Operation and maintenance monitoring platform for water conservancy conveying pipeline

By real-time monitoring and analysis of water pressure, temperature, flow and turbidity values ​​on the water conservancy pipeline operation and maintenance monitoring platform, water pipe damage, blockage and dirt are identified, which solves the problem of inaccurate positioning in traditional monitoring methods and improves operation and maintenance. efficiency and reduced costs.

CN118775781APending Publication Date: 2024-10-15HENAN PROVINCIAL WATER CONSERVANCY FIRST ENG BUREAU

Patent Information

Application Number
CN202410779361.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-17
Publication Date
2024-10-15

AI Technical Summary

Technical Problem

Traditional water conservancy pipeline operation and maintenance monitoring methods have problems such as limited monitoring range, untimely data acquisition, and weak data analysis and processing capabilities. This results in insufficient accuracy and speed in locating damaged, blocked, and cleaning areas, affecting operation and maintenance efficiency and costs.

Method used

A water conservancy pipeline operation and maintenance monitoring platform is designed, including a data collection module, a water pipe damage determination module, a water pipe blockage determination module and a water pipe cleaning determination module. By monitoring water pressure, temperature, flow and turbidity values ​​in real time, water pipe damage, Blockage and dirt index, statistics and feedback of abnormal area numbers help operation and maintenance personnel quickly locate and deal with problems.

Benefits of technology

It achieves accurate identification of damaged, blocked and cleaned areas of water conservancy pipelines, shortens troubleshooting and repair time, improves operation and maintenance efficiency, reduces maintenance and cleaning costs, and avoids energy waste and water loss.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118775781A_ABST
    Figure CN118775781A_ABST
Patent Text Reader

Abstract

The invention belongs to the field of operation and maintenance monitoring, and particularly discloses and provides an operation and maintenance monitoring platform for a water conservancy conveying pipeline, which comprises the following steps: firstly, a data acquisition module segments the water conservancy conveying pipeline according to valves, and monitors key parameters of each segment area in real time, such as water pressure, water pipe surface temperature, water temperature, water flow and water turbidity value; the water pipe damage judgment module judges whether the pipeline is damaged and counts a damaged area by analyzing the surface temperature, the water temperature and the water pressure at the head end and the tail end of the water pipe, the water pipe blockage judgment module analyzes and recognizes a blocked area by comparing the reference water flow with the actual flow, and the water pipe cleaning judgment module evaluates the pipeline dirt degree based on the water turbidity value. And finally, the operation and maintenance monitoring feedback module feeds the serial numbers of various problems back to the management platform, so that corresponding measures can be taken in time, and safe and efficient operation of the water conservancy conveying pipeline is ensured.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the field of operation and maintenance monitoring, and relates to an operation and maintenance monitoring platform for a water conservancy transmission pipeline. Background Art

[0002] With the rapid development of water conservancy project construction, the safety and reliability of water conservancy pipeline systems, as key infrastructure for water resource allocation and transportation, play a vital role in ensuring water resource supply, flood control and drought relief, farmland irrigation, etc. However, the traditional water conservancy pipeline operation and maintenance monitoring methods have many shortcomings, such as limited monitoring range, untimely data acquisition, weak data analysis and processing capabilities, etc. These problems seriously restrict the efficient operation and maintenance of water conservancy pipeline systems.

[0003] Although the existing operation and maintenance monitoring platform of water conservancy pipelines meets certain requirements, it still has limitations. Specifically: 1. The existing technology is not accurate and fast enough in locating damaged areas, blocked areas, and areas that need cleaning in water conservancy pipelines. Operation and maintenance personnel often need to spend a lot of time and energy to find them, resulting in delays in repair work.

[0004] 2. When determining the damage of a water conservancy pipeline, the prior art often only considers a single parameter, such as the water pressure of the water conservancy pipeline, without considering the temperature and water pressure of the water conservancy pipeline together, resulting in low judgment accuracy and inability to accurately locate the damaged section of the water conservancy pipeline. Summary of the invention

[0005] In view of this, in order to solve the problems raised in the above background technology, an operation and maintenance monitoring platform for water conservancy transmission pipelines is now proposed.

[0006] The purpose of the present invention can be achieved through the following technical solutions: The present invention provides an operation and maintenance monitoring platform for a water conservancy transmission pipeline, including: a data acquisition module: used to segment the water conservancy transmission pipeline according to valves to obtain each section of the water conservancy transmission pipeline, and to monitor the water pressure at both ends of each section of the water conservancy transmission pipeline, the water pipe surface temperature, the water temperature, the water flow rate and the turbidity value of the water body at both ends in real time.

[0007] Water pipe damage judgment module: used to analyze the reference water pressure of each section of the water conservancy pipeline according to the water pipe surface temperature and water temperature of each section of the water conservancy pipeline, and then analyze the water pipe damage index of each section of the water conservancy pipeline through the water pressure at the beginning and end of each section of the water conservancy pipeline, so as to judge whether there is any abnormality in each section of the water conservancy pipeline, and count the number of the damaged area of ​​each section of the water conservancy pipeline.

