Method, device and equipment for determining grid connection failure reason of hydraulic power plant unit and medium
By receiving grid connection failure signals and synchronization device signals, obtaining voltage parameter values and executing detection strategies, it solves the problem of difficulty in locating the cause of grid connection failure of hydropower plant units and achieves fast and accurate fault location and equipment recovery.
Patent Information
- Application Number
- CN202410847404.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-27
- Publication Date
- 2024-10-15
AI Technical Summary
When a hydropower plant unit fails to be connected to the grid, it is difficult to quickly and accurately locate the specific equipment abnormality that caused the failure with existing technology, causing operation and maintenance personnel to spend a long time analyzing and inspecting, affecting the rapid recovery of the equipment.
By receiving the grid connection failure signal of the hydropower plant unit and the operation signal of the synchronization device, the target voltage parameter value and system voltage parameter value of the equipment to be connected to the grid are obtained, and a matching detection strategy is executed to determine the cause of the grid connection failure, including determining the voltage amplitude. , the relationship between frequency and phase to determine the abnormality of pressure increase, pressure reduction, speed increase, deceleration circuit and closing circuit.
It significantly improves the accuracy of analysis results and work efficiency, and can quickly locate specific equipment abnormalities that failed to connect to the grid, deal with the problem in a timely manner, and ensure the rapid restoration of hydropower plant units to the grid.
Smart Images

Figure CN118783370A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of hydropower plant units, and in particular to a method, device, equipment and medium for determining the cause of grid connection failure of a hydropower plant unit. Background Art
[0002] During the operation of the power system, it is often necessary to connect the interconnection line or interconnection transformer of the power system in parallel with the power system. This operation of connecting a small system to a large system through a circuit breaker and other switchgear is called synchronous operation. Synchronous operation is achieved through a synchronous device. The synchronous device is a device used for indication, monitoring, and control when performing grid connection during the operation of the power system. It can detect whether the voltage frequency, voltage amplitude, and voltage phase on both sides of the grid connection point meet the conditions, thereby determining whether the closing and grid connection can be performed. When the module LCU is determined to issue a grid connection command, the synchronous device automatically searches for the best closing time and issues a closing command; at the same time, when the synchronous closing conditions are not met, the synchronous device sends adjustment commands to the excitation system and the speed regulator system to speed up the closing time.
[0003] During the synchronization process of hydropower plants, the phenomenon of unsuccessful synchronization and grid connection often occurs. When the unit fails to connect to the grid, the computer monitoring system SCADA will only generate a grid connection failure signal. The operation and maintenance personnel can only query the amplitude and frequency curves of the voltage to be connected to the grid U1 and the system voltage U2, and analyze the cause of the failure of the unit to connect to the grid. The reason is that the voltage amplitude condition is not met, the voltage frequency condition is not met, or the phase is not met. The failure to connect to the grid often takes a long time and energy to analyze. Most of the time, due to the lack of monitoring conditions, it is difficult to locate whether the failure to connect to the grid is caused by abnormal adjustment commands of the synchronization device, abnormal execution of the excitation and speed regulator device, abnormal secondary circuit, or abnormal operation of the switch operating mechanism. If the specific cause is to be located, it is necessary to check, test, and experiment one by one, which takes a long time and cannot find equipment abnormalities in time, which brings great inconsistency to the inspection and processing of the operation and maintenance personnel. Summary of the invention
[0004] The present invention aims to solve one of the technical problems in the related art at least to a certain extent.
[0005] To this end, the first purpose of the present invention is to propose a method for determining the cause of the failure of a hydropower plant unit to be connected to the grid. The method can accurately determine the specific equipment abnormality cause of the failure of the hydropower plant unit to be connected to the grid. Compared with the traditional manual analysis method, it greatly improves the work efficiency and the accuracy of the analysis results. This can provide decision support for professional maintenance personnel to quickly check and handle, deal with the problem in time, and quickly restore the hydropower plant unit to the grid, which has a good effect.
[0006] The second object of the present invention is to provide a device for determining the cause of failure of grid connection of a hydropower plant unit.
[0007] A third objective of the present invention is to provide an electronic device.
[0008] A fourth object of the present invention is to provide a computer-readable storage medium.
[0009] A fifth object of the present invention is to provide a computer program product.
[0010] To achieve the above-mentioned purpose, an embodiment of the first aspect of the present invention proposes a method for determining the cause of the grid-connection failure of a hydropower plant unit, comprising: in response to receiving a grid-connection failure signal sent by a hydropower plant unit and receiving an operation signal of a synchronization device in the hydropower plant unit, obtaining a first parameter value of a target voltage parameter in the grid-connected voltage of the equipment to be connected to the grid and a second parameter value of the target voltage parameter in the system voltage of the hydropower plant unit; based on the first parameter value and the second parameter value, executing a detection strategy that matches the target voltage parameter to determine the cause of the grid-connection failure of the hydropower plant unit.
[0011] According to the method for determining the cause of the failure of the hydropower plant unit to be connected to the grid in an embodiment of the present invention, in response to receiving the grid failure signal sent by the hydropower plant unit and receiving the operation signal of the synchronous device in the hydropower plant unit, the first parameter value of the target voltage parameter in the grid-connected voltage of the equipment to be connected to the grid and the second parameter value of the target voltage parameter in the system voltage of the hydropower plant unit are obtained; according to the first parameter value and the second parameter value, a detection strategy matching the target voltage parameter is executed to determine the cause of the failure of the hydropower plant unit to be connected to the grid. As a result, the method can accurately determine the specific equipment abnormality cause of the failure of the hydropower plant unit to be connected to the grid, and compared with the traditional manual analysis method, it greatly improves the work efficiency and the accuracy of the analysis results, which can provide decision support for professional maintenance personnel to quickly check and handle, timely deal with the problem, and quickly restore the hydropower plant unit to the grid, with good results.
[0012] In addition, the method for determining the cause of failure of grid connection of a hydropower plant unit proposed in the first aspect of the embodiment of the present invention may also have the following additional technical features:
[0013] According to one embodiment of the present invention, in response to the target voltage parameter being a voltage amplitude, the hydropower plant unit further includes a boost relay and an excitation system, the first output end of the synchronization device is connected to the input end of the boost relay through a first boost circuit, the first output end of the boost relay is connected to a determination module, the second output end of the boost relay is connected to the first input end of the excitation system through a second boost circuit, the output end of the excitation system is connected to the determination module, and the detection strategy matching the target voltage parameter is executed according to the first parameter value and the second parameter value to determine the cause of the grid connection failure of the hydropower plant unit, including:
[0014] Determine the magnitude relationship between the first voltage amplitude value and the second voltage amplitude value;
[0015] If the first voltage amplitude value is less than or equal to the second voltage amplitude value, determining whether the determination module receives a boost command sent by the synchronization device;
[0016] If the determining module does not receive the boost command, determining that the reason for the grid connection failure is an abnormality in the first boost circuit;
[0017] If the determination module receives the boost command, then continue to determine whether the determination module receives an excitation boost feedback command sent by the excitation system;
[0018] If the determination module does not receive the excitation boost feedback command, it determines that the reason for the grid connection failure is an abnormality in the second boost circuit;
[0019] If the determination module receives the excitation boost feedback command, it determines that the cause of the grid connection failure is that the boost regulation function of the excitation system is abnormal.
[0020] According to one embodiment of the present invention, the hydropower plant unit further includes a pressure reducing relay, the second output end of the synchronization device is connected to the input end of the pressure reducing relay through a first pressure reducing circuit, the first output end of the pressure reducing relay is connected to the determination module, and the second output end of the pressure reducing relay is connected to the second input end of the excitation system through a second pressure reducing circuit, and the detection strategy matching the target voltage parameter is executed according to the first parameter value and the second parameter value to determine the cause of the grid connection failure of the hydropower plant unit, and further includes:
[0021] If the first voltage amplitude value is greater than the second voltage amplitude value, determining whether the determination module has received a decompression command sent by the synchronization device;
[0022] If the determination module does not receive the decompression command, determining that the reason for the grid connection failure is an abnormality in the first decompression circuit;
[0023] If the determination module receives the decompression command, then continue to determine whether the determination module receives an excitation decompression feedback command sent by the excitation system;
[0024] If the determination module does not receive the excitation decompression feedback command, it determines that the reason for the grid connection failure is an abnormality in the second decompression circuit;
[0025] If the determination module receives the excitation decompression feedback command, it determines that the cause of the grid connection failure is that the decompression regulation function of the excitation system is abnormal.
