Machine tool linear guide rail assembly precision control method
By establishing a linear guide assembly deformation model and experimental measurements, the problem of low linear guide assembly accuracy is solved, efficient and high-precision linear guide assembly is achieved, the assembly process is simplified and product accuracy is improved.
Patent Information
- Application Number
- CN202410780005.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-17
- Publication Date
- 2024-10-15
AI Technical Summary
During the assembly process of linear guide rails, the assembly deformation mechanism caused by pretightening load is unclear, which makes the assembly straightness difficult to predict, thereby affecting the assembly accuracy of linear guide rails. The traditional assembly method is inefficient and may damage the thread mating surface.
Establish a linear guide rail assembly deformation model, analyze the guide rail assembly deformation through a statically indeterminate beam model, and combine experimental methods to measure the bolt pretightening force and installation base surface error. Through numerical fitting and modification of the installation base surface, the accuracy of one-time assembly of the guide rail can be achieved. promote.
It improves the assembly accuracy of linear guide rails, simplifies the assembly process, reduces the number of repeated disassembly and adjustments, and improves product processing accuracy.
Smart Images

Figure CN118779999A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a method for controlling the assembly accuracy of a machine tool linear guide rail, and belongs to the field of high-performance assembly of numerically controlled machine tools. Background Art
[0002] As a key component of the linear axis of a CNC machine tool, the linear guide plays a supporting and guiding role. Its assembly accuracy will directly affect the motion accuracy of the workbench, and then determine the positioning accuracy of the CNC machine tool and the product processing accuracy. The assembly error of the linear guide is mainly composed of the assembly deformation of the guide and the manufacturing error of the guide mounting surface. Since the assembly deformation mechanism caused by the preload during the assembly process is unclear, the assembly straightness of the linear guide is difficult to predict, which leads to the inability to guarantee the assembly accuracy of the linear guide coupled with the manufacturing error. The traditional assembly method requires the linear guide to be assembled and the straightness measured before the guide mounting surface is adjusted. This process is repeated until the design requirements are met. This assembly method not only has low assembly efficiency, but also damages the threaded mating surface of the parts.
[0003] Therefore, it is urgent to propose an efficient machine tool linear guide assembly accuracy control method for the linear guide assembly process to improve the one-time assembly accuracy of the linear guide. Summary of the invention
[0004] In order to solve the problems existing in the technical background, the purpose of the present invention is to provide a method for controlling the assembly accuracy of a machine tool linear guide rail, so as to solve the problem of repeated disassembly and adjustment caused by excessive assembly accuracy during the guide rail assembly process.
[0005] In order to achieve the above object, the present invention adopts the following technical solutions:
[0006] Step (1) establishes a linear guide rail assembly deformation model to analyze the guide rail assembly deformation caused by the preload during the linear guide rail assembly process.
[0007] Step (1) is implemented as follows:
[0008] 1) Use the hyperstatic beam model to characterize the stress state after the bed and guide rail are assembled. Since the stiffness of the guide rail is much smaller than that of the bed, when the bed and guide rail are deformed after assembly, the guide rail with smaller stiffness will fit on the guide rail installation base of the bed under the action of the bolt preload. At this time, the deformation of the guide rail is equivalent to the deformation of the bed. Therefore, taking the bed as the research object, the ribs at both ends of the guide rail installation part of the bed are equivalent to fixed supports, and the ribs in the middle are equivalent to elastic supports. In the vertical direction, the bed is equivalent to bearing n upward concentrated forces F1~F n and a statically indeterminate beam with a uniform downward load q, such as Figure 2 (a) shown.
[0009] 2) Solve the hyperstatic beam model by mechanical method and obtain the analytical expression of the guide rail assembly deformation. Use unknown force to replace the elastic constraint and Figure 2 The statically indeterminate beam shown in (a) is equivalent to Figure 2 (b) is a simply supported beam. The uniformly distributed load q is calculated using equation (1).
[0010]
[0011] Where q is the uniform load, L is the length of the linear guide, i is the number of the bolts, n is the total number of bolts, and F i is the preload force generated when the i-th bolt is tightened.
[0012] According to the stress-deformation theory of simply supported beams, the equation (2) is used to calculate the jth rib plate R j The i-th concentrated force F i Caused deformation.
