Severe cold region new energy and flexible coal power collaborative planning method and system based on double-layer iteration
By adopting a two-layer iterative collaborative planning method of new energy and flexible coal power in severe cold areas, combined with upper-level planning and lower-level operation simulation, the problem of new energy power curtailment is solved, the peak-shaving capacity of coal power units is improved, and new energy consumption is satisfied. need.
Patent Information
- Application Number
- CN202410777465.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-17
- Publication Date
- 2024-10-18
AI Technical Summary
Existing technology is difficult to effectively coordinate planning of new energy and coal power systems in severe cold areas, resulting in large-scale power abandonment of new energy sources and unable to meet the flexibility adjustment needs of high-proportion new energy power systems.
A collaborative planning method for new energy and flexible coal power in severe cold areas based on double-layer iteration is adopted. Through the combination of the upper-layer planning model and the lower-layer operation simulation model, a typical daily planning and design scheme is formed, and the typical daily set is continuously revised through the double-layer iteration strategy until The upper-level typical day simulation can truly reflect the actual operating conditions.
It improves the peak shaving range and consumption capacity of coal power units, ensures sufficient flexible supply capacity during the heating period to meet the demand for new energy consumption, and solves the research gap in electric and thermal collaborative planning.
Smart Images

Figure CN118798529A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of integrated energy system planning, and in particular to a method and system for collaborative planning of new energy and flexible coal-fired power in severe cold regions based on double-layer iteration. Background Art
[0002] Power planning is to determine the future power structure in advance according to the relevant needs of the planning year. Its core is to propose the projects, capacity and construction progress of power construction. The current planning models are mainly divided into two forms: one is the integrated planning-operation simulation model taking into account typical days. This model integrates planning decisions and operation simulation into a single-layer model, and clusters the time series of the whole year into multiple typical days for operation simulation. Although this processing form optimizes the calculation speed, it cannot fully reflect the accurate operation conditions of each period of the year, and it is easy to ignore individual extreme cases; the other is the upper-level planning-lower-level operation simulation double-layer model. The upper-level model transfers the planning scheme to the lower-level model, and the lower-level model returns the parameters obtained by the operation simulation to the upper-level model, and continuously modifies the planning scheme until it is optimal. However, this processing form only considers planning-related constraints in the upper layer. When it comes to electricity-heat collaborative planning, it is difficult to obtain the optimal planning scheme based solely on the constraints at the planning level. Therefore, it is necessary to further develop a double-layer planning model design that can integrate the two methods and perform typical day update iterations.
[0003] In the context of a high proportion of new energy, coal-fired power units must not only serve as the main power source to ensure the reliability of electricity and heat supply, but also as the most important flexible supply resource to absorb new energy. However, since coal-fired power units in extremely cold areas need to be coupled with heat supply for cogeneration, when the heating period of coal-fired power units overlaps with the peak period of new energy units, the peak-shaving capacity of coal-fired power units is limited due to ensuring heat supply, which in turn leads to large-scale abandonment of new energy, making it difficult to cope with the flexibility regulation needs of power systems with a high proportion of new energy.
[0004] Therefore, it is necessary to consider combining the above-mentioned two-level planning model design scheme with typical daily update iterations to carry out coordinated planning of flexible transformation of new energy and heating coal-fired power, so as to avoid the inability of existing coordinated planning methods to effectively combine the electric and thermal integrated energy conditions in severe cold regions and truly reflect the actual operation conditions, thereby solving the research gap in electric-thermal coordinated planning of electric-thermal integrated energy systems in severe cold regions. Summary of the invention
[0005] Based on this, in order to solve the shortcomings of the existing technology, a collaborative planning method for new energy and flexible coal-fired power in cold regions based on double-layer iteration is proposed.
[0006] A method for collaborative planning of new energy and flexible coal-fired power in severe cold regions based on double-layer iteration, characterized by comprising the following steps:
[0007] S1. Objective function of the upper planning model for creating a flexible resource and new energy collaborative planning model corresponding to severe cold regions;
[0008] S2, setting the upper-level planning constraint condition, and under the constraint of the upper-level planning constraint condition, forming a corresponding typical day planning design scheme based on a typical day set and an objective function of an upper-level planning model, wherein the typical day set has a plurality of typical day data;
[0009] S3, creating the objective function of the lower-level operation simulation model of the flexible resource and new energy collaborative planning model corresponding to the severe cold regions;
[0010] S4, setting the lower-level operation simulation constraint conditions, and under the constraints of the lower-level planning constraint conditions, based on the typical day planning design scheme and the objective function of the lower-level operation simulation model, performing actual production simulation hour by hour throughout the year to obtain actual production simulation data, i.e., initial operation results;
[0011] S5. Create a two-layer iterative strategy, obtain a typical day set correction plan based on the initial operation results and the two-layer iterative strategy, and correct the typical day set formed in step S2 based on the typical day set correction plan, so as to obtain a coordinated planning scheme for new energy and flexible coal-fired power in severe cold regions that meets the correction index requirements, wherein the correction index requirements include but are not limited to load loss rate and power abandonment rate.
[0012] In addition, a two-layer iterative collaborative planning system for new energy and flexible coal-fired power in severe cold regions based on the above design scheme is proposed, which includes:
[0013] A first model creation unit, which is used to create an objective function of an upper-level planning model of a flexible resource and new energy collaborative planning model corresponding to severe cold regions;
[0014] A first model constraint unit, which is used to set upper-level planning constraint conditions, and under the constraints of the upper-level planning constraint conditions, based on the typical day set and the objective function of the upper-level planning model, form a corresponding typical day planning design scheme;
[0015] A second model creation unit is used to create an objective function of a lower-level operation simulation model of a flexible resource and new energy collaborative planning model corresponding to severe cold regions;
[0016] The second model constraint unit is used to set the lower-level operation simulation constraint conditions. Under the constraint of the lower-level planning constraint conditions, based on the typical day planning design scheme and the objective function of the lower-level operation simulation model, the actual production simulation is performed hour by hour throughout the year to obtain the actual production simulation data, i.e., the initial operation result;
[0017] An operation processing unit is used to create a two-layer iterative strategy, obtain a typical day set correction plan according to the initial operation results and the two-layer iterative strategy, and correct the typical day set formed in step S2 based on the typical day set correction plan, so as to obtain a coordinated planning scheme for new energy and flexible coal-fired power in severe cold regions that meets the correction index requirements, wherein the correction index requirements include but are not limited to load loss rate and power abandonment rate.
[0018] In addition, in order to solve the shortcomings of the traditional technology, a computer-readable storage medium is also proposed, which includes computer instructions. When the computer instructions are executed on a computer, the computer executes the method described.
[0019] Implementing the embodiments of the present invention will have the following beneficial effects:
[0020] The present invention provides a novel coordinated planning and design scheme for flexible transformation of new energy and heating coal-fired power from the perspective of severely cold regions. Through the present invention, the coal-fired power units can be flexibly transformed to improve the peak regulation amplitude and absorption capacity of the coal-fired power units, so as to ensure that the coal-fired power units have sufficient flexible supply capacity to meet the new energy absorption demand during the heating period.
