LNG receiving station two-station collaborative interconnection and intercommunication system and use method thereof
By establishing a collaborative interconnection system between LNG receiving stations and using valves and controllers to realize pipeline switching, the problems of equipment unavailability and pressure overcontrol in the existing technology are solved, and the flexibility and safety of the system are improved.
Patent Information
- Application Number
- CN202411051108.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-01
- Publication Date
- 2024-10-18
AI Technical Summary
The process flow of the existing LNG receiving station is linear and has a single pipeline, resulting in the inability to operate normally when the equipment is unavailable. There is a risk of pressure overcontrol and high maintenance difficulty.
Design a collaborative interconnection system between two LNG receiving stations. By connecting the unloading arms, storage tanks, pumps, vaporizers and external pipelines of the two LNG receiving stations, valves and controllers are used to realize flexible switching and diversion of the pipelines. , ensuring system reliability and pressure stability.
It improves the operational scheduling flexibility and reliability of the LNG receiving station, reduces maintenance risks, provides the possibility of long-term shutdown for maintenance, and improves safety and system reliability.
Smart Images

Figure CN118793942A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to an LNG receiving station, and in particular to a two-station collaborative interconnection system of an LNG receiving station and a use method thereof. Background Art
[0002] The main functions of an LNG receiving station are divided into three parts: receiving, storage and export. Figure 1 As shown, the process flow of an existing LNG receiving station includes: the LNG ship is connected to the loading and unloading arm 100, and the LNG cargo is transported to the LNG storage tank 200 for storage through the unloading pipeline. The LNG storage tank 200 equipped with the reverse loading pump 201 can fill the ship with LNG. At the same time, the LNG storage tank 200 can also output LNG through the low-pressure pump 202 in the tank. The output LNG is pressurized by the high-pressure pump 300 and heat-exchanged by the vaporizer 400 to become gaseous before being continuously output. Due to the physical properties of LNG, there is boil-off gas (BOG) in the LNG storage tank 200. Improper handling of BOG will cause the pressure in the LNG storage tank 200 to continue to increase, and there is a risk of overpressure. Currently, the LNG receiving station collects the BOG generated by the LNG storage tank 200 and then transports it to the BOG compressor. After being pressurized by the BOG compressor, it enters the recondenser and mixes with the LNG pumped out of the LNG storage tank 200 to reliquefy the BOG into LNG. After that, the LNG is pressurized by the high-pressure pump 300 and heat-exchanged by the vaporizer 400 to become gaseous and then continues to be transported out.
[0003] As can be seen from the above, in an LNG receiving station, the entire process from receiving, storage to external transmission is linear. Although there are multiple groups of equipment such as loading and unloading arms 100, LNG storage tanks 200, low-pressure pumps 202, high-pressure pumps 300, and gasifiers 400 that work in rotation, the main process pipelines are all single. If the main process pipeline is unavailable for some reason, the receiving station will not be able to operate normally. Not only will it not be able to export natural gas, but due to the physical properties of LNG, there is a risk of pressure exceeding the control range. On the other hand, unless production is completely stopped, the main process pipelines and their ancillary equipment and instruments cannot be repaired, which greatly increases the difficulty of maintenance and operation risks. Summary of the invention
[0004] In view of the above-mentioned defects, the object of the present invention is to provide a two-station collaborative interconnection system for an LNG receiving station, so as to make the operation and scheduling of the LNG receiving station more flexible.