[0013]
[0014] Where a is the distance from the i-th concentrated force to end A, x is the distance from the j-th rib to end A, E is the elastic modulus, I is the moment of inertia, and L is the length of the linear guide.
[0015] The jth rib R is calculated by formula (3). j The deformation caused by the uniformly distributed load q.
[0016]
[0017] Where x is the distance from the jth rib to end A, E is the elastic modulus, I is the moment of inertia, and L is the length of the linear guide.
[0018] The jth rib R is calculated by formula (4). j The kth unknown reaction force F rk Caused deformation.
[0019]
[0020] Where b is the distance from the kth unknown reaction force to end A, x is the distance from the jth rib to end A, E is the elastic modulus, I is the moment of inertia, and L is the length of the linear guide.
[0021] According to the principle of superposition method, the deformation of each rib is calculated by formula (5).
[0022]
[0023] In the formula, is the total deformation at each rib, is the deformation caused by the concentrated force F1 at each rib, is the deformation caused by the uniformly distributed load at each rib, is the unknown reaction force F r1 The deformation caused at each rib, and so on.
[0024] In addition, the deformation of the rib plate is also related to its stiffness. j The deformation at can also be calculated by equation (6).
[0025]
[0026] Where K is the stiffness of the rib plate, F rj It is the support reaction force at the stiffener.
[0027] From equations (1) to (6), the unknown reaction force F can be solved: r1 ~F rm , the deformation δ at any point on the guide rail can be calculated again by using the superposition method x As shown in formula (7).
[0028]
[0029] Where x is the distance from end A to any position on the linear guide. is the deformation caused by the concentrated force F1 at position x on the guide rail, (δ x ) q is the deformation caused by the uniformly distributed load q at position x on the guide rail, It is a reaction force F r1 The deformation caused at point x on the guide rail, and so on.
[0030] (2) The bolt preload force during the actual assembly of the guide rail is obtained by an experimental method, and the actual assembly deformation of the guide rail is predicted by the linear guide rail assembly deformation model established in step (1).
[0031] Step (2) is implemented as follows:
[0032] 1) In actual guide rail assembly, it is impossible to directly control the bolt preload. The torque control method is usually used to indirectly control the application of the preload. However, the bolt preload obtained by the torque control method has a large dispersion. In order to study the actual size of the preload of each bolt during the actual assembly of the guide rail, a pressure sensor and a dynamic and static strain gauge are used to measure and record the preload size when the bolt is tightened.
[0033] 2) The measured bolt preload F1~F n Substitute the linear guide assembly deformation model in step 1 to predict the actual assembly deformation of the guide.
[0034] (3) The manufacturing error of the guide rail mounting base surface is measured by experimental method, and the manufacturing error of the guide rail mounting base surface is characterized by numerical fitting function.
[0035] Step (3) is implemented as follows:
[0036] 1) Use an electronic level to measure the shape error of the guide rail installation surface, and use the two-terminal point connection method to process the measured data to obtain the straightness error of the guide rail installation surface.
[0037] 2) The characteristic function is used to fit the measured data to obtain an accurate expression for the manufacturing error of the guide rail mounting surface.
[0038] (4) Based on the guide rail assembly deformation predicted in step (2) and the manufacturing error of the guide rail mounting base surface measured in step (3), the adjustment position and adjustment amount on the guide rail mounting base surface are determined, so that the manufacturing error of the guide rail mounting base surface after adjustment is offset by the assembly deformation after coupling, so as to improve the one-time assembly accuracy of the linear guide.
[0039] (5) After the guide rail installation base surface is adjusted, the guide rail is assembled to the bed and the straightness is measured. The measured straightness of the guide rail is compared with the straightness of the guide rail that is directly assembled without adjustment to verify the effectiveness of this method. BRIEF DESCRIPTION OF THE DRAWINGS
[0040] Figure 1 It is a flow chart of the method of the present invention.
[0041] Figure 2 It is the model diagram of bed force analysis.
[0042] Figure 3 This is a physical picture of the experimental bench.
[0043] Figure 4 This is the bolt preload collection system diagram.