[0021] Specifically, the present invention designs a collaborative planning method for new energy and flexible coal-fired power in severe cold regions based on double-layer iteration, targeting the provincial comprehensive energy system in severe cold regions with complex electric-heat source structures including wind-solar-water-fire-nuclear-storage power sources and heat source distribution characteristics such as cogeneration, electric boilers, heat storage tanks, and coal-fired boilers. In the upper-level planning model design, a typical day operation simulation is embedded to verify the rationality of the planning scheme, and the actual production simulation is carried out in the lower-level production simulation model design. At the same time, special days that are inconsistent with the upper-level typical day simulation results are added as new typical days to the upper-level typical day set, and the typical day set is continuously iterated and corrected until the upper-level typical day simulation can truly reflect the actual operation situation, thereby solving the research gap of no effective solution for the collaborative planning of electric-heat in electric-heat comprehensive energy systems in severe cold regions. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0023] in:
[0024] Figure 1 It is a schematic diagram of the basic steps corresponding to the scheme of the present invention;
[0025] Figure 2 It is a schematic diagram of the core process design of the double-layer iterative design corresponding to S5 of the present invention;
[0026] Figure 3 It is a curve diagram of the output per unit value of the electric load and the thermal load of the initial typical day set in the embodiment of the present invention;
[0027] Figure 4 A curve diagram of wind power and photovoltaic power output per unit value collected on an initial typical day in the embodiment of the present invention;
[0028] Figure 5 It is a curve diagram of the output per unit value of nuclear power and external power collected on an initial typical day in the embodiment of the present invention;
[0029] Figure 6 It is a curve diagram of the output per unit value of the electric load and the thermal load of each typical day after correction in the embodiment of the present invention;
[0030] Figure 7 It is a curve diagram of the corrected wind power and photovoltaic output per unit value of each typical day in the embodiment of the present invention;
[0031] Figure 8 It is a curve diagram of the output per unit value of nuclear power and external power collected on each typical day after correction in the embodiment of the present invention. DETAILED DESCRIPTION
[0032] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention.
[0033] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as those generally understood by those skilled in the art of the technical field of the present invention. The terms used herein in the specification of the present invention are only for the purpose of describing specific embodiments and are not intended to limit the present invention. It is understood that the terms "first", "second", etc. used in the present invention can be used to describe various elements in this article, but these elements are not limited by these terms. These terms are only used to distinguish the first element from another element. For example, without departing from the scope of the present application, the first element can be referred to as the second element, and similarly, the second element can be the first element. Both the first element and the second element are elements, but they are not the same element.
[0034] Since the coordinated planning and design of new energy and flexible coal-fired power in severe cold regions also belongs to a system optimization problem based on two-level decision-making, the upper and lower levels have their own objective functions and constraints; therefore, in this embodiment, a coordinated planning method of new energy and flexible coal-fired power in severe cold regions based on two-level iteration is proposed, such as Figure 1 As shown, the method includes:
[0035] S1. Objective function of the upper planning model for creating a flexible resource and new energy collaborative planning model corresponding to severe cold regions;
[0036] S2, setting the upper-level planning constraint condition, and under the constraint of the upper-level planning constraint condition, forming a corresponding typical day planning design scheme based on a typical day set and an objective function of an upper-level planning model, wherein the typical day set has a plurality of typical day data;
[0037] S3, creating the objective function of the lower-level operation simulation model of the flexible resource and new energy collaborative planning model corresponding to the severe cold regions;
[0038] S4, setting the lower-level operation simulation constraint conditions, and under the constraints of the lower-level planning constraint conditions, based on the typical day planning design scheme and the objective function of the lower-level operation simulation model, performing actual production simulation hour by hour throughout the year to obtain actual production simulation data, i.e., initial operation results;
[0039] S5. Create a two-layer iterative strategy, obtain a typical day set correction plan based on the initial operation results and the two-layer iterative strategy, and correct the typical day set formed in step S2 based on the typical day set correction plan, so as to obtain a coordinated planning scheme for new energy and flexible coal-fired power in severe cold regions that meets the correction index requirements, wherein the correction index requirements include but are not limited to load loss rate and power abandonment rate.
[0040] Based on the above basic design scheme, it can be known that the design core of this application is to nest typical day operation simulation in the upper-level planning model design to verify the rationality of the planning scheme, and to perform actual production simulation in the lower-level production simulation model design. At the same time, special days that are inconsistent with the upper-level typical day simulation results are added as new typical days to the upper-level typical day set, so as to continuously iterate and correct the typical day set, and then based on the corrected typical day set, the upper-level typical day simulation can truly reflect the actual operation situation.
[0041] Among them, in some specific embodiments, the upper-level planning model of the flexible resource and new energy collaborative planning model corresponding to the severe cold region in S1 aims to minimize the sum of the annualized investment cost of new resources and the total operating cost of a typical day in the planning year, and the corresponding objective function is as follows:
[0042] Min Z top=Z inv +Z sys (1)
[0043] In formula (1), the subscript top represents the upper-level planning, inv represents investment, and sys represents operation; Z inv is the annualized investment cost of new resources in the planning year, Z sys is the typical daily total operating cost in the planning year, which takes into account both planning cost and operating cost.
[0044] In some more specific embodiments, the annualized investment cost of new resources in the planning year includes the investment cost of new power source and the investment cost of flexibility resources, and the corresponding function is as follows:
[0045] Z inv =Z S,inv +Z F,inv (2)
[0046] In formula (2), Z S,inv is the investment cost of new power source, Z F,inv The cost of investing in new flexibility resources;
[0047] Among them, the investment cost of new power sources includes the investment cost of pure condensing units and the investment cost of wind and solar units, and the corresponding functions are as follows:
[0048] Z S,inv =Z CON,inv +Z Res,inv =d crf (c CON C CON,new +c Wind C Wind,new +c Solar C Solar,new ) (3)
[0049] In formula (3), the subscript CON represents the pure condensing unit, Res represents the new energy unit, Wind represents the wind turbine unit, and Solar represents the photovoltaic unit; d crf is the annualized coefficient, and its expression is d crf =α(1+α) κ / [(1+α) κ -1], α is the discount rate, κ is the useful life of the equipment; c CON 、c Wind 、c Solar are the unit investment costs of pure condensing, wind power, and photovoltaic power respectively; C CON,new , C Wind,new , C Solar,new They are the newly built capacities of pure condensing units, wind turbine units, and photovoltaic units;
[0050] Among them, the investment cost of newly added flexible resources includes 5 types of investment costs, namely, the investment cost of pure condensation transformation and extraction condensation, the investment cost of extraction condensation low-pressure cylinder removal, the investment cost of extraction condensation transformation back pressure, the investment cost of new heat storage tanks, and the investment cost of new electric boilers. The investment cost function is expressed as follows:
[0051]