[0005] The present invention provides a two-station collaborative interconnection system for LNG receiving stations, including a first LNG receiving station and a second LNG receiving station, each LNG receiving station includes a discharge arm, a discharge pipeline, an LNG storage tank, an output pipeline, a high-pressure pump, a gasifier and an external transmission pipeline that are connected in sequence, the discharge pipeline is provided with a discharge pipeline valve, the LNG storage tank is provided with a reverse transport ship loading pump and a low-pressure pump, the reverse transport ship loading pump is connected to the discharge pipeline through the reverse transport ship loading pipeline, and the reverse transport ship loading pipeline is provided with a reverse transport ship loading pipeline valve; the output pipeline is used to connect the low-pressure pump and the high-pressure pump; the LNG storage tank is also connected to a BOG compressor and a recondenser in sequence through a BOG processing pipeline; and further includes: a first connecting pipeline, used to connect the discharge arms of the two LNG receiving stations, on which a first valve and a second valve are respectively provided; a second connecting pipeline, used to connect the two LN The output pipeline of the G receiving station is provided with a third valve and a fourth valve respectively; the third connecting pipeline is used to connect the first connecting pipeline and the second connecting pipeline, one end of which is arranged between the first valve and the second valve, and the other end is arranged between the third valve and the fourth valve; the fourth connecting pipeline is used to connect the BOG processing pipelines of the two LNG receiving stations, and a fifth valve is arranged thereon; the fifth connecting pipeline is used to connect the external transmission pipelines of the two LNG receiving stations, and a sixth valve is arranged thereon; the sixth connecting pipeline is used to connect the fourth connecting pipeline and the external transmission pipeline of the first LNG receiving station, and a seventh valve is arranged thereon; the seventh connecting pipeline is used to connect the fourth connecting pipeline and the external transmission pipeline of the second LNG receiving station, and an eighth valve is arranged thereon; the ends of the sixth connecting pipeline and the seventh connecting pipeline are respectively arranged on both sides of the fifth valve.
[0006] Preferably, each LNG receiving station further comprises a dock for berthing LNG ships, and the unloading arm is used to connect with the LNG ships.
[0007] Preferably, the external transmission pipeline is used to be connected to a downstream pipeline network.
[0008] Preferably, the unloading pipeline valve, the reverse loading pipeline valve, the first valve, the second valve, the third valve, the fourth valve, the fifth valve, the sixth valve, the seventh valve and the eighth valve are all cut-off valves.
[0009] Preferably, it also includes a controller, which is signal-connected to the unloading pipeline valve, the reverse loading pipeline valve, the first valve, the second valve, the third valve, the fourth valve, the fifth valve, the sixth valve, the seventh valve, and the eighth valve, respectively.
[0010] The present invention also provides a method for using the aforementioned LNG receiving station two-station collaborative interconnection system, comprising the following steps:
[0011] When it is necessary to unload the LNG ship docked at the second LNG receiving station to the LNG storage tank of the first LNG receiving station, the first valve, the second valve, and the unloading pipeline valve of the first LNG receiving station are opened, and other valves are closed;
[0012] When the LNG storage tank of the second LNG receiving station needs to load the LNG ship docked at the first LNG receiving station, the first valve, the second valve, and the reverse loading pipeline valve of the second LNG receiving station are opened, and other valves are closed;
[0013] When it is necessary to transfer the cargo in the LNG ship docked at the second LNG receiving station to the LNG ship docked at the first LNG receiving station, the first valve and the second valve are opened, and the other valves are closed;
[0014] When it is necessary to export natural gas from the second LNG receiving station to the export pipeline of the first LNG receiving station, the sixth valve is opened and the other valves are closed;
[0015] When the second LNG receiving station needs to provide LNG to realize the cold preservation cycle of the two stations, the unloading pipeline valve of the first LNG receiving station, the unloading pipeline valve of the second LNG receiving station, the first valve, the second valve and the fourth valve are opened, and the other valves are closed;
[0016] When the second LNG receiving station is required to maintain the internal pressure of the LNG storage tank stable, the fifth valve and the seventh valve are opened and the other valves are closed.
