5G private network work order opening time limit adjustment method, device, equipment and medium
By collecting historical data and the decision tree CART regression algorithm model, the processing time limit of the 5G private network work order link is dynamically adjusted, which solves the problem of low work order processing efficiency and improves customer experience and the system's timely follow-up capabilities.
Patent Information
- Application Number
- CN202410542822.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-30
- Publication Date
- 2024-10-18
AI Technical Summary
The work order processing time in the 5G private network activation work order system is random, resulting in untimely follow-up and processing of work orders, low efficiency, and affecting customer experience.
By collecting historical work order data, the work order link time allocation file is determined based on the decision tree CART regression algorithm model, and the available processing time limit of the unfinished link is dynamically adjusted according to the actual processing time of the completed link, and a dynamic adjustment time limit algorithm is established to realize the work order Automatic monitoring and adjustment of link time limits.
It reduces the manual processing process, reduces labor costs, improves work order processing efficiency, ensures that work orders are completed within the time limit of production requirements, and improves customer experience and the system's timely follow-up capabilities.
Smart Images

Figure CN118798519A_ABST
Abstract
Description
Technical Field
[0001] The present disclosure relates to the field of electronic technology, and in particular to a method, device, equipment and medium for adjusting the time limit of a 5G private network activation work order. Background Art
[0002] In related technologies, the 5G (5th Generation Mobile Communication Technology) private network activation work order system usually adopts a conventional electronic work order assembly line operation mode, and each work order link is manually monitored to see if the work order has timed out, and the processing time of each link is random. For example, if a link exceeds the time limit, other links are still executed according to the fixed time limit. This will lead to untimely and inefficient follow-up processing of the 5G private network activation work order system, resulting in a poor customer experience. Summary of the invention
[0003] The present disclosure provides a method, device, equipment and medium for adjusting the time limit of a 5G private network activation work order. The technical solution of the present disclosure is as follows:
[0004] According to a first aspect of an embodiment of the present disclosure, a method for adjusting the time limit of a 5G private network activation work order is provided, comprising:
[0005] Collect historical work order data;
[0006] Determine a work order link duration allocation file based on the historical work order data;
[0007] Based on the work order link duration allocation file and the actual processing duration of the currently completed links of the work order, the available time limit for processing the unfinished links of the work order is adjusted.
[0008] In a possible implementation, determining the work order link duration allocation file based on the historical work order data includes:
[0009] The work order link duration allocation file is determined based on the historical work order data through a decision tree CART regression algorithm model.
[0010] In a possible implementation, adjusting the available time limit for processing the unfinished links of the work order based on the work order link duration allocation file and the actual processing duration of the currently completed links of the work order includes:
[0011] A dynamic time limit adjustment algorithm is established to allocate files according to the duration of the work order links and the actual processing time of the currently completed links of the work order, and dynamically adjust the available time limit for processing the unfinished links of the work order.
[0012] In a possible implementation, the establishment of a dynamic adjustment time limit algorithm dynamically adjusts the available time limit for processing the unfinished links of the work order according to the work order link duration allocation file and the actual processing time of the currently completed link of the work order, including:
[0013] Get the actual duration of the completed links of the work order, the allocated duration of the completed links of the work order, the number of completed links of the work order, the original allocated duration of the current link, and the total allocated duration of all remaining unfinished links of the work order;
[0014] Based on the actual duration of the completed links of the work order, the allocated duration of the completed links of the work order, the number of completed links of the work order, the original allocated duration of the current link, the total allocated duration of all remaining unfinished links of the work order, and the total number of links of the work order, the available time limit for processing the unfinished links of the work order is calculated; wherein, the current link is an unfinished link.
[0015] In a possible implementation, the method of calculating the available time limit for processing the unfinished links of the work order based on obtaining the actual duration of the completed links of the work order, the allocated duration of the completed links of the work order, the number of completed links of the work order, the original allocated duration of the current link, the total allocated duration of all remaining unfinished links of the work order, and the total number of links of the work order includes:
[0016] Based on the actual duration of the completed links of the work order, the allocated duration of the completed links of the work order, and the number of completed links of the work order, the difference between the actual duration of the completed links of the work order and the allocated duration of the completed links of the work order is calculated; wherein the allocated duration is obtained from the work order link duration allocation file;
[0017] Based on the original allocated duration of the current link, the total allocated duration of all remaining unfinished links of the work order, and the total number of links of the work order, calculate the ratio of the original allocated duration of the current link to the total allocated duration of all remaining unfinished links of the work order;
[0018] Calculate the dynamically adjusted allocated duration of the current link based on the original allocated duration of the current link, the ratio of the original allocated duration of the current link to the total allocated duration of all remaining unfinished links of the work order, and the difference duration;
[0019] The calculated allocated time length is determined as the available processing time limit of the current link.
[0020] In a possible implementation, it further includes:
[0021] Collecting operation data; wherein the operation data includes the timeout rate of each link of the work order, the average timeout duration of each link, the failure rate of each link, and the average failure duration of each link;
[0022] Calculate the expected duration of optimization corresponding to each link of the work order based on the operation data;
[0023] The optimized allocated duration corresponding to each link of the work order is determined based on the optimized expected duration corresponding to each link of the work order.
[0024] According to a second aspect of an embodiment of the present disclosure, a device for adjusting the time limit of a 5G private network activation work order is provided, comprising:
[0025] Data collection module, used to collect historical work order data;
[0026] A duration allocation module, used to determine a duration allocation file for a work order link based on the historical work order data;
[0027] The duration adjustment module is used to adjust the available time limit for processing the unfinished links of the work order based on the work order link duration allocation file and the actual processing time of the currently completed links of the work order.
[0028] In a possible implementation manner, the duration allocation module is used to:
[0029] The work order link duration allocation file is determined based on the historical work order data through a decision tree CART regression algorithm model.
[0030] In a possible implementation, the duration adjustment module is used to:
[0031] A dynamic time limit adjustment algorithm is established to allocate files according to the duration of the work order links and the actual processing time of the currently completed links of the work order, and dynamically adjust the available time limit for processing the unfinished links of the work order.
[0032] In a possible implementation, the duration adjustment module includes:
[0033] The data acquisition unit is used to obtain the actual duration of the completed links of the work order, the allocated duration of the completed links of the work order, the number of completed links of the work order, the original allocated duration of the current link, and the total allocated duration of all remaining unfinished links of the work order;
[0034] The duration calculation unit is used to calculate the available time limit for processing the unfinished links of the work order based on the actual duration of the completed links of the work order, the allocated duration of the completed links of the work order, the number of completed links of the work order, the original allocated duration of the current link, the total allocated duration of all remaining unfinished links of the work order, and the total number of links of the work order; wherein the current link is an unfinished link.
