Scene digital operation management method and system based on business big data analysis
By optimizing the supplier evaluation cycle through methods based on business big data analysis, the problem of waste of supplier evaluation resources in the existing technology is solved, and the stability of the supply chain and cost optimization are achieved.
Patent Information
- Application Number
- CN202411255804.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-09
- Publication Date
- 2024-10-18
AI Technical Summary
In the existing technology, supplier evaluation requires a large investment of manpower, material resources, and financial resources, and requires the coordination of multiple departments, resulting in a waste of resources and low evaluation efficiency, making it difficult to optimize and stabilize the supply chain.
Through the method based on business big data analysis, we obtain the supplier's procurement data, build a supply database, calculate the reliability score and on-time score, use the three-dimensional coordinate system and clustering algorithm to divide the suppliers into category clusters, and modify the evaluation cycle based on the analysis results. , optimize resource allocation.
It improves the efficiency and effectiveness of supply chain assessment, optimizes the company's cost structure, and improves the overall stability and resource usage efficiency of the supply chain.
Smart Images

Figure CN118798737A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of data evaluation technology, and in particular to a scenario digital operation management method and system based on business big data analysis. Background Art
[0002] Operation management mainly includes production management, supply chain management, inventory management, quality management, human resource management, cost management and comprehensive management. These contents together constitute the core part of the daily operation and management of the enterprise, ensuring that the enterprise can operate efficiently and orderly and achieve its strategic goals.
[0003] The supply chain is a product supporting system centered around the core enterprise. It makes an overall plan for the product from manufacturing, distribution, and logistics, and provides the product to consumers. At the same time, the target enterprise at any node in the supply chain usually selects multiple suppliers to control costs and reduce supply risks. By introducing a competition mechanism, procurement costs are optimized based on price comparison and performance evaluation. Cooperation with multiple suppliers can also quickly adjust procurement plans when problems arise with one supplier to avoid production line interruptions.
[0004] However, in reality, the quality, delivery, cost, etc. of each supplier are different. Therefore, it is necessary to conduct periodic performance evaluations on the cooperating suppliers to ensure the optimization and stability of the supply chain. However, regular evaluations require a lot of manpower, material and financial resources. From planning, execution to result analysis, each step requires resource support. At the same time, it is necessary to organize multiple departments to participate in the evaluation work, which requires a high degree of coordination and communication. Therefore, when conducting supplier evaluations, companies should reasonably plan the content and frequency of the evaluations to ensure that they can enjoy the benefits of the evaluations while avoiding potential negative effects. Summary of the invention
[0005] The purpose of the present invention is to provide a scenario digital operation management method and system based on business big data analysis to solve the following technical problems: In fact, the quality, delivery, cost, etc. of each supplier are different, so it is necessary to conduct periodic performance evaluation of the cooperating suppliers to ensure the optimization and stability of the supply chain. However, regular evaluation requires a lot of manpower, material and financial resources. From planning, execution to result analysis, each step requires resource support. At the same time, it is necessary to organize multiple departments to participate in the evaluation work, which requires a high degree of coordination and communication. Therefore, when conducting supplier evaluation, enterprises should reasonably plan the evaluation content and frequency to ensure that they can enjoy the benefits of the evaluation and avoid potential negative effects.
[0006] In order to achieve the above object, the present invention provides the following technical solutions:
[0007] The first aspect of the present application provides a scenario digital operation management method based on business big data analysis, comprising the following steps:
[0008] Acquire the purchase data of the target enterprise and construct a supply database of different suppliers; the supply database stores the sales order data and quality rate index of any supplier; the sales order data includes the number of on-time and delayed orders and the corresponding order volume;
[0009] Preset the evaluation period T, obtain the supply data within the evaluation period and calculate the reliability score A=DTBF / (DTBF+DTTR) of any supplier to obtain the reliability scores of all suppliers; where DTBF is the number of on-time orders and DTTR is the number of delayed orders; according to the calculation formula Z=log(TBF / TTR+1)*A, obtain the on-time scores of all suppliers within the evaluation period; where TBF is the order volume of on-time orders and TTR is the order volume of delayed orders;
[0010] With the reliability score as the horizontal axis, the punctuality score as the vertical axis, and the quality rate index as the Z axis, a three-dimensional evaluation coordinate system is constructed to generate feature points corresponding to all suppliers. Any feature point is selected as the center, the control radius R is set, the feature point density ρ within the control radius R is calculated, and the mean feature point density within the control radius R of all feature points is obtained. The mean feature point density is marked as Minρ. If there is any feature point with a feature point density ρ greater than Minρ within the radius R, the feature point is marked as a core point, and a category cluster is generated with the core point as the center.
[0011] The supply data in all category clusters are analyzed separately, and the evaluation period of the supplier corresponding to any category cluster is revised according to the analysis results.
