Charging facility metering misalignment judgment method

By constructing a tree topology and calculating the power error, the problem of inaccurate measurement of electric energy meters in new energy vehicle charging facilities is solved, accurate measurement monitoring and abnormal location are achieved, and operational efficiency and customer satisfaction are improved.

CN118777969APending Publication Date: 2024-10-15CHINA GRIDCOM
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410871016.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-27
Publication Date
2024-10-15

AI Technical Summary

Technical Problem

Existing technology makes it difficult to accurately monitor and locate meter inaccuracies in new energy vehicle charging facilities, resulting in inaccurate power measurement and affecting operational efficiency and customer service quality.

Method used

A charging facility metering inaccuracy determination method is adopted to obtain the monitoring data of each electric energy meter, construct a tree topology, calculate the power error of the node, and based on this, determine whether there are abnormalities on the charging line and locate the location of metering inaccuracy. Reduce additional disassembly verification and field testing steps.

Benefits of technology

It improves the accuracy of electric energy meter measurement, timely detects inaccuracies in electric energy meter measurement and abnormalities in charging facilities, reduces operating costs, and improves customer service quality.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118777969A_ABST
    Figure CN118777969A_ABST
Patent Text Reader

Abstract

The invention discloses a method for judging metering misalignment of a charging facility. The method comprises the following steps: acquiring monitoring data acquired by each electric energy meter; wherein the electric energy meters comprise a total electric energy meter and at least one branch electric energy meter, and each electric device included in a charging circuit covered by the total electric energy meter is provided with a corresponding branch electric energy meter; in the tree topology structure formed based on each electric energy meter, for each node of non-leaf nodes, calculating a power error corresponding to the node based on monitoring data collected by the sub electric energy meter corresponding to each child node of the node and monitoring data collected by the electric energy meter corresponding to the node; and monitoring whether the charging circuit is abnormal or not based on the power error corresponding to each node. By applying the scheme provided by the embodiment of the invention, metering misalignment of the electric energy meter can be found in time.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of charging facility metering, and in particular to a method for determining inaccurate metering of a charging facility. Background Art

[0002] As the market share of new energy vehicles increases year by year, the demand for new energy vehicle charging piles is showing a sharp growth trend. This growth makes the power trading scenarios more complex and diverse, and also requires more accurate power measurement. In related technologies, electric energy meters are usually used for power measurement; in this case, a technical solution is needed to ensure the accuracy of the electric energy meter so as to monitor the operation of charging facilities. Summary of the invention

[0003] The present invention aims to solve one of the technical problems in the related art at least to a certain extent. To this end, one object of the present invention is to propose a method for determining inaccurate metering of charging facilities to timely detect inaccurate metering of electric energy meters.

[0004] An embodiment of the present invention provides a method for determining inaccurate measurement of a charging facility, the method comprising:

[0005] Acquire monitoring data of each electric energy meter; wherein each electric energy meter includes: a total electric energy meter and at least one sub-electric energy meter, and each electric device included in the charging line covered by the total electric energy meter is installed with a corresponding sub-electric energy meter; wherein the monitoring data includes: monitoring power, voltage and current collected by each electric energy meter;

[0006] In the tree topology formed based on each electric energy meter, for each non-leaf node, based on the monitoring data collected by the sub-electric energy meters corresponding to each child node of the node and the monitoring data collected by the electric energy meter corresponding to the node, the power error corresponding to the node is calculated;

[0007] Wherein, each node included in the tree topology structure corresponds to the total electric energy meter or a sub-electric energy meter, and there is a connection based on electric wires between the electric energy meters corresponding to the two nodes respectively connected by each connection relationship included in the tree topology structure;

[0008] Based on the power errors corresponding to the nodes, it is monitored whether there is an abnormality on the charging line.

[0009] Optionally, the method further includes:

[0010] Establishing a first characteristic database including resistance value data and a second characteristic database including conversion efficiency data of a DC charging device;

[0011] The calculating the power error corresponding to the node based on the monitoring data collected by the sub-electric energy meters corresponding to each sub-node of the node and the monitoring data collected by the electric energy meter corresponding to the node includes:

[0012] Based on the monitoring data collected by the sub-electricity meters corresponding to each child node of the node and the monitoring data collected by the electric energy meter corresponding to the node, the resistance value data obtained from the first feature database, and the conversion efficiency data obtained from the second feature database, the power error corresponding to the node is calculated.

[0013] Optionally, the calculating the power error corresponding to the node based on the monitoring data collected by the sub-electric energy meters corresponding to each subnode of the node and the monitoring data collected by the electric energy meter corresponding to the node includes:

[0014] In the case where the node corresponds to the total electric energy meter, determining the power error corresponding to the node based on the monitoring power collected by the total electric energy meter and the sum of the first powers of each subnode;

[0015] The first power sum includes: the monitoring power collected by the sub-electricity meters corresponding to each sub-node of the node, and the power loss of the wires between the main electric energy meter and the electric equipment to which the sub-electricity meters corresponding to each sub-node of the node belong;

[0016] The power error corresponding to the node is calculated in the following manner:

[0017]

[0018] Among them, ε Ⅰ Represents the power error corresponding to the node, P 总表 Indicates the monitoring power collected by the total electric energy meter, P Ⅰ级线损 represents the power loss of the wires between the main energy meter and the electrical equipment to which the sub-energy meters corresponding to each child node of the node belong, P Ⅰ级表计 Indicates the monitored power collected by the sub-electricity meters corresponding to each child node of this node.

