Electric energy quality influence assessment method for disturbance source access power grid
By setting disturbance source access parameters and basic power grid parameters, simulating disturbance sources, and calculating comprehensive power quality indicators, the problem of strong subjectivity in existing assessment methods is solved, a more accurate and practical power quality impact assessment is achieved, and the power quality is improved. Objectivity and comprehensiveness of assessment.
Patent Information
- Application Number
- CN202410709454.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-03
- Publication Date
- 2024-10-15
AI Technical Summary
Existing power quality impact assessment methods where disturbance sources are connected to the power grid lack comprehensiveness and practicality, making it difficult to accurately assess the impact of disturbance sources on the power grid, resulting in highly subjective and inaccurate assessment results.
By setting the access parameters of disturbance sources, determine the basic parameters and topology of the power grid, adjust the access parameters of disturbance sources, simulate different types of disturbance sources, calculate comprehensive indicators of power quality, and use MATLAB to perform power flow calculations and establish a power system model. , evaluate indicators such as voltage deviation, harmonics, voltage imbalance and voltage fluctuation, and perform normalization processing to output the evaluation results.
It achieves a more accurate and practical power quality impact assessment, avoids the problem of excessive subjectivity, improves the objectivity and comprehensiveness of the assessment, can more accurately predict the impact of disturbance sources on the power grid, and formulates effective control strategy.
Smart Images

Figure CN118780658A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of electric power systems, and in particular to a method for evaluating the impact of a disturbance source connected to a power grid on power quality. Background Art
[0002] The power quality impact assessment method of disturbance sources connected to the power grid is a key technology and is of great significance in the power system. With the development of modern society, the power system has become more and more complex. At the same time, people's requirements for power quality have become higher and higher. Disturbance sources usually refer to various electrical equipment in the power grid, such as arc furnaces, motors, power electronic equipment, etc. When disturbance sources are connected to the power grid, they may cause various power quality problems, including voltage fluctuations, harmonics, electromagnetic interference, etc.
[0003] In order to ensure the stable operation of the power grid and the reliable supply of power quality, it is necessary to evaluate and analyze the impact of the disturbance source after it is connected to the power grid. In terms of power system theory, it is necessary to have an in-depth understanding of the structure, operating characteristics, transmission line parameters, etc. of the power grid in order to analyze the impact of the disturbance source on the power grid. Signal processing technology is used to process power quality data, including collection, analysis, and identification of power quality problems, providing data support for evaluation. Electromagnetic compatibility refers to the ability of electronic equipment to coexist and share interference in an electromagnetic environment, involving electromagnetic field theory, interference mechanism, shielding technology, etc., which is of great significance for analyzing the electromagnetic interference problem of the disturbance source.
[0004] By comprehensively applying the above background technologies, a complete method for evaluating the impact of disturbance sources on power quality when connected to the power grid can be developed. The method usually includes the establishment of a power quality monitoring system, collecting power quality data through high-precision sensors, and using signal processing technology for real-time analysis. At the same time, combined with power system simulation and emulation technology, a mathematical model of the power system can be established to simulate the power quality after the disturbance source is connected to the power grid. On this basis, through electromagnetic compatibility analysis, the degree of interference of the disturbance source on the surrounding electronic equipment is evaluated, and possible problems are further predicted. Finally, based on these evaluation results, corresponding control strategies can be formulated, including optimizing the power grid structure, improving the design of electronic equipment, strengthening shielding measures, etc., to ensure the stability of the power grid and the reliability of power quality.
[0005] However, the current evaluation methods still have shortcomings such as lack of comprehensiveness and lack of practicality. Summary of the invention
[0006] In order to solve the technical problems existing in the above prior art, the present invention provides a method for evaluating the impact of a disturbance source connected to a power grid on power quality.
[0007] The method includes:
[0008] Set the access parameters of the disturbance source;
[0009] Determine the basic parameters of the power grid and describe its topology and parameters through matrices;
[0010] Adjust the access parameters of the disturbance source, simulate different types of disturbance sources, and enrich the evaluation data;
[0011] Determine and normalize the evaluation indicators of power quality;
[0012] Calculate comprehensive indicators of power quality and output evaluation results.