[0008] Water pipe blockage determination module: used to collect the number of curved pipes and the curvature of each curved pipe in each section of the water conservancy transmission pipeline, analyze the reference water flow of each section of the water conservancy transmission pipeline, and then analyze the blockage index of each section of the water conservancy transmission pipeline based on the water flow of each section of the water conservancy transmission pipeline, so as to determine whether there is blockage in each section of the water conservancy transmission pipeline, and count the number of the blocked areas in each section of the water conservancy transmission pipeline.

[0009] Water pipe cleaning judgment module: It is used to analyze the dirt index of each section of the water conservancy pipeline according to the turbidity values ​​of the water bodies at both ends of each section of the water conservancy pipeline, judge whether each section of the water conservancy pipeline needs to be cleaned, and then count the numbers of the areas that need to be cleaned in each section of the water conservancy pipeline.

[0010] Operation and maintenance monitoring feedback module: used to feed back to the platform the numbers of damaged areas in each section of the water conservancy transmission pipeline, the numbers of blocked areas in each section, and the numbers of areas that need to be cleaned in each section.

[0011] Preferably, the analysis of the water pipe damage index of each section of the water conservancy pipeline includes: collecting the water pressure at both ends of each section of the water conservancy pipeline through a pressure sensor, comparing the water pressure at both ends of each section of the water conservancy pipeline, and obtaining the water pressure difference between the ends of each section of the water conservancy pipeline, recorded as Δp d , where d represents the number of the dth section of the water conservancy pipeline, d = 1, 2, 3, ...D.

[0012] The water pressure at both ends of each section of the water conservancy pipeline is added and averaged to obtain the average water pressure of each section of the water conservancy pipeline, which is used as the water pressure of each section of the water conservancy pipeline, denoted as p d .

[0013] Analyze the water pipe damage index in each section of the water conservancy pipeline where q d It represents the reference water pressure in the dth section of the water conservancy pipeline, and Δp0 represents the set allowable water pressure difference.

[0014] Preferably, the specific analysis method of the reference water pressure of each section of the water conservancy pipeline is: collecting the water pipe surface temperature and the water temperature of each section of the water conservancy pipeline through a temperature sensor.

[0015] The water temperature of each section of the water conservancy pipeline is recorded as

[0016] The surface temperature of the water pipe in each section of the water conservancy pipeline is compared with the maximum surface temperature that the water pipe can withstand under normal conditions, and the ratio of the surface temperature of the water pipe in each section of the water conservancy pipeline to the maximum surface temperature that the water pipe can withstand under normal conditions is obtained, which is used as the surface temperature deviation coefficient of the water pipe in each section of the water conservancy pipeline, denoted as R d .

[0017] Compare the water temperature of each section of the water conservancy pipeline with the set water temperature range of the water pipe under a suitable environment, and analyze the water temperature deviation coefficient τ of each section of the water conservancy pipeline d , Where [ν1, ν2] represents the water temperature range of the water pipe under a suitable environment, and v0 represents the set allowable deviation temperature.

[0018] Analyze the reference water pressure q0 of each section of the water conservancy pipeline. Wherein η represents the weight corresponding to the set water pipe surface temperature deviation coefficient, η2 represents the weight corresponding to the set water temperature deviation coefficient, and η+η2=1, and p0 represents the set safe water pressure of the water conservancy transmission pipeline under normal environment.

[0019] Preferably, the determination of whether there is an abnormality in each section of the water conservancy pipeline comprises: comparing the water pipe damage index of each section of the water conservancy pipeline with a preset water pipe damage index threshold; if the water pipe damage index of a certain section of the water conservancy pipeline is less than the preset water pipe damage index threshold, then the section of the water conservancy pipeline is recorded as a normal area; if the water pipe damage index of a certain section of the water conservancy pipeline is greater than or equal to the preset water pipe damage index threshold, then the section of the water conservancy pipeline is abnormal, thereby screening out the abnormal areas of each section of the water conservancy pipeline.

[0020] Preferably, the counting of the numbers of damaged areas in each section of the water conservancy transmission pipeline includes: counting the numbers of abnormal areas in each section of the water conservancy transmission pipeline, comparing the abnormal areas in each section of the water conservancy transmission pipeline, if the adjacent area corresponding to the abnormal area of ​​a certain section of the water conservancy transmission pipeline is a normal area, then the abnormal area of ​​this section of the water conservancy transmission pipeline is damaged; if the abnormal area of ​​a certain section of the water conservancy transmission pipeline and its adjacent areas are both abnormal areas, then the water pipe damage index of the abnormal area of ​​the section of the water conservancy transmission pipeline and the adjacent areas are sorted to obtain the abnormal area corresponding to the water pipe damage index ranked first, and use it as the area with damage, and then count the numbers of the damaged areas in each section of the water conservancy transmission pipeline.

[0021] Preferably, the analyzing the reference water flow of each section of the water conservancy pipeline includes: obtaining the number of curved pipes and the curvature of each curved pipe in each section of the water conservancy pipeline through a pipeline layout diagram.

