Channel section loss risk assessment method and device under strong wind, medium and equipment
By assessing the failure probability of transmission channel lines and tower structures under strong winds, the risk level of channel section loss is determined, which solves the problem of failure in the existing technology to effectively assess the risk of transmission channel section loss and ensures the safe and stable operation of the power grid and equipment.
Patent Information
- Application Number
- CN202410816616.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-24
- Publication Date
- 2024-10-15
AI Technical Summary
Existing technology fails to effectively assess the risk of cross-section loss of transmission channels in strong wind environments, resulting in unstable power grid operation and equipment damage.
By obtaining the line information, predicted meteorological parameters and tower location information of the transmission channel, combined with finite element tools to calculate the ultimate wind speed and tower health coefficient, calculate the structural failure probability of each tower, and based on this, determine the line and channel section loss probability and risk level .
It achieves a quantitative assessment of the risk of transmission channel sections in strong wind environments, provides technical guidance for power grid dispatching and equipment maintenance, and ensures the safety and stability of power grid operations.
Smart Images

Figure CN118780599A_ABST
Abstract
Description
Technical Field
[0001] The present disclosure relates to the technical field of overhead power transmission line operation and maintenance, and in particular to a method, device, medium and equipment for assessing the risk of channel section loss under strong winds. Background Art
[0002] With climate change, power transmission channels will inevitably face strong winds. However, strong winds may cause line tripping or damage to the transmission channels, such as string drop, line breakage, tower collapse, etc. In severe cases, it may even cause the loss of the section of the transmission channel and stop the power supply, affecting the stable operation of the power grid and the normal operation of the equipment. Therefore, during the operation and maintenance of the transmission channel, dispatchers and operation and maintenance personnel need to understand the risk of section loss of the transmission channel in order to adjust the power grid operation mode in a timely manner, deploy emergency repair personnel and repair tools, and pre-place emergency power generation equipment in advance to ensure the safe operation of the large power grid.
[0003] There are some methods and systems for transmission line risk assessment in related technologies, such as methods that use convolutional neural networks to build risk assessment models, but such methods fail to consider the impact of the transmission line's main condition on wind direction. In addition, there are also transmission line safety performance assessment methods that consider factors such as the location of loose tower bolt nodes and the number of wind vibrations at tower bolt nodes, but such methods do not specify how to assess the risk of channel section loss. Therefore, how to assess the risk of transmission channel section loss to avoid strong wind conditions causing transmission channel section loss has always been a concern for the industry. Summary of the invention
[0004] The embodiments of the present disclosure at least provide a method, device, medium and equipment for assessing the risk of channel section loss under strong winds, which can quantitatively assess the cross-sectional risk loss of the transmission channel taking into account the actual situation on site, and then serve as technical guidance and basis for grid dispatching and equipment operation and maintenance.
[0005] The present disclosure provides a method for assessing the risk of channel section loss under strong winds, including:
[0006] Acquire line information corresponding to each line in a power transmission channel; the power transmission channel includes multiple lines, each of which includes multiple towers; the line information includes tower position information and basic wind speed information corresponding to each tower;
[0007] For each line, respectively obtain the predicted meteorological parameter information within a preset time corresponding to the tower position information of each tower; the predicted meteorological parameter information includes wind speed information;
[0008] For each tower, the wind speed information is corrected based on the tower position information, the predicted meteorological parameter information and a preset correction coefficient to obtain corrected wind speed information; and the limit wind speed information corresponding to each tower is calculated based on a finite element tool;
[0009] For each line, the tower health coefficient of each tower is obtained; according to the basic wind speed information, corrected wind speed information, extreme wind speed information and tower health coefficient corresponding to each tower, the tower structure failure probability of each tower is calculated based on the structural failure probability formula; and the line failure probability of the line is determined according to the tower structure failure probability of each tower;
[0010] The channel section loss probability is determined based on the line failure probability of each line; and the channel section loss risk level is determined based on the channel section loss probability; the channel section loss risk level includes zero risk, low risk, medium risk and high risk.
[0011] In some possible embodiments, the preset correction coefficient includes a first wind speed correction coefficient, a second wind speed correction coefficient and a third wind speed correction coefficient, the first wind speed correction coefficient is less than the second wind speed correction coefficient, and the second wind speed correction coefficient is less than the third wind speed correction coefficient; the predicted meteorological parameter information also includes wind direction information; the correcting the wind speed information based on the tower position information, the predicted meteorological parameter information and the preset correction coefficient includes:
[0012] Determining the tower position of the tower according to the tower position information and the wind direction information; the tower position includes a pass, a windward slope and a canyon wind channel;
[0013] When the pole tower is located at a pass, the corrected wind speed information corresponding to the pole tower is the product of the first wind speed correction coefficient and the wind speed information;
[0014] When the pole tower is located on the windward slope, the corrected wind speed information corresponding to the pole tower is the product of the second wind speed correction coefficient and the wind speed information;
[0015] When the pole tower is located in a canyon wind tunnel, the corrected wind speed information corresponding to the pole tower is the product of a third wind speed correction coefficient and the wind speed information.
[0016] In some possible embodiments, the line information further includes tower structure information, ground wire model information, and insulator string model information; and the calculation of the limit wind speed information corresponding to each tower based on the finite element tool includes:
[0017] Calculating the tower material limit wind speed information based on the finite element tool according to the basic wind speed information corresponding to the tower and the tower structure information;
[0018] Calculating the ground wire limit wind speed information based on the finite element tool according to the basic wind speed information corresponding to the tower and the ground wire model information;
[0019] Calculating the insulator string limit wind speed information based on the finite element tool according to the basic wind speed information corresponding to the tower and the insulator string model information;
[0020] The limit wind speed information corresponding to each tower is determined based on the tower material limit wind speed information, the ground wire limit wind speed information and the insulator string limit wind speed information.
