Through the work breakdown structure-risk breakdown structure method, DEMATEL algorithm and Bayesian network, combined with chaos mapping to improve the hippocampus optimization algorithm, the problem of insufficient static assessment in communication engineering construction risk assessment is solved, and dynamic risk identification and management are achieved.
Patent Information
- Application Number
- CN202410368913.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-28
- Publication Date
- 2024-10-18
AI Technical Summary
Existing communication engineering construction risk assessment methods mainly rely on static assessment, which is difficult to fully reflect the relationship between risk factors and dynamic changes, resulting in inaccurate and comprehensive risk identification, which consumes a lot of manpower and time.
The work breakdown structure-risk breakdown structure method is used for preliminary risk identification, combined with the DEMATEL algorithm to build a risk element transfer network, and evaluated through the Bayesian network. Chaos mapping is introduced to improve the hippocampus optimization algorithm to optimize the network structure and perform forward and reverse reasoning. and sensitivity analysis to identify main risk element transmission chains and key risk elements.
It achieves a dynamic and comprehensive assessment of communications engineering project risks, accurately identifies the main risk element transmission chain and key risk elements, and improves the basis for risk management and control.
Smart Images

Figure CN118798631A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of data processing technology, and in particular to a communication engineering security risk assessment method and device. Background Art
[0002] Risk identification of engineering projects, especially communication engineering projects, is a very cumbersome process. Using traditional risk identification methods to determine risk factors often takes a lot of manpower and time, and is not comprehensive and systematic enough to understand the potential or existing risks in the project.
[0003] At present, the risk assessment of communication engineering construction is still mainly static assessment, which is difficult to reflect the causal influence relationship between risk factors and the dynamic changes during construction. Especially in complex projects, there are many risk factors and the causal influence relationship is more complex. The existing risk dynamic method is difficult to accurately and comprehensively reflect the risk transfer characteristics of the entire construction process.
[0004] Therefore, how to conduct communication engineering security risk assessment more effectively has become an urgent problem to be solved in the industry. Summary of the invention
[0005] The embodiments of the present application provide a communication engineering security risk assessment method and device to solve the problem of how to more effectively conduct communication engineering security risk assessment.
[0006] In a first aspect, an embodiment of the present application provides a communication engineering security risk assessment method, comprising:
[0007] Based on the work breakdown structure-risk breakdown structure method, the communication engineering project is preliminarily identified, and a risk element correlation matrix containing multiple risk elements is obtained;
[0008] Determine the risk element to be evaluated among the risk elements in the risk element association matrix based on the DEMATEL algorithm, and construct a risk element transmission network according to the correlation degree of each risk element to be evaluated; wherein the risk element to be evaluated is the risk element whose centrality exceeds a preset threshold;
[0009] The risk element transmission network is evaluated using a Bayesian network to obtain the prior probability, posterior probability, and sensitivity value of each risk element to be evaluated, so as to identify the main risk element transmission chain and key risk elements in the communication engineering project.
[0010] In one embodiment, the risk element transfer network is evaluated using a Bayesian network to obtain the prior probability, posterior probability, and sensitivity value of each risk element to be evaluated, including:
[0011] By introducing an improved Hippocampus optimization algorithm with a chaotic mapping method, the risk meta-transfer network is optimized to obtain an optimal directed acyclic graph structure;
[0012] Based on the optimal directed acyclic graph structure, a Bayesian network is constructed. In the Bayesian network, forward reasoning, reverse reasoning and sensitivity analysis are used to obtain the prior probability, posterior probability and sensitivity value of each risk element to be evaluated.
[0013] In one embodiment, the risk meta-transfer network is optimized by introducing an improved hippocampus optimization algorithm that introduces a chaotic mapping method to obtain an optimal directed acyclic graph structure, including:
[0014] Taking a candidate risk meta-transfer network structure as each hippocampus individual in a hippocampus population, and initializing the hippocampus population;
[0015] The Bayesian information criterion scoring function is used as the fitness value of the hippocampus individual, and the current optimal directed acyclic graph structure is recorded according to the current position of the hippocampus;
[0016] Update the individual positions of the hippocampus, update the current optimal directed acyclic graph structure, perform breeding operations on the hippocampus population, and update the optimal hippocampus population;
[0017] The updated optimal hippocampus population is subjected to chaotic mapping to obtain an updated directed acyclic graph structure, and then the position of the hippocampus population is continuously updated. When the preset stopping condition is met, the updating is stopped to obtain the optimal directed acyclic graph structure.
[0018] In one embodiment, the specific process of the chaotic mapping includes:
[0019] After the chaotic variables are initialized, the chaotic variables are applied to the problem to be solved for optimizing the Bayesian network structure to obtain a solution space of the problem to be solved;
[0020] Based on the solution space of the problem to be solved, chaotic perturbations are performed on individuals of the seahorse population to obtain individuals after chaotic perturbations, and the individuals after chaotic perturbations are updated into the seahorse population.
[0021] In one embodiment, determining the risk element to be evaluated among the risk elements in the risk element association matrix based on the DEMATEL algorithm includes:
[0022] Normalizing the risk element association matrix to obtain a normalized risk element association matrix;
[0023] Based on the normalized risk element association matrix, a comprehensive influence matrix is constructed, and the row sum and column sum of the comprehensive influence matrix are calculated to calculate the centrality of each risk element;
[0024] The risk elements whose centrality exceeds a preset threshold are taken as risk elements to be evaluated, and a risk element transmission network is determined to be constructed based on the correlation between the risk elements to be evaluated.
