Demand side resource adjustable power domain aggregation method considering time sequence correlation
By using time-phased linear boundary constraints and the Minkowski sum approximation method in demand-side resources, combined with adaptive distribution robust optimization, the problem of insufficient timing correlation in the traditional model is solved, and high-precision analysis of demand-side resources is achieved. The description and management of power adjustment capabilities reduce computational complexity and infeasibility points, and improve the efficiency of the aggregation method.
Patent Information
- Application Number
- CN202410775659.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-17
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2044-06-17
AI Technical Summary
The traditional general model lacks timing correlation considerations in the description of the dynamic characteristics of demand-side resource power adjustment capabilities, resulting in insufficient accuracy in the adjustable power domain and inability to accurately reflect the adjustable capabilities of aggregate resources. In addition, the computational complexity is high and there are infeasibility points. .
Time-series linear boundary constraints are used to consider the timing correlation of demand-side resources, the adjustable power domain is aggregated through Minkowski sum and upper and lower boundary approximation methods, and adaptive distribution robust optimization is used to solve the maximum area within the approximate feasible domain. Parameterize the set to obtain the optimal feasible region and reduce the computational complexity.
It achieves an accurate description of the power adjustment capability of demand-side resources, reduces the proportion of infeasible points, increases the total scheduling cost by only 9.8%, and improves the accuracy and feasibility of the aggregation method.
Smart Images

Figure CN118801385A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of demand-side resource prediction, and in particular to a method for demand-side resource adjustable power domain aggregation considering time series correlation. Background Art
[0002] At present, the research mainly uses general models such as virtual generator model and virtual energy storage model to characterize the adjustable power domain to quantify the power regulation capability of demand-side resources. However, the virtual generator model lacks consideration of the state constraints of demand-side resources, and the virtual energy storage model does not take into account the ramp constraints of resource equipment. Such failure to fully consider various constraints may lead to insufficient accuracy of the solved adjustable power domain. Therefore, the traditional general model is not suitable for accurately describing the dynamic characteristics of the power regulation capability of demand-side resources.
[0003] In power grid dispatching, demand-side resources report their power adjustable range to the upper grid, and the grid dispatching center optimizes dispatching based on the reported adjustment capabilities. Therefore, accurately quantifying the power adjustment capabilities of demand-side resources becomes the key to their participation in power grid dispatching.
[0004] However, due to the characteristics of demand-side resources such as a wide variety, large number, small single capacity and dispersed geographical location, separate modeling and quantitative analysis of each adjustable resource will bring a huge burden on computing and communication. At the same time, it also fails to take into account that the power boundary of the current period will be directly affected by the power of the previous period, and ignores the temporal state correlation between the power variables of demand-side resources. It is difficult to accurately describe the dynamic characteristics of the power regulation capability of demand-side resources. The traditional external approximation method directly superimposes the parameters of each device as the parameters of the aggregated device, which easily makes the adjustable power domain larger than the original adjustable power domain and contains infeasible points.
[0005] Therefore, it is necessary to consider the adjustable power domain aggregation method of demand-side resources with time correlation and build a general model that can reflect the adjustable capacity of aggregated resources, which will help the management and utilization of demand-side resources and maximize the value of demand-side resources. Summary of the invention
[0006] The purpose of the present invention is to overcome the defects of the above-mentioned prior art that the classical external approximation method for adjustable power domain approximation is not suitable for the aggregation calculation of the power regulation capability of demand-side resources and cannot ensure the safety and feasibility of the solution, and to provide a demand-side resource adjustable power domain aggregation method considering timing correlation.
[0007] The purpose of the present invention can be achieved by the following technical solutions:
[0008] A method for adjusting power domain aggregation of demand-side resources considering timing correlation includes the following steps:
[0009] Obtain the grid parameters to be evaluated, consider the time sequence correlation of the power regulation of the demand-side resources, and use the time-divided linear boundary constraints to represent the adjustable power domain of the adjacent time periods of the demand-side resources;
[0010] Aggregate the adjustable power domains of each demand-side resource to obtain an aggregation result of the adjustable power domains of the cluster demand-side resources;
[0011] According to the adjustable power domain aggregation results of cluster demand-side resources, adaptive distributed robust optimization is used to solve the maximum area parameterization set in the approximate feasible domain to obtain the optimal feasible domain.