[0021] In some possible embodiments, before obtaining the tower health coefficient of each tower, the steps include:
[0022] Acquire operation information of the line corresponding to the tower, the operation information including line operation life, line operation and maintenance information, conductor and hardware wear information, and bolt information of the tower;
[0023] The tower health factor is determined based on the operation information.
[0024] In some possible embodiments, the structural failure probability formula includes:
[0025]
[0026] Among them, f (i,j) V represents the failure probability of the tower structure of the jth tower of the i-th line; t(i,j) V represents the revised wind speed information of the jth tower of the ith line; d(i,j) V represents the basic wind speed information of the jth tower of the ith line; b(i,j) H represents the maximum wind speed information of the jth tower of the i-th line; (i,j) It represents the health factor of the jth tower of the jth line.
[0027] In some possible embodiments, determining the line failure probability of the line according to the tower structure failure probability of each tower includes:
[0028] According to the tower structure failure probability of each tower, the line failure probability is determined based on the line failure probability formula;
[0029] The line failure probability formula includes:
[0030] F i =max(f (i,j) ),j=1,2,...,m
[0031] Among them, F i represents the line failure probability of the i-th line; m represents the number of towers of the i-th line.
[0032] In some possible embodiments, determining the channel section loss probability based on the line failure probability of each line includes:
[0033] According to the line failure probability of each line, the channel section loss probability is determined based on the channel section loss probability formula;
[0034] The channel section loss probability formula includes:
[0035] F = ∏ i n =1 F i ,i=1,2,...,n
[0036] Where n represents the number of lines in the channel.
[0037] The embodiment of the present disclosure provides a device for assessing the risk of channel section loss under strong winds, comprising:
[0038] A line information acquisition module, used to acquire line information corresponding to each line in a power transmission channel; the power transmission channel includes multiple lines, each of which includes multiple towers; the line information includes tower position information and basic wind speed information corresponding to each tower;
[0039] A tower information acquisition module, for acquiring, for each line, the predicted meteorological parameter information within a preset time corresponding to the tower position information of each tower; the predicted meteorological parameter information includes wind speed information;
[0040] A wind speed information determination module is used to correct the wind speed information of each tower based on the tower position information, the predicted meteorological parameter information and a preset correction coefficient to obtain corrected wind speed information; and calculate the limit wind speed information corresponding to each tower based on a finite element tool;
[0041] A failure probability calculation module is used to obtain the tower health coefficient of each tower for each line; calculate the tower structure failure probability of each tower based on the structural failure probability formula according to the basic wind speed information, corrected wind speed information, extreme wind speed information and tower health coefficient corresponding to each tower; and determine the line failure probability of the line according to the tower structure failure probability of each tower;
[0042] A risk level determination module is used to determine the channel section loss probability based on the line failure probability of each line; and determine the channel section loss risk level according to the channel section loss probability; the channel section loss risk level includes zero risk, low risk, medium risk and high risk.
[0043] In some possible embodiments, the preset correction coefficient includes a first wind speed correction coefficient, a second wind speed correction coefficient and a third wind speed correction coefficient, the first wind speed correction coefficient is less than the second wind speed correction coefficient, and the second wind speed correction coefficient is less than the third wind speed correction coefficient; the predicted meteorological parameter information also includes wind direction information; the wind speed information determination module is specifically used to:
[0044] Determining the tower position of the tower according to the tower position information and the wind direction information; the tower position includes a pass, a windward slope and a canyon wind channel;
[0045] When the pole tower is located at a pass, the corrected wind speed information corresponding to the pole tower is the product of the first wind speed correction coefficient and the wind speed information;
[0046] When the pole tower is located on the windward slope, the corrected wind speed information corresponding to the pole tower is the product of the second wind speed correction coefficient and the wind speed information;
[0047] When the pole tower is located in a canyon wind tunnel, the corrected wind speed information corresponding to the pole tower is the product of a third wind speed correction coefficient and the wind speed information.
[0048] In some possible embodiments, the line information further includes tower structure information, ground wire model information, and insulator string model information; and the wind speed information determination module is specifically used to:
[0049] Calculating the tower material limit wind speed information based on the finite element tool according to the basic wind speed information corresponding to the tower and the tower structure information;
[0050] Calculating the ground wire limit wind speed information based on the finite element tool according to the basic wind speed information corresponding to the tower and the ground wire model information;
[0051] Calculating the insulator string limit wind speed information based on the finite element tool according to the basic wind speed information corresponding to the tower and the insulator string model information;
[0052] The limit wind speed information corresponding to each tower is determined based on the tower material limit wind speed information, the ground wire limit wind speed information and the insulator string limit wind speed information.
[0053] In some possible embodiments, the failure probability calculation module is further used to:
[0054] Acquire operation information of the line corresponding to the tower, the operation information including line operation life, line operation and maintenance information, conductor and hardware wear information, and bolt information of the tower;
[0055] The tower health factor is determined based on the operation information.
[0056] In some possible embodiments, the structural failure probability formula includes:
[0057]
[0058] Among them, f (i,j) V represents the failure probability of the tower structure of the jth tower of the i-th line; t(i,j) V represents the revised wind speed information of the jth tower of the ith line; d(i,j) V represents the basic wind speed information of the jth tower of the ith line; b(i,j) H represents the maximum wind speed information of the jth tower of the i-th line; (i,j) It represents the health factor of the jth tower of the jth line.
[0059] In some possible embodiments, the failure probability calculation module is specifically used to:
[0060] According to the tower structure failure probability of each tower, the line failure probability is determined based on the line failure probability formula;
[0061] The line failure probability formula includes:
[0062] F i =max(f (i,j) ),j=1,2,...,m
[0063] Among them, F i represents the line failure probability of the i-th line; m represents the number of towers of the i-th line.
