Shield tunnel floating model test device and test method

By designing a shield tunnel buoyancy model test device and using a grouting device and a displacement sensor to measure tunnel deformation, the problem in the existing technology that it is difficult to test the effect of slurry on tunnel buoyancy has been solved, and the tunnel buoyancy force, containment force and grouting pressure have been measured. Accurate simulation and measurement improve the efficiency and accuracy of the test.

CN118776941APending Publication Date: 2024-10-15NINGBO UNIV +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410816975.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-24
Publication Date
2024-10-15

AI Technical Summary

Technical Problem

At present, there is a lack of test equipment that can effectively test the impact of shield tunnel slurry on tunnel buoyancy, and it is difficult to meet the needs for research on the complex effects of tunnel buoyancy, containment force, slurry solidification and grouting pressure in model tests.

Method used

A shield tunnel floating model test device is designed, including a grouting device, a model test stand and a testing device. The model tunnel is grouted through the grouting head, and the vertical and lateral displacement and convergence of the tunnel are measured using displacement sensors. Combined with Static and dynamic buoyancy test methods simulate actual working conditions to study the effects of slurry ratio and grouting pressure on tunnel buoyancy.

Benefits of technology

The device can accurately reflect the floating conditions of the tunnel under the action of slurry, including vertical and lateral deformation, which improves the reference value of test data and experimental efficiency. It can conduct tests on multiple slurry ratios in a short period of time to simulate actual working conditions. The accuracy and reliability of the test are enhanced.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118776941A_ABST
    Figure CN118776941A_ABST
Patent Text Reader

Abstract

The invention relates to a shield tunnel floating model test device and method, a model test rack comprises a test base, a base support and a test sleeve, the test sleeve comprises an upper test sleeve and a lower test sleeve, and the upper test sleeve and the lower test sleeve are vertically spliced and connected and sleeve the outer side of a model tunnel; a grouting hole and an air outlet hole are formed in the top of the upper test sleeve; grouting heads are arranged at the front ends of the upper test sleeve and the lower test sleeve; and the grouting device is used for grouting a gap between the test sleeve and the model tunnel through the grouting heads. The device has the advantages that the sensor suite is arranged in the middle of the reference rod, four displacement sensors which are orthogonal in the direction are installed in a plane, it is guaranteed that displacement data measured by the sensors are deformation of the same section in the tunnel, and probes at the top ends of the sensors abut against the inner wall of the model tunnel and stretch out and draw back along with movement of the inner wall of the model tunnel; and further obtaining data of vertical displacement, transverse displacement, vertical convergence and transverse convergence of the model tunnel.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the field of geotechnical engineering testing, and in particular relates to a shield tunnel floating model test device and a test method. Background Art

[0002] Urban tunnel construction mainly relies on the shield method. The shield method is a construction process that mainly relies on shield machines as construction machinery. During construction, the cutter head of the shield machine excavates the soil in front of the face. After the excavation is completed, the tunnel segments are assembled under the protection of the shield shell. Since the diameter of the shield machine shell is larger than the outer diameter of the tunnel, when the tunnel segments are out of the shield tail, a large gap will appear between the surrounding rock and the tunnel. This gap is called the shield tail gap. The shield tail gap will cause stratum loss and cause more serious disturbance of the surrounding strata, so the gap needs to be filled in time. A grouting pipe is set at the tail of the shield machine. When the tunnel segments begin to come out of the shield tail, the grouting pipe begins to spray slurry. This process is called synchronous grouting.

[0003] When the slurry sprayed from the shield tail wraps around the tunnel segments, the segments will be lifted up significantly due to the buoyancy of the slurry. Excessive segment lifting will cause segment cracking, misalignment, and tunnel axis deviation, so it is particularly important to control the buoyancy of the tunnel segments.

[0004] The factors that affect the buoyancy of tunnel segments mainly include the deadweight of the segments, the inter-ring shear force of the tunnel segments, the static buoyancy of the slurry, the dynamic buoyancy of the slurry and the viscous resistance of the slurry. Among the above factors, the deadweight of the segments and the inter-ring shear force of the tunnel segments cannot be adjusted. Only the buoyancy and viscous resistance of the slurry can be controlled by adjusting the slurry ratio and the grouting pressure. Since the slurry will gradually solidify over time, the static buoyancy and viscous resistance of the slurry will change over time. The earlier the slurry solidifies, the less time the tunnel will be affected by the static buoyancy. The greater the viscous resistance of the slurry, the smaller the rate of tunnel buoyancy. Therefore, the solidification time and viscous resistance of the slurry directly determine the final buoyancy of the tunnel. However, if the slurry solidifies too quickly, it will affect the grouting effect and even block the grouting pipe of the shield machine. In addition, the fluidity of the slurry is also an important factor affecting the grouting effect, so a suitable slurry ratio must be selected.

[0005] The dynamic buoyancy of the slurry is related to the grouting pressure of the slurry and the arrangement of the grouting points. The greater the grouting pressure, the greater the dynamic buoyancy. If the grouting pressure is insufficient, it will affect the filling effect of the shield tail gap. The selection of grouting points and the grouting sequence also have a great influence on the dynamic buoyancy.

[0006] In summary, the influence of slurry ratio and grouting pressure on tunnel buoyancy is multifaceted, and the mechanism of action is very complex. It is difficult to study the influence of slurry ratio and grouting pressure on tunnel buoyancy through theoretical calculation. Model test as a research method is very suitable for studying complex problems. It is very effective to study the influence of slurry ratio and grouting pressure on tunnel buoyancy through model test. Combined with actual tunnel construction, the following series of problems need to be solved in the model test to study the influence of slurry on tunnel buoyancy:

[0007] 1. The newly joined tunnel segments are subject not only to their own gravity and the buoyancy of the slurry, but also to the restraining force of the previously joined tunnel segments. The restraining force of the adjacent segments constrains the buoyancy of the tunnel.