[0019] Optionally, the calculating the power error corresponding to the node based on the monitoring data collected by the sub-electric energy meters corresponding to each subnode of the node and the monitoring data collected by the electric energy meter corresponding to the node includes:

[0020] In the case where the electric device to which the sub-electric energy meter corresponding to the node belongs is a DC charging device, the second power sum is determined based on the monitoring power collected by the sub-electric energy meters corresponding to each subnode of the node, the wire loss power between the DC charging device and the electric device to which the sub-electric energy meters corresponding to each subnode of the node belong, the conversion loss power of the DC charging device, and the fixed loss power of the DC charging device;

[0021] Determine a power error of the node based on the monitoring power collected by the sub-electric energy meter corresponding to the node and the sum of the second power;

[0022] The power error corresponding to the node is calculated in the following manner:

[0023]

[0024] Among them, ε Ⅱ Indicates the power error corresponding to the node; P Ⅰ级表计 Indicates the monitoring power collected by the sub-electric energy meter corresponding to the node; P 充电机转换损耗 represents the conversion loss power of the DC charging device; P Ⅱ级线损 represents the power loss of the electric wire between the DC charging device and the electric equipment to which the sub-electric energy meters corresponding to each sub-node of the node belong; P Ⅱ级表计 Indicates the monitoring power collected by the sub-electricity meters corresponding to each child node of the node; P 充电设施固定损耗 Indicates that the sub-electric energy meter corresponding to the node collects the fixed power loss of the electrical equipment to which it belongs.

[0025] Optionally, the calculating the power error corresponding to the node based on the monitoring data collected by the sub-electric energy meters corresponding to each subnode of the node and the monitoring data collected by the electric energy meter corresponding to the node includes:

[0026] In the case where the electric device to which the sub-electric energy meter corresponding to the node belongs is a current control device in the charging device, the power error corresponding to the node is determined based on the monitoring power collected by the sub-electric energy meter corresponding to the node and the sum of the third powers of each subnode;

[0027] The third power sum is: the monitoring power collected by the sub-electricity meters corresponding to each sub-node of the node, and the power loss of the wires between the current control device and the electrical equipment to which the sub-electricity meters corresponding to each sub-node of the node belong;

[0028] The power error corresponding to the node is calculated in the following manner:

[0029]

[0030] Among them, ε Ⅲ Represents the power error corresponding to the node, P Ⅱ级表计 Indicates the monitoring power collected by the sub-electric energy meter corresponding to the node, P Ⅲ级线损 represents the power loss of the electric wire between the current control device and the electric equipment to which the electric energy meter corresponding to each child node of the node belongs, P Ⅲ级表计 Indicates the monitored power collected by the sub-electricity meters corresponding to each child node of this node.

[0031] Optionally, monitoring whether there is an abnormality on the charging line based on the power error corresponding to each node includes:

[0032] Performing a Boolean value check based on the power errors corresponding to the nodes at each level in the tree topology structure to obtain a check result; and judging whether there is an abnormality on the charging line based on the check result;

[0033] The verification results include:

[0034] The inter-group verification results between the total power meter node and the sub-power meter nodes at the next level, the inter-group verification results between any sub-power meter node and the sub-sub-power meter nodes at the next level of the sub-power meter node, and the overall verification results between the total power meter node and the sub-power meter nodes at the lowest level.

[0035] Optionally, the inter-group verification result between the total electric energy meter node and the sub-electric energy meter nodes at the next level, and the inter-group verification result between any sub-electric energy meter node and the sub-electric energy meter nodes at the next level of the sub-electric energy meter node are obtained in the following manner:

[0036] In the tree topology, for the main electric energy meter node and any sub-electric energy meter node having a sub-electric energy meter node, the Boolean value of the node and each sub-node of the node is determined based on the magnitude relationship between the power error corresponding to the node and a preset first error threshold;

[0037] For the main electric energy meter node and any sub-electric energy meter node with a sub-electric energy meter node, an OR operation is performed based on all Boolean values ​​corresponding to the node to obtain the inter-group verification result.

[0038] Optionally, the overall verification result between the total electric energy meter node and the lowest level sub-electric energy meter node is obtained in the following manner:

[0039] Calculating the overall error between the monitoring data collected by the total electric energy meter and the monitoring data collected by the sub-electric energy meters corresponding to each leaf node in the tree topology structure;

[0040] If the overall error is greater than a preset second error threshold, an overall verification result indicating that an abnormality exists on the charging circuit is obtained.

[0041] Optionally, the wire loss power is obtained based on the length and cable model of the wires between the main power meter and the electrical equipment to which the sub-power meters corresponding to each sub-node of the node belong.

[0042] Optionally, the sub-electricity meter is a rail-type electric energy meter installed on the incoming line side of each electrical equipment;

[0043] The tree topology structure is a multi-level tree topology structure established based on the hierarchical relationship of each electrical device and taking each sub-electrical energy meter as a node.

[0044] In the solution provided by the embodiment of the present invention, it is only necessary to obtain the monitoring power from the data collected by the electric energy meter, without the need for additional steps such as dismantling and verification, on-site testing, etc., which require human and material resources, thereby reducing the cost of abnormal monitoring.

[0045] During the monitoring process, a tree topology formed by each electric energy meter is used. For each non-leaf node, the power error corresponding to the node is calculated based on the monitoring power collected by the sub-electric energy meters corresponding to each child node of the node and the monitoring power collected by the electric energy meter corresponding to the node. In this way, it is possible to determine whether there is an abnormality for each node according to the power error, so as to locate the position of the abnormality on the charging line, improve the accuracy of monitoring, and promptly discover the occurrence of abnormal conditions in charging facilities such as inaccurate measurement of electric energy meters, high power loss or power theft, thereby improving customer service quality and reducing operating costs.

[0046] Additional aspects and advantages of the present invention will be given in part in the following description and in part will be obvious from the following description, or will be learned through practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS

[0047] Figure 1 It is a flow chart of a first charging facility metering inaccuracy determination method provided by an embodiment of the present invention;

[0048] Figure 2 is a schematic diagram of a charging circuit topology provided by an embodiment of the present invention;

[0049] Figure 3 It is a flow chart of a second method for determining inaccurate metering of charging facilities provided in an embodiment of the present invention. DETAILED DESCRIPTION

[0050] Embodiments of the present invention are described in detail below, examples of which are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are intended to be used to explain the present invention, and should not be construed as limiting the present invention.