[0017] The benefit of the present invention is that by setting up a collaborative interconnection system between the two stations, the reliability of the two LNG receiving stations can be greatly improved, and the independent docks and main process pipelines can be connected. Through this system, the operation and scheduling of the two LNG receiving stations are more flexible, the solutions for special working conditions are more substantial and reliable, and the safety is greatly improved. At the same time, it also provides the possibility of long-term shutdown and maintenance for the two LNG receiving stations. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] Figure 1 It is a schematic diagram of the structure of an existing LNG receiving station;
[0019] Figure 2 It is a structural schematic diagram of the collaborative interconnection system of two LNG receiving stations of the present invention;
[0020] Figure 3 It is a schematic diagram of an LNG ship docked at the second LNG receiving terminal unloading to an LNG storage tank at the first LNG receiving terminal;
[0021] Figure 4This is a schematic diagram of loading an LNG ship docked at the first LNG receiving station by the LNG storage tanks of the second LNG receiving station;
[0022] Figure 5 It is a schematic diagram of an LNG ship docked at the second LNG receiving terminal transferring cargo to an LNG ship docked at the first LNG receiving terminal;
[0023] Figure 6 This is a schematic diagram of the external transmission pipeline from the second LNG receiving station to the first LNG receiving station;
[0024] Figure 7 This is a schematic diagram of the two-station cold storage cycle being realized by the second LNG receiving station providing LNG;
[0025] Figure 8 This is a schematic diagram showing that the second LNG receiving station is responsible for maintaining the internal pressure of the LNG storage tank stable.
[0026] Component number description:
[0027] 11. First unloading pipeline
[0028] 111 First discharge pipeline valve
[0029] 112 First reverse transport loading pipeline valve
[0030] 12 Second unloading pipeline
[0031] 121 Second unloading pipeline valve
[0032] 122 Second reverse transport loading pipeline valve
[0033] 21 First LNG Storage Tank
[0034] 211 First reverse transfer loading pump
[0035] 212 First low pressure pump
[0036] 22 Second LNG Storage Tank
[0037] 221 Second reverse transport loading pump
[0038] 222 Second low pressure pump
[0039] 31 First high pressure pump
[0040] 32 Second high pressure pump
[0041] 41 First gasifier
[0042] 42 Second gasifier
[0043] 51 The first export pipeline
[0044] 52 Second export pipeline
[0045] 61 First connecting pipeline
[0046] 611 First Valve
[0047] 612 Second Valve
[0048] 62 Second connecting pipeline
[0049] 621 Third Valve
[0050] 622 Fourth Valve
[0051] 63 Third connecting pipeline
[0052] 64 Fourth connecting pipeline
[0053] 641 Fifth Valve
[0054] 65 Fifth connecting pipeline
[0055] 651 The Sixth Valve
[0056] 66 Sixth connecting pipeline
[0057] 661 Seventh Valve
[0058] 67 Seventh connecting pipeline
[0059] 671 The Eighth Valve
[0060] 71 First discharge arm
[0061] 72 Second unloading arm
[0062] 81 First BOG compressor
[0063] 82 Second BOG compressor
[0064] 91 First recondenser
[0065] 92 Second recondenser
[0066] 100 Discharge arm
[0067] 200 LNG storage tanks
[0068] 201 Backflow Ship Loading Pump
[0069] 202 Low pressure pump
[0070] 300 High pressure pump
[0071] 400 Vaporizer DETAILED DESCRIPTION
[0072] The specific embodiments of the present invention are further described in detail below in conjunction with the accompanying drawings. These embodiments are only used to illustrate the present invention, but not to limit the present invention.
[0073] In the description of the present invention, it should be noted that the orientation or positional relationship indicated by the terms "inside", "outside", etc. is based on the orientation or positional relationship shown in the drawings, and is only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", "third", "fourth", "fifth", "sixth", "seventh", and "eighth" are only used for descriptive purposes and cannot be understood as indicating or implying relative importance.
[0074] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a direct connection, or an indirect connection through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0075] Furthermore, in the description of the present invention, unless otherwise specified, “plurality” means two or more.
[0076] like Figure 2 As shown, the present invention provides a two-station collaborative interconnection system for LNG receiving stations, which includes two LNG receiving stations, namely a first LNG receiving station and a second LNG receiving station.