[0025] In one embodiment, the risk element transmission network is evaluated using a Bayesian network to obtain the prior probability, posterior probability, and sensitivity value of each risk element to be evaluated, so as to identify the main risk element transmission chain and key risk elements in the communication engineering project, including:
[0026] Determining the prior probability of each risk element to be evaluated based on the forward reasoning of the Bayesian network;
[0027] Determine the posterior probability of each risk element to be evaluated based on the reverse reasoning of the Bayesian network;
[0028] Based on the sensitivity analysis of the Bayesian network, determining the sensitivity value of each risk element to be evaluated;
[0029] Determine the key risk elements in the risk element transmission network of the communication engineering project based on the posterior probability and sensitivity value of the risk element to be evaluated;
[0030] Based on the prior probability and the posterior probability of the risk element to be evaluated, the main risk element transmission chain in the risk element transmission network of the communication engineering project is determined.
[0031] In a second aspect, an embodiment of the present application provides a communication engineering security risk assessment device, comprising:
[0032] An identification module is used to perform preliminary risk identification on a communication engineering project based on a work breakdown structure-risk decomposition structure method, and obtain a risk element association matrix containing multiple risk elements;
[0033] A construction module, used to determine the risk element to be evaluated among the risk elements in the risk element association matrix based on the DEMATEL algorithm, and to construct a risk element transmission network according to the correlation degree of each of the risk elements to be evaluated; wherein the risk element to be evaluated is the risk element whose centrality exceeds a preset threshold;
[0034] The evaluation module is used to evaluate the risk element transmission network using a Bayesian network to obtain the prior probability, posterior probability, and sensitivity value of each risk element to be evaluated, so as to identify the main risk element transmission chain and key risk elements in the communication engineering project.
[0035] Optionally, the device is also used for:
[0036] By introducing an improved Hippocampus optimization algorithm with a chaotic mapping method, the risk meta-transfer network is optimized to obtain an optimal directed acyclic graph structure;
[0037] Based on the optimal directed acyclic graph structure, a Bayesian network is constructed. In the Bayesian network, forward reasoning, reverse reasoning and sensitivity analysis are used to obtain the prior probability, posterior probability and sensitivity value of each risk element to be evaluated.
[0038] Optionally, the device is also used for:
[0039] Taking a candidate risk meta-transfer network structure as each hippocampus individual in a hippocampus population, and initializing the hippocampus population;
[0040] The Bayesian information criterion scoring function is used as the fitness value of the hippocampus individual, and the current optimal directed acyclic graph structure is recorded according to the current position of the hippocampus;
[0041] Update the individual positions of the hippocampus, update the current optimal directed acyclic graph structure, perform breeding operations on the hippocampus population, and update the optimal hippocampus population;
[0042] The updated optimal hippocampus population is subjected to chaotic mapping to obtain an updated directed acyclic graph structure, and then the position of the hippocampus population is continuously updated. When the preset stopping condition is met, the updating is stopped to obtain the optimal directed acyclic graph structure.
[0043] Optionally, the device is also used for:
[0044] After the chaotic variables are initialized, the chaotic variables are applied to the problem to be solved for optimizing the Bayesian network structure to obtain a solution space of the problem to be solved;
[0045] Based on the solution space of the problem to be solved, chaotic perturbations are performed on individuals of the seahorse population to obtain individuals after chaotic perturbations, and the individuals after chaotic perturbations are updated into the seahorse population.
[0046] Optionally, the device is also used for:
[0047] Normalizing the risk element association matrix to obtain a normalized risk element association matrix;
[0048] Based on the normalized risk element association matrix, a comprehensive influence matrix is constructed, and the row sum and column sum of the comprehensive influence matrix are calculated to calculate the centrality of each risk element;
[0049] The risk elements whose centrality exceeds a preset threshold are taken as risk elements to be evaluated, and a risk element transmission network is determined to be constructed based on the correlation between the risk elements to be evaluated.
[0050] Optionally, the device is also used for:
[0051] Determining the prior probability of each risk element to be evaluated based on the forward reasoning of the Bayesian network;
[0052] Determine the posterior probability of each risk element to be evaluated based on the reverse reasoning of the Bayesian network;
[0053] Based on the sensitivity analysis of the Bayesian network, determining the sensitivity value of each risk element to be evaluated;
[0054] Determine the key risk elements in the risk element transmission network of the communication engineering project based on the posterior probability and sensitivity value of the risk element to be evaluated;
[0055] Based on the prior probability and the posterior probability of the risk element to be evaluated, the main risk element transmission chain in the risk element transmission network of the communication engineering project is determined.
[0056] In a third aspect, an embodiment of the present application provides an electronic device, comprising a processor and a memory storing a computer program, wherein when the processor executes the program, the steps of the communication engineering security risk assessment method described in the first aspect are implemented.
[0057] In a fourth aspect, an embodiment of the present application provides a non-transitory computer-readable storage medium having a computer program stored thereon, and when the computer program is executed by a processor, the steps of the communication engineering security risk assessment method as described in the first aspect are implemented.
[0058] In a fifth aspect, an embodiment of the present application provides a computer program product, including a computer program, which, when executed by a processor, implements the steps of the communication engineering security risk assessment method described in the first aspect.
[0059] The communication engineering safety risk assessment method and device provided in the embodiment of the present application, by adopting the work breakdown structure-risk decomposition structure method, completes the preliminary identification of risk elements, introduces the decision and laboratory method (DEMATEL) to identify dynamic assessment risk elements and construct a risk element transmission network, optimizes the Bayesian network structure, and performs Bayesian probability calculation, and combines reverse reasoning and sensitivity analysis to obtain key risk elements and main risk chains. Through the scheme of the present application, the key risk elements and main risk chains in the communication engineering project can be obtained, providing a basis for risk management and control. BRIEF DESCRIPTION OF THE DRAWINGS
[0060] In order to more clearly illustrate the technical solutions in the present application or the prior art, a brief introduction will be given below to the drawings required for use in the embodiments or the description of the prior art. Obviously, the drawings described below are some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.
