Hoisting method for hoisting rolling mill stand by two machines
By designing a hoisting method for double-machine lifting of the rolling mill frame, using I-beam structure and steel wire ropes, the problem of unstable hoisting by cranes of different specifications has been solved, safe and accurate hoisting of overweight objects has been achieved, and construction costs and operations have been reduced. pressure.
Patent Information
- Application Number
- CN202411099166.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-12
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2044-08-12
AI Technical Summary
When installing heavy equipment during indoor construction, a single crane cannot meet the hoisting requirements of the rolling mill frame, resulting in the need for multiple cranes of different specifications to cooperate with each other for hoisting. Moreover, due to the difference in specifications, the hoisting is unstable and poses safety risks.
Design a hoisting method for double-machine lifting of the rolling mill frame. By connecting the hoisting tool with two cranes and rolling mill frames of different specifications, using the I-beam structure and steel wire ropes, ensure that the hoisting tool is connected with the crane hook and the rolling mill. The lifting lugs at the lifting points of the frame are equally spaced to ensure that the wire rope is lifted vertically to avoid offset and achieve safe lifting by the two cranes.
It effectively reduces construction costs, ensures the safety and accuracy of the hoisting process, reduces the pressure on operators, ensures the safe implementation of hoisting operations, and avoids overloading of equipment and exceeding the rated load range of hoisting tools.
Smart Images

Figure CN118790868A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of lifting and hoisting equipment, in particular to a lifting method for a double-machine lifting rolling mill frame. Background Art
[0002] When installing heavy equipment indoors, the equipment installation location cannot meet the working environment of automobile crane lifting, and crane lifting equipment is often used to lift and transport the equipment. For example, in the process of installing 18-roller rolling mill frame (arch) equipment of stainless steel black pickling rolling unit in a steel plant, the weight of a single rolling mill frame is 44 tons, and the equipment installation location cannot meet the working environment of automobile crane lifting, so crane lifting equipment is used to lift the rolling mill frame; multiple cranes of different specifications are usually set up in the same span of the construction site for lifting, but because the weight of the rolling mill frame is too large, a single crane cannot meet the lifting of the rolling mill frame, so at least two cranes are required to cooperate with each other for lifting. When the adjacent cranes are not When the cranes are of the same specifications, i.e. one is a 32T crane and the other is a 16T crane, although the rolling mill frame weighing 44 tons can be hoisted, since the center distance of the two cranes of different specifications is greater than the width of the lifting lugs of the rolling mill frame (the center distance of a 32T crane and a 16T crane is 6944mm, which is greater than the width of the lifting lugs of the above-mentioned 18-roller rolling mill frame of 2550mm), during hoisting, the hanging wire rope on the crane used to match the lifting lugs of the rolling mill frame will be offset, and the rolling mill frame cannot be hoisted vertically. It is impossible to ensure that the hoisted rolling mill frame meets the rated load range that the crane can withstand, resulting in certain safety hazards when hoisting the rolling mill frame. Summary of the invention
[0003] The technical problem to be solved by the present invention is to provide a lifting method for a double-machine lifting rolling mill frame, which is mainly used for lifting over-long, over-wide, and over-heavy objects by two cranes of different specifications, so as to achieve the purpose of safely lifting the objects by two cranes of different specifications when the objects are over-long, over-wide, and over-heavy.
