in advance and the sand buried risk can be eliminated to the greatest extent by establishing circulation measures, so as to ensure the normal fishing and lifting of the subsequent tubing hanger and the coiled tubing under pressure, and avoid the inability to pull out the pipe in the middle of the operation due to insufficient prediction of the drill bit stuck in the sand buried of the coiled tubing before the pipe is lifted under pressure, resulting in a long waiting time on site.
[0039] Further, step S12 includes:
[0040] When the casing pressure has not recovered to the original wellhead pressure, positive circulation nitrogen gas lift is performed, and then positive circulation well washing and sand flushing are performed, and step S11 is executed.
[0041] The beneficial effect of adopting the above further technical solution is that after predicting that the coiled tubing is buried in sand, positive circulation well washing and sand flushing can be used to try to release the jam, and a normal circulation release success rate is high, which meets the necessary conditions for lifting the tubing.
[0042] Further, step S2 includes:
[0043] When the coiled tubing gas production string is not buried in sand, determine whether the prefabricated bottom hole plugging and completion tool was put into the coiled tubing gas production string during the initial deployment;
[0044] When the prefabricated bottom hole plugging and completion tool is put into the coiled tubing gas production string in the early stage, a ball or a rod is dropped from the wellhead and pumped to the bottom of the well. The prefabricated bottom hole plugging and completion tool is driven to move by controlling the wellhead pressure to complete the bottom hole plugging.
[0045] When the prefabricated bottom hole plugging and completion tool is not put into the coiled tubing gas production string at the early stage, mechanical plugging tools or chemical plugging methods are used to plug the position 1-2m below the end of the coiled tubing at the wellhead.
[0046] The beneficial effect of adopting the above further technical solution is: according to whether the prefabricated bottom hole plugging and completion tool is lowered into the coiled tubing gas production string in the early stage, different plugging methods are used for plugging, thereby improving safety and reliability.
[0047] Further, step S3 includes:
[0048] Release the wellhead pressure and shut down the wellhead for 30 minutes;
[0049] Determine whether the wellhead can be emptied normally and the pressure does not rise within 30 minutes of closing the wellhead;
[0050] When the wellhead can be vented normally and the pressure does not rise within 30 minutes after the wellhead is closed, the internal plugging of the coiled tubing gas production string is successful.
[0051] The beneficial effect of adopting the above further technical solution is: by verifying whether the plugging in the coiled tubing gas production string is successful, it is ensured that the plugging work is completed reliably and the safety is improved.
[0052] In addition, the present invention also provides a device for lifting a tubing hanger under pressure on a coiled tubing gas production pipe string, which is used to perform any of the above-mentioned methods for lifting a tubing hanger under pressure on a coiled tubing gas production pipe string. The device for lifting a tubing hanger under pressure on a coiled tubing gas production pipe string comprises: a tubing head, a tubing hanger, a fishing neck short section, a coiled tubing in a well, a second gate valve, a blowout preventer, a blowout preventer, an injection head, a pipe body, a second connector, a release hand, a one-way valve, an accelerator, a jar, a GS fishing spear and a fishing claw. The tubing hanger is installed in the tubing head, and the fishing neck short section and the coiled tubing in the well are connected to the tubing hanger. The second gate valve is mounted on the top of the tubing head, the blowout preventer is mounted on the top of the second gate valve, the lubricant pipe is mounted on the top of the blowout preventer, the injection head is mounted on the top of the lubricant pipe, the pipe body is mounted on the injection head, the second connector is mounted on the bottom of the pipe body, the release hand is mounted on the bottom of the second connector, the one-way valve is mounted on the bottom of the release hand, the accelerator is mounted on the bottom of the one-way valve, the jar is mounted on the bottom of the accelerator, the GS salvage spear is mounted on the bottom of the jar, and the salvage claw is mounted on the bottom of the GS salvage spear.
[0053] The beneficial effect of adopting the above further technical solution is: on the basis of improving the structure of the device, the process steps and specific operating methods such as sand-buried well condition identification and analysis, plugging and sealing verification in the continuous tubing, and replacement of large-diameter gate valves are designed, which provides a complete set of process flows and operating methods for the pressure-lifting operation of the continuous tubing completion method suspended by the tubing hanger, which is more operable, feasible and has a higher success rate. In view of the imperfect process methods for lifting the 2″ continuous tubing gas production string, the lack of specific and necessary operating methods in the key core links, the ability and means to prevent accidents in the continuous tubing gas production string and effectively lift the string are established, and the comprehensive operating cost of lifting the continuous tubing gas production string under pressure is reduced. Under the condition of wellhead pressure, the first gate valve with a small diameter at the wellhead is replaced with a second gate valve with a large diameter, which solves the problem of the need for a large-diameter channel for the unsealing and salvage of the large-diameter tubing hanger.
[0054] Advantages of additional aspects of the present invention will be given in part in the following description, and in part will be obvious from the following description, or will be learned through practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS
[0055] Figure 1 One of the schematic flow charts of the method for lifting the oil production pipe hanger under pressure in a coiled tubing gas production pipe string provided in an embodiment of the present invention.
[0056] Figure 2 The second schematic flowchart of the method for lifting the oil production pipe hanger under pressure in a coiled tubing gas production pipe string provided in an embodiment of the present invention.
[0057] Figure 3 A schematic diagram of the structure of a coiled tubing gas production string production wellhead provided in an embodiment of the present invention.
[0058] Figure 4 A schematic diagram of the structure of a wellhead for suspending and installing a special fishing neck short section for an oil pipe hanger provided in an embodiment of the present invention.
[0059] Figure 5 A schematic diagram of the structure of a wellhead for unsealing and salvaging operations of an oil pipe hanger provided in an embodiment of the present invention.
[0060] Figure 6 A schematic structural diagram of a fishing tool string dedicated to a tubing hanger provided in an embodiment of the present invention.
[0061] Figure 7 A schematic structural diagram of a coiled tubing gas production string and a coiled tubing back-connection clamped by an injection head provided in an embodiment of the present invention.