[0061] Figure 1 A schematic diagram of a communication engineering security risk assessment method flow chart provided in an embodiment of the present application;
[0062] Figure 2 An optimized flow chart provided for the embodiment of the present application;
[0063] Figure 3 A schematic diagram of the dynamic security risk assessment technology described in the embodiments of the present application;
[0064] Figure 4 A schematic diagram of the structure of a communication engineering security risk assessment device provided in an embodiment of the present application;
[0065] Figure 5 It is a schematic diagram of the structure of an electronic device provided in an embodiment of the present application. DETAILED DESCRIPTION
[0066] In order to make the purpose, technical solutions and advantages of this application clearer, the technical solutions in this application will be clearly and completely described below in conjunction with the drawings in the embodiments of this application. Obviously, the described embodiments are part of the embodiments of this application, not all of them. Based on the embodiments in this application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.
[0067] In the embodiment of the present application, Bayesian Network (BN) is a graphical model for calculating fuzzy probabilities in complex logic and reasoning causal relationships, which can represent random variables and dependencies between variables. It defines the data structure of the joint probability distribution in a factorized manner and gives a series of conditional independence assumptions in this distribution.
[0068] The Bayesian network is represented by a structure G and a network parameter Θ as a pair N = (G, Θ). Its topology is a directed acyclic graph (DAG). Nodes represent random variables, and arcs represent conditional probability dependencies between them. "Directed" means that the direction of the edges connecting different nodes is fixed, and "acyclic" means that there are no loops in the graph. In graph theory, a directed acyclic structure graph G = (X, E) can be used to represent a set of independent relationships between variables. X represents a non-empty set of all nodes in the graph X = (X1, X2, ..., X i ,...,X n ),X i It can be an observed variable or a hidden variable; E represents the set of directed connecting segments between different variables in DAG, X j →X i Indicates direct dependencies between nodes.
[0069] E={X j →Xi |X j ∈pa(X i ),i=1,...,n}
[0070] Among them, pa(X i ) represents node X i The "cause" of is also called the parent node set. According to Markov independence, given the parent node set pa(X i ), X i Independent of its non-descendant node set nd(X i ). Therefore, several nodes X that follow the Markov rule i The joint probability can be expressed as:
[0071]
[0072] Network parameters Θ=(Θ1,Θ2,...,Θ n ) represents each node X i In its parent node set pa(X i ) is known. When the network structure G and network parameters Θ of a Bayesian network are known, the node X can be obtained. i The Bayesian network algorithm has a much higher computational efficiency than other methods for calculating joint probability because of the conditional independence between nodes.
[0073] In the embodiment of the present application, the Sea Horse Optimization (SHO) algorithm is a swarm intelligence-based Mas. SHO starts with overall initialization. Assuming that each seahorse represents a candidate solution in the problem search space, the entire seahorse population can be expressed as:
[0074]
[0075] Among them, Dim represents the dimension of the variable, and pop represents the overall scale of the variable.
[0076] Taking the minimum optimization problem as an example, the individual with the smallest fitness is taken as the elite individual, denoted by X elite .X elite It can be obtained by the following formula:
[0077] X elite =arg min(f(X i ))
[0078] Where f(X) represents the objective function value of a given problem.
[0079] In terms of motor behavior, the hippocampus performs spiral motion and Brownian motion. These two situations can be expressed as the new position of the hippocampus at iteration number t, as follows:
[0080]
[0081] Where Levy(λ) is calculated from the Levy flight distribution function, x, y, z represent the (x, y, z) three-dimensional components of the coordinates during spiral motion, l is a constant coefficient, β t is the random walk coefficient of Brownian motion, r1=randn() is a normal random number.
[0082] For predation behavior, a random number r2 is set in SHO to distinguish these two results, and the critical value is set to 0.1. If r2>0.1, it means that the seahorse's predation is successful. The mathematical expression of this predation behavior is as follows:
[0083]
[0084] in, represents the new position of the hippocampus after iterating t times, and r2 is a random number between [0,1]. α decreases linearly with iteration to adjust the moving step of the hippocampus hunting prey, which is calculated by the following formula:
[0085]
[0086] Where T represents the maximum number of iterations.
[0087] In terms of reproductive behavior, male and female seahorses mate randomly, which helps increase the diversity of the population. To make the SHO algorithm easy to execute, assume that each pair of seahorses only reproduces one child, and the expression of the i-th offspring is:
[0088]
[0089] Where r3 is a random number between [0,1], and i is a positive integer between [1,pop / 2]. and Representatives randomly selected parent individuals from the male and female populations, respectively.
[0090] Figure 1 A schematic diagram of a communication engineering security risk assessment method provided in an embodiment of the present application is shown in FIG. Figure 1 As shown, including:
[0091] Step 110, performing preliminary risk identification on the communication engineering project based on the work breakdown structure-risk breakdown structure method to obtain a risk element association matrix containing multiple risk elements;
[0092] In the embodiment of the present application, WBS (Work Breakdown Structure) is an important method in engineering project management and is widely used in existing engineering project management. WBS is a grouping of project elements oriented to deliverables. This grouping organizes and defines the entire scope of project work. Each level down represents a more detailed definition of project work. Work Package is the lowest level of work in WBS, which is the basic unit of risk identification in risk management. Therefore, when constructing WBS, the work should be decomposed layer by layer into work packages that are convenient for risk identification.
[0093] In the embodiment of the present application, the work can be decomposed layer by layer from top to bottom through the work breakdown structure until the project is decomposed into a suitable work unit.
[0094] In the embodiment of the present application, RBS (Risk Breakdown Structure) is a hierarchical structure that defines potential risk sources. Using the WBS definition method, RBS is defined as a source-oriented risk grouping that organizes and defines all risks of a project or enterprise.