[0013] Preferably, the basic parameters of the power grid include transformers, lines and loads;
[0014] For transformers, there are
[0015]
[0016] In the formula, is the fundamental current phasor of the primary side a, b, c and n phases of the transformer,
[0017]
[0018] is the fundamental voltage phasor of phase a, phase b, phase c and phase n of the primary side of the transformer,
[0019]
[0020] is the current phasor of each phase on the secondary side of the transformer, is the current vector of each phase on the secondary side of the transformer, and is the self-admittance matrix of the primary and secondary sides of the transformer at the fundamental frequency, and is the mutual admittance matrix;
[0021] For the line, yes,
[0022]
[0023] In the formula, are the fundamental current phasors of each phase flowing into line L from node i and node j,
[0024]
[0025] are the fundamental voltage phasors of each phase at node i and node j respectively,
[0026]
[0027] is the admittance matrix of line L at the fundamental frequency;
[0028] For load, there are
[0029]
[0030] In the formula, and are connected to node i Harmony The active power and reactive power of the load between phases, is the load fundamental current, and are connected to node i Harmony Phase voltage.
[0031] Preferably, determining basic data of the power grid includes:
[0032] Through MATLAB, power flow calculation is performed to obtain standard data of the grid before the disturbance source is connected and power quality impact data after the disturbance source is connected.
[0033] Preferably, the evaluation index of power quality is at least one of voltage deviation, harmonic current, harmonic voltage, three-phase voltage imbalance and voltage fluctuation.
[0034] Preferably, the method for evaluating the voltage deviation comprises:
[0035] For users with Vcc=35kV and 2MVA<P<40MVA, or
[0036] For users with Vcc≤20kV and 0.63MVA<P<6.3MVA, the voltage deviation level 2 assessment is performed.
[0037] The voltage deviation δU is calculated by the voltage of each node.
[0038]
[0039] Where U is the nominal voltage value calculated by simulation, U N is the rated voltage;
[0040] For users whose voltage deviation level 2 assessment does not meet the national standard limit requirements, or
[0041] Users with Vcc≥66kV, or
[0042] Users with Vcc=35kV and P≥40MVA, or
[0043] For users with Vcc≤20kV and P≥6.3MVA, a three-level voltage deviation assessment is conducted;
[0044] Among them, Vcc is the supply voltage and P is the power capacity.
[0045] Preferably, the method for evaluating harmonic current and harmonic voltage includes:
[0046] To U N Users or power supplies with a voltage of ≤1kV, equipment with an input current of ≤16A per phase, and users whose equipment does not meet the harmonic current limit values of low-voltage electrical and electronic equipment specified in GB17625.1, or
[0047] U N Users or power supplies with a voltage of ≤1kV, equipment with a per-phase input current of >16A, and users who do not meet the harmonic current limits of low-voltage electrical and electronic equipment specified in GB / Z17625.6, or
[0048] Users with Si / Ssc>0.2% shall undergo secondary harmonic assessment;
[0049] For those who do not meet the above requirements and N For users with voltage ≥35kV, conduct a three-level harmonic assessment;
[0050] Among them, the harmonic secondary assessment includes:
[0051]
[0052] In the formula, HRU h is the hth harmonic voltage content, S k is the three-phase short-circuit capacity of the common connection point, U N is the nominal voltage of the power grid, I h is the hth harmonic current;
[0053] Among them, Si is the electricity consumption agreement capacity of the i-th user, and Ssc is the short-circuit capacity.
[0054] Preferably, the method for evaluating the three-phase voltage imbalance comprises:
[0055] For three-phase unbalanced load or single-phase load, and Si / Ssc min >1%,U N For users with voltage lower than 66kV, a secondary three-phase voltage assessment is performed, i.e., the negative sequence voltage imbalance is calculated under different load conditions.
