Device and method for monitoring sedimentation and dislocation of prestressed concrete cylinder pipe based on multi-source data fusion
Through the multi-source data fusion monitoring method, using static levels and displacement meters, combined with data fusion algorithms and sensor protection devices, the problem of monitoring settlement misalignment of prestressed steel cylinder concrete pipe joints has been solved, and accurate identification of settlement misalignment has been achieved. and safety monitoring, improving the reliability of pipeline operations.
Patent Information
- Application Number
- CN202410944660.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-15
- Publication Date
- 2024-10-15
- Estimated Expiration
- 2044-07-15
AI Technical Summary
Existing technology makes it difficult to effectively monitor and evaluate the relative settlement dislocation of prestressed steel cylinder concrete pipe joints, making it difficult to detect potential leakage and damage in time, which may lead to major accidents.
Using a multi-source data fusion monitoring method, a static level and a displacement meter are installed in the middle section of the pipeline, and a data fusion algorithm is used, combined with sensor protection parts and flexible protection devices, to monitor the settlement misalignment of pipeline joints in real time.
It achieves accurate identification of settlement misalignment of pipeline joints, improves the monitoring ability of safe pipeline operation, ensures that the sensor works normally within the specified period, and simplifies the production process to adapt to uneven settlement and deformation of the foundation.
Smart Images

Figure CN118776522A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a device and a monitoring method for monitoring the settlement and displacement of a prestressed steel cylinder concrete pipe based on multi-source data fusion, and belongs to the field of pipeline monitoring. Background Art
[0002] Prestressed concrete cylinder pipe (PCCP) is a composite multi-purpose pipe that has been widely used in the construction of various long-distance water diversion projects. Traditional PCCP structures can be divided into lined and buried types. The lined PCCP consists of a steel cylinder and a concrete lining to form the pipe core, and a circumferential prestressed steel wire is wound around the outside of the steel cylinder, and then a cement mortar protective layer is made. The buried PCCP consists of a steel cylinder and concrete layers on both sides of the steel cylinder to form the pipe core, and a prestressed steel wire is wound around the outside of the core concrete, and then a cement mortar protective layer is made. The prestressed steel wire can generate a uniform initial prestress on the concrete of the pipe core, so that the pipe can resist the tensile stress generated by the internal water pressure. Adjacent PCCP pipes are spliced by socket joints, and the joints are backfilled and grouted with flexible mortar. Therefore, the PCCP pipe joint has a certain degree of flexibility and can adapt to a certain degree of uneven settlement and deformation of the foundation.
[0003] Relevant research shows that under the action of vertical load, the damage process of the socket-type water supply pipe joint is generally manifested as follows: the pipe joint first produces a certain vertical deformation and bending angle under the action of vertical load. If the joint sealing ring cannot meet the requirements of vertical deformation and bending angle, the pipe joint will leak. As the vertical deformation continues to increase, the leakage of the pipe joint will turn into leakage. If the pipeline leakage is not detected in time, the leaked water will continuously flush the soil under the pipe, causing a cavity to form under the pipe. At this time, the pipe and its joint part will become a simply supported beam, causing damage to the joint, and even leading to major accidents such as pipe burst and ground collapse.
[0004] To ensure the safe operation of PCCP pipelines and to grasp the relative settlement and displacement values of pipeline joints in real time, it is of great significance for the real-time diagnosis and evaluation of the health status of PCCP pipeline structures. Therefore, it is urgent to consider optimizing the design of traditional PCCP structures so that they have the superior performance of identifying the relative settlement and displacement of pipeline joints. Summary of the invention
[0005] Purpose of the invention: In order to overcome the shortcomings of the prior art, the present invention provides a device and a method for monitoring the settlement and displacement of prestressed steel cylinder concrete pipes based on multi-source data fusion. By making full use of the static level in the middle of the pipe section and the displacement meter data of the pipe joint, the relative settlement and displacement value of the pipe is judged based on the data fusion algorithm. The data considered in the solution process of this method is more comprehensive, and the calculation results are more reasonable.