[0051] The following describes a method for determining charging facility metering inaccuracy according to an embodiment of the present invention with reference to the accompanying drawings.

[0052] In one embodiment of the present invention, see Figure 1 , provides a method for determining inaccurate metering of a charging facility, the method comprising steps S101-S103.

[0053] S101: Acquire monitoring data of each electric energy meter.

[0054] The monitoring data include: monitoring power, voltage and current collected by each electric energy meter.

[0055] The monitoring data that can be collected by the electric energy meter include the current, voltage, and power measured by each electric energy meter, and the measured power is the monitoring power.

[0056] Among them, each electric energy meter includes: a total electric energy meter and at least one sub-electric energy meter, and each electrical device included in the charging line covered by the total electric energy meter is installed with a corresponding sub-electric energy meter.

[0057] In one embodiment of the present invention, the sub-electric energy meter is a rail-type electric energy meter installed on the incoming line side of each electrical equipment;

[0058] The tree topology structure is: a multi-level tree topology structure established based on the hierarchical relationship of each electrical device, with each sub-electricity meter as a node.

[0059] The hierarchical relationship is determined by the current direction during charging. Figure 2 As shown, starting from the P total meter, each connection to the right is a sub-electricity meter, which is a lower-level sub-electricity meter.

[0060] The energy meter is at the same level as the electrical equipment on which it is installed.

[0061] like Figure 2 The tree topology of the charging line shown in the figure, P is the total electric energy meter. The total electric energy meter covers the charging line, and the power consumption of each electric device passing through the charging line will be recorded by the total electric energy meter.

[0062] The sub-electricity meter is an electric energy meter other than the total electric energy meter in this charging circuit, such as Figure 2 As shown, it can be an electric energy meter located outside the DC charging pile or an electric energy meter located inside the DC charging pile, including an electric energy meter installed on the charger, charging pile, shunt, contactor, and charging gun input side.

[0063] Electrical equipment refers to equipment that consumes electrical energy and generates power loss during the charging process, and may include Figure 2 The DC charger, integrated DC charging pile, AC charging pile, shunt, rectifier, etc.; the electric energy meters installed on the left side of the electrical equipment are sub-electricity meters, and each sub-electricity meter is installed on the incoming line side of the corresponding electrical equipment.

[0064] The total electric energy meter can be connected to the transformer of the substation to which the charging line belongs.

[0065] Monitoring power can be achieved by continuously recording the historical data of each energy meter, see Figure 3The embodiment shown; alternatively, the data displayed by the electric energy meter can be obtained in real time to read the monitored power, which is not limited to the embodiment of the present invention.

[0066] S102: In the tree topology structure formed based on each electric energy meter, for each non-leaf node, based on the monitoring data collected by the sub-electric energy meters corresponding to each child node of the node and the monitoring data collected by the electric energy meter corresponding to the node, calculate the power error corresponding to the node.

[0067] Wherein, each node included in the tree topology structure corresponds to a total electric energy meter or a sub-electric energy meter, and there is a connection based on electric wires between the electric energy meters corresponding to two nodes respectively connected by each connection relationship included in the tree topology structure;

[0068] The connections between nodes in the tree topology correspond to the actual existing wires, that is, the routes of current transmission in the charging line. The nodes correspond to the energy meters.

[0069] The sub-electricity meters are all the electric energy meters in the charging circuit except the P total meter.

[0070] For each non-leaf node, the electric energy meter corresponding to the node may be a total electric energy meter or a sub-electric energy meter.

[0071] Figure 2 Each electric energy meter forms a node of a tree topology structure. Except for the electric energy meter on the far right of the line, such as the electric energy meter corresponding to each charging gun, the other electric energy meters are non-leaf node electric energy meters.

[0072] Figure 2 Power consumption nodes representing electrical equipment, such as charging guns, DC chargers, etc., are added. The above power consumption nodes can be regarded as the same nodes at the same level as the electric energy meters installed on the electrical equipment, and do not affect the parent-child node relationship between the nodes of the electric energy meters.

[0073] In addition to monitoring the power, when calculating the power error, the power loss of the wires connecting the tree topology structure may also be referred to, as shown in the subsequent embodiments.

[0074] S103: Monitor whether there is an abnormality on the charging line based on the power error corresponding to each node.

[0075] Specifically, the power error may be compared with a preset error threshold to determine whether an abnormality exists, see the subsequent embodiments.

[0076] In the solution provided by the embodiment of the present invention, it is only necessary to obtain the monitoring power from the data collected by the electric energy meter, without the need for additional steps such as dismantling and verification, on-site testing, etc., which require human and material resources, thereby reducing the cost of abnormal monitoring.

[0077] During the monitoring process, a tree topology formed by each electric energy meter is used. For each non-leaf node, the power error corresponding to the node is calculated based on the monitoring power collected by the sub-electric energy meters corresponding to each child node of the node and the monitoring power collected by the electric energy meter corresponding to the node. In this way, it is possible to determine whether there is an abnormality for each node according to the power error, so as to locate the position of the abnormality on the charging line, improve the accuracy of monitoring, and promptly discover the occurrence of abnormal conditions in charging facilities such as inaccurate measurement of electric energy meters, high power loss or power theft, thereby improving customer service quality and reducing operating costs.

[0078] In one embodiment of the present invention, based on the monitoring data collected by the sub-electric energy meters corresponding to each sub-node of the node and the monitoring data collected by the electric energy meter corresponding to the node, the power error corresponding to the node is calculated, including:

[0079] In the case where the node corresponds to a total electric energy meter, a power error corresponding to the node is determined based on the monitoring power collected by the total electric energy meter and the sum of the first powers of each subnode;

[0080] The first power sum includes: the monitoring power collected by the sub-electricity meters corresponding to each child node of the node, and the wire loss power between the main electric energy meter and the electrical equipment belonging to the sub-electricity meters corresponding to each child node of the node.

[0081] The power loss in cables refers to the loss caused by the resistance of the cables used to connect the electrical devices.