[0026] According to one embodiment of the present invention, in response to the target voltage parameter being a voltage frequency, the hydropower plant unit further includes a speed-increasing relay and a speed regulator system, the third output terminal of the synchronization device is connected to the input terminal of the speed-increasing relay via a first speed-increasing loop, the first output terminal of the speed-increasing relay is connected to a determination module, the second output terminal of the speed-increasing relay is connected to the first input terminal of the speed regulator system via a second speed-increasing loop, the output terminal of the speed regulator system is connected to the determination module, and the detection strategy matching the target voltage parameter is executed according to the first parameter value and the second parameter value to determine the cause of the grid connection failure of the hydropower plant unit, including:
[0027] Determine the magnitude relationship between the first voltage frequency value and the second voltage frequency value;
[0028] If the first voltage-frequency value is less than or equal to the second voltage-frequency value, determining whether the determination module has received a speed-up command sent by the synchronization device;
[0029] If the determining module does not receive the speed-up command, determining that the reason for the grid connection failure is that the first speed-up loop is abnormal;
[0030] If the determining module receives the speed-up command, then continue to determine whether the determining module receives a speed-up feedback command sent by the speed regulator system;
[0031] If the determining module does not receive the speed-up feedback command, determining that the reason for the grid connection failure is that the second speed-up loop is abnormal;
[0032] If the determining module receives the speed-increasing feedback command, it determines that the reason for the grid connection failure is that the speed-increasing regulating function of the speed regulator system is abnormal.
[0033] According to one embodiment of the present invention, the hydropower plant unit further includes a deceleration relay, the fourth output end of the synchronization device is connected to the input end of the deceleration relay through a first deceleration circuit, the first output end of the deceleration relay is connected to the determination module, and the second output end of the deceleration relay is connected to the second input end of the speed regulator system through a second deceleration circuit, and the detection strategy matching the target voltage parameter is executed according to the first parameter value and the second parameter value to determine the cause of the grid connection failure of the hydropower plant unit, and further includes:
[0034] If the first voltage-frequency value is greater than the second voltage-frequency value, determining whether the determination module has received a deceleration command sent by the synchronization device;
[0035] If the determination module does not receive the deceleration command, determining that the cause of the grid connection failure is an abnormality in the first deceleration circuit;
[0036] If the determination module receives the deceleration command, then continue to determine whether the determination module receives a deceleration feedback command sent by the speed regulator system;
[0037] If the determination module does not receive the deceleration feedback command, it determines that the reason for the grid connection failure is an abnormality of the second deceleration circuit;
[0038] If the determination module receives the deceleration feedback command, it determines that the cause of the grid connection failure is that the deceleration regulation function of the speed regulator system is abnormal.
[0039] According to one embodiment of the present invention, the hydropower plant unit further includes a closing relay and a switch, the input end of the closing relay is connected to the fifth output end of the synchronization device through a first closing circuit, the first output end of the closing relay is connected to the determination module, the second output end of the closing relay is connected to the input end of the switch through a second closing circuit, the output end of the switch is connected to the determination module, and the method further includes:
[0040] Determine whether the determination module has received a closing command sent by the synchronization device; wherein the closing command is generated by the synchronization device when the difference between the first voltage amplitude value and the second voltage amplitude value is within a set voltage amplitude difference value, the difference between the first voltage frequency value and the second voltage frequency value is within a set voltage frequency difference value, and the difference between the first voltage phase value and the second voltage phase value is within a set voltage phase difference value;
[0041] If the determination module does not receive the closing command, it determines that the reason for the grid connection failure is that the difference between the first voltage-frequency value and the second voltage-frequency value is within a set frequency difference range, or that the first closing circuit is abnormal;
[0042] If the determination module receives the closing command, it determines that the reason for the grid connection failure is that the second closing circuit is abnormal, or the actuator of the switch is abnormal.
[0043] According to one embodiment of the present invention, the method further includes:
[0044] In response to receiving a grid connection failure signal sent by a hydropower plant unit and not receiving an operation signal of a synchronization device in the hydropower plant unit, it is determined that the cause of the grid connection failure is an abnormality of the synchronization device.
[0045] To achieve the above-mentioned purpose, the second aspect of the embodiment of the present invention proposes a device for determining the cause of grid-connection failure of a hydropower plant unit, including: an acquisition module, which is used to obtain a first parameter value of a target voltage parameter in the grid-connected voltage of a device to be connected to the grid and a second parameter value of the target voltage parameter in the system voltage of the hydropower plant unit when a grid-connection failure signal sent by the hydropower plant unit and an operation signal of a synchronization device in the hydropower plant unit are received; a determination module, which is used to execute a detection strategy matching the target voltage parameter according to the first parameter value and the second parameter value to determine the cause of grid-connection failure of the hydropower plant unit.
[0046] According to the device for determining the cause of the failure of the hydropower plant unit to be connected to the grid in the embodiment of the present invention, the acquisition module receives the grid failure signal sent by the hydropower plant unit and receives the operation signal of the synchronous device in the hydropower plant unit, obtains the first parameter value of the target voltage parameter in the grid-connected voltage of the device to be connected to the grid and the second parameter value of the target voltage parameter in the system voltage of the hydropower plant unit, and the determination module executes the detection strategy matching the target voltage parameter according to the first parameter value and the second parameter value to determine the cause of the failure of the hydropower plant unit to be connected to the grid. As a result, the device can accurately determine the specific equipment abnormality cause of the failure of the hydropower plant unit to be connected to the grid, and compared with the traditional manual analysis method, it greatly improves the work efficiency and the accuracy of the analysis results, which can provide decision support for professional maintenance personnel to quickly check and handle, timely deal with the problem, and quickly restore the hydropower plant unit to the grid, with good results.
[0047] In addition, the device for determining the cause of failure of grid connection of a hydropower plant unit proposed in the second aspect of the embodiment of the present invention may also have the following additional technical features:
[0048] According to one embodiment of the present invention, in response to the target voltage parameter being a voltage amplitude, the hydropower plant unit further includes a boost relay and an excitation system, the first output end of the synchronization device is connected to the input end of the boost relay through a first boost circuit, the first output end of the boost relay is connected to a determination module, the second output end of the boost relay is connected to the first input end of the excitation system through a second boost circuit, the output end of the excitation system is connected to the determination module, and the determination module is used to execute a detection strategy matching the target voltage parameter according to the first parameter value and the second parameter value to determine the cause of the grid connection failure of the hydropower plant unit, including:
[0049] Determine the magnitude relationship between the first voltage amplitude value and the second voltage amplitude value;
[0050] If the first voltage amplitude value is less than or equal to the second voltage amplitude value, determining whether the determination module receives a boost command sent by the synchronization device;
[0051] If the determining module does not receive the boost command, determining that the reason for the grid connection failure is an abnormality in the first boost circuit;
[0052] If the determination module receives the boost command, then continue to determine whether the determination module receives an excitation boost feedback command sent by the excitation system;
[0053] If the determination module does not receive the excitation boost feedback command, it determines that the reason for the grid connection failure is an abnormality in the second boost circuit;
[0054] If the determination module receives the excitation boost feedback command, it determines that the cause of the grid connection failure is that the boost regulation function of the excitation system is abnormal.
