Marine water body flow velocity and flow monitoring system and method based on wave radar technology

Through the marine water flow rate and flow monitoring system based on wave radar technology, the ocean current flow rate and flow data are collected and analyzed in real time, and long and short-term memory networks and isolated forest algorithms are used for prediction and correction, which solves the data accuracy of existing systems in complex marine environments and The problem of insufficient response capabilities has achieved efficient and stable monitoring.

CN118897283AInactive Publication Date: 2024-11-05SHANGHAI ZHIXING ENVIRONMENTAL TECH CO LTD
View PDF 0 Cites 7 Cited by

Patent Information

Application Number
CN202411062753.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-05
Publication Date
2024-11-05
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The existing marine water flow rate and flow monitoring system lacks immediate response to dynamic changes in complex marine environments. The data accuracy is affected by physical damage and biological attachment. It lacks advanced data analysis functions and cannot effectively predict future changes, resulting in marine scientific research and resources. Delayed information acquisition and response lag in management.

Method used

The ocean water flow rate and flow monitoring system based on wave radar technology is adopted to collect data in real time through the flow rate and flow acquisition module. The ocean trend analysis module uses long and short-term memory network to identify periodic and nonlinear fluctuations. The data error correction module uses an isolated forest algorithm to locate and correct. Deviation, monitoring and optimization module optimizes the monitoring process, and generates accurate flow rate and flow prediction information.

Benefits of technology

Improve the accuracy and timeliness of data, enhance the prediction ability of periodic and nonlinear fluctuations, optimize the automation and intelligence level of data processing, reduce the dependence on manual intervention, and realize self-optimization of the monitoring process. Ensures the efficiency and stability of complex marine environment monitoring.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118897283A_ABST
    Figure CN118897283A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of flow velocity and flow monitoring, in particular to an ocean water flow velocity and flow monitoring system and method based on a wave radar technology, and the system comprises a flow velocity and flow acquisition module, an ocean trend analysis module, a data error correction module and a monitoring optimization module. According to the invention, through real-time acquisition and waveform signal analysis, the accuracy and timeliness of data are improved, the limitation on data updating frequency is solved, the long and short-term memory network is introduced to enhance the prediction capability of the system on periodic and nonlinear fluctuation, so that the prediction of future trend change points is more accurate, and the prediction efficiency is improved. The application of the isolated forest algorithm optimizes the automatic correction process of data deviation, improves the automation and intelligence level of data processing, reduces the dependence on manual intervention, and achieves the self-optimization of the monitoring process through the continuous analysis of the corrected data and historical data. And high efficiency and stability in complex marine environment monitoring activities are ensured.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of flow velocity and flow rate monitoring, and in particular to a system and method for monitoring the flow velocity and flow rate of an ocean water body based on wave radar technology. Background Art

[0002] The field of flow rate and flow monitoring technology focuses on accurately measuring the flow velocity and flow rate of fluids (such as water, gas or other fluids) in different environments such as pipelines, rivers, and oceans. The key technologies involved in this technical field include mechanical flow meters (such as turbine flow meters), electromagnetic flow meters, ultrasonic flow meters, and radar flow monitoring technology. This technology is widely used in water resource management, irrigation systems, urban water supply management, sewage treatment, and energy production (such as hydroelectric power stations), and plays an important role in ensuring the effective management of resources and environmental protection.

[0003] Among them, the ocean water velocity and flow monitoring system refers to a system specially designed to monitor and measure the velocity and flow of water in the ocean. It usually includes sensors, data processing units and communication equipment. It can collect data in real time in the marine environment and transmit the data to the monitoring center for analysis. The purpose of this system is mainly to provide support for marine scientific research, marine engineering and marine resource management, such as monitoring the dynamics of marine fluids, predicting the impact of ocean currents on marine structures, and evaluating and managing resources in the marine environment.

[0004] Existing velocity and flow monitoring systems lack the ability to respond immediately to dynamic changes in complex marine environments. The physical limitations and environmental adaptability issues of mechanical and electromagnetic flow meters have resulted in impaired data accuracy, especially in the ocean, where equipment is susceptible to physical damage and biological attachment. Traditional technologies lack advanced data analysis capabilities and cannot effectively predict future trends, which is particularly evident in marine scientific research and resource management where demands are changing rapidly. The lack of real-time data analysis capabilities not only delays the acquisition of key information, but also causes lags in marine environmental management and protection, affecting overall efficiency and response speed. Summary of the invention

[0005] The purpose of the present invention is to solve the shortcomings of the prior art and to propose a marine water velocity and flow monitoring system and method based on wave radar technology.

[0006] In order to achieve the above object, the present invention adopts the following technical solution: a marine water velocity and flow monitoring system based on wave radar technology, the system comprising:

[0007] The velocity and flow acquisition module is based on wave radar equipment, which collects ocean velocity and flow sensor data in real time, extracts key velocity and flow characteristics through signal strength and frequency analysis, analyzes waveform signals, and converts them into quantifiable velocity and flow indicators to generate a time series feature set;

[0008] The ocean trend analysis module uses a long short-term memory network based on the time series feature set to identify periodic and nonlinear fluctuations in the data, identify key trend change points, predict future flow rate and flow changes, and generate trend feature prediction information;

[0009] The data error correction module uses the isolation forest algorithm based on the trend feature prediction information to compare the current observation data with the predicted data, locate the source of the deviation, adjust the data processing flow in combination with the historical correction records, and automatically correct the identified deviations to generate deviation adjustment correction records;

[0010] The monitoring optimization module adjusts and corrects the records based on the deviations, compares and analyzes them with historical data, evaluates the accuracy of the corrected data, optimizes the monitoring process according to the evaluation results, updates the data collection and analysis plan, and generates monitoring process update results.