[0012] According to the obtained optimal feasible domain of adjustable power in a single time period, the union of adjustable power domains in multiple adjacent time periods is solved to obtain a multi-time period adjustable power domain, which is used for the management and utilization of demand-side resources of the power grid to be evaluated.
[0013] Furthermore, the linear boundary constraints of the time periods include resource power capacity constraints, resource ramp rate constraints and resource status constraints.
[0014] Furthermore, the linear boundary constraints of the time periods are divided according to the upwardly adjustable power constraints and the downwardly adjustable power constraints, so as to obtain the adjustable power domain of the adjacent time periods of the demand-side resources:
[0015]
[0016] In the formula, Ω i,k is the adjustable power domain of the i-th flexibility resource in the current period k, is the upper boundary of the adjustable power domain of the i-th flexibility resource in the current period k, is the lower boundary of the adjustable power domain of the i-th flexible resource in the current period k, P i,k,max , P i,k,min are the upper and lower limits of the power of the i-th flexibility resource under the current period k road density, r i,k,max 、r i,k,min are the upper and lower limits of the ramp rate of the i-th flexibility resource in the current period k, respectively; a, b, c are dynamic characteristic parameters; x i,0 is the initial state of the i-th flexibility resource, x i,k,max 、x i,k,min are the upper and lower limits of the state variable of the i-th flexible resource in the current period k; u i,k-1 are other variables in the i-th flexible resource period k-1, P i,k-1 is the adjustable power in the i-th flexible resource period k-1, P i,k is the adjustable power of the i-th flexibility resource in the current period k.
[0017] Furthermore, the process of aggregating the adjustable power domains of the various demand-side resources specifically includes the following steps:
[0018] Averaging the adjustable power domains of the various demand-side resources to be aggregated to obtain a basic domain;
[0019] By translating and scaling the basic domain, the adjustable power domain of each demand-side resource is approximated to obtain the adjustable power approximate domain of each demand-side resource;
[0020] The translation and scaling parameters corresponding to the adjustable power approximate domain of each demand-side resource are linearly added and aggregated to obtain the adjustable power domain of the cluster resources.
[0021] Furthermore, the expression of the adjustable power approximate domain is:
[0022]
[0023] In the formula, is the adjustable power approximation domain, are the approximate values of the upper and lower power boundaries, i is the number of the flexibility resource, and k is the time period number; are the scaling factor and translation factor corresponding to the upper power boundary respectively; are the scaling factor and translation factor corresponding to the lower power boundary respectively; represents the actual power P of device i in time period k i,k Should be located at the upper and lower approximate boundaries and between;
[0024] The adjustable power approximate domain must satisfy: area maximum:
[0025]
[0026] For each flexibility resource i, the best approximation of its original power upper and lower bounds must be found:
[0027]
[0028] Furthermore, the expression of the adjustable power domain of the cluster resources is:
[0029]
[0030] In the formula, is the lower boundary of the adjustable power domain of cluster resources in time period k, is the upper boundary of the adjustable power domain of cluster resources in time period k, P agg,kis the adjustable power domain of cluster resources in time period k, and N is the number of flexible resources in the cluster resources.
[0031] Furthermore, the method solves the maximum area parameterization set in the approximate feasible domain by establishing an approximate feasible domain boundary identification model based on two-stage ARO, and obtains the optimal feasible domain;
[0032] The construction process of the approximate feasible region boundary identification model includes:
[0033] Introducing the uncertain variable ε k The actual power value P in time period k i,k It is expressed as:
[0034]
[0035] In the formula, the actual power value P i,k Upper boundary and the lower boundary A linear combination of k ∈[0,1], T is the time set;
[0036] Will Equivalent conversion to about ε k Constraints Where Ω i is the adjustable power domain of the i-th flexibility resource, and G is the uncertain set:
[0037]
[0038] The expression of the approximate feasible region boundary identification model is obtained as follows:
[0039]
[0040] In the formula, is the approximate value of the upper power limit of the i-th flexibility resource in the current period k, is the approximate value of the lower power boundary of the i-th flexibility resource in the current period k, is the upper boundary of the adjustable power domain of the i-th flexibility resource in the current period k, is the lower boundary of the adjustable power domain of the i-th flexibility resource in the current period k, Ω i,k is the adjustable power domain of the i-th flexibility resource in the current period k.