[0022] The number of curved pipes in each section of the water conservancy pipeline is compared with the number of curved pipes in the normal situation, and the deviation coefficient of the number of curved pipes in each section of the water conservancy pipeline is obtained, which is recorded as W d .

[0023] The curvature of each curved pipe in each section of the water conservancy pipeline is compared with the curvature of the curved pipe under normal conditions, and the deflection curvature coefficient of each curved pipe in each section of the water conservancy pipeline is obtained, which is recorded as h xd , where x represents the number corresponding to different curved pipes, x=1,2,3,...O.

[0024] The water flow in each section of the water conservancy pipeline is monitored in real time by a flow meter and recorded as L d .

[0025] Analyze the reference water flow L' of each section of the water conservancy pipeline d , O represents the total number of curved pipes, wherein τ1 represents the weight corresponding to the set deviation coefficient of the number of curved pipes, τ2 represents the weight corresponding to the set deviation arc coefficient, and τ1+τ2=1, and L0 represents the water flow of the set water conservancy transmission pipeline under normal circumstances.

[0026] Preferably, the specific formula for analyzing the blockage index of each section of the water conservancy pipeline is:

[0027] Preferably, the determining whether there is blockage in each section of the water conservancy transmission pipeline comprises: comparing the blockage index of each section of the water conservancy transmission pipeline with a preset blockage index threshold; if the blockage index of a section of the water conservancy transmission pipeline is less than the preset blockage index threshold, then there is no blockage in this section of the water conservancy transmission pipeline; if the blockage index of a section of the water conservancy transmission pipeline is greater than or equal to the preset blockage index threshold, then there is blockage in this section of the water conservancy transmission pipeline, and the blocked areas of each section of the water conservancy transmission pipeline are screened out, and then the numbers of the blocked areas of each section of the water conservancy transmission pipeline are counted.

[0028] Preferably, the analysis of the blockage index of each section of the water conservancy pipeline includes: collecting the turbidity values ​​of the water bodies at the head and tail of each section of the water conservancy pipeline in real time through a turbidity meter, comparing the turbidity values ​​of the water bodies at the head and tail of each section of the water conservancy pipeline, and obtaining the difference in turbidity values ​​of the water bodies at the head and tail of each section of the water conservancy pipeline, recorded as ΔZ d .

[0029] According to the difference in turbidity values ​​of the water bodies at the beginning and end of each section of the water conservancy pipeline, the dirt index ζ of each section of the water conservancy pipeline is analyzed. d , Where ΔZ0 represents the set turbidity value difference of the reference water body.

[0030] Preferably, the determining whether each section of the water conservancy pipeline needs to be cleaned includes: comparing the dirt index of each section of the water conservancy pipeline with a preset dirt index threshold; if the dirt index of a section of the water conservancy pipeline is greater than the preset dirt index threshold, then the section of the water conservancy pipeline needs to be cleaned, screening out the sections of the water conservancy pipeline that need to be cleaned, and then counting the numbers of the sections of the water conservancy pipeline that need to be cleaned.

[0031] Preferably, the feedback to the platform includes: feeding back to the platform the numbers of damaged areas in each section of the water conservancy pipeline, the numbers of blocked areas in each section of the water conservancy pipeline, and the numbers of areas that need to be cleaned in each section of the water conservancy pipeline for early warning.

[0032] Compared with the prior art, the beneficial effects of the present invention are as follows: (1) The present invention can accurately analyze the damage conditions of various sections of the water conservancy transmission pipeline through the water pipe surface temperature, water temperature and water pressure, and accurately identify the damaged pipeline section. The operation and maintenance personnel can quickly locate and repair the damaged area according to the statistical damaged area number, which greatly shortens the troubleshooting and repair time and improves the operation and maintenance efficiency. Timely damage treatment can avoid energy waste, water loss and possible pipeline replacement costs caused by pipeline damage, thereby reducing maintenance costs.

[0033] (2) The present invention analyzes the blockage index of each section of the water conservancy transmission pipeline based on the reference water flow rate and water flow rate of each section of the water conservancy transmission pipeline, and then determines whether there is blockage in each section of the water conservancy transmission pipeline, and calculates the number of the blocked area of ​​each section of the water conservancy transmission pipeline, so as to timely discover the blockage problem in the pipeline and avoid the problem from further deteriorating. Moreover, through the statistically calculated blocked area number, the operation and maintenance personnel can quickly locate and deal with the blocked pipeline section, which greatly shortens the time for troubleshooting and repair, improves the operation and maintenance efficiency, and timely blockage processing can avoid energy waste, water loss and possible pipeline damage caused by pipeline blockage, thereby reducing maintenance costs.

