90-degree elbow type NH4Cl crystal deposition experimental device and operation method
By designing a 90° elbow type NH4Cl crystal deposition experimental device, the air heating and cooling structure is used to deposit and recover ammonium chloride in the heat exchange tube, which solves the problem of evaluating the deposition of ammonium chloride in the 90° elbow and provides prevention Scientific basis for pipe blockage and reducing environmental pollution.
Patent Information
- Application Number
- CN202411107485.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-13
- Publication Date
- 2024-10-15
AI Technical Summary
Existing technology fails to effectively evaluate and prevent pipeline clogging problems caused by ammonium chloride crystallization deposition in 90° elbows, and lacks scientific basis for the mechanism and rules of ammonium chloride crystallization deposition.
Design a 90° elbow type NH4Cl crystal deposition experimental device, including an air heating structure, an NH4Cl solution atomization structure, a heat exchange tube structure and a waste recovery structure. By controlling the temperature and flow rate, the 90° elbow type of ammonium chloride can be accurately evaluated. Sedimentation characteristics within the sediments, and through disassembly and zoning collection, record the sedimentation distribution and quality under different conditions.
It achieves an accurate assessment of the deposition of ammonium chloride in a 90° elbow, reveals the mechanism and rules of deposition, provides a scientific basis for preventing pipeline blockage, and reduces environmental pollution through waste recycling.
Smart Images

Figure CN118777535A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical fields of petroleum, energy and chemical industry, in particular to a 90-degree elbow type NH4Cl crystal deposition experimental device and an operating method. Background Art
[0002] In the field of petrochemicals, ammonium chloride crystallization is usually closely related to process parameters such as temperature, pressure, and stirring intensity. Under certain conditions, ammonium chloride will crystallize out of the gas phase and deposit in the pipeline, causing pipeline blockage and pipeline deposition corrosion, especially in complex 90-degree bends. Deposits in 90-degree bends are more difficult to clean and dredge than straight pipes, which in turn causes serious problems affecting the operation and safety of the equipment.
[0003] The current existing technologies, such as the application number CN201710103535.5, entitled a method and equipment for direct thermal decomposition of ammonium chloride in the ammonia-soda and combined alkali industries, or the application number CN201510654548.2, entitled an ammonium salt corrosion experimental device and its experimental method, are mainly focused on the acquisition of ammonium salt crystals or the exploration of the influence of ammonium salt crystal deposition on corrosion.
[0004] However, the crystallization and deposition of ammonium chloride in the 90-degree elbow pipe, which then causes pipe blockage, has not been observed, tested, or verified, thus failing to reveal the mechanism and law of ammonium chloride crystallization and deposition, and ultimately failing to provide a scientific basis for preventing pipe blockage.
[0005] Based on the above problems, it is urgent to develop a 90° elbow type NH4Cl crystal deposition experimental device and operation method, which can accurately evaluate the deposition characteristics of ammonium chloride crystals in the 90° elbow and help prevent pipeline blockage. Summary of the invention
[0006] The present invention aims to overcome the defects in the above-mentioned prior art and provide a 90° elbow type NH4Cl crystal deposition experimental device and operation method, which can accurately evaluate the deposition characteristics of ammonium chloride crystals in a 90° elbow pipe and help prevent pipeline blockage.
[0007] In order to achieve the above purpose, the technical solution adopted by the present invention is: a 90° elbow type NH4Cl crystallization deposition experimental device, comprising an air heating structure, an NH4Cl solution atomization structure, a heat exchange pipe structure, a cooling structure and a waste recovery structure connected in sequence through a conveying pipeline; the conveying pipeline is arranged horizontally or vertically; the air heating structure heats the air and conveys the air to the conveying pipeline; the NH4Cl solution atomization structure is located at the rear end of the air heating structure and is arranged vertically to the conveying pipeline, the NH4Cl solution atomization structure atomizes the NH4Cl solution and inputs the NH4Cl atomized solution into the conveying pipeline; the heat exchange pipe structure is located at the rear end of the NH4Cl solution atomization structure, the cooling structure performs heat exchange on the heat exchange pipe structure, and the air and the NH4Cl atomized solution are crystallized and deposited in the heat exchange pipe structure under the action of the cooling structure; the waste recovery structure is located at the rear end of the heat exchange pipe structure, and is used to recover the NH4Cl solution and waste gas that have not been crystallized and deposited.