[0041] Furthermore, the solution process of the approximate feasible region boundary identification model includes:
[0042] Phase 1: is the decision variable, and the goal is to maximize the flexibility area of the approximate feasible domain boundary identification model, and obtain the uncertain variable εk The value of
[0043] The second stage: Get the uncertain variable ε k After finding the value of G, find the optimal adjustable resource scheduling strategy in the worst scenario.
[0044] Furthermore, the expression of the multi-period adjustable power domain is:
[0045] Ω agg =Ω agg,1 ∪Ω agg,2 ∪…∪Ω agg,m
[0046] In the formula, Ω agg is the multi-period adjustable power domain after the aggregation of n flexible resources on the demand side, Ω agg,1 ,…,Ω agg,k k adjustable power domains in a single period after the demand-side resource cluster aggregation.
[0047] Furthermore, the method further includes using power adjustable capacity to quantify the power adjustable capability of the aggregated resources on the demand side, and the calculation expression of the power adjustable capacity is:
[0048]
[0049]
[0050] Where R is the power adjustable capacity, P k is the actual power of the aggregated resource in time period k, and are the upper and lower boundaries of the adjustable power domain of the aggregated resources in time period k, and are the power capacities of the aggregated resources that can be adjusted up and down in time period k.
[0051] Compared with the prior art, the present invention has the following advantages:
[0052] (1) The present invention considers the temporal correlation of power regulation of demand-side resources, and adopts time-divided linear boundary constraints to represent the adjustable power domain of adjacent time periods of demand-side resources; then, the adjustable power domain is aggregated based on the Minkowski sum and upper and lower boundary approximation methods, and the adaptive distributed robust optimization is used to solve the maximum area parameterization set in the approximate feasible domain for the aggregation result to obtain the optimal feasible domain, ensuring its aggregation optimality and the feasibility of the solution; finally, the multi-time period adjustable power domain suitable for day-ahead scheduling is obtained through the time period clustering method, which reduces the computational complexity; this scheme considers the temporal state correlation between the power variables of demand-side resources, can accurately describe the dynamic characteristics of the power regulation capability of demand-side resources, and is more conducive to the management and utilization of demand-side resources, as well as maximizing the value of demand-side resources.
[0053] (2) Experimental verification shows that the scheme of the present invention can reduce the proportion of infeasible points to 0, and the total scheduling cost is only increased by 9.8%. Compared with the traditional aggregation method, the approximate method proposed in the present invention has higher accuracy. BRIEF DESCRIPTION OF THE DRAWINGS
[0054] Figure 1 A schematic diagram of a flow chart of a method for demand-side resource adjustable power domain aggregation considering timing correlation provided in an embodiment of the present invention;
[0055] Figure 2 A schematic diagram of reference domains of three devices in an embodiment of a method for demand-side resource adjustable power domain aggregation considering timing correlation provided by an embodiment of the present invention;
[0056] Figure 3a A schematic diagram of the original domain and the approximate domain of device 1 in an embodiment of a method for demand-side resource adjustable power domain aggregation considering timing correlation provided by an embodiment of the present invention;
[0057] Figure 3b A schematic diagram of the original domain and the approximate domain of the device 2 in an embodiment of a method for demand-side resource adjustable power domain aggregation considering timing correlation provided by an embodiment of the present invention;
[0058] Figure 3c A schematic diagram of the original domain and the approximate domain of the device 3 in an embodiment of a method for demand-side resource adjustable power domain aggregation considering timing correlation provided by an embodiment of the present invention;
[0059] Figure 4 A schematic diagram of adjustable power domains aggregated by three devices in an embodiment of a method for aggregating adjustable power domains of demand-side resources considering timing correlation provided by an embodiment of the present invention;
[0060] Figure 5A schematic diagram of power boundary comparison based on different approximation methods in an embodiment of a method for demand-side resource adjustable power domain aggregation considering timing correlation provided by an embodiment of the present invention;
[0061] Figure 6 A schematic diagram of an adjustable power range of a demand-side resource cluster calculated in an embodiment of a method for aggregating adjustable power domains of demand-side resources considering timing correlation is provided in accordance with an embodiment of the present invention. DETAILED DESCRIPTION
[0062] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Generally, the components of the embodiments of the present invention described and shown in the drawings here can be arranged and designed in various different configurations.