[0004] The present invention discloses a method for lifting a rolling mill frame with two machines, comprising the following steps:
[0005] Step 1: Connect the lifting tool with the first crane, the second crane and the rolling mill frame;
[0006] The first crane and the second crane are both provided with steel wire ropes, and the lower ends of the steel wire ropes are both provided with hooks for lifting, and the lifting tools include an I-beam composed of a top plate, a web plate and a bottom plate, and the top plate is provided with an upper end lifting ear for connecting with the hooks of the first crane and the second crane, and the upper end lifting ear includes a first lifting ear and a second lifting ear, and the first lifting ear and the second lifting ear are respectively arranged at two ends of the top plate, and the spacing between the first lifting ear and the second lifting ear is equal to the spacing between the first crane and the second crane, and the first lifting ear is connected to the hook of the first crane, and the second lifting ear is connected to the hook of the second crane; a lower end lifting ear for connecting with a rolling mill frame is provided below the bottom plate, and the lower end lifting ear includes a third lifting ear and a fourth lifting ear, and the spacing between the third lifting ear and the fourth lifting ear is equal to the spacing of the rolling mill frames, and the third lifting ear and the fourth lifting ear are both provided with lifting belts, and the two lifting belts are connected to the rolling mill lifting points on the rolling mill frame;
[0007] The horizontal distance between the third lifting lug and the first lifting lug is X1, and the horizontal distance between the fourth lifting lug and the first lifting lug is X2; X1 and X2 are:
[0008]
[0009] X2=X1+L2;
[0010] Where: F1 is the theoretical force of the first crane, N, F2 is the theoretical force of the second crane, N; G1 is the weight of the lifting tool between the first and third lifting ears, N, G2—The weight of the lifting tool between the third lifting eye and the second lifting eye, N, G3—the weight of the hoisted rolling mill frame, N; G—the gravity of the hoisting tool, N; L1—the horizontal distance between the hook of the first crane and the hook of the second crane, mm; L2—the horizontal distance between the third lifting lug and the fourth lifting lug, that is, the horizontal distance between the two rolling mill lifting points on the rolling mill frame, mm; X1—the horizontal distance between the third lifting lug and the first lifting lug, mm; X2—the horizontal distance between the fourth lifting lug and the first lifting lug, mm.
[0011] Step 2: Lift and erect the rolling mill frame; the first crane and the second crane synchronously drive the lifting tool to lift upward, lifting the rolling mill frame off the ground and perpendicular to the ground;
[0012] Step 3: Transfer the rolling mill frame to the installation position; the first crane and the second crane synchronously drive the lifting tool to move horizontally to transfer the rolling mill frame to the installation position;
[0013] Step 4: lowering and installing the rolling mill frame; the first crane and the second crane synchronously drive the lifting tool to move downward until the rolling mill frame falls on the rolling mill base, and after the rolling mill frame is installed on the rolling mill base, the connection between the lifting belt and the rolling mill frame is released.
[0014] Furthermore, the step 2 also includes a safety inspection. The rolling mill frame is lifted 100 mm from the ground, and the connection between the rolling mill frame and the lifting tool needs to be inspected.
[0015] Furthermore, ribs having the same height as the web are provided on both the left and right sides of the web, and a plurality of groups of the ribs are arranged on the web at intervals along the length direction of the web.
[0016] As a preferred embodiment, both ends of the I-beam are provided with end sealing plates for connecting the top plate and the bottom plate.
[0017] As a preferred embodiment, a side sealing plate for connecting the two end sealing plates is further provided between the two end sealing plates, the length of the side sealing plate is consistent with the length of the web plate, and the side sealing plate and the end sealing plate cover the I-beam to form a box beam.
[0018] Furthermore, the center of the first lifting ear and the center of the second lifting ear are 200 mm away from the end of the top plate.
[0019] Furthermore, the first lifting lug, the second lifting lug, the third lifting lug and the fourth lifting lug are all made of steel plates and are welded to the I-beam by double-sided welds.