[0006] Technical solution: To solve the above technical problems, the device for monitoring the settlement and displacement of prestressed steel cylinder concrete pipe based on multi-source data fusion of the present invention comprises a static level installed on the upper side of the pipe top of the middle section of the pipe and a displacement meter arranged on the pipe socket section. A protective member is arranged on the static level, and the protective member comprises an upper protective cover, a central pressure rod, four springs, a lower protective box and a pressure plate. The static level is installed in the lower protective box, and the lower protective box is fixedly installed on the concrete pipe. On the tube, a through hole is provided on the top of the lower protection box, a pressure plate is installed on the upper surface of the static level, the central pressure rod passes through the top through hole of the lower protection box and is connected with the pressure plate, an upper protection cover is fixedly installed above the lower protection box, four springs are located in the upper protection cover, and the central pressure rod is pressed by the tension of the four springs to make the pressure plate close to the static level; the displacement meter is fixed in the displacement meter fixture at the socket end, and the displacement meter fixture includes a first clamping block, a second clamping block, a base, a connecting shaft and bolts. The base is reserved with bolt holes for connecting with bolt connectors embedded in the concrete of the pipe core, and is connected with the first clamping block and the second clamping block through a rotating shaft. The first clamping block and the second clamping block are used to clamp the displacement meter, and the other end of the displacement meter contacts the L-shaped baffle, which is installed on the socket end; the displacement meter fixing part and the outer side of the L-shaped baffle need to be installed with a displacement meter flexible protection device, which includes a first inner protective layer, a second inner protective layer, an outer protective shell, a first connecting spring, a second connecting spring and a third connecting spring. The first inner protective layer and the second inner protective layer are respectively fixedly installed on the socket end and the plug end of the pipe, and an outer protective shell is arranged outside the first inner protective layer and the second inner protective layer. The first connecting spring and the second connecting spring are respectively arranged between the outer protective shell and the first inner protective layer and the second inner protective layer. The first inner protective layer and the second inner protective layer are connected by the third connecting spring, and bolt holes for connecting with the concrete of the pipe core are arranged below the first inner protective layer and the second inner protective layer.
[0007] Preferably, seven displacement gauges are arranged at the spigot section of pipes with a diameter of 3m or more, five displacement gauges are arranged at the spigot section of pipes with a diameter of 2-3m, and four displacement gauges are arranged at the spigot section of pipes with a diameter of less than 2m. At least two displacement gauges are arranged at the bottom of the pipe, and they cannot be arranged at the bottom of the pipe. High-precision static level is arranged at the top of the pipe in the middle section of the pipe, usually one is arranged for each section of the pipe. High-precision displacement gauges are arranged at the spigot section of the pipe.
[0008] Preferably, the prestressed steel cylinder concrete pipe is prepared by the following steps:
[0009] S1. Make a socket steel ring, a spigot steel ring and a steel cylinder for connecting pipe joints, and weld the socket steel ring and the spigot steel ring to both ends of the steel cylinder;
[0010] S2. Make bolt connectors, static level protection parts, displacement meter fixing parts, displacement meter L-shaped baffles and displacement meter flexible protection devices respectively. These devices should be made of materials with waterproof, moisture-proof and corrosion-resistant functions to ensure that the sensor can work normally within the specified service life;
[0011] S3. Embed the bolted connectors in the designated positions where the static level and displacement meter need to be installed in the formwork, and pour the core concrete;
[0012] S4, placing the cured tube core on a rotating table and winding the prestressed steel wire;
[0013] S5, roller spray mortar protective layer;
[0014] S6, roller sprayed coal tar epoxy anti-corrosion coating.
[0015] A monitoring method for the device for monitoring the settlement and displacement of a prestressed steel cylinder concrete pipe based on multi-source data fusion comprises the following steps:
[0016] (a) Hoist the pipeline to the site for installation and positioning. After installing the static level at the designated position, install the static level protection on the outside of the static level. Fix the static level protection with fixing bolts. Install the L-shaped baffle of the displacement meter and the displacement meter fixing parts on the pipe socket and spigot ends respectively. After the installation is completed, fix the displacement meter in the displacement meter fixing parts and tighten the bolts. Then install the displacement meter flexible protection device.