[0056]
[0057] In the formula, ε UT is the total negative sequence voltage unbalance, α is the superposition coefficient, ε UL is the negative sequence voltage unbalance caused by the evaluation object, ε UBis the unbalance degree of negative sequence voltage in the power grid; Si is the power consumption agreement capacity of the ith user, and Sscmin is the minimum short-circuit capacity;
[0058] The secondary assessment of the three-phase voltage does not meet the requirements and U N For users ≥66kV, electrified railways and asymmetric loads of AC arc furnaces, three-phase voltage three-level assessment is performed;
[0059] Among them, the requirements for the secondary assessment of three-phase voltage are:
[0060] ε UL 95% probability maximum value ≤ 1.3%, ε UT ≤2%; maxε UL ≤2.6%,ε UT ≤4% in a short time.
[0061] Preferably, the method for evaluating voltage fluctuation comprises:
[0062] To U N <66kV,
[0063] U N For users with a voltage of ≤1kV, the input current per phase of the equipment is ≤16A, which does not meet the voltage fluctuation limit of low-voltage electrical equipment in the low-voltage power supply system specified in GB17625.2, or
[0064] U N Users with voltage ≤35kV do not meet the limits specified in the national standard GB / T12326, or
[0065] 35kV≤U N <66kV,(△S / Ssc) max >0.2% of users undergo secondary voltage fluctuation assessment;
[0066] Under high-voltage power grid, the change in reactive power of the load to be connected is ΔQ i , with fluctuation d,
[0067]
[0068] To U N ≥66kV users, or
[0069] For users who do not meet the requirements of the second-level voltage fluctuation assessment, the third-level voltage fluctuation assessment shall be carried out;
[0070] Among them, △S is the apparent power change rate.
[0071] Preferably, normalization includes:
[0072] The assessment value obtained through the secondary or tertiary assessment shall be compared with the national standard limit. If it exceeds the standard, 0 points will be awarded; if it reaches the warning value, 60 points will be awarded; if it is lower than the warning value, 100 points will be awarded.
[0073] Preferably, calculating the comprehensive index of power quality and outputting the evaluation result includes:
[0074] For m objects to be evaluated and n power quality evaluation indicators, a power quality evaluation indicator data matrix R is established.
[0075]
[0076] In the formula, r ij is the index value of the j-th power quality evaluation index of the i-th object to be evaluated;
[0077] The original power quality evaluation index data matrix R is dimensionless to obtain the data matrix C.
[0078]
[0079] In the formula, x ij is the dimensionless index value of the j-th power quality evaluation index of the i-th object to be evaluated; according to the data matrix C and the weight of the j-th power quality index, the comprehensive evaluation result y is calculated,
[0080]
[0081] In the formula, w j is the weight of the j-th power quality indicator.
[0082] The technical solution provided by the present invention uses the power system for calculation and modeling, and evaluates the comprehensive indicators of power quality, which can avoid the technical problem of the existing evaluation method being too subjective. At the same time, the evaluation result is more accurate, practical and comprehensive. BRIEF DESCRIPTION OF THE DRAWINGS
[0083] Figure 1 FIG. 4 is a flow chart of power quality assessment in one embodiment of the present invention. DETAILED DESCRIPTION
[0084] In order to solve the problem that a disturbance source has a series of impacts on power quality after being connected to the power grid and needs to be evaluated urgently, the present invention proposes a method for evaluating the impact of a disturbance source connected to the power grid on power quality.
[0085] Determine the access scheme for the power quality disturbance source to be evaluated, and collect and verify the model parameters for the access of the disturbance source to the power grid.
[0086] The power system before the disturbance source is connected is modeled and simulated to obtain the corresponding power quality indicators.
[0087] The comprehensive index is calculated according to the linear weighted comprehensive method to output the evaluation conclusion.
[0088] The present invention can more accurately evaluate the impact of disturbance source access on the power grid, and on this basis, manage the disturbance source to achieve repair and resolution of power quality problems in the power grid.
[0089] The inventor will further explain the present invention in detail below with reference to the accompanying drawings and specific embodiments.