[0011] The present invention is improved in that the steps of collecting the ocean velocity flow sensor data are specifically as follows:

[0012] Based on the wave radar equipment, the raw data of ocean velocity and flow are collected in real time, and the sensor script is used to automatically record, including velocity vector and flow value, using the formula:

[0013] D t =a·v t +b·q t

[0014] Get time-stamped synchronization data, where D t represents the collected data at time t, v t is the velocity vector, q t is the flow value, a and b are adjustment factors used to correct the data;

[0015] Based on the time-stamped synchronized data, data quality assessment is performed to identify and remove outliers using the formula:

[0016]

[0017] Get the cleaned data D clean , where n is the total number of data points, is the mean value of the data, D t represents the collected data at time t;

[0018] Based on the cleaned data, key flow rate and flow characteristics are extracted, and the sliding window method is used to smooth the data and extract trends. The formula is:

[0019]

[0020] Get key feature data F key , where w is the size of the sliding window, is the cleaned data at the jth time point, max means taking the maximum value, n is the total number of data points, and i is the starting index of the sliding window.

[0021] The present invention is improved in that the conversion steps of the flow velocity and flow index are specifically as follows:

[0022] Based on the key flow rate and flow characteristics, the flow rate and flow rate are calculated using the formula:

[0023]

[0024] Get the quantified flow rate V quant and flow rate Q quant , where a e , b e 、c e and d e is a parameter in the conversion process, used to adjust the conversion response, F key It is the key feature data;

[0025] Verify the quantified flow rate and flow rate and calculate the difference with the current measured value using the formula:

[0026]

[0027] and

[0028]

[0029] Generate verified flow rate and flow, where Error V and Error Q is the calculation error of velocity and flow rate, V quant and Q quant is the quantified velocity and flow rate, V measurcd and Q measurcd is the current measured flow rate and flow rate, n is the number of samples;

[0030] Using the verified flow rate and flow rate, the data analysis log is collated, including evaluating key data and performance, to obtain a time series feature set.

[0031] The present invention is improved in that the identification steps of the periodicity and nonlinear fluctuations are specifically as follows:

[0032] Based on the time series feature set, Fourier transform is performed to extract the frequency components of the data using the formula:

[0033] F(f)=∫x(t)e -i2πft dt

[0034] Get the initial frequency domain data F(f), where ∫ is the frequency variable, x(t) is the original time series data, and e -i2πft is the integral kernel in Fourier transform, i is the imaginary unit, and dt is the differential element in time domain integration;

[0035] Apply a filter to filter the initial frequency domain data using the formula:

[0036] F selected (f) = F(f)·(a u sin(f)+b u cos(f)+c u )

[0037] Get the filtered frequency domain data F selected (f), where F(f) is the initial frequency domain data, a u , b u and c u are parameters for adjusting the frequency screening strength and range, sin(f) and cos(f) are sine and cosine functions;

[0038] Based on the filtered frequency domain data, an inverse Fourier transform is performed to reconstruct the time domain signal and identify periodic and nonlinear fluctuations using the formula:

[0039] x reconstructed (t) = ∫F selected (f)e i2πft df

[0040] Get the reconstructed time series data x reconstructed (t), where F selected (f) is the frequency domain data after filtering, e i2πft is the complex exponential function in the inverse Fourier transform, and df is the differential element in the frequency domain integral.

[0041] The present invention is improved in that the step of acquiring the trend feature prediction information is specifically as follows:

[0042] Based on the key trend change points, the differential method and smoothing technology are used to determine the key change moments, using the formula:

[0043]

[0044] Get the trend change analysis results T change , where x reconstructed (t) is the reconstructed time series data, α y and β y is a coefficient used to adjust the effect of differencing and smoothing, Indicates time differentiation of reconstructed time series data;

[0045] Based on the trend change analysis results, the long short-term memory network is used to train the trend prediction model using the formula:

[0046] M LSTM =LSTM train (T change ,γ,δ)

[0047] Get the trained LSTM model M LSTM , where γ is the learning rate parameter, δ is the regularization parameter, and T change It is the result of trend change analysis;

[0048] Based on the trained LSTM model, the future time period is predicted using the formula:

[0049] P future =LSTM -predict (M LSTM ,∈)

[0050] Get trend feature prediction information P fufure , where M LSTM is the trained LSTM model, and ∈ is a parameter that affects the prediction sensitivity.

[0051] The present invention is improved in that the step of comparing the current observed data with the predicted data is specifically as follows:

[0052] Based on the trend feature prediction information, the current observation data and prediction data are collected, and the data are integrated through the linear weighted method, using the formula:

[0053] D integrated =w 1 ×D obs +w 2 ×D pred

[0054] Generate a weighted integrated dataset D integrated , where D obs is the current data, D pred is the predicted data, w 1 and w 2 is the weighting coefficient of the data type’s influence;

[0055] The weighted integrated data set is analyzed to identify the differences between the data using the formula:

[0056] ΔD=|D obs -D pred |×w 3

[0057] Generates the difference between the observed data and the predicted data, ΔD, where D obs is the current data, D pred is the predicted data, w 3 is the difference magnification factor.

