Three-dimensional simulation construction method and system

Through the three-dimensional simulation construction method, data collection and physics engine simulation are used to optimize the construction plan, solve the problems of long construction period, material waste and safety hazards in traditional construction technology, and improve the construction efficiency and quality.

CN118779967APending Publication Date: 2024-10-15国网河南省电力公司建设分公司
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202411091637.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-09
Publication Date
2024-10-15

AI Technical Summary

Technical Problem

Traditional construction techniques rely on manual operations, resulting in long construction cycles, difficulty in controlling progress, high material waste and energy consumption, large safety hazards, difficulty in ensuring quality, and a lack of advanced detection methods.

Method used

The three-dimensional simulation construction method is used to build a three-dimensional point cloud model through data acquisition equipment, obtain construction data and theoretical parameters, calculate construction comfort, build a simulation construction plan, use physics engines and simulation algorithms to simulate, and evaluate the results to optimize the construction plan.

Benefits of technology

Reduce on-site changes and rework, improve construction efficiency and quality, detect potential problems and conflicts in advance, and enhance construction safety and accuracy.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118779967A_ABST
    Figure CN118779967A_ABST
Patent Text Reader

Abstract

The invention provides a three-dimensional simulation construction method and system. The method comprises the following steps: constructing a three-dimensional point cloud model of a construction building based on a data acquisition result of the construction building; obtaining construction data and theoretical engineering parameters of the construction building, and performing model optimization on the three-dimensional point cloud model based on the construction data and the theoretical engineering parameters to obtain a three-dimensional simulation model of the construction building; acquiring current environment data of the construction building, and judging the current environment data by using a preset environment database to calculate the construction comfort of the construction building; constructing a simulation construction scheme of the three-dimensional simulation model based on the construction comfort, and performing three-dimensional simulation analysis on the three-dimensional simulation model by using the simulation construction scheme to obtain a corresponding three-dimensional simulation analysis result; and performing result evaluation on the three-dimensional simulation analysis result, and if the three-dimensional simulation analysis result meets evaluation requirements, generating a construction optimal scheme of the construction building according to the three-dimensional simulation analysis result.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of data processing technology, and in particular to a three-dimensional simulation construction method and system thereof. Background Art

[0002] Traditional construction technology is mainly based on the design drawings of designers and the work mode implemented by construction workers. It is highly dependent on manual operation, resulting in a long construction period and difficult to control the progress. Especially in large-scale projects, it becomes more difficult to coordinate the progress of each link. Miscommunication in any link in the middle often leads to delays in the entire project. Material waste and energy consumption are prominent problems. For example, when demolishing old buildings, many reusable materials are disposed of; when pouring concrete, cement loss and energy waste are caused due to unreasonable formwork design and inadequate insulation measures.

[0003] According to statistics, the material waste rate in traditional construction technology can be as high as 30% or more, and energy consumption is much higher than that of modern construction methods. There are many hidden safety hazards, and there are many hidden dangers in the safety management of construction sites. Due to the complex and changeable on-site working environment, traditional processes are often unable to effectively respond to various emergencies, increasing the risk of safety accidents. For example, in high-altitude operations, deep foundation pit excavation and other dangerous processes, traditional processes lack effective safety measures, which can easily lead to casualties and property losses. Quality is difficult to guarantee, and there are great difficulties in quality control. Due to the large number of human factors in the construction process, the construction quality is often affected by factors such as workers' skill level and work attitude. In addition, traditional processes lack advanced testing equipment and means, and cannot conduct a comprehensive and accurate assessment of project quality, resulting in frequent quality problems. Summary of the invention

[0004] The embodiments of the present application provide a three-dimensional simulation construction method and system thereof to at least solve the deficiencies in the above-mentioned related technologies.