[0034] (3) The present invention can accurately reflect the dirt accumulation inside the pipeline by collecting the turbidity values ​​of the water bodies at both ends of each section of the water conservancy transmission pipeline in real time and calculating the difference. Only when the dirt index of a certain section of the pipeline exceeds a preset threshold will it be determined to need cleaning. This method can avoid unnecessary cleaning operations and save manpower, material resources and water resources. By counting the numbers of the pipeline sections that need to be cleaned, the operation and maintenance personnel can quickly locate and handle the areas that need to be cleaned, thereby improving the efficiency of the cleaning work, avoiding unnecessary cleaning operations, and reducing the operation and maintenance costs. At the same time, by improving the cleaning efficiency and extending the service life of the pipeline, the long-term operation and maintenance costs are further reduced. BRIEF DESCRIPTION OF THE DRAWINGS

[0035] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the accompanying drawings required for describing the embodiments will be briefly introduced below. Obviously, the accompanying drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other accompanying drawings can be obtained based on these accompanying drawings without paying creative work.

[0036] Figure 1 It is a schematic diagram of the connection of each module of the system of the present invention. DETAILED DESCRIPTION

[0037] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0038] See also Figure 1 As shown, the present invention provides an operation and maintenance monitoring platform for water conservancy transmission pipelines, including: a data acquisition module, a water pipe damage judgment module, a water pipe blockage judgment module, a water pipe cleaning judgment module and an operation and maintenance monitoring feedback module.

[0039] The data acquisition module is respectively connected to the water pipe damage judgment module, the water pipe blockage judgment module and the water pipe cleaning judgment module, and the operation and maintenance monitoring feedback module is respectively connected to the water pipe damage judgment module, the water pipe blockage judgment module and the water pipe cleaning judgment module.

[0040] The data acquisition module is used to segment the water conservancy pipeline according to the valves to obtain each section of the water conservancy pipeline, and to monitor the water pressure at both ends of each section of the water conservancy pipeline, the water pipe surface temperature, the water temperature, the water flow rate and the turbidity value of the water body at both ends in real time.

[0041] As a preferred embodiment, the specific method for real-time monitoring of the water pressure at both ends of each section of the water conservancy transmission pipeline, the water pipe surface temperature, the water temperature, the water flow rate and the turbidity value of the water body at both ends is: placing pressure sensors on the valves in each section of the water conservancy transmission pipeline to collect the water pressure at both ends of each section of the water conservancy transmission pipeline.

[0042] For example, the water pressure at the tail end of the first section of the water conservancy pipeline is used as the water pressure at the head end of the second section of the water conservancy pipeline.

[0043] The first temperature sensor is arranged on the surface of the water pipe in each section of the water conservancy delivery pipeline to collect the surface temperature of the water pipe in each section of the water conservancy delivery pipeline.

[0044] The second temperature sensor is arranged on the valve of each section of the water conservancy transmission pipeline to collect the water temperature of each section of the water conservancy transmission pipeline.

[0045] Flow meters are arranged at valves in each section of the water conservancy transmission pipeline, and the head end water flow entering each section of the water conservancy transmission pipeline is used as the water flow of each section of the water conservancy transmission pipeline.

[0046] The turbidity meters are placed on the valves in each section of the water conservancy transmission pipeline to collect the turbidity values ​​of the water at both ends of each section of the water conservancy transmission pipeline.

[0047] The water pipe damage judgment module is used to analyze the reference water pressure of each section of the water conservancy transmission pipeline according to the water pipe surface temperature and water temperature of each section of the water conservancy transmission pipeline, and then analyze the water pipe damage index of each section of the water conservancy transmission pipeline through the water pressure at the head and tail ends of each section of the water conservancy transmission pipeline, and then determine whether there is an abnormality in each section of the water conservancy transmission pipeline, and count the numbers of the damaged areas of each section of the water conservancy transmission pipeline.

[0048] Furthermore, the analysis of the water pipe damage index of each section of the water conservancy pipeline includes: collecting the water pressure at the head and tail of each section of the water conservancy pipeline through a pressure sensor, comparing the water pressure at the head and tail of each section of the water conservancy pipeline, and obtaining the water pressure difference at the head and tail of each section of the water conservancy pipeline, recorded as Δp d , where d represents the number of the dth section of the water conservancy pipeline, d = 1, 2, 3, ...D.

[0049] The water pressure at both ends of each section of the water conservancy pipeline is added and averaged to obtain the average water pressure of each section of the water conservancy pipeline, which is used as the water pressure of each section of the water conservancy pipeline, denoted as p d .

[0050] Analyze the water pipe damage index in each section of the water conservancy pipeline where q d It represents the reference water pressure in the dth section of the water conservancy pipeline, and Δp0 represents the set allowable water pressure difference.

[0051] Furthermore, the specific analysis method of the reference water pressure of each section of the water conservancy pipeline is: collecting the water pipe surface temperature and the water temperature of each section of the water conservancy pipeline through a temperature sensor.

[0052] The water temperature of each section of the water conservancy pipeline is recorded as

[0053] The surface temperature of the water pipe in each section of the water conservancy pipeline is compared with the maximum surface temperature that the water pipe can withstand under normal conditions, and the ratio of the surface temperature of the water pipe in each section of the water conservancy pipeline to the maximum surface temperature that the water pipe can withstand under normal conditions is obtained, which is used as the surface temperature deviation coefficient of the water pipe in each section of the water conservancy pipeline, denoted as R d .