[0058] The present invention is improved in that the automatic correction step of the identified deviation is specifically:

[0059] Locate the source of the deviation and determine the key data points that cause the difference, using the formula:

[0060] S = arg max i |ΔD i |

[0061] Get the source of deviation s, where ΔD is the difference result and arg max is a mathematical operator used to capture the index i of the maximum value;

[0062] Based on the source of the deviation, the associated data processing parameters are adjusted to optimize the deviation, using the formula:

[0063] P adjusted =P original +k×ΔD[S]

[0064] Generate the adjusted processing parameter P adjusted , where P original is the original data processing parameter, k is the adjustment coefficient, ΔD is the difference result, and S is the source of deviation;

[0065] Based on the adjusted processing parameters, the identified deviations are automatically corrected and the process is recorded, using the formula:

[0066] R=V original +k×(ΔD)

[0067] Get the corrected data value R, where V original is the original data value, k is the adjustment coefficient, and ΔD is the difference result.

[0068] The present invention is improved in that the steps of obtaining the monitoring process update result are specifically as follows:

[0069] Based on the deviation adjustment correction record, compare the corrected data with the historical data set to identify key differences, using the formula:

[0070]

[0071] Get the mean absolute deviation ZΔ, where H i is a historical data point, C iis the corrected data point, n is the number of samples;

[0072] To evaluate the accuracy of the calibration data, the mean absolute deviation is compared with the threshold value, and the judgment formula is:

[0073]

[0074] Get the accuracy evaluation result Accuracy, where ZΔ is the mean absolute deviation and θ is the threshold;

[0075] According to the accuracy evaluation result, the monitoring process is updated. If the evaluation result is high, a new data processing process is adopted, otherwise the existing process is revised to obtain the monitoring process update result.

[0076] The method for monitoring the flow rate and flow of an ocean water body based on wave radar technology is implemented based on the above-mentioned ocean water body flow rate and flow monitoring system based on wave radar technology, and comprises the following steps:

[0077] S1: Based on the wave radar equipment, the water surface fluctuation is measured, the wave height and wave speed are recorded, the data and timestamp are integrated, the key waveform signals are screened by analyzing the intensity and frequency, and the waveform signals are analyzed and converted into quantifiable flow velocity and flow indicators to generate a time series feature set;

[0078] S2: Based on the time series feature set, using the long short-term memory network, identify the periodicity and nonlinear fluctuations in the data, identify the key trend change points, and predict the future flow rate and flow rate changes to generate trend feature prediction information;

[0079] S3: Based on the trend feature prediction information, the isolation forest algorithm is applied to compare the current observation data with the prediction data, locate the deviation source, adjust the data processing flow in combination with the historical correction record, automatically correct the identified deviation, and generate the deviation adjustment correction record;

[0080] S4: Analyze the deviation adjustment correction record, compare it with the historical data, evaluate the accuracy of the corrected data, optimize the monitoring process according to the evaluation results, update the data collection and analysis plan, and generate monitoring process optimization information;

[0081] S5: According to the monitoring process optimization information, adjust the configuration and operation process of the wave radar equipment, verify the effectiveness of the new monitoring plan, monitor the future data collection and analysis results, and generate monitoring effect evaluation results.

[0082] Compared with the prior art, the advantages and positive effects of the present invention are:

[0083] In the present invention, through real-time acquisition and waveform signal analysis, the accuracy and timeliness of the data are improved, the limitations in the data update frequency are solved, the introduction of long short-term memory network enhances the system's prediction ability for periodic and nonlinear fluctuations, making the prediction of future trend change points more accurate, the application of isolation forest algorithm optimizes the automatic correction process of data deviation, improves the automation and intelligence level of data processing, reduces dependence on human intervention, and realizes self-optimization of the monitoring process through continuous analysis of corrected data and historical data, ensuring high efficiency and stability in complex marine environment monitoring activities. BRIEF DESCRIPTION OF THE DRAWINGS

[0084] Figure 1 The module diagram of the ocean water velocity and flow monitoring system based on wave radar technology is proposed for the present invention;

[0085] Figure 2 This is a flow chart for collecting ocean velocity and flow sensor data in the present invention;

[0086] Figure 3 It is a conversion flow chart of flow rate and flow index in the present invention;

[0087] Figure 4 This is a flow chart for identifying periodic and nonlinear fluctuations in the present invention;

[0088] Figure 5 A flowchart for obtaining trend feature prediction information in the present invention;

[0089] Figure 6 A flowchart for comparing current observation data with predicted data in the present invention;

[0090] Figure 7 A flowchart for automatic correction of the deviations identified in the present invention;

[0091] Figure 8 This is a flow chart for obtaining the monitoring process update results in the present invention. DETAILED DESCRIPTION

[0092] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention.

[0093] In the description of the present invention, it should be understood that the terms "length", "width", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", etc., indicating positions or positional relationships, are based on the positions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, in the description of the present invention, the meaning of "multiple" is two or more, unless otherwise clearly and specifically defined.