[0012] As a further solution of the present invention: the procurement data of the target enterprise is obtained and a supply database of different suppliers is constructed; the supply database stores the sales order data and quality rate index of any supplier; the sales order data includes the number of on-time and delayed orders and the corresponding order volume, and the quality index is obtained in the following process:
[0013] The original data of the produced goods are obtained, and the evaluation indicators of the product quality are preset, and the evaluation indicators include product qualification rate, raw material quality index and maintenance rate; the typical evaluation indicator data in the product data are extracted by using the Gaussian mixture model clustering algorithm, and a decision matrix for comprehensive quality evaluation is formed, and standardized; the cluster center is obtained to form a decision matrix for comprehensive product quality evaluation, and it is standardized according to the benefit type and the cost type respectively; the weights of various evaluation indicators of the goods are calculated based on the hierarchical analysis method, the entropy weight method, the Pearson correlation coefficient method and the coefficient of variation method, and then the combination weights are obtained by using the combination optimization model of the indicator weights, and the decision matrix is weighted to obtain the evaluation matrix for comprehensive product quality evaluation; according to the evaluation matrix, the quality is comprehensively evaluated by using the angle measurement method to obtain the quality rate index.
[0014] As a further solution of the present invention: the reliability score is used as the horizontal axis, the punctuality score is used as the vertical axis, and the quality rate index is used as the Z axis to construct an evaluation three-dimensional coordinate system, generate feature points corresponding to all suppliers, select any feature point as the center, set the control radius R, calculate the feature point density ρ within the control radius R, obtain the mean feature point density within the control radius R of all feature points, mark the feature point density mean as Minρ, if there is any feature point with a feature point density ρ greater than Minρ within the radius R, mark the feature point as a core point, and generate a category cluster with the core point as the center. The specific process of setting the cluster control radius R is as follows:
[0015] Taking any feature point as the center, calculate the Euclidean distance between the feature point and any other feature point, sum each Euclidean distance to get u, and get the control radius R based on the value u. The calculation formula is as follows:
[0016] ;
[0017] ;
[0018] Among them, u is the sum of the Euclidean distance data values of all feature points, and I is the Euclidean distance between any feature points.
[0019] As a further solution of the present invention: the reliability score is used as the horizontal axis, the punctuality score is used as the vertical axis, and the quality rate index is used as the Z axis to construct an evaluation three-dimensional coordinate system, generate feature points corresponding to all suppliers, select any feature point as the center, set the control radius R, calculate the feature point density ρ within the control radius R, obtain the mean feature point density within the control radius R of all feature points, mark the mean feature point density as Minρ, if there is any feature point with a feature point density ρ greater than Minρ within the radius R, mark the feature point as a core point, and generate a category cluster with the core point as the center. The calculation formula for calculating the feature point density within the control radius R is:
[0020] ρ=3i / (4πR 3 );
[0021] Where i is the number of feature points within the control radius R.
[0022] As a further solution of the present invention: if there is a feature point that does not belong to any category cluster, then the feature point is regarded as a separate category cluster.
[0023] As a further solution of the present invention, the supply data in all category clusters are analyzed respectively, and the evaluation period of the supplier corresponding to any category cluster is corrected according to the analysis result. The specific process of supply data analysis is as follows:
[0024] With the core point in each category cluster as the center and R as the radius, several subclusters are generated. The degree of aggregation of each subcluster is calculated and marked as Dp. The calculation formula of Dp is:
[0025] ;
[0026] Where z represents the number of feature sets in the cluster, z0 represents the core point of the cluster, and v0 represents the data point in the cluster;
[0027] In each category cluster, the subcluster with the smallest Dp value is selected as the representative cluster of the category cluster. The number of feature points of the representative cluster with the highest Dp value is extracted and marked as k. The representative set of each category cluster is generated. The mean of any axis coordinates of the corresponding feature points of any representative set is calculated to obtain the corresponding representative score.
[0028] As a further solution of the present invention: the supply data in all category clusters are analyzed respectively, and the evaluation period of the supplier corresponding to any category cluster is corrected according to the analysis result. The specific calculation process of the evaluation period correction is Si=α*Si1+β*Si2+γ*Si3;
[0029] Savg= ;
[0030] T'=T*Si / Savg;
[0031] Among them, α, β and γ are preset coefficients, Si1, Si2 and Si3 are the representative scores of the corresponding representative clusters in the i-th category cluster, N is the number of all category clusters, and T' is the revised evaluation period.