[0052] In formula (4), the subscripts EC, LC, CB, EB, and HS represent the extraction condensing unit, the low-pressure cylinder removal unit, the back pressure unit, the electric boiler, and the heat storage tank, respectively; CONtoEC, ECtoLC, and ECtoCB represent the transformation of the pure condensing unit into the extraction condensing unit, the low-pressure cylinder removal transformation of the extraction condensing unit, and the transformation of the extraction condensing unit into the back pressure unit, respectively; then c CONtoEC 、c ECtoLC 、c ECtoCB 、c EB The unit capacity investment costs of pure condensing unit transformation to extraction condensing unit, extraction condensing unit low-pressure cylinder removal transformation, extraction condensing unit transformation to back pressure unit, and electric boiler are respectively HS,s 、c HS,c are the investment costs of the unit energy capacity and unit power capacity of the heat storage tank, respectively, CONtoEC , C ECtoLC , C ECtoCB , C EB,new , S HS,new , C HS,new They are the capacity of pure condensing unit transformed into extraction condensing unit, the capacity of extraction condensing unit transformed into low-pressure cylinder cutting unit, the capacity of extraction condensing unit transformed into back-pressure unit, the capacity of new electric boiler, the energy capacity of new heat storage tank, and the power capacity of new heat storage tank;
[0053] The typical daily total operating cost of the planning year includes the operating costs of three types of coal-fired power units, coal-fired boilers, and load loss penalty costs. The three types of coal-fired power units include pure condensing units, extraction condensing units, and back pressure units. At the same time, in order to reduce the difficulty of calculation, the coal consumption function of the coal-fired power unit is simplified to a linear form. The typical daily total operating cost function of the planning year is expressed as follows:
[0054]
[0055] In formula (5), the subscripts Boilder and loa d ,ele,heat,cut represent coal-fired boiler, load, electricity, heat, and load loss, respectively; the superscripts m and t are the indexes of typical days and typical day periods, respectively; M and T are the total number of typical days and the number of typical day periods, respectively; D m is the number of the mth typical day, λ Coal is the coal price; w CON is the coal consumption corresponding to the unit power generation of the pure condensing unit, w ECis the coal consumption corresponding to the unit equivalent power generation of the extraction condensing unit, w CB is the coal consumption corresponding to the unit power generation of the back pressure unit, w Boilder The coal consumption corresponding to the unit heat supply of the coal-fired boiler; are the power output of the three types of units in the mth typical day during the t period, are the heat output of the condensing unit and the coal-fired boiler in the mth typical day, period t, c v It is the reduction in power generation when more unit heating heat is extracted while the steam inlet volume of the condensing unit remains unchanged. is the equivalent electrical output of the condensing unit converted to pure condensing conditions; c ele,cut 、c heat,cut are the unit penalty costs of electrical and thermal load loss, They are respectively the electric and heat loss loads in period t of the mth typical day.
[0056] Among them, in some specific embodiments, the upper-level planning constraints include the first coupling relationship constraint of the new and old installed capacities, the first flexibility transformation capacity constraint, the first planning capacity balance constraint, the first power balance constraint in each time period, the first adjustable capacity balance constraint in each time period, the first heat balance constraint in each time period, the first new energy penetration constraint, the first new energy operation constraint, the first hydropower operation constraint, the first electric energy storage operation constraint, the first nuclear power operation constraint, the first pure condensing unit operation constraint, the first extraction condensing unit operation constraint, the first back pressure unit operation constraint, the first electric boiler operation constraint, the first heat storage tank operation constraint, and the first coal-fired boiler operation constraint;
[0057] Among them, the first coupling relationship constraint condition between the new and old installed capacities is as follows:
[0058]
[0059] In formula (6), C CON,old , C EC,old , C LC,old , C CB,old , C Wind,old , C Solar,old , C EB,old They represent the original capacities of the pure condensing unit, the extraction condensing unit, the low-pressure cylinder removal unit, the back pressure unit, the wind turbine unit, the photovoltaic unit, and the electric boiler, respectively. HS,old , S HS,old are the original power capacity and energy capacity of the heat storage tank, C CON , C EC , C LC , C CB , C Wind , CSolar , C EB are the existing capacities of the corresponding resources, C HS , S HS are the existing power capacity and energy capacity of the heat storage tank, T HS How long it takes to fill the heat storage tank;
[0060] The first flexibility transformation capacity constraint is as follows:
[0061]
[0062] In formula (7), γ CONtoEC,max is the maximum ratio of pure condensing units to extraction condensing units; the first row of formulas indicates that the capacity of pure condensing units to be transformed into extraction condensing units should not exceed a certain ratio of the original capacity of pure condensing units to the newly built capacity; the second row of formulas indicates that the capacity of the flexible transformation of extraction condensing units should be less than the capacity of ordinary extraction condensing units;
[0063] The first planning capacity balance constraint is as follows:
[0064]
[0065] In formula (8), P line,max is the maximum power output of the tie line, β inv is the annual reliable capacity factor of new energy, α inv The planned reserve ratio for the system;
[0066] S24, the power balance constraints in the first period are as follows:
[0067]
[0068] In formula (9), the subscript Nuc represents nuclear power, and the subscript Hyd represents hydropower; They represent the power output of wind power, photovoltaic power, nuclear power, hydropower, and interconnection line in the mth typical day and time period, are the discharge power and charging power of the energy storage at the mth typical day during the t period, are the power loads of the system and the electric boiler in the mth typical day, time period t;
[0069] The first time period adjustable capacity balance constraint conditions are as follows:
[0070]
[0071] In formula (10), are the maximum adjustable outputs of wind power, photovoltaic power, nuclear power, hydropower, pure condensing, extraction condensing, back pressure, and electric energy storage in the mth typical day during the t period; α sys is the system's operational reserve rate;
[0072] The heat balance constraints for each period are as follows:
[0073]
[0074] In formula (11), are back pressure and heat output of electric boiler in period t on the mth typical day, respectively; is the heat release power and heat storage power of the heat storage tank in the mth typical day during the t period; is the heat load of the system during the mth typical day and period t;
[0075] The first new energy penetration rate constraint conditions are as follows:
[0076]
[0077] In formula (12), δ Res is the permeability required by the system;
[0078] The operating constraints of the First New Energy are as follows:
[0079]
[0080] In formula (13), are the per unit values β of wind power and photovoltaic power in the mth typical day and time period Res For the credibility of new energy;
[0081] The first hydropower operation constraints are as follows:
[0082]
[0083] In formula (14), C Hyd represents the installed capacity of hydropower, The power generated by hydropower in a typical day. is the hydropower output in the nth period of the mth typical day, represents the total hydropower output before time period t;
[0084] The operating constraints of the First Electric Energy Storage are as follows:
[0085]
[0086] In formula (15), η ES The efficiency of charging and discharging of electrical energy storage, is the amount of electricity stored in the energy storage system during period t; They are the storage capacity of the electric energy storage in the first and last periods of a typical day, and the storage capacity in the first and last periods is required to be equal; are the charging and discharging states of the energy storage, respectively, and 1 represents the corresponding state; SES The maximum storage capacity of electric energy storage;
[0087] The operating constraints of the first nuclear power plant are as follows:
[0088]
[0089] In formula (16), C Nuc is the installed capacity of nuclear power units;
[0090] The operating constraints of the first pure condensing unit are as follows:
[0091]
[0092] In formula (17), the subscript on indicates on-state, and the subscript heat indicates heating; is the minimum output rate of the pure condensing unit, It indicates the operating capacity of the pure condensing unit on the mth typical day. It is assumed that the operating capacity does not change within a day. It is the heating index. When the system is in the non-heating period, its value is 0. The extraction condensing unit and the back pressure unit are both treated as pure condensing units. It is 1 during the heating period.