[0064] In some possible embodiments, the risk level determination model is specifically used to:
[0065] According to the line failure probability of each line, the channel section loss probability is determined based on the channel section loss probability formula;
[0066] The channel section loss probability formula includes:
[0067] F = ∏ i n =1 F i ,i=1,2,...,n
[0068] Where n represents the number of lines in the channel.
[0069] An embodiment of the present disclosure provides a computer device, including: a processor, a memory and a bus, wherein the memory stores machine-readable instructions executable by the processor, and when the computer device is running, the processor and the memory communicate via the bus, and when the machine-readable instructions are executed by the processor, a method for assessing the risk of channel section loss under strong winds as described in any possible implementation manner described above is performed.
[0070] An embodiment of the present disclosure provides a computer-readable storage medium having a computer program stored thereon. When the computer program is executed by a processor, the method for assessing the risk of channel section loss under strong winds as described in any of the above possible implementations is implemented.
[0071] The risk assessment method, device, medium and equipment for channel section loss under strong winds provided in the embodiments of the present disclosure calculate the failure risk of each tower on each line by combining the actual wind speed conditions on site in the transmission channel area, and then derive the probability of cross-section loss and risk level of the entire transmission channel. In this way, the present disclosure can quantitatively assess the cross-sectional risk loss of the transmission channel considering the actual on-site conditions, and then serve as a technical guide and basis for grid dispatching and equipment operation and maintenance. That is, when the risk level is high, professionals should carry out targeted grid load adjustment, emergency repair personnel and tool deployment and other operation and maintenance response work to ensure the safety and stability of grid operation.
[0072] In order to make the above-mentioned objectives, features and advantages of the present disclosure more obvious and easy to understand, preferred embodiments are specifically cited below and described in detail with reference to the attached drawings. BRIEF DESCRIPTION OF THE DRAWINGS
[0073] In order to more clearly illustrate the technical solutions of the embodiments of the present disclosure, the following briefly introduces the drawings required to be cited in the embodiments. The drawings herein are incorporated into the specification and constitute a part of the specification. These drawings illustrate embodiments consistent with the present disclosure and are used together with the specification to illustrate the technical solutions of the present disclosure. It should be understood that the following drawings only illustrate certain embodiments of the present disclosure and should not be regarded as limiting the scope. For ordinary technicians in this field, other relevant drawings can be obtained based on these drawings without creative work.
[0074] Figure 1 A flow chart of a method for assessing the risk of channel section loss under strong winds provided by an embodiment of the present disclosure is shown;
[0075] Figure 2 A schematic structural diagram of a channel section loss risk assessment device under strong winds provided by an embodiment of the present disclosure is shown;
[0076] Figure 3A schematic diagram of the structure of a computer device provided by an embodiment of the present disclosure is shown. DETAILED DESCRIPTION
[0077] In order to make the purpose, technical scheme and advantages of the embodiments of the present disclosure clearer, the technical scheme in the embodiments of the present disclosure will be clearly and completely described below in conjunction with the drawings in the embodiments of the present disclosure. Obviously, the described embodiments are only part of the embodiments of the present disclosure, rather than all of the embodiments. The components of the embodiments of the present disclosure generally described and shown in the drawings here can be arranged and designed in various different configurations. Therefore, the following detailed description of the embodiments of the present disclosure provided in the drawings is not intended to limit the scope of the present disclosure for protection, but merely represents the selected embodiments of the present disclosure. Based on the embodiments of the present disclosure, all other embodiments obtained by those skilled in the art without making creative work belong to the scope of protection of the present disclosure.
[0078] It should be noted that similar reference numerals and letters denote similar items in the following drawings, and therefore, once an item is defined in one drawing, further definition and explanation thereof is not required in subsequent drawings.
[0079] The term "and / or" herein only describes an association relationship, indicating that three relationships may exist. For example, A and / or B may represent the following three situations: A exists alone, A and B exist at the same time, and B exists alone. In addition, the term "at least one" herein represents any combination of at least two of any one or more of a plurality of. For example, including at least one of A, B, and C may represent including any one or more elements selected from the set consisting of A, B, and C.
[0080] With climate change, strong winds pose a significant challenge to the safe operation of power transmission channels. In this environment, power transmission channels may face the risk of line tripping or damage to the main body, such as string drop, line breakage, tower collapse, etc. In severe cases, it may even lead to the loss of the section of the power transmission channel, resulting in power outages, which seriously affects the stable operation of the power grid and the normal operation of the equipment. Therefore, operation and maintenance personnel need to understand the risk of loss of the section of the power transmission channel so that they can take corresponding measures in a timely manner, such as adjusting the operation mode of the power grid, deploying emergency repair personnel and repair tools, and pre-positioning emergency power generation equipment, etc., to ensure the safe operation of the large power grid.
[0081] Research has found that there are some methods and systems for transmission line risk assessment in related technologies, such as the method of using convolutional neural networks to build a risk assessment model, but this type of method fails to consider the impact of the transmission line's main condition on wind direction. In addition, there are also transmission line safety performance assessment methods that consider factors such as the loose position of tower bolt nodes and the number of wind vibrations at tower bolt nodes, but this type of method does not specify how to assess the risk of channel section loss.
[0082] Based on the above research, the embodiments of the present disclosure provide a method, device, medium and equipment for assessing the risk of channel section loss under strong winds, the method comprising: first, obtaining line information of each line in the transmission channel, including the position and basic wind speed of each tower, and obtaining wind speed information for each line by predicting meteorological parameter information; then, correcting the wind speed information of each tower according to the correction coefficient, and using finite element tools to calculate the maximum wind speed of each tower; then, obtaining the health factor of each tower, and calculating the structural failure probability of the tower according to the basic wind speed, the corrected wind speed, the maximum wind speed and the health factor, and then determining the failure probability of the line; finally, determining the channel section loss probability based on the failure probability of each line, and determining the risk level of channel section loss accordingly.