[0090] Example 1
[0091] Aiming at the problem that the influence degree of the distribution network disturbance source on the power grid is unclear and the evaluation method is not objective and clear enough, the present invention proposes a method for evaluating the power quality impact of the disturbance source connected to the power grid. Figure 1 As shown, it is divided into four steps S1-S4.
[0092] S1: Determine the access scheme for the power quality disturbance source to be evaluated.
[0093] First, it is necessary to identify the type of disturbance source to be evaluated, such as arc furnace, inverter, charging pile, etc. In this way, the characteristics of the disturbance source can be determined to set the access parameters of the disturbance source, including grid connection time, starting power, charging mode, power factor, harmonic content, etc.
[0094] S2: Computational modeling and simulation of the power system before and after the disturbance source is connected.
[0095] First, the basic parameters of the power system are determined, including the parameters of the generator, transformer, load, etc. Specifically, the rated power, rated voltage, internal reactance of the transformer, the resistance, reactance, capacitance of the transmission line, the active power, reactive power, impedance of the load, etc. The topology and parameters of the power system are described using matrices. MATLAB is used for power flow calculation to obtain the standard data of the power grid before the disturbance source is connected and the power quality impact data after the connection.
[0096] Among them, there are several basic types of distribution component models.
[0097] Transformer model:
[0098]
[0099] In the formula, is the fundamental current phasor of each phase (phase a, phase b, phase c and phase n) of the primary side of the transformer,
[0100]
[0101] is the fundamental voltage phasor of each phase (phase a, phase b, phase c and phase n) of the primary side of the transformer,
[0102]
[0103] is the current phasor of each phase on the secondary side of the transformer, is the current vector of each phase on the secondary side of the transformer, and is the self-admittance matrix of the primary and secondary sides of the transformer at the fundamental frequency, and is the mutual admittance matrix.
[0104] Line Model:
[0105]
[0106] In the formula, are the fundamental current phasors of each phase flowing into line L from node i and node j,
[0107]
[0108] are the fundamental voltage phasors of each phase at node i and node j respectively,
[0109]
[0110] is the admittance matrix of line L at the fundamental frequency.
[0111] For load, there are
[0112]
[0113] In the formula, and are connected to node i Harmony The active power and reactive power of the load between phases, is the load fundamental current, and are connected to node i Harmony Phase voltage.
[0114] S3: Determine the evaluation indicators and perform normalization calculations.
[0115] The specific power quality indicators are voltage deviation, harmonic current, harmonic voltage, three-phase voltage imbalance and voltage fluctuation. The calculation of each indicator can be divided into estimation calculation (often called secondary evaluation) and simulation calculation (often called tertiary evaluation). Estimation simulation is to make an equivalent value for the interference source itself and the power grid, and make a rough estimate of the influencing indicators; simulation calculation can take into account the actual topology of the power grid and various operating modes, the emission fluctuation characteristics of the load that needs to be evaluated, and the interference source itself, so as to obtain a more accurate evaluation result. According to the "Q / GDW 10651-2015 Technical Guidelines for Power Quality Assessment", the secondary and tertiary assessments are defined by several aspects such as access voltage level, capacity, load nature and whether it exceeds the standard.
[0116] 1. Voltage deviation index
[0117] a. First-level assessment regulations
[0118] Electricity users who meet any of the following conditions do not need to undergo assessment:
[0119] 1) Power users with a supply voltage of 35 kV and above and below 66 kV and a capacity less than (equal to) 2 MVA;
[0120] 2) Power users with a supply voltage of 380V / 220V or above, 20kV or below, and a capacity less than (equal to) 0.63MVA;
[0121] 3) Power supply systems below 10kV without special power supply loads, etc.
[0122] b. Second level assessment regulations
[0123] Electricity users who do not meet the first level and meet the following conditions shall undergo the second level assessment:
[0124] 1) Power users with a supply voltage of 35kV and a capacity greater than 2MVA and less than 40MVA;
[0125] 2) Power users with a supply voltage of 20kV and below and a capacity greater than 0.63MVA and less than 6.3MVA.
[0126] This level of assessment can use the calculation formula and limit provisions described in Section 3.4. If the voltage deviation does not meet the requirements, it should enter the third level of assessment.