[0017] (b) Decomposing the actual joint settlement displacement into four displacement components: horizontal deflection θ, vertical deflection φ, axial translation Δz and vertical translation Δy;
[0018] (c) Based on the positions and numbers of the static level and displacement gauges, and using relevant theories such as rigid body displacement, derive the changes in the static level and displacement gauge readings caused by the four displacement components acting alone;
[0019] (d) Considering the combined effect of the four displacement components, the theoretical reading of each sensor location is calculated based on the superposition principle, and the following mathematical model is established to solve the relative settlement displacement value of the pipeline:
[0020]
[0021] In the formula, is the theoretical value of the sensor reading at this location, M i is the actual monitoring value, n is the number of sensors. In actual monitoring, there is often a certain deviation between the theoretical value and the monitoring value of the sensor reading. Here, the influence of all sensors is comprehensively considered, and the above optimization model is established to solve the settlement displacement value that satisfies the minimum deviation between the theoretical value and the monitoring value of all sensors, and the corresponding horizontal deflection θ and vertical deflection θ are obtained. And the axial translation Δz and vertical translation Δy values, according to θ, Compare the Δz and Δy values with the thresholds in the manual to determine whether the settlement of the prestressed steel cylinder concrete pipe is safe.
[0022] Beneficial effects: Compared with the prior art, the present invention has the following advantages:
[0023] (1) The present invention provides a new type of PCCP pipe for monitoring settlement and displacement based on multi-source data fusion and a manufacturing method thereof. By designing corresponding sensor protection parts and fixing parts, sensors such as static level and displacement meter are fixed and protected. Compared with the method of directly sticking sensors on the outer wall of the pipe, this method is more firm and reliable. In addition, the external sensor protection parts, fixing parts, etc. are made of materials with waterproof, moisture-proof, and corrosion-resistant functions, which can maximize the guarantee of normal operation of the sensors within the specified service life.
[0024] (2) The present invention provides a new type of PCCP pipe for monitoring settlement and displacement based on multi-source data fusion and a manufacturing method thereof. The process is simple and only requires adding corresponding sensor protection parts and fixing parts production and installation steps to the traditional PCCP structure production line, which does not cause much impact on the existing PCCP production line.
[0025] (3) The present invention provides a new type of PCCP pipe for monitoring settlement and displacement based on multi-source data fusion and a manufacturing method thereof. A flexible protective device is used for the displacement meter arranged at the pipe joint. Compared with the traditional rigid protective device, the flexible protective device can not only prevent the displacement meter reading from being disturbed by the external soil, but also ensure that the pipe joint retains the original joint characteristics after the displacement meter is installed, and can freely adapt to the uneven settlement and deformation of the foundation.
[0026] (4) The present invention provides a new type of PCCP pipe and its manufacturing method for monitoring settlement and displacement based on multi-source data fusion. By making full use of the static level in the middle of the pipeline section and the displacement meter data of the pipeline joint, the relative settlement and displacement value of the pipeline is judged based on the data fusion algorithm, and the calculation result is more reasonable. BRIEF DESCRIPTION OF THE DRAWINGS
[0027] Figure 1 This is the production flow chart of a new type of prestressed steel cylinder concrete pipe for monitoring settlement and dislocation based on multi-source data fusion.
[0028] Figure 2 This is a schematic diagram of the structure after pouring the core concrete.
[0029] Figure 3 Schematic diagram of winding prestressed steel wire.
[0030] Figure 4 This is a schematic diagram of the structure of the static level protective parts.
[0031] Figure 5 It is a cross-sectional view of the static level and its protective parts along the axial direction of the pipeline.
[0032] Figure 6 It is a schematic diagram of the structure of the displacement meter fixing parts and the L-shaped baffle of the displacement meter.
[0033] Figure 7 This is a schematic diagram of the structure of the flexible protective device of the displacement meter.
[0034] Figure 8 This is a cross-sectional view of the displacement meter's flexible protective device along the pipeline axis.
[0035] Fig. 9 The figure is a schematic diagram of the sensor arrangement position according to the first embodiment of the present invention.
[0036] Fig.10 Schematic diagram of relative horizontal deflection θ of a pipeline alone.
[0037] Fig.11 Schematic diagram of relative vertical deflection φ of a pipeline alone.
[0038] Fig.12 Schematic diagram of the relative axial translation Δz of the pipeline alone.
[0039] Fig.13 Schematic diagram of the relative axial translation Δy occurring in the pipeline alone.