[0032] The second aspect of the present application provides a scenario digital operation management system based on business big data analysis, including:
[0033] A data acquisition module, used to acquire the purchase data of the target enterprise and build a supply database of different suppliers; the supply database stores the sales order data and quality rate index of any supplier; the sales order data includes the number of on-time and delayed orders and the corresponding order volume;
[0034] The data analysis module presets an evaluation period T, obtains the supply data within the evaluation period and calculates the reliability score A=DTBF / (DTBF+DTTR) of any supplier to obtain the reliability scores of all suppliers; where DTBF is the number of on-time orders and DTTR is the number of delayed orders; according to the calculation formula Z=log(TBF / TTR+1)*A, the on-time scores of all suppliers within the evaluation period are obtained; where TBF is the order volume of on-time orders and TTR is the order volume of delayed orders;
[0035] The data optimization module is used to construct a three-dimensional evaluation coordinate system with the reliability score as the horizontal axis, the punctuality score as the vertical axis, and the quality rate index as the Z axis, generate feature points corresponding to all suppliers, select any feature point as the center, set the control radius R, calculate the feature point density ρ within the control radius R, obtain the mean feature point density within the control radius R of all feature points, mark the mean feature point density as Minρ, if there is any feature point with a feature point density ρ greater than Minρ within the radius R, mark the feature point as a core point, and generate a category cluster with the core point as the center;
[0036] The result generation module is used to analyze the supply data in all category clusters respectively and to modify the evaluation period of the supplier corresponding to any category cluster according to the analysis results.
[0037] A third aspect of the present application provides a computer-readable storage medium, wherein the computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the method as described in any one of the above is implemented.
[0038] Beneficial effects of the present invention:
[0039] The present invention first obtains the supply data of all suppliers within a preset evaluation period, extracts features from the supply data and constructs a three-dimensional coordinate system, calculates the Euclidean distance between any feature points, sets the clustering control radius, divides all suppliers into several category clusters, selects the subcluster with the smallest Dp value in each category cluster as the representative cluster of the category cluster, generates a representative set for each category cluster, calculates the mean of any axis coordinates of the corresponding feature points of any representative set, obtains the corresponding representative score, and corrects the evaluation period of the supplier corresponding to any category cluster according to the representative score in the representative cluster. Through differentiated evaluation periods, limited resources can be concentrated on those suppliers that need the most attention and improvement, thereby improving the overall efficiency and effectiveness of the evaluation work, enhancing the stability of the supply chain, optimizing the enterprise cost structure, and achieving overall optimization of the supply chain. BRIEF DESCRIPTION OF THE DRAWINGS
[0040] The present invention will be further described below in conjunction with the accompanying drawings.
[0041] Figure 1 It is a flow chart of the scenario digital operation management method based on business big data analysis of the present invention. DETAILED DESCRIPTION
[0042] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0043] It will be understood by those skilled in the art that, unless specifically stated, the term "comprising" used in the specification of the present invention refers to the presence of the features, integers, steps, operations, parts / components and / or assemblies, but does not exclude the presence or addition of one or more other features, integers, steps, operations, parts / components, assemblies and / or their groups. It should be understood that when we say a part / component is "connected" to another part / component, it can be directly connected to the other part / component, or there can be intermediate parts / components. The term "and / or" used herein includes all or any unit and all combinations of one or more associated listed items.
[0044] See also Figure 1 As shown, the present invention is a scene digital operation management method based on business big data analysis, comprising the following steps:
[0045] Acquire the purchase data of the target enterprise and construct a supply database of different suppliers; the supply database stores the sales order data and quality rate index of any supplier; the sales order data includes the number of on-time and delayed orders and the corresponding order volume;
[0046] Preset the evaluation period T, obtain the supply data within the evaluation period and calculate the reliability score A=DTBF / (DTBF+DTTR) of any supplier to obtain the reliability scores of all suppliers; where DTBF is the number of on-time orders and DTTR is the number of delayed orders; according to the calculation formula Z=log(TBF / TTR+1)*A, obtain the on-time scores of all suppliers within the evaluation period; where TBF is the order volume of on-time orders and TTR is the order volume of delayed orders;
[0047] With the reliability score as the horizontal axis, the punctuality score as the vertical axis, and the quality rate index as the Z axis, a three-dimensional evaluation coordinate system is constructed to generate feature points corresponding to all suppliers. Any feature point is selected as the center, the control radius R is set, the feature point density ρ within the control radius R is calculated, and the mean feature point density within the control radius R of all feature points is obtained. The mean feature point density is marked as Minρ. If there is any feature point with a feature point density ρ greater than Minρ within the radius R, the feature point is marked as a core point, and a category cluster is generated with the core point as the center.
[0048] The supply data in all category clusters are analyzed separately, and the evaluation period of the supplier corresponding to any category cluster is revised according to the analysis results.