[0005] In a first aspect, an embodiment of the present application provides a three-dimensional simulation construction method, comprising the following steps: Step 1: Collect data of the construction building using data acquisition equipment, and construct a three-dimensional point cloud model of the construction building based on the data acquisition results; Step 2: Acquire the construction data and theoretical engineering parameters of the construction building, and optimize the three-dimensional point cloud model based on the construction data and the theoretical engineering parameters to obtain a three-dimensional simulation model of the construction building; Step 3: obtaining the current environmental data of the construction building, and using a preset environmental database to judge the current environmental data to calculate the construction comfort of the construction building; Step 4: constructing a simulation construction plan of the three-dimensional simulation model based on the construction comfort level, and performing a three-dimensional simulation analysis on the three-dimensional simulation model using the simulation construction plan to obtain a corresponding three-dimensional simulation analysis result; Step 5: Evaluate the three-dimensional simulation analysis results. If the three-dimensional simulation analysis results meet the evaluation requirements, generate a construction optimization plan for the construction building according to the three-dimensional simulation analysis results.

[0006] Furthermore, the step 1 includes: Collecting data on the construction building through data acquisition equipment to obtain geometric and physical data of the construction building; A model is constructed according to the geometrical and physical data to obtain a three-dimensional point cloud model of the construction building.

[0007] Furthermore, the step 2 includes: Extracting the construction objects and the construction scheme from the construction data, and performing model simulation on the construction objects and the construction scheme based on three-dimensional simulation software to obtain a corresponding construction model; The construction model is conditionally optimized based on the current construction environment and the theoretical construction data in the theoretical engineering parameters to obtain a three-dimensional simulation model of the construction building.

[0008] Furthermore, the step three includes: Inputting the current environmental data into the environmental database for data matching to obtain environmental comfort information corresponding to each environmental indicator in the current environmental data; A data difference between the current environmental data and the environmental comfort information is calculated, and the construction comfort of the construction building is calculated based on the data difference.

[0009] Furthermore, the step 4 includes: Constructing a simulation construction plan of the three-dimensional simulation model based on the construction comfort level, and using the simulation construction plan to simulate the construction of each construction sub-model in the three-dimensional simulation model to obtain simulation construction data of each construction sub-model; The simulated construction data of each of the construction sub-models is subjected to construction data analysis. If the simulated construction data of each of the construction sub-models meets the construction data analysis requirements, a corresponding three-dimensional simulation analysis report is generated according to the simulated construction data.

[0010] In a second aspect, an embodiment of the present application provides a three-dimensional simulation construction system, including: A data acquisition module, used to collect data of the construction building using a data acquisition device, and to construct a three-dimensional point cloud model of the construction building based on the data acquisition results; A model optimization module, used for acquiring the construction data and theoretical engineering parameters of the construction building, and optimizing the three-dimensional point cloud model based on the construction data and the theoretical engineering parameters to obtain a three-dimensional simulation model of the construction building; A data judgment module, used to obtain current environmental data of the construction building, and use a preset environmental database to judge the current environmental data to calculate the construction comfort of the construction building; A simulation analysis module, used for constructing a simulation construction plan of the three-dimensional simulation model based on the construction comfort level, and performing a three-dimensional simulation analysis on the three-dimensional simulation model using the simulation construction plan to obtain a corresponding three-dimensional simulation analysis result; The scheme generating module is used to evaluate the three-dimensional simulation analysis results, and if the three-dimensional simulation analysis results meet the evaluation requirements, generate a construction optimization scheme for the construction building according to the three-dimensional simulation analysis results.

[0011] Furthermore, the data acquisition module includes: A data acquisition unit, used to collect data on the construction building through a data acquisition device to obtain geometric and physical data of the construction building; The model building unit is used to build a model according to the geometric physical data to obtain a three-dimensional point cloud model of the construction building.

[0012] Furthermore, the model optimization module includes: A model simulation unit, used to extract the construction object and the construction plan from the construction data, and perform model simulation on the construction object and the construction plan based on three-dimensional simulation software to obtain a corresponding construction model; The model optimization unit is used to optimize the conditions of the construction model based on the current construction environment and the theoretical construction data in the theoretical engineering parameters to obtain a three-dimensional simulation model of the construction building.

[0013] Furthermore, the data judgment module includes: A data matching unit, used for inputting the current environmental data into the environmental database for data matching, so as to obtain environmental comfort information corresponding to each environmental indicator in the current environmental data; The data calculation unit is used to calculate the data difference between the current environmental data and the environmental comfort information, and calculate the construction comfort of the construction building based on the data difference.

