By marking, screening and evaluating the train grouping sequence table compiled by the technical station, using train number data to determine the train type and station name order, the problem of quality evaluation of train grouping sequence table in the existing technology is solved, and efficient train grouping is achieved Sequence table evaluation and operational efficiency improvement.

CN118798736APending Publication Date: 2024-10-18CHINA ACADEMY OF RAILWAY SCI CORP LTD +3
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411072068.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-06
Publication Date
2024-10-18

AI Technical Summary

Technical Problem

In the prior art, there is a lack of effective method for evaluating the quality of train grouping order tables, which leads to inconsistent quality of train grouping order tables.

Method used

Provide a method and device for evaluating train grouping sequence tables. By obtaining the train grouping sequence tables compiled by the technical station, marking, screening and evaluating them, using train number data to determine the order of train type and station name, and evaluating the train grouping sequence tables. Operational efficiency.

Benefits of technology

The effective evaluation of the train marshalling sequence table is realized, the quality of the train marshalling sequence table is improved, repeated shunting operations are reduced, and the marshalling efficiency is improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118798736A_ABST
    Figure CN118798736A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of train marshalling sequence table evaluation, in particular to a train marshalling sequence table evaluation method and device.The method comprises the steps that at least one train marshalling sequence table is obtained, and the train marshalling sequence table comprises a train marshalling sequence table compiled by a technical station as an intermediate station; whether the trains in the train marshalling sequence table are marked or not is judged according to the train marshalling sequence table, and a marking result is obtained; according to the marking result, a train marshalling sequence table is screened, a first screening result is obtained, and the first screening result comprises the train marshalling sequence table with the marking result; screening the first screening result according to train number data in the first screening result to obtain a second screening result; according to the train marshalling sequence table evaluation method, the train marshalling sequence table of the intermediate station can be effectively evaluated, and the operation efficiency of the train marshalling sequence table can be judged.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of train marshaling sequence table evaluation, and in particular to a train marshaling sequence table evaluation method and device. Background Art

[0002] When the technical station compiles the train marshaling sequence table for the intermediate station, the marshaling method usually adopted is to select the target vehicle flow according to the "station sequence grouping". However, the number and layout of the dedicated lines or freight lines set up at each intermediate station are not the same. This requires that goods of different categories and different consignees need to be loaded and unloaded at different locations, resulting in the quality of the compiled train marshaling sequence table being inconsistent. At the same time, there is a lack of effective methods for quality assessment of the train marshaling sequence table in the existing technology. Summary of the invention

[0003] The object of the present invention is to provide a train marshaling sequence table evaluation method and device to improve the above-mentioned problem.

[0004] In order to achieve the above objectives, the present application provides the following technical solutions:

[0005] On the one hand, an embodiment of the present application provides a train marshaling sequence table evaluation method, the method comprising:

[0006] Acquire at least one train marshaling sequence table, wherein the train marshaling sequence table includes a train marshaling sequence table compiled by a technical station for an intermediate station;

[0007] Determine whether to mark the train in the train marshaling sequence table according to the train marshaling sequence table, and obtain a marking result;

[0008] Screening the train marshaling sequence table according to the marking result to obtain a first screening result, wherein the first screening result includes the train marshaling sequence table having the marking result;

[0009] Filter the first screening result according to the train number data in the first screening result to obtain a second screening result;

[0010] The train marshalling sequence table is evaluated according to the second screening result.

[0011] In a second aspect, an embodiment of the present application provides a train marshaling sequence table evaluation device, the device comprising:

[0012] An acquisition module, used to acquire at least one train marshaling sequence table, wherein the train marshaling sequence table includes a train marshaling sequence table compiled by a technical station for an intermediate station;

[0013] A first processing module is used to determine whether to mark the train in the train marshaling sequence table according to the train marshaling sequence table, and obtain a marking result;

[0014] A second processing module is used to screen the train marshaling sequence table according to the marking result to obtain a first screening result, wherein the first screening result includes the train marshaling sequence table having the marking result;

[0015] A third processing module, configured to filter the first filtering result according to the train number data in the first filtering result to obtain a second filtering result;

[0016] An evaluation module is used to evaluate the train marshaling sequence table according to the second screening result.