[0035] In a possible implementation manner, the duration calculation unit is used to:
[0036] Based on the actual duration of the completed links of the work order, the allocated duration of the completed links of the work order, and the number of completed links of the work order, the difference between the actual duration of the completed links of the work order and the allocated duration of the completed links of the work order is calculated; wherein the allocated duration is obtained from the work order link duration allocation file;
[0037] Based on the original allocated duration of the current link, the total allocated duration of all remaining unfinished links of the work order, and the total number of links of the work order, calculate the ratio of the original allocated duration of the current link to the total allocated duration of all remaining unfinished links of the work order;
[0038] Calculate the dynamically adjusted allocated duration of the current link based on the original allocated duration of the current link, the ratio of the original allocated duration of the current link to the total allocated duration of all remaining unfinished links of the work order, and the difference duration;
[0039] The calculated allocated time length is determined as the available processing time limit of the current link.
[0040] In a possible implementation, it further includes:
[0041] A collection module is used to collect operation data; wherein the operation data includes the timeout rate of each link of the work order, the average timeout duration of each link, the failure rate of each link, and the average failure duration of each link;
[0042] A calculation module, used for calculating the expected optimization duration corresponding to each link of the work order based on the operation data;
[0043] The optimization module is used to determine the optimized allocated duration corresponding to each link of the work order based on the expected optimization duration corresponding to each link of the work order.
[0044] According to a third aspect of an embodiment of the present disclosure, there is provided an electronic device, including:
[0045] processor;
[0046] a memory for storing instructions executable by the processor;
[0047] Among them, the processor is configured to execute the instructions to implement the 5G private network activation work order time limit adjustment method as described in any one of the first aspects.
[0048] According to a fourth aspect of an embodiment of the present disclosure, a storage medium is provided. When instructions in the storage medium are executed by a processor of an electronic device, the electronic device is enabled to execute a method for adjusting the time limit of a 5G private network activation work order as described in any one of the first aspects.
[0049] According to a fifth aspect of an embodiment of the present disclosure, a computer program product is provided, including a computer program, which, when executed by a processor, implements the 5G private network activation work order time limit adjustment method as described in any one of the first aspects.
[0050] The technical solution provided by the embodiments of the present disclosure brings at least the following beneficial effects:
[0051] In the embodiments of the present disclosure, historical work order data is collected; a work order link duration allocation file is determined based on the historical work order data; and the available processing time limit for the unfinished links of the work order is adjusted based on the work order link duration allocation file and the actual processing time of the currently completed links of the work order. In this way, the available processing time limit for the work order links can be automatically realized. On the one hand, the manual processing process can be reduced, the labor cost can be reduced, and the efficiency can be improved; on the other hand, the time taken for each link of the work order can be monitored and dynamically adjusted, so as to ensure that the 5G private network activation work order can be completed according to the production demand time limit, and the 5G private network activation work order system can be followed up in time, so as to improve the processing efficiency and customer experience.
[0052] It is to be understood that the foregoing general description and the following detailed description are exemplary and explanatory only and are not restrictive of the present disclosure. BRIEF DESCRIPTION OF THE DRAWINGS
[0053] The drawings herein are incorporated into and constitute a part of the specification, illustrate embodiments consistent with the present disclosure, and together with the description are used to explain the principles of the present disclosure, and do not constitute improper limitations on the present disclosure.
[0054] Figure 1 It is a flowchart of a method for adjusting the time limit of a 5G private network activation work order according to an exemplary embodiment.
[0055] Figure 2 It is a diagram illustrating dynamic duration calculation after completing step 1 according to an exemplary embodiment.
[0056] Figure 3 It is a diagram illustrating dynamic duration calculation after completing step 1 according to an exemplary embodiment.
[0057] Figure 4 It is a diagram illustrating dynamic duration calculation after completing step 2 according to an exemplary embodiment.
[0058] Figure 5 It is a diagram illustrating dynamic duration calculation after completing step 2 according to an exemplary embodiment.
[0059] Figure 6 It is a diagram illustrating link duration allocation-optimization calculation according to an exemplary embodiment.
[0060] Figure 7 It is a flowchart of a method for adjusting the time limit of a 5G private network activation work order according to an exemplary embodiment.
[0061] Figure 8 It is a block diagram of a 5G private network activation work order time limit adjustment device according to an exemplary embodiment.
[0062] Fig. 9 It is a block diagram of an electronic device according to an exemplary embodiment. DETAILED DESCRIPTION
[0063] In order to enable ordinary persons in the art to better understand the technical solutions of the present disclosure, the technical solutions in the embodiments of the present disclosure will be clearly and completely described below in conjunction with the accompanying drawings.
[0064] It should be noted that the terms "first", "second", etc. in the specification and claims of the present disclosure and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchanged where appropriate, so that the embodiments of the present disclosure described herein can be implemented in an order other than those illustrated or described herein. The embodiments described in the following exemplary embodiments do not represent all embodiments consistent with the present disclosure. Instead, they are merely examples of devices and methods consistent with some aspects of the present disclosure as detailed in the appended claims.
[0065] As can be seen from the background technology, in the related technology, the existing solutions cannot realize the monitoring and dynamic adjustment of the time taken for each link of the work order, and cannot guarantee the time limit for meeting the production demand. For example, the existing 5G private network activation work order system usually adopts the conventional electronic work order assembly line operation mode. After the previous link is completed, the person responsible for the next link cannot be informed in time and fails to follow up in time; at the same time, there is randomness in the processing time of each link. For example, if the time taken for a certain link exceeds the time limit, while other links are still executed according to the fixed time limit, it is easy to cause the overall time of the work order to exceed the time limit, resulting in untimely follow-up and low efficiency of the 5G private network activation work order, affecting customer satisfaction. Based on this, the embodiments of the present disclosure provide a 5G private network activation work order time limit adjustment method, device, equipment and medium, which can establish a 5G private network activation work order time limit adjustment method, by collecting historical work order data; determining the work order link time allocation file based on the historical work order data; adjusting the processing available time limit of the unfinished link of the work order based on the work order link time allocation file and the actual processing time of the currently completed link of the work order. Solve the problem that the existing technology cannot dynamically adjust the duration of each link; solve the problem of inefficient management of 5G private network activation work orders and the low degree of automation in the control of activation work orders, and reduce the risk of overtime of the overall time limit for activation work orders. In this way, on the one hand, it can reduce the manual processing process, reduce labor costs, and improve efficiency; on the other hand, it can monitor and dynamically adjust the time taken for each link of the work order, so as to ensure that the 5G private network activation work order can be completed according to the production demand time limit, realize the timely follow-up of the 5G private network activation work order system, improve processing efficiency, and improve customer experience.
