Steel structure frame double-beam and beam-column connecting structure
By adopting the double-beam beam-column connection structure of the steel structure frame, the problem of insufficient overlap length in low-rise prefabricated steel structure buildings is solved, more efficient floor slab installation and smaller floor height occupation are achieved, and prefabricated floor slab drilling operations are avoided. , improving the economic benefits and safety of the building.
Patent Information
- Application Number
- CN202411110900.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-14
- Publication Date
- 2024-10-18
AI Technical Summary
In low-rise prefabricated steel structure buildings, the small cross-section of steel structure beams leads to insufficient overlap length, causing the building to occupy too much floor height, and the installation of prefabricated floor slabs requires drilling operations.
It adopts a double-beam beam-column connection structure of a steel structure frame, including an upper connecting partition, a lower connecting partition and a core column. The first steel beam and the second steel beam are fixedly connected to the core column to form a wide overlapping plane and adjust the space between the beams. The distance meets the overlap length requirement, and the gap between the beams is used as a pipeline channel to avoid drilling operations.
It effectively reduces the cross-section size of the steel beam, increases the net usable height of the building, enhances the safety of floor slab installation, avoids prefabricated floor slab opening operations, and improves the economic benefits of the building.
Smart Images

Figure CN118793166A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of steel structures, and in particular to a double-beam-column connection structure of a steel structure frame. Background Art
[0002] Steel structures have excellent strength and rigidity. The high strength of steel enables it to withstand large loads and is suitable for building large buildings and industrial facilities, such as high-rise buildings, bridges, factories, etc.
[0003] With the progress of the times, the demand for safer and more efficient building structures is also increasing. Low-rise steel structure buildings, with their unique advantages, are accepted by the public in the low-rise building market and occupy an increasingly important position. Developing steel structure connection structures suitable for the unique structural form of low-rise buildings caters to the future development prospects of steel structure buildings.
[0004] The connection between steel structure beams and steel columns usually adopts the method of full welding of beam flanges and webs, full bolting of beam flanges and webs, or welding of steel beam flanges and bolting of webs. The exposed steel structure beams affect the indoor appearance, so they are generally treated with suspended ceilings to ensure the aesthetics.
[0005] According to the requirements of building construction, there are requirements for the lap length of prefabricated floor slabs on steel beams. However, in low-rise prefabricated steel structure buildings, the cross-section of steel beams is generally small, and there is a hidden danger of insufficient lap length. In order to overcome the hidden danger, it is necessary to increase the cross-section of steel beams. Due to the increase in the cross-section of steel beams, the ceiling must be suspended after the construction of the steel beams is completed, which eventually leads to the defect of the overall structure occupying too many floors. Summary of the invention
[0006] In order to solve the problem that existing steel structure building beams occupy too much floor height space, the present application provides a steel structure frame double beam-column connection structure.
[0007] The present application provides a steel structure frame double beam column connection structure adopts the following technical solution: A double-beam-column connection structure of a steel structure frame includes a steel column, a steel beam group and a beam-column connection module; the beam-column connection module includes an upper connecting partition, a lower connecting partition and a core column; the steel beam group includes a first steel beam and a second steel beam; the core column is located between the upper connecting partition and the lower connecting partition, one end of the core column is fixedly connected to the upper connecting partition, and the other end is fixedly connected to the lower connecting partition, the end of the steel column is fixedly connected to the upper connecting partition or the lower connecting partition, and the connection is located on the side of the upper connecting partition or the lower connecting partition away from the core column; the ends of the first steel beam and the second steel beam are both fixedly connected to the core column, the first steel beam and the second steel beam are arranged in parallel and are located in the same horizontal plane, and there is a gap between the first steel beam and the second steel beam.
[0008] By adopting the above technical solution, the beam-column connection module can be fixed to the steel column whether it is placed on the top of a single steel column or between two steel columns in the vertical direction. The beam-column connection module realizes the connection between the steel column and the steel beam group, and the prefabricated floor slab is overlapped on the steel beam group. Since there is a distance between the first steel beam and the second steel beam, the distance between the first steel beam and the second steel beam can be adjusted to fully meet the overlap length when the prefabricated floor slab is installed. It is no longer limited to the need to adjust the size of the steel structure beam section. In comparison, the first and second steel beams with small cross-sections reduce the occupation of the floor height space. While meeting the overlap length of the prefabricated floor slab, the gap between the first steel beam and the second steel beam can be used as a pipeline passage for the upper and lower floors, avoiding the operation of opening holes in the prefabricated floor slab.