[0017] In a third aspect, an embodiment of the present application provides a train marshaling sequence table evaluation device, the device comprising a memory and a processor. The memory is used to store a computer program; the processor is used to implement the steps of the above train marshaling sequence table evaluation method when executing the computer program.

[0018] In a fourth aspect, an embodiment of the present application provides a readable storage medium having a computer program stored thereon, and when the computer program is executed by a processor, the steps of the above-mentioned train formation sequence table evaluation method are implemented.

[0019] The beneficial effects of the present invention are:

[0020] The present invention obtains all train marshaling sequence tables compiled by the technical station, marks and screens the train marshaling sequence tables that need to be evaluated to obtain a first screening result, then uses train number data to evaluate the trains that need to be evaluated to obtain a second screening result, and finally further judges the vehicles in the second screening result to obtain an evaluation result, thereby effectively evaluating the operating efficiency of the train marshaling sequence table and solving the problem that the prior art cannot evaluate the quality of the train marshaling sequence table.

[0021] Other features and advantages of the present invention will be described in the following description, and partly become apparent from the description, or be understood by implementing the embodiments of the present invention. The purpose and other advantages of the present invention can be realized and obtained by the structures particularly pointed out in the written description, claims, and drawings. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings required for use in the embodiments are briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present invention and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without creative work.

[0023] Figure 1 The figure is a flow chart of a train marshaling sequence table evaluation method according to an embodiment of the present invention.

[0024] Figure 2 Schematic diagram of the structure of the train marshaling sequence table evaluation device described in an embodiment of the present invention.

[0025] Figure 3 It is a schematic diagram of the structure of the train marshaling sequence table evaluation device described in an embodiment of the present invention.

[0026] Labels in the figure: 901, acquisition module; 902, first processing module; 903, second processing module; 904, third processing module; 905, evaluation module; 9041, first acquisition unit; 9042, first processing unit; 9043, second processing unit; 9051, second acquisition unit; 9052, first judgment unit; 9053, third processing unit; 90531, third acquisition unit; 90532, second judgment unit; 90533, fourth processing unit; 90534, fourth acquisition unit; 90535, third judgment unit; 90536, fifth processing unit; 90537, fifth acquisition unit; 90538, fourth judgment unit; 90539, sixth processing unit; 800, train formation sequence table evaluation device; 801, processor; 802, memory; 803, multimedia component; 804, I / O interface; 805, communication component. DETAILED DESCRIPTION

[0027] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, rather than all of the embodiments. The components of the embodiments of the present invention generally described and shown in the drawings here can be arranged and designed in various different configurations. Therefore, the following detailed description of the embodiments of the present invention provided in the drawings is not intended to limit the scope of the claimed invention, but merely represents selected embodiments of the present invention. Based on the embodiments in the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present invention.

[0028] It should be noted that similar reference numerals and letters represent similar items in the following drawings, so once an item is defined in one drawing, it does not need to be further defined and explained in the subsequent drawings. At the same time, in the description of the present invention, the terms "first", "second", etc. are only used to distinguish the description and cannot be understood as indicating or implying relative importance.

[0029] Embodiment 1:

[0030] This embodiment provides a method for evaluating a train marshaling sequence table. It can be understood that a scenario can be laid out in this embodiment, for example: evaluating the train sequence table generated for the detachment and coupling, small operation, and single-unit trailer trains of the super-marshaling plan organized by the technical station for the intermediate station.

[0031] See also Figure 1 , the figure shows that the method includes step S1, step S2, step S3, step S4 and step S5.

[0032] Step S1, obtaining at least one train marshaling sequence table, wherein the train marshaling sequence table includes a train marshaling sequence table compiled by a technical station for an intermediate station;

[0033] In this step, the train marshaling sequence table compiled by the technical station for the intermediate station includes information such as vehicle type information, usage attributes, vehicle number information, load information, destination name, product name information, arrival train number, departure station, final destination station, marshaling yard, consignee, and train number data.