[0127] c. Third level assessment regulations
[0128] For power users of 66kV and above, those who do not meet the second-level conditions and whose second-level assessments do not meet the requirements, third-level assessments should be conducted. If the assessment results do not meet the requirements, feasible improvement measures should be proposed. Professional software should be used for calculation of voltage deviation assessment at this level.
[0129] The voltage deviation simulation calculation can be performed through the voltage calculation results of each node.
[0130]
[0131] Where U is the nominal voltage value calculated by simulation, U N is the rated voltage.
[0132] 2. Harmonic indicators
[0133] a. First-level assessment regulations
[0134] Electricity users who meet any of the following conditions do not need to undergo assessment:
[0135] 1) For low-voltage electrical equipment or small low-voltage harmonic source users and power supplies (U N ≤1kV), the input current per phase of the equipment is ≤16A, which meets the harmonic current limit value of low-voltage electrical and electronic equipment specified in the national standard GB17625.1, and can be connected to the public power grid;
[0136] 2) For low-voltage electrical equipment or small low-voltage harmonic source users and power supplies (U N ≤1kV), the input current per phase of the equipment is >16A, and it meets the harmonic current limit values of low-voltage electrical and electronic equipment specified in the national standard GB / Z17625.6, and can be connected to the public power grid;
[0137] 3) For general small medium and high voltage users or users with a limited number of harmonic sources, if Si / Ssc≤0.2%, they can be directly connected to the public power grid; where Si is the power consumption agreement capacity of the i-th user and Ssc is the short-circuit capacity.
[0138] b. Second level assessment regulations
[0139] Electricity users who do not meet the first level and meet the following conditions shall undergo the second level assessment:
[0140]
[0141] In the formula, S k is the three-phase short-circuit capacity of the public connection point; U N is the nominal voltage of the power grid; I h is the hth harmonic current.
[0142] c. Third level assessment regulations
[0143] Power users of 35kV and above who do not meet the requirements of the second-level assessment should undergo a third-level assessment, and feasible measures and suggestions should be proposed if the assessment results do not meet the requirements. This level of harmonic assessment should be conducted using power system analysis software, and the simulation calculation process should focus on the parallel resonance point with the system. The assessment results should take into account the background harmonic level, and the voltage distortion caused by the user is superimposed on the background voltage distortion to obtain the harmonic voltage assessment result.
[0144] 3. Three-phase voltage imbalance index
[0145] a. First-level assessment regulations
[0146] Electricity users who meet any of the following conditions do not need to undergo assessment:
[0147] 1) The user load is a three-phase balanced load;
[0148] 2) The user load is a three-phase unbalanced load or a single-phase load, but meets Si / Ssc min ≤1%, where Si is the load capacity.
[0149] b. Second level assessment regulations
[0150] For users below 66kV that do not meet the first-level assessment requirements, a second-level assessment should be conducted.
[0151] This level of assessment can use a simplified calculation method. If the assessment results do not meet the standard requirements, they should enter the third level of assessment. At the same time, the negative sequence voltage imbalance under different load conditions should be calculated, and the background negative sequence voltage imbalance level of the power grid should be considered. The imbalance caused by the assessment object and the background value should be superimposed to obtain the total imbalance, and the superposition calculation should be performed.
[0152]
[0153] In the formula, ε UT is the total negative sequence voltage unbalance, α is the superposition coefficient, ε UL is the negative sequence voltage unbalance caused by the evaluation object, ε UB is the background negative sequence voltage imbalance of the power grid;
[0154] The 95% probability maximum value of the negative-sequence voltage imbalance caused by the evaluation object calculated based on the load current should not be greater than 1.3%, and the total negative-sequence voltage imbalance should not be greater than 2% after considering the background value; the maximum value of the negative-sequence voltage imbalance caused by the evaluation object should not be greater than 2.6%, and the total negative-sequence voltage imbalance should not exceed 4% in a short time after considering the background value.