[0020] The beneficial effects of the present invention are as follows: the rolling mill frame is hoisted by adopting the hoisting method for lifting the rolling mill frame with two machines, and the Q235 steel commonly used on the construction site can be used for the hoisting tool, which has low manufacturing cost and is simple to manufacture; the existing crane hoisting machinery on the construction site is fully utilized, and there is no need to additionally reload the crane of the corresponding specification to hoist the rolling mill frame, which effectively reduces the construction cost of equipment installation; and the first crane and the second crane are connected to the rolling mill frame by using the hoisting tool, so that during the hoisting process, the vertical angle of the steel wire ropes on the first crane and the second crane and the rolling mill frame is always 180°, which greatly ensures The safe load of the crane and the wire rope, and the hoisted rolling mill frame will not exceed the rated hoisting load capacity of the hoisting tools and the two cranes, which effectively ensures the installation and hoisting of the equipment when the rolling mill frame is lifted together by two cranes of different specifications, and reduces the safety risk during the hoisting operation; when using this method to transfer the rolling mill frame, the trolleys on the two cranes can be directly operated to move, and the requirements for the pace coordination of the two cranes are lower, which reduces the pressure on the crane operators and improves the movement accuracy of the hoisting operation; the hoisting tools used in this method are designed after detailed calculations, which greatly guarantees the safe implementation of the hoisting operation. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] Figure 1 : A structural schematic diagram of the lifting tool used in the present invention;
[0022] Figure 2 : Another structural schematic diagram of the lifting tool used in the present invention;
[0023] Figure 3 : Schematic diagram of the crane equipment using lifting tools to lift the rolling mill frame;
[0024] Figure 4 : Schematic diagram of the structure in which the lifting tool is connected to the crane equipment and the rolling mill frame;
[0025] Figure 5 : Schematic diagram of the structure of lifting the rolling mill frame off the ground;
[0026] Figure 6 : Schematic diagram of the structure of the transfer rolling mill frame;
[0027] Figure numerals: 1-lifting tool; 11-top plate; 111-first lifting ear; 112-second lifting ear; 12-web plate; 13-bottom plate; 131-third lifting ear; 132-fourth lifting ear; 14-end cover plate; 15-rib plate; 16-side cover plate; 17-lifting belt; 2-crane equipment; 21-first crane; 22-second crane; 23-wire rope; 24-hook; 25-locking piece; 3-rolling mill frame; 31-rolling mill lifting point. DETAILED DESCRIPTION
[0028] The present invention is further described below.
[0029] The present invention provides a method for lifting a rolling mill frame by lifting two cranes, which is mainly used for lifting an overlong, overwide and overweight object by two cranes of different specifications, and comprises the following steps:
[0030] Step 1: Connect the lifting tool 1 with the first crane 21, the second crane 22 and the rolling mill frame 3;
[0031] like Figure 1-Figure 6As shown, the first trolley 21 and the second trolley 22 are both provided with a steel wire rope 23, and the lower ends of the steel wire ropes 23 are both provided with hooks 24 for lifting. The lifting tool 1 includes an I-beam composed of a top plate 11, a web plate 12 and a bottom plate 13. The top plate 11 is provided with an upper end lifting lug for connecting with the hooks 24 of the first trolley 21 and the second trolley 22, and the upper end lifting lug includes a first lifting lug 111 and a second lifting lug 112. The first lifting lug 111 and the second lifting lug 112 are respectively arranged at both ends of the top plate 11, and the distance between the first lifting lug 111 and the second lifting lug 112 is the same as that between the first trolley 21 and the second trolley 22. The spacing between the two cranes 22 is equal, the first lifting lug 111 is connected to the hook 24 of the first crane 21, and the second lifting lug 112 is connected to the hook 24 of the second crane 22; a lower end lifting lug for connecting to the rolling mill frame 3 is provided below the bottom plate 13, and the lower end lifting lug includes a third lifting lug 131 and a fourth lifting lug 132, and the spacing between the third lifting lug 131 and the fourth lifting lug 132 is equal to the spacing between the rolling mill frames 3, and the third lifting lug 131 and the fourth lifting lug 132 are both provided with a lifting belt 17, and the two lifting belts 17 are connected to the rolling mill lifting point 31 on the rolling mill frame 3;
[0032] The horizontal distance between the third lifting lug 131 and the first lifting lug 111 is X1, and the horizontal distance between the fourth lifting lug 132 and the first lifting lug 111 is X2; X1 and X2 are:
[0033]
[0034] X2=X1+L2;
[0035] Where: F1 is the theoretical force of the first crane, N, F2 is the theoretical force of the second crane, N; G1 is the weight of the lifting tool between the first and third lifting ears, N, G2—The weight of the lifting tool between the third lifting eye and the second lifting eye, N, G3—the weight of the hoisted rolling mill frame, N; G—the gravity of the hoisting tool, N; L1—the horizontal distance between the hook of the first crane and the hook of the second crane, mm; L2—the horizontal distance between the third lifting lug and the fourth lifting lug, that is, the horizontal distance between the two rolling mill lifting points on the rolling mill frame, mm; X1—the horizontal distance between the third lifting lug and the first lifting lug, mm; X2—the horizontal distance between the fourth lifting lug and the first lifting lug, mm.