[0094] Example

[0095] See also Figure 1 The present invention provides a technical solution: a marine water velocity and flow monitoring system based on wave radar technology includes:

[0096] The velocity and flow acquisition module is based on wave radar equipment, which collects ocean velocity and flow sensor data in real time, extracts key velocity and flow characteristics through signal strength and frequency analysis, analyzes waveform signals, and converts them into quantifiable velocity and flow indicators to generate a time series feature set;

[0097] The ocean trend analysis module is based on the time series feature set and uses long short-term memory networks to identify periodic and nonlinear fluctuations in the data, identify key trend change points, predict future flow rate and flow changes, and generate trend feature prediction information;

[0098] The data error correction module uses the isolation forest algorithm based on trend feature prediction information to compare the current observation data with the predicted data, locate the source of the deviation, adjust the data processing flow in combination with historical correction records, and automatically correct the identified deviations to generate deviation adjustment correction records;

[0099] The monitoring optimization module adjusts and corrects records based on deviations, conducts comparative analysis with historical data, evaluates the accuracy of the corrected data, optimizes the monitoring process based on the evaluation results, updates the data collection and analysis plan, and generates monitoring process update results.

[0100] The time series feature set includes speed data, flow data, and signal timestamps. The trend feature prediction information includes predicted fluctuation patterns, key time nodes, and trend change prediction results. The deviation adjustment correction records include deviation detection points, correction parameter update results, and adjustment effects.

[0101] See also Figure 2 ,The specific steps for collecting ocean velocity and flow sensor data are:

[0102] Based on the wave radar equipment, the raw data of ocean velocity and flow are collected in real time, and the sensor script is used to automatically record, including velocity vector and flow value, using the formula:

[0103] D t =a·v t +b·q t

[0104] Get time-stamped synchronization data, where D t represents the collected data at time t, v t is the velocity vector, q t is the flow value, a and b are adjustment factors used to correct the data;

[0105] Based on the time-stamped synchronized data, data quality assessment is performed to identify and remove outliers using the formula:

[0106]

[0107] Get the cleaned data D clean , where n is the total number of data points, is the mean value of the data, D t represents the collected data at time t;

[0108] Based on the cleaned data, extract the key flow rate and flow characteristics, use the sliding window method to smooth the data and extract the trend, using the formula:

[0109]

[0110] Get key feature data F key , where w is the size of the sliding window, is the cleaned data at the jth time point, max means taking the maximum value, n is the total number of data points, and i is the starting index of the sliding window.

[0111] Assume that at time t, v t is 5 m / s, flow rate q t 3 cubic meters per second;

[0112] Assume a=0.8 and b=1.2.

[0113] Calculation process:

[0114] D t =0.8·5+1.2·3=4+3.6=7.6

[0115] Income D t =7.6 represents the velocity and flow data after comprehensive adjustment at time t.

[0116] Suppose there are 5 data points: 7.6, 8.1, 6.9, 7.8, 8.0;

[0117] average value:

[0118]

[0119] Calculation process:

[0120]

[0121]

[0122] Income D clean = 0.1816 represents the average of the sum of squares of the deviations of the data points from the mean and is used to assess the consistency of the data.

[0123] Using the above data, set the sliding window w=3.

[0124] Compute the mean for each window and find the maximum:

[0125]

[0126] The obtained F key =7.6 represents the maximum average value of the velocity and flow data in the considered time window, which is the key velocity and flow feature.

[0127] See also Figure 3 , the conversion steps of flow velocity and flow index are as follows:

[0128] Based on the key flow rate and flow characteristics, the flow rate and flow rate are calculated using the formula:

[0129]

[0130] Get the quantified flow rate V quant and flow rate Q quant , where a e , b e 、c e and d e is a parameter in the conversion process, used to adjust the conversion response, F key It is the key feature data;

[0131] Verify the quantified flow rate and flow rate and calculate the difference with the current measured value using the formula:

[0132]

[0133] and

[0134]

[0135] Generate verified flow rate and flow, where Error V and Error Q is the calculation error of velocity and flow rate, V quant and Q quant is the quantified velocity and flow rate, V measurcd and Q measurcd is the current measured flow rate and flow rate, n is the number of samples;

[0136] Using the verified flow rate and flow, the data analysis logs are collated, including evaluating key data and performance, to obtain a time series feature set.

[0137] Assumption F key =100

[0138] Set the parameter value to:

[0139] a e =0.05, b e =0.01, c e =0.5,d e =10

[0140] Calculation process:

[0141]

[0142] V, Q = 5 + 100 + 5 + 10 = 120

[0143] The results show that at a given F key The quantified flow rate and flow rate are 120, which is a synthetic indicator for further analysis and verification.

[0144] Assume V quant =120;

[0145] Q quant =120;

[0146] V measured =115;

[0147] Q measured =118;

[0148] Assume that the sample size n=1.

[0149] Calculation process:

[0150]

[0151] The error value indicates the deviation between the quantified result and the current measured value. The error for velocity is 5 and the error for flow is 2. It can be used to evaluate the accuracy and the required adjustments.