[0095] Based on the expected goals of the engineering project and combined with the work units in the WBS tree diagram, the possible risk factors in the entire project process are extended downward layer by layer until the WBS and RBS tree diagrams are divided, and the lowest-level sub-items of the two are combined to form a matrix, which is conducive to risk identification and can directly reflect the relationship between risks and work details.
[0096] In the embodiment of the present application, each sub-risk factor in the work package can be judged one by one according to each element in the RBM. If it exists, it is 1. If it does not exist or the possibility of occurrence is extremely small and the consequences are very minor, it is 0. By sorting out the risks in the matrix, you can clearly understand the risks that need to be paid attention to during the project implementation period and their location. Form a preliminary risk element list. Based on the preliminary risk element identification results, investigate accident cases, evaluate the correlation between risk elements, summarize the investigation and evaluation results to form a correlation matrix, and obtain the risk element correlation matrix, that is, the initial direct impact matrix in the DEMATEL algorithm.
[0097] Step 120, determining the risk element to be evaluated among the risk elements in the risk element association matrix based on the DEMATEL algorithm, and constructing a risk element transmission network according to the correlation degree of each of the risk elements to be evaluated; wherein the risk element to be evaluated is the risk element whose centrality exceeds a preset threshold;
[0098] In the embodiment of the present application, the Decision Making, Trial and Evaluation Laboratory (DEMATEL) is an algorithm for complex system factor analysis. The algorithm is based on graph theory and constructs an analytical structural model to recognize the causal relationship between complex social factors and identify key elements.
[0099] In the embodiment of the present application, the DEMATEL algorithm is used to calculate the influence degree f of each risk element in the risk element association matrix. i and the degree of influence i and the centrality M of the risk element i and the degree of cause N i Then the centrality of the preliminary risk element is sorted to complete the dynamic assessment of risk element identification.
[0100] Based on the risk element identification results and their correlation analysis, the risk element transmission network is constructed by combining the before and after impact relationships of risk elements in different construction processes.
[0101] Step 130, using the Bayesian network to evaluate the risk element transmission network, obtain the prior probability, posterior probability, and sensitivity value of each risk element to be evaluated, so as to identify the main risk element transmission chain and key risk elements in the communication engineering project.
[0102] In the embodiment of the present application, a risk element transmission network is constructed, and based on the correlation and causal relationship between risk elements, the risk element transmission network is converted into a Bayesian network model.
[0103] More specifically, the prior probability and conditional probability of the nodes in the Bayesian network can be further obtained. Forward reasoning is performed through the Bayesian network to calculate the posterior probability of each risk element. Reverse reasoning and sensitivity analysis of the Bayesian network are performed. According to the posterior probability, sensitivity value and other indicators of the risk element, the main risk element transmission chain and key risk elements in the communication engineering project are identified. Through the above steps, the risk element transmission network is evaluated using the Bayesian network to identify the key risk elements and the main risk transmission chain.
[0104] In the embodiment of the present application, by adopting the work breakdown structure-risk decomposition structure method, the risk element is initially identified, DEMATEL is introduced to identify the dynamic evaluation risk element and construct the risk element transmission network, the Bayesian network structure is optimized, and the Bayesian probability calculation is performed, and the key risk element and the main risk chain are obtained by combining reverse reasoning and sensitivity analysis. Through the scheme of the present application, the key risk element and the main risk chain in the communication engineering project can be obtained, providing a basis for risk management and control.
[0105] Optionally, the risk element transfer network is evaluated using a Bayesian network to obtain a priori probability, a posteriori probability, and a sensitivity value of each risk element to be evaluated, including:
[0106] By introducing an improved Hippocampus optimization algorithm with a chaotic mapping method, the risk meta-transfer network is optimized to obtain an optimal directed acyclic graph structure;
[0107] Based on the optimal directed acyclic graph structure, a Bayesian network is constructed. In the Bayesian network, forward reasoning, reverse reasoning and sensitivity analysis are used to obtain the prior probability, posterior probability and sensitivity value of each risk element to be evaluated.
[0108] The improved Hippocampus optimization algorithm using the chaotic mapping method is introduced to optimize the risk meta-transfer network to obtain the optimal directed acyclic graph structure, including:
[0109] Taking a candidate risk meta-transfer network structure as each hippocampus individual in a hippocampus population, and initializing the hippocampus population;
[0110] The Bayesian information criterion scoring function is used as the fitness value of the hippocampus individual, and the current optimal directed acyclic graph structure is recorded according to the current position of the hippocampus;
[0111] Update the individual positions of the hippocampus, update the current optimal directed acyclic graph structure, perform breeding operations on the hippocampus population, and update the optimal hippocampus population;
[0112] The updated optimal hippocampus population is subjected to chaotic mapping to obtain an updated directed acyclic graph structure, and then the position of the hippocampus population is continuously updated. When the preset stopping condition is met, the updating is stopped to obtain the optimal directed acyclic graph structure.
[0113] In the traditional Hippocampus optimization algorithm, when approaching the global optimum, the population diversity will decrease, which will lead to the phenomenon of falling into the local optimal solution, greatly reducing the detection accuracy of the model. In the embodiment of the present application, an improved Hippocampus optimization algorithm is proposed, by introducing the Tent chaotic mapping method in the optimization process of the Hippocampus optimization algorithm, which can not only effectively maintain the diversity of the population, but also help to avoid the phenomenon of the Hippocampus optimization algorithm falling into the local optimal solution, and improve the global search capability.
[0114] In the embodiment of the present application, the steps of introducing chaotic disturbance are described as follows:
[0115] Generate chaotic variable Z d .