[0049] The present invention first obtains the supply data of all suppliers within a preset evaluation period, extracts features from the supply data and constructs a three-dimensional coordinate system, calculates the Euclidean distance between any feature points, sets the clustering control radius, divides all suppliers into several category clusters, selects the subcluster with the smallest Dp value in each category cluster as the representative cluster of the category cluster, generates a representative set for each category cluster, calculates the mean of any axis coordinates of the corresponding feature points of any representative set, obtains the corresponding representative score, and corrects the evaluation period of the supplier corresponding to any category cluster according to the representative score in the representative cluster. Through differentiated evaluation periods, limited resources can be concentrated on those suppliers that need the most attention and improvement, thereby improving the overall efficiency and effectiveness of the evaluation work, enhancing the stability of the supply chain, optimizing the enterprise cost structure, and achieving overall optimization of the supply chain.
[0050] It is worth noting that in supply chain management, core enterprises face the challenge of effectively evaluating multiple suppliers. It is understandable that the production of an item is usually composed of multiple components, and one component corresponds to one or more suppliers. In order to control costs and reduce supply risks, enterprises usually select multiple suppliers and introduce competition mechanisms to optimize procurement costs through price comparison and performance evaluation. These suppliers may provide the same components or different components, and each supplier has different performances in terms of quality, delivery and cost. However, due to the limited evaluation resources, the work efficiency of evaluating multiple suppliers is not high. In order to improve the overall efficiency and effect of the evaluation work, the present invention first starts from the stability of the supply chain, performs cluster analysis on all suppliers, generates several category clusters, and analyzes representative category clusters to reduce workload and make data analysis more efficient. According to the data analysis results, the evaluation cycle of suppliers corresponding to any category cluster can be corrected, and limited resources can be prioritized for those suppliers that need the most attention and improvement. For example, for supplier groups with poor performance or high risks, the evaluation cycle can be shortened, and supervision and improvement measures can be strengthened. For supplier groups with stable and reliable performance, the evaluation cycle can be appropriately extended and the evaluation frequency can be reduced, thereby improving the efficiency of resource utilization, enhancing supply chain stability, and optimizing the enterprise cost structure, thereby achieving overall optimization of the supply chain and the achievement of corporate strategic goals.
[0051] In a preferred embodiment of the present invention, the procurement data of the target enterprise is obtained and a supply database of different suppliers is constructed; the supply database stores the sales order data and quality rate index of any supplier; the sales order data includes the number of on-time and delayed orders and the corresponding order volume, and the quality index is obtained in the following process:
[0052] The original data of the produced goods are obtained, and the evaluation indicators of the product quality are preset, and the evaluation indicators include product qualification rate, raw material quality index and maintenance rate; the typical evaluation indicator data in the product data are extracted by using the Gaussian mixture model clustering algorithm, and a decision matrix for comprehensive quality evaluation is formed, and standardized; the cluster center is obtained to form a decision matrix for comprehensive product quality evaluation, and it is standardized according to the benefit type and the cost type respectively; the weights of various evaluation indicators of the goods are calculated based on the hierarchical analysis method, the entropy weight method, the Pearson correlation coefficient method and the coefficient of variation method, and then the combination weights are obtained by using the combination optimization model of the indicator weights, and the decision matrix is weighted to obtain the evaluation matrix for comprehensive product quality evaluation; according to the evaluation matrix, the quality is comprehensively evaluated by using the angle measurement method to obtain the quality rate index.
[0053] By comprehensively considering multiple evaluation indicators such as product qualification rate, raw material quality index and maintenance rate, the quality status of the goods can be reflected more comprehensively. The Gaussian mixture model clustering algorithm is used to extract typical evaluation indicator data, which is helpful to discover the distribution law and potential characteristics of product quality. The benefit-type and cost-type indicators are standardized to make data of different dimensions comparable. The combined weights are obtained through the combined optimization model of indicator weights, and the decision matrix is weighted to make the evaluation results more in line with the actual situation and improve the effectiveness of the evaluation. The angle measurement method is used for comprehensive evaluation to obtain an intuitive quality rate index, which is easy to understand and apply, reduces the influence of subjective judgment, and improves the objectivity and credibility of the evaluation results. The evaluation results are continuously updated according to new data to adapt to the dynamic monitoring needs of changes in product quality.
[0054] In another preferred embodiment of the present invention, the reliability score is used as the horizontal axis, the punctuality score is used as the vertical axis, and the quality rate index is used as the Z axis to construct an evaluation three-dimensional coordinate system, generate feature points corresponding to all suppliers, select any feature point as the center, set the control radius R, calculate the feature point density ρ within the control radius R, obtain the mean feature point density within the control radius R of all feature points, mark the feature point density mean as Minρ, if there is any feature point with a feature point density ρ greater than Minρ within the radius R, mark the feature point as a core point, and generate a category cluster with the core point as the center. The specific process of setting the cluster control radius R is as follows:
[0055] Taking any feature point as the center, calculate the Euclidean distance between the feature point and any other feature point, sum each Euclidean distance to get u, and get the control radius R based on the value u. The calculation formula is as follows:
[0056] ;
[0057] ;
[0058] Among them, u is the sum of the Euclidean distance data values of all feature points, and I is the Euclidean distance between any feature points.