[0093] The operating constraints of the first condensing unit are as follows:
[0094]
[0095] In formula (18), P EC,e,min , P EC,e,0 are the minimum electrical output and electrothermal characteristic constant of the condensing unit, c m,EC is the electric-to-heat ratio of the condensing unit; Δq is the additional heating power introduced by the low-pressure cylinder removal unit, q LC,a dd is the additional heating power of the unit low-pressure cylinder removal unit; Q EC,max It is the maximum heating power of the condensing unit under the maximum steam extraction condition;
[0096] The operating constraints of the first back pressure unit are as follows:
[0097]
[0098] In formula (19), is the rate of change of electrical output when the back pressure unit changes from pure condensing condition to back pressure condition, is the minimum output rate of the back pressure unit, c m,CB is the electric-to-heat ratio of the back pressure unit;
[0099] The operating constraints of the first electric boiler are as follows:
[0100]
[0101] In formula (20), η EB is the electricity-to-heat efficiency of the electric boiler;
[0102] The operating constraints of the first thermal storage tank are as follows:
[0103]
[0104] In formula (21), ε HS is the heat loss rate of the heat storage tank, η HS The efficiency of heat storage and release in the heat storage tank, is the heat storage capacity of the heat storage tank in period t; are the heat storage of the heat storage tank in the first and last periods of a typical day, respectively, and it is stipulated that the heat storage in the first and last periods is equal; are the heat storage and heat release states of the heat storage tank, respectively, and 1 represents the corresponding state;
[0105] The operating constraints of the first coal-fired boiler are as follows:
[0106]
[0107] In formula (22), C Boilder Installed capacity of coal-fired boilers.
[0108] Among them, in some specific embodiments, the objective function of the lower-level operation simulation model of the flexible resource and new energy collaborative planning model should be the objective function of the hourly operation simulation throughout the year, that is,
[0109] The objective function of the lower-level operation simulation model of the flexible resources and new energy collaborative planning model corresponding to the severe cold regions is similar to the objective function of the upper-level planning model of the flexible resources and new energy collaborative planning model corresponding to the severe cold regions, and the difference is that:
[0110] The benchmark time period corresponding to the considered operation data of the objective function of the upper-level planning model of the flexible resource and new energy coordinated planning model corresponding to the severe cold region is a typical day;
[0111] The benchmark time period corresponding to the operation data considered by the objective function of the lower-level operation simulation model of the flexible resource and new energy coordinated planning model corresponding to the severe cold regions is hourly throughout the year;
[0112] That is, the objective function of the lower-level operation simulation model of the flexible resource and new energy collaborative planning model corresponding to the severe cold region is to minimize the sum of the annualized investment cost of new resources in the planning year and the total hourly operation cost throughout the year. The corresponding objective function is as follows:
[0113] Min Z down =Z inv +Z bottom(twenty three)
[0114] In formula (23), the subscript down represents the lower-level operation simulation model, inv represents investment, and bottom represents the actual simulation operation; Z inv is the annualized investment cost of new resources in the planning year, Z bottom The total hourly operating cost for the entire year of the planning year;
[0115] Similarly, in order to reduce the difficulty of calculation, the coal consumption function of the coal-fired power unit is simplified to a linear form, as follows:
[0116]
[0117] In formula (24), d is the index of the operating days, and D is the total number of days in the whole year; are the power outputs of pure condensing, extraction condensing and back pressure units at time t on day d, respectively. is the heat output of the condensing and coal-fired boilers at time t on day d, It is the power and heat loss load in the t period on the d day.
[0118] Among them, in some specific embodiments, the constraints for constructing the hourly operation simulation throughout the year, that is, the constraints for constructing the hourly operation simulation throughout the year are basically the same as the constraints for the upper-level typical day operation simulation, and only the operation time period is expanded from the typical day to the hourly operation throughout the year, that is, m and M in the upper-level constraints are replaced by d and D.
[0119] The lower-level operation simulation constraint conditions are basically consistent with the constraint requirements of the upper-level planning constraint conditions, except that the reference time period corresponding to the operation data considered by each specific constraint requirement in the upper-level planning constraint conditions is replaced from a typical day to hourly throughout the year;
[0120] That is, the lower-level operation simulation constraints include the second coupling relationship constraint of the new and old installed capacities, the second flexibility transformation capacity constraint, the second planning capacity balance constraint, the second power balance constraint in each time period, the second adjustable capacity balance constraint in each time period, the second heat balance constraint in each time period, the second new energy penetration constraint, the second new energy operation constraint, the second hydropower operation constraint, the second electric energy storage operation constraint, the second nuclear power operation constraint, the second pure condensing unit operation constraint, the second extraction condensing unit operation constraint, the second back pressure unit operation constraint, the second electric boiler operation constraint, the second heat storage tank operation constraint, and the second coal-fired boiler operation constraint; and the parameters of the corresponding formulas are replaced by d and D instead of m and M.
[0121] In some specific embodiments, S5, a two-layer iterative strategy is created, and a typical day set correction scheme is obtained according to the initial operation results and the two-layer iterative strategy, and the typical day set formed in step S2 is corrected based on the typical day set correction scheme, so as to obtain a coordinated planning scheme for new energy and flexible coal-fired power in severe cold regions that meets the correction index requirements, wherein the correction index requirements include but are not limited to load loss rate and power abandonment rate. Among them, the process of creating a two-layer iterative strategy in S5 and obtaining a typical day set correction scheme according to the initial operation results and the two-layer iterative strategy includes the following steps:
[0122] S51, obtaining the typical day operation loss load rate corresponding to each typical day in the typical day set and the initial operation result; wherein the two types of loss load rate calculation formulas are as follows:
[0123] For the typical daily operating load loss rate of the upper layer:
[0124]
[0125] For the lower layer, the hourly load loss rate throughout the year is:
[0126]
[0127] In the formula, γ load,cut,top , γ load,cut,bottom They are the typical daily operating load loss rate and the annual hourly operating load loss rate;
[0128] S52, comparing and analyzing the typical daily operation loss load rate and the annual hourly operation loss load rate one by one to see whether they do not exceed the standard loss load rate difference;
[0129] S53. If the current comparison result exceeds the standard deviation value of the load loss rate, it is confirmed that there is an abnormality in the time zone table to which the typical day belongs, and the load loss amount of each time zone is calculated based on the operation data of the corresponding typical day. After finding the time zone with the largest calculated load loss amount, the Euclidean distance between the load loss of each day in the time zone and the corresponding typical day is calculated (i.e., the gap is obtained by obtaining the power abandonment matrix of each day and the power abandonment matrix of the corresponding typical day, and the corresponding Euclidean distance is calculated) and a gap arrangement table is formed in descending order of the gap value, and the day with the largest gap in the current gap arrangement table is selected as the candidate special day;
[0130] S54, determining whether the candidate special day has not been selected as the first category special day, if yes, taking the candidate special day as the first category special day, otherwise executing step S55;
[0131] S55, eliminating the current candidate special day and updating the gap ranking table in step S53, and continuing to select the day with the largest gap from the gap ranking table as the candidate special day for a new round of cyclic iteration process;
[0132] S56, extracting the operation data corresponding to the time zone of the first type of special day and adding it as a new typical day to the typical day set to perform a layer of iterative correction to form a first typical day set, while removing the operation data corresponding to the time zone of the first type of special day in the original typical day;
[0133] S57, obtaining the typical day operation abandonment rate corresponding to each typical day in the first typical day set and the annual hourly operation abandonment rate corresponding to the initial operation result;
[0134] The calculation formulas for the two types of power abandonment rates are as follows:
[0135] For the typical daily curtailment rate of the upper layer:
[0136]
[0137] For the lower tier, the hourly curtailment rate for the entire year is:
[0138]
[0139] In the formula, γ loss,top , γ loss,bottom They are the typical daily power abandonment rate and the hourly power abandonment rate throughout the year respectively.