[0082] Referring to Formula 1, the power error corresponding to the node is calculated as follows:

[0083] Formula 1:

[0084]

[0085] Among them, ε Ⅰ Represents the power error corresponding to the node, P 总表 Indicates the monitoring power collected by the total electric energy meter, P Ⅰ级线损 Represents the power loss of the wires between the main energy meter and the electrical equipment to which the sub-energy meters corresponding to each child node of this node belong, P Ⅰ级表计 Indicates the monitored power collected by the sub-electricity meters corresponding to each child node of this node.

[0086] Formula 1 is expanded to become Formula 2.

[0087] Formula 2:

[0088]

[0089] Among them, ε Ⅰ , P 总表The meaning is the same as formula 1. n represents the number of child nodes of the node, P k represents the monitoring power of the electric energy meter corresponding to the kth child node, I k represents the current monitored by the electric energy meter corresponding to the kth child node, R k Indicates the resistance between the main energy meter and the electrical equipment to which the sub-energy meters corresponding to each child node of this node belong. It is the power loss of the electric wires of the electrical equipment to which the total electric energy meter and the sub-electric energy meter corresponding to the kth child node belong; the sum of them is the line loss R in the figure Ⅰ-0 , Line loss R Ⅰ-1 , Line loss R Ⅰ-2 ,……,Line loss R Ⅰ-k ,……,Line loss R Ⅰ-n The total power loss of the line loss R Ⅰ-0 It is the power loss of the distribution lines between the ancillary equipment and the main meter in the charging station. The ancillary equipment generates fixed losses in the charging station: power consumption of the monitoring system, overflow gate system, and other non-charging facilities.

[0090] P 总表 The energy meter corresponding to the child node is the energy meter D in the figure. Ⅰ-0 、Electricity meter D Ⅰ-1 , Point Energy Table D Ⅰ-2 ,……,Electricity meter D Ⅰ-k ,……,Electricity meter D Ⅰ-n .

[0091] In one embodiment of the present invention, based on the monitoring data collected by the sub-electric energy meters corresponding to each sub-node of the node and the monitoring data collected by the electric energy meter corresponding to the node, the power error corresponding to the node is calculated, including:

[0092] In the case where the electric device to which the sub-electric energy meter corresponding to the node belongs is a DC charging device, the second power sum is determined based on the monitoring power collected by the sub-electric energy meters corresponding to each subnode of the node, the wire loss power between the DC charging device and the electric device to which the sub-electric energy meters corresponding to each subnode of the node belong, the conversion loss power of the DC charging device, and the fixed loss power of the DC charging device;

[0093] The power error of the node is determined based on the monitoring power collected by the sub-electric energy meter corresponding to the node and the sum of the second power.

[0094] The DC charging device can be an integrated DC charging device or a split DC charging device, corresponding to Figure 2 The integrated DC charging pile and DC charger both generate fixed loss and charger conversion loss, namely the fixed loss power and conversion loss power mentioned above.

[0095] Conversion loss power refers to the loss caused by the DC charging device converting AC power into DC power.

[0096] In one embodiment of the present invention, the power loss of the electric wire can be obtained based on the length and cable type of the electric wire between the main electric energy meter and the electric equipment to which the sub-electric energy meters corresponding to each sub-node of the node belong.

[0097] In one embodiment of the present invention, a first characteristic database including resistance value data and a second characteristic database including conversion efficiency data of a DC charging device may be established;

[0098] In this case, the calculation method of the power error in the above step S102 may include:

[0099] Based on the monitoring data collected by the sub-electricity meters corresponding to each child node of the node and the monitoring data collected by the electric energy meter corresponding to the node, the resistance value data obtained from the first feature database, and the conversion efficiency data obtained from the second feature database, the power error corresponding to the node is calculated.

[0100] The first feature database and the second feature database may be pre-established databases. The resistance value data may include resistance value data of wires of different cable models, and the resistance value data may record the resistance value per kilometer corresponding to the wires of different cable models. When the resistance value data in the database is obtained, the resistance value of each section of the wire is calculated based on the length of the wire and the resistance value per kilometer corresponding to the cable model of the wire in the charging line, and the wire loss power is calculated based on the resistance value.

[0101] In the subsequent embodiments, the calculation method of the power loss of the wire is similar to this.

[0102] The conversion efficiency data can be used to record the conversion loss power when the DC charging device converts AC power into AC power. The specific usage is shown in the following formula 3.

[0103] Referring to Formula 3, the power error corresponding to the node is calculated as follows.

[0104] Formula 3:

[0105]

[0106] Among them, ε Ⅱ Indicates the power error corresponding to the node; P Ⅰ级表计 Indicates the monitoring power collected by the sub-electric energy meter corresponding to the node; P 充电机转换损耗 Represents the conversion loss power of DC charging equipment; P Ⅱ级线损 Represents the power loss of the wires between the DC charging device and the electrical equipment to which the sub-electrical energy meters corresponding to each child node of the node belong; P Ⅱ级表计Indicates the monitoring power collected by the sub-electricity meters corresponding to each child node of the node; P 充电设施固定损耗 Indicates that the sub-electric energy meter corresponding to the node collects the fixed power loss of the electrical equipment to which it belongs, which may specifically include the fixed loss of ancillary equipment such as the internal control system and display screen.

[0107] like Figure 2 As shown, ε Ⅱ When the power error of the DC charger is expressed, the power loss of the wire is the line loss R Ⅱ-1 ,……,Line loss R Ⅱ-j ,……,Line loss R Ⅱ-m The total power loss of each child node is the energy meter D Ⅱ-1 ,……,Electricity meter D Ⅱ-j ,……,Electricity meter D Ⅱ-n The electrical equipment to which the energy meter belongs is a DC charging pile, and wires are connected from the DC charger to the shunt, contactor and other current control devices in the pile.