[0054] Compare the water temperature of each section of the water conservancy pipeline with the set water temperature range of the water pipe under a suitable environment, and analyze the water temperature deviation coefficient τ of each section of the water conservancy pipeline d , Where [ν1, ν2] represents the water temperature range of the water pipe under a suitable environment, and v0 represents the set allowable deviation temperature.

[0055] Analyze the reference water pressure q0 of each section of the water conservancy pipeline. Wherein η represents the weight corresponding to the set water pipe surface temperature deviation coefficient, η2 represents the weight corresponding to the set water temperature deviation coefficient, and η+η2=1, and p0 represents the set safe water pressure of the water conservancy transmission pipeline under normal environment.

[0056] It should be noted that, in one embodiment, η can be set to 0.5, η2 can be set to 0.5, the water pipe surface temperature deviation coefficient and the water temperature deviation coefficient are equally important in evaluating the performance of the water pipe system. The surface temperature deviation coefficient reflects the change in the external temperature of the water pipe, while the water temperature deviation coefficient is directly related to the temperature stability of the fluid inside the water pipe. Both are key factors to ensure the normal operation of the water pipe system. Therefore, the weights corresponding to the water pipe surface temperature deviation coefficient and the water temperature deviation coefficient are equal.

[0057] Furthermore, the determination of whether there are abnormalities in each section of the water conservancy transmission pipeline includes: comparing the water pipe damage index of each section of the water conservancy transmission pipeline with a preset water pipe damage index threshold; if the water pipe damage index of a certain section of the water conservancy transmission pipeline is less than the preset water pipe damage index threshold, then the section of the water conservancy transmission pipeline is recorded as a normal area; if the water pipe damage index of a certain section of the water conservancy transmission pipeline is greater than or equal to the preset water pipe damage index threshold, then the section of the water conservancy transmission pipeline has an abnormality, thereby screening out the abnormal areas of each section of the water conservancy transmission pipeline.

[0058] Furthermore, the method of counting the numbers of damaged areas in each section of the water conservancy transmission pipeline includes: comparing the abnormal areas in each section of the water conservancy transmission pipeline, if the adjacent area corresponding to the abnormal area in a certain section of the water conservancy transmission pipeline is a normal area, then the abnormal area in this section of the water conservancy transmission pipeline is damaged; if the abnormal area in a certain section of the water conservancy transmission pipeline and its adjacent areas are both abnormal areas, then sorting the water pipe damage indexes of the abnormal area in this section of the water conservancy transmission pipeline and its adjacent areas, obtaining the abnormal area corresponding to the water pipe damage index ranked first, and taking it as the area with damage, and then counting the numbers of the damaged areas in each section of the water conservancy transmission pipeline.

[0059] The present invention can accurately analyze the damage conditions of various sections of the water transport pipeline through the water pipe surface temperature, water temperature and water pressure, and precisely identify the damaged pipeline sections. Operation and maintenance personnel can quickly locate and repair them according to the statistical damaged area numbers, which greatly shortens the time for troubleshooting and repair and improves operation and maintenance efficiency. Timely damage treatment can avoid energy waste, water loss and possible pipeline replacement costs caused by pipeline damage, thereby reducing maintenance costs.

[0060] The water pipe blockage determination module is used to collect the number of curved pipes and the curvature of each curved pipe in each section of the water conservancy transmission pipeline, analyze the reference water flow of each section of the water conservancy transmission pipeline, and then analyze the blockage index of each section of the water conservancy transmission pipeline based on the water flow of each section of the water conservancy transmission pipeline, so as to determine whether there is blockage in each section of the water conservancy transmission pipeline, and count the numbers of the blocked areas in each section of the water conservancy transmission pipeline.

[0061] Furthermore, the analysis of the reference water flow of each section of the water conservancy pipeline includes: obtaining the number of curved pipes and the curvature of each curved pipe in each section of the water conservancy pipeline through a pipeline layout diagram.

[0062] The number of curved pipes in each section of the water conservancy pipeline is compared with the number of curved pipes in the normal situation, and the deviation coefficient of the number of curved pipes in each section of the water conservancy pipeline is obtained, which is recorded as W d .

[0063] The curvature of each curved pipe in each section of the water conservancy pipeline is compared with the curvature of the curved pipe under normal conditions, and the deflection curvature coefficient of each curved pipe in each section of the water conservancy pipeline is obtained, which is recorded as h xd , where x represents the number corresponding to different curved pipes, x=1,2,3,...O.

[0064] The water flow in each section of the water conservancy pipeline is monitored in real time by a flow meter and recorded as L d .

[0065] Analyze the reference water flow L' of each section of the water conservancy pipeline d , O represents the total number of curved pipes, wherein τ1 represents the weight corresponding to the set deviation coefficient of the number of curved pipes, τ2 represents the weight corresponding to the set deviation arc coefficient, and τ1+τ2=1, and L0 represents the water flow of the set water conservancy transmission pipeline under normal circumstances.