[0008] 2. After the segment comes out of the shield tail, it will not directly contact the surrounding soil, but will be completely wrapped by the slurry. Compared with the buoyancy of the slurry, the force of the surrounding soil on the segment can be ignored, so in the model test, the segment needs to be completely placed in the slurry environment.

[0009] 3. The slurry contains a curing agent, which will gradually solidify the slurry. After solidification, the slurry will no longer make the tunnel float up, but will press the tunnel downward under the action of its own weight. The shield tail gap in an actual tunnel project is very small compared to the tunnel diameter, and the slurry's own weight is also very small compared to the tunnel's own weight. Therefore, the volume of the slurry environment needs to be strictly limited in the model test, otherwise the slurry's own weight will seriously affect the test results.

[0010] 4. The synchronous grouting of the shield tail has a certain pressure, which will produce dynamic buoyancy on the tunnel, so the pressure grouting needs to be simulated during the model test.

[0011] 5. The shield tail of the shield machine is generally equipped with 6 grouting holes. The model test needs to adjust the grouting order and grouting pressure of the grouting holes according to the actual situation.

[0012] 6. The segments are assembled piece by piece. Tunnel deformation is mainly caused by the misalignment between the segments. When the tunnel is subjected to the buoyancy of the slurry, the buoyancy causes the segments to be misaligned with each other, which in turn causes the tunnel to float. The misalignment between the segments should be reflected in the model test.

[0013] 7. Under the action of the buoyancy of the slurry, the tunnel will not only rise, but also converge vertically and horizontally. Therefore, the deformation test of the tunnel should include four directions: up, down, left and right, and the sensors for testing these four directions should be in the same plane.

[0014] However, at present, there is a lack of test equipment that can meet the above requirements and effectively test the impact of slurry on tunnel buoyancy. Therefore, it is necessary to develop a set of shield tunnel buoyancy model test equipment and test methods. Summary of the invention

[0015] The purpose of the present invention is to overcome the deficiencies in the prior art and to provide a shield tunnel floating model test device and a test method.

[0016] The shield tunnel floating model test device comprises: a grouting device, a model test frame, a model tunnel and a test device. The model test frame comprises a test base, a base bracket and a test sleeve. The test sleeve comprises a test upper sleeve and a test lower sleeve. The test upper sleeve and the test lower sleeve are spliced ​​and connected up and down and sleeved on the outside of the model tunnel. A grouting hole and an air outlet are provided on the top of the test upper sleeve. Grouting heads are provided at the front ends of the test upper sleeve and the test lower sleeve. The grouting device grouts the gap between the test sleeve and the model tunnel through the grouting heads.

[0017] The testing device includes a data acquisition instrument and a tunnel deformation testing device. The tunnel deformation testing device passes through the model tunnel. Displacement sensors are provided in the middle of the tunnel deformation testing device in four directions facing the inner wall of the model tunnel. The displacement sensors are against the inner wall of the model tunnel and are connected to the data acquisition instrument.

[0018] Preferably, the tunnel deformation testing device includes a reference rod and a sensor kit. The sensor kit is provided with sleeves in six directions. A displacement sensor is inserted into each of the four sleeves of the sensor kit facing the inner wall of the model tunnel. The two sleeves of the sensor kit corresponding to the length direction of the model tunnel are threaded tubes. The two threaded tubes are each connected to a reference rod. The two reference rods are respectively extended to the outside of the front and rear ends of the model tunnel and fixed.

[0019] Preferably, the model tunnel comprises tunnel segments, both ends of the tunnel segments are provided with annular tenons, both sides of the tunnel segments are provided with inter-ring tenons, several tunnel segments are interconnected by the annular tenons to form a segment ring, the segment rings are connected by the inter-ring tenons to form a complete model tunnel, and the inter-ring tenons and annular tenons are provided with inter-ring connecting holes and annular connecting holes for inserting wires.

[0020] Preferably, the test upper sleeve and the test lower sleeve both include a sealing rubber pad and an outer shell. The sealing rubber pad is arranged around the outer shell edge of the test upper sleeve and the test lower sleeve. The outer shell is in the shape of a semicircular arc plate. The front and rear ends of the outer shell are respectively provided with test sleeve side rings. The grouting heads are symmetrically arranged on the test sleeve side rings at the front ends of the test upper sleeve and the test lower sleeve. Two fasteners are respectively provided on both sides of the outer shell perpendicular to the length direction of the model tunnel. The fasteners of the test upper sleeve and the test lower sleeve are connected and fixed by fastening bolts.

[0021] Preferably, a square iron plate is provided on the test base at the front and rear ends of the test sleeve, a magnetic table seat is placed on the square iron plate, a vertical rod is provided on the magnetic table seat, a magnetic table seat connecting hole and a sensor cable threading hole are opened at the end of the reference rod, the vertical rod is passed through the magnetic table seat connecting hole, and a fixing sleeve is respectively installed on the vertical rods above and below the reference rod, the fixing sleeve includes a ring sleeve and a bolt, the ring sleeve is sleeved on the vertical rod, the bolt passes through the ring sleeve through a threaded hole and rests on the vertical rod, the reference rod is clamped between the two fixing sleeves, the reference rod is hollow, and the sensor cable of the displacement sensor passes through the sensor cable threading hole of the reference rod and is connected to the data acquisition instrument.

[0022] Preferably, the grouting device includes an air compressor, a grouting tank and a grouting valve. A sealing cover is provided on the top of the grouting tank, and a grouting port, a grouting tank air inlet pipe and a grouting tank outlet pipe are provided on the sealing cover. The air compressor is connected to the grouting tank air inlet pipe through an air pipe, and the bottom end of the grouting tank outlet pipe extends below the slurry liquid level in the grouting tank. The grouting tank outlet pipe is connected to all grouting heads through a multi-way connector.