[0140] S58, comparing and analyzing the typical daily power abandonment rate and the annual hourly power abandonment rate one by one to see whether they do not exceed the standard power abandonment rate difference;
[0141] S59. If the current comparison result exceeds the standard deviation of the power abandonment rate, it is confirmed that there is an abnormality in the time zone table to which the typical day belongs, and the power abandonment of each time zone is calculated based on the operation data of the corresponding typical day. After finding the time zone with the largest calculated power abandonment, the Euclidean distance, i.e., the gap, between the power abandonment of each day in the time zone and the corresponding typical day is calculated, and a gap arrangement table is formed in descending order of the gap values. According to the given day number threshold M, M candidate special days are selected in sequence;
[0142] S510, determining in turn whether the candidate special day has not been selected as the second category special day, if yes, taking the candidate special day as the second category special day, otherwise executing step S511;
[0143] S511, remove the current candidate special days and update the gap ranking table in step S59, and continue to select N days with the largest gaps from the gap ranking table as candidate special days for a new round of cyclic iteration process;
[0144] S55. Extract the operating data corresponding to the time zone of each second-category special day and aggregate it into the operating data of a certain day, then add it as a new typical day to the typical day set for two-layer iterative correction to form a second typical day set, and then form the final typical day set correction plan. At the same time, the second-category special day is eliminated. When the operating results of the lower layer in the original pawn are too different from the upper layer typical days, the typical day set will be corrected so that the upper layer can better reflect the operating conditions throughout the year, and then the most appropriate planning scheme will be obtained.
[0145] Based on the above design, the core step of S5 is to create a two-layer iterative strategy and obtain a typical day set correction plan, that is, the correction index of the typical day set correction plan is based on the load loss rate and the power abandonment rate as the judgment criteria, that is, firstly correct the power shortage. When the difference between the load loss rates of the upper and lower layers exceeds the standard deviation of the load loss rate (preferably 0.01% in this example), the day with the largest difference between the load loss result and the corresponding typical day in the time zone with the largest total load loss in the lower layer is added as a new typical day to the typical day set until the requirements are met; after the power demand is met, correct the excess power. When the difference between the power abandonment rates of the upper and lower layers exceeds the standard deviation (preferably 1% in this example), the ten days with the largest difference between the power abandonment result and the corresponding typical day in the time zone with the largest total power abandonment in the lower layer are aggregated into one day as a new typical day and added to the upper layer typical day set until the requirements are met. See the specific process. Figure 2 First, the comparative iterative analysis process of the load loss rate is carried out, and the comparative iterative analysis process of the power abandonment rate is continued after the conditions are met. After two iterations, the corresponding new typical days are obtained and added to the typical day set, thereby forming the final typical day set correction plan.
[0146] The correction standards and methods for load loss and power abandonment in the indicators that are corrected at the same time are slightly different. This is because as the penetration rate of new energy increases, the proportion of wind and solar power gradually increases, and the amount of power abandonment also increases. If the judgment standard is set at 0.01%, it will lead to the addition of many typical days in the upper model. Although it can better reflect the operation of the whole year, the correction time will be very lengthy and the correction process will be difficult to converge; if only the day with the largest difference in power abandonment is selected as the new typical day, it will take dozens of cycles, which will also make the correction process impossible to estimate and difficult to converge. Therefore, in order to simplify the correction process, the correction standard is relaxed to 1%, and the method of adding typical days is also adjusted accordingly.
[0147] Based on the same inventive concept, the present invention also proposes a collaborative planning system formed according to any one of the specific implementation schemes of the above-mentioned collaborative planning method for new energy and flexible coal-fired power in severe cold regions based on double-layer iteration, comprising:
[0148] A first model creation unit, which is used to create an objective function of an upper-level planning model of a flexible resource and new energy collaborative planning model corresponding to severe cold regions;
[0149] A first model constraint unit, which is used to set upper-level planning constraint conditions, and under the constraints of the upper-level planning constraint conditions, based on the typical day set and the objective function of the upper-level planning model, form a corresponding typical day planning design scheme;
[0150] A second model creation unit is used to create an objective function of a lower-level operation simulation model of a flexible resource and new energy collaborative planning model corresponding to severe cold regions;
[0151] The second model constraint unit is used to set the lower-level operation simulation constraint conditions. Under the constraint of the lower-level planning constraint conditions, based on the typical day planning design scheme and the objective function of the lower-level operation simulation model, the actual production simulation is performed hour by hour throughout the year to obtain the actual production simulation data, i.e., the initial operation result;
[0152] An operation processing unit is used to create a two-layer iterative strategy, obtain a typical day set correction plan according to the initial operation results and the two-layer iterative strategy, and correct the typical day set formed in step S2 based on the typical day set correction plan, so as to obtain a coordinated planning scheme for new energy and flexible coal-fired power in severe cold regions that meets the correction index requirements, wherein the correction index requirements include but are not limited to load loss rate and power abandonment rate.
[0153] Based on the same inventive concept, the present invention also proposes a computer-readable storage medium, comprising computer instructions, and when the computer instructions are executed on a computer, the computer executes the method described.
[0154] Based on the above design scheme, this application conducts specific implementation analysis:
[0155] First, obtain the required basic parameter tables, as shown in Table 1 - Investment parameters of each unit and flexibility resource and Table 2 - Original installed capacity of each equipment and related parameters:
[0156] Table 1 Investment parameters
[0157]
[0158] Table 2 Original installed capacity and related parameters of each equipment
[0159]
[0160]
[0161] Secondly, the initial typical day set; for this example, for the wind and solar power output per unit value, electric-heat load per unit value and other data in the planning year, according to the time sequence of non-heating period 1-heating period-non-heating period 2, the average values are taken to form the initial typical day set, where the number of typical days in the typical day set is 123 days, 152 days, and 91 days respectively;
[0162] Again, the first step is to form the corresponding objective function and the upper-level planning constraints according to the steps of the objective function of the upper-level planning model of the flexible resource and new energy collaborative planning model corresponding to the severe cold regions and the upper-level planning constraints. Under the constraints of the upper-level planning constraints, the corresponding typical day planning design scheme is formed based on the typical day set and the objective function of the upper-level planning model; specifically, in this example, the initial planning scheme is obtained by planning based on the per-unit value curves of the above three typical days and relevant parameters such as the planned annual maximum load; the output per-unit values of the initial typical day set of electric load, thermal load, wind power, photovoltaic, nuclear power, and external power are as follows: Figures 3 to 5 As shown; among them, the planned annual maximum electricity load is 35980.5MW, the maximum thermal load is 35429MW, and the maximum output of external electricity is 6683MW; the planned reserve rate is 20%, the operating reserve rate is 8%, and the new energy penetration rate is set at 20%.