[0034] Step S2: judging whether to mark the train in the train marshaling sequence table according to the train marshaling sequence table, and obtaining a marking result;

[0035] In this step, it is determined whether the train exceeds the marshaling plan, and the train marshaling sequence table that exceeds the marshaling plan is marked for subsequent screening.

[0036] Step S3, screening the train marshaling sequence table according to the marking result to obtain a first screening result, wherein the first screening result includes the train marshaling sequence table having the marking result;

[0037] In this step, each train marshaling sequence table is traversed to filter out the train marshaling sequence tables with marked results, and the first screening result is obtained.

[0038] Step S4, filtering the first screening result according to the train number data in the first screening result to obtain a second screening result;

[0039] In this step, the step S4 also includes step S41, step S42 and step S43, which specifically include:

[0040] Step S41, obtaining the train number data corresponding to each train marshaling sequence table;

[0041] Step S42: determining the train type according to the train number data to obtain train type information;

[0042] Step S43: determine whether the train type information meets the preset vehicle type, and obtain a second screening result.

[0043] In this embodiment, train types include detachable trains, small operating trains and single-unit trailers. It should be noted that the train number data corresponding to the detachable train is (40001-44998), the train number data corresponding to the small operating train is (45001-49998), and the train number data corresponding to the single-unit trailer is (51001-51998, 52001-52998). When the train number data is within the above train number data range, it is judged that the vehicle meets the preset train type.

[0044] Step S5: Evaluate the train marshalling sequence table according to the second screening result.

[0045] In this step, the train formation sequence tables corresponding to the detaching and coupling trains, small operation trains and single-unit trailers are screened out for evaluation.

[0046] The step S5 also includes step S51, step S52 and step S53, which specifically include:

[0047] Step S51, obtaining first information, wherein the first information includes the name of the first arrival station corresponding to the vehicle in the train marshaling sequence table corresponding to the second screening result;

[0048] In this step, the arrival station name corresponding to the vehicle ranked 1 in the train sequence table is used as the first information.

[0049] Step S52: traverse the first information to determine whether the first information is arranged in sequence, and obtain a first determination result;

[0050] In this step, if the arrival name corresponding to the vehicle ranked 1 in the train sequence table is Hongpailou, all the arrival names in the train sequence table are traversed to determine whether the arrival name Hongpailou is arranged in sequence and continuously to obtain a first judgment result.

[0051] Step S53: Evaluate the train marshaling sequence table according to the first judgment result.

[0052] The step S53 also includes step S531, step S532 and step S533, which specifically include:

[0053] Step S531: when the first judgment result is that the first information is not arranged in sequence, obtaining second information, wherein the second information includes an arrival station name that is arranged in sequence with the first arrival station name in the train marshaling sequence table and is different from the first arrival station name;

[0054] In this step, a specific implementation method is to use Tianhui Town as the second information when the destination name corresponding to the vehicles in sequence 1-8 in the train marshalling sequence table is Hongpailou and the destination name corresponding to the vehicle in sequence 9 is Tianhui Town.

[0055] Step S532: traverse the second information to determine whether the second information is arranged in sequence, until the arrival station name corresponding to each vehicle in the train marshaling sequence table is traversed in sequence, and a second determination result is obtained;

[0056] In this step, it is necessary to traverse the arrival station names corresponding to each vehicle included in the train marshaling sequence table to determine whether they are grouped together.

[0057] Step S533: If the second judgment result is that the arrival station names corresponding to each vehicle are not arranged in sequence, the train formation sequence table is evaluated as unqualified.

[0058] In this step, if the arrival station names corresponding to each vehicle are not arranged in sequence, it means that there is no arrival station grouped vehicle set in the train formation sequence table, which is not a high-quality vehicle set. It should be noted that the high-quality vehicle set is specifically the detachment, small operation, and single-unit trailer train of the super-formation plan organized by the technical station for the intermediate station. The vehicles in the train formation are based on the basic premise of meeting the arrival station sequence grouping. The vehicles at the same arrival station are further subdivided and assembled together according to the grouping rules of the intermediate station's dedicated line, freight line, category, consignee, etc. The intermediate station can directly carry out pick-up and delivery shunting operations after the arrival of the traffic flow, reducing the repeated reverse shunting operations, and it is judged to be a high-quality vehicle set.