[0055] According to one embodiment of the present invention, the hydropower plant unit further includes a pressure reducing relay, the second output end of the synchronization device is connected to the input end of the pressure reducing relay through a first pressure reducing circuit, the first output end of the pressure reducing relay is connected to the determination module, and the second output end of the pressure reducing relay is connected to the second input end of the excitation system through a second pressure reducing circuit, and the determination module is used to execute a detection strategy matching the target voltage parameter according to the first parameter value and the second parameter value to determine the cause of the grid connection failure of the hydropower plant unit, and further includes:
[0056] If the first voltage amplitude value is greater than the second voltage amplitude value, determining whether the determination module has received a decompression command sent by the synchronization device;
[0057] If the determination module does not receive the decompression command, determining that the reason for the grid connection failure is an abnormality in the first decompression circuit;
[0058] If the determination module receives the decompression command, then continue to determine whether the determination module receives an excitation decompression feedback command sent by the excitation system;
[0059] If the determination module does not receive the excitation decompression feedback command, it determines that the reason for the grid connection failure is an abnormality in the second decompression circuit;
[0060] If the determination module receives the excitation decompression feedback command, it determines that the cause of the grid connection failure is that the decompression regulation function of the excitation system is abnormal.
[0061] According to one embodiment of the present invention, in response to the target voltage parameter being a voltage frequency, the hydropower plant unit further includes a speed-increasing relay and a speed regulator system, the third output end of the synchronization device is connected to the input end of the speed-increasing relay through a first speed-increasing loop, the first output end of the speed-increasing relay is connected to a determination module, the second output end of the speed-increasing relay is connected to the first input end of the speed regulator system through a second speed-increasing loop, the output end of the speed regulator system is connected to the determination module, and the determination module is used to execute a detection strategy matching the target voltage parameter according to the first parameter value and the second parameter value to determine the cause of the grid connection failure of the hydropower plant unit, including:
[0062] Determine the magnitude relationship between the first voltage frequency value and the second voltage frequency value;
[0063] If the first voltage-frequency value is less than or equal to the second voltage-frequency value, determining whether the determination module has received a speed-up command sent by the synchronization device;
[0064] If the determining module does not receive the speed-up command, determining that the reason for the grid connection failure is that the first speed-up loop is abnormal;
[0065] If the determining module receives the speed-up command, then continue to determine whether the determining module receives a speed-up feedback command sent by the speed regulator system;
[0066] If the determining module does not receive the speed-up feedback command, determining that the reason for the grid connection failure is that the second speed-up loop is abnormal;
[0067] If the determining module receives the speed-increasing feedback command, it determines that the reason for the grid connection failure is that the speed-increasing regulating function of the speed regulator system is abnormal.
[0068] According to one embodiment of the present invention, the hydropower plant unit further includes a deceleration relay, the fourth output end of the synchronization device is connected to the input end of the deceleration relay through a first deceleration circuit, the first output end of the deceleration relay is connected to the determination module, and the second output end of the deceleration relay is connected to the second input end of the speed regulator system through a second deceleration circuit. The determination module is used for the first parameter value and the second parameter value, and executes a detection strategy matching the target voltage parameter to determine the cause of the grid connection failure of the hydropower plant unit, and further includes:
[0069] If the first voltage-frequency value is greater than the second voltage-frequency value, determining whether the determination module has received a deceleration command sent by the synchronization device;
[0070] If the determination module does not receive the deceleration command, determining that the cause of the grid connection failure is an abnormality in the first deceleration circuit;
[0071] If the determination module receives the deceleration command, then continue to determine whether the determination module receives a deceleration feedback command sent by the speed regulator system;
[0072] If the determination module does not receive the deceleration feedback command, it determines that the reason for the grid connection failure is an abnormality of the second deceleration circuit;
[0073] If the determination module receives the deceleration feedback command, it determines that the cause of the grid connection failure is that the deceleration regulation function of the speed regulator system is abnormal.
[0074] According to one embodiment of the present invention, the hydropower plant unit further includes a closing relay and a switch, the input end of the closing relay is connected to the fifth output end of the synchronization device through a first closing circuit, the first output end of the closing relay is connected to the determination module, the second output end of the closing relay is connected to the input end of the switch through a second closing circuit, the output end of the switch is connected to the determination module, and the determination module is further used to:
[0075] Determine whether the determination module has received a closing command sent by the synchronization device; wherein the closing command is generated by the synchronization device when the difference between the first voltage amplitude value and the second voltage amplitude value is within a set voltage amplitude difference value, the difference between the first voltage frequency value and the second voltage frequency value is within a set voltage frequency difference value, and the difference between the first voltage phase value and the second voltage phase value is within a set voltage phase difference value;
[0076] If the determination module does not receive the closing command, it determines that the reason for the grid connection failure is that the difference between the first voltage-frequency value and the second voltage-frequency value is within a set frequency difference range, or that the first closing circuit is abnormal;
[0077] If the determination module receives the closing command, it determines that the reason for the grid connection failure is that the second closing circuit is abnormal, or the actuator of the switch is abnormal.
[0078] According to one embodiment of the present invention, the determining module is further used for:
[0079] In response to receiving a grid connection failure signal sent by a hydropower plant unit and not receiving an operation signal of a synchronization device in the hydropower plant unit, it is determined that the cause of the grid connection failure is an abnormality of the synchronization device.
[0080] To achieve the above object, the third aspect of the present invention further provides an electronic device, including:
[0081] at least one processor; and,
[0082] a memory communicatively connected to the at least one processor; wherein,
[0083] The memory stores instructions executable by the at least one processor, and the instructions are executed by the at least one processor so that the at least one processor can execute the above-mentioned method for determining the cause of the failure of the hydropower plant unit to be connected to the grid.
[0084] The battery equipment of the embodiment of the present invention can accurately determine the specific equipment abnormality cause of the failure of the hydropower plant unit to be connected to the grid by executing the above-mentioned method for determining the cause of the failure of the hydropower plant unit to be connected to the grid. Compared with the traditional manual analysis method, it greatly improves the work efficiency and the accuracy of the analysis results. This can provide decision support for professional maintenance personnel to quickly check and handle, solve the problem in time, and quickly restore the hydropower plant unit to the grid, which has a good effect.
[0085] To achieve the above-mentioned purpose, the fourth aspect of the present invention further proposes a computer-readable storage medium, wherein the computer instructions are used to enable the computer to execute the above-mentioned method for determining the cause of failure of grid connection of a hydropower plant unit.
[0086] The computer-readable storage medium of the embodiment of the present invention can accurately determine the specific equipment abnormality cause of the failure of the hydropower plant unit to be connected to the grid by executing the above-mentioned method for determining the cause of the failure of the hydropower plant unit to be connected to the grid. Compared with the traditional manual analysis method, it greatly improves the work efficiency and the accuracy of the analysis results. This can provide decision support for professional maintenance personnel to quickly check and handle, solve the problem in time, and quickly restore the hydropower plant unit to the grid, which has a good effect.
[0087] To achieve the above-mentioned purpose, the fifth aspect of the present invention further proposes a computer program product, which, when executed by an instruction processor in the computer program product, executes the above-mentioned method for determining the cause of failure of grid connection of a hydropower plant unit.
[0088] The computer program product of the embodiment of the present invention can accurately determine the specific equipment abnormality cause of the failure of the hydropower plant unit to be connected to the grid by executing the above-mentioned method for determining the cause of the failure of the hydropower plant unit to be connected to the grid. Compared with the traditional manual analysis method, it greatly improves the work efficiency and the accuracy of the analysis results. This can provide decision support for professional maintenance personnel to quickly check and handle, solve the problem in time, and quickly restore the hydropower plant unit to the grid, which has a good effect.
[0089] Additional aspects and advantages of the present invention will be given in part in the following description and in part will be obvious from the following description, or will be learned through practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS
[0090] The accompanying drawings, which are incorporated in and constitute a part of this specification, illustrate embodiments consistent with the invention and, together with the description, serve to explain the principles of the invention.