[0040] In the figure: a socket steel ring 1; a pipe core concrete 2; a bolt connector 3 embedded in the pipe core concrete; a prestressed steel wire 4; a stress generating device 5; an upper protective cover and a central pressure rod 6; four springs 7; a lower protective box 8; a pressure plate 9; a pre-tightening bolt 10; a mortar protective layer 11; a steel cylinder 12; a first clamping block 13; a second clamping block 14; bolts 15 and 16; a base 17; a connecting shaft 20; an outer protective shell 21, a first connecting spring 22; a second connecting spring 23; a third connecting spring 24; a second inner protective layer 25; a socket steel ring 26; and a rubber sealing ring 27. DETAILED DESCRIPTION
[0041] The present invention will be further described below in conjunction with the accompanying drawings.
[0042] like Figures 1 to 13 As shown, this embodiment provides a method for manufacturing a new PCCP pipe with a pre-buried static level and displacement meter with a pipeline length of 5m and a pipeline settlement and displacement monitoring process based on multi-source data fusion. The construction steps of the new PCCP pipe based on multi-source data fusion monitoring settlement and displacement corresponding to this embodiment are as follows: Figure 1 As shown, it specifically includes the following steps:
[0043] Step (1): Make a socket steel ring and a spigot steel ring for connecting pipe joints. At the same time, make a steel cylinder, roll the steel strip into a 1.5 mm strip, and weld the joints of the steel plates. Then weld the socket steel ring and the spigot steel ring to the two ends of the steel cylinder respectively.
[0044] Step (2): respectively manufacture bolt connectors, static level instrument protection components, displacement meter fixing components, displacement meter L-shaped baffles, and displacement meter flexible protection devices.
[0045] Step (3): pouring the core concrete, such as Figure 2As shown. 1 is the pipe socket steel ring, 2 is the pipe core concrete, and 3 is the bolt connector pre-buried in the pipe core concrete. The pipe core concrete is cast by vertical vibration method. Before casting, the anchor device and bolt connector for tensioning prestressed steel wire are buried on the outside of the pipe core concrete. The steel cylinder welded with the socket steel ring and the socket steel ring is hoisted into the inner mold for pipe core casting for accurate positioning. The socket ring should match the working surface of the bottom mold. Strictly mix the concrete according to the C55 model concrete batching sheet, and pour the concrete along the inner and outer walls of the steel mold so that the steel cylinder is embedded in the concrete. Start the vibrator while casting to ensure that the concrete is poured densely. The inner diameter of the concrete pipe core is 1800mm, the outer diameter of the steel cylinder is 1923mm, and the thickness of the pipe core is 200mm. After casting, the pipe core concrete is steam cured. When the concrete strength reaches 70% of the design strength, the next step is entered.
[0046] Step (4): Winding the prestressed steel wire. Figure 3 As shown in the figure, the cured pipe core is placed on the prestressed wire winding table. Before the wire winding operation, a layer of cement slurry needs to be sprayed on the surface of the pipe core. The wire winding table base rotates to drive the pipe core at a speed of v 3 Rotating, the stress generating device 5 at a speed v 2 Rotating at speed v 1 Move along the pipe axis direction, control the rotation speed v of the stress generating device 5 2 Less than the rotating table rotation speed v 3 , so that the high-strength steel wire 4 with a diameter of 5mm (elastic modulus 205000MPa, tensile strength 1570MPa) produces a prestress of 1100MPa (70% of the tensile strength of the steel wire), and is wound around the outer side of the pipe core concrete at a pitch of 20mm. During the winding process, care should be taken to avoid the position of the embedded bolt connector, and the stress fluctuation of the steel wire should be monitored throughout the process.
[0047] Step (5): Roller spray mortar protective layer. Prepare mortar according to the M45 mortar strength, and control the total thickness of the mortar net protective layer after roller spraying to be no less than 30 mm.
[0048] Step (6): Roller spraying coal tar epoxy anti-corrosion coating.
[0049] Step (7): Lift the pipeline to the site for installation and positioning. Install the high-precision static level at the specified position and then install the static level protection on the outside of the sensor. The static level protection has the following structure: Figure 4As shown, it is composed of an upper protective cover and a central pressure rod 6, four springs 7, a lower protective box 8 and a pressure plate 9. The static level is installed in the lower protective box 8, and the lower protective box 8 is reserved with four bolt holes for connecting with the pipe core concrete bolt connector. The four springs 7 are used to connect the lower protective box 8 with the upper protective cover and the central pressure rod 6, and the upper protective cover is used to protect the four springs 7. The pressure plate 9 is connected to the central pressure rod and is close to the static level. The strong spring of this structure can apply a pre-tightening force to the static level through the central pressure rod and the pressure plate 9 to ensure that the static level is close to the surface of the pipe wall. Figure 5 This is a cross-sectional view of the static level and its protective parts along the axial direction of the pipeline after installation. In the figure, 10 is a pre-tightening bolt, 11 is a mortar protective layer, and 12 is a steel cylinder.