[0062] Figure 8 for Figure 7 A partial enlarged view of the structure shown in area A.
[0063] Explanation of the accompanying drawings: 1. first gate valve; 2. tubing head; 3. collection tree; 5. tubing hanger; 6. fishing neck short section; 8. coiled tubing in the well; 9. second gate valve; 10. blowout preventer; 11. blowout preventer; 12. injection head; 131. pipe body; 132. second connector; 133. release handle; 134. check valve; 135. accelerator; 136. jar; 137. GS fishing spear; 1371. fishing claw; 14. first connector. DETAILED DESCRIPTION
[0064] The principles and features of the present invention are described below in conjunction with the accompanying drawings. The examples given are only used to explain the present invention and are not used to limit the scope of the present invention.
[0065] like Figure 1 As shown, an embodiment of the present invention provides a method for lifting a production tubing hanger under pressure in a coiled tubing gas production string, comprising:
[0066] S1. Analyze whether the coiled tubing gas production string is buried in sand;
[0067] S2. When the coiled tubing gas production string is not buried in sand, the coiled tubing gas production string is plugged inside the tube;
[0068] S3, verifying whether the plugging inside the coiled tubing gas production string is successful;
[0069] S4. When the plugging of the coiled tubing gas production string is successful, the first gate valve and the collection tree above the tubing head are removed, a fishing neck nipple is installed on the tubing hanger, a second gate valve is installed above the tubing head to facilitate the passage of the tubing hanger, and the second gate valve is closed;
[0070] S5, installing a blowout preventer, a blowout preventer, an injection head and a pipe body above the second gate valve, installing a fishing tool string at the lower end of the pipe body, grasping the fishing neck nipple by the fishing tool string, and lifting the pipe body by the injection head, so that the tubing hanger is separated from the tubing head and moves upward until the tubing hanger enters the blowout preventer, and closing the blowout preventer;
[0071] S6, applying pressure to the tubular body, controlling the salvage tool string to separate from the salvage neck nipple, cutting the tubular body below the tubing hanger and above the salvage tool string, and connecting the coiled tubing in the well to the tubular body through a first connector;
[0072] S7, lift up and pull out the coiled tubing in the well until the tail end of the coiled tubing in the well is located above the second gate valve, close the second gate valve, drain the pressure and fluid of the blowout preventer, the blowout preventer, the injection head, the pipe body and the coiled tubing in the well, remove the blowout preventer, the blowout preventer, the injection head and the pipe body, install the collection tree on the second gate valve, and complete the pulling out work.
[0073] The beneficial effects of adopting the above further technical scheme are: designing process steps and specific operating methods such as sand-buried well condition identification and analysis, plugging and sealing verification in coiled tubing, and replacing large-diameter gate valves, providing a complete set of process flows and operating methods for the pressure-lifting operation of the coiled tubing completion method with the tubing hanger hanging, which is more operable, feasible and has a higher success rate. In view of the imperfect process methods for lifting the 2″ coiled tubing gas production string, the lack of specific and necessary operating methods in the key core links, the ability and means to prevent accidents in the coiled tubing gas production string and effectively lift the string are established, and the comprehensive operating cost of lifting the coiled tubing gas production string under pressure is reduced. Under the condition of wellhead pressure, the first gate valve with a small diameter at the wellhead is replaced with a second gate valve with a large diameter, which solves the problem of the need for a large-diameter channel for the unsealing and salvaging of the large-diameter tubing hanger.
[0074] The present invention relates to an operation process method for completely pulling out the 2" coiled tubing under pressure at the wellhead after the well is completed and put into production by using a 2" coiled tubing as a production tubing string and adopting an original wellhead tubing hanger suspension method (a method for pulling out the tubing hanger of a coiled tubing gas production string under pressure).
[0075] Aiming at the problems of imperfect 2″ coiled tubing gas production string lifting process and lack of specific and necessary operation methods in key core links, a relatively comprehensive method for lifting coiled tubing gas production string under pressure (method for lifting tubing hanger under pressure in coiled tubing gas production string) is provided. At the same time, aiming at the problem of excessive load on tubing hanger unstuck in the link of salvaging tubing hanger, which is one of the key steps of lifting coiled tubing gas production string under pressure, a set of progressive salvage methods such as gas balance pressure method trial salvage - gas balance pressure method shock-assisted unstuck salvage - liquid throttling pressure difference-assisted unstuck are innovatively proposed to improve the feasibility and success rate of coiled tubing gas production string lifting process operation, reduce the construction risk of salvaging tubing hanger, form a set of coiled tubing gas production string lifting technology under pressure with optimized process flow and high feasibility, establish the ability and means to prevent coiled tubing gas production string accidents and effectively lift the string, reduce the comprehensive operation cost of coiled tubing gas production string lifting under pressure, and solve the worries about the development of coiled tubing gas production string technology.
[0076] like Figure 2 As shown, start, 1. Identify and analyze the well condition; 2. Determine whether it is sand buried; 3. If so, positive circulation sand flushing; 4. Determine whether it can circulate normally; 5. If so, positive circulation sand flushing until the sand burial is released; 6. Seal inside the pipe; 7. Seal inspection; 8. Determine whether the seal inspection is qualified; 9. If so, replace the large-diameter gate valve; 10. Unseal and salvage the tubing hanger; 11. Determine whether the injection head or the continuous pipe is overloaded; 12. If so, supplement the pressure of the casing annulus and add the shock tool; 13. After the tubing hanger is unsealed, lift it up to the blowout preventer; 14. Connect the pipe string; 15. Reverse the tail pipe process to release the tail gas and restore the wellhead; 16. End.
[0077] Among them, after step 2, 17, if not, execute step 6; after step 8, 18, if not, use the backup blocking method and execute step 9; after step 11, 19, if not, execute step 13.
[0078] Furthermore, the salvage tool string includes: a second connector, a release handle, a one-way valve and a GS salvage spear.
