Rapid intelligent design method for construction road in complex terrain

By using the A* algorithm and three-dimensional cost function in complex terrain, combined with the consideration of distance, slope and invalid values, a fast and safe construction road path in complex terrain is designed, which solves the problem of path design efficiency and safety in the existing technology. The problem of sexual balance.

CN118797778AActive Publication Date: 2024-10-18CHINA CONSTR RAILWAY INVESTMENT CONSTR DEV CO LTD +1
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
CN202410923193.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-10
Publication Date
2024-10-18
Estimated Expiration
2044-07-10

AI Technical Summary

Technical Problem

Designing construction road paths in complex terrain requires both speed and safety. It is difficult to find an effective solution with existing technology, especially when multiple constraints need to be considered.

Method used

Adopt a rapid and intelligent design method for complex terrain construction access roads. By logging into the construction access road design platform, input the starting point and target point coordinate information and DEM data, use the A* algorithm and three-dimensional cost function to calculate the optimal path, taking into account distance, slope and invalidity Value, select the optimal node through assigned value or three-dimensional cost function to ensure the smoothness and safety of the path.

Benefits of technology

It can quickly find the optimal path in complex terrain, balance the operating efficiency of the algorithm and the accuracy of path planning, ensure the safety and feasibility of the path, and is suitable for various terrain conditions.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118797778A_ABST
    Figure CN118797778A_ABST
Patent Text Reader

Abstract

The invention provides a rapid and intelligent design method for a construction road in a complex terrain. The method comprises the following steps: step 1, logging in a construction road design platform; step 2, after logging in a construction road design platform, inputting coordinate information of a starting point and a target point and DEM data into a construction road optimal path system to obtain an optimal path; and 3, displaying the optimal path. According to the method, the evaluation method of the three-dimensional cost function is adopted, fine regulation and control are achieved by introducing the slope ratio factor and using the exponential function and the amplification coefficient k of the exponential function, path planning better meets the requirements of actual topographic conditions, and a new solution is provided for balancing the operation efficiency and the result accuracy of the algorithm.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of road construction, and in particular to a rapid intelligent design method for construction access roads on complex terrains. Background Art

[0002] A road is a three-dimensional entity. It is a linear structure composed of roadbed, pavement, bridges, culverts, tunnels and facilities along the road. It must be coordinated with the terrain, landforms, environment and landscape. The construction road path planning is quite complicated because it involves many restrictions and many factors need to be considered comprehensively. For example, roads in valleys should avoid steep slopes, roads should avoid swamps, roads should reasonably cross rivers, pass through small villages, connect residential areas, and calculate the shortest route to large cities. Reasonable construction road planning is a prerequisite for various infrastructure projects. How to design the construction road path and find an optimal path that is both fast and safe in complex terrain, which can reach the destination efficiently and avoid steep or difficult terrain as much as possible. At present, there is no solution in the existing technology. Summary of the invention

[0003] The present invention aims to at least solve the technical problems existing in the prior art, and in particular innovatively proposes a rapid intelligent design method for construction access roads in complex terrain.

[0004] In order to achieve the above-mentioned object of the present invention, the present invention provides a rapid intelligent design method for construction access roads in complex terrain, comprising the following steps:

[0005] The first step is to log in to the construction access road design platform;

[0006] The second step is to log in to the construction access road design platform and input the coordinate information of the starting point and the target point as well as the DEM data into the construction access road optimal path system to obtain the optimal path;

[0007] The third step is to display the optimal path.

[0008] In a preferred embodiment of the present invention, the second step includes the following steps:

[0009] S1, preprocessing the DEM data to obtain the input starting point and target point coordinate information;

[0010] S2, put the starting point into the open list, traverse the nodes adjacent to the starting point, and put the nodes adjacent to the starting point into the open list;

[0011] S3, among the nodes adjacent to the starting point, calculate the cost required for the adjacent nodes and select the optimal node;

[0012] S4, determine whether the optimal node is the target node, if so, output the optimal path, otherwise execute the next step;

[0013] S5, expand the child nodes of the current optimal node, and determine whether the child nodes of the current optimal node exist in the open list or the closed list; if the child node does not exist in the open list or the closed list, put the child node in the open list, and then select the next optimal node; if the child node already exists in the closed list, skip the node; if the child node already exists in the open list, it means that the node has been calculated as a neighboring node of other nodes, and recalculate the cost value as a child node, compare the new and old cost values ​​of the node, if the new cost value is smaller, take the optimal node as the parent node of the child node; if the old cost value is smaller, keep the old parent node;

[0014] S6, loop the above operations until the end is reached or the open list is empty.