[0066] The following is a detailed description of the 5G private network activation work order time limit adjustment method, device, equipment and medium provided by the embodiments of the present disclosure in conjunction with the accompanying drawings.
[0067] Figure 1 The present invention is a flowchart of a method for adjusting the time limit of a 5G private network activation work order according to an exemplary embodiment. The method can be applied to a server, for example, a single server or a server cluster. The server can be deployed with a 5G private network activation work order system. Figure 1 As shown, the method for adjusting the time limit of a 5G private network activation work order may include the following steps.
[0068] In step S101, historical work order data is collected.
[0069] In the disclosed embodiment, historical work order data can be obtained, mainly including the following data: based on the historical data of 5G private network activation work orders, normalized and cleaned into the warehouse, including work order scenarios, demand analysis duration, solution design duration, bureau data configuration duration, resource allocation duration, etc. It can be understood that a basic database can be established based on historical work order data.
[0070] In step S102, a work order link duration allocation file is determined based on historical work order data.
[0071] In the disclosed embodiment, after collecting historical work order data, a work order link duration allocation file can be determined based on the historical work order data. The work order link duration allocation file can be, for example, a work order link duration allocation table. Exemplarily, the duration of each link of the work order can be counted, the initial duration of each link in multiple scenarios of 5G private network opening can be output, and a work order link duration allocation table can be established to provide a data basis for the subsequent dynamic adjustment of the work order link duration.
[0072] In step S103, based on the work order link duration allocation file and the actual processing duration of the currently completed link of the work order, the available time limit for processing the unfinished link of the work order is adjusted.
[0073] In the disclosed embodiment, after determining the work order link duration allocation file based on the historical work order data, the actual processing duration of the currently completed link of the work order can be obtained. For example, assuming that the completed links of the work order include link 1, link 2, and link 3, the actual processing duration 1 of link 1, the actual processing duration 2 of link 2, and the actual processing duration 3 of link 3 can be obtained. Then, based on the work order link duration allocation table and the actual processing duration of the currently completed link of the work order, the available processing time limit of the unfinished link in the work order can be adjusted. In other words, the available processing time limit of the unfinished link of the work order can be dynamically adjusted in combination with the actual processing time of the completed link and the work order link duration allocation table, so as to realize the monitoring and dynamic adjustment of the time used in each link of the work order.
[0074] In the embodiments of the present disclosure, historical work order data is collected; a work order link duration allocation file is determined based on the historical work order data; and the available processing time limit for the unfinished links of the work order is adjusted based on the work order link duration allocation file and the actual processing time of the currently completed links of the work order. In this way, the available processing time limit for the work order links can be automatically realized. On the one hand, the manual processing process can be reduced, the labor cost can be reduced, and the efficiency can be improved; on the other hand, the time taken for each link of the work order can be monitored and dynamically adjusted, so as to ensure that the 5G private network activation work order can be completed according to the production demand time limit, and the 5G private network activation work order system can be followed up in time, so as to improve the processing efficiency and customer experience.
[0075] In a possible implementation, the above steps of determining the work order link duration allocation file based on historical work order data include:
[0076] The decision tree CART regression algorithm model is used to determine the duration allocation file for work order links based on historical work order data.
[0077] In the disclosed embodiment, the work order link duration allocation file can be determined by the decision tree CART regression algorithm model. Exemplarily, the initial value allocation of link duration is based on the "5G private network activation historical work order table" data, 5G private network activation business process rules and other parameter data, and the decision tree CART regression algorithm model is used to predict the duration of each link in multiple scenarios of 5G private network activation. Taking the execution of the 5G private network activation work order system as an example, it specifically includes the following steps:
[0078] Step 1: Collect data through the [Work Order Data Collection Module] of the 5G private network activation work order system, including the "5G private network activation historical work order table" (example as shown in Table 1), 5G private network activation business process rules, production demand duration (configuration value), and the reserved time for system connection in each link (configuration value).
[0079] Table 1 5G private network activation history work order field table
[0080]
[0081] Among them, the business process rules for opening 5G private network may include: Premium opening: demand analysis, solution design (can fall back to demand analysis), core resource allocation, core bureau data configuration, business joint debugging test (process node, not included in the total time for work order to open production demand); Exclusive and premium opening: demand analysis, solution design (can fall back to demand analysis), core resource allocation, core bureau data configuration, exclusive UPF resource allocation, exclusive UPF data production, wireless resource allocation, transmission resource allocation, transmission data production, wireless data production, business joint debugging test (process node, not included in the total time for work order to open production demand); Others: Production demand time T (configuration value): the total time of all links under the opening work order; The reserved time for system connection of each link TY (configuration value): the reserved time for production system connection of each link.
[0082] In the [Initial Value Allocation Module for Link Duration] of the 5G private network activation work order system, the decision tree CART (Classification and Regression Tree) regression algorithm model is used for modeling: The CART regression tree is different from the linear regression model. It can model complex and nonlinear data. It divides the data set into multiple parts by using a binary recursive segmentation technique. The label values in each sub-dataset are distributed more concentratedly (the mean square error of the data set is used as an indicator of relatively concentrated data distribution), and then the average value of the data set is used as its predicted value.
[0083] CART is a classification and regression tree model, and its regression tree is used in the embodiment of the present disclosure to predict the duration. The regression tree is a decision tree based on which all splits are binary forks, and can be abstractly represented as formula (1).
[0084]
[0085] Among them, C n represents the output value of the nth region; I represents the coefficient of the nth region; r n Represents the nth region; N is the total number of regions.
[0086] Specifically, the model will divide the predicted duration into n regions, and the division criteria are determined by the training process. The tree model training method will be determined according to the input characteristics of the data, specifically: starting from the root node, the tree model can be based on each input feature, such as "whether it is a cross-city order", "whether rollback occurs", "service package type" in the "5G private network activation history work order table" in Table 1, and a value of the actual production duration of the 10 links. Each binary fork will split into two left and right regions R1 and R2, respectively expressed as formula (2).