[0014] Furthermore, the simulation analysis module includes: A simulation construction unit, used for constructing a simulation construction plan of the three-dimensional simulation model based on the construction comfort level, and performing simulation construction on each construction sub-model in the three-dimensional simulation model using the simulation construction plan to obtain simulation construction data of each construction sub-model; The report generating unit is used to perform construction data analysis on the simulated construction data of each of the construction sub-models, and if the simulated construction data of each of the construction sub-models meets the construction data analysis requirements, a corresponding three-dimensional simulation analysis report is generated according to the simulated construction data.

[0015] Compared with the related art, the embodiment of the present application provides a 3D simulation construction method and system thereof, which utilizes the data collection results of the construction building to accurately establish the 3D point cloud models of various complex objects, optimizes the 3D point cloud model according to the construction data and theoretical engineering parameters of the construction building, so that the model parameters are more in line with the simulation analysis conditions; obtains the current environmental data of the construction building, and calculates the construction comfort using the current environmental data, and constructs a simulation construction plan of the 3D simulation model using the construction comfort, and dynamically simulates and renders the model through the physical engine and simulation algorithm, including the movement, deformation, collision, etc. of the object, so that the simulation results are more realistic, and evaluates the simulation results, and uses the evaluation results to obtain the optimal construction plan for the construction building, so as to discover potential problems and conflicts in advance, optimize the construction plan, reduce on-site changes and rework, and construction personnel can rehearse and practice in a virtual environment to improve construction efficiency and quality.

[0016] Details of one or more embodiments of the present application are set forth in the following drawings and description to make other features, objects, and advantages of the present application more readily apparent. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] The drawings described herein are used to provide a further understanding of the present application and constitute a part of the present application. The illustrative embodiments of the present application and their descriptions are used to explain the present application and do not constitute an improper limitation on the present application. In the drawings: Figure 1 is a flow chart of a three-dimensional simulation construction method in a first embodiment of the present invention; Figure 2 for Figure 1 Detailed flow chart of step S101; Figure 3 for Figure 1 Detailed flow chart of step S102; Figure 4 for Figure 1 Detailed flow chart of step S103; Figure 5 for Figure 1 Detailed flow chart of step S104; Figure 6 It is a structural block diagram of a three-dimensional simulation construction system in the second embodiment of the present invention.

[0018] The following specific implementation manner will further illustrate the present invention in conjunction with the above-mentioned drawings. DETAILED DESCRIPTION

[0019] In order to make the purpose, technical solutions and advantages of the present application clearer, the present application is described and illustrated below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present application and are not intended to limit the present application. Based on the embodiments provided in the present application, all other embodiments obtained by ordinary technicians in the field without making creative work are within the scope of protection of the present application.

[0020] Obviously, the drawings described below are only some examples or embodiments of the present application. For ordinary technicians in this field, the present application can also be applied to other similar scenarios based on these drawings without creative work. In addition, it can also be understood that although the efforts made in this development process may be complicated and lengthy, for ordinary technicians in this field related to the content disclosed in this application, some changes in design, manufacturing or production based on the technical content disclosed in this application are just conventional technical means, and should not be understood as insufficient content disclosed in this application.

[0021] Reference to "embodiments" in this application means that a particular feature, structure, or characteristic described in conjunction with the embodiments may be included in at least one embodiment of the present application. The appearance of the phrase in various locations in the specification does not necessarily refer to the same embodiment, nor is it an independent or alternative embodiment that is mutually exclusive with other embodiments. It is explicitly and implicitly understood by those of ordinary skill in the art that the embodiments described in this application may be combined with other embodiments without conflict.

[0022] Unless otherwise defined, the technical terms or scientific terms involved in this application should be understood by people with ordinary skills in the technical field to which this application belongs. The words "one", "a", "a", "the" and the like involved in this application do not indicate a quantitative limitation and may represent the singular or plural. The terms "include", "comprise", "have" and any of their variations involved in this application are intended to cover non-exclusive inclusions; for example, a process, method, system, product or device that includes a series of steps or modules (units) is not limited to the listed steps or units, but may also include steps or units that are not listed, or may also include other steps or units inherent to these processes, methods, products or devices. The words "connect", "connected", "coupled" and the like involved in this application are not limited to physical or mechanical connections, but may include electrical connections, whether direct or indirect. Embodiment 1

[0023] See also Figure 1 , which shows a three-dimensional simulation construction method in the first embodiment of the present invention, and the method specifically includes steps S101 to S105: S101, collecting data of the building under construction using a data collection device, and constructing a three-dimensional point cloud model of the building under construction based on the data collection results; For further information, see Figure 2 , the step S101 specifically includes steps S1011~S1012: S1011, collecting data on the construction building through a data collection device to obtain geometric and physical data of the construction building; S1012: constructing a model according to the geometric and physical data to obtain a three-dimensional point cloud model of the building under construction.