[0009] Optionally, a partition board is provided between the first steel beam and the second steel beam, the partition board is vertically arranged, one end of the partition board is fixedly connected to the first steel beam, and the other end is fixedly connected to the second steel beam; there are multiple partition boards, and adjacent partition boards are spaced apart along the length direction of the first steel beam.
[0010] By adopting the above technical solution, the partition plate connects the first steel beam and the second steel beam into one, thereby ensuring the lateral stability of the steel beam group.
[0011] Optionally, a plurality of steel beam groups are provided, and adjacent steel beam groups are spaced apart along the circumferential outer wall of the core column.
[0012] By adopting the above technical solution, different numbers of steel beam groups are set for different positions in the building to achieve the design requirements. For example, if the steel column is a middle side column, three or two steel beam groups will be required. If the steel column is a corner column, two steel beam groups at the top of the corner column will be required with an included angle of ninety degrees.
[0013] Optionally, the core column includes a connecting plate, which is vertically arranged, one end of the connecting plate is fixedly connected to the outer wall of the core column, and the other end is cantilevered, the number of connecting plates is twice the number of steel beam groups, and adjacent connecting plates are spaced apart along the circumferential outer wall of the core column; the web of the first steel beam and the web of the second steel beam are bolted to the corresponding connecting plates.
[0014] By adopting the above technical solution, the first steel beam and the second steel beam are bolted to the corresponding connecting plates, thereby achieving the initial fixation of the first steel beam, the second steel beam and the beam-column connecting module, which provides convenience for the subsequent secondary fixation.
[0015] Optionally, the upper flange end of the first steel beam is fixed to the edge of the upper connecting partition, and the lower flange end of the first steel beam is fixed to the edge of the lower connecting partition; the upper flange end of the second steel beam is fixed to the edge of the upper connecting partition, and the lower flange end of the second steel beam is fixed to the edge of the lower connecting partition.
[0016] By adopting the above technical solution, after the first steel beam, the second steel beam and the beam-column connection module are initially bolted, the first steel beam, the second steel beam and the beam-column connection module are secondary fixed by welding the upper flange end with the corresponding position of the upper connecting partition edge, thereby further improving the stability of the connection.
[0017] Optionally, the top end of the connecting plate is fixed to the inner wall of the upper flange of the first steel beam or the second steel beam, and the bottom end of the connecting plate is fixed to the inner wall of the lower flange of the first steel beam or the second steel beam.
[0018] By adopting the above technical solution, the connecting plate can transfer force, so that the connecting plate can further support the first steel beam and the second steel beam.
[0019] Optionally, the upper flange ends and lower flange ends of the first steel beam and the second steel beam are both provided with grooves.
[0020] By adopting the above technical solution, setting the groove helps to improve the welding quality. The existence of the groove can increase the penetration depth and fusion area of the weld, making the connection between the steel beam group and the beam-column connection module more firm and tight; the groove can improve the stress performance of the weld. When the weld is subjected to external force, the stress distribution is more uniform and the stress concentration phenomenon is reduced; the groove helps to improve the welding efficiency. A reasonably designed groove can make the welding process smoother, reduce the occurrence of welding defects, and increase the welding speed.
[0021] Optionally, the core column is a box-type core column.
[0022] Optionally, the steel column is an H-shaped steel column, a box column or a circular tube column.