[0059] By calculating the average Euclidean distance based on the Euclidean distance between all feature points and using the average Euclidean distance as the clustering control radius, the information of multiple feature points can be integrated, which helps to more comprehensively evaluate the distance between data points in multidimensional space, and determine the similarity between feature points based on the distance between data points. Through the similarity between feature sets, all feature sets can be effectively and reasonably divided into category groups.
[0060] In another preferred embodiment of the present invention, the reliability score is used as the horizontal axis, the punctuality score is used as the vertical axis, and the quality rate index is used as the Z axis to construct an evaluation three-dimensional coordinate system, generate feature points corresponding to all suppliers, select any feature point as the center, set the control radius R, calculate the feature point density ρ within the control radius R, obtain the mean feature point density within the control radius R of all feature points, mark the feature point density mean as Minρ, if there is any feature point with a feature point density ρ greater than Minρ within the radius R, then mark the feature point as a core point, and generate a category cluster with the core point as the center. The calculation formula for calculating the feature point density within the control radius R is:
[0061] ρ=3i / (4πR 3 );
[0062] Where i is the number of feature points within the control radius R.
[0063] In another preferred embodiment of the present invention, the three-dimensional evaluation coordinate system is constructed with the reliability score as the horizontal axis, the punctuality score as the vertical axis, and the quality rate index as the Z axis, and feature points corresponding to all suppliers are generated. Any feature point is selected as the center, and the control radius R is set. The feature point density ρ within the control radius R is calculated, and the mean feature point density within the control radius R of all feature points is obtained. The mean feature point density is marked as Minρ. If there is any feature point with a feature point density ρ greater than Minρ within the radius R, the feature point is marked as a core point, and a category cluster is generated with the core point as the center. It also includes that if there is a non-core point in any category cluster and the density ρ within the control radius R is also greater than Minρ, the category cluster generated by the non-core point is merged with the original category cluster to generate several category clusters.
[0064] In a preferred case of this embodiment, if there is a feature point that does not belong to any category cluster, the feature point is regarded as a separate category cluster.
[0065] In another preferred embodiment of the present invention, the supply data in all category clusters are analyzed respectively, and the evaluation period of the supplier corresponding to any category cluster is corrected according to the analysis result. The specific process of analyzing the supply data is as follows:
[0066] With the core point in each category cluster as the center and R as the radius, several subclusters are generated. The degree of aggregation of each subcluster is calculated and marked as Dp. The calculation formula of Dp is:
[0067] ;
[0068] Where z represents the number of feature sets in the cluster, z0 represents the core point of the cluster, and v0 represents the data point in the cluster;
[0069] In each category cluster, the subcluster with the smallest Dp value is selected as the representative cluster of the category cluster. The number of feature points of the representative cluster with the highest Dp value is extracted and marked as k. The representative set of each category cluster is generated. The mean of any axis coordinates of the corresponding feature points of any representative set is calculated to obtain the corresponding representative score.
[0070] The Dp value represents the average distance from other feature set points to the center point in each cluster. The smaller the Dp value, the higher the compactness of the subcluster and the better the clustering effect. By selecting the cluster with the smallest Dp value in each category cluster, the most representative subcluster in the category cluster can be obtained. By analyzing each representative cluster, there is no need to analyze each feature set in the category cluster, thereby reducing the workload of actual data analysis and improving work efficiency.
[0071] In another preferred embodiment of the present invention, the supply data in all category clusters are analyzed respectively, and the evaluation period of the supplier corresponding to any category cluster is corrected according to the analysis result. The specific calculation process of the evaluation period correction is Si=α*Si1+β*Si2+γ*Si3;
[0072] Savg= ;
[0073] T'=T*Si / Savg;
[0074] Among them, α, β and γ are preset coefficients, Si1, Si2 and Si3 are the representative scores of the corresponding representative clusters in the i-th category cluster, N is the number of all category clusters, and T' is the revised evaluation period.