[0063] Therefore, the following detailed description of the embodiments of the present invention provided in the accompanying drawings is not intended to limit the scope of the invention claimed for protection, but merely represents selected embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0064] It should be noted that similar reference numerals and letters denote similar items in the following drawings, and therefore, once an item is defined in one drawing, further definition and explanation thereof is not required in subsequent drawings.
[0065] Example 1
[0066] like Figure 1 As shown, this embodiment provides a method for demand-side resource adjustable power domain aggregation considering timing correlation, including the following steps:
[0067] S1: Obtain the grid parameters to be evaluated, consider the time series correlation of the power regulation of the demand-side resources, use the time-divided linear boundary constraints to represent the adjustable power domain of the demand-side resources in adjacent time periods, and quantify its power regulation capability;
[0068] S2: Based on the Minkowski sum and upper and lower bounds approximation method, an adjustable power domain aggregation method is proposed to aggregate the adjustable power domains of each demand-side resource to obtain the adjustable power domain aggregation result of the cluster demand-side resources;
[0069] S3: Based on the aggregation results of the adjustable power domain of the cluster demand-side resources, the adaptive distributed robust optimization is used to solve the maximum area parameterization set in the approximate feasible domain to obtain the optimal feasible domain, ensuring its aggregation optimality and the feasibility of the solution;
[0070] S4: Based on the obtained optimal feasible domain of adjustable power in a single time period, the union of adjustable power domains in multiple adjacent time periods is solved to obtain a multi-time period adjustable power domain suitable for day-ahead scheduling, thereby reducing the computational complexity and being used for the management and utilization of demand-side resources of the power grid to be evaluated, such as day-ahead scheduling and other power grid scheduling schemes.
[0071] This example uses scientific evidence to verify the effectiveness of the technology used in the present invention.
[0072] The verification environment is set as follows: Taking a specific demand-side resource device as an example, the time period is set to 1h, and the adjustable power domain of its adjacent time periods is depicted. Considering three distributed energy storage devices with different parameters as demand-side resources to be aggregated, the parameters of the three devices and the benchmark domain are shown in Table 1:
[0073] Table 1 Equipment parameters
[0074]
[0075] In order to analyze the effectiveness of this method when processing a large amount of data, the Monte Carlo sampling method is used to randomly generate 1000 data. It is assumed that the device parameters obey the probability distribution function in Table 2:
[0076] Table 2 Probability distribution of equipment parameters
[0077]
[0078] Specifically, in step S1, the adjustable power domain of adjacent time periods of the demand-side resources is represented by linear boundary constraints in time periods in consideration of the timing correlation of the power regulation of the demand-side resources.
[0079] It should be noted that the linear boundary constraints of the time periods are used to represent the adjustable power domain of the demand-side resources in adjacent time periods.
[0080] Assume that the scheduling period T of a flexible resource is divided into m periods, and the power of the current period is P k , the power of the previous period is P k-1 , where k = 1, 2, ..., m.
[0081] The constraint space of flexible resource operation can be expressed by a set of inequality constraints, namely:
[0082] 1) Resource power capacity constraints:
[0083] P k,min ≤P k ≤P k,max (1)
[0084] Among them, P k,max, P k,min They are respectively the upper and lower limits of power under the road density k in the current period.
[0085] 2) Resource ramp rate constraints, that is, constraints on the amount of power change in adjacent time periods. The power that the demand-side resources can generate in the current period is not only affected by the parameters of their own equipment and the scheduling time scale, but also by the power constraints of the previous period.
