Embedded pipeline arranging and marking method based on BIM technology

Through BIM technology and the method of identifying different-colored pads, the problem of large position deviations of embedded pipe fittings in underground pipeline construction has been solved, automatic optimization and accurate embedding of pipelines has been achieved, and construction quality and efficiency have been improved.

CN118775627APending Publication Date: 2024-10-15CHINA MCC22 GROUP CORP LTD

Patent Information

Application Number
CN202410822776.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-25
Publication Date
2024-10-15

AI Technical Summary

Technical Problem

In the construction of underground pipelines, it is difficult to accurately position the embedded pipe fittings with the existing technology, resulting in collisions during installation, unreasonable safety spaces, and large deviations between the embedded pipe openings and the equipment, which affects the quality and appearance of the construction.

Method used

Pipeline models are created through BIM technology for automatic arrangement and detection. Pads of different colors are used to mark the direction of each professional pipeline. This is combined with structural steel bar binding and concrete pouring to ensure accurate pipeline locations.

Benefits of technology

It reduces pipeline collision problems, improves construction quality and efficiency, clarifies the distinction between different professional pipelines, reduces construction difficulty, and improves the accuracy of embedded pipe fittings.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118775627A_ABST
    Figure CN118775627A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of embedded pipeline construction, in particular to an embedded pipeline arrangement and marking method based on a BIM technology, which comprises the following steps: calculating and analyzing spatial analysis of pipeline avoidance and structure foundation penetration through BIM software, performing automatic arrangement and detection, and providing a construction node graph of each professional pipeline trend; structural steel bars are bound, and cushion blocks are placed in combination with all professional pipeline trend construction node diagrams and sites; workers need to place cushion blocks with different colors under different professional pipelines to mark the professional pipelines; according to the method, automatic optimization of pipeline arrangement is achieved in combination with the BIM technology, the problem that collision occurs due to the unreasonable position during actual construction of the pipeline is solved, and the construction quality is improved; meanwhile, different professional pipelines are marked through the different-color cushion blocks, the trend of each professional pipeline is clearly represented, the construction difficulty is greatly reduced, various professional pipelines which are arranged in a complex mode are classified, and the working efficiency is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of pre-buried pipeline construction, and in particular to a pre-buried pipeline arrangement and marking method based on BIM technology. Background Art

[0002] Underground pipelines are an important part of modern urban infrastructure, including water supply pipelines, recycled water pipelines, thermal pipelines, natural gas pipelines and communication pipelines. In the construction drawings, the comprehensive layout of on-site pipelines is complex, and the positions of the pipelines on the drawings are all schematic positions, and the specific positions are unclear. As a result, the following problems may arise during construction: 1. Collisions between pipelines occur during installation; 2. After installation, there are problems with unreasonable safety space and operating space, and large deviations between the pre-buried pipe openings and the equipment positions; 3. The route and turning radius of the pre-buried pipes in the concrete cannot be determined in advance, and the actual construction quality is difficult to control.

[0003] The BIM-based pre-buried pipeline technology for water conservancy projects with the existing application number CN202311766966.1 builds models of various professional pipelines and related equipment in BIM, conducts inspection and optimization, generates a detailed model and produces detailed node drawings required for construction, and guides on-site workers in construction by combining the visualization of the model; the problem of unreasonable pipeline positions and easy collisions during construction is solved in advance, but since the positions of the pre-buried pipe openings and equipment junction boxes on the model cannot be accurately deepened, during actual construction, construction personnel can only install them based on experience, and the problem of large deviations in the positions of reserved holes and pre-buried pipe fittings is still not completely solved. Once the pre-buried position deviation of the pipeline end is large, it is necessary to re-drill or groove and then pre-buried pipes or use hoses to make up for it, which is time-consuming and labor-intensive, affects the appearance, and does not meet the design and specification requirements. Summary of the invention

[0004] In view of the deficiencies in the prior art, the object of the present invention is to provide a method for arranging and marking pre-buried pipelines based on BIM technology, which can solve the problem of large position deviation of pre-buried pipe fittings during construction in advance and improve the pre-buried quality of pipelines.