[0079] Step S5 includes:
[0080] S51, installing a blowout preventer, a blowout preventer, an injection head and a pipe body above the second gate valve, and sequentially installing a second connector, a release handle, a one-way valve and a GS salvage spear at the lower end of the pipe body to form a salvage tool string, and grasping the salvage neck short section through the GS salvage spear;
[0081] S52, introducing casing pressure into the second gate valve, the blowout preventer, the blowout preventer, the injection head and the tubing body, attempting to lift the tubing body through the injection head, and determining whether the tubing hanger is separated from the tubing head and moves upward;
[0082] S53, when the tubing hanger is separated from the tubing head and moves upward, the tubing body is continuously lifted up by the injection head until the tubing hanger enters the blowout preventer, and the blowout preventer is closed.
[0083] The beneficial effect of adopting the above further technical solution is: designing a gas balance pressure method to test the salvage method, at this time, the lifting load of the salvage tool string = the weight of the coiled tubing + the viscous resistance of the tubing hanger and the tubing head. The GS salvage spear with a salvage claw can be used to quickly grab the tubing hanger with the salvage tool string dedicated to the tubing hanger, and the pressure control can be quickly released when it is necessary to release it.
[0084] Further, step S52 includes:
[0085] S521, when the tubing hanger is not separated from the tubing head and moves upward, an accelerator and a jar are installed between the one-way valve and the GS salvage spear to form a jarring salvage tool string;
[0086] S522, introducing casing pressure into the second gate valve, the blowout preventer, the blowout preventer, the injection head and the tubing body, stimulating the upward impact load at least 5 times by the jar, attempting to lift the tubing body by the injection head, and determining whether the tubing hanger is separated from the tubing head and moved upward;
[0087] S523. When the tubing hanger is separated from the tubing head and moves upward, execute step S53.
[0088] The beneficial effect of adopting the above further technical solution is: by designing a gas balance pressure method jarring-assisted unstuck salvage method, the lifting load is not less than the deadweight of the coiled tubing in the well, so that the jar is fired to generate a large instantaneous impact load, and the jarring operation is repeated for not less than 5 times, so that the tubing hanger and the tubing head produce axial slippage, reducing the viscous resistance between them, and then the tubing hanger is tried to be lifted. At this time, the lifting load of the salvage tool string = the deadweight of the coiled tubing + the reduced viscous resistance between the tubing hanger and the tubing head.
[0089] Further, step S522 includes:
[0090] S5221, when the tubing hanger is not separated from the tubing head and moves upward, the second gate valve, the blowout preventer, the blowout preventer, the injection head and the pipe body are filled with clean water, and the second gate valve, the blowout preventer, the blowout preventer, the injection head and the pipe body are connected to atmospheric pressure through a throttling device;
[0091] S5222, stimulating the upward impact load at least 5 times by the jar, attempting to lift the tubing body by the injection head, and determining whether the tubing hanger is separated from the tubing head and moves upward;
[0092] S5223. When the tubing hanger is separated from the tubing head and moves upward, execute step S53.
[0093] The beneficial effect of adopting the above further technical solution is: by designing a liquid throttling pressure difference assisted unstuck salvage method, the lifting load is not less than the deadweight of the coiled tubing in the well, so that the jar is fired to generate a large instantaneous impact load, and the jar operation is repeated for not less than 5 times, so that the tubing hanger and the tubing head produce axial slippage, reducing the viscous resistance between them. At this time, the lifting load of the salvage tool string = the deadweight of the coiled tubing + the reduced viscous resistance between the tubing hanger and the tubing head - the upward force generated by the upper and lower pressure differences of the tubing hanger. The tubing hanger is salvaged by filling the operating wellhead above the tubing hanger with clean water and connecting it to atmospheric pressure under supporting throttling measures. On the one hand, the uplift force generated by the wellhead pressure difference can be effectively utilized to reduce the lifting load of the coiled tubing injection head, leaving a larger safety margin for the lifting load on the injection head. At the same time, due to the incompressibility of water and throttling measures, it can play a good buffering role, preventing the tubing hanger from having too large a pressure difference between the upper and lower parts at the moment of unsealing and unstuck, and preventing the tubing string from suddenly and quickly rising with a large stroke to damage the salvage tool string and the coiled tubing, thereby improving the safety of operating equipment and well control. Aiming at the problem of excessive load on the tubing hanger to release the tubing hanger, which is one of the key steps in the pressurized lifting of the coiled tubing gas production string, a set of progressive salvage methods, including trial salvage using gas balanced pressure method, salvage using gas balanced pressure method shock-assisted release, and liquid throttling pressure difference-assisted release, are proposed to improve the feasibility and success rate of the process operation of lifting the coiled tubing gas production string under pressure, reduce the construction risk of salvaging the tubing hanger, form a set of pressurized lifting technology for coiled tubing gas production string with optimized process flow and high feasibility, establish the ability and means to prevent accidents of coiled tubing gas production string and effectively lift the string, reduce the comprehensive operation cost of lifting the coiled tubing gas production string under pressure, and solve the worries about the development of coiled tubing gas production string technology.
[0094] Further, step S5222 includes:
[0095] The jar is used to stimulate the upper impact load at least five times, and the nitrogen generator is used to replenish the pressure to the second gate valve, the blowout preventer, the blowout preventer, the injection head and the pipe body;
[0096] The tubing body is tried to be lifted up by the injection head, and it is determined whether the tubing hanger is separated from the tubing head and moved upward.