[0086] r k,min ≤P k -P k-1 ≤r k,max (2)
[0087] Where: r k,max 、r k,min They are the upper and lower limits of the climbing rate in the current period k respectively.
[0088] 3) Resource status constraint: The operating status of demand-side resources is a continuous cumulative quantity that changes with the power changes in each period, such as the remaining capacity of energy storage, the temperature of the temperature control system, etc.
[0089] The capacity constraint status of energy storage load is:
[0090]
[0091] SOC k,min ≤SOC k ≤SOC k,max (4)
[0092] Where: E is the rated capacity of the energy storage load; SOC k is the state of charge of the energy storage load in the current period k, SOC k,max , SOC k,min They are the upper and lower limits of the state of charge of the energy storage load in the current time period k; the parameter η represents the charging and discharging efficiency.
[0093] During the operation of temperature control loads such as air conditioners, it is necessary to control the indoor temperature within the human comfort temperature range. The relationship between indoor temperature and air conditioner power is as follows:
[0094]
[0095] T r,k,min ≤T r,k ≤T r,k,max (6)
[0096] Where: T r,k is the indoor temperature in the current period k, T r,k,max 、T r,k,min are the highest and lowest temperatures that meet the comfort requirements in the current period k; To,k-1 is the outdoor temperature; R and C are the heat capacity and equivalent resistance of the temperature control system respectively; parameter η is the energy efficiency ratio.
[0097] The operating characteristics of adjustable resources are different, and the state constraints that need to be satisfied are also different. The state constraints of various demand-side resources can be uniformly expressed as:
[0098] x k,min ≤ax k-1 +bu k-1 +cP k ≤x k,max (7)
[0099] Where: a, b, c are dynamic characteristic parameters; x k-1 is the state variable of the previous period, x k,max 、x k,min are the upper and lower limits of the state variable in the current period k; u k-1 For other variables.
[0100] In order to highlight the influence of state constraints on the power relationship between two adjacent time periods, given the initial state x0, equation (7) can be rewritten as follows:
[0101] x k,min ≤a(x0+cP k-1 )+bu k-1 +cP k ≤x k,max (8)
[0102] By rearranging equations (1), (2), and (8), the constraints are divided into upward power constraints ①~③ and downward power constraints ④~⑥, and the adjustable power domain Ω of the demand-side flexibility resource is obtained. i,k as follows:
[0103]
[0104] Where: is the upper boundary of the adjustable power domain; is the lower boundary of the adjustable power domain.
[0105] In step S2, a method for approximating and clustering the adjustable power domain of demand-side flexibility resources is proposed, including three steps: setting the reference domain, approximating the adjustable power domain, and aggregating the adjustable power domain. It should be noted that:
[0106] Since the demand-side flexibility resources are diverse, numerous, and have small individual capacities, they need to be aggregated to form a cluster of adjustable power domains:
[0107]
[0108] In the formula: Symbol represents Minkowski summation; Ω agg,k Ω is the adjustable power domain after the aggregation of n flexible resources on the demand side in time period k; 1,k ,…,Ω n,k The n flexibility resources each have their own adjustable power domain.
[0109] The specific process is:
[0110] 1) The benchmark domain of resource aggregation, the results are as follows Figure 2 As shown in this paper, the adjustable power domain Ω of all resource devices to be aggregated i,k (i=1,..,n) and average to get the reference domain Ω 0,k ,Ω 0,k The form of is the same as that of formula (9), and its parameters are the average of n resource parameters.
[0111]
[0112] 2) Approximation of the adjustable power domain of a single resource, the result is as follows Figure 3a-3c As shown. By translating and scaling the reference domain to approximate the boundaries of the original adjustable power domain, the adjustable power approximate domain of each resource is obtained. First, translate and scale the upper and lower boundaries of the reference domain to obtain the approximate values of the upper and lower boundaries of the power:
[0113]
[0114] Where: are the approximate values of the upper and lower bounds of power, respectively; are the scaling factor and translation factor corresponding to the upper power boundary respectively; are the scaling factor and translation factor corresponding to the lower power boundary respectively; Formula (14) represents the actual power P of device i in time period k i,k Should be located at the upper and lower approximate boundaries between.