[0087]
[0088] Among them, R 1 (j,s) represents the jth feature value x (j) = the left region split from s; R 2 (j,s) represents the jth feature value x (j) = the right region split from s; x (j) represents the jth feature.
[0089] The growth of a regression tree is a process of continuous division. The main steps are as follows:
[0090] 1) Traverse all the values of all features and calculate the following loss, where C 1 and C 2 They are R 1 (j,s) and r 2 The average regional output value of (j,s), that is, the duration of 10 links:
[0091]
[0092] 2) Select the split point corresponding to the smallest obj for splitting, dividing it into two left and right regions;
[0093] 3) Repeat the first two steps until the partition cannot be completed.
[0094] The final binary tree generated is the required regression tree model.
[0095] Then, the duration of each link in the 5G private network activation scenario can be output through the [Link Duration Initial Value Allocation Module] of the 5G private network activation work order system. For example, assuming that the production demand duration T = 4 hours (configuration value) and the reserved time for the connection of each link system TY = 0.25 hours (configuration value), the available time of all links output by the CART regression algorithm model (i.e., the available time of each link in different scenarios of 5G private network opening), that is, the work order link time allocation table can be shown in Table 2. In this way, using the decision tree CART regression algorithm model to determine the work order link time allocation table can improve the accuracy and efficiency of the work order link time allocation table.
[0096] Table 2: Example of available time allocation for each link in different scenarios of 5G private network activation
[0097] Serial number Link Name Service package type = Premium Service package type = exclusive, premium T1 Demand analysis time 0.3 0.2 T2 Design time 0.4 0.25 T3 Core resource allocation duration 1.35 0.3 T4 Core Bureau Data Configuration Duration 1.7 0.3 T5 Wireless resource allocation duration NULL 0.5 T6 Transmission resource allocation duration NULL 0.5 T7 Data transmission configuration time NULL 0.5 T8 Wireless data configuration duration NULL 0.6 T9 Exclusive UPF resource allocation duration NULL 0.3 T10 Exclusive UPF resource configuration duration NULL 0.3
[0098] In a possible implementation, the above steps adjust the available time limit for processing the unfinished links of the work order based on the work order link duration allocation file and the actual processing time of the currently completed links of the work order, including:
[0099] Establish a dynamic time limit adjustment algorithm to allocate files and the actual processing time of the currently completed links of the work order according to the duration of the work order links, and dynamically adjust the available time limit for processing the unfinished links of the work order.
[0100] In the disclosed embodiments, a dynamic time limit adjustment algorithm can be established in advance, and the method can be set according to actual needs. Then, the available time limit for processing the unfinished links of the work order can be dynamically adjusted according to the work order link duration allocation file and the actual processing time of the currently completed link of the work order through the dynamic time limit adjustment algorithm. Exemplarily, in the actual circulation process of the work order, the [Duration Dynamic Adjustment Module] of the work order system opened through the 5G private network can be used to compare the actual processing time of each link of the work order with the allocated time of the [Link Duration Allocation Module], which may be completed early or late. The available time of the subsequent links needs to be dynamically adjusted accordingly, and the actual available time of the next link is calculated and output in real time.
[0101] In a further possible implementation, the above steps establish a dynamic time limit adjustment algorithm, which dynamically adjusts the available time limit for processing the unfinished links of the work order according to the work order link duration allocation file and the actual processing time of the currently completed link of the work order, including:
[0102] Get the actual duration of the completed links of the work order, the allocated duration of the completed links of the work order, the number of completed links of the work order, the original allocated duration of the current link, and the total allocated duration of all remaining unfinished links of the work order;
[0103] The available time limit for processing the unfinished links of the work order is calculated based on the actual duration of the completed links of the work order, the allocated duration of the completed links of the work order, the number of completed links of the work order, the original allocated duration of the current link, the total allocated duration of all remaining unfinished links of the work order, and the total number of links of the work order.
[0104] Among them, the current link is an unfinished link.
[0105] In the disclosed embodiments, when establishing a dynamic adjustment time limit algorithm, according to the work order link duration allocation file and the actual processing duration of the current completed link of the work order, the available processing time limit of the unfinished link of the work order can be dynamically adjusted. The actual duration of the completed link of the work order (for example, the actual processing duration of each completed link), the allocated duration of the completed link of the work order (for example, the allocated duration of each completed link of the work order), the number of completed links of the work order, the original allocated duration of the current link (for example, the current link is an unfinished link that needs to be executed next), and the total allocated duration of all remaining unfinished links of the work order (that is, the sum of the allocated durations of the remaining unfinished links of the work order). Then, the available processing time limit of the unfinished work order can be calculated based on the aforementioned data. For example, the available processing time limit of the unfinished link of the work order can be calculated. The unfinished link can be one or more. Then, the available processing time limit of the unfinished link of the work order is dynamically adjusted based on the calculated available processing time limit of the unfinished link of the work order.
[0106] In a further possible implementation, the above steps calculate the available time limit for processing the unfinished links of the work order based on the actual duration of the completed links of the work order, the allocated duration of the completed links of the work order, the number of completed links of the work order, the original allocated duration of the current link, the total allocated duration of all remaining unfinished links of the work order, and the total number of links of the work order, including:
[0107] Based on the actual duration of the completed links of the work order, the allocated duration of the completed links of the work order, and the number of completed links of the work order, the difference between the actual duration of the completed links of the work order and the allocated duration of the completed links of the work order is calculated; wherein the allocated duration is obtained from the work order link duration allocation file;
[0108] Based on the original allocated duration of the current link, the total allocated duration of all remaining unfinished links of the work order, and the total number of links in the work order, calculate the ratio of the original allocated duration of the current link to the total allocated duration of all remaining unfinished links of the work order;
[0109] Calculate the dynamically adjusted allocated duration of the current link based on the original allocated duration of the current link, the ratio of the original allocated duration of the current link to the total allocated duration of all remaining unfinished links of the work order, and the difference duration;
[0110] The calculated allocated time is determined as the available processing time limit for the current link.
[0111] In the embodiment of the present disclosure, the specific process of calculating the available time limit for processing the unfinished links of the work order may be:
[0112] Step 1: First, based on the actual duration of the completed links of the work order, the allocated duration of the completed links of the work order, and the number of completed links of the work order, calculate the difference between the actual duration of the completed links of the work order and the allocated duration (i.e., the allocated duration of the completed links of the work order) as shown in formula (4).