[0005] The technical solution adopted by the present invention to solve its technical problem is: A method for arranging and marking pre-buried pipelines based on BIM technology comprises the following steps: S1: Create a BIM model based on the construction drawings provided by the designer, calculate and analyze pipeline avoidance and spatial analysis of passing through the structural foundation through BIM software, and perform automatic layout and detection; S2: After analyzing and optimizing to meet the space requirements, the pre-buried pipelines are subdivided for each professional pipeline and the model is drawn, and the construction node diagram of each professional pipeline is issued; S3: Conduct on-site dimension review based on the construction node diagram of each professional pipeline direction; S4: Structural steel bar binding, place pads based on the construction node diagram of each professional pipeline and the site; workers need to place pads of different colors under different professional pipelines to mark each professional line pipe according to the markings on the construction node diagram of each professional pipeline; S5: The pipeline is fixed with pads and concrete is poured.

[0006] Preferably, in step S4, when placing pads, in addition to placing pads on both sides of each wire box, when the length of the wire tube is less than 4m, pads need to be placed on the lower side of both ends of the wire tube; when the length of the wire tube is greater than or equal to 4m, a pad is placed every 2m.

[0007] Preferably, a V-shaped groove is provided on the top of the cushion block, and a grid groove is provided on the lower side; the wire tube is clamped in the cushion block through the V-shaped groove, and the cushion block is clamped on the structural steel bar through the grid groove.

[0008] Preferably, after the spacer block is tied to the structural reinforcement, the design elevation of the spacer block is flush with the elevation of the top surface of the concrete structure.

[0009] Compared with the prior art, the present invention adopting the above technical solution has the following outstanding features: This method combines BIM technology to achieve automatic optimization of pipeline layout, reduces the problem of collision due to unreasonable position during actual construction of pipelines, and improves construction quality; at the same time, pipelines of different professions are marked by different-colored pads, which clearly indicate the direction of each professional pipeline. When pre-buried pipelines, pipelines of different professions can be distinguished, which greatly reduces the difficulty of construction. Multiple professional pipelines with complex layouts are classified to improve work efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0010] Figure 1 It is a schematic diagram of using different colored pads to construct pre-buried wire pipes in an embodiment of the present invention; Figure 2 is another schematic diagram of using different colored pads to construct pre-buried wire pipes in an embodiment of the present invention; Figure 3 It is a schematic diagram of the side structure of the cushion block in the embodiment of the present invention.

[0011] Explanation of the reference numerals: 1. Wire tube; 2. Spacer block; 201. V-shaped groove; 202. Grid groove; 3. Wire box. DETAILED DESCRIPTION

[0012] The present invention is further described below in conjunction with specific embodiments, the purpose of which is only to provide a better understanding of the content of the present invention. Therefore, the examples given do not limit the protection scope of the present invention.

[0013] like Figure 1 , Figure 2 As shown, this embodiment provides a method for arranging and marking pre-buried pipelines based on BIM technology, including the following steps: S1: Convene a meeting for mechanical and electrical installation, clarify the detailed drawings of integrated pipelines and the process of drawing reserved openings; create a BIM model through the construction drawings provided by the design, calculate and analyze the pipeline avoidance and spatial analysis of passing through the structural foundation through BIM software, and perform automatic layout and detection.

[0014] S2: After analysis and optimization, the space requirements are met, and the electromechanical subcontractor and the on-site person in charge sign and confirm; the pre-buried pipelines are subdivided for each professional pipeline and the model is drawn, and a construction node diagram of the direction of each professional pipeline is issued.

[0015] S3: Conduct on-site dimension review based on the construction node diagram of each professional pipeline route.

[0016] S4: Structural reinforcement binding, placing pads 2 in combination with the construction node diagram of each professional pipeline direction and the site; workers need to place pads 2 of different colors under different professional pipelines to mark each professional line pipe 1 according to the markings on the construction node diagram of each professional pipeline direction.

[0017] When placing the pads 2, in addition to placing pads 2 on both sides of each wire box 3, when the length of the wire tube 1 is less than 4m, it is necessary to place pads 2 on the lower sides of both ends of the wire tube 1; when the length of the wire tube 1 is greater than or equal to 4m, place a pad 2 every 2m.