[0036] Specifically, taking the case where the first crane 21 uses a 32T crane and the second crane 22 uses a 16T crane to hoist a 44T rolling mill frame 3, the hoisting tool 1 is designed and strength calculated:
[0037] The lifting tool 1 is made of Q235 steel plate to make an I-beam of 800*500*20*20mm, and 14 pairs of evenly spaced webs 12 can be welded at the web 12 to strengthen the bending strength of the I-beam. Two sealing plates are welded on both sides of the I-beam. The first lifting lug 111 and the second lifting lug 112 with a hole spacing of 6944mm are welded on the top plate 11 of the I-beam, which is equal to the center distance between the two cranes. The third lifting lug 131 and the fourth lifting lug 132 with a hole spacing of 2550mm are welded on the bottom plate 13 of the I-beam, which is equal to the spacing between the lifting points of the rolling mill frame 3. The above-mentioned first lifting lug 111, second lifting lug 112, third lifting lug 131, and fourth lifting lug 132 are all made of Q235 steel plate with a thickness of 30mm and a length of 400mm, with double-sided welds.
[0038] Design of lifting tools:
[0039] Design conditions: Permanent load partial factor: 1.35; Dynamic load and other comprehensive safety factors: 1.5; Overall stability factor: Φb = 0.6; The self-weight uniform load of the lifting tool is 5.4kN / m, that is, G = L1×5.4×10 6 N / mm; material Q235, f=215N / mm 2 ; Considering the theoretical force of 32T crane is 31.8T, that is, F1=31.8×10 3 ×9.8N; the actual force on a 16T crane is 15T, i.e. F2 = 15 × 10 3 ×9.8N; L1=6944mm, L2=2550mm; S=50×20mm 2 ; carry out accounting.
[0040] Calculation of the installation positions of the third lifting lug 131 and the fourth lifting lug 132:
[0041] The distance X1 between the third lifting lug 131 and the first lifting lug 111 is:
[0042]
[0043] X1=856mm;
[0044] The distance X2 between the fourth lifting lug 132 and the first lifting lug 111 is: X2=X1+L2=856+2550=3406 mm;
[0045] Maximum bending moment calculation:
[0046] M1=1.35×1.5×318×0.856=551KN·m;
[0047] M2=1.35×1.5×150×(6944-3046)=1076KN·m;
[0048] It can be seen that the maximum bending moment is 1076KN·m.
[0049] W x calculate:
[0050]
[0051] Verification according to existing design beam
[0052] I-beam: 800*500*20*20mm
[0053] Moment of inertia:
[0054]
[0055]
[0056] w′ x >w x ;
[0057] The lifting tools meet the requirements. In order to make the overall structure of the lifting beam more stable, end sealing plates 14 can be set at the ends of the I-beam, and side sealing plates 16 can be set between the end sealing plates 14 to form a box beam, and Φb=1.0 is taken to improve the safety and stability of the lifting process.
[0058] The hoisting capacity of the crane allows for 25% overload. A 16-ton crane can lift no more than 20 tons of heavy objects; a 32-ton crane can lift 40 tons. In this hoisting operation, the hoisting equipment and rigging weigh 4 tons, and the hoisting equipment and the frame weigh about 44 tons in total. The total weight is less than the rated lifting capacity of 48 tons and the maximum weight of 60 tons, so it meets the use requirements.