[0008] As a preferred embodiment of the present invention, the air heating structure includes a blower, a first flow regulating valve, a heater and a first bimetallic thermometer arranged in sequence, the first flow regulating valve is used to adjust the air flow of the blower entering the conveying pipe, and the heater heats the air entering the conveying pipe to the temperature set by the first bimetallic thermometer.
[0009] As a preferred solution of the present invention, the NH4Cl solution atomization structure includes an atomizer and a second flow regulating valve arranged in sequence from top to bottom, the atomizer atomizes the NH4Cl solution and regulates the flow of the NH4Cl atomized solution entering the delivery pipeline through the second flow regulating valve.
[0010] As a preferred solution of the present invention, the heat exchange tube structure includes a flow meter, a second bimetallic thermometer, a 90° elbow, a third bimetallic thermometer and a stop valve connected in sequence, the flow meter is used to measure the flow rate of the mixture of air and NH4Cl solution, and the second bimetallic thermometer and the third bimetallic thermometer are used to control the temperature of the mixture of air and NH4Cl solution entering the 90° elbow.
[0011] As a preferred solution of the present invention, the cooling structure includes a heat exchange tube located outside the 90° elbow and a water tank, a water pump, a cooler and a third flow regulating valve for controlling the entry of cooling water into the heat exchange tube, and the water tank, water pump, cooler and the third flow regulating valve are connected in sequence.
[0012] As a preferred solution of the present invention, a plurality of connecting rods are circumferentially arranged between the heat exchange tube and the 90° elbow, and the 90° elbow is divided into a plurality of collecting areas by angles.
[0013] As a preferred embodiment of the present invention, the waste recovery structure includes a gas-liquid separator, a gas storage tank and a solution tank. The NH4Cl solution without crystallization deposition enters the solution tank through the gas-liquid separator, and the waste gas enters the gas storage tank through the gas-liquid separator.
[0014] As a preferred solution of the present invention, the first bimetallic thermometer, the second bimetallic thermometer and the third bimetallic thermometer are all bimetallic thermometers, and the bimetallic thermometers include a straight connector, and the straight connector is vertically inserted into the conveying pipeline.
[0015] An operating method of a 90° elbow type NH4Cl crystallization deposition experimental device comprises: Step 1: Connect the air heating structure, the NH4Cl solution atomization structure, the heat exchange tube structure, the cooling structure and the waste recovery structure in sequence; Step 2: Control the temperature and flow rate of the air output by the air heating structure; Step 3: Control the flow rate of cooling water output by the cooling structure; Step 4: The NH4Cl solution atomizing structure atomizes the NH4Cl solution and controls the injection amount of the NH4Cl atomized solution; Step 5: The NH4Cl atomized solution and air enter the heat exchange tube structure and crystallize in the heat exchange tube structure, and photos of NH4Cl crystallization in the heat exchange tube structure at different time periods are taken; Step 6: The waste recovery structure recovers the NH4Cl solution and waste gas that have not been crystallized and deposited; Step 7: turn off the NH4Cl solution atomization structure, cooling structure and air heating structure in sequence; Step 8: Remove the 90° elbow, cut different collection areas in the 90° elbow, and collect NH4Cl crystals in different collection areas; Step 9: Replace the 90° elbow and repeat steps 2 to 8, adjusting the injection volume of the NH4Cl atomized solution for repeated testing.
[0016] As a preferred embodiment of the present invention, before the NH4Cl atomized solution and air enter the heat exchange tube structure in step 5, a second bimetallic thermometer is required to ensure that the temperature of the mixture reaches the crystallization temperature of NH4Cl before entering the deposition part.
[0017] The beneficial effects of the present invention are: 1. The present invention heats the atomized NH4Cl solution through an air heating structure, and crystallizes and deposits it in the heat exchange tube structure under the action of the cooling structure, while the uncrystallized NH4Cl solution and waste are recovered through a waste recovery structure. The deposition distribution and quality of NH4Cl in a 90° elbow under different variable conditions can be tested and recorded, which helps prevent pipeline blockage.