[0097] The beneficial effect of adopting the above further technical solution is: in the process of using the liquid throttling pressure difference to assist the unstuck fishing method, if necessary, the pressure can be gradually supplemented through the tubing head four-way into the casing. Specifically, if the wellhead pressure is too low and the pressure difference acting on the tubing hanger is too small, the nitrogen generator can be used to supplement the pressure through the tubing head four-way into the casing. Increase the pressure difference between the upper and lower parts of the tubing hanger, and then try to lift the tubing hanger. Aiming at the problem of excessive load on the tubing hanger to release the tubing hanger, which is one of the key steps in the pressurized lifting of the coiled tubing gas production string, a set of progressive salvage methods, including trial salvage using gas balanced pressure method, salvage using gas balanced pressure method shock-assisted release, and liquid throttling pressure difference-assisted release, are proposed to improve the feasibility and success rate of the process operation of lifting the coiled tubing gas production string under pressure, reduce the construction risk of salvaging the tubing hanger, form a set of pressurized lifting technology for coiled tubing gas production string with optimized process flow and high feasibility, establish the ability and means to prevent accidents of coiled tubing gas production string and effectively lift the string, reduce the comprehensive operation cost of lifting the coiled tubing gas production string under pressure, and solve the worries about the development of coiled tubing gas production string technology. By adopting balanced pressure, shock, pressure difference assisted unstuck and various combined measures, the problem that the unstuck load of the tubing hanger far exceeds the weight of the tubing itself and the salvage cannot be effectively unstuck and salvaged by simply lifting the injection head is solved. This improves the success rate of salvaging tubing hangers with large viscous resistance and ensures the normal implementation of subsequent tubing lifting operations.
[0098] Further, step S1 includes:
[0099] S11, reduce the casing pressure by 0.5-1MPa and close the wellhead;
[0100] S12. Within 15-30 minutes after closing the wellhead, determine whether the casing pressure has returned to the original wellhead pressure;
[0101] S13. When the casing pressure returns to the original wellhead pressure, the coiled tubing gas production string is not buried in sand.
[0102] The beneficial effect of adopting the above-mentioned further technical scheme is: by implementing sand buried well condition identification and analysis measures, the sand buried situation of the coiled tubing can be predicted in advance and the sand buried risk can be eliminated to the greatest extent by establishing circulation measures, so as to ensure the normal fishing and lifting of the subsequent tubing hanger and the coiled tubing under pressure, and avoid the inability to pull out the pipe in the middle of the operation due to insufficient prediction of the drill bit stuck in the sand buried of the coiled tubing before the pipe is lifted under pressure, resulting in a long waiting time on site.
[0103] Further, step S12 includes:
[0104] When the casing pressure has not recovered to the original wellhead pressure, positive circulation nitrogen gas lift is performed, and then positive circulation well washing and sand flushing are performed, and step S11 is executed.
[0105] The beneficial effect of adopting the above further technical solution is that after predicting that the coiled tubing is buried in sand, positive circulation well washing and sand flushing can be used to try to release the jam, and a normal circulation release success rate is high, which meets the necessary conditions for lifting the tubing.
[0106] Further, step S2 includes:
[0107] When the coiled tubing gas production string is not buried in sand, determine whether the prefabricated bottom hole plugging and completion tool was put into the coiled tubing gas production string during the initial deployment;
[0108] When the prefabricated bottom hole plugging and completion tool is put into the coiled tubing gas production string in the early stage, a ball or a rod is dropped from the wellhead and pumped to the bottom of the well. The prefabricated bottom hole plugging and completion tool is driven to move by controlling the wellhead pressure to complete the bottom hole plugging.
[0109] When the prefabricated bottom hole plugging and completion tool is not put into the coiled tubing gas production string at the early stage, mechanical plugging tools or chemical plugging methods are used to plug the position 1-2m below the end of the coiled tubing at the wellhead.
[0110] The beneficial effect of adopting the above further technical solution is: according to whether the prefabricated bottom hole plugging and completion tool is lowered into the coiled tubing gas production string in the early stage, different plugging methods are used for plugging, thereby improving safety and reliability.
[0111] Further, step S3 includes:
[0112] Release the wellhead pressure and shut down the wellhead for 30 minutes;
[0113] Determine whether the wellhead can be emptied normally and the pressure does not rise within 30 minutes of closing the wellhead;
[0114] When the wellhead can be vented normally and the pressure does not rise within 30 minutes after the wellhead is closed, the internal plugging of the coiled tubing gas production string is successful.
[0115] The beneficial effect of adopting the above further technical solution is: by verifying whether the plugging in the coiled tubing gas production string is successful, it is ensured that the plugging work is completed reliably and the safety is improved.
[0116] The main process flow of pulling out the coiled tubing gas production string under pressure (the method of pulling out the tubing hanger under pressure of the coiled tubing gas production string) includes the following steps:
[0117] Step 1: Identification and analysis of sand-buried well conditions. After partially releasing the casing pressure, close the wellhead and observe and determine whether the tubing is sand-buried based on the change in casing pressure. After predicting that the coiled tubing is sand-buried, you can try to unblock it by flushing the well and sand through a positive circulation. If you can establish a normal circulation, the success rate of unblocking is high and the necessary conditions for lifting the tubing are met.
[0118] Specifically, the casing pressure is released by 0.5-1MPa through the wellhead production process, and within 15-30 minutes after closing the wellhead, it is determined whether the tubing is buried in sand according to the change in casing pressure. Furthermore, if the casing pressure cannot be restored to the original wellhead pressure, the tubing is likely to be buried in sand; after predicting that the coiled tubing is buried in sand, it can be lifted by positive circulation nitrogen gas, and then flushed by positive circulation. The success rate of unblocking can be high if a normal circulation is established, and the conditions for the next step of tubing lifting are met.
[0119] Step 2: Plugging inside the pipe. After confirming that the coiled pipe is not buried in sand or has been freed from sand jam, determine the plugging method and position inside the pipe based on whether a prefabricated bottom hole plugging completion tool short section (prefabricated bottom hole plugging completion tool) was lowered into the coiled pipe gas production string during the previous deployment. The plugging methods that can be selected include mechanical tool plugging and chemical plugging, and the plugging positions that can be selected include bottom hole plugging and near wellhead plugging.