[0015] In a preferred embodiment of the present invention, in step S3, an evaluation function is used to select the optimal node from the adjacent nodes, and the evaluation function is in the form of a scoring value or a three-dimensional cost function.

[0016] In a preferred embodiment of the present invention, in step S3, an evaluation function is constructed in the form of assigned scores, distance determination, slope determination and invalid value determination are considered, the points to be determined are assigned values ​​according to the rules, and the node with the largest total assigned values ​​is selected as the optimal node.

[0017] In a preferred embodiment of the present invention, in step S3, an evaluation function is constructed in the form of a three-dimensional cost function, wherein the slope function expression is e k*slope , calculate the evaluation values ​​of different points to be determined, and select the node with the smallest evaluation value as the optimal node.

[0018] In a preferred embodiment of the present invention, in step S3, the cost value is the fundamental criterion for determining whether a node is an optimal node, and a three-dimensional distance calculation formula is used. The calculation result of the formula reflects the actual distance between two pixels, and its expression is:

[0019]

[0020] Where:

[0021] X i and X e Represent the X-axis coordinates of the i-node and the e-node respectively;

[0022] Y i and Y e Represents the Y-axis coordinates of the i-node and the e-node respectively

[0023] Z iand Z e Represents the elevation data of i-node and e-node respectively;

[0024] Size indicates the pixel size of the DEM model.

[0025] In a preferred embodiment of the present invention, based on the distance calculation formula, an evaluation function of a scoring value and a three-dimensional cost function is adopted. By scoring the child nodes of the optimal node or directly calculating the three-dimensional cost, the child node with the largest scoring value or the smallest three-dimensional cost is used as the new optimal node.

[0026] In a preferred embodiment of the present invention, the application of the A* algorithm with assigned scores in path planning is used to determine the optimal path by comparing specific attributes between the parent node and different child nodes. The algorithm assigns a score to each possible adjacent child node of the parent node, and the score is based on a comprehensive evaluation of multiple key factors, including:

[0027] The distance from the starting point to the child node (node_g) is compared with the distance from the starting point to the parent node (cur_g);

[0028] if node_g <cur_g;score+=x (2)

[0029] The distance from the child node to the end point (node_d) is compared with the distance from the parent node to the end point (cur_d);

[0030] if node_d <cur_d;score+=y (3)

[0031] Slope determination and invalid point determination between parent nodes and child nodes;

[0032]

[0033] In the above formula, x, y, z, and k should at least satisfy the following constraints:

[0034] k>x+y+z (5)

[0035] in:

[0036] x, y, z, k are the first, second, third, and fourth assignments respectively;

[0037] node_g, cur_g, node_d, cur_d are calculated using formula (1);

[0038] The slope is calculated using formula (4);

[0039] node_h and cur_h refer to the elevation of the child node and parent node respectively;

[0040] α refers to the set slope threshold;

[0041] The elevation values ​​of invalid points are all -9999;

[0042] score+=x is equivalent to score=score+x, which means assigning the value obtained by score+x to score;

[0043] score+=y is equivalent to score=score+y, which means assigning the value obtained by score+y to score;

[0044] score+=z is equivalent to score=score+z, which means assigning the value obtained by score+z to score;

[0045] score-=k is equivalent to score=score-k, which means assigning the value obtained by score-k to score;

[0046] Compare the parent node with the eight surrounding child nodes, and select the node with the largest score as the optimal node.

[0047] In a preferred embodiment of the present invention, the algorithm preferentially selects path points that have a longer distance from the starting point to the current point, a shorter distance from the current point to the end point, and a smaller slope.