[0059] The step S53 also includes step S534, step S535 and step S536, which specifically include:

[0060] Step S534: when the first judgment result is that the first information is arranged in sequence, obtaining third information, the third information including product name information corresponding to the arrival station names arranged in sequence;

[0061] Step S535, judging whether each product name information is consistent according to the third information, and obtaining a third judgment result;

[0062] In this step, when the train formation meets the requirements of grouping at the station, the product name information corresponding to each arrival station is determined. It can be understood that the product name information is the name of the items loaded by the train set, which may specifically include but not be limited to fertilizers, gasoline, steel sections, steel plates, etc. It should be noted that in the present application, the third information includes but is not limited to product name information, which also includes information such as consignee, dedicated line, vehicle type, and usage attributes.

[0063] Step S536: Evaluate the train marshaling sequence table according to the third judgment result.

[0064] In this step, if the third judgment result is that there is inconsistency in the product name information, it means that the goods loaded on the same train set arriving at the station are different, and there may be repeated shunting operations, which does not meet the definition of a high-quality train set; if the third judgment result is that there is no inconsistency in the product name information, it means that the train sets arriving at the station all meet the definition of a high-quality train set, and the data of the train sets arriving at the station are counted to obtain the first statistical result.

[0065] The step S53 also includes step S537, step S538 and step S539, which specifically include:

[0066] Step S537: when the first judgment result is that the first information is arranged in sequence, obtaining fourth information, the fourth information including the vehicles corresponding to the arrival station names arranged in sequence and the corresponding arrival train number information;

[0067] Step S538: judging whether the arrival train information corresponding to all vehicles corresponding to each arrival station name is consistent according to the fourth information, and obtaining a fourth judgment result;

[0068] In this step, when the train grouping meets the requirements of arrival grouping, whether the arrival train information corresponding to the arrival station name is consistent.

[0069] Step S539: Evaluate the train marshaling sequence table according to the fourth judgment result.

[0070] In this step, if the fourth judgment result is that the vehicles corresponding to each arrival name have the same arrival train information, then the definition of a high-quality train set is not met; if the fourth judgment result is that the vehicles corresponding to each arrival name have inconsistent arrival train information, that is, there are two or more arrival trains in the vehicle set corresponding to the same arrival name, indicating that the train sets corresponding to the arrival station all meet the definition of a high-quality train set, and the train set data of the arrival station are counted to obtain a second statistical result; the first statistical result and the second statistical result are added together to obtain the total number of train sets that meet the definition of a high-quality train set in the train marshaling sequence table. According to the total number of train sets that meet the definition of a high-quality train set in the train marshaling sequence table, the number of train sets in the train marshaling sequence table that do not need to repeat the reverse hook shunting operation can be effectively evaluated, thereby effectively evaluating the train marshaling sequence table, effectively solving the problem that the quality of the marshaling sequence table cannot be evaluated in the prior art.

[0071] Embodiment 2:

[0072] like Figure 2 As shown, this embodiment provides a train marshaling sequence table evaluation device, the device includes an acquisition module 901, a first processing module 902, a second processing module 903, a third processing module 904 and an evaluation module 905, which specifically includes:

[0073] An acquisition module 901 is used to acquire at least one train marshaling sequence table, wherein the train marshaling sequence table includes a train marshaling sequence table compiled by a technical station for an intermediate station;

[0074] The first processing module 902 is used to determine whether to mark the train in the train marshaling sequence table according to the train marshaling sequence table, and obtain a marking result;

[0075] The second processing module 903 is used to screen the train marshaling sequence table according to the marking result to obtain a first screening result, wherein the first screening result includes the train marshaling sequence table having the marking result;

[0076] A third processing module 904 is used to filter the first filtering result according to the train number data in the first filtering result to obtain a second filtering result;

[0077] The evaluation module 905 is used to evaluate the train marshaling sequence table according to the second screening result.