[0023] The test method of the shield tunnel floating model test device includes a static buoyancy test method and a dynamic buoyancy test method. The static buoyancy test method includes the following steps:

[0024] Step 1: clamp the test upper sleeve and the test lower sleeve on the upper and lower sides of the model tunnel, fix them to form the test sleeve, and block the grouting head;

[0025] Step 2: Install the tunnel deformation test device, with the sensor probes of the four displacement sensors against the inner wall of the model tunnel;

[0026] Step 3: Pour the slurry into the grouting hole through the grouting funnel until the slurry overflows from the vent hole;

[0027] Step 4: The displacement sensor transmits the displacement data of the model tunnel to the data acquisition instrument; the vertical displacement, lateral displacement, vertical convergence and lateral convergence of the model tunnel are calculated based on the data measured by the four displacement sensors.

[0028] Preferably, the dynamic buoyancy test method comprises the following steps:

[0029] Step 1: clamp the upper test sleeve and the lower test sleeve on the upper and lower sides of the model tunnel to form a test sleeve, and install a pressure relief valve and a sealing plug on the air outlet and the grouting hole respectively;

[0030] Step 2: Install the tunnel deformation test device, with the sensor probes of the four displacement sensors against the inner wall of the model tunnel;

[0031] Step 3: Connect the grouting head to the grouting equipment, and grout the gap between the test sleeve and the model tunnel through the grouting head in sequence according to the actual working conditions until the slurry overflows from the pressure relief valve;

[0032] Step 4: The displacement sensor transmits the displacement data of the model tunnel to the data acquisition instrument; the vertical displacement, lateral displacement, vertical convergence and lateral convergence of the model tunnel are calculated based on the data measured by the four displacement sensors.

[0033] The beneficial effects of the present invention are:

[0034] 1) The test device of the present invention is arranged along the inside of the model tunnel through a reference rod, and a sensor kit is arranged in the middle of the reference rod. The kit can be equipped with displacement sensors in four orthogonal directions in one plane, ensuring that the displacement data measured by the sensor is the deformation of the same cross-section in the tunnel. The probe at the top of the sensor is against the inner wall of the model tunnel and expands and contracts with the movement of the inner wall of the model tunnel, thereby obtaining the vertical displacement, lateral displacement, vertical convergence and lateral convergence data of the model tunnel, which is consistent with the position of theoretical calculation and actual engineering test, so that the test data has a high reference value; at the same time, the height of the two ends of the test device fixed on the magnetic table base is adjustable, and the magnetic table base is magnetically attracted to a square iron plate of a certain area, which is easy to install, and the initial position of the test device in the horizontal direction can be adjusted according to needs without affecting the fixation of the test device body during the test.

[0035] 2) The model tunnel of the present invention is composed of multiple ring segments, and each ring segment is assembled from multiple segments. The segments are provided with convex and concave tenons and connecting holes. The segments are connected by convex and concave tenons and iron wires. The iron wires simulate the connecting screws of the actual tunnel. The segment rings at both ends are fixed, and only the middle ring segments are allowed to float under the action of slurry. While floating, the ring segments are subject to the restraining force of the adjacent segments, simulating the working conditions of the actual tunnel, so that the obtained test data can more accurately reflect the influence of slurry on the buoyancy of the tunnel.

[0036] 3) The present invention provides grouting holes and air outlet holes on the top of the test upper sleeve of the tunnel sleeve. The grouting holes are used for grouting during static buoyancy test, and are sealed with sealing plugs during dynamic buoyancy test; the air outlet holes are used for exhaust, and do not need to be sealed during static buoyancy test, and are covered with a pressure relief valve during dynamic buoyancy test. The grouting holes are connected to the grouting equipment through a hose, and the grouting equipment is equipped with a pressure regulating valve for controlling the grouting pressure. A switch valve is provided on the hose connected to the grouting holes for controlling the grouting sequence, thereby further improving the accuracy of the device in simulating actual working conditions; the test device can study the influence of static buoyancy on tunnel buoyancy as well as the influence of dynamic buoyancy on tunnel buoyancy, and the upper and lower sleeves are detachable, easy to manufacture, low in cost, and relatively simple to install and disassemble. Tests of various slurry ratios can be carried out in a short period of time, which is convenient for carrying out several different tests in sequence and improves efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0037] Figure 1 This is a schematic diagram of the shield tunnel floating model test device;

[0038] Figure 2 is a schematic diagram of the model device;

[0039] Figure 3 is a schematic diagram of a fixed sleeve in a model device;

[0040] Figure 4 A schematic diagram of the bottom base support of the model device;

[0041] Figure 5 This is a schematic diagram of the model tunnel;

[0042] Figure 6 is a schematic diagram of a single tunnel segment;

[0043] Figure 7 A schematic diagram of the tunnel segment from another perspective;

[0044] Figure 8 This is a schematic diagram of the tunnel deformation test device;

[0045] Fig. 9 is a schematic diagram of the benchmark rod;

[0046] Fig.10 is a schematic diagram of a displacement sensor;

[0047] Fig.11 is a schematic diagram of the sensor suite;

[0048] Fig.12 A schematic diagram of the sensor suite from another perspective;

[0049] Fig.13 is a schematic diagram of a vertical sensor sleeve;

[0050] Fig.14 is a schematic diagram of a lateral sensor sleeve;

[0051] Fig.15 A schematic diagram of a reference rod connecting sleeve;

[0052] Fig.16 It is a schematic diagram of the test sleeve;

[0053] Fig.17 It is a schematic diagram of the test sleeve divided into upper and lower parts;

[0054] Fig.18 is a schematic diagram of a sealing rubber pad;

[0055] Fig.19 Schematic diagram of the test sleeve housing

[0056] Fig. 20It is a schematic diagram of the casing of the upper sleeve of the test;

[0057] Fig.21 This is an exploded view of the test sleeve;

[0058] Fig. 22 is a schematic diagram of a pressure relief valve;

[0059] Fig.23 Schematic diagram of the hole sealing plug.