[0116] Apply chaotic variables to the solution space of the problem to be solved:
[0117]
[0118] Where, d max and d min are the d-th dimension variables The maximum and minimum values of .
[0119] Perform chaotic perturbations on individuals in the seahorse population:
[0120]
[0121] In the formula, X' is the hippocampus individual that needs to be disturbed; X new is the chaotic disturbance amount generated; X′ new This is a hippocampus individual after chaos disturbance.
[0122] In the embodiment of the present application, the process of moving random hippocampal individuals to the positions of hippocampal elite individuals in the hippocampal optimization algorithm is abstracted as a process of learning the BN structure from a data set.
[0123] The spiral motion and Brownian motion of the hippocampus are equivalent to the process of learning the BN structure from the data set, that is, continuously optimizing and adjusting the BN structure. The hippocampal optimization process is equivalent to the process of learning the optimal BN structure, that is, continuously optimizing the BN structure until the optimal BN structure is found.
[0124] In the seahorse optimization algorithm, each seahorse individual represents a candidate BN structure, the position of the seahorse corresponds to the BN structure parameters, and the fitness value of the seahorse corresponds to the score of the BN structure. The goal of the entire seahorse optimization process is to find the elite seahorse individual with the smallest fitness value, corresponding to the optimal BN structure with the highest score.
[0125] By iteratively updating the hippocampus position and fitness value, the optimal BN structure with the highest score is finally found.
[0126] The corresponding relationship between the two processes is shown in Table 1.
[0127] Table 1
[0128] Seahorse looking for location BN structure learning All Seahorse Positions All BN structures The fitness value of the seahorse BN's score Seahorse elite position (smallest fitness value) Optimal BN structure
[0129] Figure 2 The optimization flow chart provided in the embodiment of the present application is as follows: Figure 2 As shown, including:
[0130] Initialization parameters: The number of hippocampal populations is N, the maximum number of iterations is T, the search space dimension is dim, the sample data is divided into training set and test set according to a certain ratio, and the training set D is used as input.
[0131] Generate an initial population of seahorses.
[0132] The Bayesian information criterion scoring function is used as the fitness value of the hippocampus individual, and the optimal DAG structure is recorded according to the current position of the hippocampus.
[0133] Update the position of individual seahorses and update the optimal DAG structure. Perform reproduction operations on the seahorse population and update the optimal seahorse population. Perform chaos mapping on the updated optimal population to obtain the updated DAG structure.
[0134] Determine whether the maximum number of iterations T is reached. If not, the Bayesian information criterion scoring function is used again as the fitness value of the hippocampus individual. If it is reached, the algorithm ends and outputs the global optimal DAG matrix; establish the BN model based on the output optimal DAG matrix.
[0135] Optionally, determining the risk element to be evaluated among the risk elements in the risk element association matrix based on the DEMATEL algorithm includes:
[0136] Normalizing the risk element association matrix to obtain a normalized risk element association matrix;
[0137] Based on the normalized risk element association matrix, a comprehensive influence matrix is constructed, and the row sum and column sum of the comprehensive influence matrix are calculated to calculate the centrality of each risk element;
[0138] The risk elements whose centrality exceeds a preset threshold are taken as risk elements to be evaluated, and a risk element transmission network is determined to be constructed based on the correlation between the risk elements to be evaluated.
[0139] In the embodiment of the present application, the risk element association matrix is used as the direct impact matrix in the DEMATEL algorithm, and then the risk element association matrix is normalized.
[0140] Let the normalized risk element correlation matrix be X, then its calculation formula is
[0141]
[0142] Construct the comprehensive influence matrix T. The specific formula is:
[0143]
[0144] Among them, t ij Reflects the factor s i Factors j The comprehensive influence degree of , I is the unit matrix.
[0145] Solve the centrality and causality of each factor in the matrix, that is, each risk element. First, calculate the row sum f of the comprehensive influencing factor matrix T i and columns and e i .
[0146] f i Indicator i The sum of the direct and indirect effects on other factors is called si The influence of i Indicator i The sum of the direct and indirect effects of other factors is called s i On this basis, we finally get the factor s i The centrality f i +e i (This indicator represents the factor s i The relative importance of the system) and the degree of cause f i -e i (If f i -e i >0, then s i is the cause factor, and vice versa is the result factor)
[0147] In the embodiment of the present application, a centrality threshold is set, and risk elements with centralities exceeding the threshold are used as risk elements to be evaluated. A risk element transmission network is established based on the correlation between the risk elements to be evaluated.
[0148] By utilizing the correlation between risk elements, the transmission relationship between risk elements is determined and a risk element transmission network is constructed.
[0149] In an embodiment of the present application, based on the Decision and Laboratory (DEMATEL) algorithm, on the basis of the preliminary risk element identification results, after removing the low-correlation risk elements using centrality sorting, the key risk elements are identified to participate in the dynamic assessment, and a risk element transmission network is established by risk element correlation analysis and causal reasoning, which can facilitate the processing of subsequent steps.
[0150] Optionally, the risk element transmission network is evaluated using a Bayesian network to obtain the prior probability, posterior probability, and sensitivity value of each risk element to be evaluated, so as to identify the main risk element transmission chain and key risk elements in the communication engineering project, including:
[0151] Determining the prior probability of each risk element to be evaluated based on the forward reasoning of the Bayesian network;
[0152] Determine the posterior probability of each risk element to be evaluated based on the reverse reasoning of the Bayesian network;
[0153] Based on the sensitivity analysis of the Bayesian network, determining the sensitivity value of each risk element to be evaluated;
[0154] Determine the key risk elements in the risk element transmission network of the communication engineering project based on the posterior probability and sensitivity value of the risk element to be evaluated;
[0155] Based on the prior probability and the posterior probability of the risk element to be evaluated, a main risk element transmission chain in the risk element transmission network of the communication engineering project is determined.