[0115] By approximation of the upper and lower power limits The adjustable power approximation domain
[0116]
[0117] The approximate domain needs to meet the following conditions:
[0118] ① In order to obtain more flexibility and adjustability, the approximate domain is the original feasible region Ω i,k The best approximation domain of maximum.
[0119]
[0120] ② The feasibility of the solution must be guaranteed. Any power within the range All of them can be obtained by scheduling the demand-side resource devices without violating the constraints. Specifically, for each device i, the optimal approximation of its original power upper and lower boundaries must be found.
[0121]
[0122] 3) Adjustable power domain aggregation of cluster demand-side resources. The results are as follows: Figure 4 After the adjustable power domain of a single resource is approximated, the adjustable power domain of the cluster resources can be aggregated by directly linearly adding the translation and rotation parameters of each approximate adjustable power domain.
[0123]
[0124] In step S3, in order to ensure the optimality of the approximate feasible region aggregation and the feasibility of the solution, an approximate feasible region boundary identification model based on two-stage ARO is established. It should be noted that:
[0125] The feasible region is composed of decision variables Described, while the upper and lower boundaries is a time variable, for which we introduce an uncertain variable ε k The actual power value P in time period k i,k It is expressed as:
[0126]
[0127] In the formula, the actual power value P i,k Can be seen as the upper boundary and the lower boundary A linear combination of k ∈[0,1]. When ε k =1, When ε k = 0,
[0128] Through the above variable transformation, we can Equivalent conversion to about ε k Constraints Where G is an uncertain set:
[0129]
[0130] The problem of approximate aggregation of adjustable power domains is formulated as a model using ARO:
[0131]
[0132] Satisfy ①-⑥ in formula (8).
[0133] A parameterized set is used to characterize the variation of aggregate power over time, and a two-stage adaptive robust optimization model is established to solve the maximum area parameterized set in the approximate feasible domain. The first stage objective is to maximize the flexibility area, and the decision variables are In the second stage, when the uncertain variable ε k After the value of is determined, the objective function of the second stage is to find the optimal adjustable resource scheduling strategy under the worst scenario of G.
[0134] In step S4, the single-period adjustable power domain of the demand-side resource cluster needs to be aggregated into multiple periods. Therefore, the present invention proposes a method for calculating the multi-period adjustable power domain of the demand-side resource cluster. It should be noted that:
[0135] According to step S3, the adjustable power domain of the demand-side resource cluster in a single period is obtained, and the union of the adjustable power domains of multiple adjacent periods is solved to obtain the adjustable power domain of multiple periods, so as to realize the dimensionality reduction calculation of the high-dimensional problem, that is:
[0136] Ω agg =Ω agg,1 ∪Ω agg,2 ∪…∪Ω agg,m (25)
[0137] Where: the symbol “∪” means to find the union; Ω agg It is the multi-period adjustable power domain after the aggregation of n flexibility resources on the demand side; Ω agg,1 ,…,Ω agg,k It is a single-period k-adjustable power domain aggregated by the demand-side resource cluster.
[0138] In order to more intuitively quantify the power adjustable capability of aggregated resources, the power adjustable capacity R is defined as:
[0139]
[0140]
[0141] Where: P k is the actual power of the aggregated resource in time period k, are the upper and lower boundaries of the adjustable power domain of the aggregated resources in time period k, respectively; are the power capacities of the aggregated resources that can be adjusted up and down in time period k.
[0142] Since the adjustable power domain of a single demand-side flexibility resource is approximated and then aggregated, the demand-side resource adjustment power cost function needs to undergo corresponding equivalent changes:
[0143]
[0144] Where: r k is the power regulation amount; is the cluster scaling parameter, is the cluster translation parameter; a i 、b i and c i is the operating cost coefficient of equipment i; is the operating cost coefficient of the aggregated resource.