[0108] When ε Ⅱ When the power error of the integrated DC charging pile is expressed, the power loss of the wire is the line loss R Ⅱ-1 ,……,Line loss R Ⅱ-y ,……,Line loss R Ⅱ-w The total power loss of each child node is the energy meter D Ⅱ-1 ,……,Electricity meter D Ⅱ-y ,……,Electricity meter D Ⅱ-w ; The electrical equipment to which the electric energy meter belongs is a charging gun.

[0109] In the embodiment of the present invention, each electric device is installed with an electric energy meter, and the electric device is referred to as the electric device to which the installed electric energy meter belongs.

[0110] Formula 3 is specifically expanded into the following formula 4.

[0111] Formula 4:

[0112]

[0113] Among them, ε Ⅱ , P Ⅰ级表计 , P 充电设施固定损耗 Same as formula 3. C*P Ⅰ级表计 Corresponding to the conversion loss power, C is a preset proportionality factor representing the power remaining after the loss.

[0114] The proportional coefficient can be set manually. Specifically, the working efficiency of the charger can be controlled to be stable in the highest efficiency range. The power loss of AC to DC conversion in this case can be measured to obtain the corresponding proportional coefficient. m represents the number of child nodes, P jIndicates the monitoring power of the sub-electric energy meter corresponding to the j-th child node. j represents the current monitored by the electric energy meter corresponding to the jth child node, R j Indicates the resistance between the DC charging device and the electrical equipment to which the sub-electrical energy meters corresponding to each child node of this node belong. Represents the power loss of the wire between the DC charging device and the electrical equipment to which the sub-electrical energy meter corresponding to the j-th child node belongs.

[0115] In addition, if Figure 2 As shown, the calculation method of the power error of the AC charging equipment and the AC charging pile in the figure is similar to formula 3 and 4, the difference is that there is no charger conversion loss. The formula used to calculate the power error and the corresponding expansion formula are as follows:

[0116]

[0117] Among them, ε 交流 is the power error of the AC charging equipment, P Ⅰ级表计 To monitor the power of the electric energy meter installed with the AC charging equipment; P 充电桩固定损耗 represents the fixed loss of AC charging equipment; P Ⅱ级线损 Represents the power loss of the wires between the AC charging pile and the electrical equipment to which the sub-electrical energy meters corresponding to each sub-node of the node corresponding to the electric energy meter of the AC charging pile belong; P Ⅱ级表计 represents the monitoring power collected by the sub-electricity meter corresponding to each child node; w is the number of child nodes, P y为 The monitoring power collected by the electric energy meter corresponding to the yth byte node, I y Represents the current monitored by the electric energy meter corresponding to the yth child node, R y Represents the resistance between the AC charging device and the electrical equipment to which the sub-electrical energy meter corresponding to each sub-node belongs, corresponding to Figure 2 In the right branch of the AC charging pile, the power loss of the wire is line loss R Ⅱ-1 ,……,Line loss R Ⅱ-y ,……,Line loss R Ⅱ-2 The total power loss of each child node is the energy meter D Ⅱ-1 ,……,Electricity meter D Ⅱ-y ,……,Electricity meter D Ⅱ-w ; The electrical equipment to which the electric energy meter belongs is a charging gun.

[0118] In one embodiment of the present invention, based on the monitoring data collected by the sub-electric energy meters corresponding to each sub-node of the node and the monitoring data collected by the electric energy meter corresponding to the node, the power error corresponding to the node is calculated, including:

[0119] In the case where the electric device to which the sub-electric energy meter corresponding to the node belongs is a current control device in the charging device, the power error corresponding to the node is determined based on the monitoring power collected by the sub-electric energy meter corresponding to the node and the sum of the third powers of each subnode;

[0120] The third power sum is: the monitoring power collected by the sub-electricity meters corresponding to each child node of the node, and the wire loss power between the current control device and the electrical equipment to which the sub-electricity meters corresponding to each child node of the node belong.

[0121] In this case, the current control device can be Figure 2 The shunt, contactor, etc. in the sub-node. The electrical equipment to which the sub-meters correspond to can be charging guns. In this case, the power loss of the wire corresponds to the line loss R in the figure. Ⅲ-1 ,……,Line loss R Ⅲ-y ,……,Line loss R Ⅲ-w The total power loss of each node is the energy meter D Ⅲ-1 ,……,Electricity meter D Ⅲ-y ,……,Electricity meter D Ⅲ-w .

[0122] Referring to Formula 5, the power error corresponding to the node is calculated as follows.

[0123] Formula 5:

[0124]

[0125] Among them, ε Ⅲ Represents the power error corresponding to the node, P Ⅱ级表计 Indicates the monitoring power collected by the sub-electric energy meter corresponding to the node, P Ⅲ级线损 Represents the power loss of the wires between the current control device and the electrical equipment to which the sub-electrical energy meters corresponding to each child node of this node belong, P Ⅲ级表计 Indicates the monitored power collected by the sub-electricity meters corresponding to each child node of this node.

[0126] Formula 5 can be expanded into the following formula 6.

[0127] Formula 6:

[0128]

[0129] Among them, ε Ⅲ , P Ⅱ级表计 Same as Formula 5. w represents the number of child nodes, P y represents the monitoring power collected by the electric energy meter corresponding to the yth child node, I y Represents the current monitored by the electric energy meter corresponding to the yth child node, R yRepresents the resistance between the current control device and the electrical equipment to which the sub-electrical energy meter corresponding to the y-th child node belongs.

[0130] The embodiments described in the above formulas are only partial implementations of the present invention. For example, if the line loss is small relative to the monitoring power collected by each electric energy meter, the ratio of the monitoring power collected by the electric energy meter corresponding to each node and the sub-node can also be directly calculated, and the power error can be determined based on the obtained ratio.