[0077] The first LNG receiving station includes a first unloading arm 71, a first unloading pipeline 11, a first LNG storage tank 21, a first output pipeline, a first high-pressure pump 31, a first vaporizer 41 and a first external transmission pipeline 51 which are connected in sequence. The first LNG receiving station also includes a wharf, and the first unloading arm 71 is used to connect with an LNG ship docked at the first LNG receiving station wharf; a first unloading pipeline valve 111 is provided on the first unloading pipeline 11; a first reverse transfer and loading pump 211 and a first low-pressure pump 212 are provided in the first LNG storage tank 21, and the first reverse transfer and loading pump 211 is connected to the first unloading pipeline 11 through the first reverse transfer and loading pipeline, and a first reverse transfer and loading pipeline valve 112 is provided on the first reverse transfer and loading pipeline; the first output pipeline is used to connect the first low-pressure pump 212 and the first high-pressure pump 31. The first LNG storage tank 21 is also connected to the first BOG compressor 81 and the first recondenser 91 in sequence through the first BOG processing pipeline.
[0078] The second LNG receiving station includes a second unloading arm 72, a second unloading pipeline 12, a second LNG storage tank 22, a second output pipeline, a second high-pressure pump 32, a second vaporizer 42, and a second external transmission pipeline 52, which are connected in sequence. The second LNG receiving station also includes a wharf, and the second unloading arm 72 is used to connect with the LNG ship docked at the second LNG receiving station wharf; a second unloading pipeline valve 121 is provided on the second unloading pipeline 12; a second reverse transfer and loading pump 221 and a second low-pressure pump 222 are provided in the second LNG storage tank 22, and the second reverse transfer and loading pump 221 is connected to the second unloading pipeline 12 through the second reverse transfer and loading pipeline, and a second reverse transfer and loading pipeline valve 122 is provided on the second reverse transfer and loading pipeline; the second output pipeline is used to connect the second low-pressure pump 222 and the second high-pressure pump 32. The second LNG storage tank 22 is also connected to the second BOG compressor 82 and the second recondenser 92 in sequence through the second BOG processing pipeline.
[0079] The LNG receiving station two-station cooperative interconnection system provided by the present invention also includes a first connecting pipeline 61, a second connecting pipeline 62, a third connecting pipeline 63, a fourth connecting pipeline 64, a fifth connecting pipeline 65, a sixth connecting pipeline 66 and a seventh connecting pipeline 67. Among them, the first connecting pipeline 61 is used to connect the first unloading arm 71 and the second unloading arm 72, and the first connecting pipeline 61 is respectively provided with a first valve 611 close to the first LNG receiving station and a second valve 612 close to the second LNG receiving station; the second connecting pipeline 62 is used to connect the first output pipeline and the second output pipeline, and the second connecting pipeline 62 is respectively provided with a third valve 621 close to the first LNG receiving station and a fourth valve 622 close to the second LNG receiving station; the third connecting pipeline 63 is used to connect the first connecting pipeline 61 and the second connecting pipeline 62, one end of which is arranged between the first valve 611 and the second valve 612, and the other end is arranged between the third valve 621 and the fourth valve 622; the fourth connecting pipeline 64 is used to connect the first BOG processing pipeline and the second BOG processing pipeline, and the fourth connecting pipeline 64 is provided with a fifth valve 641; the fifth connecting pipeline 65 is used to connect the first external transmission pipeline 51 and the second external transmission pipeline 52, and the fifth connecting pipeline 65 is provided with a sixth valve 651; the sixth connecting pipeline 66 is used to connect the fourth connecting pipeline 64 and the first external transmission pipeline 51, and the sixth connecting pipeline 66 is provided with a seventh valve 661; the seventh connecting pipeline 67 is used to connect the fourth connecting pipeline 64 and the second external transmission pipeline 52, and the seventh connecting pipeline 67 is provided with an eighth valve 671. The ends of the sixth connecting pipeline 66 and the seventh connecting pipeline 67 are respectively arranged on both sides of the fifth valve 641. Specifically, the connecting end of the sixth connecting pipeline 66 and the fourth connecting pipeline 64 is arranged on the side of the fifth valve 641 close to the first LNG receiving station, and the connecting end of the seventh connecting pipeline 67 and the fourth connecting pipeline 64 is arranged on the side of the fifth valve 641 close to the second LNG receiving station.