[0145] Figure 5 The comparison chart of the proposed approximation method with other existing approximation methods is shown in Figure 1. The average scale factor φ of the approximate adjustable power domain relative to the original adjustable power domain is used. ave is 0.8124 compared to the φ of the "zonotope" method ave The value is closer to 1, Figure 6 The results of aggregating the adjustable power domains of cluster ES, EV, and HAVC show that compared with the RO algorithm, the ARO algorithm proposed in the present invention can reduce the proportion of infeasible points to 0, and the total scheduling cost only increases by 9.8%. Under the same circumstances, the proportion of infeasible points of the external approximation method reaches 13.62. Therefore, compared with the traditional aggregation method, the approximation method proposed in the present invention has higher accuracy.
[0146] The preferred specific embodiments of the present invention are described in detail above. It should be understood that a person skilled in the art can make many modifications and changes based on the concept of the present invention without creative work. Therefore, any technical solution that can be obtained by a person skilled in the art through logical analysis, reasoning or limited experiments based on the concept of the present invention on the basis of the prior art should be within the scope of protection determined by the claims.
Claims
1. A method for demand-side resource adjustable power domain aggregation considering timing correlation, It is characterized in that The following steps are involved: Obtain the grid parameters to be evaluated, consider the time sequence correlation of the power regulation of the demand-side resources, and use the time-divided linear boundary constraints to represent the adjustable power domain of the adjacent time periods of the demand-side resources; Aggregate the adjustable power domains of each demand-side resource to obtain an aggregation result of the adjustable power domains of the cluster demand-side resources; According to the adjustable power domain aggregation results of cluster demand-side resources, adaptive distributed robust optimization is used to solve the maximum area parameterization set in the approximate feasible domain to obtain the optimal feasible domain. According to the obtained optimal feasible domain of adjustable power in a single time period, the union of adjustable power domains in multiple adjacent time periods is solved to obtain a multi-time period adjustable power domain, which is used for the management and utilization of demand-side resources of the power grid to be evaluated.
2. According to the method for adjusting power domain aggregation of demand-side resources considering timing correlation according to claim 1, It is characterized in that The time-divided linear boundary constraints include resource power capacity constraints, resource ramp rate constraints and resource status constraints.
3. According to the method for demand-side resource adjustable power domain aggregation considering timing correlation according to claim 2, It is characterized in that The linear boundary constraints of the time periods are divided according to the upwardly adjustable power constraints and the downwardly adjustable power constraints, and the adjustable power domains of the adjacent time periods of the demand-side resources are obtained: In the formula, Ω i,k is the adjustable power domain of the i-th flexibility resource in the current period k, is the upper boundary of the adjustable power domain of the i-th flexibility resource in the current period k, is the lower boundary of the adjustable power domain of the i-th flexible resource in the current period k, P i,k,max , P i,k,min are the upper and lower limits of the power of the i-th flexibility resource under the current period k road density, r i,k,max 、r i,k,min are the upper and lower limits of the ramp rate of the i-th flexibility resource in the current period k, respectively; a, b, c are dynamic characteristic parameters; x i,0 is the initial state of the i-th flexibility resource, x i,k,max 、x i,k,min are the upper and lower limits of the state variable of the i-th flexibility resource in the current period k; u i,k-1 are other variables in the i-th flexible resource period k-1, P i,k-1 is the adjustable power in the i-th flexible resource period k-1, P i,k is the adjustable power of the i-th flexibility resource in the current period k.
4. According to the method for demand-side resource adjustable power domain aggregation considering timing correlation according to claim 1, It is characterized in that The process of aggregating the adjustable power domains of various demand-side resources specifically includes the following steps: Averaging the adjustable power domains of the various demand-side resources to be aggregated to obtain a basic domain; By translating and scaling the basic domain, the adjustable power domain of each demand-side resource is approximated to obtain the adjustable power approximate domain of each demand-side resource; The translation and scaling parameters corresponding to the adjustable power approximate domain of each demand-side resource are linearly added and aggregated to obtain the adjustable power domain of the cluster resources.