[0044] Figure 5 This is the guide rail assembly deformation prediction result diagram.
[0045] Figure 6 This is a measurement diagram of the manufacturing error of the guide rail mounting base.
[0046] Figure 7 It is the straightness error curve of the guide rail installation base.
[0047] Figure 8 This is a comparison chart of the guide rail assembly straightness before and after the guide rail installation base surface is pre-adjusted. DETAILED DESCRIPTION
[0048] The present invention will be further described below in conjunction with the accompanying drawings and embodiments.
[0049] A method for controlling the assembly accuracy of a machine tool linear guide rail comprises the following steps:
[0050] (1) A linear guide rail assembly deformation model is established to analyze the guide rail assembly deformation caused by the preload during the linear guide rail assembly process.
[0051] (2) The bolt preload force during the actual assembly of the guide rail is obtained through experimental methods and used to predict the actual assembly deformation of the guide rail.
[0052] (3) The manufacturing error of the guide rail mounting base surface is measured by experimental method, and the manufacturing error of the guide rail mounting base surface is characterized by numerical fitting function.
[0053] (4) The surface profile of the guide rail mounting base surface is reversely adjusted based on the predicted guide rail assembly deformation and the measured manufacturing error of the guide rail mounting base surface.
[0054] (5) The straightness of the guide rail assembly after adjustment is compared with the straightness of the guide rail assembly that is directly assembled without adjustment to verify the effectiveness of this method.
[0055] Claim 2, according to step (1) in claim 1, is implemented as follows:
[0056] 1) Use the hyperstatic beam model to characterize the stress state after the bed-guide assembly.
[0057] 2) The hyperstatic beam model is solved by mechanical methods to obtain the analytical expression of the guide rail assembly deformation.
[0058] Claim 3, according to step (2) in claim 1, is implemented as follows:
[0059] 1) Use pressure sensors and dynamic and static strain gauges to measure and record the preload force when the bolts are tightened, and obtain the preload force of each bolt during the actual assembly of the guide rail.
[0060] 2) Substitute the measured bolt preload force into the linear guide rail assembly deformation model to predict the actual assembly deformation of the guide rail.
[0061] Claim 4, according to step (3) in claim 1, is implemented as follows:
[0062] 1) Use an electronic level to measure the shape error of the guide rail installation surface, and use the two-terminal point connection method to process the measured data to obtain the straightness error of the guide rail installation surface.
[0063] 2) The characteristic function is used to fit the measured data to obtain an accurate expression for the manufacturing error of the guide rail mounting surface.
[0064] Claim 5, according to step (4) in claim 1, is implemented as follows:
[0065] Based on the predicted guide rail assembly deformation and the measured manufacturing error of the guide rail mounting base surface, the adjustment position and adjustment amount on the guide rail mounting base surface are determined, and then the contour error of the guide rail mounting base surface is reversely adjusted so that the manufacturing error of the adjusted guide rail mounting base surface is offset after coupling with the assembly deformation, thereby achieving an improvement in the one-time assembly accuracy of the linear guide.
[0066] Claim 6, according to claims 1, 2, 3, 4, and 5, has the advantages that: an efficient method for controlling the assembly accuracy of a machine tool linear guide rail is proposed. On the basis of establishing a linear guide rail assembly deformation model, the influence of the manufacturing error of the guide rail mounting surface on the assembly accuracy of the linear guide rail is considered, and a method for controlling the assembly accuracy of a linear guide rail based on assembly deformation and repairing the manufacturing error of the mounting base surface is proposed. This method simplifies the guide rail assembly process while improving the assembly accuracy of the linear guide rail, and can achieve efficient and high-precision assembly of the linear guide rail.
[0067] Embodiments of the present invention are as follows:
[0068] (1) Figure 3 Taking the experimental bench shown in the figure as an example, a linear guide rail assembly deformation model is established to analyze the guide rail assembly deformation caused by the preload during the linear guide rail assembly process. The bed of the experimental bench is 2200mm long, 1500mm wide, and 500mm high. The guide rail is 1680mm long, and the bolt specification for fastening the guide rail is M12×1.75. The other parameters are shown in Table 1.