[0023] In summary, the present application includes at least one of the following beneficial technical effects: 1. Compared with conventional technologies, the steel structure double beams used in this application can provide a very wide overlap plane, which is conducive to the overlap and mutual connection of prefabricated floor slabs, and improves the safety of floor slab installation and use. The wide overlap plane eliminates the need for corner cutting at the steel column position of the prefabricated floor slab; 2. The double steel beams of the steel structure each share half of the floor load, that is, the first steel beam and the second steel beam each share half of the floor load, which has better lateral stability and no limitation on the overlap width. It can effectively reduce the cross-sectional size of the beam, increase the net height of the building or reduce the floor height, and has good economic benefits; 3. The cavity formed between the first steel beam and the second steel beam can be used as a pipeline channel for the upper and lower floors, avoiding the opening operation of the prefabricated floor slab. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] Figure 1 is a schematic diagram of the structure of Example 1 of the present application; Figure 2 It is a structural schematic diagram of the beam-column connection module; Figure 3 It is a structural schematic diagram of the steel beam group; Figure 4 It is a partial structural diagram of Example 2 of the present application; Figure 5 yes Figure 4 A partial enlarged schematic diagram of part A; Figure 6 This is a partial cross-sectional view showing the internal structure of the locking box.
[0025] In the figure, 1. steel column; 2. beam-column connection module; 21. upper connecting partition; 22. lower connecting partition; 23. core column; 231. connecting plate; 3. steel beam group; 31. first steel beam; 32. second steel beam; 4. partition plate; 5. groove; 6. bottom mold; 7. locking assembly; 71. first connecting rod; 72. second connecting rod; 73. third connecting rod; 74. locking box; 741. rack; 742. gear; 743. handwheel; 744. limit pin; 8. plug. DETAILED DESCRIPTION
[0026] The following is combined with Figure 1-Figure 6 This application is described in further detail.
[0027] The embodiment of the present application discloses a double-beam-column connection structure of a steel structure frame.
[0028] Example 1: Reference Figure 1 A double beam-column connection structure of a steel structure frame includes a steel column 1, a beam-column connection module 2 and a steel beam group 3. The steel column 1 is vertically arranged, and a plurality of steel columns 1 are arranged along the vertical direction, and the beam-column connection module 2 is located between adjacent steel columns 1. The steel column 1 is an H-shaped steel, a box column or a circular tube column.
[0029] refer to Figure 2 The beam-column connection module 2 includes an upper connection partition 21, a lower connection partition 22 and a core column 23. The core column 23 is a box-shaped core column 23, but is not limited to the box-shaped one, and can also be other shapes. The upper connection partition 21 is located above the lower connection partition 22 and both are arranged horizontally. The core column 23 is located between the upper connection partition 21 and the lower connection partition 22. The top end of the core column 23 is fixedly connected to the upper connection partition 21, and the bottom end of the core column 23 is fixedly connected to the lower connection partition 22. The core column 23 includes a connecting plate 231, which is arranged vertically. There are multiple connecting plates 231, one end of the connecting plate 231 is fixedly connected to the outer wall of the core column 23, and the other end of the connecting plate 231 is cantilevered; adjacent connecting plates 231 are arranged at intervals along the circumferential outer wall of the core column 23.
[0030] refer to Figure 1 and Figure 3The steel beam group 3 includes a first steel beam 31 and a second steel beam 32. The first steel beam 31 and the second steel beam 32 are located on the same horizontal plane and are arranged parallel to each other. There is a distance between the first steel beam 31 and the second steel beam 32. A partition board 4 is arranged between the first steel beam 31 and the second steel beam 32. One end of the partition board 4 is fixedly connected to the first steel beam 31, and the other end is fixedly connected to the second steel beam 32. A plurality of partition boards 4 are provided, and adjacent partition boards 4 are arranged at intervals along the length direction of the first steel beam 31.
[0031] refer to Figure 1 and Figure 2 , multiple steel beam groups 3 are provided, and adjacent steel beam groups 3 are spaced apart along the circumferential outer wall of the core column 23. The number of connecting plates 231 provided is twice the number of steel beam groups 3. The web of the first steel beam 31 and the web of the second steel beam 32 are bolted to the corresponding connecting plates 231, that is, bolt holes are provided on the connecting plates 231, at the ends of the webs of the first steel beam 31 and at the ends of the webs of the second steel beam 32, so as to facilitate the fixing connection by bolts.