[0083] In the embodiment of the present disclosure, by combining the actual wind speed conditions on site in the transmission channel area, the failure risk of each tower on each line is calculated, and then the probability of loss of the entire transmission channel section and the risk level are obtained. In this way, the present disclosure can quantitatively evaluate the cross-sectional risk loss of the transmission channel considering the actual situation on site, and then serve as a technical guidance and basis for grid dispatching and equipment operation and maintenance. That is, when the risk level is high, professionals should carry out targeted grid load adjustment, emergency repair personnel and equipment deployment and other operation and maintenance response work to ensure the safety and stability of grid operation.
[0084] To facilitate understanding of this embodiment, the execution subject of the risk assessment method for channel section loss under strong winds provided by the embodiment of the present disclosure is first introduced in detail. The execution subject of the risk assessment method for channel section loss under strong winds provided by the embodiment of the present disclosure is a computer device. The computer device can be a server. Among them, the server can be an independent physical server, or a server cluster or distributed system composed of multiple physical servers, or a cloud server that provides basic cloud computing services such as cloud services, cloud databases, cloud computing, cloud storage, big data and artificial intelligence platforms.
[0085] The following is a detailed description of the risk assessment method for channel section loss under strong winds provided by the embodiment of the present application in conjunction with the accompanying drawings. Figure 1 As shown, it is a flow chart of a method for assessing the risk of channel section loss under strong winds provided by an embodiment of the present disclosure, and the method includes the following S101 to S105:
[0086] S101, obtaining line information corresponding to each line in a transmission channel; the transmission channel includes multiple lines, each line includes multiple towers; the line information includes tower position information and basic wind speed information corresponding to each tower.
[0087] It can be understood that a transmission channel refers to a path or passage used to transmit electricity, which is usually composed of multiple power lines; among them, the line is the power transmission path connecting the power station and the power consumption location, and the pole tower is the structure supporting the transmission line, which is usually a tower made of metal or concrete, used to suspend the transmission line high above the ground to prevent contact with the ground.
[0088] Specifically, line information refers to data and characteristics about each line, which may include the tower location information, basic wind speed information, and tower structure information of each tower on the line; it may also include line ground wire model information and insulator string model information. Here, the tower location information of the tower refers to the specific location of each tower on the line, which may include longitude and latitude coordinates or other information that can represent the geographical location, so as to accurately locate the location of each tower; the basic wind speed information is used to evaluate the wind resistance of the transmission line, that is, the basic wind speed that each tower can withstand (which may include wind direction, wind force, etc.). In some other embodiments, the line information may also include other information such as voltage level, line length, line type, etc., which are not specifically limited here.
[0089] S102: For each line, respectively obtain the predicted meteorological parameter information within a preset time corresponding to the tower position information of each tower.
[0090] It is understandable that on a line, the weather forecast may be different due to the different locations of the towers. Therefore, according to the location of each tower in the line, the weather forecast acquisition method such as Weather Research and Forecasting Model (WRF) can be used to obtain the hourly wind speed and direction data of each tower location within a preset time. Here, the preset time can be the next 72 hours or 96 hours, which is not specifically limited here. The predicted meteorological parameter information includes wind speed information and wind direction information.
[0091] S103, for each tower, correct the wind speed information based on the tower position information, the predicted meteorological parameter information and a preset correction coefficient to obtain corrected wind speed information; and calculate the limit wind speed information corresponding to each tower based on a finite element tool.
[0092] Specifically, after obtaining the predicted meteorological parameter information of each tower, the digital elevation model (DEM) is used to obtain the slope, slope direction, terrain undulation and other data of the tower location according to the latitude and longitude position information and wind direction information of the tower, and then determine the location of the tower (such as a pass, windward slope and canyon wind channel, etc.). Considering the acceleration effect of the terrain on the wind speed, the wind speed information of the tower can be corrected using a preset correction coefficient to obtain the corrected wind speed information of each tower. Here, the preset correction coefficient may include a first wind speed correction coefficient, a second wind speed correction coefficient and a third wind speed correction coefficient, the first wind speed correction coefficient is less than the second wind speed correction coefficient, and the second wind speed correction coefficient is less than the third wind speed correction coefficient.
[0093] For example, in the embodiment of the present disclosure, it is assumed that there are i lines in the transmission channel, the tower number of each line is j, and the wind speed information of the jth tower of the i-th line can be expressed as V y(i,j) , the corrected wind speed information of the jth tower of the ith line can be expressed as V t(i,j) , the correction coefficient of the jth tower of the ith line can be expressed as a g(i,j) Then, the wind speed information of the jth tower of the i-th line can be corrected as follows:
[0094] V t(i,j) =V y(i,j) *a g(i,j) ,
[0095]
[0096] It can be understood that when the tower is located at the pass, the corrected wind speed information corresponding to the tower is the first wind speed correction coefficient (i.e., a g(i,j) =1.5) multiplied by the wind speed information; when the tower is located on the windward slope, the corrected wind speed information corresponding to the tower is the second wind speed correction coefficient (i.e., a g(i,j) =1.6) and the wind speed information; when the tower is located in the canyon wind tunnel, the corrected wind speed information corresponding to the tower is the third wind speed correction coefficient (i.e., a g(i,j) =2.1) multiplied by the wind speed information. In some other embodiments, the wind speed correction coefficient may also take other values, which are not specifically limited here.