[0066] It should be noted that, in one embodiment, τ1 can be set to 0.4 and τ2 can be set to 0.6. In the water conservancy transmission pipeline system, the deviation curvature coefficient can reflect the degree of pipe bending, thereby affecting the flow rate of the fluid, which is crucial to the efficient and safe operation of the pipeline system. Although the number of curved pipes is an important parameter in the design and layout of the pipeline system, it may be more related to the complexity and cost of the system than the curvature coefficient, rather than directly affecting the fluid dynamics. Therefore, the weight corresponding to the deviation curvature coefficient is larger.

[0067] Furthermore, the specific formula for analyzing the blockage index of each section of the water conservancy pipeline is:

[0068] Furthermore, the determination of whether there is blockage in each section of the water conservancy transmission pipeline includes: comparing the blockage index of each section of the water conservancy transmission pipeline with a preset blockage index threshold; if the blockage index of a section of the water conservancy transmission pipeline is less than the preset blockage index threshold, then there is no blockage in this section of the water conservancy transmission pipeline; if the blockage index of a section of the water conservancy transmission pipeline is greater than or equal to the preset blockage index threshold, then there is blockage in this section of the water conservancy transmission pipeline, and the blocked areas of each section of the water conservancy transmission pipeline are screened out, and then the numbers of the blocked areas of each section of the water conservancy transmission pipeline are counted.

[0069] The present invention analyzes the blockage index of each section of the water conservancy transmission pipeline according to the reference water flow and water flow of each section of the water conservancy transmission pipeline, and then determines whether each section of the water conservancy transmission pipeline is blocked, and counts the numbers of the blocked areas of each section of the water conservancy transmission pipeline, so that the blockage problem in the pipeline can be discovered in time to avoid further deterioration of the problem. Moreover, through the counted blocked area numbers, operation and maintenance personnel can quickly locate and handle the blocked pipeline section, which greatly shortens the time for troubleshooting and repair, improves operation and maintenance efficiency, and timely blockage processing can avoid energy waste, water loss and possible pipeline damage caused by pipeline blockage, thereby reducing maintenance costs.

[0070] The water pipe cleaning judgment module is used to analyze the dirt index of each section of the water conservancy pipeline according to the turbidity values ​​of the water bodies at both ends of each section of the water conservancy pipeline, judge whether each section of the water conservancy pipeline needs to be cleaned, and then count the numbers of the areas that need to be cleaned in each section of the water conservancy pipeline.

[0071] Furthermore, the dirt index of each section of the water conservancy pipeline is analyzed, including: collecting the turbidity values ​​of the water bodies at both ends of each section of the water conservancy pipeline in real time through a turbidity meter, comparing the turbidity values ​​of the water bodies at both ends of each section of the water conservancy pipeline, and obtaining the difference in turbidity values ​​of the water bodies at both ends of each section of the water conservancy pipeline, recorded as ΔZ d .

[0072] According to the difference in turbidity values ​​of the water bodies at the beginning and end of each section of the water conservancy pipeline, the dirt index ζ of each section of the water conservancy pipeline is analyzed. d , Where ΔZ0 represents the set turbidity value difference of the reference water body.

[0073] Furthermore, the determination of whether each section of the water conservancy pipeline needs to be cleaned includes: comparing the dirt index of each section of the water conservancy pipeline with a preset dirt index threshold; if the dirt index of a section of the water conservancy pipeline is greater than the preset dirt index threshold, then the section of the water conservancy pipeline needs to be cleaned, screening out the sections of the water conservancy pipeline that need to be cleaned, and then counting the numbers of the sections of the water conservancy pipeline that need to be cleaned.

[0074] The present invention can accurately reflect the dirt accumulation inside the pipeline by collecting the turbidity values ​​of the water bodies at both ends of each section of the water conservancy transmission pipeline in real time and calculating the difference. Only when the dirt index of a certain section of the pipeline exceeds a preset threshold value will it be determined to need cleaning. This method can avoid unnecessary cleaning operations and save manpower, material resources and water resources. By counting the numbers of the pipeline sections that need to be cleaned, the operation and maintenance personnel can quickly locate and process the areas that need to be cleaned, thereby improving the efficiency of the cleaning work, avoiding unnecessary cleaning operations, and reducing the operation and maintenance costs. At the same time, by improving the cleaning efficiency and extending the service life of the pipeline, the long-term operation and maintenance costs are further reduced.

[0075] The operation and maintenance monitoring feedback module is used to feed back to the platform the numbers of damaged areas in each section of the water conservancy transmission pipeline, the numbers of blocked areas in each section, and the numbers of areas that need to be cleaned in each section.

[0076] Furthermore, the feedback to the platform includes: feeding back to the platform the numbers of damaged areas in each section of the water conservancy pipeline, the numbers of blocked areas in each section of the water conservancy pipeline, and the numbers of areas that need to be cleaned in each section of the water conservancy pipeline, for early warning.

[0077] Through clear numbering, the invention enables operation and maintenance personnel to accurately locate the problematic pipeline section, greatly shortening the time for troubleshooting and repairing, improving operation and maintenance efficiency, and timely warning can reduce losses such as water outages and water leaks caused by pipeline problems, thereby reducing maintenance costs.