[0059] By adding the lifting tool 1 and adjusting the positions of the third lifting lug 131 and the fourth lifting lug 132 on the lifting tool 1 for connecting to the rolling mill frame 3, the rolling mill frame 3 of different weights can be lifted. Specifically, the moment balance of the lifting tool 1 is calculated according to the known theoretical forces of the first trolley 21 and the second trolley 22, the gravity of the rolling mill frame 3 to be lifted, and the self-gravity of the lifting tool 1 to obtain the installation points of the third lifting lug 131 and the fourth lifting lug 132, so that in the process of lifting the rolling mill frame 3, the steel wire ropes 23 at the first lifting lug 111 and the second lifting lug 112 respectively connected to the first trolley 21 and the second trolley 22 can always remain vertical without tilting to cause safety hazards during the lifting process. Specifically, as shown in the figure It is shown that the moment conservation on both sides of the third lifting eye 131 is calculated to obtain the distance between the third lifting eye 131 and the first lifting eye 111, so that the setting point of the fourth lifting eye 132 can be obtained, the hook 24 of the first crane 21 is connected to the first lifting eye 111, the hook 24 of the second crane 22 is connected to the second lifting eye 112, one of the rolling mill lifting points 31 of the rolling mill frame 3 is connected to the third lifting eye 131 through the lifting belt 17, and the other rolling mill lifting point 31 is connected to the fourth lifting eye 132 through the lifting belt 17, and the rolling mill frame 3 is hoisted between the first crane 21 and the second crane 22 by using the lifting tool 1. After the connection is completed, it is locked with a lock to avoid the accident of the wire rope 23 loosening during the movement, resulting in the unstable connection and the falling of the rolling mill frame 3. When two cranes of different specifications are used to hoist an overweight rolling mill frame 3, the vertical hoisting angle between the crane's steel wire rope 23 and the rolling mill frame 3 is 180°, which greatly ensures the safe load of the crane and the steel wire rope 23, and the hoisted rolling mill frame 3 will not exceed the rated hoisting carrying capacity of the hoisting tool 1 and the two cranes; and the hoisting tool 1 can be directly made of existing I-shaped steel, with low manufacturing cost and simple manufacturing process, making full use of the hoisting machinery on the construction site, and effectively reducing the construction cost of equipment installation.
[0060] Step 2: Lift and erect the rolling mill frame 3; the first crane 21 and the second crane 22 synchronously drive the lifting tool 1 to lift upward, lifting the rolling mill frame 3 off the ground and perpendicular to the ground. Figure 4 , Figure 5As shown, after the rolling mill frame 3 is connected to the first crane 21 and the second crane 22 through the lifting tool 1, the first crane 21 and the second crane 22 are started synchronously, and the recovery wire rope 23 drives the hooks 24 of the first crane 21 and the second crane 22 to move upward, and the rolling mill frame 3 is slowly lifted upward to be upright, that is, perpendicular to the ground. During the uprighting process, the synchronization between the first crane 21 and the second crane 22 should be ensured, and the entire rolling mill frame 3 rotates with the bottom of the rolling mill frame 3 as the axis until the rolling mill frame 3 Completely upright, in the process of using the first crane 21 and the second crane 22 to lift the rolling mill frame 3, the first crane 21 and the second crane 22 also need to slowly move to the position where the rolling mill frame 3 is about to be upright, so as to ensure the verticality between the wire rope 23 and the rolling mill frame 3 during the whole process; when the rolling mill frame 3 is stably vertical to the ground, the first crane 21 and the second crane 22 continue to lift synchronously, that is, slowly retract the wire ropes 23 of the first crane 21 and the second crane 22, and lift the rolling mill frame 3 off the ground.
[0061] Step 3: Transfer the rolling mill frame 3 to the installation position; the first crane 21 and the second crane 22 synchronously drive the lifting tool 1 to move horizontally, and transfer the rolling mill frame 3 to the installation position. Figure 6 As shown, the trolleys of the first crane 21 and the second crane 22 run synchronously, so that the rolling mill frame 3 moves slowly to the specified position. The trolleys of the first crane 21 and the second crane 22 drive the first crane 21 and the second crane 22 to run synchronously, which requires lower coordination of the two cranes, reduces the pressure on the crane operator, and improves the movement accuracy of the lifting operation.