[0032] refer to Figure 1 , Figure 2 and Figure 3 , while the web of the first steel beam 31 and the web of the second steel beam 32 are bolted to the corresponding connection plate 231, the upper flange end of the first steel beam 31 is welded to the edge of the upper connection partition 21, the lower flange end of the first steel beam 31 is welded to the edge of the lower connection partition 22, the upper flange end of the second steel beam 32 is welded to the edge of the upper connection partition 21, the lower flange end of the second steel beam 32 is welded to the edge of the lower connection partition 22, the top of the connection plate 231 is welded to the corresponding upper flange inner wall of the first steel beam 31 or the second steel beam 32, and the bottom of the connection plate 231 is welded to the corresponding lower flange inner wall of the first steel beam 31 or the second steel beam 32. The upper flange ends and lower flange ends of the first steel beam 31 and the second steel beam 32 are both provided with grooves 5, and the setting of the grooves 5 provides convenience for the welding process.
[0033] The implementation principle of the double-beam beam-column connection structure of a steel structure frame in the embodiment of the present application is as follows: the beam-column connection module 2 can be fixed to the steel column 1 whether it is placed on the top of a single steel column 1 or between two steel columns 1 in the vertical direction. The beam-column connection module 2 realizes the connection between the steel column 1 and the steel beam group 3, and the prefabricated floor is overlapped on the steel beam group 3. Since there is a distance between the first steel beam 31 and the second steel beam 32, the distance between the first steel beam 31 and the second steel beam 32 can be adjusted to fully meet the overlap length during the installation of the prefabricated floor, and it is no longer limited to the need to adjust the size of the steel structure beam section. In comparison, the first steel beam 31 and the second steel beam 32 with a small cross-section reduce the occupation of the floor height space. While meeting the overlap length of the prefabricated floor, the gap between the first steel beam 31 and the second steel beam 32 can be used as a pipeline passage between the upper and lower floors, avoiding the operation of opening holes in the prefabricated floor.
[0034] Embodiment 2: The difference from Embodiment 1 is that, reference Figure 4 , Figure 5 and Figure 6 The first steel beam 31 and the second steel beam 32 are detachably connected with a bottom mold 6 and a locking assembly 7. The locking assembly 7 includes a first connecting rod 71, a second connecting rod 72, a third connecting rod 73 and a locking box 74. One end of the first connecting rod 71 is fixedly connected to the bottom mold 6, and the fixing method can be bolt fixing. The other end of the first connecting rod 71 is slidably connected to the locking box 74. With the use state as a reference, the sliding direction of the first connecting rod 71 slides in the vertical direction. One end of the second connecting rod 72 is fixedly connected to the outer wall of the locking box 74, and the other end is actively connected to one end of the third connecting rod 73. A bolt is set at the rotation connection between the third connecting rod 73 and the second connecting rod 72. The bolt is rotated to achieve the locking of the third connecting rod 73 relative to the second connecting rod 72. A gear 742 is rotatably arranged in the locking box 74, a rack 741 is fixed to one end of the first connecting rod 71 away from the bottom mold 6, the rack 741 penetrates the locking box 74 and meshes with the gear 742, a hand wheel 743 is rotatably arranged on the outer wall of the locking box 74, one end of the hand wheel 743 penetrates the inside of the locking box 74 and is fixedly connected to the gear 742, a positioning hole is provided on the locking box and the outer wall, a limit pin 744 is slidably arranged on the hand wheel 743, and the limit pin 744 slides in the direction close to or away from the positioning hole. A plurality of positioning holes are arranged at intervals, and the connecting line of all positioning holes is circular with the center of the circle being the place where the hand wheel 743 penetrates the locking box 74. A plurality of locking components 7 are arranged, and the locking components 7 are symmetrically distributed on both sides of the bottom mold 6. When in use: the third connecting rod 73 rotates to a position perpendicular to the second connecting rod 72, the second connecting rod 72 is in a vertical state, the third connecting rod 73 overlaps the edge of the lower flange of the first steel beam 31 or the second steel beam 32, the bottom mold 6 is located between the first steel beam 31 and the second steel beam 32, and the plane where the top of the bottom mold 6 is located is coplanar with the plane where the bottom of the first steel beam 31 is located, thereby facilitating the secondary pouring of the gap between the first steel beam 31 and the second steel beam 32 on site.