[0018] 2. Compared with the deposition probe method, the present invention can more accurately evaluate the deposition characteristics of ammonium chloride particles in the 90° elbow pipe by disassembling the 90° elbow pipe, including particle concentration distribution, particle size distribution, etc., which is conducive to accurately evaluating the deposition characteristics of ammonium chloride crystals in the 90° elbow pipe and helps prevent pipeline blockage.
[0019] 3. The present invention can more accurately obtain the distribution law of NH4Cl crystal deposition in each area and the total mass of NH4Cl crystal deposition under different variables by disassembling, zoning and collecting the 90° elbows.
[0020] 4. The present invention can regulate the flow of air, NH4Cl solution and cooling water through the first flow regulating valve, the second flow regulating valve and the third flow regulating valve, and can intuitively determine the influence of each variable on the crystallization deposition of NH4Cl in the 90° elbow, so that the experimental data is more accurate and in line with reality.
[0021] 5. The present invention uses the first bimetallic thermometer and the second bimetallic thermometer to constantly control the crystallization temperature of NH4Cl so that the mixture can be crystallized and deposited in the 90° elbow, helping to monitor and adjust the temperature in real time and study the influence of temperature changes on the crystallization and deposition characteristics of NH4Cl solution.
[0022] 6. The crystallization temperature range of NH4Cl in the present invention is between 175℃-210℃, and the bimetallic thermometer can directly measure between -80℃-500℃, and can measure the temperature of liquid, steam and gas medium. On the other hand, it also has the advantages of good shock resistance, firmness, not easy to damage and corrosion resistance, which is conducive to the accurate output of measurement data.
[0023] 7. The present invention strictly controls the flow rate and temperature of air through the air heating structure, thereby achieving water-free heating of the NH4Cl atomized solution, and avoiding the dissolution of the NH4Cl solution in water after atomization, which affects the crystallization of the NH4Cl atomized solution in the 90° elbow.
[0024] 8. The present invention classifies and collects the uncrystallized NH4Cl solution and waste gas through the waste recovery structure, which can not only classify and recycle the NH4Cl solution and waste gas for reuse, but also avoid the pollution of the environment caused by the discharge of the NH4Cl solution and waste gas.
[0025] 9. The present invention can test the regularity and quantity of crystal deposition of ammonium chloride solution in a 90° elbow pipe at different air temperatures and flow rates, which helps to reveal the mechanism and regularity of the ammonium chloride deposition process, and is of great significance for preventing pipeline blockage.
[0026] 10. The present invention can test the regularity and quantity of crystal deposition of different ammonium chloride solutions in a 90° elbow under the same environment, which helps to reveal the mechanism and regularity of the ammonium chloride deposition process, and is of great significance for preventing pipeline blockage. BRIEF DESCRIPTION OF THE DRAWINGS
[0027] Figure 1 It is a schematic diagram of the structure of the present invention; Figure 2 It is a schematic diagram of the installation of the bimetallic thermometer of the present invention; Figure 3 is a front cross-sectional view of a 90° elbow of the present invention; Figure 4 is a side cross-sectional view of a 90° elbow of the present invention; Attached symbols in the figure: air heating structure 1, NH4Cl solution atomization structure 2, heat exchange tube structure 3, cooling structure 4, waste recovery structure 5, conveying pipeline 6, blower 11, first flow regulating valve 12, heater 13, first bimetallic thermometer 14, atomizer 21, second flow regulating valve 22, flowmeter 31, second bimetallic thermometer 32, 90° elbow 33, third bimetallic thermometer 34, stop valve 35, heat exchange tube 41, water tank 42, water pump 43, cooler 44, third flow regulating valve 45, connecting rod 46, gas-liquid separator 51, gas storage tank 52, solution tank 53, straight connector 100, collection area 331. DETAILED DESCRIPTION
[0028] The embodiments of the present invention are described in detail below with reference to the accompanying drawings.
[0029] like Figure 1-Figure 4 As shown, a 90° elbow type NH4Cl crystallization deposition experimental device includes an air heating structure 1, an NH4Cl solution atomization structure 2, a heat exchange tube structure 3, a cooling structure 4 and a waste recovery structure 5 which are sequentially connected through a conveying pipeline.