[0097] Exemplarily, after the wind speed information of each tower is corrected, the finite element tool is used to calculate the limit wind speed information corresponding to each tower (i.e., the minimum limit wind speed at which the tower exceeds its bearing capacity). Here, the finite element tool is an engineering software used for structural analysis, which may be one of the commonly used finite element analysis software such as ANSYS, ABAQUS, LS-DYNA, etc. Through the finite element tool, a model can be established to simulate the structure of each tower, considering its response and behavior when subjected to wind load. Then, using the basic wind speed of the line as the initial calculation condition, the wind speed value is gradually increased in steps of 1m / s until the minimum limit wind speed at which the tower exceeds its bearing capacity is calculated. Specifically, when calculating the limit wind speed information corresponding to each tower based on the finite element tool, the following (1) to (4) can be included:
[0098] (1) calculating the tower material limit wind speed information based on the finite element tool according to the basic wind speed information corresponding to the tower and the tower structure information;
[0099] (2) calculating the maximum wind speed information of the ground wire based on the finite element tool according to the basic wind speed information corresponding to the tower and the model information of the ground wire;
[0100] (3) calculating the limit wind speed information of the insulator string based on the finite element tool according to the basic wind speed information corresponding to the tower and the model information of the insulator string;
[0101] (4) Determine the limit wind speed information corresponding to each tower based on the tower material limit wind speed information, the ground wire limit wind speed information and the insulator string limit wind speed information.
[0102] First, according to the basic wind speed information and structural information of each tower, the finite element tool is used to calculate the ultimate wind speed of the tower material, which specifically involves considering factors such as the geometric shape, material properties and wind load of the tower to simulate the stress and deformation of the tower under different wind speeds, so as to determine its ultimate wind speed. Then, according to the basic wind speed information and ground wire model information of each tower, the finite element tool is used to calculate the ultimate wind speed of the ground wire, taking into account the material properties of the ground wire and the effect of wind load to determine the ultimate wind speed information of the ground wire. Subsequently, according to the basic wind speed information and insulator string model information of each tower, the finite element tool is used to calculate the ultimate wind speed of the insulator string, where the material, structural form and response of the insulator string under wind load are usually considered to determine the ultimate bearing capacity of the insulator string under different wind speeds. Finally, the ultimate wind speed information of the tower material, ground wire and insulator string is comprehensively considered to determine the overall ultimate wind speed information corresponding to each tower. In this way, by using finite element tools to calculate the limit wind speeds of tower materials, ground wires and insulator strings, and then calculating the limit wind speed information of each tower based on the calculated tower material limit wind speed information, ground wire limit wind speed information and insulator string limit wind speed information, the minimum limit wind speed corresponding to each tower that exceeds its bearing capacity can be accurately evaluated.
[0103] S104, for each line, obtaining the tower health coefficient of each tower; calculating the tower structure failure probability of each tower based on the structural failure probability formula according to the basic wind speed information, modified wind speed information, extreme wind speed information and tower health coefficient corresponding to each tower; and determining the line failure probability of the line according to the tower structure failure probability of each tower.
[0104] It is understandable that the tower health factor is a parameter used to evaluate the health status of the tower structure. When the tower health factor is high, the probability of its structural failure will be relatively low, that is, a tower with a high health factor indicates that its tower structure is relatively intact and can withstand greater external loads, and its structural failure probability will be low. Therefore, when calculating the probability of tower structure failure, it is necessary to first obtain the operation information of the line corresponding to the tower, which may include the line operation years, line operation and maintenance information, conductor and hardware wear information, and tower bolt information, and then determine the tower health factor based on the operation information.
[0105] For example, in the disclosed embodiment, after obtaining the line operation information, the health conditions of the pole tower are divided into three categories (good operation and maintenance, conductor hardware wear, and loose tower bolts) according to the line operation information, and different tower health coefficients are set according to the three health conditions. For example, when the health condition of the pole tower is good operation and maintenance, its tower health coefficient is 1; when the health condition of the pole tower is conductor hardware wear, its tower health coefficient can be between 0.85-0.95; when the health condition of the pole tower is loose tower bolts, its tower health coefficient can be between 0.75-0.85. In some other embodiments, the tower health coefficient can be set to other values according to the actual health condition, which is not specifically limited here.
[0106] After obtaining the tower health factor, the structural failure probability of each tower is calculated according to the structural failure probability formula. Here, the tower structural failure probability formula is as follows:
[0107]
[0108] Among them, f (i,j) V represents the failure probability of the tower structure of the jth tower of the i-th line; t(i,j) V represents the revised wind speed information of the jth tower of the ith line; d(i,j) V represents the basic wind speed information of the jth tower of the ith line; b(i,j) H represents the maximum wind speed information of the jth tower of the i-th line; (i,j) It represents the health factor of the jth tower of the jth line.
[0109] Exemplarily, after obtaining the tower structure failure probability of each tower, the line failure probability of each line is calculated according to the line failure probability formula, and the line failure probability formula includes:
[0110] F i =max(f (i,j) ),j=1,2,...,m;
[0111] Among them, F i represents the line failure probability of the i-th line; m represents the number of towers of the i-th line.
[0112] Here, the line failure probability of each line is taken as the maximum value of the tower structure failure probability on the line. This is because in the power transmission line, the towers in each line are connected in series, and the reliability of the entire line depends on the weakest link. Specifically, each tower on a transmission line bears corresponding wind loads and structural pressures, and if any of the towers fails structurally, it may cause overall failure or interruption of the line. Therefore, in order to comprehensively evaluate the reliability of the line, it is necessary to focus on the towers that are most likely to fail.
[0113] S105, determining a channel section loss probability based on the line failure probability of each line; and determining a channel section loss risk level according to the channel section loss probability.
[0114] Specifically, in the transmission channel, each line is connected in parallel, and the current can pass through any line to complete the power transmission. Therefore, after obtaining the line failure probability of each line, the section loss probability of the transmission channel is determined based on the section loss probability formula according to the line failure probability of each line. Since the transmission channel will only experience a section loss when all lines fail, the section loss probability formula includes:
[0115] F = ∏ i n =1 F i ,i=1,2,...,n;
[0116] Where n represents the number of lines in the channel.