[0048] In a preferred embodiment of the present invention, a three-dimensional cost function is used as the evaluation function, which takes into account the three-dimensional spatial distance of the path and takes the slope of the terrain into account, so that the path planning can be closer to the actual terrain conditions. The introduction of the slope is achieved through an exponential function e k*slope To achieve this, slope is the slope between the parent node and the child node, k is the magnification factor, the role of the magnification factor is to adjust the influence of the slope factor in the entire evaluation function, with the increase of k value, the influence of the slope on the evaluation function also increases, the algorithm pays more attention to the smoothness of the path when evaluating different paths, avoids those terrains with large slopes, and ensures the safety and feasibility of the path. The expression of the three-dimensional cost function is:

[0049]

[0050] in:

[0051] X i and X e Represent the X-axis coordinates of the i-node and the e-node respectively;

[0052] Y i and Y e Represent the Y-axis coordinates of the i-node and the e-node respectively;

[0053] Z i and Z e Represents the elevation data of i-node and e-node respectively;

[0054] Size indicates the pixel size of the DEM model;

[0055] Slope is the slope between the parent node and the child node;

[0056] k is the magnification factor;

[0057] e k*slope The base e in represents the natural base;

[0058] The new evaluation function is constructed as follows:

[0059]

[0060] Among them, F(n) represents the new evaluation function;

[0061] node represents a child node;

[0062] cur represents the parent node;

[0063] end means the end point;

[0064] S(,) represents the three-dimensional cost function;

[0065] When the k value increases, the algorithm needs to analyze the slope of each path more carefully, and the algorithm takes longer to process and evaluate the path; the path results obtained by increasing the k value meet the actual line selection requirements, and these paths take the actual conditions of the terrain into consideration.

[0066] In a preferred embodiment of the present invention, the input file of the algorithm is an ASC file converted from a digital elevation model. The scale of the digital elevation model is an important factor affecting the running time of the algorithm. Under the same k value setting, for a large digital elevation model, the algorithm needs to process more data and takes longer to complete the evaluation and selection of the path. In order to balance the operating efficiency of the algorithm and the accuracy of path planning, different k values ​​are designed and adjusted according to digital elevation models of different sizes. For sections with large terrain undulations, a smaller k value is used; for sections with smaller terrain undulations, a larger k value is used. This can ensure that the algorithm can run efficiently and ensure the practicality and reliability of the path planning results.

[0067] In a preferred embodiment of the present invention, in the first step, the mobile phone number of the logging-in user is used to log in to the construction access road design platform. The operation steps of the present invention are simple. It only requires entering the user's mobile phone number and the six-digit SMS code received by the mobile phone number on the login interface of the computer to log in to the construction access road design platform and display the optimal path.

[0068] In a preferred embodiment of the present invention, it is first necessary to enter the user's mobile phone number in the mobile phone number input box on the login interface. After the mobile phone number is entered, click to obtain the SMS code. The system will send the six-digit SMS code to the user's mobile phone through the filled-in mobile phone number; after the user receives the SMS code, the user enters the SMS code into the SMS code input box, and finally clicks to log in to the construction access road design platform.

[0069] In the above steps, the program will encrypt the mobile phone number entered by the user to ensure the security of the mobile phone number entered by the user. The encryption method of the mobile phone number is as follows:

[0070] First, get the serial number of the computer processor, and generate a table with 1 row and U columns according to the number of digits in the serial number and the mobile phone number. The size of U is equal to the sum of the number of digits in the serial number and the number of digits in the mobile phone number.

[0071] The squares in the table are randomly colored. The total number of colored squares is 11, because the number of digits in the mobile phone number is 11, and the number of consecutive colored squares is 2 to 4. This can reduce the continuity of the mobile phone number and prevent cracking. After this operation, a table with 1 row and U columns is obtained;

[0072] After completing the above operations, fill in the colored squares with the mobile phone number from left to right, and fill in the uncolored squares with the serial number from left to right. After completion, take out the characters from the squares from left to right to get the encrypted mobile phone number.