[0131] In one embodiment of the present invention, whether there is an abnormality in the charging line can be monitored in the following manner:

[0132] Perform a Boolean value check based on the power errors corresponding to the nodes at each level in the tree topology structure to obtain a check result; and determine whether there is an abnormality on the charging line based on the check result;

[0133] The verification results include:

[0134] The inter-group verification results between the total power meter node and the sub-power meter nodes at the next level, the inter-group verification results between any sub-power meter node and the sub-sub-power meter nodes at the next level of the sub-power meter node, and the overall verification results between the total power meter node and the sub-power meter nodes at the lowest level.

[0135] The total energy meter node is a node corresponding to the total energy meter in the tree topology structure. The sub-energy meter node is a node corresponding to the sub-energy meter in the tree topology structure.

[0136] The inter-group verification results can be obtained in the following ways:

[0137] In the tree topology, for the main electric energy meter node and any sub-electric energy meter node having a sub-electric energy meter node, the Boolean value of the node and each sub-node of the node is determined based on the magnitude relationship between the power error corresponding to the node and a preset first error threshold;

[0138] For the main electric energy meter node and any sub-electric energy meter node with a sub-electric energy meter node, an OR operation is performed based on all Boolean values ​​corresponding to the node to obtain the inter-group verification result.

[0139] like Figure 2 As shown, the total meter P and the first-level sub-meter D Ⅰ-0 、Electricity meter D Ⅰ-1 , Point Energy Table D Ⅰ-2 ,……,Electricity meter D Ⅰ-k ,……,Electricity meter D Ⅰ-n The inter-group verification result is obtained between the first-level sub-electricity meters, such as the electric energy meter electric energy meter D Ⅰ-n It can be connected with the second-level sub-meter D Ⅱ-1,……,Electricity meter D Ⅱ-j ,……,Electricity meter D Ⅱ-m The inter-group verification result can be obtained between the sub-electricity meters of the second level and the sub-electricity meters of the third level; and so on, the inter-group verification result can be obtained between the sub-electricity meters of the second level and the sub-electricity meters of the third level.

[0140] For example, a Boolean value may be determined as follows.

[0141] If the power error corresponding to the node is less than the first error threshold, the Boolean values ​​of the node and each child node of the node are set to 1, otherwise they are set to 0.

[0142] For the Boolean value operation of each node, you can refer to the following two cases.

[0143] In the first case, the node corresponds to a Boolean value, such as the node of the total power meter and the leaf node. Then, it is directly determined whether there is an abnormality at the charging line position corresponding to the node based on the Boolean value corresponding to the node. If the Boolean value is 1, there is no abnormality, and if the Boolean value is 0, there is an abnormality.

[0144] In the second case, the node corresponds to more than one Boolean value, for example, Figure 2 Middle-split energy meter node: energy meter D Ⅰ-n The corresponding child node has a sub-electricity meter node of the child node at the lower level, and the child node itself is a child node of the upper level node in the topological structure; in this case, all Boolean values ​​of the node can be ORed, if the operation result is 1, there is no exception, if the operation result is 0, there is an exception.

[0145] In one embodiment of the present invention, the overall verification result between the total electric energy meter node and the lowest level sub-electric energy meter node can be obtained in the following manner:

[0146] The overall error between the monitoring data collected by the total electric energy meter and the monitoring data collected by the sub-electric energy meters corresponding to each leaf node in the tree topology structure can also be calculated; if the overall error is greater than the preset second error threshold, an overall verification result indicating that there is an abnormality on the charging line is obtained.

[0147] In the tree topology, the leaf node itself does not have child nodes, that is, the lowest level sub-electricity meter node.

[0148] The above-mentioned overall error may be an overall power error of the tree topology structure. The overall error is determined by the ratio of the sum of the monitoring powers collected by the sub-electric energy meters corresponding to each leaf node to the monitoring power collected by the total electric energy meter.

[0149] In this way, the charging process from the main meter to the terminal can be monitored overall, avoiding the problem that the measurement of local thresholds has limited reflection on the overall global loss.

[0150] According to the above-mentioned formulas at all levels, the tree topology structure reflects the precise topological relationship of "station-transformer-pile-meter", realizing the operation data collection and monitoring of key metering points such as the inlet side of the substation, the inlet side of the equipment, and the outlet side of the equipment. According to the law of conservation of energy, a metering inaccuracy judgment model is constructed, the analysis results are cross-validated, and the abnormal points are accurately located, which supports the digital development and lean management of power grid companies. It has strong engineering practicality for reducing operating costs and improving customer satisfaction.

[0151] The following Figure 3 The charging facility metering inaccuracy determination method shown illustrates the overall process of an embodiment of the present invention.

[0152] The steps corresponding to the preconditions in the figure are steps that can be performed in advance before monitoring the electric energy meter, as follows.

[0153] 1. Add energy meters to the charging piles and chargers so that each electrical device on the charging line covered by the total energy meter is equipped with a corresponding sub-energy meter.

[0154] 2. Establish a database of resistance values ​​per kilometer for cable models and an AC-DC (Alternating Current-Direct Current) conversion efficiency database for charging facility models; record the resistance values ​​per kilometer corresponding to wires of different cable models and the power loss ratio of AC to DC conversion.

[0155] 3. Construct a tree topology structure between the main energy meter, sub-energy meters, cables and other facilities.

[0156] 4. Register the cable model and length used to calculate the resistance value and then the line loss; register the charging facility model AC-DC conversion efficiency and then calculate the conversion loss power of the DC charging equipment.

[0157] 5. Set the error threshold according to the market technology level and input-output economy. The error threshold may include the aforementioned first error threshold and second error threshold.

[0158] The specific process of analysis and judgment is as follows.

[0159] 1. Obtain the tree topology structure, as well as the corresponding facility parameters, cable resistance values, AC-DC conversion efficiency and other information.

[0160] 2. Obtain 96 points of data collected from each meter in the charging station during the preset time period.

[0161] Step 2 is a specific implementation method for obtaining historical data. The 96-point collected data shown represents the monitoring data collected at each sampling point when a day is equally divided into 96 sampling points, which is equivalent to collecting monitoring data from each electric energy meter every 15 minutes.