[0091] Figure 1 is a flow chart of a method for determining the cause of failure of a hydropower plant unit to be connected to the grid according to an embodiment of the present invention;
[0092] Figure 2 is a structural diagram of a hydropower plant unit according to an embodiment of the present invention;
[0093] Figure 3 is a flowchart of the first part of a method for determining the cause of failure of a hydropower plant unit to be connected to the grid according to an embodiment of the present invention;
[0094] Figure 4 is a flow chart of the second part of the method for determining the cause of failure of grid connection of a hydropower plant unit according to one embodiment of the present invention;
[0095] Figure 5 is a flowchart of the third part of a method for determining a cause of a failure to connect a hydropower plant unit to the grid according to an embodiment of the present invention;
[0096] Figure 6 4 is a block diagram of a device for determining the cause of failure of grid connection of a hydropower plant unit according to an embodiment of the present invention. DETAILED DESCRIPTION
[0097] Embodiments of the present invention are described in detail below, examples of which are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are intended to be used to explain the present invention, and should not be construed as limiting the present invention.
[0098] The following describes, with reference to the accompanying drawings, a method, device, equipment and medium for determining the cause of a failure in grid connection of a hydropower plant unit according to an embodiment of the present invention.
[0099] Figure 1 The present invention is a flowchart of a method for determining the cause of failure of a hydropower plant unit to be connected to the grid according to an embodiment of the present invention.
[0100] like Figure 1 As shown, the method for determining the cause of the failure of the hydropower plant unit to be connected to the grid in an embodiment of the present invention includes:
[0101] S1, in response to receiving a grid connection failure signal sent by a hydropower plant unit and receiving an operation signal of a synchronization device in the hydropower plant unit, obtains a first parameter value of a target voltage parameter in the grid-connected voltage of the device to be connected to the grid and a second parameter value of a target voltage parameter in the system voltage of the hydropower plant unit.
[0102] S2, executing a detection strategy that matches the target voltage parameter according to the first parameter value and the second parameter value to determine the cause of the failure of the hydropower plant unit to be connected to the grid.
[0103] In the embodiment of the present invention, the target voltage parameters are voltage amplitude, voltage frequency and voltage phase. Figure 2 The above-mentioned step S2 is described.
[0104] like Figure 2 As shown, the hydropower plant unit also includes a boost relay J3 and an excitation system, the first output end of the synchronization device SD is connected to the input end of the boost relay J3 through a first boost circuit, the first output end of the boost relay J3 is connected to the determination module, the second output end of the boost relay J3 is connected to the first input end of the excitation system through a second boost circuit, and the output end of the excitation system is connected to the determination module. It should be noted that the determination module includes a local control unit LCU and a monitoring system SCADA, the local control unit LCU is connected to the monitoring system SCADA, and the monitoring system SCADA is used to execute the method for determining the cause of the failure of the hydropower plant unit to be connected to the grid according to the embodiment of the present invention.
[0105] According to the first parameter value and the second parameter value, a detection strategy matching the target voltage parameter is executed to determine the cause of the grid connection failure of the hydropower plant unit, including:
[0106] Determine the magnitude relationship between the first voltage amplitude value and the second voltage amplitude value;
[0107] If the first voltage amplitude value is less than or equal to the second voltage amplitude value, then judging whether the determination module receives a boost command sent by the synchronization device SD;
[0108] If the module is determined to have not received the boost command, it is determined that the cause of the grid connection failure is an abnormality in the first boost circuit;
[0109] If the determination module receives a boost command, then continue to determine whether the determination module receives an excitation boost feedback command sent by the excitation system;
[0110] If the module is determined to have not received the excitation boost feedback command, it is determined that the cause of the grid connection failure is an abnormality in the second boost circuit;
[0111] If the module is determined to receive an excitation boost feedback command, it is determined that the cause of the grid connection failure is an abnormality in the boost regulation function of the excitation system.
[0112] like Figure 2 As shown, the hydropower plant unit also includes a pressure reducing relay J4, the second output end of the synchronization device SD is connected to the input end of the pressure reducing relay J4 through a first pressure reducing circuit, the first output end of the pressure reducing relay J4 is connected to the determination module, and the second output end of the pressure reducing relay J4 is connected to the second input end of the excitation system through a second pressure reducing circuit.
[0113] According to the first parameter value and the second parameter value, a detection strategy matching the target voltage parameter is executed to determine the cause of the failure of the hydropower plant unit to be connected to the grid, and further comprising:
[0114] If the first voltage amplitude value is greater than the second voltage amplitude value, it is determined whether the determination module has received a decompression command sent by the synchronization device SD;
[0115] If the determination module does not receive the decompression command, it is determined that the reason for the grid connection failure is an abnormality in the first decompression circuit;
[0116] If the determination module receives the decompression command, then continue to determine whether the determination module receives the excitation decompression feedback command sent by the excitation system;
[0117] If the determination module does not receive the excitation decompression feedback command, it is determined that the cause of the grid connection failure is the abnormality of the second decompression circuit;
[0118] If the determination module receives the excitation decompression feedback command, it is determined that the cause of the grid connection failure is the abnormality of the decompression regulation function of the excitation system.
[0119] like Figure 2As shown, the hydropower plant unit also includes a speed-increasing relay J1 and a speed regulator system. The third output terminal of the synchronization device SD is connected to the input terminal of the speed-increasing relay J1 through a first speed-increasing loop, the first output terminal of the speed-increasing relay J1 is connected to the determination module, the second output terminal of the speed-increasing relay J1 is connected to the first input terminal of the speed regulator system through a second speed-increasing loop, and the output terminal of the speed regulator system is connected to the determination module.
[0120] According to the first parameter value and the second parameter value, a detection strategy matching the target voltage parameter is executed to determine the cause of the grid connection failure of the hydropower plant unit, including:
[0121] Determine the magnitude relationship between the first voltage frequency value and the second voltage frequency value;
[0122] If the first voltage-frequency value is less than or equal to the second voltage-frequency value, it is determined whether the determination module receives a speed-up command sent by the synchronization device SD;
[0123] If the determination module does not receive the speed-up command, it is determined that the reason for the grid connection failure is an abnormality in the first speed-up loop;
[0124] If the determination module receives the speed-up command, then continue to determine whether the determination module receives the speed-up feedback command sent by the speed regulator system;
[0125] If the determination module does not receive the speed-up feedback command, it is determined that the reason for the grid connection failure is the abnormality of the second speed-up loop;
[0126] If the module receives the speed-increasing feedback command, it is determined that the cause of the grid connection failure is that the speed-increasing regulating function of the speed regulator system is abnormal.
[0127] like Figure 2 As shown, the hydropower plant unit also includes a deceleration relay J2, the fourth output terminal of the synchronization device SD is connected to the input terminal of the deceleration relay J2 through a first deceleration circuit, the first output terminal of the deceleration relay J2 is connected to the determination module, and the second output terminal of the deceleration relay J2 is connected to the second input terminal of the speed regulator system through a second deceleration circuit.
[0128] According to the first parameter value and the second parameter value, a detection strategy matching the target voltage parameter is executed to determine the cause of the failure of the hydropower plant unit to be connected to the grid, and further comprising:
[0129] If the first voltage-frequency value is greater than the second voltage-frequency value, it is determined whether the determination module has received a deceleration command sent by the synchronization device SD;
[0130] If the module does not receive the deceleration command, it is determined that the cause of the grid connection failure is an abnormality in the first deceleration circuit;
[0131] If the determination module receives a deceleration command, then continue to determine whether the determination module receives a deceleration feedback command sent by the speed regulator system;
[0132] If the determination module does not receive the deceleration feedback command, it is determined that the cause of the grid connection failure is an abnormality in the second deceleration circuit;
[0133] If the module receives a deceleration feedback command, it is determined that the cause of the grid connection failure is an abnormality in the deceleration regulation function of the speed regulator system.
[0134] like Figure 2 As shown, the hydropower plant unit also includes a closing relay and a switch, the input end of the closing relay is connected to the fifth output end of the synchronization device SD through a first closing circuit, the first output end of the closing relay is connected to the determination module, the second output end of the closing relay is connected to the input end of the switch through a second closing circuit, and the output end of the switch is connected to the determination module.