[0073] To sum up, due to the adoption of the above-mentioned technical scheme, the rapid intelligent design method for construction access roads in complex terrain of the present invention adopts an evaluation method of a three-dimensional cost function, and achieves fine control by introducing a slope factor and using an exponential function and its amplification factor k. This not only makes the path planning more in line with the requirements of actual terrain conditions, but also proposes a new solution for how to balance the operating efficiency of the algorithm and the accuracy of the results.

[0074] Additional aspects and advantages of the present invention will be given in part in the following description and in part will be obvious from the following description, or will be learned through practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS

[0075] The above and / or additional aspects and advantages of the present invention will become apparent and easily understood from the description of the embodiments in conjunction with the following drawings, in which:

[0076] Figure 1 It is the flow chart of the A* algorithm of the present invention.

[0077] Figure 2The construction road planning route is obtained by using the A* algorithm with an evaluation function that uses a scoring method as the core.

[0078] Figure 3 The construction road planning route is obtained by using the A* algorithm with a three-dimensional cost function as the core evaluation function, and the k value is 6.

[0079] Figure 4 The construction road planning route is obtained by using the A* algorithm with a three-dimensional cost function as the core evaluation function, and the k value is 7.

[0080] Figure 5 The construction road planning route is obtained by using the A* algorithm with a three-dimensional cost function as the core evaluation function, and the k value is 8.

[0081] Figure 6 It is a flow chart of the steps of the present invention. DETAILED DESCRIPTION

[0082] Embodiments of the present invention are described in detail below, examples of which are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are only used to explain the present invention, and cannot be understood as limiting the present invention.

[0083] The invention discloses a method for rapid intelligent design of construction access roads in complex terrain, comprising the following steps:

[0084] The first step is to log in to the construction access road design platform; in the first step, the mobile phone number of the user is used to log in to the construction access road design platform. The operation steps of the present invention are simple. It only needs to enter the user's mobile phone number and the six-digit SMS code received by the mobile phone number on the login interface of the computer to log in to the construction access road design platform and realize the display of the optimal path.

[0085] In a preferred embodiment of the present invention, it is first necessary to enter the user's mobile phone number in the mobile phone number input box on the login interface. After the mobile phone number is entered, click to obtain the SMS code. The system will send the six-digit SMS code to the user's mobile phone through the filled-in mobile phone number; after the user receives the SMS code, the user enters the SMS code into the SMS code input box, and finally clicks to log in to the construction access road design platform.

[0086] In the above steps, the program will encrypt the mobile phone number entered by the user to ensure the security of the mobile phone number entered by the user. The encryption method of the mobile phone number is as follows:

[0087] First, get the serial number of the computer processor, and generate a table with 1 row and U columns according to the number of digits in the serial number and the mobile phone number. The size of U is equal to the sum of the number of digits in the serial number and the number of digits in the mobile phone number.

[0088] The squares in the table are randomly colored. The total number of colored squares is 11, because the number of digits in the mobile phone number is 11, and the number of consecutive colored squares is 2 to 4. This can reduce the continuity of the mobile phone number and prevent cracking. After this operation, a table with 1 row and U columns is obtained;

[0089] After completing the above operations, fill the mobile phone number in the colored squares from left to right, and fill the serial number in the uncolored squares from left to right. After completion, take out the characters from the squares from left to right to get the encrypted mobile phone number;

[0090] The encrypted mobile phone number is sent to the construction access road design platform, and the construction access road design platform analyzes the encrypted mobile phone number:

[0091] Fill the encrypted mobile phone number into the colored 1 row and U column table from left to right. After completion, take characters from the uncolored squares from left to right to get the serial number. Take characters from the colored squares from left to right to get the mobile phone number.

[0092] After the construction access road design platform obtains the mobile phone number and serial number, it determines whether the obtained mobile phone number exists on the platform:

[0093] If the obtained mobile phone number exists on the platform, six characters are randomly selected from the serial number as a text message code and sent to the mobile phone number; the mobile phone number and the text message code are associated for subsequent verification;

[0094] If the obtained mobile phone number does not exist on the platform, the mobile phone number has not been set on the platform and needs to be set by the administrator.