[0078] In a specific implementation of the present disclosure, the third processing module 904 further includes a first acquisition unit 9041, a first processing unit 9042 and a second processing unit 9043, which specifically include:

[0079] The first acquisition unit 9041 is used to acquire the train number data corresponding to each train marshaling sequence table;

[0080] The first processing unit 9042 is used to determine the train type according to the train number data and obtain train type information;

[0081] The second processing unit 9043 is used to determine whether the train type information meets the preset vehicle type and obtain a second screening result.

[0082] In a specific implementation of the present disclosure, the evaluation module 905 further includes a second acquisition unit 9051, a first judgment unit 9052 and a third processing unit 9053, which specifically include:

[0083] The second acquisition unit 9051 is used to acquire first information, where the first information includes the name of the first arrival station corresponding to the vehicle in the train marshaling sequence table corresponding to the second screening result;

[0084] A first judgment unit 9052 is used to traverse the first information to determine whether the first information is arranged in sequence, and obtain a first judgment result;

[0085] The third processing unit 9053 is used to evaluate the train formation sequence table according to the first judgment result.

[0086] In a specific implementation of the present disclosure, the third processing unit 9053 further includes a third acquisition unit 90531, a second judgment unit 90532 and a fourth processing unit 90533, which specifically include:

[0087] The third acquisition unit 90531 is used to acquire second information when the first judgment result is that the first information is not arranged in sequence, wherein the second information includes an arrival station name that is arranged in sequence with the first arrival station name in the train marshaling sequence table and is different from the first arrival station name;

[0088] The second judgment unit 90532 is used to traverse the second information to determine whether the second information is arranged in sequence, until the arrival station name corresponding to each vehicle in the train marshaling sequence table is traversed in sequence to obtain a second judgment result;

[0089] The fourth processing unit 90533 is used to evaluate the train formation sequence table as unqualified if the second judgment result is that the arrival station names corresponding to each vehicle are not arranged in sequence.

[0090] In a specific implementation of the present disclosure, the third processing unit 9053 further includes a fourth acquisition unit 90534, a third judgment unit 90535 and a fifth processing unit 90536, which specifically include:

[0091] The fourth acquisition unit 90534 is used to acquire third information when the first judgment result is that the first information is arranged in sequence, wherein the third information includes product name information corresponding to the arrival station names arranged in sequence;

[0092] The third judgment unit 90535 is used to judge whether each product name information is consistent according to the third information, and obtain a third judgment result;

[0093] The fifth processing unit 90536 is used to evaluate the train formation sequence table according to the third judgment result.

[0094] In a specific implementation of the present disclosure, the third processing unit 9053 further includes a fifth acquisition unit 90537, a fourth judgment unit 90538 and a sixth processing unit 90539, which specifically include:

[0095] A fifth acquisition unit 90537 is configured to acquire fourth information when the first judgment result is that the first information is arranged in sequence, wherein the fourth information includes the vehicles corresponding to the arrival station names arranged in sequence and the corresponding arrival train number information;

[0096] The fourth judgment unit 90538 is used to judge whether the arrival train information corresponding to all vehicles corresponding to each arrival station name is consistent according to the fourth information, and obtain a fourth judgment result;

[0097] The sixth processing unit 90539 is used to evaluate the train formation sequence table according to the fourth judgment result.

[0098] It should be noted that, regarding the device in the above embodiment, the specific manner in which each module performs the operation has been described in detail in the embodiment of the method, and will not be elaborated here.

[0099] Embodiment 3:

[0100] Corresponding to the above method embodiment, this embodiment also provides a train marshaling sequence table evaluation device, and the train marshaling sequence table evaluation device described below and the train marshaling sequence table evaluation method described above can refer to each other.

[0101] Figure 3 FIG. 8 is a block diagram of a train marshaling sequence table evaluation device 800 according to an exemplary embodiment. Figure 3 As shown, the train formation sequence table evaluation device 800 may include: a processor 801 and a memory 802. The train formation sequence table evaluation device 800 may also include one or more of a multimedia component 803, an I / O interface 804, and a communication component 805.