[0120] Specifically: if a prefabricated bottom-hole plugging and completion tool was lowered when the coiled tubing gas production string was deployed in the early stage, bottom-hole plugging is adopted. The specific operation is to use the wellhead ball / rod and pump it to the bottom of the well, and drive the prefabricated bottom-hole plugging and completion tool to complete the bottom-hole plugging by controlling the wellhead pressure. If a prefabricated bottom-hole plugging and completion tool was not lowered when the coiled tubing gas production string was deployed in the early stage, near-wellhead plugging is adopted. The specific operation is to use a mechanical plugging tool or a chemical plugging method to plug 1-2m below the end of the wellhead coiled tubing. Near-wellhead plugging can be used as an alternative solution when there is no bottom-hole plugging or the bottom-hole plugging fails.
[0121] Step 3: Check the seal. After the plugging tool is delivered or the plugging operation is completed, the wellhead pressure is vented. If the wellhead can be vented normally and the pressure does not rise within 30 minutes after the wellhead is closed, the plugging is successful.
[0122] Specifically, when using bottom plugging, the pump truck that cooperates with the plugging operation will stop pumping to release pressure after the pressure reaches the design pressure, and close the wellhead. If the wellhead pressure does not rise, the plugging is successful. When using near-wellhead plugging, the mechanical plugging tool will seal or the chemical plugging will solidify, and the wellhead will be emptied and closed. If the wellhead can be emptied normally and the pressure does not rise after closing, the plugging is successful.
[0123] Step 4: Replace the large-diameter gate valve. After the internal plugging and sealing test is successful, remove the cover flange above the tubing head 2, the small-diameter production gate valve (i.e., the first gate valve 1), the gas production tree 3, etc., to expose the tubing hanger 5, connect and install the special fishing neck short section 6 on the tubing hanger 5, and then install a large-diameter gate valve (i.e., the second gate valve 9) with an inner diameter not less than the maximum outer diameter of the tubing hanger 5 above the tubing head 2. After the installation is completed, close the large-diameter gate valve.
[0124] Step 5: Salvage the tubing hanger 5 to unseal and unblock. Install the large-diameter blowout preventer (i.e., blowout preventer 10), the blowout preventer 11, the injection head 12, and the coiled tubing (i.e., the tubing body 131) on the large-diameter gate valve in sequence, and install a salvage tool string at the lower end of the coiled tubing. Lower the salvage tool string to grab the special salvage neck short section 6, and the injection head 12 lifts the coiled tubing (i.e., the tubing body 131), driving the tubing hanger 5 to separate from the tubing head 2 and move upward. Lift the tubing hanger 5 into the blowout preventer 11, close the suspension and semi-closed gate of the large-diameter blowout preventer (i.e., blowout preventer 10), and realize the suspension of the pipe string and the sealing of the oil casing annulus.
[0125] Try the three steps described in the method for unblocking the tubing hanger in sequence until the tubing hanger 5 is unblocked and unstuck successfully: gas balance pressure method trial salvage - gas balance pressure method shock-assisted unblocking salvage - liquid throttling pressure difference-assisted unblocking salvage.
[0126] Step 6: Reconnect the tubing string. The roller of the coiled tubing machine applies pressure to the coiled tubing 131 clamped by the injection head 12, and the special salvage tool string is controlled to be released from the special salvage neck short section 6 of the tubing hanger 5, and the special salvage tool string is pulled out. Disassemble the connection between the blowout preventer 11 and the large-diameter blowout preventer (i.e., blowout preventer 10), and remove the operating wellhead above the large-diameter blowout preventer (i.e., blowout preventer 10). Cut the coiled tubing from the bottom of the tubing hanger 5 and the top of the special salvage tool string respectively, and select a suitable winding connector (i.e., the first connector 14) according to the specifications and wall thickness of the coiled tubing to connect the coiled tubing 8 in the well and the coiled tubing clamped by the injection head 12 (i.e., the tubing body 131) into a whole coiled tubing, and prepare to lift the coiled tubing 8 out of the well.
[0127] Specifically, the operating wellhead, salvage tool string and tubing hanger above the large-diameter blowout preventer are removed, and a reelable connector (i.e., the first connector 14) having a maximum outer diameter equal to that of the coiled tubing is used to connect the coiled tubing clamped by the injection head. The injection head is suspended as a whole by a crane, so that the other end of the reelable connector is docked with the coiled tubing at the wellhead and the installation is completed. Then, the operating wellhead is docked, the upper and lower pressures of the large-diameter blowout preventer are connected, the large-diameter blowout preventer is opened, and preparations are made to lift up and remove the coiled tubing.
[0128] Step 7: Tail pipe reverse process to release tail gas and restore wellhead. According to the normal pipe lifting operation procedure, after the tail end of the downhole coiled pipe is lifted to above the gate of the large-diameter gate valve at the wellhead, stop lifting the pipe, close the large-diameter gate valve (i.e., the second gate valve 9), and drain the operating wellhead and residual pressure and fluid in the coiled pipe above the large-diameter gate valve (i.e., the second gate valve 9) through the wellhead blowout prevention pipeline, remove the operating wellhead above the large-diameter gate valve (i.e., the second gate valve 9), and reinstall the original gas production wellhead (i.e., the production tree 3) above the large-diameter gate valve 9. At this point, the main construction of the coiled pipe gas production string under pressure is completed.
[0129] The present invention discloses a method for unsealing the fishing tubing hanger 5, which is one of the key links of the process for pulling out the coiled tubing gas production string under pressure, and comprises the following steps:
[0130] Step 1: Trial salvage using gas balance pressure method. Connect the coiled tubing connector (i.e., the second connector 132), the release handle 133, the check valve 134, and the GS salvage spear 137 to form a salvage tool string, and install the operating wellhead, including a large-diameter gate valve (i.e., the second gate valve 9), a large-diameter blowout preventer (i.e., the blowout preventer 10), a blowout preventer 11, and an injection head 12. The internal diameters of the large-diameter gate valve (i.e., the second gate valve 9), the large-diameter blowout preventer (i.e., the blowout preventer 10), and the blowout preventer 11 are not less than the maximum outer diameter of the tubing hanger 5. Through the tubing head 4-way, the casing pressure is introduced into the operating wellhead above the tubing hanger 5. The injection head 12 drives the lowering of the salvage tool string. After confirming that the special salvage neck short section 6 is grasped, the tubing hanger 5 is tried to be lifted. At this time, the lifting load of the salvage tool string = the weight of the coiled tubing + the viscous resistance of the tubing hanger 5 and the tubing head 2. If the tubing hanger 5 can be slowly moved upward, it is lifted into the blowout preventer 11, and the suspension and half-closed gate of the large-diameter blowout preventer (i.e., the blowout preventer 10) are closed, and the operation of salvaging the tubing hanger 5 ends here. Otherwise, the second step (gas balanced pressure method shock-assisted unstuck salvage) is carried out.