[0030] Among them, in order to undertake the 90° elbow 33, the conveying pipeline at the entrance end of the 90° elbow 33 is horizontally arranged, and the conveying pipeline at the output end of the 90° elbow 33 is vertically arranged. Accordingly, the conveying pipeline is both horizontally arranged and vertically arranged. The material of the conveying pipeline is preferably Q304 stainless steel pipe, and the 90° elbow is an organic transparent glass tube, which is convenient for observing the crystallization of NH4Cl in the 90° elbow.
[0031] The present invention heats the atomized NH4Cl solution through the air heating structure, and crystallizes and deposits it in the heat exchange tube structure under the action of the cooling structure, while the uncrystallized NH4Cl solution and waste are recovered through the waste recovery structure. The deposition distribution and quality of NH4Cl in the 90° elbow under different variable conditions can be tested and recorded, which is helpful to prevent pipeline blockage.
[0032] The air heating structure 1 heats the air and delivers the air to the delivery pipe. More specifically, the air heating structure 1 includes a blower 11, a first flow regulating valve 12, a heater 13 and a first bimetallic thermometer 14 arranged in sequence. The blower 11, the first flow regulating valve 12, the heater 13 and the first bimetallic thermometer 14 are connected through a delivery pipe. The blower 11 inputs air into the delivery pipe. The first flow regulating valve 12 is used to adjust the air flow of the blower 11 entering the delivery pipe. The heater 13 heats the air input into the delivery pipe to the temperature set by the first bimetallic thermometer 14.
[0033] The temperature set by the first bimetallic thermometer 14 is the temperature at which NH4Cl crystallizes under normal pressure.
[0034] The present invention strictly controls the flow rate and temperature of air through the air heating structure 1, thereby being able to heat the NH4Cl atomized solution in the NH4Cl solution atomizing structure 2 without water, thereby promoting the crystallization of the NH4Cl atomized solution.
[0035] The NH4Cl solution atomizing structure 2 is located at the rear end of the air heating structure 1 and is arranged vertically to the conveying pipeline. The NH4Cl solution atomizing structure 2 atomizes the NH4Cl solution and inputs the NH4Cl atomized solution into the conveying pipeline. More specifically, the NH4Cl solution atomizing structure 2 includes an atomizer 21 and a second flow regulating valve 22 arranged sequentially from top to bottom. The atomizer 21 atomizes the NH4Cl solution and adjusts the flow rate of the NH4Cl atomized solution entering the conveying pipeline through the second flow regulating valve 22.
[0036] Compared with NH4Cl solution, the NH4Cl atomized solution is more convenient to circulate in the conveying pipeline and finally crystallize and deposit in the 90° elbow 33.
[0037] Furthermore, the hot air generated by the air heating structure 1 and the NH4Cl atomized solution generated by the NH4Cl solution atomizing structure 2 are mixed at the front end of the heat exchange tube structure 3 to form a mixture.
[0038] The hot air temperature and flow rate of the present invention are controllable, and the flow rate of the NH4Cl atomized solution is controllable, which can not only explore the crystallization deposition of NH4Cl atomized solutions with different flow rates at the same temperature in the heat exchange tube structure 3, but also explore the crystallization deposition of NH4Cl atomized solutions with the same flow rate at different temperatures in the heat exchange tube structure 3.
[0039] The heat exchange tube structure 3 is located at the rear end of the NH4Cl solution atomization structure 2, and the heat exchange tube structure 3 includes a flow meter 31, a second bimetallic thermometer 32, a 90° elbow 33, a third bimetallic thermometer 34 and a stop valve 35 connected in sequence. The flow meter 31 is used to measure the flow rate of the mixture of air and NH4Cl solution, the second bimetallic thermometer 32 is located at the front end of the 90° elbow 33, and the third bimetallic thermometer 34 is located at the rear end of the 90° elbow 33. The second bimetallic thermometer 32 is used to measure the temperature of the mixture entering the 90° elbow 33, and the third bimetallic thermometer 34 is used to measure the temperature of the mixture leaving the 90° elbow 33 after crystallization and deposition.