[0156] In the embodiment of the present application, the prior probability of each risk element to be evaluated is calculated by forward reasoning of the Bayesian network. The posterior probability of each risk element to be evaluated is determined by reverse reasoning of the Bayesian network. The sensitivity value of each risk element to be evaluated is calculated by sensitivity analysis of the Bayesian network.
[0157] According to the posterior probability and sensitivity value of the risk element to be evaluated, the key risk element in the risk element transmission network is determined. Based on the prior probability and posterior probability of the risk element to be evaluated, the main risk element transmission chain in the risk element transmission network is identified.
[0158] Therefore, through forward reasoning, reverse reasoning and sensitivity analysis, the prior probability, posterior probability and sensitivity value of the risk element to be evaluated are calculated, and these indicators are used to determine the key risk element and the main risk element transmission chain.
[0159] The communication engineering security risk assessment device provided in an embodiment of the present application is described below. The communication engineering security risk assessment device described below and the communication engineering security risk assessment method described above can be referenced to each other.
[0160] Figure 3 This is a schematic diagram of the dynamic security risk assessment technology described in the embodiment of the present application, such as Figure 3 As shown, it includes: The dynamic assessment of communication engineering construction risks consists of two parts: dynamic assessment risk element identification and dynamic risk assessment. In the dynamic risk element identification, a preliminary risk element identification based on the WBS-RBS method is first carried out on the basis of data collection and engineering characteristics analysis to form a preliminary risk element list. Based on the preliminary risk element identification results, accident cases are investigated and experts are invited to assess the correlation between risk elements. The investigation and evaluation results are summarized to form a correlation matrix B, which is the initial direct impact matrix B in the DEMATEL algorithm. Afterwards, the DEMATEL algorithm is used to calculate the impact of the risk element f i and the degree of influence i and the centrality M of the risk element i and the degree of cause N i Then the centrality of the preliminary risk element is sorted to complete the dynamic assessment of risk element identification.
[0161] Based on the risk element identification results and their correlation analysis, a risk element transmission network is constructed in combination with the before-and-after impact relationship of risk elements in different construction processes, and a Bayesian network model is used to evaluate it. Finally, the prior probability, posterior probability, and sensitivity value of the risk element node are calculated through Bayesian network forward reasoning, reverse reasoning, and sensitivity analysis, and the main risk element transmission chain and key risk elements are identified.
[0162] Figure 4 A schematic diagram of the structure of a communication engineering security risk assessment device provided in an embodiment of the present application is shown in FIG. Figure 4 As shown, including:
[0163] The identification module 410 is used to perform preliminary risk identification on the communication engineering project based on the work breakdown structure-risk decomposition structure method to obtain a risk element association matrix containing multiple risk elements;
[0164] The construction module 420 is used to determine the risk element to be evaluated among the risk elements in the risk element association matrix based on the DEMATEL algorithm, and to construct a risk element transmission network according to the correlation degree of each of the risk elements to be evaluated; wherein the risk element to be evaluated is the risk element whose centrality exceeds a preset threshold;
[0165] The evaluation module 430 is used to evaluate the risk element transmission network using a Bayesian network to obtain the prior probability, posterior probability, and sensitivity value of each risk element to be evaluated, so as to identify the main risk element transmission chain and key risk elements in the communication engineering project.
[0166] Optionally, the device is also used for:
[0167] By introducing an improved Hippocampus optimization algorithm with a chaotic mapping method, the risk meta-transfer network is optimized to obtain an optimal directed acyclic graph structure;
[0168] Based on the optimal directed acyclic graph structure, a Bayesian network is constructed. In the Bayesian network, forward reasoning, reverse reasoning and sensitivity analysis are used to obtain the prior probability, posterior probability and sensitivity value of each risk element to be evaluated.
[0169] Optionally, the device is also used for:
[0170] Taking a candidate risk meta-transfer network structure as each hippocampus individual in a hippocampus population, and initializing the hippocampus population;
[0171] The Bayesian information criterion scoring function is used as the fitness value of the hippocampus individual, and the current optimal directed acyclic graph structure is recorded according to the current position of the hippocampus;
[0172] Update the individual positions of the hippocampus, update the current optimal directed acyclic graph structure, perform breeding operations on the hippocampus population, and update the optimal hippocampus population;
[0173] The updated optimal hippocampus population is subjected to chaotic mapping to obtain an updated directed acyclic graph structure, and then the position of the hippocampus population is continuously updated. When the preset stopping condition is met, the updating is stopped to obtain the optimal directed acyclic graph structure.
[0174] Optionally, the device is also used for:
[0175] After the chaotic variables are initialized, the chaotic variables are applied to the problem to be solved for optimizing the Bayesian network structure to obtain a solution space of the problem to be solved;
[0176] Based on the solution space of the problem to be solved, chaotic perturbations are performed on individuals of the seahorse population to obtain individuals after chaotic perturbations, and the individuals after chaotic perturbations are updated into the seahorse population.
[0177] Optionally, the device is also used for:
[0178] Normalizing the risk element association matrix to obtain a normalized risk element association matrix;
[0179] Based on the normalized risk element association matrix, a comprehensive influence matrix is constructed, and the row sum and column sum of the comprehensive influence matrix are calculated to calculate the centrality of each risk element;
[0180] The risk elements whose centrality exceeds a preset threshold are taken as risk elements to be evaluated, and a risk element transmission network is determined to be constructed based on the correlation between the risk elements to be evaluated.