[0117] In this way, after the probability of channel section loss is obtained, the risk level of section loss is determined according to the probability of channel section loss, and the specific levels may include zero risk, low risk, medium risk and high risk. In the embodiment of the present disclosure, when the probability of channel section loss is equal to zero, its risk level is zero risk; when the probability of channel section loss is greater than zero and less than 0.43, its risk level can be determined to be low risk; when the probability of channel section loss is between 0.43 and 0.85, its risk level can be determined to be medium risk; when the probability of channel section loss is greater than 0.85, its risk level is high risk.
[0118] In some other embodiments, the relationship between the probability of channel section loss and its risk level can be set through other numerical ranges (for example, when the probability of channel section loss is greater than 0.5, its risk level is determined to be high risk), which is not specifically limited here.
[0119] The risk assessment method, device, medium and equipment for channel section loss under strong winds provided in the embodiments of the present disclosure calculate the failure risk of each tower on each line by combining the actual wind speed conditions on site in the transmission channel area, and then derive the probability of cross-section loss and risk level of the entire transmission channel. In this way, the present disclosure can quantitatively assess the cross-sectional risk loss of the transmission channel considering the actual on-site conditions, and then serve as a technical guide and basis for grid dispatching and equipment operation and maintenance. That is, when the risk level is high, professionals should carry out targeted grid load adjustment, emergency repair personnel and tool deployment and other operation and maintenance response work to ensure the safety and stability of grid operation.
[0120] Those skilled in the art will appreciate that, in the above method of specific implementation, the order in which the steps are written does not imply a strict execution order and does not constitute any limitation on the implementation process. The specific execution order of the steps should be determined by their functions and possible internal logic.
[0121] Based on the same inventive concept, the presently disclosed embodiment also provides a channel section loss risk assessment device under strong winds corresponding to the channel section loss risk assessment method under strong winds. Since the principle of solving the problem by the device in the presently disclosed embodiment is similar to the channel section loss risk assessment method under strong winds mentioned above in the presently disclosed embodiment, the implementation of the device can refer to the implementation of the method, and the repeated parts will not be repeated.
[0122] Reference Figure 2 FIG. 2 is a schematic diagram of a device 200 for assessing the risk of channel section loss under strong winds provided by an embodiment of the present disclosure, the device comprising:
[0123] The line information acquisition module 201 is used to acquire line information corresponding to each line in the power transmission channel; the power transmission channel includes multiple lines, each of which includes multiple towers; the line information includes tower position information and basic wind speed information corresponding to each tower;
[0124] The tower information acquisition module 202 is used to acquire, for each line, the predicted meteorological parameter information within a preset time corresponding to the tower position information of each tower; the predicted meteorological parameter information includes wind speed information;
[0125] The wind speed information determination module 203 is used to correct the wind speed information of each tower based on the tower position information, the predicted meteorological parameter information and a preset correction coefficient to obtain corrected wind speed information; and calculate the limit wind speed information corresponding to each tower based on a finite element tool;
[0126] The failure probability calculation module 204 is used to obtain the tower health coefficient of each tower for each line; calculate the tower structure failure probability of each tower based on the structural failure probability formula according to the basic wind speed information, modified wind speed information, extreme wind speed information and tower health coefficient corresponding to each tower; and determine the line failure probability of the line according to the tower structure failure probability of each tower;
[0127] The risk level determination module 205 is used to determine the channel section loss probability based on the line failure probability of each line; and determine the channel section loss risk level according to the channel section loss probability; the channel section loss risk level includes zero risk, low risk, medium risk and high risk.
[0128] In some possible embodiments, the preset correction coefficient includes a first wind speed correction coefficient, a second wind speed correction coefficient and a third wind speed correction coefficient, the first wind speed correction coefficient is less than the second wind speed correction coefficient, and the second wind speed correction coefficient is less than the third wind speed correction coefficient; the predicted meteorological parameter information also includes wind direction information; the wind speed information determination module 203 is specifically used to:
[0129] Determining the tower position of the tower according to the tower position information and the wind direction information; the tower position includes a pass, a windward slope and a canyon wind channel;
[0130] When the pole tower is located at a pass, the corrected wind speed information corresponding to the pole tower is the product of the first wind speed correction coefficient and the wind speed information;
[0131] When the pole tower is located on the windward slope, the corrected wind speed information corresponding to the pole tower is the product of the second wind speed correction coefficient and the wind speed information;
[0132] When the pole tower is located in a canyon wind tunnel, the corrected wind speed information corresponding to the pole tower is the product of a third wind speed correction coefficient and the wind speed information.
[0133] In some possible embodiments, the line information further includes tower structure information, ground wire model information, and insulator string model information; the wind speed information determination module 203 is specifically used to:
[0134] Calculating the tower material limit wind speed information based on the finite element tool according to the basic wind speed information corresponding to the tower and the tower structure information;
[0135] Calculating the ground wire limit wind speed information based on the finite element tool according to the basic wind speed information corresponding to the tower and the ground wire model information;
[0136] Calculating the insulator string limit wind speed information based on the finite element tool according to the basic wind speed information corresponding to the tower and the insulator string model information;
[0137] The limit wind speed information corresponding to each tower is determined based on the tower material limit wind speed information, the ground wire limit wind speed information and the insulator string limit wind speed information.
[0138] In some possible embodiments, the failure probability calculation module 204 is further used to:
[0139] Acquire operation information of the line corresponding to the tower, the operation information including line operation life, line operation and maintenance information, conductor and hardware wear information, and bolt information of the tower;
[0140] The tower health factor is determined based on the operation information.
[0141] In some possible embodiments, the structural failure probability formula includes:
[0142]
[0143] Among them, f (i,j) V represents the failure probability of the tower structure of the jth tower of the i-th line; t(i,j) V represents the revised wind speed information of the jth tower of the ith line; d(i,j) V represents the basic wind speed information of the jth tower of the ith line; b(i,j) H represents the maximum wind speed information of the jth tower of the i-th line; (i,j) It represents the health factor of the jth tower of the jth line.