[0075] The scenario-based digital operation management system based on business big data analysis includes:
[0076] A data acquisition module, used to acquire the purchase data of the target enterprise and build a supply database of different suppliers; the supply database stores the sales order data and quality rate index of any supplier; the sales order data includes the number of on-time and delayed orders and the corresponding order volume;
[0077] The data analysis module is used to preset the evaluation period T, obtain the supply data within the evaluation period and calculate the reliability score A=DTBF / (DTBF+DTTR) of any supplier to obtain the reliability scores of all suppliers; where DTBF is the number of on-time orders and DTTR is the number of delayed orders; according to the calculation formula Z=log(TBF / TTR+1)*A, the on-time scores of all suppliers within the evaluation period are obtained; where TBF is the order volume of on-time orders and TTR is the order volume of delayed orders;
[0078] The data optimization module is used to construct a three-dimensional evaluation coordinate system with the reliability score as the horizontal axis, the punctuality score as the vertical axis, and the quality rate index as the Z axis, generate feature points corresponding to all suppliers, select any feature point as the center, set the control radius R, calculate the feature point density ρ within the control radius R, obtain the mean feature point density within the control radius R of all feature points, mark the mean feature point density as Minρ, if there is any feature point with a feature point density ρ greater than Minρ within the radius R, mark the feature point as a core point, and generate a category cluster with the core point as the center;
[0079] The result generation module is used to analyze the supply data in all category clusters respectively and to modify the evaluation period of the supplier corresponding to any category cluster according to the analysis results.
[0080] The present application also provides a computer-readable storage medium, wherein the computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the method as described in any one of the above items is implemented.
[0081] It should be noted that the information interaction, execution process, etc. between the above-mentioned devices / units are based on the same concept as the method embodiment of the present application. Their specific functions and technical effects can be found in the method embodiment part and will not be repeated here.
[0082] It should be noted that the information interaction, execution process, etc. between the above-mentioned devices / units are based on the same concept as the method embodiment of the present application. Their specific functions and technical effects can be found in the method embodiment part and will not be repeated here.
[0083] Those skilled in the art can clearly understand that, for the convenience and simplicity of description, only the division of the above-mentioned functional elements and circuits is used as an example for illustration. In practical applications, the above-mentioned function allocation can be completed by different functional elements and circuits as needed, that is, the internal structure of the circuit is divided into different functional elements or circuits to complete all or part of the functions described above. The functional elements and circuits in the embodiments can be integrated into a processing element, or each element can exist physically alone, or two or more elements can be integrated into one element. The above-mentioned integrated elements can be implemented in the form of hardware or in the form of software functional elements. In addition, the specific names of the functional elements and circuits are only for the convenience of distinguishing each other, and are not used to limit the scope of protection of this application. The specific working process of the elements and circuits in the above-mentioned system can refer to the corresponding process in the aforementioned method embodiment, which will not be repeated here.
[0084] References throughout the specification to "various embodiments," "in an embodiment," "one embodiment," or "an embodiment," etc., mean that a particular feature, structure, or characteristic described with respect to the embodiment is included in at least one embodiment. Therefore, the appearance of the phrases "in various embodiments," "in some embodiments," "in one embodiment," or "in an embodiment," etc., in appropriate places throughout the specification do not necessarily refer to the same embodiment. In addition, particular features, structures, or characteristics may be combined in any appropriate manner in one or more embodiments. Therefore, particular features, structures, or characteristics shown or described with respect to one embodiment may be combined in whole or in part with features, structures, or characteristics of one or more other embodiments without assuming that such a combination is not an illogical or non-functional limitation.
[0085] In the above embodiments, the description of each embodiment has its own emphasis. For parts that are not described or recorded in detail in a certain embodiment, reference can be made to the relevant descriptions of other embodiments.
[0086] Those of ordinary skill in the art will appreciate that the elements and algorithm steps of each example described in conjunction with the embodiments disclosed herein can be implemented in electronic hardware, or a combination of computer software and electronic hardware. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution. Professional and technical personnel can use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of the present invention.
[0087] In the embodiments provided by the present invention, it should be understood that the disclosed circuits / terminal devices and methods can be implemented in other ways. For example, the circuit / terminal device embodiments described above are only schematic. For example, the division of the circuits or components is only a logical function division. There may be other division methods in actual implementation, such as multiple components or circuits can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, indirect coupling or communication connection of circuits or components, which can be electrical, mechanical or other forms.
[0088] The components described as separate components may or may not be physically separated, and the components shown as components may or may not be physical components, that is, they may be located in one place or distributed on multiple network components. Some or all of the components may be selected according to actual needs to achieve the purpose of the solution of this embodiment.
[0089] In addition, each functional element in each embodiment of the present invention may be integrated into one processing element, or each element may exist physically separately, or two or more elements may be integrated into one element. The above-mentioned integrated element may be implemented in the form of hardware or in the form of software functional elements.
[0090] An embodiment of the present application further provides a computer-readable storage medium, wherein the computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the steps in the above-mentioned method embodiments can be implemented.