[0060] Explanation of reference numerals: air compressor 1, air pipe 2, pressure regulating valve 3, grouting tank 4, grouting port 5, grouting tank air inlet pipe 6, grouting tank slurry outlet pipe 7, grouting tank valve 8, seven-way connector 9, grouting valve 10, grouting head 11, grouting funnel 12, slurry 13, model test frame 14, sensor cable 15, data acquisition instrument 16, test base 17, magnetic table base 18, tunnel deformation test device 19, fixing sleeve 20, model tunnel 21, test sleeve 22, square iron plate 23, base bracket 24, tunnel segment 25, inter-ring connecting hole 26, annular connecting hole 27, inter-ring concave-convex tenon 28, annular concave-convex tenon Tenon 29, reference rod 30, magnetic base connecting hole 31, sensor cable threading hole 32, displacement sensor 33, sensor probe 34, sensor kit 35, sensor fastening screw 36, vertical sensor sleeve 37, transverse sensor sleeve 38, reference rod connecting sleeve 39, sealing rubber pad 40, test upper sleeve 41, test lower sleeve 42, test sleeve side ring with grouting holes 43, test sleeve side ring without grouting holes 44, test upper sleeve shell 45, test lower sleeve shell 46, fastening bolts 47, fastening fasteners 48, grouting holes 49, air outlet 50, pressure relief valve 51, sealing plug 52. DETAILED DESCRIPTION

[0061] The present invention is further described below in conjunction with embodiments. The description of the following embodiments is only used to help understand the present invention. It should be noted that for ordinary persons in the art, without departing from the principle of the present invention, the present invention can also be modified in some ways, and these improvements and modifications also fall within the scope of protection of the claims of the present invention.

[0062] Embodiment 1

[0063] As an example, Figures 1 to 23As shown, the shield tunnel floating model test device comprises: a grouting device, a model test frame 14, a model tunnel 21 and a test device, the model test frame comprises a test base 17, a base support 24 and a test sleeve 22, the test sleeve 22 comprises a test upper sleeve 41 and a test lower sleeve 42, the test upper sleeve 41 and the test lower sleeve 42 are spliced ​​and connected up and down, and are sleeved on the outside of the model tunnel 21; a grouting hole 49 and an air outlet 50 are opened on the top of the test upper sleeve 41; a grouting head 11 is opened at the front end of the test upper sleeve 41 and the test lower sleeve 42, and the grouting device grouts the gap between the test sleeve 22 and the model tunnel 21 through the grouting head 11;

[0064] The testing device includes a data acquisition device 16 and a tunnel deformation testing device 19. The tunnel deformation testing device 19 passes through the model tunnel 21. A displacement sensor 33 is provided in the middle of the tunnel deformation testing device 19 in four directions facing the inner wall of the model tunnel 21. The displacement sensor 33 is against the inner wall of the model tunnel 21 and is connected to the data acquisition device 16.

[0065] like Figures 5 to 7 As shown, the model tunnel 21 includes a tunnel segment 25, an annular convex and concave tenon 29 is provided at both ends of the tunnel segment 25, and an inter-ring convex and concave tenon 28 is provided on both sides of the tunnel segment 25. Several tunnel segments 25 are connected to each other through the annular convex and concave tenon 29 to form a segment ring, and the segment rings are connected through the inter-ring convex and concave tenon 28 to form a complete model tunnel 21. The segment rings at both ends are fixed, and only the middle rings of the segments are allowed to float under the action of the slurry in the test sleeve 22.

[0066] In this embodiment, the model tunnel 21 has 7 rings, each ring has 5 tunnel segments 25, and a total of 35 tunnel segments 25. The tunnel segments 25 are printed by a 3D printer, and the thickness of the tunnel segments 25 is 15 mm. The outer diameter of the model tunnel 21 is 24 cm, and the inner diameter is 21 cm. The edges of the tunnel segments 25 are provided with inter-ring convex and concave tenons 28 and annular convex and concave tenons 29. Inter-ring connecting holes 26 and annular connecting holes 27 are provided on the inter-ring convex and concave tenons 28 and the annular convex and concave tenons 29. Select the 5 printed tunnel segments 25, and connect the 5 tunnel segments 25 into a ring by passing the iron wire through the annular connecting holes 27 of the tunnel segments 25. Then, the tunnel segments 25 are spliced ​​one by one in a staggered splicing manner. When splicing, the iron wire needs to be passed through the inter-ring connecting holes 26 and the annular connecting holes 27. After all 35 tunnel segments 25 are spliced, several layers of plastic wrap are covered on the outer surface of the tunnel. The segment rings at both ends are fixed, and only the 5-ring segment in the middle is allowed to float up under the action of the slurry. While floating up, the 5-ring segment is also affected by the restraining force of the adjacent segments.

[0067] like Figures 16 to 23As shown, the test upper sleeve 41 and the test lower sleeve 42 both include a sealing rubber pad 40 and an outer shell. The sealing rubber pad 40 is arranged around the outer shell edge of the test upper sleeve 41 and the test lower sleeve 42. The outer shell is in the shape of a semicircular arc plate. The front and rear ends of the outer shell are respectively provided with test sleeve side rings. The grouting heads 11 are symmetrically arranged on the test sleeve side rings at the front ends of the test upper sleeve 41 and the test lower sleeve 42; two fasteners 48 are respectively provided on both sides of the outer shell perpendicular to the length direction of the model tunnel 21, and the fasteners 48 of the test upper sleeve 41 and the test lower sleeve 42 are connected and fixed by fastening bolts 47.