[0135] The method for determining the cause of failure of a hydropower plant unit to be connected to the grid according to an embodiment of the present invention further includes:
[0136] Determine whether the module has received the closing command sent by the synchronization device SD;
[0137] If the module does not receive the closing command, it is determined that the reason for the grid connection failure is that the difference between the first voltage-frequency value and the second voltage-frequency value is within the set frequency difference range, or the first closing circuit is abnormal;
[0138] If the module receives a closing command, it is determined that the reason for the grid connection failure is that the second closing circuit is abnormal, or the actuator of the switch is abnormal.
[0139] The method for determining the cause of failure of a hydropower plant unit to be connected to the grid according to an embodiment of the present invention further includes:
[0140] In response to receiving a grid connection failure signal sent by a hydropower plant unit and not receiving an operation signal of a synchronization device SD in the hydropower plant unit, it is determined that the cause of the grid connection failure is an abnormality of the synchronization device SD.
[0141] Therefore, the present invention adopts an increase-speed relay J1 and a decrease-speed relay J2 with more than two normally open nodes, so that when the synchronization device SD opens an increase-speed or decrease-speed signal, one of the node signals is output to the speed regulator system, and another node signal is added to be output to the local control unit LCU, ensuring that the two nodes do not interfere with each other, and a new speed regulator system receives the increase-speed command and decrease-speed command issued by the synchronization device SD, and uses a communication line or hard wiring to feed back the corresponding command signal received to the local area; a boost relay J3 and a pressure-building relay with more than two normally open nodes are adopted, and when the synchronization device SD opens a boost ... local control unit LCU, The signal is output to the excitation system, and another sub-node signal is added to output to the local control unit LCU. In addition, the excitation system receives the boost command and depressurization command issued by the synchronization device SD, and uses communication lines or hard wiring to feed back the received corresponding command signals to the local site; a closing relay with two or more normally open nodes is used. When the synchronization device SD issues a closing command signal, one of the sub-node signals is output to the switch body, and another sub-node signal is added to output to the local control unit LCU, and all collected signals are uniformly sent to the monitoring system SCADA, which determines the specific abnormality that caused the failure of the hydropower plant unit to be connected to the grid.
[0142] In order to make those skilled in the art understand the present invention more clearly, Figure 3-Figure 5 The method for determining the cause of failure of grid connection of a hydropower plant unit according to the present invention is described.
[0143] When the monitoring system SCADA receives the grid connection failure signal, it starts to automatically analyze the cause of the grid connection failure. The judgment is made according to the following process:
[0144] (1) Whether the monitoring system SCADA receives the "synchronization device SD operation signal". If not, the switch will not close and the grid connection will fail, indicating that the reason for the failure of the generator set to connect to the grid is the abnormality of the synchronization device SD. The monitoring system SCADA outputs an alarm signal "the abnormality of the synchronization device SD caused the grid connection failure this time". If the monitoring system SCADA receives the "synchronization device SD operation signal", the judgment of step (2) is carried out.
[0145] (2) Determine whether the amplitude difference between the waiting voltage U1 and the system voltage U2 during the grid connection process of the hydropower plant unit is within the allowable range, that is, whether it is within the set voltage amplitude difference. If it is within the allowable range, jump to step (4) for execution; if it is not within the allowable range, proceed to step (3) for judgment.
[0146] (3) Determine whether U1>U2 is true. If so, execute step 1); otherwise, execute step 2).
[0147] 1) Determine whether the local control unit LCU receives a decompression command. If yes, execute step ①; otherwise, execute step ②.
[0148] Step 1: Determine whether the local control unit LCU receives the excitation decompression feedback command. If yes, but the grid connection fails, it means that the reason for the failure of the generator set to connect to the grid is the abnormality of the decompression adjustment of the excitation system, and the monitoring system SCADA outputs an alarm signal "the abnormality of the decompression adjustment of the excitation system for this grid connection leads to the failure of the grid connection"; otherwise, it means that the reason for the failure of the generator set to connect to the grid is the abnormality of the second decompression circuit, and the monitoring system SCADA outputs an alarm signal "the abnormality of the second decompression circuit for this grid connection leads to the failure of the grid connection".
[0149] Step ②, the local control unit LCU did not receive the decompression command. This indicates that the failure of the generator set to connect to the grid is due to the abnormality of the first decompression circuit, and the monitoring system SCADA outputs an alarm signal "the abnormality of the first decompression circuit of this grid connection caused the failure of the grid connection".
[0150] 2) Determine whether the local control unit LCU receives a boost command. If yes, execute step ③; otherwise, execute step ④.
[0151] Step ③, determine whether the local control unit LCU receives the excitation boost feedback command. If yes, but the grid connection fails, it means that the reason for the failure of the generator set to connect to the grid is the abnormality of the boost regulation of the excitation system, and the monitoring system SCADA outputs an alarm signal "the abnormality of the boost regulation of the grid-connected excitation system has caused the failure to connect to the grid"; otherwise, it means that the reason for the failure of the generator set to connect to the grid is the abnormality of the second boost circuit, and the monitoring system SCADA outputs an alarm signal "the abnormality of the second boost circuit of the grid connection has caused the failure to connect to the grid".
[0152] Step ④: The local control unit LCU did not receive the excitation boost feedback command, indicating that the reason for the failure of the generator set to be connected to the grid was the abnormality of the first boost circuit. The monitoring system SCADA outputs an alarm signal "The abnormality of the first boost circuit of this grid connection caused the failure to be connected to the grid".
[0153] (4) Determine whether the frequency difference between the grid-connected voltage U1 and the system voltage U2 of the hydropower plant unit is within the allowable range. If so, jump to step (6) for execution. If not, that is, whether the voltage-frequency difference is within the set range, proceed to step (5) for judgment.
[0154] (5) Determine whether f1>f2: If yes, execute step 1); if no, execute step 2).
[0155] 1) Determine whether the local control unit LCU has received a deceleration command. If yes, go to step ⑤; if no, go to step ⑥.
[0156] Step 5: Determine whether the local control unit LCU receives the governor deceleration feedback command. If yes, but the grid connection fails, it means that the reason for the failure of the generator set to connect to the grid is the abnormality of the governor system deceleration adjustment, and the monitoring system SCADA outputs an alarm signal "the abnormality of the governor system deceleration adjustment caused the grid connection failure this time"; if no, it means that the reason for the failure of the generator set to connect to the grid is the abnormality of the second deceleration circuit, and the monitoring system SCADA outputs an alarm signal "the abnormality of the second deceleration circuit caused the grid connection failure this time".
[0157] Step ⑥: The local control unit LCU did not receive the governor deceleration feedback command, indicating that the reason for the failure of the generator set to connect to the grid was the abnormality of the first deceleration circuit. The monitoring system SCADA outputs an alarm signal "The abnormality of the first deceleration circuit of this grid connection caused the failure of grid connection".
[0158] 2) Determine whether the local control unit LCU receives a speed-up command. If yes, execute step 7; if no, execute step 8.
[0159] Step 7: Determine whether the local control unit LCU receives the governor speed feedback command. If yes, but the grid connection fails, it means that the reason for the failure of the generator set to connect to the grid is the abnormal speed regulation of the governor system, and the monitoring system SCADA outputs an alarm signal "the abnormal speed regulation of the governor system for this grid connection leads to the failure of the grid connection"; if no, it means that the reason for the failure of the generator set to connect to the grid is the abnormality of the second speed increase loop, and the monitoring system SCADA outputs an alarm signal "the abnormality of the second speed increase loop for this grid connection leads to the failure of the grid connection".
[0160] In step ⑧, the local control unit LCU did not receive the governor speed increase feedback command, indicating that the reason for the failure of the generator set to connect to the grid was the abnormality of the first speed increase loop, and the monitoring system SCADA output an alarm signal "the abnormality of the first speed increase loop of this grid connection caused the failure of grid connection".
[0161] (6) Determine whether the local control unit LCU receives the closing command. If yes, execute step 9; otherwise, execute step 10.
[0162] In step 9, the local control unit LCU receives the closing command. The failure of grid connection may be caused by an abnormality in the second closing circuit or an abnormality in the switch actuator. The monitoring system SCADA outputs an alarm signal "grid connection failure caused by an abnormality in the second closing circuit or the switch actuator".