[0152] See also Figure 4 , the identification steps of periodic and nonlinear fluctuations are as follows:

[0153] Based on the time series feature set, Fourier transform is performed to extract the frequency components of the data using the formula:

[0154] F(f)=∫x(t)e -i2πft dt

[0155] Get the initial frequency domain data F(f), where ∫ is the frequency variable, x(t) is the original time series data, and e -i2πft is the integral kernel in Fourier transform, i is the imaginary unit used to convert the signal from time domain to frequency domain, and dt is the differential element in time domain integration;

[0156] Apply a filter to filter the initial frequency domain data using the formula:

[0157] F selected (f) = F(f)·(a u sin(f)+b u cos(f)+c u )

[0158] Get the filtered frequency domain data F selectes (f), where F(f) is the initial frequency domain data, a u , b u and c u are parameters for adjusting the frequency screening strength and range, sin(f) and cos(f) are sine and cosine functions;

[0159] Based on the filtered frequency domain data, an inverse Fourier transform is performed to reconstruct the time domain signal and identify periodic and nonlinear fluctuations using the formula:

[0160] x reconstructed (t) = ∫F selected (f)e i2πft df

[0161] Get the reconstructed time series data x reconstructed (t), where F selected (f) is the frequency domain data after filtering, e i2πft is the complex exponential function in the inverse Fourier transform, which is used to convert the signal from the frequency domain back to the time domain, and df is the differential element in the frequency domain integral.

[0162] Assume x(t) = cos(2πt)

[0163] Calculate the frequency component when f = 1 Hz and perform Fourier transform:

[0164] F(1)=∫cos(2πt)e -i2π1t Integrating dt over one period (e.g. 0 to 1 second) yields:

[0165]

[0166] The analytical solution is F(1) = 0.5;

[0167] At a frequency of 111 Hz, the amplitude of the complex frequency component is 0.50.50.5, indicating that the main frequency component of the input signal is located here.

[0168] Using the above F(1)=0.5;

[0169] Assume a u =1, b u =2, c u =0.5 emphasizes 1Hz frequency.

[0170] Application formula:

[0171] F selected (1)=0.5·(1sin(1)+2cos(1)+0.5)

[0172] Substituting the values ​​into the formula we get:

[0173] F selected (1) = 0.5·(0.8415+1.0806+0.5) = 0.5·2.4221 = 1.21105

[0174] The result 1.211 shows that after the filter adjustment, the 1Hz frequency component is effectively enhanced.

[0175] Using F selected (f) Perform an inverse Fourier transform.

[0176] If F selexted (f) is mainly concentrated at 1Hz, and the inverse transformation is:

[0177] x reconstructed (t) = ∫1.211cos(2πft)df

[0178] Here, f is around 1 Hz, and the result of the inverse transform will highlight the component of this frequency, and the reconstructed signal will show enhanced periodic characteristics in the time series;

[0179] The obtained x reconstructed (t) In the time domain, the 1 Hz frequency is clearly emphasized, reflecting the strengthening of the periodicity and nonlinear fluctuations of the original signal.

[0180] See also Figure 5,The specific steps for obtaining trend feature prediction information are:

[0181] Based on the key trend change points, the differential method and smoothing technology are used to determine the key change moments, using the formula:

[0182]

[0183] Get the trend change analysis results T change , where x reconstructed (t) is the reconstructed time series data, α y and β y is a coefficient used to adjust the effect of differencing and smoothing, Indicates time differentiation of reconstructed time series data, and smooth is a smoothing operation on reconstructed time series data;

[0184] Based on the trend change analysis results, the long short-term memory network is used to train the trend prediction model using the formula:

[0185] M LSTM =LSTM train (T change ,γ,δ)

[0186] Get the trained LSTM model M LSTM , where γ is the learning rate parameter, δ is the regularization parameter, and T change It is the result of trend change analysis, LSTM train It is a function used to train LSTM, which is used to receive training data and parameters;

[0187] Based on the trained LSTM model, the future time period is predicted using the formula:

[0188] P future =LSTM -predict (M LSTM ,∈)

[0189] Get trend feature prediction information P future , where M LSTM is the trained LSTM model, ∈ is the parameter that affects the prediction sensitivity, LSTM -predict is the prediction function used to use M LSTM Make predictions.

[0190] Assume x reconstructed (t) is composed of simple sinusoidal waveforms, such as:

[0191] x reconstructed (t) = sin(2πt)

[0192] Let α y=2 and β y =1;

[0193] Calculate x reconstructed The derivative of (t):

[0194]

[0195] Apply a smoothing function, assuming smooth(x reconstructed (t)) is a simple moving average, which is sin(2πt).

[0196] Calculation process:

[0197] T change =2πcos(2πt)·2+1·sin(2πt)

[0198] If t = 0.25 (1 / 4 period, i.e. the peak point of the cosine function):

[0199] T change =2π·1·2+1·0=4π≈12.57

[0200] It means that at t = 0.25, the trend change point T change The value of is approximately 12.57, reflecting a significant change point in the trend at this moment.

[0201] Assume that we use a small dataset consisting of T change The values ​​are 12.57, 12.00, 11.47, etc.

[0202] Set γ=0.01, δ=0.001;

[0203] Use the LSTM model for training. Through multiple iterations, the model learns the time series characteristics of trend change points and obtains M LSTM , able to predict future changes based on historical trend data.

[0204] Assuming ∈ = 0.05, use the trained LSTM model to predict future trends and predict the trend changes at the next three time points;

[0205] Predicted trend characteristics P future Indicates how flow rate and flow will change at several points in the future.