[0068] A 90cm long, 40cm wide, and 2cm thick organic glass plate is processed as the test base 17, two 20cm long, 20cm wide, and 3mm thick square iron plates 23 are processed, and the square iron plates 23 are pasted to the two ends of the test base 17 with glass glue, and three 6cm high, 20cm wide, and 144mm concave arc radius organic glass plates are processed as the base bracket 24. The test sleeve 22 is mainly composed of a test upper sleeve 41, a test lower sleeve 42, a pressure relief valve 51, a sealing plug 52, and a fastening bolt 47. The test upper sleeve 41 and the test lower sleeve 42 are composed of a sealing rubber pad 40, a grouting head 11, a fastening fastener 48, a test upper sleeve shell 45, a test lower sleeve shell 46, a test sleeve side ring 43 with a grouting hole, and a test sleeve side ring 44 without a grouting hole.

[0069] The manufacturing steps of the test upper sleeve 41 and the test lower sleeve 42 are as follows: a stainless steel cylinder with a wall thickness of 3mm, an outer radius of 144mm, and a height of 300mm is processed, and the stainless steel cylinder is cut in half along the axial direction. Take the cut half of the cylinder and drill two holes with a diameter of 10mm on the top, one hole is used as a grouting hole 49, and the other hole is used as an air outlet 50. In this way, the manufacturing of the test upper sleeve shell 45 is completed, and the remaining half of the cylinder is the test lower sleeve shell 46. Cut two circular stainless steel plates with a thickness of 5mm, an inner radius of 121mm, and an outer radius of 141mm, and drill 6 holes with a diameter of 10mm in the circumferential direction at equal intervals on one of the circular stainless steel plates, and then cut the circular stainless steel in half, so that two test sleeve side rings 43 with grouting holes are made. Cut the other circular stainless steel plate without holes in half, so that two test sleeve side rings 44 without grouting holes are made. Take a stainless steel pipe with an outer diameter less than 10mm, a wall thickness not less than 3mm, and a length of 24cm, and cut it into 6 sections according to each section of 4cm long, and one end of each section of stainless steel pipe is threaded with a lathe, and a gas nozzle matching with a diameter of 8mm is installed. The production of the grouting head 11 has been completed in this way. Take a stainless steel bar with a width of 2cm, a thickness of 7mm, and a length of 40cm, and cut it into 8 sections. The end of each small section is lathe-turned into a groove with a length of 3cm and a width of 6mm, and the end is ground into a fillet, so that a fastening fastener 48 is made. According to the size of the test upper sleeve shell 45 and the test sleeve side ring 43 with grouting holes, two sealing rubber pads 40 are customized, and it is required that the sealing rubber pad 40 can completely wrap the edge of the test upper sleeve shell 45 and the test sleeve side ring 43 with grouting holes, so that the test upper sleeve 41 and the test lower sleeve 42 are assembled without air leakage or slurry leakage. When customizing the sealing rubber pad 40, a gap for the grouting head 11 needs to be left on one side to facilitate the installation of the grouting head 11. Insert the six grouting heads 11 into the six holes of the test sleeve side ring 43 with grouting holes and weld them in place. Weld the test sleeve side ring 43 with grouting holes and the test sleeve side ring 44 without grouting holes to the two ends of the test upper sleeve shell 45 and the test lower sleeve shell 46. Weld the eight fasteners 48 to both sides of the test upper sleeve shell 45 and the test lower sleeve shell 46. Put two sealing rubber pads 40 on the edges of the test upper sleeve shell 45 and the test lower sleeve shell 46.

[0070] Embodiment 2

[0071] As another example, Figure 1 As shown, this second embodiment proposes a more specific shield tunnel floating model test device based on the first embodiment, wherein the grouting device includes an air compressor 1, a grouting tank 4 and a grouting valve 10.

[0072] A sealing cover is provided on the top of the grouting tank 4, on which a grouting port 5, a grouting tank air inlet pipe 6 and a grouting tank slurry outlet pipe 7 are provided. The air compressor 1 is connected to the grouting tank air inlet pipe 6 through the air pipe 2. The bottom end of the grouting tank slurry outlet pipe 7 extends below the liquid level of the slurry 13 in the grouting tank 4. The grouting tank slurry outlet pipe 7 is connected to all grouting heads 11 through a multi-way connector, which is a seven-way connector 9 in this embodiment.

[0073] The grouting tank 4 needs to be specially processed and manufactured. A stainless steel pipe with a wall thickness of not less than 3mm and an outer diameter of about 30cm is selected and cut into a cylinder with a height of 50cm. Two circular stainless steel plates with a diameter of 30cm and a thickness of 5mm are cut, and one of the circular stainless steel plates is welded to one end of the cut stainless steel pipe as the bottom of the grouting tank 4.

[0074] Drill two holes with a diameter of 3 cm and one with a diameter of 5 cm on another circular stainless steel plate as a sealing cover. Weld the circular stainless steel plate with holes drilled on the upper part of the stainless steel pipe as the top of the grouting tank 4. Process a suitable iron cover that can be unscrewed and weld it on the 5 cm circular hole as the grouting port 5. Process a circular tube with an outer diameter of less than 3 cm and a length of 55 cm, thread one end of the circular tube with a lathe, install a grouting tank valve 8 on the threaded end, insert the other end of the circular tube into the 3 cm hole on the top of the grouting tank 4, and leave a proper gap between the bottom of the circular tube and the bottom of the grouting tank 4. After insertion, weld the circular tube and the grouting tank 4 at the top of the grouting tank 4.