[0050] Step (8): Install the displacement meter L-shaped baffle and displacement meter fixing parts on the pipe socket end and the spigot end respectively, such as Figure 6 As shown in the figure, 18 is an L-shaped baffle of the displacement meter, 19 is a displacement meter, and the remaining structures are displacement meter fixing parts. The displacement meter fixing parts are composed of two clamping blocks 13 and 14, a base 17, a connecting shaft 20, and bolts 15 and 16. The two clamping blocks 13 and 14 are connected to the base 17 through the connecting shaft 20, and the clamping blocks can rotate along the shaft 20. After the displacement meter is installed and positioned, the two clamping blocks are closed, and then the bolts 15 and 16 are tightened. The bases of the L-shaped baffle and the displacement meter fixing parts are reserved with bolt holes for connecting with the bolt connectors buried in the pipe core concrete.
[0051] Step (9): Install the displacement meter flexible protection device on the outer side of the displacement meter L-shaped baffle and the displacement meter fixing part. Figure 7 As shown, the device mainly consists of an outer protective shell 21, a first inner protective layer and a second inner protective layer 25, a first connecting spring 23, a second connecting spring 24 and a third connecting spring 22. The displacement meter L-shaped baffle and the displacement meter fixing parts are installed in the first inner protective layer and the second inner protective layer 25. The left and right sides of the first inner protective layer and the second inner protective layer 25 are respectively installed at the socket end and the plug end, and are connected by the third connecting spring 22, and the base is reserved with holes for bolt connection with bolt connectors. The first inner protective layer and the second inner protective layer 25 are connected to the outer protective shell 21 through the first connecting spring 23 and the second connecting spring 24, and the part of the outer protective shell 21 that contacts the outer side of the pipe wall is not connected or bonded and can move freely. Figure 8 It is a cross-sectional view of the displacement meter and its flexible protective device along the axial direction of the pipeline after installation. In the figure, 26 is the socket steel ring matched with the socket steel ring 1, and 27 is the rubber sealing ring.
[0052] Step (10): Connect the static level and displacement meter to the data acquisition instrument respectively to carry out real-time monitoring of pipeline settlement and displacement.
[0053] Example 1 Data collection and pipeline settlement and displacement discrimination test:
[0054] In order to verify the effectiveness of the present invention for monitoring the relative settlement and displacement of pipelines, two new PCCP pipelines manufactured by the method described in Example 1 were used to carry out the relative settlement and displacement monitoring test of pipelines. The two pipelines were connected by the head and tail sockets. The inner diameter of the pipeline is 1.8m and the axial length is 5m. A high-precision static level is used with a measuring range of ±5mm, an accuracy of 0.01mm / m, and an operating temperature of -20℃~+50℃; a high-precision linear displacement sensor is selected with a measuring range of 0~500mm, an accuracy of 0.05% of the full range, and an operating temperature of -40℃~+125℃.
[0055] The relative positions of the sensors are as follows: Fig. 9 As shown. Among them, the static level is arranged at the top of the pipe in the middle section of the pipeline, and the displacement meter is arranged at the pipe socket section. Consider arranging 4 displacement meters. Sensor ① in the figure is a static level, and the remaining sensors ②, ③, ④, and ⑤ are all displacement meters. A method for monitoring the settlement and dislocation of PCCP pipe joints based on multi-source data fusion includes the following steps:
[0056] (a) The actual joint settlement displacement is decomposed into four displacement components: horizontal deflection θ, vertical deflection φ, axial translation Δz and vertical translation Δy.
[0057] (b) Based on the location and number of the static level and displacement meter, and using relevant theories such as rigid body displacement, the change values of the static level and displacement meter readings caused by the four displacement components acting alone are derived. Fig.10 , Fig.11 , Fig.12 and Fig.13 They are schematic diagrams of relative horizontal deflection θ, vertical deflection φ, axial translation Δz and vertical translation Δy of the pipeline. Based on the relevant theories such as rigid body displacement, the change value of the sensor reading caused by each displacement component alone can be derived, as shown in Table 1. In the table, R represents the pipeline radius and L represents the pipeline length.