[0091] If the integrated circuit / component is implemented in the form of a software functional element and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the present invention implements all or part of the processes in the above-mentioned embodiment method, and can also be completed by instructing the relevant hardware through a computer program. The computer program can be stored in a computer-readable storage medium. When the computer program is executed by the processor, the steps of the above-mentioned method embodiments can be implemented. Among them, the computer program includes computer program code, and the computer program code can be in source code form, object code form, executable file or some intermediate form. The computer-readable medium may include: any entity or circuit that can carry the computer program code, recording medium, U disk, mobile hard disk, disk, optical disk, computer memory, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), electric carrier signal, telecommunication signal and software distribution medium. It should be noted that the content contained in the computer-readable medium can be appropriately increased or decreased according to the requirements of legislation and patent practice in the jurisdiction. For example, in some jurisdictions, according to legislation and patent practice, computer-readable media do not include electric carrier signals and telecommunication signals.
[0092] The above descriptions are only some embodiments of the present invention. It should be pointed out that, for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principles of the present invention. These improvements and modifications should also be regarded as the scope of protection of the present invention.
Claims
1. A scenario digital operation management method based on business big data analysis, characterized in that: include: Obtain the target company's procurement data and build a supply database of different suppliers; The supply database stores sales order data and quality rate index of any supplier; The sales order data includes the number of on-time and delayed orders and the corresponding order volumes; Preset the evaluation period T, obtain the supply data within the evaluation period and calculate the reliability score A=DTBF / (DTBF+DTTR) of any supplier to obtain the reliability scores of all suppliers; where DTBF is the number of on-time orders and DTTR is the number of delayed orders; according to the calculation formula Z=log(TBF / TTR+1)*A, obtain the on-time scores of all suppliers within the evaluation period; where TBF is the order volume of on-time orders and TTR is the order volume of delayed orders; With the reliability score as the horizontal axis, the punctuality score as the vertical axis, and the quality rate index as the Z axis, a three-dimensional evaluation coordinate system is constructed to generate feature points corresponding to all suppliers. Any feature point is selected as the center, the control radius R is set, the feature point density ρ within the control radius R is calculated, and the mean feature point density within the control radius R of all feature points is obtained. The mean feature point density is marked as Minρ. If there is any feature point with a feature point density ρ greater than Minρ within the radius R, the feature point is marked as a core point, and a category cluster is generated with the core point as the center. The supply data in all category clusters are analyzed separately, and the evaluation period of the supplier corresponding to any category cluster is revised according to the analysis results.
2. The scene digital operation management method based on business big data analysis according to claim 1 is characterized in that: The procurement data of the target enterprise is obtained and a supply database of different suppliers is constructed; the supply database stores the sales order data and quality rate index of any supplier; the sales order data includes the number of on-time and delayed orders and the corresponding order volume, and the quality index is obtained in the following process: Obtain the original data of the produced goods, preset the evaluation indicators of the product quality, which include the product qualification rate, the raw material quality index and the maintenance rate; use the Gaussian mixture model clustering algorithm to extract the typical evaluation indicator data in the product data, form a decision matrix for comprehensive quality evaluation, and perform standardization processing; obtain the cluster center to form a decision matrix for comprehensive product quality evaluation, and perform standardization processing on it according to the benefit type and cost type respectively; Calculate the weights of each evaluation index of the product based on the analytic hierarchy process, entropy weight method, Pearson correlation coefficient method and coefficient of variation method, then use the combination optimization model of index weights to obtain the combination weights, perform weighted processing on the decision matrix to obtain the evaluation matrix for comprehensive evaluation of product quality; According to the evaluation matrix, the quality is comprehensively evaluated using the angle measurement method to obtain the quality rate index.
3. The scene digital operation management method based on business big data analysis according to claim 1 is characterized in that: The three-dimensional coordinate system for evaluation is constructed with the reliability score as the horizontal axis, the punctuality score as the vertical axis, and the quality rate index as the Z axis, and the feature points corresponding to all suppliers are generated. Any feature point is selected as the center, and the control radius R is set. The density ρ of the feature points within the control radius R is calculated, and the mean density of the feature points within the control radius R of all feature points is obtained. The mean density of the feature points is marked as Minρ. If there is any feature point whose density ρ within the radius R is greater than Minρ, the feature point is marked as a core point, and a category cluster is generated with the core point as the center. The specific process of setting the cluster control radius R is as follows: Taking any feature point as the center, calculate the Euclidean distance between the feature point and any other feature point, sum each Euclidean distance to get u, and get the control radius R based on the value u. The calculation formula is as follows: ; ; Among them, u is the sum of the Euclidean distance data values of all feature points, and I is the Euclidean distance between any feature points.
4. The scene digital operation management method based on business big data analysis according to claim 1 is characterized in that: The three-dimensional coordinate system for evaluation is constructed with the reliability score as the horizontal axis, the punctuality score as the vertical axis, and the quality rate index as the Z axis, and the feature points corresponding to all suppliers are generated. Any feature point is selected as the center, and the control radius R is set. The density ρ of the feature points within the control radius R is calculated, and the mean density of the feature points within the control radius R of all feature points is obtained. The mean density of the feature points is marked as Minρ. If there is any feature point whose density ρ within the radius R is greater than Minρ, the feature point is marked as a core point, and a category cluster is generated with the core point as the center. The calculation formula for calculating the density of the feature points within the control radius R is: ρ=3i / (4πR 3 ); Where i is the number of feature points within the control radius R.