[0181] Optionally, the device is also used for:
[0182] Determining the prior probability of each risk element to be evaluated based on the forward reasoning of the Bayesian network;
[0183] Determine the posterior probability of each risk element to be evaluated based on the reverse reasoning of the Bayesian network;
[0184] Based on the sensitivity analysis of the Bayesian network, determining the sensitivity value of each risk element to be evaluated;
[0185] Determine the key risk elements in the risk element transmission network of the communication engineering project based on the posterior probability and sensitivity value of the risk element to be evaluated;
[0186] Based on the prior probability and the posterior probability of the risk element to be evaluated, the main risk element transmission chain in the risk element transmission network of the communication engineering project is determined.
[0187] In the embodiment of the present application, by adopting the work breakdown structure-risk decomposition structure method, the risk element is initially identified, the decision and laboratory method (DEMATEL) is introduced to identify the dynamic evaluation risk element and construct the risk element transmission network, the Bayesian network structure is optimized, and the Bayesian probability calculation is performed, and the key risk element and the main risk chain are obtained by combining reverse reasoning and sensitivity analysis. Through the scheme of the present application, the key risk element and the main risk chain in the communication engineering project can be obtained, providing a basis for risk management and control.
[0188] Figure 5 is a schematic diagram of the structure of an electronic device provided in an embodiment of the present application, such as Figure 5 As shown, the electronic device may include: a processor 510, a communication interface 520, a memory 530 and a communication bus 540, wherein the processor 510, the communication interface 520 and the memory 530 communicate with each other through the communication bus 540. The processor 510 may call a computer program in the memory 530 to execute the steps of the communication engineering security risk assessment method, for example including:
[0189] Based on the work breakdown structure-risk breakdown structure method, the communication engineering project is preliminarily identified, and a risk element correlation matrix containing multiple risk elements is obtained;
[0190] Determine the risk element to be evaluated among the risk elements in the risk element association matrix based on the DEMATEL algorithm, and construct a risk element transmission network according to the correlation degree of each risk element to be evaluated; wherein the risk element to be evaluated is the risk element whose centrality exceeds a preset threshold;
[0191] The risk element transmission network is evaluated using a Bayesian network to obtain the prior probability, posterior probability, and sensitivity value of each risk element to be evaluated, so as to identify the main risk element transmission chain and key risk elements in the communication engineering project.
[0192] In addition, the logic instructions in the above-mentioned memory 530 can be implemented in the form of a software functional unit and can be stored in a computer-readable storage medium when it is sold or used as an independent product. Based on this understanding, the technical solution of the present application can be essentially or partly embodied in the form of a software product that contributes to the prior art, and the computer software product is stored in a storage medium, including several instructions to enable a computer device (which can be a personal computer, a server, or a network device, etc.) to perform all or part of the steps of the method described in each embodiment of the present application. The aforementioned storage medium includes: various media that can store program codes, such as a USB flash drive, a mobile hard disk, a read-only memory (ROM), a random access memory (RAM), a magnetic disk or an optical disk.
[0193] On the other hand, an embodiment of the present application further provides a computer program product, the computer program product including a computer program, the computer program can be stored on a non-transitory computer-readable storage medium, and when the computer program is executed by a processor, the computer can perform the steps of the communication engineering security risk assessment method provided in the above embodiments, for example, including:
[0194] Based on the work breakdown structure-risk breakdown structure method, the communication engineering project is preliminarily identified, and a risk element correlation matrix containing multiple risk elements is obtained;
[0195] Determine the risk element to be evaluated among the risk elements in the risk element association matrix based on the DEMATEL algorithm, and construct a risk element transmission network according to the correlation degree of each risk element to be evaluated; wherein the risk element to be evaluated is the risk element whose centrality exceeds a preset threshold;
[0196] The risk element transmission network is evaluated using a Bayesian network to obtain the prior probability, posterior probability, and sensitivity value of each risk element to be evaluated, so as to identify the main risk element transmission chain and key risk elements in the communication engineering project.
[0197] On the other hand, an embodiment of the present application further provides a processor-readable storage medium, wherein the processor-readable storage medium stores a computer program, wherein the computer program is used to enable the processor to execute the steps of the methods provided in the above embodiments, for example, including:
[0198] Based on the work breakdown structure-risk breakdown structure method, the communication engineering project is preliminarily identified, and a risk element correlation matrix containing multiple risk elements is obtained;
[0199] Determine the risk element to be evaluated among the risk elements in the risk element association matrix based on the DEMATEL algorithm, and construct a risk element transmission network according to the correlation degree of each risk element to be evaluated; wherein the risk element to be evaluated is the risk element whose centrality exceeds a preset threshold;
[0200] The risk element transmission network is evaluated using a Bayesian network to obtain the prior probability, posterior probability, and sensitivity value of each risk element to be evaluated, so as to identify the main risk element transmission chain and key risk elements in the communication engineering project.
[0201] The processor-readable storage medium can be any available medium or data storage device that can be accessed by the processor, including but not limited to magnetic storage (such as floppy disks, hard disks, magnetic tapes, magneto-optical disks (MO), etc.), optical storage (such as CD, DVD, BD, HVD, etc.), and semiconductor storage (such as ROM, EPROM, EEPROM, non-volatile memory (NANDFLASH), solid-state drive (SSD)), etc.
[0202] The device embodiments described above are merely illustrative, wherein the units described as separate components may or may not be physically separated, and the components displayed as units may or may not be physical units, that is, they may be located in one place, or they may be distributed on multiple network units. Some or all of the modules may be selected according to actual needs to achieve the purpose of the scheme of this embodiment. Ordinary technicians in this field can understand and implement it without paying creative labor.
[0203] Through the description of the above implementation methods, those skilled in the art can clearly understand that each implementation method can be implemented by means of software plus a necessary general hardware platform, and of course, it can also be implemented by hardware. Based on this understanding, the above technical solution is essentially or the part that contributes to the prior art can be embodied in the form of a software product, and the computer software product can be stored in a computer-readable storage medium, such as ROM / RAM, a disk, an optical disk, etc., including a number of instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) to execute the methods described in each embodiment or some parts of the embodiments.