[0058] Table 1 Sensor readings considering displacement component alone
[0059]
[0060] (c) Considering the combined effect of the four displacement components, the theoretical reading of each sensor location is calculated based on the superposition principle. For example, for sensor No. ②, the theoretical reading value under the combined effect of the four displacement components is: The hydraulic loading device was used to apply simulated pipeline settlement displacement, and the specific values of the five sensors were recorded simultaneously, as shown in Table 2:
[0061] Table 2 Sensor readings after settlement and displacement (unit: mm)
[0062] Sensor ① Sensor No. ② Sensor ③ Sensor No. ④ Sensor No. ⑤ 75.32 7.45 -30.41 -5.04 32.73
[0063] (d) Consider establishing the following mathematical model to solve the relative settlement displacement value of the pipeline:
[0064]
[0065] In the formula, is the theoretical value of the sensor reading at this location, M i is the actual monitoring value, and n is the number of sensors. In actual monitoring, there is often a certain deviation between the theoretical value and the monitoring value of the sensor reading. Here, the influence of all sensors is comprehensively considered, the above optimization model is established, and the genetic algorithm is used to solve the settlement displacement value that satisfies the minimum deviation between the theoretical value and the monitoring value of all sensors.
[0066] For example: for sensor ①,
[0067] For sensor No. ②,
[0068] For sensor ③,
[0069] For sensor ④,
[0070] For sensor ⑤,
[0071] The above five expressions all contain four displacement components. The mathematical model in formula (1) is input into the function in the MATLAB genetic algorithm toolbox, and the four displacement components are obtained: horizontal deflection θ = -0.05, vertical deflection The axial translation Δz=1.15mm, the vertical translation Δy=0.47mm. The result obtained is substituted into formula (1) again to calculate the deviation between the theoretical value and the monitoring value of all sensors. The deviation calculation result is 25.01mm. The pipe diameter provided in this embodiment is 1800mm and the pipe length is 5000mm. It can be seen that the deviation value of the settlement and displacement is much smaller than the actual size of the pipe structure. Therefore, the pipeline settlement and displacement monitoring based on multi-source data fusion proposed in the present invention has a good effect.
[0072] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principle of the present invention. These improvements and modifications should also be regarded as the scope of protection of the present invention.
Claims
1. A device for monitoring the settlement and displacement of prestressed concrete cylinder pipes based on multi-source data fusion, characterized in that: The utility model comprises a static level installed on the upper side of the pipe top of the middle section of the pipeline and a displacement meter arranged on the pipe socket section, wherein a protective part is arranged on the static level, and the protective part comprises an upper protective cover, a central pressure rod, four springs, a lower protective box and a pressure plate, the static level is installed in the lower protective box, and the lower protective box is fixedly installed on the concrete pipe, a through hole is provided on the top of the lower protective box, a pressure plate is installed on the upper surface of the static level, the central pressure rod passes through the top through hole of the lower protective box and is connected with the pressure plate, an upper protective cover is fixedly installed above the lower protective box, four springs are located in the upper protective cover, and the central pressure rod is pressed by the tension of the four springs to make the pressure plate close to the static level; the displacement meter is fixed in the displacement meter fixing part at the socket end, and the displacement meter fixing part comprises a first clamping block, a second clamping block, a base, a connecting shaft and bolts, and the base is reserved with bolt holes for connecting with bolt connectors buried in the concrete of the pipe core, and the bottom The seat is connected to the first clamping block and the second clamping block through a rotating shaft. The first clamping block and the second clamping block are used to clamp one end of the displacement meter. The other end of the displacement meter is fixedly connected to the L-shaped baffle, and the L-shaped baffle is installed on the socket end; a flexible protective device for the displacement meter is installed outside the displacement meter fixing part and the L-shaped baffle. The flexible protective device for the displacement meter comprises a first inner protective layer, a second inner protective layer, an outer protective shell, a first connecting spring, a second connecting spring and a third connecting spring. The first inner protective layer and the second inner protective layer are respectively fixedly installed on the socket end and the plug end of the pipeline. An outer protective shell is arranged outside the first inner protective layer and the second inner protective layer. A first connecting spring and a second connecting spring are respectively arranged between the outer protective shell and the first inner protective layer and the second inner protective layer. The first inner protective layer and the second inner protective layer are connected by the third connecting spring. Bolt holes for connecting to the pipe core concrete are arranged below the first inner protective layer and the second inner protective layer.