[0113]
[0114] Among them, ΔT represents the difference between the actual duration of the completed link and the allocated duration, T i Represents the duration of the corresponding link allocation, t i represents the actual duration of the corresponding completed link, and m (m>=1) represents the number of completed links.
[0115] When ΔT>0, it means that the completion time of the previous link is advanced, and there is remaining time for the subsequent links. Conversely, when ΔT<0, it means that the completion time of the previous link is delayed, and the available time for the subsequent links needs to be compressed accordingly.
[0116] Step 2: Based on the original allocated duration of the current link, the total allocated duration of all remaining unfinished links of the work order, and the total number of links in the work order, calculate the ratio of the original allocated duration of the current link to the total allocated duration of all remaining unfinished links of the work order, as shown in formula (5).
[0117]
[0118] Among them, α represents the proportion of the current link to the total duration of all remaining links in the work order, T m+1 Represents the original allocated duration of the current link. Represents the total time allocated for all remaining links of the work order, and n (n>m) represents the total number of links in the work order.
[0119] Step 3: Based on the original allocated duration of the current link, the ratio of the original allocated duration of the current link to the total allocated duration of all remaining unfinished links of the work order, and the difference duration, calculate the dynamically adjusted allocated duration of the current link, as shown in formula (6), and then determine the calculated allocated duration as the available processing time limit for the current link.
[0120] T′ m+1 =T m+1 +α×ΔT (6)
[0121] Among them, T′ m+1 Represents the dynamically adjusted allocated duration of the current link, T m+1represents the original allocated duration of the current link, α represents the proportion of the current link to the total allocated duration of all remaining links in the work order, calculated using formula (5), and ΔT represents the difference between the actual duration of the completed link and the allocated duration, calculated using formula (4). It can be understood that for the first link, since there is no previous completed link, the dynamically adjusted allocated duration T 1 ′=T 1 .
[0122] It should be noted that if Figure 2 In the case 1 shown, the actual completion time of link 1 is less than the allocated time, that is, link 1 is completed ahead of schedule, ΔT>0, and the remaining time can be allocated to the remaining links in proportion. Among them, the dynamically adjusted time T of link 2 needs to be calculated immediately. 2 ′, since ΔT>0, the calculated T 2 ′>T 2 .like Figure 3 In the second case shown, the actual completion time of link 1 is greater than the allocated time, that is, link 1 is delayed, ΔT<0, and the delayed time needs to be allocated to the remaining links in proportion. Among them, the dynamically adjusted time T of link 2 needs to be calculated immediately. 2 ′, since ΔT<0, the calculated T 2 ' <T 2 .like Figure 4 In case 3, the actual completion time of completed links 1 and 2 is less than the allocated time, that is, links 1 and 2 are completed ahead of schedule, ΔT>0, and the remaining time can be allocated to the remaining links in proportion. Among them, the dynamically adjusted time T of link 3 needs to be calculated immediately. 3 ′, since ΔT>0, the calculated T 3 ′>T 3 .like Figure 5 In case 4, the actual completion time of completed links 1 and 2 is greater than the allocated time. That is, the total of links 1 and 2 is delayed, ΔT<0, and the delayed time needs to be allocated to the remaining links in proportion. Among them, the dynamically adjusted time T of link 3 needs to be calculated immediately. 3 ′, since ΔT<0, the calculated T 3 ' <T 3 Then, the calculated allocated time can be determined as the available processing time limit of the current link. In this way, the accuracy of the dynamically adjusted available processing time limit can be further improved.
[0123] As a specific example, taking a work order with a "business package type" of exclusive and premium as an example, the first four steps have been completed, and the time taken is shown in Table 3.
[0124] Table 3: Time allocation and actual time for completed links of a work order
[0125] Serial number Business package type Allocate time state Actual time 1 Demand analysis time 0.2 Completed 0.1 2 Design time 0.25 Completed 0.15 3 Core resource allocation duration 0.3 Completed 0.3 4 Core Bureau Data Configuration Duration 0.3 Completed 0.2 5 Wireless resource allocation duration 0.5 in progress 6 Transmission resource allocation duration 0.5 Unfinished 7 Data transmission configuration time 0.5 Unfinished 8 Wireless data configuration duration 0.6 Unfinished 9 Exclusive UPF resource allocation duration 0.3 Unfinished 10 Exclusive UPF resource configuration duration 0.3 Unfinished
[0126] According to the original allocated time and the actual time, the difference time is calculated as follows according to formula (4):
[0127] ΔT = (0.2-0.1) + (0.25-0.15) + (0.3-0.3) + (0.3-0.2) = 0.3 hours, which means that the previous 4 steps were completed 0.3 hours ahead of schedule.
[0128] Then, according to formula (5), calculate the ratio of the original allocated duration of the current link 5 (m+1=4+1=5) to the total allocated duration of all remaining links of the work order:
[0129] α=0.5 / (0.5+0.5+0.5+0.6+0.3+0.3)=0.185
[0130] Finally, the dynamically adjusted allocation duration is calculated according to formula (6) as follows:
[0131] T′ m+1 =0.5+0.185×0.3=0.556 hours, which means that the dynamically adjusted allocated time for the current 5th link is 0.556 hours, which is 0.056 hours more than the original allocated time of 0.5 hours.
[0132] In a possible implementation, it further includes:
[0133] Collect operation data; the operation data includes the timeout rate of each link of the work order, the average timeout duration of each link, the failure rate of each link, and the average failure duration of each link;
[0134] Calculate the expected tuning time for each link of the work order based on the operation data;
[0135] Based on the expected optimization duration of each link of the work order, the optimized allocated duration corresponding to each link of the work order is determined.
[0136] In the disclosed embodiment, the link allocation duration can also be tuned. For example, after a period of operation, the [work order data collection module] can be used to collect data such as the timeout rate of each link of the work order, the average timeout duration of the link, the link failure rate, and the average failure duration of the link, and the following data table (such as Table 4) can be established, and then the link duration allocation can be tuned through the [link duration allocation-tuning module] to meet the actual needs of production.
[0137] Table 4: Statistics of timeout rate, average timeout duration, failure rate, and average failure duration for each link of a work order
[0138]
[0139] Then, the expected tuning time corresponding to each link of the work order can be calculated based on the operation data, and the specific calculation formula can be as shown in formula (7).