[0080] The first connecting pipeline 61, the second connecting pipeline 62, the third connecting pipeline 63, the first unloading pipeline 11, the second unloading pipeline 12, the first reverse transport loading pipeline, the second reverse transport loading pipeline, the first output pipeline, and the second output pipeline are all liquefied natural gas (LNG) pipelines. The fourth connecting pipeline 64, the sixth connecting pipeline 66, the seventh connecting pipeline 67, the first BOG processing pipeline and the second BOG processing pipeline are all boil-off gas (BOG) pipelines. The fifth connecting pipeline 65, the first external transmission pipeline 51 and the second external transmission pipeline 52 are all natural gas (NG) pipelines, wherein the first external transmission pipeline 51 and the second external transmission pipeline 52 are used to connect with the downstream pipeline network to output natural gas to various cities and residential areas, providing residents with gas for daily use and providing energy for industries, commerce and other fields.
[0081] In a specific embodiment of the present invention, the first discharge pipeline valve 111, the first reverse transport loading pipeline valve 112, the second discharge pipeline valve 121, the second reverse transport loading pipeline valve 122, the first valve 611, the second valve 612, the third valve 621, the fourth valve 622, the fifth valve 641, the sixth valve 651, the seventh valve 661 and the eighth valve 671 are all cut-off valves. Those skilled in the art can select a manual cut-off valve or an automatic cut-off valve as needed. The former requires manual control, while the latter can be controlled by electrical, pneumatic or hydraulic means, and has a higher degree of automation. Furthermore, the system of the present invention further comprises a controller, which is respectively connected to the first discharge pipeline valve 111, the first reverse transport loading pipeline valve 112, the second discharge pipeline valve 121, the second reverse transport loading pipeline valve 122, the first valve 611, the second valve 612, the third valve 621, the fourth valve 622, the fifth valve 641, the sixth valve 651, the seventh valve 661 and the eighth valve 671. The controller preferably adopts a PLC controller, which can control the opening and closing state of each valve according to different working conditions. The above-mentioned discharge arm, LNG storage tank, reverse transport loading pump, low-pressure pump, high-pressure pump, vaporizer, BOG compressor and recondenser are all prior art and will not be described in detail here.
[0082] The present invention also provides a method for using the aforementioned LNG receiving station two-station collaborative interconnection system, the method comprising the following steps:
[0083] In the initial state, all valves in the system are closed.
[0084] like Figure 3As shown, when it is necessary to unload the LNG ship docked at the second LNG receiving station to the first LNG storage tank 21, the first valve 611, the second valve 612 and the first unloading pipeline valve 111 are opened, and other valves are kept closed, and the LNG is unloaded to the first LNG storage tank 21 through the second unloading arm 72, the first connecting pipeline 61 and the first unloading pipeline 11 by the ship pump of the LNG ship. On the contrary, when it is necessary to unload the LNG ship docked at the first LNG receiving station to the second LNG storage tank 22, the first valve 611, the second valve 612 and the second unloading pipeline valve 121 are opened, and other valves are kept closed, and the LNG is unloaded to the second LNG storage tank 22 through the first unloading arm 71, the first connecting pipeline 61 and the second unloading pipeline 12 by the ship pump of the LNG ship. In this way, the working conditions that any receiving station terminal is unavailable or the remaining space of the LNG storage tank of any receiving station is insufficient can be solved.