[0040] The heat exchange tube structure 3 clearly controls the flow rate of the mixture of air and NH4Cl solution entering the 90° elbow 33 and records the temperature of the NH4Cl solution before and after crystallization, which is helpful to determine the conditions required for the crystallization of the NH4Cl solution in the 90° elbow.
[0041] The second bimetallic thermometer 32 of the present invention is used to measure whether the temperature of the incoming mixture reaches the temperature required for crystallization. The third bimetallic thermometer 34 measures the temperature of the residual NH4Cl solution and the hot air. It measures the temperature of the output mixture to determine whether the mixture is safe and prevents safety hazards caused by excessively high output mixture temperature. Secondly, the temperature change before and after crystallization is calculated by the temperature before and after crystallization to study the influence of temperature change on the crystallization deposition characteristics of NH4Cl solution.
[0042] The cooling structure 4 exchanges heat with the heat exchange tube structure 3. More specifically, the cooling structure 4 includes a heat exchange tube 41 located outside the 90° elbow 33 and a water tank 42, a water pump 43, a cooler 44 and a third flow regulating valve 45 for controlling cooling water to enter the heat exchange tube 41. The water tank 42, the water pump 43, the cooler 44 and the third flow regulating valve 45 are connected in sequence. The heat exchange tube 41 covers the 90° elbow 33. Cooling water flows in the heat exchange tube 41 and can exchange heat with the 90° elbow 33 so that the NH4Cl solution is crystallized and deposited in the 90° elbow 33.
[0043] The heat exchange tube 41 is connected to the water tank 42 , the water pump 43 , the cooler 44 , and the third flow regulating valve 45 in sequence through a delivery pipeline to form a cooling circulation loop. The third flow regulating valve 45 can adjust the flow of cooling water entering the heat exchange tube 41 .
[0044] A plurality of connecting rods 46 are arranged circumferentially between the heat exchange tube 41 and the 90° elbow 33, so that the heat exchange tube 41 and the 90° elbow 33 are tightly connected. The heat exchange tube 41, the 90° elbow 33 and the connecting rod 46 are all made of transparent glass. The connecting rod 46 is coated with high-strength sealant on both sides facing the 90° elbow 33 and the connecting rod 46 to stably connect the three. A gap is formed between the connecting rods 46 to facilitate the passage of cooling water. The gap is much larger than the volume of the connecting rod 4, which facilitates efficient heat exchange of the 90° elbow 33. The 90° elbow 33 is divided into a plurality of collection areas 331 by angles. Accordingly, the division angle set in this embodiment is 15°, and the 90° elbow 33 is divided into 6 collection areas 331 by 15°. In the experiment, the crystal deposition of the 6 collection areas is collected respectively to judge the distribution of the crystal deposition of NH4Cl crystals in different collection areas 331 and the total mass of NH4Cl crystal deposition.
[0045] The particles of NH4Cl crystallization deposition are weighed by a high-precision balance (eg, accuracy 0.0001 g).
[0046] The present invention obtains the distribution law of NH4Cl crystal deposition amount in each area and the total mass of NH4Cl crystal deposition under different variables by disassembling the 90° elbow 33 and collecting the NH4Cl crystals in different areas by the 90° elbow 33.
[0047] The waste recovery structure 5 is located at the rear end of the heat exchange tube structure 3, and is used to recover the uncrystallized and deposited NH4Cl solution and waste gas. More specifically, the waste recovery structure 5 includes a gas-liquid separator 51, a gas storage tank 52 and a solution tank 53. The uncrystallized and deposited NH4Cl solution enters the gas-liquid separator 51 through the stop valve 35, the NH4Cl solution enters the solution tank 53 from the lower outlet of the gas-liquid separator 51, and the waste gas enters the gas storage tank 52 from the upper outlet of the gas-liquid separator 51.
[0048] The present invention classifies and collects the uncrystallized NH4Cl solution and waste gas through the waste recovery structure 5, which can not only classify and recover the NH4Cl solution and waste gas for reuse, but also prevent the discharge of the NH4Cl solution and waste gas from causing pollution to the environment.