[0162] 3. Filter out a group of 96-point acquisition data in the reverse chronological direction, in which the voltage of the total electric energy meter is within the calibrated voltage range and the current load is within the calibrated current range of 50%-100%.

[0163] The reverse chronological direction means starting from the most recently collected monitoring data. If it does not meet the conditions of step 3, that is, it is not within the calibrated voltage range or calibrated current range, the monitoring data of the previous 15 minutes will be screened, and the monitoring data that meets the conditions will be screened in this direction. Avoid the situation where the accuracy of the measured power error decreases significantly when it is less than 50%.

[0164] The calibrated voltage range and calibrated current range are artificially set ranges.

[0165] The preset time period can be set to the past 7 days, a total of 168 hours. If there is no monitoring data that meets the requirements within 7 days, the time range for obtaining monitoring data will be extended forward, or the analysis will be canceled and wait for more monitoring data to be generated.

[0166] 4. Model, analyze and judge the selected monitoring data based on the law of energy conservation, and perform secondary logical OR operation on the Boolean value of the primary result to guide on-site inspection and solve the problem of inaccurate measurement.

[0167] The specific implementation methods of modeling analysis and judgment, and obtaining Boolean values ​​for OR operations can be found in the formulas of the aforementioned embodiments and will not be described in detail here.

[0168] It should be noted that in the process Figure 1The logic and / or steps represented in or otherwise described herein, for example, may be considered as an ordered list of executable instructions for implementing logical functions, and may be embodied in any computer-readable medium for use by, or in conjunction with, an instruction execution system, device, or apparatus (such as a computer-based system, a system including a processor, or other system that can fetch instructions from and execute instructions on an instruction execution system, device, or apparatus). For purposes of this specification, a "computer-readable medium" may be any device that can contain, store, communicate, propagate, or transmit a program for use by, or in conjunction with, an instruction execution system, device, or apparatus. More specific examples (a non-exhaustive list) of computer-readable media include the following: an electrical connection having one or more wires (electronic device), a portable computer disk case (magnetic device), a random access memory (RAM), a read-only memory (ROM), an erasable and programmable read-only memory (EPROM or flash memory), a fiber optic device, and a portable compact disk read-only memory (CDROM). In addition, the computer-readable medium may even be paper or other suitable medium on which the program is printed, since the program may be obtained electronically, for example, by optically scanning the paper or other medium and then editing, interpreting or processing in other suitable ways if necessary, and then stored in a computer memory.

[0169] It should be understood that the various parts of the present invention can be implemented by hardware, software, firmware or a combination thereof. In the above-mentioned embodiments, a plurality of steps or methods can be implemented by software or firmware stored in a memory and executed by a suitable instruction execution system. For example, if implemented by hardware, as in another embodiment, it can be implemented by any one of the following technologies known in the art or their combination: a discrete logic circuit having a logic gate circuit for implementing a logic function for a data signal, a dedicated integrated circuit having a suitable combination of logic gate circuits, a programmable gate array (PGA), a field programmable gate array (FPGA), etc.

[0170] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "examples", "specific examples", or "some examples" means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner.

[0171] In the description of the present invention, it is to be understood that the terms “center”, “longitudinal”, “lateral”, “length”, “width”, “thickness”, “up”, “down”, “front”, “back”, “left”, “right”, “vertical”, “horizontal”, “top”, “bottom”, “inside”, “outside”, “clockwise”, “counterclockwise”, “axial”, “radial”, “circumferential”, etc., indicating orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as limiting the present invention.

[0172] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In the description of the present invention, the meaning of "plurality" is at least two, such as two, three, etc., unless otherwise clearly and specifically defined.

[0173] In the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements, unless otherwise clearly defined. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0174] In the present invention, unless otherwise clearly specified and limited, a first feature being "above" or "below" a second feature may mean that the first and second features are in direct contact, or the first and second features are in indirect contact through an intermediate medium. Moreover, a first feature being "above", "above" or "above" a second feature may mean that the first feature is directly above or obliquely above the second feature, or simply means that the first feature is higher in level than the second feature. A first feature being "below", "below" or "below" a second feature may mean that the first feature is directly below or obliquely below the second feature, or simply means that the first feature is lower in level than the second feature.

[0175] Although the embodiments of the present invention have been shown and described above, it is to be understood that the above embodiments are exemplary and are not to be construed as limitations of the present invention. A person skilled in the art may change, modify, replace and vary the above embodiments within the scope of the present invention.

Claims

1. A method for determining inaccurate measurement of charging facilities, characterized in that: The method comprises: Acquire monitoring data of each electric energy meter; wherein each electric energy meter includes: a total electric energy meter and at least one sub-electric energy meter, and each electric device included in the charging line covered by the total electric energy meter is installed with a corresponding sub-electric energy meter; wherein the monitoring data includes: monitoring power, voltage and current collected by each electric energy meter; In the tree topology structure formed based on each electric energy meter, for each non-leaf node, based on the monitoring data collected by the sub-electric energy meters corresponding to each child node of the node and the monitoring data collected by the electric energy meter corresponding to the node, the power error corresponding to the node is calculated; Wherein, each node included in the tree topology structure corresponds to the total electric energy meter or a sub-electric energy meter, and there is a connection based on electric wires between the electric energy meters corresponding to the two nodes respectively connected by each connection relationship included in the tree topology structure; Based on the power errors corresponding to the nodes, it is monitored whether there is an abnormality on the charging line.

2. The method according to claim 1, characterized in that The method further comprises: Establishing a first characteristic database including resistance value data and a second characteristic database including conversion efficiency data of a DC charging device; The calculating the power error corresponding to the node based on the monitoring data collected by the sub-electric energy meters corresponding to each sub-node of the node and the monitoring data collected by the electric energy meter corresponding to the node includes: Based on the monitoring data collected by the sub-electricity meters corresponding to each child node of the node and the monitoring data collected by the electric energy meter corresponding to the node, the resistance value data obtained from the first feature database, and the conversion efficiency data obtained from the second feature database, the power error corresponding to the node is calculated.