[0085] like Figure 4 As shown, when the second LNG storage tank 22 is needed to load the LNG ship docked at the first LNG receiving station, the first valve 611, the second valve 612 and the second reverse loading pipeline valve 122 are opened, and other valves are kept closed, and the LNG is reversed to the LNG ship through the second reverse loading pipeline, the second unloading pipeline 12, the first connecting pipeline 61, and the first unloading arm 71 through the second reverse loading pump 221. On the contrary, when the first LNG storage tank 21 is needed to load the LNG ship docked at the second LNG receiving station, the first valve 611, the second valve 612 and the first reverse loading pipeline valve 112 are opened, and other valves are kept closed, and the LNG is reversed to the LNG ship through the first reverse loading pipeline, the first unloading pipeline 11, the first connecting pipeline 61, and the second unloading arm 72 through the first reverse loading pump 211. This can solve the working conditions where any receiving station terminal is unavailable or the remaining space of the LNG storage tank of any receiving station is insufficient.
[0086] like Figure 5As shown, when it is necessary to transfer the cargo in the LNG ship docked at the second LNG receiving station terminal to the LNG ship docked at the first LNG receiving station terminal, the first valve 611 and the second valve 612 are opened, and the other valves are kept closed. The LNG is transported to the LNG ship docked at the first LNG receiving station terminal through the second unloading arm 72, the first connecting pipeline 61, and the first unloading arm 71 in sequence through the ship pump of the LNG ship docked at the second LNG receiving station terminal. Conversely, when it is necessary to transfer the cargo in the LNG ship docked at the first LNG receiving station terminal to the LNG ship docked at the second LNG receiving station terminal, the first valve 611 and the second valve 612 are opened, and the other valves are kept closed. The LNG is transported to the LNG ship docked at the second LNG receiving station terminal through the first unloading arm 71, the first connecting pipeline 61, and the second unloading arm 72 in sequence through the ship pump of the LNG ship docked at the first LNG receiving station terminal. This can realize the rapid transfer of cargo between LNG ships, such as the transfer from a large ocean LNG ship to a small inland LNG ship, both of which can be berthed at the first LNG receiving station and the second LNG receiving station at the same time. Compared with the traditional method of transferring cargo from a large ship to a small ship after berthing and unloading, the system of the present invention can save time and improve work efficiency by directly transferring cargo from a large ship to a small ship.
[0087] like Figure 6 As shown, there are no LNG ships docked at the two LNG receiving stations, and the first LNG receiving station stops exporting natural gas. When the second LNG receiving station needs to export natural gas to the first export pipeline 51, the sixth valve 651 is opened, and other valves are kept closed. The second low-pressure pump 222 outputs the LNG in the second LNG storage tank 22, and the LNG is pressurized by the second high-pressure pump 32 and heat-exchanged with the second vaporizer 42 to become gaseous NG, and then it is exported through the fifth connecting pipeline 65 and the first export pipeline 51. During this process, the second export pipeline 52 is closed. On the contrary, the first low-pressure pump 212 outputs the LNG in the first LNG storage tank 21, and the LNG is pressurized by the first high-pressure pump 31 and heat-exchanged with the first vaporizer 41 to become gaseous NG, and then it is exported through the fifth connecting pipeline 65 and the second export pipeline 52. During this process, the first export pipeline 51 is closed, thereby completing the process of exporting natural gas from the first LNG receiving station to the second export pipeline 52. The above method can solve the working conditions where the vaporizer / export pipeline of any receiving station is unavailable or the cargo in the LNG storage tank of any receiving station is insufficient.