[0131] Step 2: Gas balanced pressure method jarring to assist in unblocking and salvaging. Connect the coiled tubing connector (second connector 132), the release handle 133, the check valve 134, the accelerator 135, the jar 136 and the GS salvage spear 137 to form a jarring and salvaging tool string, and install the operating wellhead. Through the tubing head spool, the casing pressure is introduced into the operating wellhead above the tubing hanger 5. At this time, the downward load borne by the tubing hanger 5 is only the deadweight of the coiled tubing. The injection head 12 drives the lowering of the fishing tool string, and after confirming that the special fishing neck short section 6 is caught, the tubing hanger 5 is tried to be lifted, and the lifting load is not less than the deadweight of the coiled tubing 8 in the well, so that the jar 136 is triggered to produce a large instantaneous impact load, and the jar operation is repeated for not less than 5 times, so that the tubing hanger 5 and the tubing head produce axial slippage, reducing the viscous resistance between them, and then the tubing hanger 5 is tried to be lifted. At this time, the lifting load of the fishing tool string = the deadweight of the coiled tubing + the reduced viscous resistance between the tubing hanger 5 and the tubing head. If the tubing hanger 5 can be slowly moved up, it is lifted into the blowout preventer 11, and the suspension and semi-sealed gate of the large-diameter blowout preventer (blowout preventer 10) are closed. The operation link of salvaging the tubing hanger 5 ends here, otherwise the third step (liquid throttling pressure difference assisted unblocking salvage) is carried out.
[0132] Step 3: Liquid throttling pressure difference assists in unblocking and salvaging. Use a shock salvage tool string and install an operating wellhead. Fill the operating wellhead above the tubing hanger 5 with clean water and connect it to atmospheric pressure through a throttling device. The injection head 12 drives the salvage tool string to be lowered. After confirming that the special salvage neck short section 6 is grabbed, try to lift the tubing hanger 5. The lifting load is not less than the deadweight of the continuous pipe 8 in the well, so that the jar 136 is triggered to produce a large instantaneous impact load. Repeat the shock operation for not less than 5 times to cause axial slippage between the tubing hanger 5 and the tubing head to reduce the viscous resistance between them. If necessary, the pressure can be gradually supplemented through the tubing head four-way to the casing. Specifically, if the wellhead pressure is too low and the pressure difference acts on the tubing hanger 5 to generate too little upward force, a nitrogen generator can be used to supplement the pressure through the tubing head four-way to the casing. Increase the pressure difference between the upper and lower parts of the tubing hanger 5, and then try to lift the tubing hanger 5. At this time, the lifting load of the fishing tool string = the weight of the coiled tubing + the reduced viscous resistance between the tubing hanger 5 and the tubing head - the upward force generated by the pressure difference between the upper and lower parts of the tubing hanger 5. If the tubing hanger 5 can be slowly moved upward, it will be slowly lifted into the blowout preventer 11, the suspension and semi-sealed gate of the large-diameter blowout preventer (blowout preventer 10) will be closed, and the coiled tubing operation machine drum will pressurize the coiled tubing (tube body 131) clamped by the injection head, and the special fishing tool string and the special fishing neck short section 6 will be controlled to be released, and the operation link of fishing the tubing hanger 5 ends here, otherwise the well will be killed and overhauled.
[0133] The method for pulling out a coiled tubing gas production string under pressure (a method for pulling out a tubing hanger under pressure for a coiled tubing gas production string) described in the present invention further improves and refines the existing operating steps, and newly adds process steps and specific operating methods such as sand-buried well condition identification and analysis, plugging and sealing verification inside the coiled tubing, and replacement of large-diameter gate valves, thereby providing a complete set of process flows and operating methods for pulling out tubing under pressure in a well completion mode in which a coiled tubing hanger is suspended, which has stronger operability, higher feasibility, and higher operation success rate.
[0134] By implementing sand buried well condition identification and analysis measures, the sand buried situation of coiled tubing can be predicted in advance and the sand buried risk can be eliminated to the greatest extent by establishing circulation measures, ensuring the normal fishing and lifting of the subsequent tubing hanger 5 and coiled tubing under pressure, and avoiding the inability to pull out the tubing during the operation due to insufficient prediction of the drill bit stuck in the sand buried of the coiled tubing before the pressure lifting, resulting in a long waiting time on site.
[0135] By adopting the continuous pipe plugging method, it is possible to replace the small-diameter production gate valve (first gate valve 1) at the wellhead with a large-diameter gate valve (second gate valve 9) under wellhead pressure conditions, thereby solving the problem of requiring a large-diameter channel for unsealing and salvaging a large-diameter tubing hanger (tubing hanger 5).
[0136] By adopting the measures of balanced pressure, shock, pressure difference auxiliary release and various combinations, the problem that the unblocking and unblocking load of the tubing hanger 5 far exceeds the weight of the tubing itself, and the injection head 12 cannot be directly lifted up to effectively release and salvage the tubing hanger 5 is solved, the success rate of salvaging the tubing hanger 5 with large viscous resistance is improved, and the normal implementation of the subsequent pipe lifting operation is guaranteed. Among them, the method of filling the upper working wellhead of the tubing hanger 5 with clean water and connecting it to the atmospheric pressure under the matching throttling measures to salvage the tubing hanger 5 can effectively utilize the upward force generated by the wellhead pressure difference to reduce the lifting load of the coiled tubing injection head 12, leaving a larger safety margin for the lifting load of the injection head 12. At the same time, due to the incompressibility of water and the throttling measures, it can play a good buffering role, preventing the upper and lower pressure differences of the tubing hanger 5 from being too large at the moment of unblocking and unblocking, and preventing the tubing string from suddenly rushing up quickly and with a large stroke to damage the salvage tool string and the coiled tubing (tube body 131), thereby improving the safety of the operating equipment and well control.