[0163] Step ⑩, the local control unit LCU did not receive the closing command. The failure of grid connection may be caused by the abnormality of the first closing circuit, or the frequency of the synchronization process U1 and U2 is too close. Because if the voltage amplitude and frequency of the synchronization process are all under the conditions, according to the voltage trigonometric function expression Asin(2π+φ), 2π is 360°, and the grid-connected phase angle difference expression of the unit is (2πf1t+Φ1)-(2πf2t+Φ2)→2πt(f1-f2)+(Φ1-Φ2). When f1≈f2, the phase angle difference is a fixed value and is not within the allowable phase angle difference range. The monitoring system SCADA outputs an alarm signal "the first closing circuit of this grid connection is abnormal or the frequency is too close, resulting in grid connection failure."
[0164] In summary, according to the method for determining the cause of the failure of the hydropower plant unit to be connected to the grid, in response to receiving the grid failure signal sent by the hydropower plant unit and receiving the operation signal of the synchronous device in the hydropower plant unit, the first parameter value of the target voltage parameter in the grid-connected voltage of the equipment to be connected to the grid and the second parameter value of the target voltage parameter in the system voltage of the hydropower plant unit are obtained; according to the first parameter value and the second parameter value, the detection strategy matching the target voltage parameter is executed to determine the cause of the failure of the hydropower plant unit to be connected to the grid. As a result, the method can accurately determine the specific equipment abnormality cause of the failure of the hydropower plant unit to be connected to the grid, and compared with the traditional manual analysis method, it greatly improves the work efficiency and the accuracy of the analysis results, so that professional maintenance personnel can quickly check and handle the decision support, timely deal with the problem, and quickly restore the hydropower plant unit to the grid, which has a good effect. In the current era of relative shortage of electricity in the country, when the power grid needs power supply, the generator set is not connected to the grid, which will have a great impact on power users. This method can have a good promotion significance and value in the hydropower industry and even the power industry, and has universality, which will generate greater economic value.
[0165] Figure 6 4 is a block diagram of a device for determining the cause of failure of grid connection of a hydropower plant unit according to an embodiment of the present invention.
[0166] like Figure 6 As shown, the device 600 for determining the cause of failure of a hydropower plant unit to be connected to the grid according to an embodiment of the present invention includes: an acquisition module 610 and a determination module 620 .
[0167] The acquisition module 610 is used to obtain the first parameter value of the target voltage parameter in the grid-connected voltage of the device to be connected to the grid and the second parameter value of the target voltage parameter in the system voltage of the hydropower plant unit when receiving the grid-connected failure signal sent by the hydropower plant unit and the operation signal of the synchronization device in the hydropower plant unit. The determination module 620 is used to execute the detection strategy matching the target voltage parameter according to the first parameter value and the second parameter value to determine the cause of the grid-connected failure of the hydropower plant unit.
[0168] According to one embodiment of the present invention, in response to the target voltage parameter being a voltage amplitude, the hydropower plant unit further includes a boost relay and an excitation system, the first output end of the synchronization device is connected to the input end of the boost relay through a first boost circuit, the first output end of the boost relay is connected to the determination module, the second output end of the boost relay is connected to the first input end of the excitation system through a second boost circuit, the output end of the excitation system is connected to the determination module, and the determination module 620 is used to execute a detection strategy matching the target voltage parameter according to the first parameter value and the second parameter value to determine the cause of the grid connection failure of the hydropower plant unit, including:
[0169] Determine the magnitude relationship between the first voltage amplitude value and the second voltage amplitude value;
[0170] If the first voltage amplitude value is less than or equal to the second voltage amplitude value, determining whether the module has received a boost command sent by the synchronization device;
[0171] If the module is determined to have not received the boost command, it is determined that the cause of the grid connection failure is an abnormality in the first boost circuit;
[0172] If the determination module receives a boost command, then continue to determine whether the determination module receives an excitation boost feedback command sent by the excitation system;
[0173] If the module is determined to have not received the excitation boost feedback command, it is determined that the cause of the grid connection failure is an abnormality in the second boost circuit;
[0174] If the module is determined to receive an excitation boost feedback command, it is determined that the cause of the grid connection failure is an abnormality in the boost regulation function of the excitation system.
[0175] According to one embodiment of the present invention, the hydropower plant unit further includes a pressure reducing relay, the second output end of the synchronization device is connected to the input end of the pressure reducing relay through a first pressure reducing circuit, the first output end of the pressure reducing relay is connected to the determination module, the second output end of the pressure reducing relay is connected to the second input end of the excitation system through a second pressure reducing circuit, and the determination module is used to execute a detection strategy matching the target voltage parameter according to the first parameter value and the second parameter value to determine the cause of the grid connection failure of the hydropower plant unit, and further includes:
[0176] If the first voltage amplitude value is greater than the second voltage amplitude value, determining whether the determination module has received a decompression command sent by the synchronization device;
[0177] If the determination module does not receive the decompression command, it is determined that the reason for the grid connection failure is an abnormality in the first decompression circuit;
[0178] If the determination module receives the decompression command, then continue to determine whether the determination module receives the excitation decompression feedback command sent by the excitation system;
[0179] If the determination module does not receive the excitation decompression feedback command, it is determined that the cause of the grid connection failure is the abnormality of the second decompression circuit;
[0180] If the determination module receives the excitation decompression feedback command, it is determined that the cause of the grid connection failure is the abnormality of the decompression regulation function of the excitation system.
[0181] According to one embodiment of the present invention, in response to the target voltage parameter being the voltage frequency, the hydropower plant unit further includes a speed-increasing relay and a speed regulator system, the third output terminal of the synchronization device is connected to the input terminal of the speed-increasing relay through a first speed-increasing loop, the first output terminal of the speed-increasing relay is connected to the determination module, the second output terminal of the speed-increasing relay is connected to the first input terminal of the speed regulator system through a second speed-increasing loop, the output terminal of the speed regulator system is connected to the determination module, and the determination module 620 is used to execute a detection strategy matching the target voltage parameter according to the first parameter value and the second parameter value to determine the cause of the grid connection failure of the hydropower plant unit, including:
[0182] Determine the magnitude relationship between the first voltage frequency value and the second voltage frequency value;
[0183] If the first voltage-frequency value is less than or equal to the second voltage-frequency value, then determining whether the determination module receives a speed-up command sent by the synchronization device;
[0184] If the determination module does not receive the speed-up command, it is determined that the reason for the grid connection failure is an abnormality in the first speed-up loop;
[0185] If the determination module receives the speed-up command, then continue to determine whether the determination module receives the speed-up feedback command sent by the speed regulator system;
[0186] If the determination module does not receive the speed-up feedback command, it is determined that the reason for the grid connection failure is the abnormality of the second speed-up loop;
[0187] If the module receives the speed-increasing feedback command, it is determined that the cause of the grid connection failure is that the speed-increasing regulating function of the speed regulator system is abnormal.
[0188] According to one embodiment of the present invention, the hydropower plant unit further includes a deceleration relay, the fourth output end of the synchronization device is connected to the input end of the deceleration relay through a first deceleration loop, the first output end of the deceleration relay is connected to the determination module, and the second output end of the deceleration relay is connected to the second input end of the speed regulator system through a second deceleration loop. The determination module 620 is used for the first parameter value and the second parameter value, and executes a detection strategy matching the target voltage parameter to determine the cause of the grid connection failure of the hydropower plant unit, and also includes:
[0189] If the first voltage-frequency value is greater than the second voltage-frequency value, determining whether the module has received a deceleration command sent by the synchronization device;
[0190] If the module does not receive the deceleration command, it is determined that the cause of the grid connection failure is an abnormality in the first deceleration circuit;
[0191] If the determination module receives a deceleration command, then continue to determine whether the determination module receives a deceleration feedback command sent by the speed regulator system;
[0192] If the determination module does not receive the deceleration feedback command, it is determined that the cause of the grid connection failure is an abnormality in the second deceleration circuit;
[0193] If the module receives a deceleration feedback command, it is determined that the cause of the grid connection failure is an abnormality in the deceleration regulation function of the speed regulator system.