[0075] Purchase a plastic hose with a total length of not less than 15m and an outer diameter of 8mm as the air pipe 2. Install a gas nozzle that can be inserted into the air pipe 2 on the upper part of the grouting tank valve 8. Then process a round tube with an outer diameter of less than 3cm and a length of 10cm, and similarly thread one end of the round tube with a lathe, and install a grouting tank valve 8 on the threaded end, and insert the other end of the round tube into another hole with a diameter of 3cm in the grouting tank 4. After insertion, weld the round tube and the grouting tank 4 at the top of the grouting tank 4. In this way, the production of the grouting tank 4 is completed.

[0076] It should be noted that the parts in this embodiment that are the same or similar to those in the first embodiment can be referenced to each other and will not be described in detail in this application.

[0077] Embodiment 3

[0078] As another example, Figure 1As shown, the third embodiment of the present invention is proposed on the basis of the first and second embodiments, and is a more specific shield tunnel floating model test device, wherein the tunnel deformation test device 19 includes a reference rod 30 and a sensor kit 35, the sensor kit 35 is provided with sleeves in six directions, and a displacement sensor 33 is inserted into each of the four sleeves of the sensor kit 35 facing the inner wall of the model tunnel 21, and the two sleeves of the sensor kit 35 corresponding to the length direction of the model tunnel 21 are threaded tubes, and the two threaded tubes are each connected to a reference rod 30, and the two reference rods 30 are respectively extended to the outside of the front and rear ends of the model tunnel 21 and fixed.

[0079] like Figure 2 and Figure 3 , Figures 8 to 15 As shown, a square iron plate 23 is respectively provided on the test base 17 at the front and rear ends of the test sleeve 22, a magnetic table seat 18 is placed on the square iron plate 23, a vertical rod is provided on the magnetic table seat 18, a magnetic table seat connecting hole 31 and a sensor cable threading hole 32 are opened at the end of the reference rod 30, the vertical rod is passed through the magnetic table seat connecting hole 31, and a fixing sleeve 20 is respectively installed on the vertical rods above and below the reference rod 30, the fixing sleeve 20 includes a ring sleeve and a bolt, the ring sleeve is sleeved on the vertical rod, the bolt passes through the ring sleeve through a threaded hole and rests on the vertical rod, the reference rod 30 is clamped between the two fixing sleeves 20, the reference rod 30 is hollow, and the sensor cable 15 of the displacement sensor 33 passes through the sensor cable threading hole 32 of the reference rod 30 and is connected to the data acquisition instrument 16.

[0080] The tunnel deformation test device 19 needs to be processed and manufactured. The tunnel deformation test device 19 includes a reference rod 30 , a fixing sleeve 20 , a sensor kit 35 and a displacement sensor 33 .

[0081] The manufacturing steps of the sensor kit 35 are as follows: cut two iron pipes with a length of 350 mm, a wall thickness of 3 mm, and an outer diameter of 24 mm, thread one end of each iron pipe, and drill a magnetic base connection hole 31 with a diameter of 13 mm and a sensor cable threading hole 32 with a width of 10 mm and a length of 30 mm at the other end to obtain a reference rod 30.

[0082] Cut off an iron pipe with a length of 100mm, a wall thickness of 5mm, and an outer diameter of 36mm, drill a hole with a diameter of 26mm in the center of the pipe wall, drill another hole with a diameter of 18mm in the direction orthogonal to this hole, and drill a small hole with a diameter of 4mm at the upper and lower ends of the side wall to obtain a vertical displacement sensor sleeve 37. Cut off two sections of round pipes with a length of 32mm, a wall thickness of 5mm, and an outer diameter of 36mm, and drill a round hole with a diameter of 4mm on the side wall, thus completing the production of the horizontal sensor sleeve 38. Cut off two round pipes with a length of 40mm, a wall thickness of 3mm, and an outer diameter of 28mm, and thread the inner wall of one end of the round pipe, thus completing the production of the reference rod connecting sleeve 39. Weld the two horizontal sensor sleeves 38 and the two reference rod connecting sleeves 39 to the vertical sensor sleeve 37, thus completing the production of the sensor kit 35. Process 4 round tubes with a height of 7mm, an inner diameter greater than 12mm, and a wall thickness of not less than 5mm, and drill a hole with a diameter of 4mm on the side wall of the round tube.

[0083] As required, a plurality of sensor kits 35 may be provided in the tunnel deformation testing device 19 , so as to detect different cross-sectional positions in the model tunnel 21 .

[0084] It should be noted that the parts in this embodiment that are the same or similar to those in the first embodiment can be referenced to each other and will not be described in detail in this application.

[0085] Embodiment 4

[0086] As another embodiment, this embodiment 4, based on the embodiments 1 to 3, proposes the following installation steps for the shield tunnel floating model test device:

[0087] Step 1: Number the four displacement sensors 33 and the sensor cables 15, and determine the displacement direction of the tunnel to be tested by the displacement sensor 33. Install the displacement sensors 33 one by one on the sensor kit 35. When installing the first displacement sensor 33, first insert the thread end of the sensor cable 15 of this displacement sensor 33 into the vertical sensor sleeve 37, then pass it out from the reference rod connecting sleeve 39, then insert it into the threaded end of the reference rod 30, and finally pass it out from the square groove at the other end of the reference rod. When installing the second to fourth displacement sensors 33, the sensor cables 15 pass through the other end of the vertical sensor sleeve 37 and the two transverse sensor sleeves 38 respectively, and then the threading path is consistent with the first displacement sensor 33. After the sensor cables 15 of the four displacement sensors 33 are all threaded, start to adjust the position of the displacement sensor 33 in the sensor kit 35, requiring that the distance between the two points of the sensor probes 34 of the two displacement sensors 33 in opposite directions is greater than the inner diameter of the model tunnel 21. After the position of the displacement sensor 33 is adjusted, the sensor fastening screws 36 are tightened to fix the four displacement sensors 33. The two reference rods 30 are screwed into the sensor kit 35. After the reference rods 30 are tightened, the sensor cables 15 are tightened. At this point, the tunnel deformation test device 19 is installed.