[0137] The coiled tubing in the wellbore (coiled tubing in the well 8) and the coiled tubing (tube body 131) clamped by the injection head 12 are connected into a whole by a reelable connector (first connector 14) whose maximum outer diameter is equal to that of the coiled tubing, so that the coiled tubing in the wellbore 8 can be smoothly connected back and can be rewound onto the coiled tubing operation machine drum together with the wellhead operation devices such as the injection head 12 without any hindrance.
[0138] The GS salvage spear 137 with the salvage claw 1371 can be used to realize the rapid grabbing of the tubing hanger 5 by the salvage tool string dedicated to the tubing hanger 5, and the pressure control can be used to quickly release the tubing hanger 5 when it is necessary to release the tubing hanger 5.
[0139] In addition to solving the problem of lifting the tubing under pressure when the tubing hanger is suspended in the coiled tubing completion mode, it can also be used to handle the complex accidents such as the tubing hanger failing to be delivered to the tubing head and the coiled tubing slipping during the coiled tubing gas production string delivery operation. At the same time, it drives the improvement of some key links and operations of the slip-type suspended 2″ coiled tubing completion under pressure lifting technology.
[0140] like Figures 3 to 8As shown, in addition, the present invention also provides a device for lifting a tubing hanger under pressure on a coiled tubing gas production pipe string, which is used to perform any of the above-mentioned methods for lifting a tubing hanger under pressure on a coiled tubing gas production pipe string. The device for lifting a tubing hanger under pressure on a coiled tubing gas production pipe string comprises: a tubing head 2, a tubing hanger 5, a fishing neck short section 6, a coiled tubing in a well 8, a second gate valve 9, a blowout preventer 10, a blowout preventer 11, an injection head 12, a pipe body 131, a second connector 132, a release handle 133, a one-way valve 134, an accelerator 135, a jar 136, a GS fishing spear 137 and a fishing claw 1371. The tubing hanger 5 is installed in the tubing head 2, the fishing neck short section 6 and the coiled tubing in the well 8 are connected to the tubing hanger 5, and the second gate valve 9 is installed in the tubing head 2. The blowout preventer 10 is installed on the top of the second gate valve 9, the blowout preventer 11 is installed on the top of the blowout preventer 10, the injection head 12 is installed on the top of the blowout preventer 11, the pipe body 131 is installed on the injection head 12, the second connector 132 is installed on the bottom of the pipe body 131, the release hand 133 is installed on the bottom of the second connector 132, the one-way valve 134 is installed on the bottom of the release hand 133, the accelerator 135 is installed on the bottom of the one-way valve 134, the jar 136 is installed on the bottom of the accelerator 135, the GS salvage spear 137 is installed on the bottom of the jar 136, and the salvage claw 1371 is installed on the bottom of the GS salvage spear 137.
[0141] The beneficial effect of adopting the above further technical solution is: on the basis of improving the structure of the device, the process steps and specific operating methods such as sand-buried well condition identification and analysis, plugging and sealing verification in the continuous tubing, and replacement of large-diameter gate valves are designed, which provides a complete set of process flows and operating methods for the pressure-lifting operation of the continuous tubing completion method suspended by the tubing hanger, which is more operable, feasible and has a higher success rate. In view of the imperfect process methods for lifting the 2″ continuous tubing gas production string, the lack of specific and necessary operating methods in the key core links, the ability and means to prevent accidents in the continuous tubing gas production string and effectively lift the string are established, and the comprehensive operating cost of lifting the continuous tubing gas production string under pressure is reduced. Under the condition of wellhead pressure, the first gate valve with a small diameter at the wellhead is replaced with a second gate valve with a large diameter, which solves the problem of the need for a large-diameter channel for the unsealing and salvage of the large-diameter tubing hanger.
[0142] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or replace some or all of the technical features therein with equivalents. However, these modifications or replacements do not cause the essence of the corresponding technical solutions to deviate from the scope of the technical solutions of the embodiments of the present invention.
Claims
1. A method for lifting a production tubing hanger under pressure in a coiled tubing gas production string. It is characterized in that include: S1. Analyze whether the coiled tubing gas production string is buried in sand; S2. When the coiled tubing gas production string is not buried in sand, the coiled tubing gas production string is plugged inside the tube; S3, verifying whether the plugging inside the coiled tubing gas production string is successful; S4. When the plugging of the coiled tubing gas production string is successful, the first gate valve and the collection tree above the tubing head are removed, a fishing neck nipple is installed on the tubing hanger, a second gate valve is installed above the tubing head to facilitate the passage of the tubing hanger, and the second gate valve is closed; S5, installing a blowout preventer, a blowout preventer, an injection head and a pipe body above the second gate valve, installing a fishing tool string at the lower end of the pipe body, grasping the fishing neck nipple by the fishing tool string, and lifting the pipe body by the injection head, so that the tubing hanger is separated from the tubing head and moves upward until the tubing hanger enters the blowout preventer, and closing the blowout preventer; S6, applying pressure to the tubular body, controlling the salvage tool string to separate from the salvage neck nipple, cutting the tubular body below the tubing hanger and above the salvage tool string, and connecting the coiled tubing in the well to the tubular body through a first connector; S7, lift up and pull out the coiled tubing in the well until the tail end of the coiled tubing in the well is located above the second gate valve, close the second gate valve, drain the pressure and fluid of the blowout preventer, the blowout preventer, the injection head, the pipe body and the coiled tubing in the well, remove the blowout preventer, the blowout preventer, the injection head and the pipe body, install the collection tree on the second gate valve, and complete the pulling out work.