[0024] In the specific implementation, data collection equipment is used to collect data on the construction building, wherein the data collection equipment includes but is not limited to laser sensors, laser rangefinders, three-dimensional scanners and other equipment with relevant functions. The corresponding geometric and physical parameters are obtained by collecting data on the construction building, and the three-dimensional point cloud model of the construction model is constructed using the geometric and physical parameters, wherein the geometric and physical model includes shape, size, color, texture and material, etc.

[0025] S102, obtaining construction data and theoretical engineering parameters of the building under construction, and optimizing the three-dimensional point cloud model based on the construction data and the theoretical engineering parameters to obtain a three-dimensional simulation model of the building under construction; For further information, see Figure 3 , the step S102 specifically includes steps S1021~S1022: S1021, extracting the construction objects and the construction scheme from the construction data, and performing model simulation on the construction objects and the construction scheme based on three-dimensional simulation software to obtain a corresponding construction model; S1022, optimizing the conditions of the construction model based on the current construction environment and the theoretical construction data in the theoretical engineering parameters to obtain a three-dimensional simulation model of the construction building.

[0026] In the specific implementation, the construction data of the construction building is obtained, wherein the construction data is the construction-related data used in the design stage of the construction building, such as: construction blueprint, construction process table, construction object and construction plan, etc., the construction object and construction plan in the construction data are extracted, and the construction object and construction plan are modeled and simulated using three-dimensional simulation software, so as to obtain the corresponding construction model; Furthermore, the current construction environment and theoretical engineering data are obtained, wherein the theoretical engineering parameters are parameters generated by theoretical construction through construction data, and the theoretical engineering data and the current construction environment are used to optimize the conditions of the construction model to reduce the error between the construction model and the actual construction, thereby obtaining a three-dimensional simulation model of the construction building.

[0027] S103, obtaining current environmental data of the building under construction, and using a preset environmental database to judge the current environmental data to calculate the construction comfort of the building under construction; For further information, see Figure 4 , the step S103 specifically includes steps S1031~S1032: S1031, inputting the current environmental data into the environmental database for data matching to obtain environmental comfort information corresponding to each environmental indicator in the current environmental data; S1032, calculating the data difference between the current environmental data and the environmental comfort information, and calculating the construction comfort of the construction building based on the data difference.

[0028] In the specific implementation, the current construction environment data of the construction building is obtained, and the current environment data is matched with the preset environment database. The current construction environment data contains corresponding environmental indicators. For example, in the current construction period, the average temperature is 32 degrees Celsius, the average wind speed is 22m / s, and the average wind level is 7-level strong wind, etc. This environment means that high-rise construction cannot be carried out in the current construction period. According to the environmental indicators, the corresponding environmental comfort information is found in the environmental database; Furthermore, the environmental comfort information is used to perform data subtraction with the current environmental data. When there are multiple data differences between the environmental comfort information and the data related to the construction environment in the current environmental data, it means that the construction comfort of the current environment is low. At the same time, referring to the environmental indicators in the current environmental data, if both items do not meet the requirements, the construction comfort of the construction building is marked as 0; when there is no data difference between the environmental comfort information and the data related to the construction environment in the current environmental data, and the environmental indicators in the current environmental data are not up to standard, the construction comfort of the construction building is marked as 0.25; when there are a few data differences between the environmental comfort information and the data related to the construction environment in the current environmental data, and the impact of the data differences on the construction environment is not large, and the environmental indicators in the current environmental data are up to standard, the construction comfort of the construction building is marked as 0.5; when there is no data difference between the environmental comfort information and the data related to the construction environment in the current environmental data, and the environmental indicators in the current environmental data are up to standard, the construction comfort of the construction building is marked as 1.