[0144] In some possible embodiments, the failure probability calculation module 204 is specifically used to:
[0145] According to the tower structure failure probability of each tower, the line failure probability is determined based on the line failure probability formula;
[0146] The line failure probability formula includes:
[0147] F i =max(f (i,j) ),j=1,2,...,m
[0148] Among them, F i represents the line failure probability of the i-th line; m represents the number of towers of the i-th line.
[0149] In some possible embodiments, the risk level determination model 205 is specifically used to:
[0150] According to the line failure probability of each line, the channel section loss probability is determined based on the channel section loss probability formula;
[0151] The channel section loss probability formula includes:
[0152]
[0153] Where n represents the number of lines in the channel.
[0154] Based on the same technical concept, the embodiment of the present disclosure also provides a computer device. Figure 3 , which is a schematic diagram of the structure of a computer device 300 provided in an embodiment of the present disclosure, including a processor 301, a memory 302, and a bus 303. The memory 302 is used to store execution instructions, including a memory 3021 and an external memory 3022; the memory 3021 is also called an internal memory, which is used to temporarily store the operation data in the processor 301 and the data exchanged with the external memory 3022 such as a hard disk. The processor 301 exchanges data with the external memory 3022 through the memory 3021.
[0155] In the embodiment of the present application, the memory 302 is specifically used to store the application code for executing the solution of the present application, and the execution is controlled by the processor 301. That is, when the computer device 300 is running, the processor 301 communicates with the memory 302 through the bus 303, so that the processor 301 executes the application code stored in the memory 302, and then executes the method described in any of the above embodiments.
[0156] Among them, the memory 302 can be, but is not limited to, random access memory (Random Access Memory, RAM), read only memory (Read Only Memory, ROM), programmable read-only memory (Programmable Read-Only Memory, PROM), erasable programmable read-only memory (Erasable Programmable Read-Only Memory, EPROM), electrically erasable read-only memory (Electric Erasable Programmable Read-Only Memory, EEPROM), etc.
[0157] The processor 301 may be an integrated circuit chip with signal processing capabilities. The above-mentioned processor may be a general-purpose processor, including a central processing unit (CPU), a network processor (NP), etc.; it may also be a digital signal processor (DSP), an application-specific integrated circuit (ASIC), a field programmable gate array (FPGA) or other programmable logic devices, discrete gates or transistor logic devices, discrete hardware components. The disclosed methods, steps and logic block diagrams in the embodiments of the present invention may be implemented or executed. The general-purpose processor may be a microprocessor or the processor may also be any conventional processor, etc.
[0158] It is to be understood that the structure illustrated in the embodiment of the present application does not constitute a specific limitation on the computer device 300. In other embodiments of the present application, the computer device 300 may include more or fewer components than shown in the figure, or combine some components, or split some components, or arrange the components differently. The components shown in the figure may be implemented in hardware, software, or a combination of software and hardware.
[0159] The present disclosure also provides a computer-readable storage medium, on which a computer program is stored, and when the computer program is executed by a processor, the steps of the method for assessing the risk of channel section loss under strong winds described in the above method embodiment are executed. The storage medium may be a volatile or non-volatile computer-readable storage medium.
[0160] The disclosed embodiments also provide a computer program product that carries a program code. The program code includes instructions that can be used to execute the steps of the method for assessing the risk of channel section loss under strong winds described in the above method embodiment. For details, please refer to the above method embodiment, which will not be repeated here.
[0161] The computer program product may be implemented in hardware, software or a combination thereof. In one optional embodiment, the computer program product is implemented as a computer storage medium. In another optional embodiment, the computer program product is implemented as a software product, such as a software development kit (SDK).
[0162] Those skilled in the art can clearly understand that, for the convenience and simplicity of description, the specific working process of the system and device described above can refer to the corresponding process in the aforementioned method embodiment, and will not be repeated here. In the several embodiments provided in the present disclosure, it should be understood that the disclosed system and method can be implemented in other ways. The device embodiments described above are merely schematic. For example, the division of the units is only a logical function division. There may be other division methods in actual implementation. For example, multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some communication interfaces, indirect coupling or communication connection of devices or units, which can be electrical, mechanical or other forms.
[0163] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.
[0164] In addition, each functional unit in each embodiment of the present disclosure may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit.
[0165] If the functions are implemented in the form of software functional units and sold or used as independent products, they can be stored in a non-volatile computer-readable storage medium that is executable by a processor. Based on this understanding, the technical solution of the present disclosure, or the part that contributes to the prior art or the part of the technical solution, can be embodied in the form of a software product, which is stored in a storage medium and includes several instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) to perform all or part of the steps of the method described in each embodiment of the present disclosure. The aforementioned storage medium includes: various media that can store program codes, such as a USB flash drive, a mobile hard disk, a read-only memory (ROM), a random access memory (RAM), a magnetic disk or an optical disk.
[0166] Finally, it should be noted that the above-described embodiments are only specific implementation methods of the present disclosure, which are used to illustrate the technical solutions of the present disclosure, rather than to limit them. The protection scope of the present disclosure is not limited thereto. Although the present disclosure is described in detail with reference to the above-described embodiments, ordinary technicians in the field should understand that any technician familiar with the technical field can still modify the technical solutions recorded in the above-described embodiments within the technical scope disclosed in the present disclosure, or can easily think of changes, or make equivalent replacements for some of the technical features therein; and these modifications, changes or replacements do not make the essence of the corresponding technical solutions deviate from the spirit and scope of the technical solutions of the embodiments of the present disclosure, and should be included in the protection scope of the present disclosure. Therefore, the protection scope of the present disclosure should be based on the protection scope of the claims.