[0049] The first bimetallic thermometer 14, the second bimetallic thermometer 32 and the third bimetallic thermometer 34 are all bimetallic thermometers, and the bimetallic thermometers include a straight connector 100, and the straight connector 100 is vertically inserted into the conveying pipeline. The model of the bimetallic thermometer is preferably wss-401. The wss-401 bimetallic thermometer is a single-needle indicating thermometer that uses a bimetallic strip wound into a spiral tube, one end of which is fixed and the other free end is connected to a pointer. It rotates with the change of temperature and drives the pointer to rotate to indicate the temperature. That is, one end of the bimetallic strip is fixed on the straight connector 100 and inserted into the conveying pipeline, and the other end of the bimetallic strip drives the pointer to change with the temperature change, thereby achieving the effect of measuring the temperature in the pipe.
[0050] The crystallization temperature range of NH4Cl in the present invention is between 175℃ and 210℃, and the bimetallic thermometer can directly measure between -80℃ and 500℃, and can measure the temperature of liquid, steam and gas medium. On the other hand, it also has the advantages of good shock resistance, firmness, not easy to damage and corrosion resistance, which is conducive to the accurate output of measurement data.
[0051] An operating method of a 90° elbow type NH4Cl crystallization deposition experimental device comprises: Step 1: Connect the air heating structure 1, the NH4Cl solution atomization structure 2, the heat exchange tube structure 3, the cooling structure 4 and the waste recovery structure 5 in sequence; Step 2: Control the temperature and flow rate of the air output by the air heating structure 1. Specifically, start the blower 11 and the stop valve 35 to allow air to enter the pipeline, turn on the heater 13 to heat the air, and adjust the flow rate of the air entering the pipeline through the first flow regulating valve 12. Set the temperature at which the heater 13 heats the air to ensure that the value of the bimetallic thermometer 14 reaches the temperature at which NH4Cl crystallizes under normal pressure; Step 3: Control the flow rate of cooling water output by the cooling structure 4. Specifically, turn on the water pump 43 and the cooler 44. The water pump 43 draws water from the water tank 42, cools the water through the cooler 44, and then controls the flow rate of cooling water in the circulation system through the third flow regulating valve 45. The cooling water flows in the heat exchange tube 41 and performs heat exchange with the 90° elbow 33. Step 4: The NH4Cl solution atomizing structure 2 atomizes the NH4Cl solution and controls the injection amount of the NH4Cl atomized solution. Specifically, the second flow regulating valve 22 is opened, and the atomizer 21 atomizes the NH4Cl solution and enters the pipeline through the second flow regulating valve 22. The second flow regulating valve 22 controls the flow rate of the NH4Cl solution entering the pipeline; Step 5: The NH4Cl atomized solution and air enter the heat exchange tube structure 3 and crystallize in the heat exchange tube structure 3, and photos of NH4Cl crystallization in the heat exchange tube structure 3 at different time periods are taken. Specifically, the NH4Cl atomized solution and air are passed through the flow meter 31 and the second bimetallic thermometer 32 to obtain the flow rate and temperature of the mixture before entering the heat exchange tube, and the mixture enters the 90° elbow 33 for heat exchange and crystallizes and deposits inside the 90° elbow 33. The value changes of the second bimetallic thermometer 32 and the third bimetallic thermometer 34 are observed at regular intervals to ensure that the temperature of the mixture reaches the crystallization temperature of NH4Cl before entering the 90° elbow 33, and the 90° elbow tube is photographed; Step 6: The waste recovery structure 5 recovers the NH4Cl solution and waste gas that have not been crystallized and deposited. Specifically, the NH4Cl solution and waste gas that have not been crystallized and deposited flow out from the outlet of the 90° elbow 33 and enter the gas-liquid separator 5. The solution enters the solution tank 53 from the outlet below the gas-liquid separator 5. The waste gas itself has a relatively high temperature and enters the gas storage tank 52 from the top of the gas-liquid separator 5 to prevent safety problems. Step 7: After the experiment is over, the NH4Cl solution atomization structure 2, the cooling structure 4 and the air heating structure 1 are closed in sequence. Specifically, the atomizer 21 and the second flow regulating valve 22 are closed first, and then the water pump 43 and the cooler 44 are closed to ensure that there is no NH4Cl solution in the pipeline. Then, the heater 13 and the blower 11 are closed, and the crystallized sediment in the 90° elbow 33 is allowed to cool naturally. Step 8: In order to accurately obtain the deposition amount of different collection areas 331, the 90° elbow 33 is removed after cooling, and different collection areas 331 in the 90° elbow 33 are cut, and the NH4Cl crystals in different collection areas 331 are collected, and then weighed using a high-precision balance (such as an accuracy of 0.0001g) to obtain the distribution and total amount of ammonium chloride salt crystal deposition in each area; Step 9: Replace the 90° elbow 33 and repeat steps 2 to 8 to adjust the injection amount of the NH4Cl atomized solution, the temperature and flow rate of the air, and the flow rate of the cooling water, so as to perform multiple tests on the ammonium salt crystal deposition at the deposition site of the 90° elbow 33.