[0029] S104, constructing a simulation construction plan of the three-dimensional simulation model based on the construction comfort level, and performing a three-dimensional simulation analysis on the three-dimensional simulation model using the simulation construction plan to obtain a corresponding three-dimensional simulation analysis result; For further information, see Figure 5 , the step S104 specifically includes steps S1041-S1042: S1041, constructing a simulation construction plan of the three-dimensional simulation model based on the construction comfort level, and using the simulation construction plan to simulate the construction of each construction sub-model in the three-dimensional simulation model to obtain simulation construction data of each construction sub-model; S1042, performing construction data analysis on the simulated construction data of each of the construction sub-models, and if the simulated construction data of each of the construction sub-models meets the construction data analysis requirements, generating a corresponding three-dimensional simulation analysis report based on the simulated construction data.

[0030] In the specific implementation, a simulation construction plan of the three-dimensional simulation model is constructed based on the construction comfort calculated as above, and the simulation construction plan is used to simulate the construction of each construction sub-model in the three-dimensional simulation model to obtain the simulation construction data of each construction sub-model, that is, the model is dynamically simulated using a physical engine to simulate physical phenomena in the real world, such as gravity, collision, friction, etc., and the model is rendered using a simulation algorithm to realistically reproduce objects and phenomena in the real world.

[0031] Furthermore, construction data analysis is performed on the simulated construction data of each construction sub-model. If the simulated construction data of each construction sub-model meets the construction data analysis requirements, a corresponding three-dimensional simulation analysis report is generated based on the simulated construction data, wherein the simulated construction data of each construction sub-model is systematically compared or manually verified. When the system comparison result meets the requirements or the manual verification result meets the requirements, it means that the simulated construction data of each construction sub-model meets the requirements, and a corresponding three-dimensional simulation analysis report is generated based on the simulated construction data.

[0032] S105, evaluating the three-dimensional simulation analysis results, and if the three-dimensional simulation analysis results meet the evaluation requirements, generating a construction optimization plan for the building under construction according to the three-dimensional simulation analysis results.

[0033] In specific implementation, the above three-dimensional simulation analysis results are evaluated. If the three-dimensional simulation analysis results meet the evaluation requirements, a construction optimization plan for the construction building is generated according to the three-dimensional simulation analysis results.

[0034] In summary, the three-dimensional simulation construction method in the above-mentioned embodiment of the present invention uses the data collection results of the construction building to accurately establish the three-dimensional point cloud models of various complex objects, and optimizes the three-dimensional point cloud model according to the construction data and theoretical engineering parameters of the construction building to make the model parameters more in line with the simulation analysis conditions; obtains the current environmental data of the construction building, and uses the current environmental data to calculate the construction comfort, and uses the construction comfort to construct a simulation construction plan of the three-dimensional simulation model, and uses the physical engine and simulation algorithm, and the three-dimensional simulation technology to dynamically simulate and render the model, including the movement, deformation, collision, etc. of the object, so that the simulation result is more realistic, and the result evaluation is performed on the simulation result, and the result evaluation is used to obtain the construction optimization plan of the construction building, so as to discover potential problems and conflicts in advance, optimize the construction plan, reduce on-site changes and rework, and construction personnel can rehearse and practice in a virtual environment to improve construction efficiency and quality. Embodiment 2

[0035] Another aspect of the present invention is to provide a three-dimensional simulation construction system. Figure 6 , shown is a three-dimensional simulation construction system in the second embodiment of the present invention, comprising: The data acquisition module 11 is used to collect data of the construction building using data acquisition equipment, and to construct a three-dimensional point cloud model of the construction building based on the data acquisition results; Furthermore, the data acquisition module 11 includes: A data acquisition unit, used to collect data on the construction building through a data acquisition device to obtain geometric and physical data of the construction building; The model building unit is used to build a model according to the geometric physical data to obtain a three-dimensional point cloud model of the construction building.