[0069] Table 1 Model parameters
[0070]
[0071] (2) The bolt preload during the actual assembly of the guide rail is obtained through experimental methods, and the actual assembly deformation of the guide rail is predicted through the linear guide rail assembly deformation model.
[0072] Connect the pressure sensor to the dynamic and static strain gauges and connect the strain gauges to the computer, such as Figure 4 As shown in the figure, the bolts and each bolt hole on the mounting surface of the bed rail are numbered and corresponded one by one. The pressure sensor is used to measure the bolt preload force of each bolt after tightening at the corresponding bolt hole position, and the stabilized bolt preload force value is recorded by computer. The measurement results are shown in Table 2. Substituting the bolt preload force measurement values in Table 2 into equations (1) to (7), the assembly deformation curve of the rail is calculated as follows: Figure 5 As shown in the results, it can be seen that during the actual assembly process of the linear guide rail of the experimental table, the assembly straightness error of the linear guide rail caused by assembly deformation is 3.06μm.
[0073] Table 1 Bolt preload measurement results
[0074]
[0075]
[0076] (3) The manufacturing error of the guide rail mounting base surface is measured by experimental method, and the manufacturing error of the guide rail mounting base surface is characterized by numerical fitting function.
[0077] Use an electronic level to measure the manufacturing error of the guide rail mounting surface, such as Figure 6 As shown in the figure, the guide rail mounting surface is divided into 21 sections, each section is 80 mm long. First, place the check block at the starting position, then place the electronic level on the check block and adjust it to zero before measuring the straightness of the guide rail mounting surface. During the measurement, push the check block from the starting position to the other end section by section and record the reading of the electronic level after each stabilization. After the measurement, the recorded data is processed to obtain the manufacturing error curve of the guide rail mounting surface as shown in the figure. Figure 7 As shown in the results, it can be seen that the straightness error of the guide rail mounting surface of the experimental table is 5.58μm.
[0078] (4) Basis Figure 5 The calculated guide rail assembly deformation curve and Figure 7 The manufacturing error curve of the guide rail mounting surface is measured, and the surface profile of the guide rail mounting surface is reversely adjusted according to the calculated guide rail assembly deformation curve using tools such as files, grinding blocks and sandpaper, so that the adjusted guide rail assembly deformation and the manufacturing error of the guide rail mounting surface are coupled and offset each other.
[0079] (5) After the guide rail installation base surface is adjusted, the guide rail is assembled to the bed and the straightness of the installed guide rail is measured and compared with the straightness measurement result of the guide rail directly assembled without adjustment. Figure 8 When the guide rail mounting surface is not adjusted before the guide rail is assembled, the straightness error of the guide rail is 10.76μm. The straightness error of the guide rail assembled after the guide rail mounting surface is pre-adjusted is 3.82μm, which is 64.5% higher than the straightness error of the directly assembled guide rail.
Claims
1. A method for controlling the assembly accuracy of a machine tool linear guide rail, characterized in that: The following steps are involved: (1) Establish a linear guide rail assembly deformation model to analyze the guide rail assembly deformation caused by the preload during the linear guide rail assembly process; (2) The bolt preload force during the actual assembly of the guide rail is obtained by experimental methods and used to predict the actual assembly deformation of the guide rail; (3) Measuring the manufacturing error of the guide rail mounting base surface by experimental methods, and using a function to perform numerical fitting to characterize the manufacturing error of the guide rail mounting base surface; (4) reversely adjusting the surface profile of the guide rail mounting base surface based on the predicted guide rail assembly deformation and the measured manufacturing error of the guide rail mounting base surface; (5) The straightness of the guide rail assembly after adjustment is compared with the straightness of the guide rail assembly that is directly assembled without adjustment to verify the effectiveness of this method.
2. The method for controlling the assembly accuracy of a machine tool linear guide rail according to claim 1, characterized in that: Step (1) is implemented as follows: 1) Use the hyperstatic beam model to characterize the stress state after the bed-guide assembly; 2) The hyperstatic beam model is solved by mechanical methods to obtain the analytical expression of the guide rail assembly deformation.