[0052] In step 5, before the NH4Cl atomized solution and air enter the heat exchange tube structure 3, the second bimetallic thermometer 32 is required to ensure that the temperature of the mixture reaches the crystallization temperature of NH4Cl before entering the deposition part.
[0053] The operating method of the present invention realizes the crystallization deposition of the NH4Cl solution in the 90° elbow 33, reveals the mechanism and law of its deposition process, and provides a scientific basis for preventing the tube bundle blockage problem; at the same time, it also provides important support for the development of prevention and control technology for the ammonium chloride particle deposition problem.
[0054] The above description of the disclosed embodiments enables one skilled in the art to implement or use the present invention. Various modifications to these embodiments will be apparent to one skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present invention; therefore, the present invention will not be limited to the embodiments shown herein, but rather to the widest scope consistent with the principles and novel features disclosed herein.
[0055] Although this article uses more of the figure markings: air heating structure 1, NH4Cl solution atomization structure 2, heat exchange tube structure 3, cooling structure 4, waste recovery structure 5, conveying pipeline 6, blower 11, first flow regulating valve 12, heater 13, first bimetallic thermometer 14, atomizer 21, second flow regulating valve 22, flowmeter 31, second bimetallic thermometer 32, 90° elbow 33, third bimetallic thermometer 34, stop valve 35, heat exchange tube 41, water tank 42, water pump 43, cooler 44, third flow regulating valve 45, connecting rod 46, gas-liquid separator 51, gas storage tank 52, solution tank 53, straight connector 100, collection area 331 and other terms, it does not exclude the possibility of using other terms; these terms are used only to more conveniently describe and explain the essence of the present invention; interpreting them as any additional restrictions is contrary to the spirit of the present invention.
Claims
1. A 90° elbow type NH4Cl crystallization deposition experimental device, characterized in that: It comprises an air heating structure (1), an NH4Cl solution atomizing structure (2), a heat exchange pipe structure (3), a cooling structure (4) and a waste recovery structure (5) which are sequentially connected via a conveying pipeline; The conveying pipeline is arranged horizontally or vertically; The air heating structure (1) heats the air and delivers the air to the delivery pipeline; The NH4Cl solution atomizing structure (2) is located at the rear end of the air heating structure (1) and is arranged vertically to the conveying pipeline. The NH4Cl solution atomizing structure (2) atomizes the NH4Cl solution and inputs the NH4Cl atomized solution into the conveying pipeline. The heat exchange tube structure (3) is located at the rear end of the NH4Cl solution atomization structure (2), and the cooling structure (4) performs heat exchange with the heat exchange tube structure (3). Air and the NH4Cl atomized solution are crystallized and deposited in the heat exchange tube structure (3) under the action of the cooling structure (4); The waste recovery structure (5) is located at the rear end of the heat exchange tube structure (3) and is used to recover NH4Cl solution and waste gas that have not been crystallized and deposited.
2. The 90° elbow type NH4Cl crystallization deposition experimental device according to claim 1, characterized in that: The air heating structure (1) comprises a blower (11), a first flow regulating valve (12), a heater (13) and a first bimetallic thermometer (14) which are arranged in sequence, wherein the first flow regulating valve (12) is used to regulate the air flow rate of the blower (11) entering the delivery pipeline, and the heater (13) heats the air entering the delivery pipeline to a temperature set by the first bimetallic thermometer (14).