[0036] A model optimization module 12, used for acquiring the construction data and theoretical engineering parameters of the construction building, and optimizing the three-dimensional point cloud model based on the construction data and the theoretical engineering parameters to obtain a three-dimensional simulation model of the construction building; Furthermore, the model optimization module 12 includes: A model simulation unit, used to extract the construction object and the construction plan from the construction data, and perform model simulation on the construction object and the construction plan based on three-dimensional simulation software to obtain a corresponding construction model; The model optimization unit is used to optimize the conditions of the construction model based on the current construction environment and the theoretical construction data in the theoretical engineering parameters to obtain a three-dimensional simulation model of the construction building.

[0037] A data judgment module 13 is used to obtain the current environmental data of the construction building, and use a preset environmental database to judge the current environmental data to calculate the construction comfort of the construction building; Furthermore, the data judgment module 13 includes: A data matching unit, used for inputting the current environmental data into the environmental database for data matching, so as to obtain environmental comfort information corresponding to each environmental indicator in the current environmental data; The data calculation unit is used to calculate the data difference between the current environmental data and the environmental comfort information, and calculate the construction comfort of the construction building based on the data difference.

[0038] A simulation analysis module 14 is used to construct a simulation construction plan of the three-dimensional simulation model based on the construction comfort level, and perform a three-dimensional simulation analysis on the three-dimensional simulation model using the simulation construction plan to obtain a corresponding three-dimensional simulation analysis result; Furthermore, the simulation analysis module 14 includes: A simulation construction unit, used for constructing a simulation construction plan of the three-dimensional simulation model based on the construction comfort level, and performing simulation construction on each construction sub-model in the three-dimensional simulation model using the simulation construction plan to obtain simulation construction data of each construction sub-model; The report generating unit is used to perform construction data analysis on the simulated construction data of each of the construction sub-models, and if the simulated construction data of each of the construction sub-models meets the construction data analysis requirements, a corresponding three-dimensional simulation analysis report is generated according to the simulated construction data.

[0039] The scheme generating module 15 is used to evaluate the three-dimensional simulation analysis results, and if the three-dimensional simulation analysis results meet the evaluation requirements, generate a construction optimization scheme for the construction building according to the three-dimensional simulation analysis results.

[0040] The functions or operation steps implemented when the above modules are executed are substantially the same as those in the above method embodiments, and will not be repeated here.

[0041] The three-dimensional simulation construction system provided in the embodiment of the present invention has the same implementation principle and technical effects as those in the aforementioned method embodiment. For the sake of brief description, for matters not mentioned in the system embodiment, reference may be made to the corresponding contents in the aforementioned method embodiment.

[0042] The technical features of the above-described embodiments may be arbitrarily combined. To make the description concise, not all possible combinations of the technical features in the above-described embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.

[0043] The above-mentioned embodiments only express several implementation methods of the present application, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the scope of the invention patent. It should be pointed out that, for a person of ordinary skill in the art, several variations and improvements can be made without departing from the concept of the present application, and these all belong to the protection scope of the present application. Therefore, the protection scope of the patent of the present application shall be subject to the attached claims.

Claims

1. A three-dimensional simulation construction method, It is characterized in that The following steps are involved: Step 1: Collect data of the construction building using data acquisition equipment, and construct a three-dimensional point cloud model of the construction building based on the data acquisition results; Step 2: Acquire the construction data and theoretical engineering parameters of the construction building, and optimize the three-dimensional point cloud model based on the construction data and the theoretical engineering parameters to obtain a three-dimensional simulation model of the construction building; Step 3: obtaining the current environmental data of the construction building, and using a preset environmental database to judge the current environmental data to calculate the construction comfort of the construction building; Step 4: constructing a simulation construction plan of the three-dimensional simulation model based on the construction comfort level, and performing a three-dimensional simulation analysis on the three-dimensional simulation model using the simulation construction plan to obtain a corresponding three-dimensional simulation analysis result; Step 5: Evaluate the three-dimensional simulation analysis results. If the three-dimensional simulation analysis results meet the evaluation requirements, generate a construction optimization plan for the construction building according to the three-dimensional simulation analysis results.

2. The three-dimensional simulation construction method according to claim 1, It is characterized in that The step one comprises: Collecting data on the construction building through data acquisition equipment to obtain geometric and physical data of the construction building; A model is constructed according to the geometrical and physical data to obtain a three-dimensional point cloud model of the construction building.