[0155] c. Third level assessment regulations
[0156] Users who meet the second-level assessment conditions or those who do not meet the second-level assessment requirements, users of 66kV and above, electrified railways, AC arc furnaces and other asymmetric loads should enter the third-level assessment for more detailed calculations.
[0157] 4. Voltage fluctuation index
[0158] a. First-level assessment regulations
[0159] Electricity users who meet any of the following conditions do not need to undergo assessment:
[0160] 1) For low voltage electrical equipment or small low voltage users (U N ≤1kV), the input current of each phase of the equipment is ≤16A, and it complies with the voltage fluctuation limit value generated by low-voltage electrical equipment in the low-voltage power supply system specified in the national standard GB 17625.2;
[0161] 2) For users with rated voltage less than or equal to 35kV, the limit value specified by the national standard shall be met;
[0162] 3) For users with rated voltage greater than 35kV and less than or equal to 220kV, (△S / Ssc) is satisfied max <0.2%. Where △S is the apparent power change rate.
[0163] b. Second level assessment regulations
[0164] For power users below 66kV that do not meet the first-level assessment requirements, a second-level assessment should be conducted. If the assessment results do not meet the requirements, a third-level assessment should be conducted. Under high-voltage power grid, the change in reactive power ΔQ of the load to be connected is known. i , and PCC minimum short-circuit capacity Ssc min When , the fluctuation d is:
[0165]
[0166] c. Third level assessment regulations
[0167] For power users of 66kV and above and those whose second-level assessment does not meet the requirements, a third-level assessment should be conducted, and feasible improvement measures should be proposed if the assessment results do not meet the requirements. This level of assessment should be calculated using power system analysis software.
[0168] On the basis of selecting the above evaluation indicators, each indicator will be normalized and calculated. Normalization of each indicator means normalizing each indicator of different physical meanings to a score range of 0 to 100 according to the degree of pass / fail. Specifically, when the indicator is excellent or within the standard, the score is 100; when the indicator exceeds the standard or is poor, the score is reduced, with the minimum score being 0. According to the calculation methods of each indicator given in the previous article, for the power quality indicator, in order to take into account the margin of the power quality indicator from the exceeding limit, a warning limit close to the limit is set for each indicator, and a lower score is given when the calculated value reaches the warning value.
[0169] For power quality indicators: voltage deviation, harmonics, imbalance, voltage fluctuation. The previous section gives the estimation and simulation calculation methods of various indicators. When using simulation evaluation, if the simulation involves timing and random calculations, the indicator calculation results will be a series of values (timing series or multiple random calculation results). According to the relevant national standards for power quality and the conventions in engineering applications, different indicators should take different statistical values for limit comparison. Specifically: the voltage deviation takes a 99% probability value, the harmonic current, voltage and total distortion rate of harmonic voltage take a 95% probability value, the three-phase voltage imbalance takes a 95% probability value (compared with the 2% limit) and the maximum value (compared with the short-time limit of 4%), and the voltage fluctuation takes the maximum value.
[0170] The above-mentioned indicator values will be compared with the national standard limits. If they exceed the limits, 0 points will be scored. In addition, in order to take into account the margin of the power quality indicators from exceeding the limits, a warning limit lower than the national standard limit is set for each indicator. When the calculated value reaches the warning value, 60 points will be given. When the calculated value of the indicator is lower than the warning limit, the score is 100 points.
[0171] Taking voltage deviation as an example, the normalized calculation method of the indicator is as follows:
[0172]
[0173] Where, δU is the calculated value of voltage deviation, Th δU Thw is the national standard limit of voltage deviation corresponding to the voltage level, δU It is the warning limit (looser than the national standard limit). When the calculated value is between the warning limit and the national standard limit, the score is 60.
[0174] S4: Calculate comprehensive indicators based on the linear weighted comprehensive method and output evaluation conclusions.
[0175] If there are m objects to be evaluated and n power quality evaluation indicators in the comprehensive evaluation process of power quality, the original power quality evaluation indicator data matrix can be established, where r ij represents the index value of the jth power quality evaluation index of the i-th object to be evaluated,
[0176]
[0177] The original power quality evaluation index data matrix R is dimensionless to obtain the data matrix C.