3. The 90° elbow type NH4Cl crystallization deposition experimental device according to claim 1, characterized in that: The NH4Cl solution atomizing structure (2) comprises an atomizer (21) and a second flow regulating valve (22) arranged in sequence from top to bottom. The atomizer (21) atomizes the NH4Cl solution and regulates the flow rate of the NH4Cl atomized solution entering the delivery pipeline through the second flow regulating valve (22).
4. The 90° elbow type NH4Cl crystallization deposition experimental device according to claim 1, characterized in that: The heat exchange tube structure (3) comprises a flow meter (31), a second bimetallic thermometer (32), a 90° elbow (33), a third bimetallic thermometer (34) and a stop valve (35) which are connected in sequence. The flow meter (31) is used to measure the flow rate of the mixture of air and NH4Cl solution, and the second bimetallic thermometer (32) and the third bimetallic thermometer (34) are used to control the temperature of the mixture of air and NH4Cl solution entering the 90° elbow (33).
5. The 90° elbow type NH4Cl crystallization deposition experimental device according to claim 1, characterized in that: The cooling structure (4) comprises a heat exchange tube (41) located outside the 90° elbow (33), and a water tank (42), a water pump (43), a cooler (44) and a third flow regulating valve (45) for controlling the flow of cooling water into the heat exchange tube (41); the water tank (42), the water pump (43), the cooler (44) and the third flow regulating valve (45) are connected in sequence.
6. The 90° elbow type NH4Cl crystallization deposition experimental device according to claim 5, characterized in that: A plurality of connecting rods (46) are arranged circumferentially between the heat exchange tube (41) and the 90° elbow (33), and the 90° elbow (33) is divided into a plurality of collecting areas (331) by angles.
7. The 90° elbow type NH4Cl crystallization deposition experimental device according to claim 1, characterized in that: The waste recovery structure (5) comprises a gas-liquid separator (51), a gas storage tank (52) and a solution tank (53); the NH4Cl solution without crystallization and deposition enters the solution tank (53) through the gas-liquid separator (51); and the waste gas enters the gas storage tank (52) through the gas-liquid separator (51).
8. The 90° elbow type NH4Cl crystallization deposition experimental device according to claim 2, characterized in that: The first bimetallic thermometer (14), the second bimetallic thermometer (32) and the third bimetallic thermometer (34) are all bimetallic thermometers, each comprising a straight connecting head (100), wherein the straight connecting head (100) is vertically inserted into the conveying pipeline.
9. An operating method of a 90° elbow type NH4Cl crystal deposition experimental device, characterized in that: include, Step 1: Connecting the air heating structure (1), the NH4Cl solution atomization structure (2), the heat exchange tube structure (3), the cooling structure (4) and the waste recovery structure (5) in sequence; Step 2: Control the temperature and flow rate of the air output by the air heating structure (1); Step 3: Control the flow rate of cooling water output by the cooling structure (4); Step 4: The NH4Cl solution atomization structure (2) atomizes the NH4Cl solution and controls the injection amount of the NH4Cl atomized solution; Step 5: the NH4Cl atomized solution and air enter the heat exchange tube structure (3) and crystallize in the heat exchange tube structure (3), and photographs of NH4Cl crystallization in the heat exchange tube structure (3) at different time periods are taken; Step 6: Waste recovery structure (5) recovers the NH4Cl solution and waste gas that have not been crystallized and deposited; Step 7: sequentially close the NH4Cl solution atomization structure (2), the cooling structure (4) and the air heating structure (1); Step 8: Remove the 90° elbow (33), cut different collection areas (331) in the 90° elbow (33), and collect NH4Cl crystals in different collection areas (331); Step 9: Replace the 90° elbow (33) and repeat steps 2 to 8 to adjust the injection volume of the NH4Cl atomized solution and perform repeated tests.
10. The operating method of the 90° elbow type NH4Cl crystal deposition experimental device according to claim 9, characterized in that: In step 5, before the NH4Cl atomized solution and air enter the heat exchange tube structure (3), a second bimetallic thermometer (32) is required to ensure that the temperature of the mixture reaches the crystallization temperature of NH4Cl before entering the deposition part.