[0102] The processor 801 is used to control the overall operation of the train marshaling sequence table evaluation device 800 to complete all or part of the steps in the above-mentioned train marshaling sequence table evaluation method. The memory 802 is used to store various types of data to support the operation of the train marshaling sequence table evaluation device 800, and these data may include, for example, instructions for any application or method operated on the train marshaling sequence table evaluation device 800, and application-related data, such as contact data, sent and received messages, pictures, audio, video, etc. The memory 802 can be implemented by any type of volatile or non-volatile storage device or a combination thereof, such as static random access memory (SRAM), electrically erasable programmable read-only memory (EEPROM), erasable programmable read-only memory (EPROM), programmable read-only memory (PROM), read-only memory (ROM), magnetic memory, flash memory, disk or optical disk. The multimedia component 803 can include a screen and an audio component. The screen can be, for example, a touch screen, and the audio component is used to output and / or input audio signals. For example, the audio component can include a microphone, and the microphone is used to receive external audio signals. The received audio signal can be further stored in the memory 802 or sent through the communication component 805. The audio component also includes at least one speaker for outputting audio signals. The I / O interface 804 provides an interface between the processor 801 and other interface modules, and the above-mentioned other interface modules can be keyboards, mice, buttons, etc. These buttons can be virtual buttons or physical buttons. The communication component 805 is used for wired or wireless communication between the train marshaling sequence table evaluation device 800 and other devices. Wireless communication, such as Wi-Fi, Bluetooth, Near Field Communication (NFC), 2G, 3G or 4G, or a combination of one or more of them, so the corresponding communication component 805 can include: Wi-Fi module, Bluetooth module, NFC module.

[0103] In an exemplary embodiment, the train formation sequence table evaluation device 800 can be implemented by one or more application-specific integrated circuits (ASIC), digital signal processors (DSP), digital signal processing devices (DSPD), programmable logic devices (PLD), field programmable gate arrays (FPGA), controllers, microcontrollers, microprocessors or other electronic components to execute the above-mentioned train formation sequence table evaluation method.

[0104] In another exemplary embodiment, a computer-readable storage medium including program instructions is also provided, and when the program instructions are executed by a processor, the steps of the above-mentioned train marshaling sequence table evaluation method are implemented. For example, the computer-readable storage medium can be the above-mentioned memory 802 including program instructions, and the above-mentioned program instructions can be executed by the processor 801 of the train marshaling sequence table evaluation device 800 to complete the above-mentioned train marshaling sequence table evaluation method.

[0105] Embodiment 4:

[0106] Corresponding to the above method embodiment, a readable storage medium is also provided in this embodiment. The readable storage medium described below and the train formation sequence table evaluation method described above can refer to each other.

[0107] A readable storage medium stores a computer program, which, when executed by a processor, implements the steps of the train marshaling sequence table evaluation method of the above method embodiment.

[0108] The readable storage medium may specifically be a U disk, a mobile hard disk, a read-only memory (ROM), a random access memory (RAM), a magnetic disk or an optical disk, or other readable storage medium that can store program codes.

[0109] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

[0110] The above is only a specific embodiment of the present invention, but the protection scope of the present invention is not limited thereto. Any person skilled in the art can easily think of changes or substitutions within the technical scope disclosed by the present invention, which should be included in the protection scope of the present invention. Therefore, the protection scope of the present invention should be based on the protection scope of the claims.

Claims

1. A train marshaling sequence table evaluation method, It is characterized in that include: Acquire at least one train marshaling sequence table, wherein the train marshaling sequence table includes a train marshaling sequence table compiled by a technical station for an intermediate station; Determine whether to mark the train in the train marshaling sequence table according to the train marshaling sequence table, and obtain a marking result; Screening the train marshaling sequence table according to the marking result to obtain a first screening result, wherein the first screening result includes the train marshaling sequence table having the marking result; Filter the first screening result according to the train number data in the first screening result to obtain a second screening result; The train marshalling sequence table is evaluated according to the second screening result.

2. The train marshaling sequence table evaluation method according to claim 1, It is characterized in that Filtering the first screening result according to the train number data in the first screening result includes: Get the train number data corresponding to each train marshaling sequence table; Determine the train type according to the train number data to obtain train type information; Whether the train type information meets the preset vehicle type is determined according to the train type information to obtain a second screening result.