[0078] The above contents are merely examples and explanations of the concept of the present invention. Those skilled in the art may make various modifications or additions to the specific embodiments described or replace them in a similar manner. As long as they do not deviate from the concept of the invention or exceed the scope defined by the present invention, they shall all fall within the protection scope of the present invention.

Claims

1. An operation and maintenance monitoring platform for water conservancy pipelines, characterized by: include: Data acquisition module: used to divide the water conservancy pipeline into sections according to the valves, obtain the sections of the water conservancy pipeline, and monitor the water pressure at both ends of each section of the water conservancy pipeline, the surface temperature of the water pipe, the water temperature, the water flow rate and the turbidity value of the water body at both ends in real time; Water pipe damage judgment module: used to analyze the reference water pressure of each section of the water conservancy pipeline according to the surface temperature and water temperature of the water pipe in each section of the water conservancy pipeline, and then analyze the water pipe damage index of each section of the water conservancy pipeline according to the water pressure at both ends of each section of the water conservancy pipeline, and then judge whether there is any abnormality in each section of the water conservancy pipeline, and count the number of the damaged area of ​​each section of the water conservancy pipeline; Water pipe blockage determination module: used to collect the number of curved pipes and the curvature of each curved pipe in each section of the water conservancy pipeline, analyze the reference water flow of each section of the water conservancy pipeline, and then analyze the blockage index of each section of the water conservancy pipeline according to the water flow of each section of the water conservancy pipeline, and then determine whether there is blockage in each section of the water conservancy pipeline, and count the number of the blocked area in each section of the water conservancy pipeline; Water pipe cleaning judgment module: used to analyze the dirt index of each section of the water conservancy pipeline according to the turbidity value of the water body at both ends of each section of the water conservancy pipeline, judge whether each section of the water conservancy pipeline needs to be cleaned, and then count the number of the area that needs to be cleaned in each section of the water conservancy pipeline; Operation and maintenance monitoring feedback module: used to feed back to the platform the numbers of damaged areas in each section of the water conservancy transmission pipeline, the numbers of blocked areas in each section, and the numbers of areas that need to be cleaned in each section.

2. The operation and maintenance monitoring platform for water conservancy pipeline according to claim 1 is characterized by: The analysis of the water pipe damage index of each section of the water conservancy pipeline includes: The water pressure at both ends of each section of the water conservancy pipeline is collected by the pressure sensor, and the water pressure at both ends of each section of the water conservancy pipeline is compared to obtain the water pressure difference between the ends of each section of the water conservancy pipeline, which is recorded as Δp d , where d represents the number of the dth section of the water conservancy pipeline, d = 1, 2, 3, ... D; The water pressure at both ends of each section of the water conservancy pipeline is added and averaged to obtain the average water pressure of each section of the water conservancy pipeline, which is used as the water pressure of each section of the water conservancy pipeline, denoted as p d ; Analyze the water pipe damage index θ of each section of the water conservancy pipeline d , where q d It represents the reference water pressure in the dth section of the water conservancy pipeline, and Δp0 represents the set allowable water pressure difference.

3. The operation and maintenance monitoring platform of a water conservancy pipeline according to claim 2 is characterized in that: The specific analysis method of the reference water pressure in each section of the water conservancy pipeline is as follows: The water pipe surface temperature and water temperature of each section of the water conservancy pipeline are collected by temperature sensors; The water temperature of each section of the water conservancy pipeline is recorded as θ d ; The surface temperature of the water pipe in each section of the water conservancy pipeline is compared with the maximum surface temperature that the water pipe can withstand under normal conditions, and the ratio of the surface temperature of the water pipe in each section of the water conservancy pipeline to the maximum surface temperature that the water pipe can withstand under normal conditions is obtained, which is used as the surface temperature deviation coefficient of the water pipe in each section of the water conservancy pipeline, denoted as R d ; Compare the water temperature of each section of the water conservancy pipeline with the set water temperature range of the water pipe under a suitable environment, and analyze the water temperature deviation coefficient τ of each section of the water conservancy pipeline d , Where [ν1, ν2] represents the water temperature range of the water pipe under the appropriate environment, and v0 represents the set allowable deviation temperature; Analyze the reference water pressure q0 of each section of the water conservancy pipeline. Wherein η represents the weight corresponding to the set water pipe surface temperature deviation coefficient, η2 represents the weight corresponding to the set water temperature deviation coefficient, and η+η2=1, and p0 represents the set safe water pressure of the water conservancy transmission pipeline under normal environment.

4. The operation and maintenance monitoring platform for water conservancy pipeline according to claim 1 is characterized by: The determining whether there is an abnormality in each section of the water conservancy pipeline includes: The water pipe damage index of each section of the water conservancy transmission pipeline is compared with the preset water pipe damage index threshold. If the water pipe damage index of a section of the water conservancy transmission pipeline is less than the preset water pipe damage index threshold, the section of the water conservancy transmission pipeline is recorded as a normal area; if the water pipe damage index of a section of the water conservancy transmission pipeline is greater than or equal to the preset water pipe damage index threshold, there is an abnormality in the section of the water conservancy transmission pipeline, and the abnormal areas of each section of the water conservancy transmission pipeline are screened out.