[0194] According to one embodiment of the present invention, the hydropower plant unit further includes a closing relay and a switch, the input end of the closing relay is connected to the fifth output end of the synchronization device through a first closing circuit, the first output end of the closing relay is connected to the determination module, the second output end of the closing relay is connected to the input end of the switch through a second closing circuit, the output end of the switch is connected to the determination module, and the determination module 620 is further used to:
[0195] Determine whether the module has received a closing command sent by the synchronization device;
[0196] If the module does not receive the closing command, it is determined that the reason for the grid connection failure is that the difference between the first voltage-frequency value and the second voltage-frequency value is within the set frequency difference range, or the first closing circuit is abnormal;
[0197] If the module receives a closing command, it is determined that the reason for the grid connection failure is that the second closing circuit is abnormal, or the actuator of the switch is abnormal.
[0198] According to one embodiment of the present invention, the determination module 620 is further configured to:
[0199] In response to receiving a grid connection failure signal sent by a hydropower plant unit and not receiving an operation signal of a synchronization device in the hydropower plant unit, it is determined that the cause of the grid connection failure is an abnormality of the synchronization device.
[0200] It should be noted that for details not disclosed in the device for determining the cause of failure of grid connection of a hydropower plant unit in an embodiment of the present invention, please refer to the details disclosed in the method for determining the cause of failure of grid connection of a hydropower plant unit in an embodiment of the present invention, and the details will not be repeated here.
[0201] According to the device for determining the cause of the failure of the hydropower plant unit to be connected to the grid in the embodiment of the present invention, the acquisition module receives the grid failure signal sent by the hydropower plant unit and receives the operation signal of the synchronous device in the hydropower plant unit, obtains the first parameter value of the target voltage parameter in the grid-connected voltage of the device to be connected to the grid and the second parameter value of the target voltage parameter in the system voltage of the hydropower plant unit, and the determination module executes the detection strategy matching the target voltage parameter according to the first parameter value and the second parameter value to determine the cause of the failure of the hydropower plant unit to be connected to the grid. As a result, the device can accurately determine the specific equipment abnormality cause of the failure of the hydropower plant unit to be connected to the grid, and compared with the traditional manual analysis method, it greatly improves the work efficiency and the accuracy of the analysis results, which can provide decision support for professional maintenance personnel to quickly check and handle, timely deal with the problem, and quickly restore the hydropower plant unit to the grid, with good results.
[0202] Based on the above embodiments, the present invention further provides an electronic device.
[0203] An electronic device according to an embodiment of the present invention comprises: at least one processor; and a memory connected in communication with the at least one processor; wherein the memory stores instructions executable by the at least one processor, and the instructions are executed by the at least one processor so that the at least one processor can execute the above-mentioned method for determining the cause of failure of grid connection of a hydropower plant unit.
[0204] The battery equipment of the embodiment of the present invention can accurately determine the specific equipment abnormality cause of the failure of the hydropower plant unit to be connected to the grid by executing the above-mentioned method for determining the cause of the failure of the hydropower plant unit to be connected to the grid. Compared with the traditional manual analysis method, it greatly improves the work efficiency and the accuracy of the analysis results. This can provide decision support for professional maintenance personnel to quickly check and handle, solve the problem in time, and quickly restore the hydropower plant unit to the grid, which has a good effect.
[0205] Based on the above embodiments, the present invention also proposes a computer-readable storage medium.
[0206] The computer instructions in the computer-readable storage medium of the embodiment of the present invention are used to enable a computer to execute the above-mentioned method for determining the cause of the failure of the hydropower plant unit to be connected to the grid.
[0207] The computer-readable storage medium of the embodiment of the present invention can accurately determine the specific equipment abnormality cause of the failure of the hydropower plant unit to be connected to the grid by executing the above-mentioned method for determining the cause of the failure of the hydropower plant unit to be connected to the grid. Compared with the traditional manual analysis method, it greatly improves the work efficiency and the accuracy of the analysis results. This can provide decision support for professional maintenance personnel to quickly check and handle, solve the problem in time, and quickly restore the hydropower plant unit to the grid, which has a good effect.
[0208] Based on the above embodiments, the present invention also proposes a computer program product.
[0209] In an embodiment of the present invention, when the instruction processor in the computer program product is executed, the above-mentioned method for determining the cause of failure of grid connection of a hydropower plant unit is executed.
[0210] The computer program product of the embodiment of the present invention can accurately determine the specific equipment abnormality cause of the failure of the hydropower plant unit to be connected to the grid by executing the above-mentioned method for determining the cause of the failure of the hydropower plant unit to be connected to the grid. Compared with the traditional manual analysis method, it greatly improves the work efficiency and the accuracy of the analysis results. This can provide decision support for professional maintenance personnel to quickly check and handle, solve the problem in time, and quickly restore the hydropower plant unit to the grid, which has a good effect.
[0211] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "example", "specific example", or "some examples" etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine the different embodiments or examples described in this specification and the features of the different embodiments or examples, without contradiction.
[0212] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In the description of the present invention, the meaning of "plurality" is at least two, such as two, three, etc., unless otherwise clearly and specifically defined.
[0213] Any process or method description in a flowchart or otherwise described herein may be understood to represent a module, segment or portion of code comprising one or more executable instructions for implementing the steps of a custom logical function or process, and the scope of the preferred embodiments of the present invention includes alternative implementations in which functions may not be performed in the order shown or discussed, including performing functions in a substantially simultaneous manner or in reverse order depending on the functions involved, which should be understood by technicians in the technical field to which the embodiments of the present invention belong.
[0214] The logic and / or steps represented in the flowchart or otherwise described herein, for example, can be considered as an ordered list of executable instructions for implementing logical functions, and can be embodied in any computer-readable medium for use by an instruction execution system, device or apparatus (such as a computer-based system, a system including a processor, or other system that can fetch instructions from an instruction execution system, device or apparatus and execute the instructions), or in combination with these instruction execution systems, devices or apparatuses. For the purpose of this specification, "computer-readable medium" can be any device that can contain, store, communicate, propagate or transmit a program for use by an instruction execution system, device or apparatus, or in combination with these instruction execution systems, devices or apparatuses. More specific examples of computer-readable media (a non-exhaustive list) include the following: an electrical connection with one or more wires (electronic device), a portable computer disk box (magnetic device), a random access memory (RAM), a read-only memory (ROM), an erasable and programmable read-only memory (EPROM or flash memory), a fiber optic device, and a portable compact disk read-only memory (CDROM). In addition, the computer-readable medium may even be paper or other suitable medium on which the program is printed, since the program may be obtained electronically, for example, by optically scanning the paper or other medium and then editing, interpreting or processing in other suitable ways if necessary, and then stored in a computer memory.
[0215] It should be understood that the various parts of the present invention can be implemented by hardware, software, firmware or a combination thereof. In the above-mentioned embodiments, a plurality of steps or methods can be implemented by software or firmware stored in a memory and executed by a suitable instruction execution system. For example, if implemented by hardware, as in another embodiment, it can be implemented by any one of the following technologies known in the art or their combination: a discrete logic circuit having a logic gate circuit for implementing a logic function for a data signal, a dedicated integrated circuit having a suitable combination of logic gate circuits, a programmable gate array (PGA), a field programmable gate array (FPGA), etc.
[0216] A person skilled in the art may understand that all or part of the steps in the method for implementing the above-mentioned embodiment may be completed by instructing related hardware through a program, and the program may be stored in a computer-readable storage medium, which, when executed, includes one or a combination of the steps of the method embodiment.
[0217] In addition, each functional unit in each embodiment of the present invention may be integrated into a processing module, or each unit may exist physically separately, or two or more units may be integrated into one module. The above-mentioned integrated module may be implemented in the form of hardware or in the form of a software functional module. If the integrated module is implemented in the form of a software functional module and sold or used as an independent product, it may also be stored in a computer-readable storage medium.
[0218] The storage medium mentioned above may be a read-only memory, a magnetic disk or an optical disk, etc. Although the embodiments of the present invention have been shown and described above, it can be understood that the above embodiments are exemplary and cannot be understood as limiting the present invention. A person of ordinary skill in the art may change, modify, replace and modify the above embodiments within the scope of the present invention.