5. The scene digital operation management method based on business big data analysis according to claim 1 is characterized in that: The method constructs a three-dimensional evaluation coordinate system with the reliability score as the horizontal axis, the punctuality score as the vertical axis, and the quality rate index as the Z axis, generates feature points corresponding to all suppliers, selects any feature point as the center, sets the control radius R, calculates the feature point density ρ within the control radius R, obtains the mean feature point density within the control radius R of all feature points, marks the mean feature point density as Minρ, and if there is any feature point with a feature point density ρ greater than Minρ within the radius R, marks the feature point as a core point, and generates a category cluster with the core point as the center. It also includes merging the category cluster generated by the non-core point with the original category cluster if there is a non-core point in any category cluster with a density ρ within the control radius R that is also greater than Minρ, to generate several category clusters.
6. The scene digital operation management method based on business big data analysis according to claim 5 is characterized in that: If there is a feature point that does not belong to any category cluster, the feature point is regarded as a separate category cluster.
7. The scene digital operation management method based on business big data analysis according to claim 1 is characterized in that: The supply data in all category clusters are analyzed respectively, and the evaluation period of the supplier corresponding to any category cluster is corrected according to the analysis results. The specific process of supply data analysis is as follows: With the core point in each category cluster as the center and R as the radius, several subclusters are generated. The degree of aggregation of each subcluster is calculated and marked as Dp. The calculation formula of Dp is: ; Where z represents the number of feature sets in the cluster, z0 represents the core point of the cluster, and v0 represents the data point in the cluster; In each category cluster, the subcluster with the smallest Dp value is selected as the representative cluster of the category cluster. The number of feature points of the representative cluster with the highest Dp value is extracted and marked as k. The representative set of each category cluster is generated. The mean of any axis coordinates of the corresponding feature points of any representative set is calculated to obtain the corresponding representative score.
8. The scene digital operation management method based on business big data analysis according to claim 1 is characterized in that: The supply data in all category clusters are analyzed respectively, and the evaluation period of the supplier corresponding to any category cluster is corrected according to the analysis results. The specific calculation process of the evaluation period correction is Si=α*Si1+β*Si2+γ*Si3; Savg= ; T'=T*Si / Savg; Among them, α, β and γ are preset coefficients, Si1, Si2 and Si3 are the representative scores of the corresponding representative clusters in the i-th category cluster, N is the number of all category clusters, and T' is the revised evaluation period.
9. A scenario-based digital operation management system based on business big data analysis, characterized in that: include: Data acquisition module, used to obtain the target enterprise's procurement data and build a supply database of different suppliers; The supply database stores sales order data and quality rate index of any supplier; the sales order data includes the number of on-time and delayed orders and the corresponding order volume; The data analysis module is used to preset the evaluation period T, obtain the supply data within the evaluation period and calculate the reliability score A=DTBF / (DTBF+DTTR) of any supplier to obtain the reliability scores of all suppliers; where DTBF is the number of on-time orders and DTTR is the number of delayed orders; according to the calculation formula Z=log(TBF / TTR+1)*A, the on-time scores of all suppliers within the evaluation period are obtained; where TBF is the order volume of on-time orders and TTR is the order volume of delayed orders; The data optimization module is used to construct a three-dimensional evaluation coordinate system with the reliability score as the horizontal axis, the punctuality score as the vertical axis, and the quality rate index as the Z axis, generate feature points corresponding to all suppliers, select any feature point as the center, set the control radius R, calculate the feature point density ρ within the control radius R, obtain the mean feature point density within the control radius R of all feature points, mark the mean feature point density as Minρ, if there is any feature point with a feature point density ρ greater than Minρ within the radius R, mark the feature point as a core point, and generate a category cluster with the core point as the center; The result generation module is used to analyze the supply data in all category clusters respectively and to modify the evaluation period of the supplier corresponding to any category cluster according to the analysis results.
10. A computer-readable storage medium storing a computer program, wherein the computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the method according to any one of claims 1 to 8 is implemented.
Citation Information
Patent Citations
Supplier performance assessment system for enterprise supplier management
CN117875767A
Ai driven supplier selection and TAM allocation
US20210158236A1
Cited By
Ship equipment maintenance support service activity model construction method and system
CN119130417A
A ship equipment maintenance support business activity model construction method and system
CN119130417B
Digital printing quality detection method based on image analysis
CN119600009A
A digital printing quality detection method based on image analysis
CN119600009B
Network payment authentication method for commodity supply chain platform
CN120087968A