[0062] Step 4: lowering and installing the rolling mill frame 3; the first crane 21 and the second crane 22 synchronously drive the lifting tool 1 to move downward until the rolling mill frame 3 falls on the rolling mill base. After the rolling mill frame 3 is installed on the rolling mill base, the connection between the lifting belt 17 and the rolling mill frame 3 is released. After the rolling mill frame 3 is translated to the designated position, after the rolling mill frame 3 is stable, the steel strands of the first crane 21 and the second crane 22 are synchronously lowered until the rolling mill frame 3 falls on the rolling mill base. After the rolling mill frame 3 is in place, the rolling mill frame 3 and the rolling mill base are preliminarily fastened by connecting bolts, and then the lifting belt 17 connecting the lifting tool 1 and the rolling mill frame 3 is released, and the locks of the lifting tool 1 and the rolling mill frame 3 are removed, and then the next frame is lifted.
[0063] The rolling mill frame is hoisted by adopting the hoisting method for lifting the rolling mill frame by two machines, and the hoisting tool 1 is made, specifically, it can be made of Q235 steel commonly used in the construction site, and the manufacturing cost is low and the manufacturing is simple; the existing crane hoisting machinery at the construction site is fully utilized, and there is no need to reload the crane of the corresponding specification to hoist the rolling mill frame 3, which effectively reduces the construction cost of equipment installation; and the first crane 21 and the second crane 22 are connected to the rolling mill frame 3 by using the hoisting tool 1, so that during the hoisting process, the steel wire rope 23 on the first crane 21 and the second crane 22 and the rolling mill frame 3 are always at a vertical angle of 180°, which greatly ensures The safe load of the crane and the wire rope 23 is ensured, and the hoisted rolling mill frame 3 will not exceed the rated hoisting load capacity of the hoisting tool 1 and the two cranes, which effectively ensures that when the rolling mill frame 3 is lifted together by two cranes of different specifications, the installation and hoisting of the equipment is guaranteed, and the safety risk during the hoisting operation is reduced; when the rolling mill frame 3 is transferred by this method, the trolleys on the two cranes can be directly operated to move, and the requirements for the coordination of the pace of the two cranes are lower, which reduces the pressure on the crane operator and improves the movement accuracy of the hoisting operation; the hoisting tool 1 used in this method is designed after detailed calculations, which greatly guarantees the safe implementation of the hoisting operation.
[0064] In order to ensure the stability of the connection between the rolling mill frame 3 and the lifting tool 1, and avoid instability during the lifting of the rolling mill frame 3 due to connection errors; the step 2 also includes a safety inspection. The rolling mill frame 3 is lifted 100 mm from the ground, and the connection between the rolling mill frame 3 and the lifting tool 1 needs to be inspected; when the rolling mill frame 3 is completely lifted off the ground and stably perpendicular to the ground, the first crane 21 and the second crane 22 continue to be lifted synchronously. When the bottom of the rolling mill frame 3 is 100 mm from the ground, a safety inspection is carried out. During the inspection, the locking of the lifting belt 17 and the connection between the lifting belt 17 and the lifting ear on the rolling mill frame 3 need to be verified to ensure that the lifting belt 17 is locked to fix the relative position between the rolling mill frame 3 and the lifting tool 1, and to ensure that the lifting tool 1 will not deviate or tilt during the lifting of the rolling mill frame 3, thereby ensuring stability and safety when the rolling mill frame 3 is lifted by the crane.
[0065] In order to further enhance the bending strength of the I-beam, Figure 1As shown, ribs 15 having the same height as the web 12 are provided on both sides of the left and right sides of the web 12, and a plurality of groups of the ribs 15 are arranged on the web 12 at intervals along the length direction of the web 12; specifically, the distance between two adjacent groups of ribs 15 is determined according to the length of the lifting tool 1 actually manufactured, that is, the length of the I-beam; by adding ribs 15 located between the top plate 11 and the bottom plate 13 and connected to the web 12, the bending strength of the entire lifting tool 1 is enhanced, so as to avoid bending, deformation or fracture of the I-beam due to insufficient bending strength during use due to the excessive weight of the rolling mill frame 3 when lifting the rolling mill frame 3, thereby ensuring the safety and stability of the lifting tool 1 during use.