[0088] Step 2, paste and install the base bracket 24 in the middle of the test base 17. Wrap the model tunnel 21 with the test upper sleeve 41 and the test lower sleeve 42, insert the fastening bolt 47 into the groove of the fastening fastener 48 and tighten the screw. Insert the tunnel deformation test device 19 into the model tunnel 21, adjust the posture of the reference rod 30 so that the sensor probes 34 of the four displacement sensors 33 are against the inner wall of the model tunnel 21. Suction the two magnetic bases 18 on the square iron plate 23, pass the rod of the magnetic base 18 through the magnetic base connection hole 31 of the reference rod 30, and put the fixing sleeve 20 on the rod of the magnetic base 18 so that the reference rod 30 and the magnetic base 18 are fixed to each other. Connect the sensor cable 15 to the data acquisition instrument 16.

[0089] Step 3: Connect the air pipe 2 to the air compressor 1, then to the pressure regulating valve 3, and then to the grouting tank 4. Connect the air pipe 2 from the grouting tank to the seven-way connector 9, and lead out 6 air pipes 2 from the seven-way connector 9. Each of the air pipes 2 is connected to the grouting valve 10, and the grouting valve 10 is connected to the 6 grouting heads 11 on the test sleeve 22 with the air pipe 2. At this point, the installation of the entire test device is completed.

[0090] Embodiment 5

[0091] As another embodiment, this embodiment 5 proposes, based on embodiments 1 to 4, that this shield tunnel buoyancy model test device can perform both static buoyancy tests and dynamic buoyancy tests:

[0092] The steps of the static buoyancy test are as follows:

[0093] Step 1: Wrap the model tunnel 21 with plastic wrap, apply a layer of vaseline on the inner wall of the upper test sleeve 41 and the lower test sleeve 42, then place the model tunnel 21 wrapped with plastic wrap on the upper test sleeve 42, cover the upper test sleeve 41, and fix the upper test sleeve 41 and the lower test sleeve 42 with the fastening bolts 47. Apply glass glue to the gap of the entire test sleeve 22. When doing the static buoyancy test, there is no need to install the pressure relief valve 51 and the sealing plug 52, and the grouting head 11 needs to be blocked with glass glue.

[0094] Step 2: Install the tunnel deformation test device 19, the sensor probes 34 of the four displacement sensors 33 should be against the inner wall of the model tunnel 21, and tighten the fixing sleeve 20. Connect the sensor cables 15 of the four displacement sensors 33 to the data acquisition instrument 16, turn on the data acquisition instrument 16, connect the data acquisition instrument 16 to the computer, open the control software of the data acquisition instrument 16 in the computer, and start collecting data after making relevant settings.

[0095] Step 3: Prepare the slurry 13 according to the required ratio of the test, insert the bottom of the grouting funnel 12 into the grouting hole 49 at the top of the test upper sleeve 41, and then pour the prepared slurry 13 from the grouting funnel 12 until the slurry 13 overflows from the air outlet 50, and stop grouting.

[0096] Step 4: Generally, after the slurry 13 has been left standing for 24 hours, the deformation of the model tunnel 21 will be stable. At this time, the data acquisition instrument 16 can be stopped and the test data can be saved. The fastening bolts 47 are removed, the test upper sleeve 41 is removed, the model tunnel 21 is taken out, the solidified slurry 13 is cleaned, the test upper sleeve 41 and the test lower sleeve 42 are cleaned, and then the next set of tests can be continued.

[0097] After a set of tests, the test data of the four displacement sensors 33 can be derived from the data acquisition instrument 16. Assuming that the data measured by the two vertical displacement sensors 33 are S1 and S2, and the data measured by the two horizontal displacement sensors are H1 and H2, the calculation formulas for the vertical displacement, horizontal displacement, vertical convergence, and horizontal convergence of the tunnel are as follows:

[0098] Vertical displacement = (S1-S2) / 2

[0099] Lateral displacement = (H1-H2) / 2

[0100] Vertical convergence = S1 + S2

[0101] Horizontal convergence = H1 + H2

[0102] Steps for dynamic buoyancy test:

[0103] Step 1: After the device is installed as in step 1 of the static buoyancy test, a pressure relief valve 51 and a sealing plug 52 are installed on the air outlet 50 and the grouting hole 49 respectively.

[0104] Step 2: Step 2 of the dynamic buoyancy test is the same as that of the static buoyancy test.

[0105] Step 3: Dynamic buoyancy test is a grouting with pressure, which is carried out by a grouting device. Before grouting, the grouting equipment should be connected first, the grouting port 5 should be opened, the prepared slurry 13 should be poured into the grouting tank 4, the lid of the tank slurry port 5 should be covered, the pressure regulating valve 3 should be adjusted according to the preset grouting pressure, the grouting tank valve 8 should be opened, and the grouting valves 10 out of the grouting head 11 should be opened one by one according to the preset grouting scheme. When the slurry overflows from the pressure relief valve 51, the grouting should be stopped.

[0106] Step 4: Step 4 of the dynamic buoyancy test is the same as that of the static buoyancy test.

[0107] The various embodiments in this specification are described in a progressive manner, and each embodiment focuses on the differences from other embodiments. The same or similar parts between the various embodiments can be referenced to each other.