[0178]
[0179] In the formula, x ij is the dimensionless index value of the j-th power quality evaluation index of the i-th object to be evaluated;
[0180] According to the data matrix C and the weight of the j-th power quality index, the comprehensive evaluation result y is calculated.
[0181]
[0182] In the formula, w j is the weight of the j-th power quality indicator.
[0183] The technical solution provided by the present invention uses the power system for calculation and modeling, and evaluates the comprehensive indicators of power quality, which can avoid the technical problem of the existing evaluation method being too subjective. At the same time, the evaluation result is more accurate, practical and comprehensive.
[0184] While achieving the above beneficial effects, each embodiment also achieves the following beneficial effects: determining the disturbance source and its access parameters is conducive to improving the objectivity and accuracy of the evaluation; calculating the basic data of the power grid before and after the disturbance source is connected can clarify the impact of the disturbance source on the power grid and improve the accuracy of the evaluation; multi-dimensional evaluation indicators and their normalization and linear weighting can further improve the accuracy and comprehensiveness of the evaluation.
[0185] The above are only preferred embodiments of the present invention and are not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
Claims
1. A method for assessing the impact of a disturbance source on power quality when it is connected to a power grid, characterized in that: include: Set the access parameters of the disturbance source; Determine the basic parameters of the power grid and describe its topology and parameters through matrices; Adjust the access parameters of the disturbance source, simulate different types of disturbance sources, and enrich the evaluation data; Determine and normalize the evaluation indicators of power quality; Calculate comprehensive indicators of power quality and output evaluation results.
2. The method for assessing the impact of a disturbance source connected to a power grid as claimed in claim 1, characterized in that: The basic parameters of the power grid include transformers, lines and loads; For transformers, there are In the formula, is the fundamental current phasor of the primary side a, b, c and n phases of the transformer, is the fundamental voltage phasor of the primary side a, b, c and n phases of the transformer, is the current phasor of each phase on the secondary side of the transformer, is the current vector of each phase on the secondary side of the transformer, and is the self-admittance matrix of the primary and secondary sides of the transformer at the fundamental frequency, and is the mutual admittance matrix; For the line, yes, In the formula, are the fundamental current phasors of each phase flowing into line L from node i and node j, are the fundamental voltage phasors of each phase at node i and node j respectively, is the admittance matrix of line L at the fundamental frequency; For load, there are In the formula, and are connected to node i Harmony The active power and reactive power of the load between phases, is the load fundamental current, and are connected to node i Harmony Phase voltage.
3. The method for assessing the impact of a disturbance source connected to a power grid as claimed in claim 1, characterized in that: The basic data of the power grid is determined, including: Through MATLAB, power flow calculation is performed to obtain standard data of the grid before the disturbance source is connected and power quality impact data after the disturbance source is connected.
4. The method for assessing the impact of a disturbance source connected to a power grid as claimed in claim 1, characterized in that: The evaluation index of the power quality is at least one of voltage deviation, harmonic current, harmonic voltage, three-phase voltage imbalance and voltage fluctuation.
5. The method for evaluating the impact of a disturbance source connected to a power grid as claimed in claim 4, characterized in that: including a method for evaluating said voltage deviation; For users with Vcc=35kV and 2MVA<P<40MVA, or For users with Vcc≤20kV and 0.63MVA<P<6.3MVA, the voltage deviation level 2 assessment is performed. The voltage deviation δU is calculated by the voltage of each node. Where U is the nominal voltage value calculated by simulation, U N is the rated voltage; For users whose voltage deviation level 2 assessment does not meet the national standard limit requirements, or Users with Vcc≥66kV, or Users with Vcc=35kV and P≥40MVA, or For users with Vcc≤20kV and P≥6.3MVA, a three-level voltage deviation assessment is conducted; Among them, Vcc is the supply voltage and P is the power capacity.