[0088] Due to the special physical properties of LNG, a low-pressure pump in the LNG storage tank is generally used in LNG receiving stations to circulate a small amount of LNG in the main process pipelines in the station to keep it cold, prevent stress fatigue in the pipelines caused by alternating hot and cold conditions, and help unused equipment or pipelines stay cold to ensure that they can work quickly when they are needed. Figure 7 As shown, there are no LNG ships docked at the two LNG receiving station terminals, the first vaporizer 41 does not output NG, and the second LNG receiving station operates normally. When the second LNG receiving station needs to provide LNG to realize the cold preservation cycle of the two stations, the first unloading pipeline valve 111, the second unloading pipeline valve 121, the first valve 611, the second valve 612 and the fourth valve 622 are opened, and the other valves are kept closed. The second low-pressure pump 222 outputs the LNG in the second LNG storage tank 22, and the LNG flows in the second output pipeline, the second connecting pipeline 62, the third connecting pipeline 63, the first connecting pipeline 61, the first unloading pipeline 11, and the second unloading pipeline 12, thereby realizing the cold preservation function of the main pipelines of the two LNG receiving stations. On the contrary, the second vaporizer 42 does not output NG, the first LNG receiving station operates normally, and the first LNG receiving station needs to provide LNG to realize the cold preservation cycle of the two stations, the first discharge pipeline valve 111, the second discharge pipeline valve 121, the first valve 611, the second valve 612 and the third valve 621 are opened, and other valves are kept closed, and the first low-pressure pump 212 outputs the LNG in the first LNG storage tank 21, and the LNG flows in the first output pipeline, the second connecting pipeline 62, the third connecting pipeline 63, the first connecting pipeline 61, the first discharge pipeline 11, and the second discharge pipeline 12. The above method can solve the working condition of partial or complete shutdown of any receiving station.
[0089] Due to the physical properties of LNG, there is BOG in the LNG storage tank, which needs to be processed by BOG compressor and recondenser to maintain the pressure inside the LNG storage tank stable. Figure 8As shown, when there are no LNG ships docked at the two LNG receiving stations, the first vaporizer 41 does not output NG, and the second LNG receiving station operates normally, and the second LNG receiving station is required to maintain the internal pressure of the LNG storage tank stable, the fifth valve 641 and the seventh valve 661 are opened, and other valves are kept closed, and the BOG freely flowing in the BOG pipelines such as the fourth connecting pipeline 64, the sixth connecting pipeline 66, the first BOG processing pipeline and the second BOG processing pipeline are collected to the low-pressure area formed by the second BOG compressor 82, and then recovered through the second recondenser 92. At the same time, the NG in the first external transmission pipeline 51 can also be recovered to the BOG pipeline to maintain the pressure stability of the LNG storage tanks of the two stations. On the contrary, when the second vaporizer 42 does not output NG and the first LNG receiving station operates normally, and the first LNG receiving station is required to maintain the internal pressure of the LNG storage tank stable, the fifth valve 641 and the eighth valve 671 are opened, and other valves are kept closed, and the BOG freely flowing in the BOG pipelines such as the fourth connecting pipeline 64, the seventh connecting pipeline 67, the first BOG processing pipeline and the second BOG processing pipeline are collected to the low-pressure area formed by the first BOG compressor 81, and then recovered through the first recondenser 91. At the same time, the NG in the second external transmission pipeline 52 can also be recovered to the BOG pipeline to maintain the pressure stability of the LNG storage tanks of the two stations. The above method can solve the working conditions of partial or complete shutdown of any receiving station, or maintain the pressure stability of the LNG storage tanks of the two receiving stations in an emergency.
[0090] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and substitutions can be made without departing from the technical principles of the present invention. These improvements and substitutions should also be regarded as the scope of protection of the present invention.