[0018] S5: The pipeline is fixed by pad 2 and concrete is poured.

[0019] Furthermore, a V-shaped groove 201 is provided on the top of the cushion block 2, and a grid groove 202 is provided on the lower side; the wire tube 1 is clamped in the cushion block 2 through the V-shaped groove 201, and the cushion block 2 is clamped on the structural steel bar through the grid groove 202.

[0020] Furthermore, the color of the pad block 2 is selected from bright colors such as yellow, green, and red. After the pad block 2 is tied to the structural steel bar, the design elevation of the pad block 2 is flush with the elevation of the top surface of the concrete structure. After pouring is completed, the pad block 2 is used to facilitate construction workers to know the position and direction of the wire pipe 1.

[0021] This method combines BIM technology to achieve automatic optimization of pipeline layout, reduces the problem of collision caused by unreasonable position of wire pipe 1 during actual construction, and improves construction quality; at the same time, different professional pipelines are marked by different-colored pads 2, and the direction of each professional wire pipe 1 is clearly indicated. When pre-burying the wire pipe 1, the wire pipes 1 of different professions can be distinguished, which greatly reduces the difficulty of construction, and classifies various professional pipelines with complex layouts, thereby improving work efficiency.

[0022] The above description is only the preferred embodiment of the present invention, and does not limit the scope of rights of the present invention. All equivalent changes made by using the contents of the present invention specification and its drawings are included in the scope of rights of the present invention.

Claims

1. A method for arranging and marking pre-buried pipelines based on BIM technology, characterized in that: The steps include: S1: Create a BIM model based on the construction drawings provided by the designer, calculate and analyze pipeline avoidance and spatial analysis of passing through the structural foundation through BIM software, and perform automatic layout and detection; S2: After analyzing and optimizing to meet the space requirements, the pre-buried pipelines are subdivided for each professional pipeline and the model is drawn, and the construction node diagram of each professional pipeline is issued; S3: Conduct on-site dimension review based on the construction node diagram of each professional pipeline direction; S4: Structural steel bar binding, placing pads (2) in combination with the construction node diagram of the direction of each professional pipeline and the site; workers need to place pads (2) of different colors under different professional pipelines according to the markings on the construction node diagram of the direction of each professional pipeline to mark each professional line pipe (1); S5: The pipeline is fixed by means of pads (2) and concrete is poured.

2. The method for arranging and marking pre-buried pipelines based on BIM technology according to claim 1 is characterized in that: In step S4, when placing the cushion blocks (2), in addition to placing cushion blocks (2) on both sides of each wire box (3), when the length of the wire tube (1) is less than 4 m, cushion blocks (2) need to be placed on the lower sides of both ends of the wire tube (1); when the length of the wire tube (1) is greater than or equal to 4 m, a cushion block (2) is placed every 2 m.

3. The method for arranging and marking pre-buried pipelines based on BIM technology according to claim 1 is characterized in that: The cushion block (2) is provided with a V-shaped groove (201) on the top and a grid groove (202) on the bottom; the wire tube (1) is clamped in the cushion block (2) through the V-shaped groove (201), and the cushion block (2) is clamped on the structural steel bar through the grid groove (202).

4. The method for arranging and marking pre-buried pipelines based on BIM technology according to claim 1 is characterized in that: After the spacer (2) is tied to the structural steel bar, the design elevation of the spacer (2) is flush with the elevation of the top surface of the concrete structure.

Citation Information

Patent Citations

  • Self-stabilizing type internal mold installation method for hollow floor slab

    CN103174293A

  • Pipeline arrangement optimization method based on BIM

    CN112685862A

  • BIM-based pipeline automatic analysis and arrangement application and construction guidance method

    CN117951768A

  • Method for preventing conflicts between embedded pipeline and structure post-trepanning and nailing positions in building process

    CN117993057A

  • Temporary protection device for hydropower fire-fighting wire box on construction working plane

    CN214674178U

Cited By

  • Pipeline path optimization method in ALC wallboard prefabrication process based on BIM

    CN122548850A