Claims

1. A shield tunnel floating model test device, characterized in that: include: A grouting device, a model test frame, a model tunnel and a testing device, wherein the model test frame comprises a test base, a base bracket and a test sleeve, wherein the test sleeve comprises a test upper sleeve and a test lower sleeve, wherein the test upper sleeve and the test lower sleeve are spliced ​​and connected up and down and sleeved on the outside of the model tunnel; a grouting hole and an air outlet are provided on the top of the test upper sleeve; a grouting head is provided at the front end of the test upper sleeve and the test lower sleeve, and the grouting device grouts the gap between the test sleeve and the model tunnel through the grouting head; The testing device includes a data acquisition instrument and a tunnel deformation testing device. The tunnel deformation testing device passes through the model tunnel. Displacement sensors are provided in the middle of the tunnel deformation testing device in four directions facing the inner wall of the model tunnel. The displacement sensors are against the inner wall of the model tunnel and are connected to the data acquisition instrument.

2. The shield tunnel floating model test device according to claim 1 is characterized in that: The tunnel deformation testing device includes a reference rod and a sensor kit. The sensor kit is provided with sleeves in six directions. A displacement sensor is inserted in each of the four sleeves of the sensor kit facing the inner wall of the model tunnel. The two sleeves of the sensor kit corresponding to the length direction of the model tunnel are threaded tubes. Each of the two threaded tubes is connected with a reference rod. The two reference rods are respectively extended to the outside of the front and rear ends of the model tunnel and fixed.

3. The shield tunnel floating model test device according to claim 1 is characterized in that: The model tunnel includes tunnel segments, both ends of the tunnel segments are provided with annular tenons, both sides of the tunnel segments are provided with inter-ring tenons, several tunnel segments are connected to each other through the annular tenons to form a segment ring, and the segment rings are connected through the inter-ring tenons to form a complete model tunnel, and the inter-ring tenons and annular tenons are respectively provided with inter-ring connecting holes and annular connecting holes for inserting iron wires.

4. The shield tunnel floating model test device according to claim 1, characterized in that: The test upper sleeve and the test lower sleeve both include a sealing rubber pad and an outer shell. The sealing rubber pad is arranged around the outer shell edge of the test upper sleeve and the test lower sleeve. The outer shell is in the shape of a semicircular arc plate. The front and rear ends of the outer shell are respectively provided with test sleeve side rings. The grouting heads are symmetrically arranged on the test sleeve side rings at the front ends of the test upper sleeve and the test lower sleeve. Two fasteners are respectively arranged on both sides of the outer shell perpendicular to the length direction of the model tunnel. The fasteners of the test upper sleeve and the test lower sleeve are connected and fixed by fastening bolts.

5. The shield tunnel floating model test device according to claim 2 is characterized in that: A square iron plate is provided on the test base at the front and rear ends of the test sleeve, and a magnetic table seat is placed on the square iron plate. A vertical rod is provided on the magnetic table seat. A magnetic table seat connecting hole and a sensor cable threading hole are opened at the end of the reference rod. The vertical rod is passed through the magnetic table seat connecting hole. A fixing sleeve is respectively installed on the vertical rods above and below the reference rod. The fixing sleeve includes a ring sleeve and a bolt. The ring sleeve is sleeved on the vertical rod. The bolt passes through the ring sleeve through a threaded hole and rests on the vertical rod. The reference rod is clamped between the two fixing sleeves. The reference rod is hollow. The sensor cable of the displacement sensor passes through the sensor cable threading hole of the reference rod and is connected to the data acquisition instrument.

6. The shield tunnel floating model test device according to claim 1, characterized in that: The grouting device includes an air compressor, a grouting tank and a grouting valve. A sealing cover is provided on the top of the grouting tank. A grouting port, an air inlet pipe of the grouting tank and a grouting tank outlet pipe are provided on the sealing cover. The air compressor is connected to the air inlet pipe of the grouting tank through an air pipe. The bottom end of the grouting tank outlet pipe extends below the slurry level in the grouting tank. The grouting tank outlet pipe is connected to all grouting heads through a multi-way connector.

7. The test method of the shield tunnel floating model test device according to any one of claims 1 to 6, characterized in that: The method comprises a static buoyancy test method and a dynamic buoyancy test method. The static buoyancy test method comprises the following steps: Step 1: clamp the test upper sleeve and the test lower sleeve on the upper and lower sides of the model tunnel, fix them to form the test sleeve, and block the grouting head; Step 2: Install the tunnel deformation test device, with the sensor probes of the four displacement sensors against the inner wall of the model tunnel; Step 3: Pour the slurry into the grouting hole through the grouting funnel until the slurry overflows from the vent hole; Step 4: The displacement sensor transmits the displacement data of the model tunnel to the data acquisition instrument; the vertical displacement, lateral displacement, vertical convergence and lateral convergence of the model tunnel are calculated based on the data measured by the four displacement sensors.

8. The test method of the shield tunnel floating model test device according to claim 7 is characterized in that: The dynamic buoyancy test method comprises the following steps: Step 1: clamp the upper test sleeve and the lower test sleeve on the upper and lower sides of the model tunnel to form a test sleeve, and install a pressure relief valve and a sealing plug on the air outlet and the grouting hole respectively; Step 2: Install the tunnel deformation test device, with the sensor probes of the four displacement sensors against the inner wall of the model tunnel; Step 3: Connect the grouting head to the grouting equipment, and grout the gap between the test sleeve and the model tunnel through the grouting head in sequence according to the actual working conditions until the slurry overflows from the pressure relief valve; Step 4: The displacement sensor transmits the displacement data of the model tunnel to the data acquisition instrument; the vertical displacement, lateral displacement, vertical convergence and lateral convergence of the model tunnel are calculated based on the data measured by the four displacement sensors.