[0140] f(i)=C i ×TC i +G i ×TG i (7)
[0141] Among them, f(i) represents the expected tuning time of each link, C i Indicates the link timeout rate, TG i Indicates the average timeout duration of the link, G i Indicates link failure rate, TG i Indicates the average failure time of a link.
[0142] Afterwards, the optimized allocated duration corresponding to each link of the work order can be determined based on the expected optimized duration corresponding to each link of the work order. For example, since the total duration of the work order is fixed, it is necessary to first cut out a portion of the duration F(i) from the original allocated duration of each link, and the sum of F(i) of each link is equal to the sum of f(i); the following formula (8) is used to calculate the duration that needs to be cut out first for each link in proportion.
[0143]
[0144] Among them, F(i) represents the duration of each link that needs to be intercepted first, T i represents the original allocation duration, T represents the production demand duration (configuration value), T Y Represents the reserved time for system connection in each link (configuration value), Represents the sum of the tuning expectations of all links.
[0145] Then use the following formula (9) to calculate the duration of each link after optimization.
[0146] T i ′=T i -F(i)+f(i) (9)
[0147] Among them, T′ i It represents the duration of the link after optimization, F(i) represents the duration that needs to be cut out of each link first, and f(i) represents the expected optimization duration of each link.
[0148] It can be understood that the link duration allocation optimization calculation can be based on the work order operation status to count the timeout rate, average timeout duration, failure rate, and average failure duration of each link, and then use formula (7) to calculate the "optimization expected duration" that needs to be increased in each link under ideal conditions. Figure 6 As shown in the figure, if each link directly adds the "tuning expected duration" on the basis of the original allocated duration, it usually exceeds the constraint condition that T represents the production demand duration (configuration value). Therefore, it is necessary to first extract part of the duration from each link in proportion and include it in the "tuning expected duration" pool, and finally add the "tuning expected duration" of each link to obtain the duration T′ after link tuning. i When the required interception time F(i) of a link is greater than the expected adjustment time f(i), the optimized time of the link is T′ i <Original allocation phase duration T i ; When the required interception time F(i) of the link is less than the expected adjustment time f(i), the optimized time of the link is T′ i >Original allocation phase duration T i .
[0149] Based on the above method embodiment, the disclosed embodiment provides a method for adjusting the time limit of a 5G private network opening work order, using a decision tree CART regression algorithm to calculate the initial duration of each link in multiple scenarios of 5G private network opening, and then dynamically adjust the actual duration of each link of the opening work order, and finally, periodically optimize the link duration distribution by collecting data such as the timeout rate of each link of the work order in the system operation. In this way, it is possible to dynamically adjust the available time of subsequent links according to the actual duration of each link, and calculate and output the actual available time of the next link in real time, and the link duration distribution can also be optimized to meet the actual needs of production. In this way, the technical problems of the inability to dynamically adjust the link duration, the inefficiency of the opening work order management and the low degree of automation of management and control in the prior art can be solved, the timeout rate of the 5G private network opening work order can be reduced, and customer satisfaction can be improved. At the same time, the intelligent control of the flow of each link of the 5G private network opening work order can be realized to ensure that the time limit requirements of production requirements are met. Compared with the existing 5G private network activation work orders that adopt the conventional electronic work order assembly line operation method, the disclosed embodiment can realize intelligent management and control of work order flow by monitoring the arrival of links, link time, reasonable link duration configuration (decision tree CART regression algorithm model), and dynamic adjustment of link duration, so as to ensure that production demand time limits are met and improve customer satisfaction.
[0150] To make the method provided by the embodiment of the present disclosure clearer, the following is combined with Figure 7 For explanation. Figure 7 As shown, the method for adjusting the time limit of a 5G private network activation work order provided in an embodiment of the present disclosure includes:
[0151] (1) Historical data processing: Obtain historical work order data and establish a basic database.
[0152] (2) Establish a work order duration allocation table: Count the duration of each work order link, output the initial duration of each link in multiple scenarios of 5G private network activation, and establish a "link duration allocation table" to provide basic data for the subsequent "dynamic adjustment of duration".
[0153] (III) Dynamic adjustment of duration: During the actual circulation of work orders, the actual duration of each link may be compared with the duration of [Link Duration Allocation] through the [Dynamic Adjustment of Duration] module. The available duration of subsequent links needs to be dynamically adjusted accordingly, and the actual available duration of the next link is calculated and output in real time.
[0154] (IV) Link duration allocation - tuning: After a period of operation, the system collects data such as the timeout rate of each link of the work order, the average timeout duration of each link, the link failure rate, the average failure duration of each link, etc. through the [Work Order Data Collection] module, and establishes a data table (such as Table 4). Then, the link duration allocation is optimized through the [Link duration allocation - tuning] module to meet the actual production needs.
[0155] The specific implementation methods and technical effects of the above steps are similar to those of the above embodiments and will not be repeated here.
[0156] Based on the same inventive concept, the embodiment of the present disclosure also provides a 5G private network activation work order time limit adjustment device, such as Figure 8 As shown, Figure 8 1 is a block diagram of a device for adjusting the time limit of a 5G private network activation work order according to an exemplary embodiment. Figure 8 , the 5G private network activation work order time limit adjustment device 800 may include:
[0157] Data collection module 810, used to collect historical work order data;
[0158] A duration allocation module 820 is used to determine a duration allocation file for a work order link based on the historical work order data;
[0159] The duration adjustment module 830 is used to adjust the available time limit for processing the unfinished links of the work order based on the work order link duration allocation file and the actual processing time of the currently completed links of the work order.
[0160] In a possible implementation, the duration allocation module 820 is configured to:
[0161] The work order link duration allocation file is determined based on the historical work order data through a decision tree CART regression algorithm model.
[0162] In a possible implementation, the duration adjustment module is used to:
[0163] A dynamic time limit adjustment algorithm is established to allocate files according to the duration of the work order links and the actual processing time of the currently completed links of the work order, and dynamically adjust the available time limit for processing the unfinished links of the work order.
[0164] In a possible implementation, the duration adjustment module 830 includes:
[0165] The data acquisition unit is used to obtain the actual duration of the completed links of the work order, the allocated duration of the completed links of the work order, the number of completed links of the work order, the original allocated duration of the current link, and the total allocated duration of all remaining unfinished links of the work order;
[0166] The duration calculation unit is used to calculate the available time limit for processing the unfinished links of the work order based on the actual duration of the completed links of the work order, the allocated duration of the completed links of the work order, the number of completed links of the work order, the original allocated duration of the current link, the total allocated duration of all remaining unfinished links of the work order, and the total number of links of the work order; wherein the current link is an unfinished link.