[0035] refer to Figure 4 A plurality of threading holes are provided on the bottom mold 6, and a plug 8 is threadedly connected to the bottom mold 6. During the secondary pouring, the corresponding plug 8 is taken out and the threading pipe is inserted into the corresponding threading hole, thereby reserving a channel for threading the floor without destroying the prefabricated floor slab.
[0036] The embodiments of this specific implementation method are all preferred embodiments of the present application, and are not intended to limit the protection scope of the present application. Therefore, all equivalent changes made based on the structure, shape, and principle of the present application should be included in the protection scope of the present application.
Claims
1. A double beam-column connection structure of a steel structure frame, comprising a steel column (1), Features: It also comprises a steel beam group (3) and a beam-column connection module (2); the beam-column connection module (2) comprises an upper connection partition (21), a lower connection partition (22) and a core column (23); the steel beam group (3) comprises a first steel beam (31) and a second steel beam (32); the core column (23) is located between the upper connection partition (21) and the lower connection partition (22); one end of the core column (23) is fixedly connected to the upper connection partition (21), and the other end is fixedly connected to the lower connection partition (22). The ends of the steel column (1) are fixedly connected to the upper connecting partition (21) or the lower connecting partition (22), and the connection point is located on the side of the upper connecting partition (21) or the lower connecting partition (22) away from the core column (23); the ends of the first steel beam (31) and the second steel beam (32) are both fixedly connected to the core column (23), the first steel beam (31) and the second steel beam (32) are arranged in parallel and located on the same horizontal plane, and there is a gap between the first steel beam (31) and the second steel beam (32).
2. A double beam-column connection structure for a steel structure frame according to claim 1, Features: A partition plate (4) is provided between the first steel beam (31) and the second steel beam (32); the partition plate (4) is vertically arranged, one end of the partition plate (4) is fixedly connected to the first steel beam (31), and the other end of the partition plate (4) is fixedly connected to the second steel beam (32); a plurality of partition plates (4) are provided, and adjacent partition plates (4) are arranged at intervals along the length direction of the first steel beam (31).
3. A double beam-column connection structure for a steel structure frame according to claim 1 or 2, Features: A plurality of steel beam groups (3) are provided, and adjacent steel beam groups (3) are arranged at intervals along the circumferential outer wall of the core column (23).
4. A steel structure frame double beam column connection structure according to claim 1, Features: The core column (23) comprises a connecting plate (231), the connecting plate (231) being arranged vertically, one end of the connecting plate (231) being fixedly connected to the outer wall of the core column (23), and the other end being cantilevered, the number of connecting plates (231) being arranged being twice the number of the steel beam group (3), and adjacent connecting plates (231) being arranged at intervals along the circumferential outer wall of the core column (23); the web of the first steel beam (31) and the web of the second steel beam (32) being bolted to the corresponding connecting plates (231).
5. A double beam-column connection structure for a steel structure frame according to claim 4, Features: The upper flange end of the first steel beam (31) is fixed to the edge of the upper connecting partition (21), and the lower flange end of the first steel beam (31) is fixed to the edge of the lower connecting partition (22); the upper flange end of the second steel beam (32) is fixed to the edge of the upper connecting partition (21), and the lower flange end of the second steel beam (32) is fixed to the edge of the lower connecting partition (22).
6. A steel structure frame double beam column connection structure according to claim 5, Features: The top end of the connecting plate (231) is fixed to the inner wall of the upper flange of the first steel beam (31) or the second steel beam (32), and the bottom end of the connecting plate (231) is fixed to the inner wall of the lower flange of the first steel beam (31) or the second steel beam (32).
7. A steel structure frame double beam column connection structure according to claim 1, Features: The upper flange ends and lower flange ends of the first steel beam (31) and the second steel beam (32) are both provided with grooves (5).
8. A steel structure frame double beam column connection structure according to claim 1, Features: The stem (23) is a box-shaped stem (23).
9. A double beam-column connection structure for a steel structure frame according to claim 1, Features: The steel column (1) is an H-shaped steel column, a box column or a circular tube column.