Claims
1. A method for assessing the risk of channel section loss under strong winds, characterized in that: include: Obtain line information corresponding to each line in the transmission channel; The power transmission channel includes a plurality of lines, and each of the lines includes a plurality of pole towers; The line information includes tower location information and basic wind speed information corresponding to each tower; For each line, respectively obtain the predicted meteorological parameter information within a preset time corresponding to the tower position information of each tower; the predicted meteorological parameter information includes wind speed information; For each tower, the wind speed information is corrected based on the tower position information, the predicted meteorological parameter information and a preset correction coefficient to obtain corrected wind speed information; And calculate the corresponding extreme wind speed information of each tower based on finite element tools; For each line, obtain the tower health factor of each tower; According to the basic wind speed information, corrected wind speed information, extreme wind speed information and tower health factor corresponding to each tower, the tower structure failure probability of each tower is calculated based on the structural failure probability formula; and determining the line failure probability of the line according to the tower structure failure probability of each tower; Determining a channel section loss probability based on the line failure probability of each line; and determining the channel section loss risk level according to the channel section loss probability; The channel section loss risk levels include zero risk, low risk, medium risk and high risk.
2. The method according to claim 1, characterized in that The preset correction coefficient includes a first wind speed correction coefficient, a second wind speed correction coefficient and a third wind speed correction coefficient, the first wind speed correction coefficient is less than the second wind speed correction coefficient, and the second wind speed correction coefficient is less than the third wind speed correction coefficient; the predicted meteorological parameter information also includes wind direction information; the wind speed information is corrected based on the tower position information, the predicted meteorological parameter information and the preset correction coefficient, including: Determining the tower position of the tower according to the tower position information and the wind direction information; the tower position includes a pass, a windward slope and a canyon wind channel; When the pole tower is located at a pass, the corrected wind speed information corresponding to the pole tower is the product of the first wind speed correction coefficient and the wind speed information; When the pole tower is located on the windward slope, the corrected wind speed information corresponding to the pole tower is the product of the second wind speed correction coefficient and the wind speed information; When the pole tower is located in a canyon wind tunnel, the corrected wind speed information corresponding to the pole tower is the product of a third wind speed correction coefficient and the wind speed information.
3. The method according to claim 1, characterized in that The line information also includes tower structure information, ground wire model information and insulator string model information; The calculation of the extreme wind speed information corresponding to each tower based on the finite element tool includes: Calculating the tower material limit wind speed information based on the finite element tool according to the basic wind speed information corresponding to the tower and the tower structure information; Calculating the ground wire limit wind speed information based on the finite element tool according to the basic wind speed information corresponding to the tower and the ground wire model information; Calculating the insulator string limit wind speed information based on the finite element tool according to the basic wind speed information corresponding to the tower and the insulator string model information; The limit wind speed information corresponding to each tower is determined based on the tower material limit wind speed information, the ground wire limit wind speed information and the insulator string limit wind speed information.
4. The method according to claim 1, characterized in that: Before obtaining the health factor of each tower, the following steps are included: Acquire operation information of the line corresponding to the tower, the operation information including line operation life, line operation and maintenance information, conductor and hardware wear information, and bolt information of the tower; The tower health factor is determined based on the operation information.
5. The method according to claim 1, characterized in that The structural failure probability formula includes: Among them, f (i,j) V represents the failure probability of the tower structure of the jth tower of the i-th line; t(i,j) V represents the revised wind speed information of the jth tower of the ith line; d(i,j) V represents the basic wind speed information of the jth tower of the ith line; b(i,j) H represents the maximum wind speed information of the jth tower of the i-th line; (i,j) It represents the health factor of the jth tower of the jth line.
6. The method according to claim 1, characterized in that The determining of the line failure probability of the line according to the tower structure failure probability of each tower comprises: According to the tower structure failure probability of each tower, the line failure probability is determined based on the line failure probability formula; The line failure probability formula includes: F i =max(f (i,j) ),j=1,2,...,m Among them, F i represents the line failure probability of the i-th line; m represents the number of towers of the i-th line.
7. The method according to claim 1, characterized in that Determining the channel section loss probability based on the line failure probability of each line includes: According to the line failure probability of each line, the channel section loss probability is determined based on the channel section loss probability formula; The channel section loss probability formula includes: Where n represents the number of lines in the channel.
8. A device for assessing the risk of channel section loss under strong winds, characterized in that: include: A line information acquisition module is used to obtain line information corresponding to each line in the power transmission channel; The power transmission channel includes a plurality of lines, and each of the lines includes a plurality of pole towers; The line information includes tower location information and basic wind speed information corresponding to each tower; A tower information acquisition module, for acquiring, for each line, the predicted meteorological parameter information within a preset time corresponding to the tower position information of each tower; the predicted meteorological parameter information includes wind speed information; A wind speed information determination module, configured to correct the wind speed information of each tower based on the tower position information, the predicted meteorological parameter information and a preset correction coefficient to obtain corrected wind speed information; And calculate the corresponding extreme wind speed information of each tower based on finite element tools; A failure probability calculation module is used to obtain the tower health factor of each tower for each line; According to the basic wind speed information, corrected wind speed information, extreme wind speed information and tower health factor corresponding to each tower, the tower structure failure probability of each tower is calculated based on the structural failure probability formula; and determining the line failure probability of the line according to the tower structure failure probability of each tower; A risk level determination module, used to determine the probability of channel section loss based on the line failure probability of each line; and determining the channel section loss risk level according to the channel section loss probability; The channel section loss risk levels include zero risk, low risk, medium risk and high risk.
9. A storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the method according to any one of claims 1 to 7 is implemented.
10. A computer device comprising a storage medium, a processor, and a computer program stored in the storage medium and executable on the processor, characterized in that: When the processor executes the computer program, the method according to any one of claims 1 to 7 is implemented.