[0066] In order to strengthen the connection stability between the top plate 11, the bottom plate 13 and the web 12, and avoid the connection ends between the top plate 11, the bottom plate 13 and the web 12 from being broken or desoldered due to excessive force, as shown in FIG. Figure 1 , Figure 2 As shown, both ends of the I-beam are provided with end sealing plates 14 for connecting the top plate 11 and the bottom plate 13; by providing the end sealing plates 14, the ends of the top plate 11, the bottom plate 13 and the web 12 are connected to the same end sealing plate 14, thereby strengthening the connection strength between the top plate 11, the bottom plate 13 and the web 12, avoiding the I-beam from breaking or desoldering due to excessive weight of the hoisted object, and ensuring safety during the hoisting process.
[0067] In order to make the overall structure of the lifting tool 1 more stable, Figure 2 As shown, a side sealing plate 16 for connecting the two end sealing plates 14 is further provided between the two end sealing plates 14, and the length of the side sealing plate 16 is consistent with the length of the web 12, and the side sealing plates 16 and the end sealing plates 14 cover the I-beam to form a box beam; through the cooperation of the end sealing plates 14 and the side sealing plates 16, the entire I-shaped lifting tool 1 is enclosed to form a box beam, so as to improve the safety and stability of the lifting process.
[0068] In order to ensure the installation stability of the first lifting ear 111 and the second lifting ear 112, and the balance of the entire lifting tool 1 when connected using the hook 24 of the first trolley 21 and the hook 24 of the second trolley 22, the center of the first lifting ear 111 and the center of the second lifting ear 112 are 200 mm away from the end of the top plate 11; by setting the center of the first lifting ear 111 and the second lifting ear 112 at 200 mm away from the end of the top plate 11, the length of the entire lifting tool 1 is extended to be longer than the horizontal distance between the hook 24 of the first trolley 21 and the hook 24 of the second trolley 22, thereby ensuring that the entire lifting tool 1 can be balanced when connected to the first trolley 21 and the second trolley 22, and ensuring the connection stability of the first lifting ear 111, the second lifting ear 112 and the I-beam.
[0069] In order to ensure the connection strength of the first lifting lug 111, the second lifting lug 112, the third lifting lug 131 and the fourth lifting lug 132 on the lifting tool 1 and avoid safety accidents caused by breakage due to unstable connection when lifting heavy equipment, the first lifting lug 111, the second lifting lug 112, the third lifting lug 131 and the fourth lifting lug 132 are all made of steel plates and welded to the I-beam with double-sided welds.
Claims
1. A method for lifting a rolling mill frame with two machines, characterized in that: The following steps are involved: Step 1: Connecting the lifting tool (1) with the first crane (21), the second crane (22) and the rolling mill frame (3); The first trolley (21) and the second trolley (22) are both provided with a steel wire rope (23), and the lower end of each steel wire rope (23) is provided with a hook (24) for lifting. The lifting tool (1) comprises an I-beam composed of a top plate (11), a web plate (12) and a bottom plate (13). The top plate (11) is provided with an upper end lifting lug for connecting with the hook (24) of the first trolley (21) and the second trolley (22), and the upper end lifting lug comprises a first lifting lug (111) and a second lifting lug (112). The first lifting lug (111) and the second lifting lug (112) are respectively arranged at two ends of the top plate (11), and the distance between the first lifting lug (111) and the second lifting lug (112) is the same as that between the first trolley (21) and the web plate (12). and the second crane (22), the first lifting lug (111) is connected to the hook of the first crane (21), and the second lifting lug (112) is connected to the hook of the second crane (22); a lower end lifting lug for connecting to a rolling mill frame (3) is provided below the bottom plate (13), the lower end lifting lug includes a third lifting lug (131) and a fourth lifting lug (132), the spacing between the third lifting lug (131) and the fourth lifting lug (132) is equal to the spacing between the rolling mill