3. The method according to claim 1, characterized in that: The calculating the power error corresponding to the node based on the monitoring data collected by the sub-electric energy meters corresponding to each sub-node of the node and the monitoring data collected by the electric energy meter corresponding to the node includes: In the case where the node corresponds to the total electric energy meter, determining the power error corresponding to the node based on the monitoring power collected by the total electric energy meter and the sum of the first powers of each subnode; The first power sum includes: the monitoring power collected by the sub-electricity meters corresponding to each sub-node of the node, and the power loss of the wires between the main electric energy meter and the electric equipment to which the sub-electricity meters corresponding to each sub-node of the node belong; The power error corresponding to the node is calculated in the following manner: Among them, ε Ⅰ Represents the power error corresponding to the node, P 总表 Indicates the monitoring power collected by the total electric energy meter, P Ⅰ级线损 represents the power loss of the wires between the main energy meter and the electrical equipment to which the sub-energy meters corresponding to each child node of the node belong, P Ⅰ级表计 Indicates the monitored power collected by the sub-electricity meters corresponding to each child node of this node.

4. The method according to claim 1, characterized in that: The calculating the power error corresponding to the node based on the monitoring data collected by the sub-electric energy meters corresponding to each sub-node of the node and the monitoring data collected by the electric energy meter corresponding to the node includes: In the case where the electric device to which the sub-electric energy meter corresponding to the node belongs is a DC charging device, the second power sum is determined based on the monitoring power collected by the sub-electric energy meters corresponding to each subnode of the node, the wire loss power between the DC charging device and the electric device to which the sub-electric energy meters corresponding to each subnode of the node belong, the conversion loss power of the DC charging device, and the fixed loss power of the DC charging device; Determine a power error of the node based on the monitoring power collected by the sub-electric energy meter corresponding to the node and the sum of the second power; The power error corresponding to the node is calculated in the following manner: Among them, ε Ⅱ Indicates the power error corresponding to the node; P Ⅰ级表计 Indicates the monitoring power collected by the sub-electric energy meter corresponding to the node; P 充电机转换损耗 represents the conversion loss power of the DC charging device; P Ⅱ级线损 represents the power loss of the electric wire between the DC charging device and the electric equipment to which the sub-electric energy meters corresponding to each child node of the node belong; P Ⅱ级表计 Indicates the monitoring power collected by the sub-electricity meters corresponding to each child node of the node; P 充电设施固定损耗 Indicates that the sub-electric energy meter corresponding to the node collects the fixed power loss of the electrical equipment to which it belongs.

5. The method according to claim 1, characterized in that The calculating the power error corresponding to the node based on the monitoring data collected by the sub-electric energy meters corresponding to each sub-node of the node and the monitoring data collected by the electric energy meter corresponding to the node includes: In the case where the electric device to which the sub-electric energy meter corresponding to the node belongs is a current control device in the charging device, the power error corresponding to the node is determined based on the monitoring power collected by the sub-electric energy meter corresponding to the node and the sum of the third powers of each subnode; The third power sum is: the monitoring power collected by the sub-electricity meters corresponding to each sub-node of the node, and the power loss of the wires between the current control device and the electrical equipment to which the sub-electricity meters corresponding to each sub-node of the node belong; The power error corresponding to the node is calculated in the following manner: Among them, ε Ⅲ Represents the power error corresponding to the node, P Ⅱ级表计 Indicates the monitoring power collected by the sub-electric energy meter corresponding to the node, P Ⅲ级线损 represents the power loss of the electric wire between the current control device and the electric equipment to which the electric energy meter corresponding to each child node of the node belongs, P Ⅲ级表计 Indicates the monitored power collected by the sub-electricity meters corresponding to each child node of this node.

6. The method according to claim 1, characterized in that The monitoring whether there is an abnormality on the charging line based on the power error corresponding to each node includes: Performing a Boolean value check based on the power errors corresponding to the nodes at each level in the tree topology structure to obtain a check result; and judging whether there is an abnormality on the charging line based on the check result; The verification results include: The inter-group verification results between the total power meter node and the sub-power meter nodes at the next level, the inter-group verification results between any sub-power meter node and the sub-sub-power meter nodes at the next level of the sub-power meter node, and the overall verification results between the total power meter node and the sub-power meter nodes at the lowest level.

7. The method according to claim 6, characterized in that The inter-group verification result between the main electric energy meter node and the sub-electric energy meter nodes at the next level, and the inter-group verification result between any sub-electric energy meter node and the sub-electric energy meter nodes at the next level of the sub-electric energy meter node are obtained in the following manner: In the tree topology, for the main electric energy meter node and any sub-electric energy meter node having a sub-electric energy meter node, the Boolean value of the node and each sub-node of the node is determined based on the magnitude relationship between the power error corresponding to the node and a preset first error threshold; For the main electric energy meter node and any sub-electric energy meter node with a sub-electric energy meter node, an OR operation is performed based on all Boolean values ​​corresponding to the node to obtain the inter-group verification result.

8. The method according to claim 7, characterized in that The overall verification result between the total electric energy meter node and the lowest level sub-electric energy meter node is obtained in the following manner: Calculating the overall error between the monitoring data collected by the total electric energy meter and the monitoring data collected by the sub-electric energy meters corresponding to each leaf node in the tree topology structure; If the overall error is greater than a preset second error threshold, an overall verification result indicating that an abnormality exists on the charging circuit is obtained.

9. The method according to claim 3, characterized in that: The power loss of the electric wire is obtained based on the length and cable model of the electric wire between the main electric energy meter and the electric equipment to which the sub-electric energy meters corresponding to each sub-node of the node belong.

10. The method according to claim 1, characterized in that The sub-electricity meter is a rail-type electric energy meter installed on the incoming line side of each electrical equipment; The tree topology structure is a multi-level tree topology structure established based on the hierarchical relationship of each electrical device and taking each sub-electrical energy meter as a node.