3. The method for controlling the assembly accuracy of a machine tool linear guide rail according to claim 1, characterized in that: Step (2) is implemented as follows: 1) Use pressure sensors and dynamic and static strain gauges to measure and record the preload force of bolts during tightening, and obtain the preload force of each bolt during actual assembly of the guide rail; 2) Substitute the measured bolt preload force into the linear guide rail assembly deformation model to predict the actual assembly deformation of the guide rail.
4. The method for controlling the assembly accuracy of a machine tool linear guide rail according to claim 1, characterized in that: Step (3) is implemented as follows: 1) Use an electronic level to measure the shape error of the guide rail installation surface, and use the two-terminal point connection method to process the measured data to obtain the straightness error of the guide rail installation surface; 2) The characteristic function is used to fit the measured data to obtain an accurate expression for the manufacturing error of the guide rail mounting surface.
5. The method for controlling the assembly accuracy of a machine tool linear guide rail according to claim 1, characterized in that: Step (4) is implemented as follows: Based on the predicted guide rail assembly deformation and the measured manufacturing error of the guide rail mounting base surface, the adjustment position and adjustment amount on the guide rail mounting base surface are determined, and then the contour error of the guide rail mounting base surface is reversely adjusted so that the manufacturing error of the adjusted guide rail mounting base surface is offset after coupling with the assembly deformation, thereby achieving an improvement in the one-time assembly accuracy of the linear guide.
6. The method for controlling the assembly accuracy of a machine tool linear guide rail according to claim 1, characterized in that: In step (1), 1) Use the hyperstatic beam model to characterize the stress state after the bed-guide rail assembly; take the bed as the research object, and make the ribs at both ends of the bed guide rail installation part equivalent to fixed support, and the middle ribs equivalent to elastic support. In the vertical direction, the bed is equivalent to bearing n upward concentrated forces F1~F n and a statically indeterminate beam with a uniformly distributed downward load q; 2) Solve the statically indeterminate beam model by mechanical method and obtain the analytical expression of the guide rail assembly deformation; use unknown force to replace the elastic constraint and make the statically indeterminate beam equivalent to a simply supported beam; the uniformly distributed load q is calculated by formula (1); Where q is the uniform load, L is the length of the linear guide, i is the number of the bolts, n is the total number of bolts, and F i is the preload force generated when the i-th bolt is tightened; According to the stress-deformation theory of simply supported beams, the equation (2) is used to calculate the jth rib plate R j The i-th concentrated force F i Deformation caused by Where a is the distance from the i-th concentrated force to end A, x is the distance from the j-th rib plate to end A, E is the elastic modulus, I is the moment of inertia, and L is the length of the linear guide; The jth rib R is calculated by formula (3). j The deformation caused by the uniformly distributed load q at Where x is the distance from the jth rib to end A, E is the elastic modulus, I is the moment of inertia, and L is the length of the linear guide; The jth rib R is calculated by formula (4). j The kth unknown reaction force F rk Deformation caused by Where b is the distance from the kth unknown reaction force to end A, x is the distance from the jth rib plate to end A, E is the elastic modulus, I is the moment of inertia, and L is the length of the linear guide; According to the principle of superposition method, the deformation at each rib plate is calculated by formula (5); In the formula, is the total deformation at each rib, is the deformation caused by the concentrated force F1 at each rib, is the deformation caused by the uniformly distributed load at each rib, is the unknown reaction force F r1 The deformation caused at each rib, and so on; In addition, the deformation of the rib plate is also related to its stiffness. j The deformation at is calculated by formula (6); Where K is the stiffness of the rib plate, F rj is the support reaction force at the rib plate; From equations (1) to (6), the unknown reaction force F is solved: r1 ~F rm , the deformation δ at any point on the guide rail can be calculated again by using the superposition method x As shown in formula (7); Where x is the distance from end A to any position on the linear guide. is the deformation caused by the concentrated force F1 at position x on the guide rail, (δ x ) q is the deformation caused by the uniformly distributed load q at position x on the guide rail, It is a reaction force F r1 The deformation caused at position x on the guide rail.
Citation Information
Cited By
Method for guaranteeing motion precision of hydrostatic guideway of high-precision hard turning machine tool
CN119609690A
Machine tool precision improving method based on guide rail morphology design
CN119720591A
Forward design method for motion precision of hydrostatic guide rail
CN121525193A