[0206] See also Figure 6 , the steps to compare the current observed data with the predicted data are as follows:

[0207] Based on the trend feature prediction information, the current observation data and prediction data are collected, and the data are integrated through the linear weighted method, using the formula:

[0208] Dintegrated =w 1 ×D obs +w 2 ×D pred

[0209] Generate a weighted integrated dataset D integrated , where D obs is the current data, D pred is the predicted data, w 1 and w 2 is the weighting coefficient of the data type’s influence;

[0210] The weighted integrated data set was analyzed to identify the differences between the data using the formula:

[0211] ΔD=|D obs -D pred |×w 3

[0212] Generates the difference between the observed data and the predicted data, ΔD, where D obs is the current data, D pred is the predicted data, w 3 is the difference magnification factor.

[0213] Assumptions:

[0214] D obs is 150;

[0215] D pred is 145;

[0216] w 1 =0.6;

[0217] w 2 =0.4.

[0218] Calculation process:

[0219] D integrated =0.6×150+0.4×145=90+58=148

[0220] Result D integrated =148 represents the data value after weighted integration, which is used for subsequent analysis.

[0221] Assume that the difference magnification factor w 3 =1.5.

[0222] Calculation process:

[0223] ΔD=|150-145|×1.5=5×1.5=7.5

[0224] The result ΔD=7.5 represents the difference between the weighted actual and predicted data.

[0225] See also Figure 7 , the automatic correction steps for the identified deviation are as follows:

[0226] Locate the source of the deviation and determine the key data points that cause the difference, using the formula:

[0227] S = arg max i |ΔD i |

[0228] Get the deviation source S, where ΔD is the difference result and arg max is a mathematical operator used to capture the index i of the maximum value;

[0229] Based on the source of the deviation, adjust the associated data processing parameters to optimize the deviation, using the formula:

[0230] P adjusted =P original +k×ΔD[S]

[0231] Generate the adjusted processing parameter P adjusted , where P original is the original data processing parameter, k is the adjustment coefficient, which is used to adjust the size of the parameter according to the difference, ΔD is the difference result, and S is the source of deviation;

[0232] Based on the adjusted processing parameters, the identified deviations are automatically corrected and the process is documented using the formula:

[0233] R=V original +j×(ΔD)

[0234] Get the corrected data value R, where V original is the original data value, k is the adjustment coefficient used to adjust the size of the parameter according to the difference, and ΔD is the difference result.

[0235] Assume the following difference data:

[0236] ΔD=[0.2,-0.5,0.4,-0.8]

[0237] Calculate the absolute value of each element: [0.2, 0.5, 0.4, 0.8]

[0238] Find the location of the maximum value: the maximum value 0.8 is at index 3.

[0239] Given the difference data:

[0240] ΔD=[0.2,-0.5,0.4,-0.8]

[0241] Maximum deviation point index:

[0242] S=3

[0243] The source of deviation is the fourth data point, which has the largest difference of -0.8.

[0244] Assume the following data:

[0245] P original =1.0;

[0246] ΔD[S]=-0.8;

[0247] k=0.3.

[0248] Calculation process:

[0249] Using the above data, S and ΔD[S] calculate P adjusted :

[0250] P adjusted =1.0+0.3×(-0.8)=1.0-0.24=0.76

[0251] Assume the following data:

[0252] V original =100

[0253] ΔD=-0.275

[0254] Calculate the correction result:

[0255] R=100+0.3×(-0.275)=100-0.0825=99.9175

[0256] R=99.9175 indicates the new data value after adjustment based on the deviation between the current data and the prediction.

[0257] See also Figure 8 , the specific steps for obtaining the monitoring process update results are:

[0258] Based on the deviation adjustment correction records, compare the corrected data with the historical data set to identify key differences, using the formula:

[0259]

[0260] Get the mean absolute deviation ZΔ, where H i is a historical data point, C i is the corrected data point, n is the number of samples; to evaluate the accuracy of the corrected data, the mean absolute deviation is compared with the threshold, and the judgment formula is:

[0261]

[0262] Get the accuracy evaluation result Accuracy, where ZΔ is the mean absolute deviation and θ is the threshold;

[0263] According to the accuracy assessment results, the monitoring process is updated. If the assessment result is high, a new data processing process is adopted. Otherwise, the existing process is revised to obtain the updated monitoring process result.

[0264] Assume that there are 5 data points of historical data and the corrected data are as follows:

[0265] H = [10, 20, 30, 40, 50]

[0266] C = [12, 19, 29, 43, 49]

[0267] Compute the difference between each pair of data points and then calculate the mean absolute deviation:

[0268]

[0269]

[0270] The resulting ZΔ=1.6 represents the average deviation between the historical data and the corrected data.

[0271] Based on the above 1.6, assuming the threshold is 2, a judgment is made. Since 1.6 is less than 2, it is high, and the corrected data is evaluated as having high accuracy.