[0163] The second step is to create the objective function of the lower-level operation simulation model of the flexible resource and new energy collaborative planning model corresponding to the severe cold region and set the lower-level operation simulation constraints; according to the initial planning scheme delivered in the first step, the hourly production simulation is carried out throughout the year to obtain the initial operation results. The load loss and power abandonment of typical days and hourly operations throughout the year are shown in Table 3, and the initial planning results are shown in Table 4.
[0164] Finally, according to the initial operation results and the two-layer iterative strategy, a typical day set correction scheme is obtained, and the typical day set formed in the above steps is corrected based on the typical day set correction scheme, so as to obtain a coordinated planning scheme for new energy and flexible coal-fired power in severe cold regions that meets the correction index requirements. Specifically, in this example, the typical day data transmitted to the upper layer is corrected according to the typical day set correction scheme, and the load loss rate and power abandonment rate of each cycle are obtained as shown in Table 3, the planning scheme of each correction is shown in Table 4, and the time zone to which the newly added typical day belongs is shown in Table 5. That is, each typical day in the new typical day set still follows the time order of non-heating period 1-heating period-non-heating period 2, and the corresponding days are: 113 days, 10 days, 141 days, 10 days, 1 day, 71 days, 10 days, and 10 days. The output per unit values of the electric load, thermal load, wind power, photovoltaic power, nuclear power, and external power of each typical day after correction are as follows: Figures 6 to 8 shown.
[0165] Table 3 Comparison of load loss rate and power abandonment rate
[0166]
[0167] Table 4 Planning result correction table
[0168]
[0169] Table 5 Newly added typical day time zone table
[0170]
[0171]
[0172] Based on the above table and the simulation effect diagram, it can be seen from the correction situation that after one cycle, the difference between the load loss rates of the upper and lower layers can meet the requirements, while the correction of the power abandonment rate index requires four cycles; this is because the way the upper layer forms the initial typical day set is too simple, resulting in the actual operation of new energy sources not being fully considered, so the number of cycles is greater; and it can be seen from Table 5 that after fully considering the power abandonment conditions of each time zone, the difference between the power abandonment rates of the upper and lower layers meets the design requirements, which further proves the necessity of the double-layer iterative strategy correction given in this application with the load loss rate and the power abandonment rate as correction indicators to obtain the typical day set correction scheme.
[0173] The above-mentioned embodiments only express several implementation methods of the present application, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the scope of the present application. It should be pointed out that, for a person of ordinary skill in the art, several variations and improvements can be made without departing from the concept of the present application, and these all belong to the protection scope of the present application. Therefore, the protection scope of the present application shall be subject to the attached claims.
Claims
1. A method for collaborative planning of new energy and flexible coal-fired power in severe cold regions based on double-layer iteration, characterized in that: The steps include: S1. Objective function of the upper planning model for creating a flexible resource and new energy collaborative planning model corresponding to severe cold regions; S2, setting upper-level planning constraints, and under the constraints of the upper-level planning constraints, forming a corresponding typical day planning design scheme based on a typical day set and an objective function of an upper-level planning model, wherein the typical day set has a plurality of typical day data; S3, creating the objective function of the lower-level operation simulation model of the flexible resource and new energy collaborative planning model corresponding to the severe cold regions; S4. Setting lower-level operation simulation constraints, and under the constraints of the lower-level planning constraints, based on the typical day planning design scheme and the objective function of the lower-level operation simulation model, performing actual production simulation hour by hour throughout the year to obtain actual production simulation data, i.e., initial operation results; S5. Create a two-layer iterative strategy, obtain a typical day set correction plan based on the initial operation results and the two-layer iterative strategy, and correct the typical day set formed in step S2 based on the typical day set correction plan, so as to obtain a coordinated planning scheme for new energy and flexible coal-fired power in severe cold regions that meets the correction index requirements, wherein the correction index requirements include but are not limited to load loss rate and power abandonment rate.
2. The method for collaborative planning of new energy and flexible coal-fired power in severe cold regions based on double-layer iteration according to claim 1 is characterized in that: The process of creating a two-layer iteration strategy in S5 and obtaining a typical day set correction solution according to the initial operation result and the two-layer iteration strategy includes the following steps: S51, obtaining the typical day operation loss load rate corresponding to each typical day in the typical day set and the annual hourly operation loss load rate corresponding to the initial operation result; S52, comparing and analyzing the typical daily operation loss load rate and the annual hourly operation loss load rate one by one to see whether they do not exceed the standard loss load rate difference; S53. If the current comparison result exceeds the standard deviation of the load loss rate, it is confirmed that there is an abnormality in the time zone table to which the typical day belongs, and the load loss amount of each time zone is calculated based on the operation data of the corresponding typical day. After finding the time zone with the largest calculated load loss amount, the Euclidean distance between the load loss of each day in the time zone and the corresponding typical day is calculated, and a gap arrangement table is formed in descending order of the gap value, and the day with the largest gap in the current gap arrangement table is selected as the candidate special day; S54, determining whether the candidate special day has not been selected as the first category special day, if yes, taking the candidate special day as the first category special day, otherwise executing step S55; S55, eliminating the current candidate special day and updating the gap ranking table in step S53, and continuing to select the day with the largest gap from the gap ranking table as the candidate special day for a new round of cyclic iteration process; S56, extracting the operation data corresponding to the time zone of the first type of special day and adding it as a new typical day to the typical day set to perform a layer of iterative correction to form a first typical day set, while removing the operation data corresponding to the time zone of the first type of special day in the original typical day; S57, obtaining the typical day operation abandonment rate corresponding to each typical day in the first typical day set and the annual hourly operation abandonment rate corresponding to the initial operation result; S58, comparing and analyzing the typical daily power abandonment rate and the annual hourly power abandonment rate one by one to see whether they do not exceed the standard power abandonment rate difference; S59. If the current comparison result exceeds the standard deviation of the power abandonment rate, it is confirmed that there is an abnormality in the time zone table to which the typical day belongs, and the power abandonment of each time zone is calculated based on the operation data of the corresponding typical day. After finding the time zone with the largest calculated power abandonment, the Euclidean distance between the power abandonment of each day in the time zone and the corresponding typical day is calculated, and a gap arrangement table is formed in descending order of the gap value. According to the given day number threshold M, M candidate special days are selected in turn; S510, determining in sequence whether the candidate special day has not been selected as the second category special day, if yes, taking the candidate special day as the second category special day, otherwise executing step S511; S511, remove the current candidate special days and update the gap ranking table in step S59, and continue to select N days with the largest gaps from the gap ranking table as candidate special days for a new round of cyclic iteration process; S55. Extract the operating data corresponding to the time zone of each second-category special day and aggregate them into the operating data of a certain day, and then add it as a new typical day to the typical day set for two-layer iterative correction to form a second typical day set, and then form a final typical day set correction plan, while eliminating the operating data of the second-category special day corresponding to the time zone to which the original typical day belongs.