[0095] Correspondingly, after the user's mobile phone receives the SMS code, the user enters the SMS code into the SMS code input box and finally clicks "Login". The above steps will be executed, but the serial number will be replaced by the SMS code, that is:

[0096] The program will encrypt the mobile phone number entered by the user to ensure the security of the mobile phone number entered by the user. The encryption method for the mobile phone number is as follows:

[0097] First, get the input SMS code, and generate a table with 1 row and V columns according to the number of digits of the SMS code and the mobile phone number. The size of V is equal to the sum of the number of digits of the SMS code and the mobile phone number.

[0098] The squares in the table are randomly colored. The total number of colored squares is 11, because the number of digits in the mobile phone number is 11, and the number of consecutive colored squares is 2 to 4. This can reduce the continuity of the mobile phone number and prevent cracking. After this operation, a table with 1 row and V columns is obtained;

[0099] After completing the above operations, fill the mobile phone number in the colored squares from left to right, and fill the SMS code in the uncolored squares from left to right. After completion, take out the characters from the squares from left to right to get the encrypted mobile phone number;

[0100] The encrypted mobile phone number is sent to the construction access road design platform, and the construction access road design platform analyzes the encrypted mobile phone number:

[0101] Fill the encrypted mobile phone number into the colored 1 row and V column table from left to right. After completion, take characters from the uncolored squares from left to right to get the SMS code. Take characters from the colored squares from left to right to get the mobile phone number.

[0102] After the construction access road design platform obtains the mobile phone number and SMS code, it determines whether the obtained mobile phone number and SMS code are consistent with the associated mobile phone number and SMS code:

[0103] If the obtained mobile phone number and SMS code are consistent with the associated mobile phone number and SMS code, the construction platform can be securely logged in using the mobile phone number; otherwise, it fails.

[0104] The second step is to log in to the construction access road design platform and input the coordinate information of the starting point and the target point as well as the DEM data into the construction access road optimal path system to obtain the optimal path; refer to Figure 6 As shown, to obtain the optimal path, the following steps are included:

[0105] S1, preprocessing the DEM data to obtain the input starting point and target point coordinate information;

[0106] S2, put the starting point into the open list, traverse the nodes adjacent to the starting point, and put the nodes adjacent to the starting point into the open list;

[0107] S3, among the nodes adjacent to the starting point, select the optimal node by calculating the cost required for each node;

[0108] S4, determine whether the optimal node is the target node, if so, output the optimal path, otherwise proceed to the next step;

[0109] S5, expand the child nodes of the current optimal node, and determine whether the child nodes of the current optimal node exist in the open list or the closed list; if the child node does not exist in the open list or the closed list, put the child node in the open list, and then select the next optimal node; if the child node already exists in the closed list, skip the node; if the child node already exists in the open list, it means that the node has been calculated as a neighboring node of other nodes, and recalculate the cost value as a child node, compare the new and old cost values ​​of the node, if the new cost value is smaller, take the optimal node as the parent node of the child node; if the old cost value is smaller, keep the old parent node;

[0110] S6, loop the above operations until the end is reached or the open list is empty.

[0111] Specifically, the A* algorithm process is shown in 1, including the following steps:

[0112] S1, DEM data preprocessing, obtaining the coordinate information of the starting point and the target point;

[0113] S2, first put the starting point into the open list, and traverse the nodes adjacent to the starting point, and put these nodes into the open list as well;

[0114] S3, selecting the best node from the neighboring nodes using an evaluation function using a scoring value or a three-dimensional cost function;

[0115] S4, determine whether bestnode is the target node, if so, output the optimal path, otherwise proceed to the next step;

[0116] S5, expand the child nodes of the current bestnode node, and determine whether the child nodes of the current bestnode node exist in the open list or the closed list; if the child node does not exist in the open list or the closed list, put the child node in the open list, and then select the bestnode; if the child node already exists in the closed list, skip the node; if the child node already exists in the open list, recalculate the F value or score value, compare the new value and the old value of F(n) or score(n), take the smaller F(n) value, and select the child node with F(n)=min{F(n)} or score(n)=max{score(n)} as the next bestnode node;

[0117] S6, loop the above operations until the end is reached or the open list is empty.