5. The operation and maintenance monitoring platform of a water conservancy pipeline according to claim 4 is characterized in that: The method of counting the number of damaged areas of each section of the water conservancy pipeline includes: The abnormal areas of each section of the water conservancy transmission pipeline are compared. If the adjacent area corresponding to the abnormal area of ​​a section of the water conservancy transmission pipeline is a normal area, then the abnormal area of ​​the section of the water conservancy transmission pipeline is damaged; if the abnormal area of ​​a section of the water conservancy transmission pipeline and its adjacent areas are both abnormal areas, the water pipe damage index of the abnormal area of ​​the section of the water conservancy transmission pipeline and the adjacent areas are sorted, and the abnormal area corresponding to the water pipe damage index ranked first is obtained, and it is used as the area with damage, and then the numbers of the damaged areas of each section of the water conservancy transmission pipeline are counted.

6. The operation and maintenance monitoring platform for water conservancy pipeline according to claim 2 is characterized by: The analysis of the reference water flow of each section of the water conservancy pipeline includes: The number of curved pipes in each section of the water conservancy transmission pipeline and the curvature of each curved pipe are obtained through the pipeline layout diagram; The number of curved pipes in each section of the water conservancy pipeline is compared with the number of curved pipes in the normal situation, and the deviation coefficient of the number of curved pipes in each section of the water conservancy pipeline is obtained, which is recorded as W d ; The curvature of each curved pipe in each section of the water conservancy pipeline is compared with the curvature of the curved pipe under normal conditions, and the deflection curvature coefficient of each curved pipe in each section of the water conservancy pipeline is obtained, which is recorded as h xd , where x represents the number corresponding to different curved pipes, x = 1, 2, 3, ... O; The water flow in each section of the water conservancy pipeline is monitored in real time by a flow meter and recorded as L d ; Analyze the reference water flow L' of each section of the water conservancy pipeline d , O represents the total number of curved pipes, wherein τ1 represents the weight corresponding to the set deviation coefficient of the number of curved pipes, τ2 represents the weight corresponding to the set deviation arc coefficient, and τ1+τ2=1, and L0 represents the water flow of the set water conservancy transmission pipeline under normal circumstances.

7. The operation and maintenance monitoring platform for water conservancy pipeline according to claim 6 is characterized by: The specific formula for analyzing the blockage index of each section of the water conservancy pipeline is:

8. The operation and maintenance monitoring platform for water conservancy pipeline according to claim 1 is characterized by: The method of judging whether each section of the water conservancy pipeline is blocked includes: The congestion index of each section of the water conservancy transmission pipeline is compared with the preset congestion index threshold. If the congestion index of a section of the water conservancy transmission pipeline is less than the preset congestion index threshold, there is no congestion in this section of the water conservancy transmission pipeline; if the congestion index of a section of the water conservancy transmission pipeline is greater than or equal to the preset congestion index threshold, there is congestion in this section of the water conservancy transmission pipeline, and the congested areas of each section of the water conservancy transmission pipeline are screened out, and then the numbers of the congested areas of each section of the water conservancy transmission pipeline are counted.

9. The operation and maintenance monitoring platform of a water conservancy pipeline according to claim 2, characterized in that: The analysis of the fouling index of each section of the water conservancy pipeline includes: The turbidity values ​​of the water bodies at both ends of each section of the water conservancy pipeline are collected in real time by using a turbidity meter. The turbidity values ​​of the water bodies at both ends of each section of the water conservancy pipeline are compared to obtain the difference in turbidity values ​​of the water bodies at both ends of each section of the water conservancy pipeline, which is recorded as ΔZ d ; According to the difference in turbidity values ​​of the water bodies at the beginning and end of each section of the water conservancy pipeline, the dirt index ζ of each section of the water conservancy pipeline is analyzed. d , Where ΔZ0 represents the set turbidity value difference of the reference water body.

10. The operation and maintenance monitoring platform of a water conservancy pipeline according to claim 1, characterized in that: The step of judging whether each section of the water conservancy pipeline needs to be cleaned includes: The dirt index of each section of the water conservancy pipeline is compared with the preset dirt index threshold. If the dirt index of a section of the water conservancy pipeline is greater than the preset dirt index threshold, the section of the water conservancy pipeline needs to be cleaned, and the sections of the water conservancy pipeline that need to be cleaned are screened out, and then the numbers of the sections of the water conservancy pipeline that need to be cleaned are counted.

Citation Information

Patent Citations

  • Pipe clearing work intelligent monitoring early warning system and work method thereof

    CN110939869A

  • Intelligent full-automatic cleaning, sewage discharging and water distributing and collecting device

    CN115289402A

  • Heat distribution pipeline leakage detection method, device and equipment and storage medium

    CN116928608A

Cited By

  • Water conservancy pipeline data management system based on cloud computing

    CN121119474A