6. The method for assessing the impact of a disturbance source connected to a power grid as claimed in claim 4, characterized in that: Including methods for evaluating the harmonic currents and harmonic voltages; To U N Users or power supplies with a voltage of ≤1kV, equipment with an input current of ≤16A per phase, and users whose equipment does not meet the harmonic current limit values of low-voltage electrical and electronic equipment specified in GB17625.1, or U N Users or power supplies with a voltage of ≤1kV, equipment with a per-phase input current of >16A, and users who do not meet the harmonic current limits of low-voltage electrical and electronic equipment specified in GB / Z17625.6, or Users with Si / Ssc>0.2% shall undergo secondary harmonic assessment; For users who do not meet the above requirements and whose Vcc is ≥ 35kV, a three-level harmonic assessment shall be conducted; Among them, the harmonic secondary assessment includes: In the formula, HRU h is the hth harmonic voltage content, S k is the three-phase short-circuit capacity of the common connection point, I h is the hth harmonic current; Among them, Si is the electricity consumption agreement capacity of the i-th user, and Ssc is the short-circuit capacity.
7. The method for assessing the impact of a disturbance source connected to a power grid as claimed in claim 4, characterized in that: A method for evaluating the three-phase voltage imbalance is included; For three-phase unbalanced load or single-phase load, and Si / Ssc min For users with Vcc>1% and Vcc<66kV, the three-phase voltage secondary assessment is performed, that is, the negative sequence voltage unbalance degree under different load conditions is calculated. In the formula, ε UT is the total negative sequence voltage unbalance, α is the superposition coefficient, ε UL is the negative sequence voltage unbalance caused by the evaluation object, ε UB is the unbalance degree of negative sequence voltage in the power grid; Si is the power consumption agreement capacity of the ith user, and Sscmin is the minimum short-circuit capacity; The secondary assessment of the three-phase voltage does not meet the requirements and U N For users ≥66kV, electrified railways and asymmetric loads of AC arc furnaces, three-phase voltage three-level assessment is performed; Among them, the requirements for the secondary assessment of three-phase voltage are: ε UL 95% probability maximum value ≤ 1.3%, ε UT ≤2%; maxε UL ≤2.6%,ε UT ≤4% in a short time.
8. The method for evaluating the impact of a disturbance source connected to a power grid as claimed in claim 4, characterized in that: including a method for evaluating said voltage fluctuations; To U N <66kV, U N Users with a voltage of ≤1kV, an input current of ≤16A per phase, and users whose low-voltage electrical equipment does not meet the voltage fluctuation limit in the low-voltage power supply system specified in GB17625.2, or U N Users with voltages ≤35kV, users who do not meet the limits specified in the national standard GB / T12326, or 35kV≤U N <66kV,(△S / Ssc) max >0.2% of users undergo secondary voltage fluctuation assessment, Under high-voltage power grid, the change in reactive power of the load to be connected is ΔQ i , then the fluctuation d, To U N ≥66kV users, or For users whose voltage fluctuation is not within the scope of the second-level assessment, a third-level voltage fluctuation assessment will be conducted; Among them, △S is the apparent power change rate.
9. A method for assessing the impact of a disturbance source connected to a power grid as claimed in any one of claims 5 to 8, characterized in that: The normalization includes: The assessment value obtained through the secondary or tertiary assessment shall be compared with the national standard limit. If it exceeds the standard, 0 points will be awarded; if it reaches the warning value, 60 points will be awarded; if it is lower than the warning value, 100 points will be awarded.
10. The method for assessing the impact of a disturbance source connected to a power grid as claimed in claim 9, characterized in that: The method of calculating the comprehensive index of power quality and outputting the evaluation result includes: For m objects to be evaluated and n power quality evaluation indicators, a power quality evaluation indicator data matrix R is established. In the formula, r ij is the index value of the j-th power quality evaluation index of the i-th object to be evaluated; The original power quality evaluation index data matrix R is dimensionless to obtain the data matrix C. In the formula, x ij is the dimensionless index value of the j-th power quality evaluation index of the i-th object to be evaluated; According to the data matrix C and the weight of the j-th power quality index, the comprehensive evaluation result y is calculated. In the formula, w j is the weight of the j-th power quality indicator.