[0167] In a possible implementation manner, the duration calculation unit is used to:
[0168] Based on the actual duration of the completed links of the work order, the allocated duration of the completed links of the work order, and the number of completed links of the work order, the difference between the actual duration of the completed links of the work order and the allocated duration of the completed links of the work order is calculated; wherein the allocated duration is obtained from the work order link duration allocation file;
[0169] Based on the original allocated duration of the current link, the total allocated duration of all remaining unfinished links of the work order, and the total number of links of the work order, calculate the ratio of the original allocated duration of the current link to the total allocated duration of all remaining unfinished links of the work order;
[0170] Calculate the dynamically adjusted allocated duration of the current link based on the original allocated duration of the current link, the ratio of the original allocated duration of the current link to the total allocated duration of all remaining unfinished links of the work order, and the difference duration;
[0171] The calculated allocated time length is determined as the available processing time limit of the current link.
[0172] In a possible implementation, it further includes:
[0173] A collection module is used to collect operation data; wherein the operation data includes the timeout rate of each link of the work order, the average timeout duration of each link, the failure rate of each link, and the average failure duration of each link;
[0174] A calculation module, used for calculating the expected optimization duration corresponding to each link of the work order based on the operation data;
[0175] The optimization module is used to determine the optimized allocated duration corresponding to each link of the work order based on the expected optimization duration corresponding to each link of the work order.
[0176] Regarding the device in the above embodiment, the specific manner in which each module performs operations has been described in detail in the embodiment of the method, and will not be elaborated here.
[0177] According to an embodiment of the present disclosure, the present disclosure also provides an electronic device, a storage medium and a computer program product.
[0178] Fig. 9 A schematic block diagram of an example electronic device 900 that can be used to implement an embodiment of the present disclosure is shown. The electronic device 900 is intended to represent various forms of digital computers, such as laptop computers, desktop computers, workstations, personal digital assistants, servers, blade servers, mainframe computers, and other suitable computers. The electronic device can also represent various forms of mobile devices, such as personal digital processing, cellular phones, smart phones, wearable devices, and other similar computing devices. The components shown herein, their connections and relationships, and their functions are merely examples and are not intended to limit the implementation of the present disclosure described and / or required herein.
[0179] like Fig. 9 As shown, the electronic device 900 includes a computing unit 901, which can perform various appropriate actions and processes according to a computer program stored in a read-only memory (ROM) 902 or a computer program loaded from a storage unit 908 into a random access memory (RAM) 903. In the RAM 903, various programs and data required for the operation of the device 900 can also be stored. The computing unit 901, the ROM 902, and the RAM 903 are connected to each other via a bus 904. An input / output (I / O) interface 905 is also connected to the bus 904.
[0180] Multiple components in the electronic device 900 are connected to the I / O interface 905, including: an input unit 906, such as a keyboard, a mouse, etc.; an output unit 907, such as various types of displays, speakers, etc.; a storage unit 908, such as a disk, an optical disk, etc.; and a communication unit 909, such as a network card, a modem, a wireless communication transceiver, etc. The communication unit 909 allows the electronic device 900 to exchange information / data with other devices through a computer network such as the Internet and / or various telecommunication networks.
[0181] The computing unit 901 may be a variety of general and / or special processing components with processing and computing capabilities. Some examples of the computing unit 901 include, but are not limited to, a central processing unit (CPU), a graphics processing unit (GPU), various dedicated artificial intelligence (AI) computing chips, various computing units running machine learning model algorithms, digital signal processors (DSPs), and any appropriate processors, controllers, microcontrollers, etc. The computing unit 901 performs the various methods and processes described above, such as a 5G private network activation work order time limit adjustment method. For example, in some embodiments, the 5G private network activation work order time limit adjustment method may be implemented as a computer software program, which is tangibly included in a machine-readable medium, such as a storage unit 908. In some embodiments, part or all of the computer program may be loaded and / or installed on the electronic device 900 via ROM 902 and / or a communication unit 909. When the computer program is loaded into RAM 903 and executed by the computing unit 901, one or more steps of the 5G private network activation work order time limit adjustment method described above may be performed. Alternatively, in other embodiments, the computing unit 901 may be configured to execute the 5G private network activation work order time limit adjustment method in any other appropriate manner (for example, by means of firmware).
[0182] Various implementations of the systems and techniques described above herein can be implemented in digital electronic circuit systems, integrated circuit systems, field programmable gate arrays (FPGAs), application specific integrated circuits (ASICs), application specific standard products (ASSPs), systems on chips (SOCs), load programmable logic devices (CPLDs), computer hardware, firmware, software, and / or combinations thereof. These various implementations can include: being implemented in one or more computer programs that can be executed and / or interpreted on a programmable system including at least one programmable processor, which can be a special purpose or general purpose programmable processor that can receive data and instructions from a storage system, at least one input device, and at least one output device, and transmit data and instructions to the storage system, the at least one input device, and the at least one output device.
[0183] The program code of the computer program product for implementing the method of the present disclosure can be written in any combination of one or more programming languages. These program codes can be provided to a processor or controller of a general-purpose computer, a special-purpose computer, or other programmable data processing device, so that the program code, when executed by the processor or controller, enables the functions / operations specified in the flow chart and / or block diagram to be implemented. The program code can be executed entirely on the machine, partially on the machine, partially on the machine as a stand-alone software package and partially on a remote machine, or entirely on a remote machine or server.
[0184] In the context of the present disclosure, a storage medium may be a tangible medium that may contain or store a program for use by or in conjunction with an instruction execution system, device, or equipment. A storage medium may be a machine-readable signal medium or a machine-readable storage medium. Storage media may include, but are not limited to, electronic, magnetic, optical, electromagnetic, infrared, or semiconductor systems, devices, or equipment, or any suitable combination of the foregoing. More specific examples of storage media may include electrical connections based on one or more lines, portable computer disks, hard disks, random access memories (RAM), read-only memories (ROM), erasable programmable read-only memories (EPROM or flash memory), optical fibers, portable compact disk read-only memories (CD-ROM), optical storage devices, magnetic storage devices, or any suitable combination of the foregoing.