3. The method for collaborative planning of new energy and flexible coal-fired power in severe cold regions based on double-layer iteration according to claim 1 is characterized in that: The upper-level planning model of the flexible resource and new energy collaborative planning model corresponding to the severe cold regions in S1 aims to minimize the sum of the annualized investment cost of new resources and the total operating cost of typical days in the planning year, and the corresponding objective function is as follows: Min Z top =Z inv +Z sys (1) In formula (1), the subscript top represents the upper-level planning model, inv represents investment, and sys represents operation; Z inv is the annualized investment cost of new resources in the planning year, Z sys is the total operating cost for a typical day in the planning year.
4. The method for collaborative planning of new energy and flexible coal-fired power in severe cold regions based on double-layer iteration according to claim 3 is characterized in that: The annualized investment cost of new resources in the planning year includes the investment cost of new power sources and the investment cost of flexible resources, and the corresponding function is as follows: WITH inv =Z S,inv +Z F,inv (2) In formula (2), Z S,inv is the investment cost of new power source, Z F,inv The cost of investing in new flexibility resources; Among them, the investment cost of new power sources includes the investment cost of pure condensing units and the investment cost of wind and solar units, and the corresponding functions are as follows: Z S,inv =Z CON,inv +Z Res,inv =d crf (c CON C CON,new +c Wind C Wind,new +c Solar C Solar,new )(3) In formula (3), the subscript CON represents the pure condensing unit, Res represents the new energy unit, Wind represents the wind turbine unit, and Solar represents the photovoltaic unit; d crf is the annualized coefficient, and its expression is d crf =α(1+α) κ / [(1+α) κ -1], α is the discount rate, κ is the useful life of the equipment; c CON 、c Wind 、c Solar are the unit investment costs of pure condensing, wind power, and photovoltaic power respectively; C CON,new , C Wind,new , C Solar,new They are the newly built capacities of pure condensing units, wind turbine units, and photovoltaic units; Among them, the investment cost of the newly added flexible resources includes the investment cost of pure condensation transformation and extraction condensation, the investment cost of the extraction condensation low-pressure cylinder removal, the investment cost of the extraction condensation transformation back pressure, the investment cost of the new heat storage tank, and the investment cost of the new electric boiler. The investment cost function is expressed as follows: In formula (4), the subscripts EC, LC, CB, EB, and HS represent the extraction condensing unit, the low-pressure cylinder removal unit, the back pressure unit, the electric boiler, and the heat storage tank, respectively; CONtoEC, ECtoLC, and ECtoCB represent the transformation of the pure condensing unit into the extraction condensing unit, the low-pressure cylinder removal transformation of the extraction condensing unit, and the transformation of the extraction condensing unit into the back pressure unit, respectively; then c CONtoEC 、c ECtoLC 、c ECtoCB 、c EB The unit capacity investment costs of pure condensing unit transformation to extraction condensing unit, extraction condensing unit low-pressure cylinder removal transformation, extraction condensing unit transformation to back pressure unit, and electric boiler are respectively HS,s 、c HS,c are the investment costs of the unit energy capacity and unit power capacity of the heat storage tank, respectively, CONtoEC , C ECtoLC , C ECtoCB , C EB,new , S HS,new , C HS,new They are the capacity of pure condensing unit transformed into extraction condensing unit, the capacity of extraction condensing unit transformed into low-pressure cylinder cutting unit, the capacity of extraction condensing unit transformed into back-pressure unit, the capacity of new electric boiler, the energy capacity of new heat storage tank, and the power capacity of new heat storage tank; The typical daily total operating cost of the planning year includes the operating costs of three types of coal-fired power units, coal-fired boilers, and load loss penalty costs. The three types of coal-fired power units include pure condensing units, extraction condensing units, and back pressure units. The typical daily total operating cost function of the planning year is expressed as follows: In formula (5), the subscripts Boilder and loa d ,ele,heat,cut represent coal-fired boiler, load, electricity, heat, and load loss, respectively; the superscripts m and t are the indexes of typical days and typical day periods, respectively; M and T are the total number of typical days and the number of typical day periods, respectively; D m is the number of the mth typical day, λ Coal is the coal price; w CON is the coal consumption corresponding to the unit power generation of the pure condensing unit, w EC is the coal consumption corresponding to the unit equivalent power generation of the extraction condensing unit, w CB is the coal consumption corresponding to the unit power generation of the back pressure unit, w Boilder The coal consumption corresponding to the unit heat supply of the coal-fired boiler; are the power output of the three types of units in the mth typical day during the t period, are the heat output of the condensing unit and the coal-fired boiler in the mth typical day, period t, c v It is the reduction in power generation when more unit heating heat is extracted while the steam inlet volume of the condensing unit remains unchanged. is the equivalent electrical output of the condensing unit converted to pure condensing conditions; c ele,cut 、c heat,cut are the unit penalty costs of electrical and thermal load loss, They are respectively the electric and heat loss loads in period t of the mth typical day.
5. The method for collaborative planning of new energy and flexible coal-fired power in severe cold regions based on double-layer iteration according to claim 1 is characterized in that: The upper-level planning constraints include the first coupling relationship constraint of the new and old installed capacities, the first flexibility transformation capacity constraint, the first planning capacity balance constraint, the first power balance constraint in each time period, the first adjustable capacity balance constraint in each time period, the first heat balance constraint in each time period, the first new energy penetration constraint, the first new energy operation constraint, the first hydropower operation constraint, the first electric energy storage operation constraint, the first nuclear power operation constraint, the first pure condensing unit operation constraint, the first extraction condensing unit operation constraint, the first back pressure unit operation constraint, the first electric boiler operation constraint, the first heat storage tank operation constraint, and the first coal-fired boiler operation constraint; Among them, the first coupling relationship constraint condition between the new and old installed capacities is as follows: In formula (6), C CON,old , C EC,old , C LC,old , C CB,old , C Wind,old , C Solar,old , C EB,old They represent the original capacities of the pure condensing unit, the extraction condensing unit, the low-pressure cylinder removal unit, the back pressure unit, the wind turbine unit, the photovoltaic unit, and the electric boiler, respectively. HS,old , S HS,old are the original power capacity and energy capacity of the heat storage tank, C CON , C EC , C LC , C CB , C Wind , C Solar , C EB are the existing capacities of the corresponding resources, C HS , S HS are the existing power capacity and energy capacity of the heat storage tank, T HS How long it takes to fill the heat storage tank; The first flexibility transformation capacity constraint is as follows: In formula (7), γ CONtoEC,max The maximum proportion of pure condensing units converted into extraction condensing units; The first planning capacity balance constraint is as follows: In formula (8), P line,max is the maximum power output of the tie line, β inv is the annual reliable capacity factor of new energy, α inv The planned reserve ratio for the system; S24, the power balance constraints in the first period are as follows: In formula (9), the subscript Nuc represents nuclear power, and the subscript Hyd represents hydropower; They represent the power output of wind power, photovoltaic power, nuclear power, hydropower, and interconnection line in the mth typical day and time period, are the discharge power and charging power of the energy storage at the mth typical day during the t period, are the power loads of the system and the electric boiler in the mth typical day, time period t; The first time period adjustable capacity balance constraint conditions are as follows: In formula (10), are the maximum adjustable outputs of wind power, photovoltaic power, nuclear power, hydropower, pure condensing, extraction condensing, back pressure, and electric energy storage in the mth typical day during the t period; α sys is the system's operational reserve rate; The heat balance constraints for each period are as follows: In formula (11), are back pressure and heat output of electric boiler in period t on the mth typical day, respectively; is the heat release power and heat storage power of the heat storage tank in the mth typical day during the t period; is the heat load of the system during the mth typical day and period t; The first new energy penetration rate constraint conditions are as