[0118] Example 1

[0119] Preprocessing of DEM data: parse the DEM model of the plot corresponding to the road line selection operation and convert it into the ASC file required by the algorithm. The ASC file contains the file format description, number of rows and columns, map origin coordinates, pixel size, missing value identification and raster elevation data. The algorithm completes the line selection work by reading these data. The algorithm will also generate an ASC file. By opening the data format file in software such as ArcGis, the operation of generating path visualization can be realized.

[0120] The algorithm also needs to obtain the starting and ending points of the road to be selected in advance. The starting and ending points of the line selection cases used in the present invention are all specified by experts, and then the digital coordinates are obtained through ArcGis software. The digital coordinates can directly become the input of the algorithm.

[0121] The search algorithm is implemented as follows:

[0122] Initialize the open list and the closed list, put the starting point A into the open list, and traverse the nodes adjacent to the starting point, put these nodes into the open list, then set point A as the parent node, the adjacent nodes as child nodes, and finally put the starting point A into the closed list.

[0123] Then the optimal node is selected using two methods:

[0124] Evaluation function using scoring

[0125] Table 1 shows a set of elevation data and starting and ending elevations of parent nodes and child nodes;

[0126] Table 1 Node elevation data

[0127] Starting point elevation End elevation Parent node elevation Node1 Node2 Node3 Node4 Node5 Node6 Node7 Node8 120 140 101.27 101.26 101.1 101.75 100.77 101.74 100.7 101.86 100.8

[0128] Table 2 shows a set of two-dimensional coordinate data of the parent node and child node and the two-dimensional coordinate data of the starting and ending points;

[0129] Table 2 Node coordinate data

[0130]

[0131]

[0132] Based on the above data, we can calculate the values ​​of cur_d, cur_g, node_d, node_g, slope, etc. We choose to set the slope and invalid value judgment as the decisive conditions, assign k to 100, assign z to 20, set the distance judgment as the influencing condition, assign x and y to 10, set the slope threshold α to 0.09, and after calculation and comparison, the scores of each sub-node are shown in Table 3.

[0133] Table 3 Score values ​​of each child node

[0134] Node1 Node2 Node3 Node4 Node5 Node6 Node7 Node8 Score 30 10 0 10 20 10 10 0

[0135] So Node1 is selected as the optimal node.

[0136] Evaluation function using three-dimensional cost function

[0137] Using the above data, because the selected road section is relatively flat, a larger k value should be assigned. In this example, k is 6, 7, and 8 respectively. The calculated F(n) values ​​are shown in Table 4;

[0138] Table 4 F(n) values ​​of each child node

[0139]

[0140] Continue iterating until the end is reached or the open list is empty, such as Figure 2 The figure shows the construction road line selection result obtained by using the scoring evaluation function under the condition of slope; Figure 3 , Figure 4 and Figure 5 The figure shows the construction road line selection results obtained by using the evaluation function of the three-dimensional cost function when k is 6, 7 and 8 respectively. Practice has proved that the two line selection results considering the slope are consistent with the manual line selection results.

[0141] Although the embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the claims and their equivalents.

Claims

1. A fast and intelligent design method for construction access roads in complex terrain, characterized in that: The following steps are involved: The first step is to log in to the construction access road design platform; The second step is to log in to the construction access road design platform and input the coordinate information of the starting point and the target point as well as the DEM data into the construction access road optimal path system to obtain the optimal path; The third step is to display the optimal path.

2. The method for rapid intelligent design of construction access roads in complex terrain according to claim 1 is characterized in that: The second step includes the following steps: S1, preprocessing the DEM data to obtain the input starting point and target point coordinate information; S2, put the starting point into the open list, traverse the nodes adjacent to the starting point, and put the nodes adjacent to the starting point into the open list; S3, among the nodes adjacent to the starting point, select the optimal node by calculating the cost required for each node; S4, determine whether the optimal node is the target node, if so, output the optimal path, otherwise proceed to the next step; S5, expand the child nodes of the current optimal node, and determine whether the child nodes of the current optimal node exist in the open list or the closed list; if the child node does not exist in the open list or the closed list, put the child node in the open list, and then select the next optimal node; if the child node already exists in the closed list, skip the node; if the child node already exists in the open list, it means that the node has been calculated as a neighboring node of other nodes, and recalculate the cost value as a child node, compare the new and old cost values ​​of the node, if the new cost value is smaller, take the optimal node as the parent node of the child node; if the old cost value is smaller, keep the old parent node; S6, repeat the above steps until reaching the end point.