Claims
1. A method for determining the cause of failure of grid connection of a hydropower plant unit, characterized in that: include: In response to receiving a grid connection failure signal sent by a hydropower plant unit and receiving an operation signal of a synchronization device in the hydropower plant unit, obtaining a first parameter value of a target voltage parameter in a grid-connected voltage of a grid-connected device and a second parameter value of the target voltage parameter in a system voltage of the hydropower plant unit; According to the first parameter value and the second parameter value, a detection strategy matching the target voltage parameter is executed to determine the cause of the grid connection failure of the hydropower plant unit.
2. The method according to claim 1, characterized in that In response to the target voltage parameter being a voltage amplitude, the hydropower plant unit further includes a boost relay and an excitation system, the first output end of the synchronization device is connected to the input end of the boost relay through a first boost circuit, the first output end of the boost relay is connected to a determination module, the second output end of the boost relay is connected to the first input end of the excitation system through a second boost circuit, the output end of the excitation system is connected to the determination module, and the detection strategy matching the target voltage parameter is executed according to the first parameter value and the second parameter value to determine the cause of the grid connection failure of the hydropower plant unit, including: Determine the magnitude relationship between the first voltage amplitude value and the second voltage amplitude value; If the first voltage amplitude value is less than or equal to the second voltage amplitude value, determining whether the determination module receives a boost command sent by the synchronization device; If the determining module does not receive the boost command, determining that the reason for the grid connection failure is an abnormality in the first boost circuit; If the determination module receives the boost command, then continue to determine whether the determination module receives an excitation boost feedback command sent by the excitation system; If the determination module does not receive the excitation boost feedback command, it determines that the reason for the grid connection failure is an abnormality in the second boost circuit; If the determination module receives the excitation boost feedback command, it determines that the cause of the grid connection failure is that the boost regulation function of the excitation system is abnormal.
3. The method according to claim 2, characterized in that The hydropower plant unit also includes a pressure reducing relay, the second output end of the synchronization device is connected to the input end of the pressure reducing relay through a first pressure reducing circuit, the first output end of the pressure reducing relay is connected to the determination module, and the second output end of the pressure reducing relay is connected to the second input end of the excitation system through a second pressure reducing circuit, and the detection strategy matching the target voltage parameter is executed according to the first parameter value and the second parameter value to determine the cause of the grid connection failure of the hydropower plant unit, and further includes: If the first voltage amplitude value is greater than the second voltage amplitude value, determining whether the determination module has received a decompression command sent by the synchronization device; If the determination module does not receive the decompression command, determining that the reason for the grid connection failure is an abnormality in the first decompression circuit; If the determination module receives the decompression command, then continue to determine whether the determination module receives an excitation decompression feedback command sent by the excitation system; If the determination module does not receive the excitation decompression feedback command, it determines that the reason for the grid connection failure is the abnormality of the second decompression circuit; If the determination module receives the excitation decompression feedback command, it determines that the cause of the grid connection failure is that the decompression regulation function of the excitation system is abnormal.
4. The method according to claim 1, characterized in that: In response to the target voltage parameter being the voltage frequency, the hydropower plant unit further includes a speed-increasing relay and a speed regulator system, the third output terminal of the synchronization device is connected to the input terminal of the speed-increasing relay via a first speed-increasing loop, the first output terminal of the speed-increasing relay is connected to a determination module, the second output terminal of the speed-increasing relay is connected to the first input terminal of the speed regulator system via a second speed-increasing loop, the output terminal of the speed regulator system is connected to the determination module, and the detection strategy matching the target voltage parameter is executed according to the first parameter value and the second parameter value to determine the cause of the grid connection failure of the hydropower plant unit, including: Determine the magnitude relationship between the first voltage frequency value and the second voltage frequency value; If the first voltage-frequency value is less than or equal to the second voltage-frequency value, determining whether the determination module has received a speed-up command sent by the synchronization device; If the determining module does not receive the speed-up command, determining that the reason for the grid connection failure is that the first speed-up loop is abnormal; If the determining module receives the speed-up command, then continue to determine whether the determining module receives a speed-up feedback command sent by the speed regulator system; If the determining module does not receive the speed-up feedback command, determining that the reason for the grid connection failure is an abnormality in the second speed-up loop; If the determining module receives the speed-increasing feedback command, it determines that the reason for the grid connection failure is that the speed-increasing regulating function of the speed regulator system is abnormal.
5. The method according to claim 4, characterized in that The hydropower plant unit also includes a deceleration relay, the fourth output end of the synchronization device is connected to the input end of the deceleration relay through a first deceleration circuit, the first output end of the deceleration relay is connected to the determination module, and the second output end of the deceleration relay is connected to the second input end of the speed regulator system through a second deceleration circuit. The detection strategy matching the target voltage parameter is executed according to the first parameter value and the second parameter value to determine the cause of the grid connection failure of the hydropower plant unit, and further includes: If the first voltage-frequency value is greater than the second voltage-frequency value, determining whether the determination module has received a deceleration command sent by the synchronization device; If the determination module does not receive the deceleration command, determining that the cause of the grid connection failure is an abnormality in the first deceleration circuit; If the determination module receives the deceleration command, then continue to determine whether the determination module receives a deceleration feedback command sent by the speed regulator system; If the determination module does not receive the deceleration feedback command, it determines that the reason for the grid connection failure is an abnormality of the second deceleration circuit; If the determination module receives the deceleration feedback command, it determines that the cause of the grid connection failure is that the deceleration regulation function of the speed regulator system is abnormal.
6. The method according to claim 1, characterized in that The hydropower plant unit further includes a closing relay and a switch, the input end of the closing relay is connected to the fifth output end of the synchronization device through a first closing circuit, the first output end of the closing relay is connected to the determination module, the second output end of the closing relay is connected to the input end of the switch through a second closing circuit, the output end of the switch is connected to the determination module, and the method further includes: Determine whether the determination module has received a closing command sent by the synchronization device; wherein the closing command is generated by the synchronization device when the difference between the first voltage amplitude value and the second voltage amplitude value is within a set voltage amplitude difference value, the difference between the first voltage frequency value and the second voltage frequency value is within a set voltage frequency difference value, and the difference between the first voltage phase value and the second voltage phase value is within a set voltage phase difference value; If the determination module does not receive the closing command, it determines that the reason for the grid connection failure is that the difference between the first voltage-frequency value and the second voltage-frequency value is within a set frequency difference range, or that the first closing circuit is abnormal; If the determination module receives the closing command, it determines that the reason for the grid connection failure is that the second closing circuit is abnormal, or the actuator of the switch is abnormal.
7. The method according to claim 1, characterized in that The method further comprises: In response to receiving a grid connection failure signal sent by a hydropower plant unit and not receiving an operation signal of a synchronization device in the hydropower plant unit, it is determined that the cause of the grid connection failure is an abnormality of the synchronization device.
8. A device for determining the cause of failure of a hydropower plant unit to be connected to the grid, characterized in that: include: An acquisition module, configured to acquire a first parameter value of a target voltage parameter in a to-be-connected voltage of a to-be-connected device and a second parameter value of the target voltage parameter in a system voltage of the hydropower plant unit, upon receiving a grid connection failure signal sent by the hydropower plant unit and receiving an operation signal of a synchronization device in the hydropower plant unit; A determination module is used to execute a detection strategy that matches the target voltage parameter according to the first parameter value and the second parameter value to determine the cause of the grid connection failure of the hydropower plant unit.
9. An electronic device, characterized in that: include: at least one processor; as well as, a memory communicatively connected to the at least one processor; wherein, The memory stores instructions executable by the at least one processor, and the instructions are executed by the at least one processor so that the at least one processor can execute the method for determining the cause of failure of grid connection of a hydropower plant unit according to any one of claims 1-7.
10. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the program is executed by a processor, a method for determining the cause of failure of a hydropower plant unit to be connected to the grid is implemented as described in any one of claims 1 to 7.