2. A method for lifting a flow line hanger with pressure in a coiled tubing gas production string according to claim 1, It is characterized in that The salvage tool string includes: a second connector, a drop handle, a one-way valve and a GS salvage spear. Step S5 includes: S51, installing a blowout preventer, a blowout preventer, an injection head and a pipe body above the second gate valve, and sequentially installing a second connector, a release handle, a one-way valve and a GS salvage spear at the lower end of the pipe body to form a salvage tool string, and grasping the salvage neck short section through the GS salvage spear; S52, introducing casing pressure into the second gate valve, the blowout preventer, the blowout preventer, the injection head and the tubing body, attempting to lift the tubing body through the injection head, and determining whether the tubing hanger and the tubing head are separated and moved upward; S53, when the tubing hanger is separated from the tubing head and moves upward, the tubing body is continuously lifted up by the injection head until the tubing hanger enters the blowout preventer, and the blowout preventer is closed.
3. A method for lifting a flow line hanger with pressure on a coiled tubing gas production string according to claim 2, It is characterized in that Step S52 includes: S521, when the tubing hanger is not separated from the tubing head and moves upward, an accelerator and a jar are installed between the one-way valve and the GS salvage spear to form a jarring salvage tool string; S522, introducing casing pressure into the second gate valve, the blowout preventer, the blowout preventer, the injection head and the tubing body, stimulating the upward impact load at least 5 times by the jar, attempting to lift the tubing body by the injection head, and determining whether the tubing hanger is separated from the tubing head and moved upward; S523. When the tubing hanger is separated from the tubing head and moves upward, execute step S53.
4. A method for lifting a flow line hanger with pressure in a coiled tubing gas production string according to claim 3, It is characterized in that Step S522 includes: S5221, when the tubing hanger is not separated from the tubing head and moves upward, the second gate valve, the blowout preventer, the blowout preventer, the injection head and the pipe body are filled with clean water, and the second gate valve, the blowout preventer, the blowout preventer, the injection head and the pipe body are connected to atmospheric pressure through a throttling device; S5222, stimulating the upward impact load at least 5 times by the jar, attempting to lift the tubing body by the injection head, and determining whether the tubing hanger is separated from the tubing head and moves upward; S5223. When the tubing hanger is separated from the tubing head and moves upward, execute step S53.
5. A method for lifting a flow line hanger with pressure in a coiled tubing gas production string according to claim 4, It is characterized in that Step S5222 includes: The jar is used to stimulate the upper impact load at least five times, and the nitrogen generator is used to replenish the pressure to the second gate valve, the blowout preventer, the blowout preventer, the injection head and the pipe body; The tubing body is tried to be lifted up by the injection head, and it is determined whether the tubing hanger is separated from the tubing head and moved upward.
6. The method for lifting the oil pipe hanger with pressure in a coiled tubing gas production string according to claim 1, It is characterized in that Step S1 includes: S11, reduce the casing pressure by 0.5-1MPa and close the wellhead; S12. Within 15-30 minutes after closing the wellhead, determine whether the casing pressure has returned to the original wellhead pressure; S13. When the casing pressure returns to the original wellhead pressure, the coiled tubing gas production string is not buried in sand.
7. A method for lifting a flow line hanger with pressure in a coiled tubing gas production string according to claim 6, It is characterized in that Step S12 includes: When the casing pressure has not recovered to the original wellhead pressure, positive circulation nitrogen gas lift is performed, and then positive circulation well washing and sand flushing are performed, and step S11 is executed.
8. The method for lifting the oil pipe hanger with pressure in a coiled tubing gas production string according to claim 1, It is characterized in that Step S2 includes: When the coiled tubing gas production string is not buried in sand, determine whether the prefabricated bottom hole plugging and completion tool was put into the coiled tubing gas production string during the initial deployment; When the prefabricated bottom hole plugging and completion tool is put into the coiled tubing production string in the early stage, the ball / rod is dropped at the wellhead and pumped to the bottom of the well, and the prefabricated bottom hole plugging and completion tool is driven to move by controlling the wellhead pressure to complete the bottom hole plugging; When the prefabricated bottom hole plugging and completion tool is not put into the coiled tubing gas production string at the early stage, mechanical plugging tools or chemical plugging methods are used to plug the position 1-2m below the end of the coiled tubing at the wellhead.
9. The method for lifting the oil pipe hanger with pressure in a coiled tubing gas production string according to claim 1, It is characterized in that Step S3 includes: Release the wellhead pressure and shut down the wellhead for 30 minutes; Determine whether the wellhead can be emptied normally and the pressure does not rise within 30 minutes of closing the wellhead; When the wellhead can be vented normally and the pressure does not rise within 30 minutes after the wellhead is closed, the internal plugging of the coiled tubing gas production string is successful.
10. A device for pressurizing the oil pipe hanger with a coiled tubing gas production string. It is characterized in that A method for performing a method of lifting a tubing hanger under pressure on a coiled tubing gas production string as described in any one of claims 1 to 9, wherein the device for lifting a tubing hanger under pressure on a coiled tubing gas production string comprises: a tubing head, a tubing hanger, a fishing neck short section, a coiled tubing in a well, a second gate valve, a blowout preventer, a blowout preventer, an injection head, a pipe body, a second connector, a release handle, a one-way valve, an accelerator, a jar, a GS fishing spear and a fishing claw, wherein the tubing hanger is installed in the tubing head, the fishing neck short section and the coiled tubing in the well are connected to the tubing hanger, and the second gate valve is installed in the tubing The blowout preventer is mounted on the top of the second gate valve, the lubricant pipe is mounted on the top of the blowout preventer, the injection head is mounted on the top of the lubricant preventer, the pipe body is mounted on the injection head, the second connector is mounted on the bottom of the pipe body, the release hand is mounted on the bottom of the second connector, the one-way valve is mounted on the bottom of the release hand, the accelerator is mounted on the bottom of the one-way valve, the jar is mounted on the bottom of the accelerator, the GS salvage spear is mounted on the bottom of the jar, and the salvage claw is mounted on the bottom of the GS salvage spear.