5. According to the method for demand-side resource adjustable power domain aggregation considering timing correlation according to claim 4, It is characterized in that The expression of the adjustable power approximate domain is: In the formula, is the adjustable power approximation domain, are the approximate values of the upper and lower power boundaries, i is the number of the flexibility resource, and k is the time period number; are the scaling factor and translation factor corresponding to the upper power boundary respectively; are the scaling factor and translation factor corresponding to the lower power boundary respectively; represents the actual power P of device i in time period k i,k Should be located at the upper and lower approximate boundaries and between; The adjustable power approximate domain must satisfy: area maximum: For each flexibility resource i, the best approximation of its original power upper and lower bounds must be found:
6. A method for demand-side resource adjustable power domain aggregation considering timing correlation according to claim 5, It is characterized in that The expression of the adjustable power domain of the cluster resources is: In the formula, is the lower boundary of the adjustable power domain of cluster resources in time period k, is the upper boundary of the adjustable power domain of cluster resources in time period k, P agg,k is the adjustable power domain of cluster resources in time period k, and N is the number of flexible resources in the cluster resources.
7. According to claim 1, a method for demand-side resource adjustable power domain aggregation considering timing correlation, It is characterized in that The method solves the maximum area parameterization set in the approximate feasible domain by establishing an approximate feasible domain boundary identification model based on two-stage ARO, and obtains the optimal feasible domain; The construction process of the approximate feasible region boundary identification model includes: Introducing the uncertain variable ε k The actual power value P in time period k i,k It is expressed as: In the formula, the actual power value P i,k Upper boundary and the lower boundary A linear combination of k ∈[0,1], T is the time set; Will Equivalent conversion to about ε k Constraints Where Ω i is the adjustable power domain of the i-th flexibility resource, and G is the uncertain set: The expression of the approximate feasible region boundary identification model is obtained as follows: In the formula, is the approximate value of the upper power limit of the i-th flexibility resource in the current period k, is the approximate value of the lower power boundary of the i-th flexibility resource in the current period k, is the upper boundary of the adjustable power domain of the i-th flexibility resource in the current period k, is the lower boundary of the adjustable power domain of the i-th flexibility resource in the current period k, Ω i,k is the adjustable power domain of the i-th flexibility resource in the current period k.
8. A method for demand-side resource adjustable power domain aggregation considering timing correlation according to claim 7, It is characterized in that The solution process of the approximate feasible region boundary identification model includes: Phase 1: is the decision variable, and the goal is to maximize the flexibility area of the approximate feasible domain boundary identification model, and obtain the uncertain variable ε k The value of The second stage: Get the uncertain variable ε k After finding the value of G, find the optimal adjustable resource scheduling strategy in the worst scenario.
9. According to claim 1, a method for demand-side resource adjustable power domain aggregation considering timing correlation, It is characterized in that The expression of the multi-period adjustable power domain is: Oh agg =Oh agg,1 ∪Ω agg,2 ∪…∪Ω agg,m In the formula, Ω agg is the multi-period adjustable power domain after the aggregation of n flexible resources on the demand side, Ω agg,1 ,…,Ω agg,k k adjustable power domains in a single period after the demand-side resource cluster aggregation.
10. A method for demand-side resource adjustable power domain aggregation considering timing correlation according to claim 1, It is characterized in that The method further includes quantifying the power adjustable capability of the aggregated resource on the demand side by using the power adjustable capacity, and the calculation expression of the power adjustable capacity is: Where R is the power adjustable capacity, P k is the actual power of the aggregated resource in time period k, and are the upper and lower boundaries of the adjustable power domain of the aggregated resources in time period k, and are the power capacities of the aggregated resources that can be adjusted up and down in time period k.
Citation Information
Patent Citations
Flexibility optimization scheduling method and system for power distribution system containing large-scale demand side resources
CN112531681A
Virtual power plant adjustable power domain aggregation method based on cost-benefit analysis
CN115221723A
Accurate modeling and approximation method, device and equipment for flexible resource aggregation feasible region
CN115271454A
Calculation method for aggregation flexibility parameters of virtual power plant
CN116544945A
Multi-type energy storage and load side flexibility resource joint planning method and device
CN116613743A
Cited By
Aggregation method and device for adjustable power domain of power grid demand side resources
CN119448415A