2. The device for monitoring the settlement and displacement of prestressed concrete cylinder pipes based on multi-source data fusion according to claim 1 is characterized in that: For pipes with a diameter of 3m or more, seven displacement gauges are arranged on the bell section; for pipes with a diameter of 2-3m, five displacement gauges are arranged on the bell section; for pipes with a diameter of less than 2m, four displacement gauges are arranged on the bell section. At least two displacement gauges are arranged on the lower side of the pipe and cannot be arranged at the bottom of the pipe.
3. The device for monitoring the settlement and displacement of prestressed steel cylinder concrete pipes based on multi-source data fusion according to claim 1 is characterized in that: The static level is arranged on the upper side of the pipe top of the middle section of the pipeline.
4. The device for monitoring the settlement and displacement of prestressed steel cylinder concrete pipes based on multi-source data fusion according to claim 1 is characterized in that: The prestressed steel cylinder concrete pipe is prepared by the following steps: S1. Make a socket steel ring, a spigot steel ring and a steel cylinder for connecting pipe joints, and weld the socket steel ring and the spigot steel ring to both ends of the steel cylinder; S2. Make bolt connectors, static level protection parts, displacement meter fixing parts, displacement meter L-shaped baffles and displacement meter flexible protection devices respectively. These devices should be made of materials with waterproof, moisture-proof and corrosion-resistant functions to ensure that the sensor can work normally within the specified service life; S3. Embed the bolted connectors in the designated positions where the static level and displacement meter need to be installed in the formwork, and pour the core concrete; S4, placing the cured tube core on a rotating table and winding the prestressed steel wire; S5, roller spray mortar protective layer; S6, roller sprayed coal tar epoxy anti-corrosion coating.
5. A monitoring method for a device for monitoring the settlement and displacement of a prestressed steel cylinder concrete pipe based on multi-source data fusion according to any one of claims 1 to 4, characterized in that: The following steps are involved: (a) Hoist the pipeline to the site for installation and positioning. After installing the static level at the designated position, install the static level protection on the outside of the static level. Fix the static level protection with fixing bolts. Install the L-shaped baffle of the displacement meter and the displacement meter fixing parts on the pipe socket and spigot ends respectively. After the installation is completed, fix the displacement meter in the displacement meter fixing parts and tighten the bolts. Then install the displacement meter flexible protection device. (b) Decomposing the actual joint settlement displacement into four displacement components: horizontal deflection θ, vertical deflection φ, axial translation Δz and vertical translation Δy; (c) Based on the positions and numbers of the static level and displacement gauges, and using the rigid body displacement correlation theory, derive the change values of the static level and displacement gauge readings caused by the four displacement components acting alone; (d) Considering the combined effect of the four displacement components, the theoretical reading of each sensor location is calculated based on the superposition principle, and the following mathematical model is established to solve the relative settlement displacement value of the pipeline: In the formula, is the theoretical value of the sensor reading at this location, T iθ is the theoretical reading of the ith sensor when a relative horizontal deflection θ occurs alone, For relative vertical deflection alone The theoretical reading of the ith sensor at time T iΔz is the theoretical reading of the ith sensor when a relative axial translation Δz occurs alone, T iΔy is the theoretical reading of the ith sensor when a relative vertical translation Δy occurs alone, M i is the actual monitoring value, which is the reading of the static level and displacement meter, and n is the total number of displacement meters and static levels. The settlement displacement value that satisfies the minimum deviation between the theoretical value and the monitoring value of all sensors is solved, and the corresponding horizontal deflection θ and vertical deflection are obtained. And the axial translation Δz and vertical translation Δy values, according to θ, Compare the Δz and Δy values with the thresholds in the manual to determine whether the settlement of the prestressed steel cylinder concrete pipe is safe.
Citation Information
Patent Citations
Automatic monitoring system of horizontal displacement deformation of shield tunnel duct piece and monitoring method thereof
CN110779482A
Tunnel convergence settlement monitoring system
CN110926409A
Shield tunnel structure monitoring system and method based on array grating
CN114894102A
Measuring device for determining a change in path and / or angle between the measuring device and an opposing position element and measuring method
DE102018222569A1