[0185] To provide interaction with a user, the systems and techniques described herein can be implemented on a computer having: a display device (e.g., a CRT (cathode ray tube) or LCD (liquid crystal display) monitor) for displaying information to the user; and a keyboard and pointing device (e.g., a mouse or trackball) through which the user can provide input to the computer. Other types of devices can also be used to provide interaction with the user; for example, the feedback provided to the user can be any form of sensory feedback (e.g., visual feedback, auditory feedback, or tactile feedback); and input from the user can be received in any form (including acoustic input, voice input, or tactile input).
[0186] The systems and techniques described herein can be implemented in a computing system that includes backend components (e.g., as a data server), or a computing system that includes middleware components (e.g., an application server), or a computing system that includes frontend components (e.g., a user computer with a graphical user interface or a web browser through which a user can interact with implementations of the systems and techniques described herein), or a computing system that includes any combination of such backend components, middleware components, or frontend components. The components of the system can be interconnected by any form or medium of digital data communication (e.g., a communication network). Examples of communication networks include: a local area network (LAN), a wide area network (WAN), the Internet, and a blockchain network.
[0187] A computer system may include a client and a server. The client and the server are generally remote from each other and usually interact through a communication network. The relationship between the client and the server is generated by computer programs running on the corresponding computers and having a client-server relationship with each other. The server may be a cloud server, also known as a cloud computing server or cloud host, which is a host product in the cloud computing service system to solve the defects of difficult management and weak business scalability in traditional physical hosts and VPS services ("Virtual Private Server", or "VPS" for short). The server may also be a server of a distributed system, or a server combined with a blockchain.
[0188] It should be understood that the various forms of processes shown above can be used to reorder, add or delete steps. For example, the steps recorded in this disclosure can be executed in parallel, sequentially or in different orders, as long as the desired results of the technical solutions disclosed in this disclosure can be achieved, and this document does not limit this.
[0189] The above specific implementations do not constitute a limitation on the protection scope of the present disclosure. It should be understood by those skilled in the art that various modifications, combinations, sub-combinations and substitutions can be made according to design requirements and other factors. Any modification, equivalent substitution and improvement made within the spirit and principle of the present disclosure shall be included in the protection scope of the present disclosure.
Claims
1. A method for adjusting the time limit of a 5G private network activation work order. It is characterized in that include: Collect historical work order data; Determine a work order link duration allocation file based on the historical work order data; Based on the work order link duration allocation file and the actual processing duration of the currently completed links of the work order, the available time limit for processing the unfinished links of the work order is adjusted.
2. According to the 5G private network activation work order time limit adjustment method of claim 1, It is characterized in that The determining of the work order link duration allocation file based on the historical work order data includes: The work order link duration allocation file is determined based on the historical work order data through a decision tree CART regression algorithm model.
3. According to the 5G private network activation work order time limit adjustment method of claim 1, It is characterized in that The adjusting the available time limit for processing the unfinished links of the work order based on the work order link duration allocation file and the actual processing duration of the currently completed links of the work order includes: A dynamic time limit adjustment algorithm is established to allocate files according to the duration of the work order links and the actual processing time of the currently completed links of the work order, and dynamically adjust the available time limit for processing the unfinished links of the work order.
4. According to the 5G private network activation work order time limit adjustment method of claim 1, It is characterized in that The dynamically adjusting time limit algorithm is established to dynamically adjust the available time limit for processing the unfinished links of the work order according to the work order link duration allocation file and the actual processing time of the currently completed link of the work order, including: Get the actual duration of the completed links of the work order, the allocated duration of the completed links of the work order, the number of completed links of the work order, the original allocated duration of the current link, and the total allocated duration of all remaining unfinished links of the work order; Based on the actual duration of the completed links of the work order, the allocated duration of the completed links of the work order, the number of completed links of the work order, the original allocated duration of the current link, the total allocated duration of all remaining unfinished links of the work order, and the total number of links of the work order, the available time limit for processing the unfinished links of the work order is calculated; wherein, the current link is an unfinished link.
5. According to the 5G private network activation work order time limit adjustment method of claim 4, It is characterized in that The method of calculating the available time limit for processing the unfinished links of the work order based on the actual duration of the completed links of the work order, the allocated duration of the completed links of the work order, the number of completed links of the work order, the original allocated duration of the current link, the total allocated duration of all remaining unfinished links of the work order, and the total number of links of the work order includes: Based on the actual duration of the completed links of the work order, the allocated duration of the completed links of the work order, and the number of completed links of the work order, the difference between the actual duration of the completed links of the work order and the allocated duration of the completed links of the work order is calculated; wherein the allocated duration is obtained from the work order link duration allocation file; Based on the original allocated duration of the current link, the total allocated duration of all remaining unfinished links of the work order, and the total number of links of the work order, calculate the ratio of the original allocated duration of the current link to the total allocated duration of all remaining unfinished links of the work order; Calculate the dynamically adjusted allocated duration of the current link based on the original allocated duration of the current link, the ratio of the original allocated duration of the current link to the total allocated duration of all remaining unfinished links of the work order, and the difference duration; The calculated allocated time length is determined as the available processing time limit of the current link.
6. According to any one of claims 1 to 5, the method for adjusting the time limit of a 5G private network activation work order, It is characterized in that Also includes: Collecting operation data; wherein the operation data includes the timeout rate of each link of the work order, the average timeout duration of each link, the failure rate of each link, and the average failure duration of each link; Calculate the expected duration of optimization corresponding to each link of the work order based on the operation data; The optimized allocated duration corresponding to each link of the work order is determined based on the optimized expected duration corresponding to each link of the work order.
7. A 5G private network activation work order time limit adjustment device, It is characterized in that include: Data collection module, used to collect historical work order data; A duration allocation module, used to determine a duration allocation file for a work order link based on the historical work order data; The duration adjustment module is used to adjust the available time limit for processing the unfinished links of the work order based on the work order link duration allocation file and the actual processing time of the currently completed links of the work order.
8. An electronic device, It is characterized in that include: processor; a memory for storing instructions executable by the processor; The processor is configured to execute the instructions to implement the 5G private network activation work order time limit adjustment method as described in any one of claims 1 to 6.
9. A storage medium, when the instructions in the storage medium are executed by a processor of an electronic device, enables the electronic device to execute the 5G private network activation work order time limit adjustment method as described in any one of claims 1 to 6.
10. A computer program product, comprising a computer program, which, when executed by a processor, implements the 5G private network activation work order time limit adjustment method as described in any one of claims 1 to 6.