Claims
1. The collaborative interconnection system of two LNG receiving stations is characterized by: It includes a first LNG receiving station and a second LNG receiving station, each LNG receiving station includes a discharge arm, a discharge pipeline, an LNG storage tank, an output pipeline, a high-pressure pump, a gasifier and an external transmission pipeline which are connected in sequence, the discharge pipeline is provided with a discharge pipeline valve, the LNG storage tank is provided with a reverse transfer ship loading pump and a low-pressure pump, the reverse transfer ship loading pump is connected with the discharge pipeline through the reverse transfer ship loading pipeline, and the reverse transfer ship loading pipeline is provided with a reverse transfer ship loading pipeline valve; the output pipeline is used to connect the low-pressure pump and the high-pressure pump; the LNG storage tank is also connected with the BOG compressor and the recondenser in sequence through the BOG processing pipeline; it also includes: A first connecting pipeline is used to connect the unloading arms of the two LNG receiving stations, and is provided with a first valve and a second valve respectively; A second connecting pipeline is used to connect the output pipelines of two LNG receiving stations, and a third valve and a fourth valve are respectively provided on the second connecting pipeline; a third connecting pipeline, used to connect the first connecting pipeline with the second connecting pipeline, one end of which is arranged between the first valve and the second valve, and the other end of which is arranged between the third valve and the fourth valve; a fourth connecting pipeline, used to connect the BOG processing pipelines of the two LNG receiving stations, and provided with a fifth valve; A fifth connecting pipeline is used to connect the external transmission pipelines of the two LNG receiving stations, and a sixth valve is provided on the fifth connecting pipeline; a sixth connecting pipeline, used to connect the fourth connecting pipeline and the external transmission pipeline of the first LNG receiving station, and provided with a seventh valve; a seventh connecting pipeline, used to connect the fourth connecting pipeline and the external transmission pipeline of the second LNG receiving station, and provided with an eighth valve; Ends of the sixth communicating line and the seventh communicating line are respectively arranged on both sides of the fifth valve.
2. The LNG receiving station two-station collaborative interconnection system according to claim 1 is characterized in that: Each LNG receiving station further includes a dock for berthing LNG ships, and the unloading arm is used to connect with the LNG ships.
3. The LNG receiving station two-station collaborative interconnection system according to claim 1 is characterized in that: The external transmission pipeline is used to connect with the downstream pipeline network.
4. The LNG receiving station two-station collaborative interconnection system according to claim 1 is characterized in that: The unloading pipeline valve, the reverse loading pipeline valve, the first valve, the second valve, the third valve, the fourth valve, the fifth valve, the sixth valve, the seventh valve and the eighth valve are all cut-off valves.
5. The LNG receiving station two-station collaborative interconnection system according to claim 1 is characterized in that: It also includes a controller, which is respectively connected to the unloading pipeline valve, the reverse loading pipeline valve, the first valve, the second valve, the third valve, the fourth valve, the fifth valve, the sixth valve, the seventh valve, and the eighth valve by signal.
6. A method for using the LNG receiving station two-station collaborative interconnection system according to any one of claims 1 to 5, characterized in that: The following steps are involved: When it is necessary to unload the LNG ship docked at the second LNG receiving station to the LNG storage tank of the first LNG receiving station, the first valve, the second valve, and the unloading pipeline valve of the first LNG receiving station are opened, and other valves are closed; When the LNG storage tank of the second LNG receiving station needs to load the LNG ship docked at the first LNG receiving station, the first valve, the second valve, and the reverse loading pipeline valve of the second LNG receiving station are opened, and other valves are closed; When it is necessary to transfer the cargo in the LNG ship docked at the second LNG receiving station to the LNG ship docked at the first LNG receiving station, the first valve and the second valve are opened, and the other valves are closed; When it is necessary to export natural gas from the second LNG receiving station to the export pipeline of the first LNG receiving station, the sixth valve is opened and the other valves are closed; When the second LNG receiving station needs to provide LNG to realize the cold preservation cycle of the two stations, the unloading pipeline valve of the first LNG receiving station, the unloading pipeline valve of the second LNG receiving station, the first valve, the second valve and the fourth valve are opened, and the other valves are closed; When the second LNG receiving station is required to maintain the internal pressure of the LNG storage tank stable, the fifth valve and the seventh valve are opened and the other valves are closed.
Citation Information
Patent Citations
liquefied natural gas receiving terminal
CN102287614A
Ground process treatment system and method for different treatment scales of multi-set station yard
CN106837292A
Ship-to-ship transfer system based on shore-based liquefied natural gas receiving station
CN106907570A
Wharf platform pipeline cold insulation system and method of offshore LNG receiving station
CN111779967A
System for realizing simultaneous ship loading and unloading of LNG receiving station
CN211649813U