[0204] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present application, rather than to limit it. Although the present application has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present application.
Claims
1. A communication engineering security risk assessment method, It is characterized in that include: Based on the work breakdown structure-risk breakdown structure method, the communication engineering project is preliminarily identified, and a risk element correlation matrix containing multiple risk elements is obtained; Determine the risk element to be evaluated among the risk elements in the risk element association matrix based on the DEMATEL algorithm, and construct a risk element transmission network according to the correlation degree of each risk element to be evaluated; wherein the risk element to be evaluated is the risk element whose centrality exceeds a preset threshold; The risk element transmission network is evaluated using a Bayesian network to obtain the prior probability, posterior probability, and sensitivity value of each risk element to be evaluated, so as to identify the main risk element transmission chain and key risk elements in the communication engineering project.
2. The communication engineering security risk assessment method according to claim 1, It is characterized in that The risk element transmission network is evaluated using a Bayesian network to obtain the prior probability, posterior probability, and sensitivity value of each risk element to be evaluated, including: By introducing an improved Hippocampus optimization algorithm with a chaotic mapping method, the risk meta-transfer network is optimized to obtain an optimal directed acyclic graph structure; Based on the optimal directed acyclic graph structure, a Bayesian network is constructed. In the Bayesian network, forward reasoning, reverse reasoning and sensitivity analysis are used to obtain the prior probability, posterior probability and sensitivity value of each risk element to be evaluated.
3. The communication engineering security risk assessment method according to claim 2, It is characterized in that The improved Hippocampus optimization algorithm using the chaotic mapping method is introduced to optimize the risk meta-transfer network to obtain the optimal directed acyclic graph structure, including: Taking a candidate risk meta-transfer network structure as each hippocampus individual in a hippocampus population, and initializing the hippocampus population; The Bayesian information criterion scoring function is used as the fitness value of the hippocampus individual, and the current optimal directed acyclic graph structure is recorded according to the current position of the hippocampus; Update the individual positions of the hippocampus, update the current optimal directed acyclic graph structure, perform breeding operations on the hippocampus population, and update the optimal hippocampus population; The updated optimal hippocampus population is subjected to chaotic mapping to obtain an updated directed acyclic graph structure, and then the position of the hippocampus population is continuously updated. When the preset stopping condition is met, the updating is stopped to obtain the optimal directed acyclic graph structure.
4. The communication engineering security risk assessment method according to claim 3, It is characterized in that The specific process of the chaotic mapping includes: After the chaotic variables are initialized, the chaotic variables are applied to the problem to be solved for optimizing the Bayesian network structure to obtain a solution space of the problem to be solved; Based on the solution space of the problem to be solved, chaotic perturbations are performed on individuals of the seahorse population to obtain individuals after chaotic perturbations, and the individuals after chaotic perturbations are updated into the seahorse population.
5. The communication engineering security risk assessment method according to claim 1, It is characterized in that Determining the risk element to be evaluated among the risk elements in the risk element association matrix based on the DEMATEL algorithm includes: Normalizing the risk element association matrix to obtain a normalized risk element association matrix; Based on the normalized risk element association matrix, a comprehensive influence matrix is constructed, and the row sum and column sum of the comprehensive influence matrix are calculated to calculate the centrality of each risk element; The risk elements whose centrality exceeds a preset threshold are taken as risk elements to be evaluated, and a risk element transmission network is determined to be constructed based on the correlation between the risk elements to be evaluated.
6. The communication engineering security risk assessment method according to claim 1, It is characterized in that The risk element transmission network is evaluated using a Bayesian network to obtain the prior probability, posterior probability, and sensitivity value of each risk element to be evaluated, so as to identify the main risk element transmission chain and key risk elements in the communication engineering project, including: Determining the prior probability of each risk element to be evaluated based on the forward reasoning of the Bayesian network; Determine the posterior probability of each risk element to be evaluated based on the reverse reasoning of the Bayesian network; Based on the sensitivity analysis of the Bayesian network, determining the sensitivity value of each risk element to be evaluated; Determine the key risk elements in the risk element transmission network of the communication engineering project based on the posterior probability and sensitivity value of the risk element to be evaluated; Based on the prior probability and the posterior probability of the risk element to be evaluated, a main risk element transmission chain in the risk element transmission network of the communication engineering project is determined.
7. A communication engineering security risk assessment device, It is characterized in that include: An identification module is used to perform preliminary risk identification on a communication engineering project based on a work breakdown structure-risk decomposition structure method, and obtain a risk element association matrix containing multiple risk elements; A construction module, used to determine the risk element to be evaluated among the risk elements in the risk element association matrix based on the DEMATEL algorithm, and to construct a risk element transmission network according to the correlation degree of each of the risk elements to be evaluated; wherein the risk element to be evaluated is the risk element whose centrality exceeds a preset threshold; The evaluation module is used to evaluate the risk element transmission network using a Bayesian network to obtain the prior probability, posterior probability, and sensitivity value of each risk element to be evaluated, so as to identify the main risk element transmission chain and key risk elements in the communication engineering project.
8. An electronic device comprising a processor and a memory storing a computer program, It is characterized in that When the processor executes the computer program, the steps of the communication engineering security risk assessment method described in any one of claims 1 to 6 are implemented.
9. A non-transitory computer-readable storage medium having a computer program stored thereon, It is characterized in that When the computer program is executed by a processor, the steps of the communication engineering security risk assessment method as described in any one of claims 1 to 6 are implemented.
10. A computer program product comprising a computer program, It is characterized in that When the computer program is executed by a processor, the steps of the communication engineering security risk assessment method according to any one of claims 1 to 6 are implemented.