frames (3), the third lifting lug (131) and the fourth lifting lug (132) are both provided with lifting belts (17), and the two lifting belts (17) are connected to a rolling mill lifting point (31) provided on the rolling mill frame (3); The horizontal distance between the third lifting lug (131) and the first lifting lug (111) is X1, and the horizontal distance between the fourth lifting lug (132) and the first lifting lug (111) is X2; X1 and X2 are: X2=X1+L2; Where: F1 is the theoretical force of the first crane, N, F2 is the theoretical force of the second crane, N; G1 is the weight of the lifting tool between the first lifting eye and the third lifting eye, N, G2—The weight of the lifting tool between the third lifting eye and the second lifting eye, N, G3—weight of the hoisted rolling mill frame, N; G—gravity of the hoisting tool, N; L1—horizontal distance between the hook of the first crane and the hook of the second crane, mm; L2—horizontal distance between the third lifting lug and the fourth lifting lug, that is, the horizontal distance between the two rolling mill lifting points on the rolling mill frame, mm; X1—horizontal distance between the third lifting lug and the first lifting lug, mm; X2—horizontal distance between the fourth lifting lug and the first lifting lug, mm; Step 2: lifting and erecting the rolling mill frame (3); the first crane (21) and the second crane (22) synchronously drive the lifting tool (1) to lift upward, lifting the rolling mill frame (3) off the ground and perpendicular to the ground; Step 3: Transferring the rolling mill frame (3) to the installation position; the first crane (21) and the second crane (22) synchronously drive the lifting tool (1) to move horizontally, and transfer the rolling mill frame (3) to the installation position; Step 4: lowering and installing the rolling mill frame (3); the first crane (21) and the second crane (22) synchronously drive the lifting tool (1) to move downward until the rolling mill frame (3) falls on the rolling mill base. After the rolling mill frame (3) is installed on the rolling mill base, the connection between the lifting belt and the rolling mill frame (3) is released.
2. A method for lifting a rolling mill frame with two machines as claimed in claim 1, characterized in that: The second step also includes a safety inspection. The rolling mill frame (3) is lifted 100 mm from the ground, and the connection between the rolling mill frame (3) and the lifting tool (1) needs to be inspected.
3. A method for lifting a rolling mill frame with two machines as claimed in claim 1, characterized in that: The left and right sides of the web (12) are both provided with ribs (15) having the same height as the web (12), and a plurality of groups of the ribs (15) are arranged on the web (12) at intervals along the length direction of the web (12).
4. A method for lifting a rolling mill frame with two machines as claimed in claim 3, characterized in that: Both ends of the I-beam are provided with end sealing plates (14) for connecting the top plate (11) and the bottom plate (13).
5. A method for lifting a rolling mill frame with two machines as claimed in claim 4, characterized in that: A side sealing plate (16) for connecting the two end sealing plates (14) is also provided between the two end sealing plates (14); the length of the side sealing plate (16) is consistent with the length of the web (12); the side sealing plate (16) and the end sealing plate (14) wrap around the I-beam to form a box beam.
6. A method for lifting a rolling mill frame with two machines as claimed in claim 1, characterized in that: The center of the first lifting ear (111) and the center of the second lifting ear (112) are 200 mm away from the end of the top plate (11).
7. A method for lifting a rolling mill frame with two machines as claimed in claim 1, characterized in that: The first lifting lug (111), the second lifting lug (112), the third lifting lug (131), and the fourth lifting lug (132) are all made of steel plates and are welded to the I-beam by double-sided welds.
Citation Information
Patent Citations
Hoisting method of large mill housing under limited hoisting height
CN101518784A
Post lifting method of improved acid continuous rolling mill
CN104909258A
Rolling mill stand hoisting method
CN109052140A
Method for installing rolling mill pressure cylinder in limited space
CN113428779A
new adjustable multi-purpose lifting beam and its lifting method
DE112022000099T5