[0272] The method for monitoring the flow rate and flow of ocean water bodies based on wave radar technology includes the following steps:

[0273] S1: Based on the wave radar equipment, the water surface fluctuation is measured, the wave height and wave speed are recorded, the data and timestamp are integrated, the key waveform signals are screened by analyzing the intensity and frequency, and the waveform signals are analyzed and converted into quantifiable flow velocity and flow indicators to generate a time series feature set;

[0274] S2: Based on the time series feature set, the long short-term memory network is used to identify periodic and nonlinear fluctuations in the data, identify key trend change points, and predict future flow rate and flow changes to generate trend feature prediction information;

[0275] S3: Based on the trend feature prediction information, the isolation forest algorithm is applied to compare the current observation data with the predicted data, locate the deviation source, adjust the data processing flow in combination with the historical correction records, automatically correct the identified deviation, and generate the deviation adjustment correction record;

[0276] S4: Analyze the deviation adjustment correction records, compare with historical data, evaluate the accuracy of the corrected data, optimize the monitoring process based on the evaluation results, update the data collection and analysis plan, and generate monitoring process optimization information;

[0277] S5: Based on the monitoring process optimization information, adjust the configuration and operation process of the wave radar equipment, verify the effectiveness of the new monitoring plan, monitor the future data collection and analysis results, and generate monitoring effect evaluation results.

[0278] The above are only preferred embodiments of the present invention and are not intended to limit the present invention in other forms. Any technician familiar with the profession may use the technical contents disclosed above to change or modify them into equivalent embodiments with equivalent changes and apply them to other fields. However, any simple modification, equivalent change and modification made to the above embodiments based on the technical essence of the present invention without departing from the technical solution of the present invention still falls within the protection scope of the technical solution of the present invention.

Claims

1. The ocean water velocity and flow monitoring system based on wave radar technology is characterized by: The system comprises: The velocity and flow acquisition module is based on wave radar equipment, which collects ocean velocity and flow sensor data in real time, extracts key velocity and flow characteristics through signal strength and frequency analysis, analyzes waveform signals, and converts them into quantifiable velocity and flow indicators to generate a time series feature set; The ocean trend analysis module uses a long short-term memory network based on the time series feature set to identify periodic and nonlinear fluctuations in the data, identify key trend change points, predict future flow rate and flow changes, and generate trend feature prediction information; The data error correction module uses the isolation forest algorithm based on the trend feature prediction information to compare the current observation data with the predicted data, locate the source of the deviation, adjust the data processing flow in combination with the historical correction records, and automatically correct the identified deviations to generate deviation adjustment correction records; The monitoring optimization module adjusts and corrects the records based on the deviations, compares and analyzes them with historical data, evaluates the accuracy of the corrected data, optimizes the monitoring process according to the evaluation results, updates the data collection and analysis plan, and generates monitoring process update results.

2. The ocean water velocity and flow monitoring system based on wave radar technology according to claim 1 is characterized in that: The steps for collecting the ocean velocity flow sensor data are specifically as follows: Based on the wave radar equipment, the raw data of ocean velocity and flow are collected in real time, and the sensor script is used to automatically record, including velocity vector and flow value, using the formula: D t =a·v t +b·q t Get time-stamped synchronization data, where D t represents the collected data at time t, v t is the velocity vector, q t is the flow value, a and b are adjustment factors used to correct the data; Based on the time-stamped synchronized data, data quality assessment is performed to identify and remove outliers using the formula: Get the cleaned data D clean , where n is the total number of data points, is the mean value of the data, D t represents the collected data at time t; Based on the cleaned data, key flow rate and flow characteristics are extracted, and the sliding window method is used to smooth the data and extract trends. The formula is: Get key feature data F key , where w is the size of the sliding window, is the cleaned data at the jth time point, max means taking the maximum value, n is the total number of data points, and i is the starting index of the sliding window.

3. The ocean water velocity and flow monitoring system based on wave radar technology according to claim 1 is characterized in that: The conversion steps of the flow rate and flow index are specifically as follows: Based on the key flow rate and flow characteristics, the flow rate and flow rate are calculated using the formula: Get the quantified flow rate V quant and flow rate Q quant , where a e 、b e 、c e and d e is a parameter in the conversion process, used to adjust the conversion response, F key It is the key feature data; Verify the quantified flow rate and flow rate and calculate the difference with the current measured value using the formula: and Generate verified flow rate and flow, where Error V and Error Q is the calculation error of velocity and flow rate, V quant and Q quant is the quantified velocity and flow rate, V measurcd and Q measurcd is the current measured flow rate and flow rate, n is the number of samples; Using the verified flow rate and flow rate, the data analysis log is collated, including evaluating key data and performance, to obtain a time series feature set.

4. The ocean water velocity and flow monitoring system based on wave radar technology according to claim 1 is characterized in that: The identification steps of the periodic and nonlinear fluctuations are specifically as follows: Based on the time series feature set, Fourier transform is performed to extract the frequency components of the data using the formula: F(f)=∫x(t)e -i2πft dt Get the initial frequency domain data F(f), where ∫ is the frequency variable, x(t) is the original time series data, and e -i2πft is the integral kernel in Fourier transform, i is the imaginary unit, and dt is the differential element in time domain integration; Apply a filter to filter the initial frequency domain data using the formula: F selected (f)=F(f)·(a u sin(f)+b u cos(f)+c u ) Get the filtered frequency domain data F selected (f), where F(f) is the initial frequency domain data, a u 、b u and c u are parameters for adjusting the frequency screening strength and range, sin(f) and cos(f) are sine and cosine functions; Based on the filtered frequency domain data, an inverse Fourier transform is performed to reconstruct the time domain signal and identify periodic and nonlinear fluctuations using the formula: X reconstructed (t)=∫F selected (f)e i2πft df Get the reconstructed time series data x reconstructed (t), where F selected (f) is the frequency domain data after filtering, e i2 πft is the complex exponential function in the inverse Fourier transform, and df is the differential element in the frequency domain integral.