3. The three-dimensional simulation construction method according to claim 1, It is characterized in that The second step comprises: Extracting the construction objects and the construction scheme from the construction data, and performing model simulation on the construction objects and the construction scheme based on three-dimensional simulation software to obtain a corresponding construction model; The construction model is conditionally optimized based on the current construction environment and the theoretical construction data in the theoretical engineering parameters to obtain a three-dimensional simulation model of the construction building.

4. The three-dimensional simulation construction method according to claim 1, It is characterized in that The step three comprises: Inputting the current environmental data into the environmental database for data matching to obtain environmental comfort information corresponding to each environmental indicator in the current environmental data; A data difference between the current environmental data and the environmental comfort information is calculated, and the construction comfort of the construction building is calculated based on the data difference.

5. The three-dimensional simulation construction method according to claim 1, It is characterized in that The fourth step comprises: Constructing a simulation construction plan of the three-dimensional simulation model based on the construction comfort level, and using the simulation construction plan to simulate the construction of each construction sub-model in the three-dimensional simulation model to obtain simulation construction data of each construction sub-model; The simulated construction data of each of the construction sub-models is subjected to construction data analysis. If the simulated construction data of each of the construction sub-models meets the construction data analysis requirements, a corresponding three-dimensional simulation analysis report is generated according to the simulated construction data.

6. A three-dimensional simulation construction system, It is characterized in that include: A data acquisition module, used to collect data of the construction building using a data acquisition device, and to construct a three-dimensional point cloud model of the construction building based on the data acquisition results; A model optimization module, used for acquiring the construction data and theoretical engineering parameters of the construction building, and optimizing the three-dimensional point cloud model based on the construction data and the theoretical engineering parameters to obtain a three-dimensional simulation model of the construction building; A data judgment module, used to obtain current environmental data of the construction building, and use a preset environmental database to judge the current environmental data to calculate the construction comfort of the construction building; A simulation analysis module, used for constructing a simulation construction plan of the three-dimensional simulation model based on the construction comfort level, and performing a three-dimensional simulation analysis on the three-dimensional simulation model using the simulation construction plan to obtain a corresponding three-dimensional simulation analysis result; The scheme generating module is used to evaluate the three-dimensional simulation analysis results, and if the three-dimensional simulation analysis results meet the evaluation requirements, generate a construction optimization scheme for the construction building according to the three-dimensional simulation analysis results.

7. The three-dimensional simulation construction system according to claim 6, It is characterized in that The data acquisition module comprises: A data acquisition unit, used to collect data on the construction building through a data acquisition device to obtain geometric and physical data of the construction building; The model building unit is used to build a model according to the geometric physical data to obtain a three-dimensional point cloud model of the construction building.

8. The three-dimensional simulation construction system according to claim 6, It is characterized in that The model optimization module includes: A model simulation unit, used to extract the construction object and the construction plan from the construction data, and perform model simulation on the construction object and the construction plan based on three-dimensional simulation software to obtain a corresponding construction model; The model optimization unit is used to optimize the conditions of the construction model based on the current construction environment and the theoretical construction data in the theoretical engineering parameters to obtain a three-dimensional simulation model of the construction building.

9. The three-dimensional simulation construction system according to claim 6, It is characterized in that The data judgment module comprises: A data matching unit, used for inputting the current environmental data into the environmental database for data matching, so as to obtain environmental comfort information corresponding to each environmental indicator in the current environmental data; The data calculation unit is used to calculate the data difference between the current environmental data and the environmental comfort information, and calculate the construction comfort of the construction building based on the data difference.

10. The three-dimensional simulation construction system according to claim 6, It is characterized in that The simulation analysis module includes: A simulation construction unit, used for constructing a simulation construction plan of the three-dimensional simulation model based on the construction comfort level, and performing simulation construction on each construction sub-model in the three-dimensional simulation model using the simulation construction plan to obtain simulation construction data of each construction sub-model; The report generating unit is used to perform construction data analysis on the simulated construction data of each of the construction sub-models, and if the simulated construction data of each of the construction sub-models meets the construction data analysis requirements, a corresponding three-dimensional simulation analysis report is generated according to the simulated construction data.