3. The method for rapid intelligent design of construction access roads in complex terrain according to claim 2 is characterized in that: In step S3, an evaluation function is used to select an optimal node from adjacent nodes. The evaluation function takes the form of a scoring value or a three-dimensional cost function.

4. The method for rapid intelligent design of construction access roads in complex terrain according to claim 3 is characterized in that: In step S3, an evaluation function is constructed in the form of scoring, taking into account distance determination, slope determination and invalid value determination, assigning values ​​to the points to be determined according to the rules, and selecting the node with the largest total value assignment as the optimal node.

5. The method for rapid intelligent design of construction access roads in complex terrain according to claim 3 is characterized in that: In step S3, an evaluation function is constructed in the form of a three-dimensional cost function, where the slope function expression is ek*slope, where slope is the slope between the parent node and the child node, and k is the magnification coefficient. The evaluation values ​​of different points to be determined are calculated, and the node with the smallest evaluation value is selected as the optimal node.

6. The method for rapid intelligent design of construction access roads in complex terrain according to claim 2 is characterized in that: In step S3, the cost value is the fundamental criterion for determining whether a node is the optimal node. The three-dimensional distance calculation formula is used. The calculation result of the formula reflects the actual distance between two pixels. The expression is: Where: X i and X e Corresponding to the X-axis coordinates of the i-node and the e-node; Y i and Y e Corresponding to the Y-axis coordinates of the i-node and the e-node Z i and Z e Elevation data corresponding to i-node and e-node; Size corresponds to the pixel size of the DEM model.

7. The method for rapid intelligent design of construction access roads in complex terrain according to claim 6 is characterized in that: On the basis of the distance calculation formula, the evaluation function of the scoring value and the three-dimensional cost function is adopted. By scoring the child nodes of the optimal node or directly calculating the three-dimensional cost, the child node with the largest scoring value or the smallest three-dimensional cost is taken as the new optimal node.

8. The method for rapid intelligent design of construction access roads in complex terrain according to claim 7 is characterized in that: The application of the scoring A* algorithm in path planning determines the optimal path by comparing the specific attributes between the parent node and different child nodes. The algorithm assigns a score to each possible adjacent child node of the parent node, and the score is based on a comprehensive evaluation of multiple key factors.

9. The method for rapid intelligent design of construction access roads in complex terrain according to claim 7 is characterized in that: The evaluation function of the three-dimensional cost function takes into account the three-dimensional spatial distance of the path and takes the slope of the terrain into account, so that the path planning can be closer to the actual terrain conditions. The introduction of the slope is through an exponential function e k*slope to achieve this, where slope is the slope between the parent node and the child node, and k is the magnification factor. The function of the magnification factor is to adjust the influence of the slope factor in the entire evaluation function. As the k value increases, the influence of the slope on the evaluation function also increases. When evaluating different paths, the algorithm pays more attention to the flatness of the path, avoids terrains with large slopes, and ensures the safety and feasibility of the path.

10. The method for rapid intelligent design of construction access roads in complex terrain according to claim 1 is characterized in that: In the first step, the mobile phone number of the logged-in user is used to log in to the construction access road design platform.

Citation Information

Patent Citations

  • Parametric modeling and design optimization method for railway engineering construction shortcut

    CN110569538A

  • Normal-pressure automatic water-gas mixed flushing method and flushing system

    CN114182793A

  • Global path planning method of unmanned ship, terminal and storage medium

    CN117419730A

  • Login to big data block chain cloud platform by means of intelligent handheld mobile terminal

    CN117768197A

  • Intercepting ditch intelligent design method based on engineering quantity optimization and storage medium

    CN117951780A