5. The ocean water velocity and flow monitoring system based on wave radar technology according to claim 1 is characterized in that: The steps for obtaining the trend feature prediction information are specifically as follows: Based on the key trend change points, the differential method and smoothing technology are used to determine the key change moments, using the formula: Get the trend change analysis results T change , where x reconstructed (t) is the reconstructed time series data, α y and β y is a coefficient used to adjust the effect of differencing and smoothing, Indicates time differentiation of reconstructed time series data; Based on the trend change analysis results, the long short-term memory network is used to train the trend prediction model using the formula: M LSTM =LSTM train (T change ,γ,δ) Get the trained LSTM model M LSTM , where γ is the learning rate parameter, δ is the regularization parameter, and T change It is the result of trend change analysis; Based on the trained LSTM model, the future time period is predicted using the formula: P future =LSTM -predict (M LSTM ,∈) Get trend feature prediction information P future , where M LSTM is the trained LSTM model, and ∈ is a parameter that affects the prediction sensitivity.

6. The ocean water velocity and flow monitoring system based on wave radar technology according to claim 1 is characterized in that: The step of comparing the current observed data with the predicted data is specifically as follows: Based on the trend feature prediction information, current observation data and prediction data are collected, and data integration is performed through linear weighting method, using the formula: D integrated =w1×D obs +w2×D pred Generate a weighted integrated dataset D integrated , where D obs is the current data, D pred is the predicted data, w1 and W2 are the weighted coefficients of the data type; The weighted integrated data set is analyzed to identify the differences between the data using the formula: ΔD=|D obs -D pred |×w3 Generates the difference between the observed data and the predicted data, ΔD, where D obs is the current data, D pred is the predicted data, and W3 is the difference magnification coefficient.

7. The ocean water velocity and flow monitoring system based on wave radar technology according to claim 1 is characterized in that: The steps for automatically correcting the identified deviation are specifically: Locate the source of the deviation and determine the key data points that cause the difference, using the formula: S=arg max i |ΔD i | Get the deviation source S, where ΔD is the difference result and arg max is a mathematical operator used to capture the index i of the maximum value; Based on the source of the deviation, the associated data processing parameters are adjusted to optimize the deviation, using the formula: P adjusted =P original +k×ΔD[S] Generate the adjusted processing parameter P adjusted , where P original is the original data processing parameter, k is the adjustment coefficient, ΔD is the difference result, and S is the source of deviation; Based on the adjusted processing parameters, the identified deviations are automatically corrected and the process is recorded, using the formula: R=V original +k×(ΔD) Get the corrected data value R, where V original is the original data value, k is the adjustment coefficient, and ΔD is the difference result.

8. The ocean water velocity and flow monitoring system based on wave radar technology according to claim 1 is characterized in that: The steps for obtaining the update result of the monitoring process are specifically as follows: Based on the deviation adjustment correction record, compare the corrected data with the historical data set to identify key differences, using the formula: Get the mean absolute deviation ZΔ, where H i is a historical data point, C i is the corrected data point, n is the number of samples; To evaluate the accuracy of the calibration data, the mean absolute deviation is compared with the threshold value, and the judgment formula is: Get the accuracy evaluation result Accuracy, where ZΔ is the mean absolute deviation and θ is the threshold; The monitoring process is updated according to the accuracy evaluation result. If the evaluation result is high, a new data processing process is adopted, otherwise the existing process is revised to obtain the monitoring process update result.

9. A method for monitoring the flow rate of ocean water bodies based on wave radar technology, characterized in that: The ocean water velocity and flow monitoring system based on wave radar technology according to any one of claims 1 to 8 comprises the following steps: Based on wave radar equipment, water surface fluctuations are measured, wave height and wave speed are recorded, data and timestamps are integrated, key waveform signals are screened by analyzing intensity and frequency, and waveform signals are analyzed and converted into quantifiable flow velocity and flow indicators to generate time series feature sets; Based on the time series feature set, using a long short-term memory network, identifying periodic and nonlinear fluctuations in the data, identifying key trend change points, and predicting future flow rate and flow changes, generating trend feature prediction information; Based on the trend feature prediction information, the isolation forest algorithm is applied to compare the current observation data with the prediction data, locate the deviation source, adjust the data processing flow in combination with the historical correction record, automatically correct the identified deviation, and generate the deviation adjustment correction record; Analyze the deviation adjustment correction records, compare with historical data, evaluate the accuracy of the corrected data, optimize the monitoring process based on the evaluation results, update the data collection and analysis plan, and generate monitoring process optimization information; According to the monitoring process optimization information, the configuration and operation process of the wave radar equipment are adjusted, the effectiveness of the new monitoring plan is verified, the future data collection and analysis effects are monitored, and the monitoring effect evaluation results are generated.

Citation Information

Cited By

  • Open channel flow velocity monitoring method based on data analysis

    CN119147779A

  • Marine fishery intelligent cost accounting data real-time acquisition method and system

    CN120373649A

  • A method and system for real-time acquisition of intelligent cost accounting data for marine fisheries

    CN120373649B

  • Portable flow measuring device for hydrological survey

    CN120490530A

  • Intelligent gateway communication method, system and equipment for edge computing

    CN121125793A