follows: In formula (12), δ Res is the permeability required by the system; The operating constraints of the First New Energy are as follows: In formula (13), are the per unit values of wind power and photovoltaic power in the mth typical day and time period, β Res For the credibility of new energy; The first hydropower operation constraints are as follows: In formula (14), C Hyd represents the installed capacity of hydropower, The power generated by hydropower in a typical day. is the hydropower output in the nth period of the mth typical day, represents the total hydropower output before time period t; The operating constraints of the First Electric Energy Storage are as follows: In formula (15), η ES The efficiency of charging and discharging of electrical energy storage, is the amount of electricity stored in the energy storage system during period t; They are the storage capacity of the electric energy storage in the first and last periods of a typical day, and the storage capacity in the first and last periods is required to be equal; are the charging and discharging states of the energy storage, respectively, and 1 represents the corresponding state; S ES The maximum storage capacity of electric energy storage; The operating constraints of the first nuclear power plant are as follows: In formula (16), C Nuc is the installed capacity of nuclear power units; The operating constraints of the first pure condensing unit are as follows: In formula (17), the subscript on indicates on-state, and the subscript heat indicates heating; is the minimum output rate of the pure condensing unit, It indicates the operating capacity of the pure condensing unit on the mth typical day. It is assumed that the operating capacity does not change within a day. It is the heating index. When the system is in the non-heating period, its value is 0. The extraction condensing unit and the back pressure unit are both treated as pure condensing units. It is 1 during the heating period. The operating constraints of the first condensing unit are as follows: In formula (18), P EC,e,min , P EC,e,0 are the minimum electrical output and electrothermal characteristic constant of the condensing unit, c m,EC is the electric-to-heat ratio of the condensing unit; Δq is the additional heating power introduced by the low-pressure cylinder removal unit, q LC,add The additional heating power of the unit low-pressure cylinder removal unit; Q EC,max It is the maximum heating power of the condensing unit under the maximum steam extraction condition; The operating constraints of the first back pressure unit are as follows: In formula (19), is the rate of change of electrical output when the back pressure unit changes from pure condensing condition to back pressure condition, is the minimum output rate of the back pressure unit, c m,CB is the electric-to-heat ratio of the back pressure unit; The operating constraints of the first electric boiler are as follows: In formula (20), η EB is the electricity-to-heat efficiency of the electric boiler; The operating constraints of the first thermal storage tank are as follows: In formula (21), ε HS is the heat loss rate of the heat storage tank, η HS The efficiency of heat storage and release in the heat storage tank, is the heat storage capacity of the heat storage tank in period t; are the heat storage of the heat storage tank in the first and last periods of a typical day, respectively, and it is stipulated that the heat storage in the first and last periods is equal; are the heat storage and heat release states of the heat storage tank, respectively, and 1 represents the corresponding state; The operating constraints of the first coal-fired boiler are as follows: In formula (22), C Boilder Installed capacity of coal-fired boilers.
6. The method for collaborative planning of new energy and flexible coal-fired power in severe cold regions based on double-layer iteration according to claim 1 is characterized in that: The objective function of the lower-level operation simulation model of the flexible resources and new energy collaborative planning model corresponding to the severe cold regions is similar to the objective function of the upper-level planning model of the flexible resources and new energy collaborative planning model corresponding to the severe cold regions, and the difference is that: The benchmark time period corresponding to the considered operation data of the objective function of the upper-level planning model of the flexible resource and new energy coordinated planning model corresponding to the severe cold region is a typical day; The benchmark time period corresponding to the operation data considered by the objective function of the lower-level operation simulation model of the flexible resource and new energy coordinated planning model corresponding to the severe cold regions is hourly throughout the year; That is, the objective function of the lower-level operation simulation model of the flexible resource and new energy collaborative planning model corresponding to the severe cold region is to minimize the sum of the annualized investment cost of new resources in the planning year and the total hourly operation cost throughout the year. The corresponding objective function is as follows: Min Z down =Z inv +Z bottom (23) In formula (23), the subscript down represents the lower-level operation simulation model, inv represents investment, and bottom represents the actual simulation operation; Z inv is the annualized investment cost of new resources in the planning year, Z bottom is the total hourly operating cost for the planning year and In formula (24), d is the index of the operating days, and D is the total number of days in the whole year; are the power outputs of pure condensing, extraction condensing and back pressure units at time t on day d, respectively. is the heat output of the condensing and coal-fired boilers at time t on day d, It is the power and heat loss load in the t period on the d day.
7. The method for collaborative planning of new energy and flexible coal-fired power in severe cold regions based on double-layer iteration according to claim 6 is characterized in that: The lower-level operation simulation constraint conditions are basically consistent with the constraint requirements of the upper-level planning constraint conditions, except that the reference time period corresponding to the operation data considered by each specific constraint requirement in the upper-level planning constraint conditions is replaced from a typical day to hourly throughout the year; That is, the lower-level operation simulation constraints include the second coupling relationship constraint of the new and old installed capacities, the second flexibility transformation capacity constraint, the second planning capacity balance constraint, the second power balance constraint in each time period, the second adjustable capacity balance constraint in each time period, the second heat balance constraint in each time period, the second new energy penetration constraint, the second new energy operation constraint, the second hydropower operation constraint, the second electric energy storage operation constraint, the second nuclear power operation constraint, the second pure condensing unit operation constraint, the second extraction condensing unit operation constraint, the second back pressure unit operation constraint, the second electric boiler operation constraint, the second heat storage tank operation constraint, and the second coal-fired boiler operation constraint; and the parameters of the corresponding formulas are replaced by d and D instead of m and M.
8. A collaborative planning system formed by the collaborative planning method for new energy and flexible coal-fired power in severe cold regions based on double-layer iteration according to any one of claims 1 to 7, comprising: A first model creation unit, which is used to create an objective function of an upper-level planning model of a flexible resource and new energy collaborative planning model corresponding to severe cold regions; A first model constraint unit, which is used to set upper-level planning constraint conditions, and under the constraints of the upper-level planning constraint conditions, based on the typical day set and the objective function of the upper-level planning model, form a corresponding typical day planning design scheme; A second model creation unit is used to create an objective function of a lower-level operation simulation model of a flexible resource and new energy collaborative planning model corresponding to severe cold regions; The second model constraint unit is used to set the lower-level operation simulation constraint conditions. Under the constraint of the lower-level planning constraint conditions, based on the typical day planning design scheme and the objective function of the lower-level operation simulation model, the actual production simulation is performed hour by hour throughout the year to obtain the actual production simulation data, i.e., the initial operation result; An operation processing unit is used to create a two-layer iterative strategy, obtain a typical day set correction plan according to the initial operation results and the two-layer iterative strategy, and correct the typical day set formed in step S2 based on the typical day set correction plan, so as to obtain a coordinated planning scheme for new energy and flexible coal-fired power in severe cold regions that meets the correction index requirements, wherein the correction index requirements include but are not limited to load loss rate and power abandonment rate.
Citation Information
Cited By
Coal mine micro-grid optimal configuration method and electronic equipment
CN122717145A