3. The train marshaling sequence table evaluation method according to claim 1, It is characterized in that The train marshaling sequence table is evaluated according to the second screening result, including: Acquire first information, wherein the first information includes the name of the first arrival station corresponding to the vehicle in the train marshaling sequence table corresponding to the second screening result; Traversing the first information to determine whether the first information is arranged in sequence, and obtaining a first determination result; The train marshaling sequence table is evaluated according to the first judgment result.

4. The train marshaling sequence table evaluation method according to claim 3, It is characterized in that The train marshaling sequence table is evaluated according to the first judgment result, including: When the first judgment result is that the first information is not arranged in sequence, obtaining second information, wherein the second information includes a station name that is arranged in sequence with the first station name in the train marshaling sequence table and is different from the first station name; Traversing the second information to determine whether the second information is arranged in sequence, until the arrival station name corresponding to each vehicle in the train marshaling sequence table is traversed in sequence, and a second determination result is obtained; If the second judgment result is that the arrival station names corresponding to each vehicle are not arranged in sequence, the train formation sequence table is evaluated as unqualified.

5. The train marshaling sequence table evaluation method according to claim 3, It is characterized in that The train marshaling sequence table is evaluated according to the first judgment result, including: When the first judgment result is that the first information is arranged in sequence, obtaining third information, the third information including product name information corresponding to the arrival station names arranged in sequence; Determine whether each product name information is consistent according to the third information, and obtain a third determination result; The train marshaling sequence table is evaluated according to the third judgment result.

6. A train marshaling sequence table evaluation device, It is characterized in that include: An acquisition module, used to acquire at least one train marshaling sequence table, wherein the train marshaling sequence table includes a train marshaling sequence table compiled by a technical station for an intermediate station; A first processing module is used to determine whether to mark the train in the train marshaling sequence table according to the train marshaling sequence table, and obtain a marking result; A second processing module is used to screen the train marshaling sequence table according to the marking result to obtain a first screening result, wherein the first screening result includes the train marshaling sequence table having the marking result; A third processing module, configured to filter the first filtering result according to the train number data in the first filtering result to obtain a second filtering result; An evaluation module is used to evaluate the train marshaling sequence table according to the second screening result.

7. The train marshaling sequence table evaluation device according to claim 6, It is characterized in that The third processing module comprises: A first acquisition unit is used to acquire the train number data corresponding to each train marshaling sequence table; A first processing unit, configured to determine a train type according to the train number data, and obtain train type information; The second processing unit is used to determine whether the train type information meets the preset vehicle type and obtain a second screening result.

8. The train marshaling sequence table evaluation device according to claim 6, It is characterized in that The evaluation module comprises: A second acquisition unit is used to acquire first information, wherein the first information includes a first arrival station name corresponding to the vehicle in the train marshaling sequence table corresponding to the second screening result; A first judgment unit, configured to traverse the first information to determine whether the first information is arranged in sequence, and obtain a first judgment result; The third processing unit is used to evaluate the train marshaling sequence table according to the first judgment result.

9. The train marshaling sequence table evaluation device according to claim 8, It is characterized in that The third processing unit comprises: A third acquisition unit is used to acquire second information when the first judgment result is that the first information is not arranged in sequence, wherein the second information includes an arrival station name that is arranged in sequence with the first arrival station name in the train marshaling sequence table and is different from the first arrival station name; A second judgment unit is used to traverse the second information to determine whether the second information is arranged in sequence, until the arrival station name corresponding to each vehicle in the train formation sequence table is traversed in sequence, and a second judgment result is obtained; The fourth processing unit is used to evaluate the train formation sequence table as unqualified if the second judgment result is that the arrival station names corresponding to each vehicle are not arranged in sequence.

10. The train marshaling sequence table evaluation device according to claim 8, It is characterized in that The third processing unit comprises: A fourth acquisition unit, configured to acquire third information when the first judgment result is that the first information is arranged in sequence, wherein the third information includes product name information corresponding to the arrival station names arranged in sequence; A third judgment unit, used for judging whether each product name information is consistent according to the third information, and obtaining a third judgment result; The fifth processing unit is used to evaluate the train formation sequence table according to the third judgment result.