Energy storage capacity cross-period distribution method and equipment considering dynamic life characteristics
By considering dynamic life characteristics in the energy storage system and optimizing the power distribution of energy storage equipment, the problems of shortened life of energy storage equipment and high operation and maintenance costs are solved, and the safe and stable operation of the energy storage system and the improvement of economic benefits are achieved.
Patent Information
- Application Number
- CN202410916657.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-09
- Publication Date
- 2024-10-18
AI Technical Summary
Existing energy storage systems fail to fully consider the dynamic life characteristics of different energy storage devices during the grid interaction process, resulting in shortened equipment service life and increased operation and maintenance costs, affecting the overall operating efficiency of the system.
A cross-time allocation method of energy storage capacity that takes into account dynamic life characteristics is designed. By obtaining energy storage system prediction data, establishing a dynamic life decay function and a fixed cost function, constructing a cost quantification model, and optimizing the power allocation of energy storage equipment, in order to Achieve the capacity allocation plan with optimal overall benefits.
It effectively avoids the impact of new energy and load fluctuations on capacity allocation, extends the service life of energy storage equipment, reduces operation and maintenance costs, and reserves sufficient capacity for system frequency response to ensure the safe and stable operation of the power system.
Smart Images

Figure CN118801432A_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the field of energy storage distribution, and in particular relates to a method and device for distributing energy storage capacity across time periods taking into account dynamic life characteristics. Background Art
[0002] As the uncertainty factors in the new power system have greatly increased, the scale of energy storage power stations is showing a steady upward trend. With the development of energy storage technology and the support of relevant policies, a large number of manufacturers in my country have invested in and built a large number of energy storage equipment with different parameters on the "source-grid-load-storage" side. However, in the process of interaction with the power grid, in order to reduce the difficulty of operation and reduce unnecessary burdens, such energy storage equipment is often integrated into a fixed energy storage power station, or integrated by certain operators, and participates in the power system dispatch and market operation process as a whole.
[0003] In the existing power system planning or dispatching process, energy storage power stations are usually regarded as a whole, or multiple energy storage power stations in the system are set to the same parameters. However, in the actual operation of the system, a certain energy storage power station may contain a variety of energy storage devices with different rated capacities, rated powers, charging and discharging efficiencies, and life characteristics. The response time and climbing characteristics of different energy storage power stations are also different. Therefore, in the process of allocating energy storage capacity and power, it is necessary not only to consider the overall needs of the system, but also to fully consider the parameter differences between different equipment and different power stations to form a capacity allocation plan with the best overall benefits.
[0004] At the same time, in the process of formulating capacity allocation strategies, the dynamic life characteristics of different equipment should also be taken into consideration. As an important factor related to the economy and available capacity of energy storage, too frequent charging and discharging, deep charging and deep discharging, etc. will seriously damage the service life of energy storage. Existing research focuses more on control signal decomposition and the investment process of different types of energy storage, and less consideration is given to the impact of dynamic life characteristics. As energy storage power stations assume more and more extensive responsibilities in new power systems, the service life of some energy storage equipment may be accelerated due to the provision of services, resulting in a rapid increase in operation and maintenance costs. Therefore, how to consider the dynamic life characteristics of various energy storage equipment in the process of formulating capacity allocation plans is crucial to the overall operating cost of power stations.
[0005] The Chinese patent with publication number CN110676870B discloses a hybrid energy storage capacity configuration method suitable for wind power grid connection: first, decompose the unbalanced power of wind power, divide the compensation power of different energy storage devices, and use this to determine the capacity configuration of different energy storage devices; then, introduce the gradient method to optimize the filter order, and compare the equipment costs of different filter orders, and select the filter order that minimizes the cost as the power and capacity allocation standard; finally, establish an opportunity constraint model based on the volatility of electricity prices, and use the improved quantum genetic algorithm to calculate the economic cost of energy storage equipment based on system stability, and obtain a hybrid energy storage capacity configuration that meets both the needs of smoothing wind power instability and the economic cost. This invention comprehensively considers the instability needs of wind power and the economic cost to optimize the capacity configuration of the hybrid energy storage system, but does not consider the dynamic life characteristics of the energy storage equipment, which may affect the energy storage planning of the energy storage system. Summary of the invention
[0006] In order to overcome the problems existing in the prior art, the present invention designs a method and device for allocating energy storage capacity across time periods taking into account dynamic life characteristics. This method aims to solve the capacity allocation problem among different types of energy storage devices in an energy storage power station, takes into account the dynamic life characteristics of each device, and comprehensively considers the energy storage power station's participation in the electric energy balance and frequency regulation process, so as to obtain an energy storage capacity allocation plan across time periods within the power station with the best overall benefits.
[0007] In order to achieve the above object, the present invention provides a method for allocating energy storage capacity across time periods taking into account dynamic life characteristics, comprising the following steps:
[0008] S1: Obtain energy storage system prediction data and generate optimization scenarios, specifically:
[0009] S11: Obtaining prediction data of the energy storage system, wherein the prediction data includes the day-ahead dispatch plan of conventional units including thermal power units, predicted output of new energy sources including wind power and photovoltaic power, and load prediction curve;
[0010] S12: Determine the overall electric energy demand of the energy storage power station across time periods based on the energy storage system forecast data;
[0011] S13: Determine the overall frequency regulation and inertia cross-period demand of the energy storage power station based on the energy storage system prediction data;
[0012] S14: Calculate the energy storage power requirements of the energy storage system at each future moment and generate an energy storage optimization scenario.
[0013] S2: Considering the dynamic life characteristics of different energy storage devices in the energy storage power station, a cost quantification model for each energy storage device is established, specifically:
[0014] S21: Establish dynamic life decay function and fixed cost function for different energy storage devices;
[0015] S22: Convert the dynamic life decay functions of different energy storage devices into unit life decay factors;
[0016] S23: construct a dynamic cost function according to the unit life attenuation factor of different energy storage devices, and establish a cost quantification model for each energy storage device according to the fixed cost function and the dynamic cost function.
[0017] S3: According to the cost quantification model of the energy storage device, a power optimization model of different energy storage devices is constructed to determine the energy storage power to be allocated.
[0018] S4: Calculate the energy storage capacity allocation plan across time periods based on the energy storage power optimization configuration results.
[0019] Preferably, the overall electric energy demand of the energy storage power station across time periods is expressed as:
[0020]
[0021] Where P En,t is the electric energy demand of the entire energy storage power station at time t; is the load demand predicted by the system at time t; N(G) is the set of thermal power units; i∈N(G) is the i-th thermal power unit; is the predicted output of the i-th thermal power unit at time t according to the dispatch plan; is the predicted start-stop state variable of the i-th thermal power unit at time t according to the dispatch plan; N(W) is the set of wind farms; w∈N(W) is the w-th wind farm; is the output of the w-th wind farm at time t; N(S) is the set of photovoltaic power stations; s∈N(S) is the s-th photovoltaic power station; is the output of the s-th photovoltaic power station at time t.
[0022] The overall frequency regulation and inertia cross-period demand of the energy storage power station is expressed as:
[0023]
[0024]
[0025] Where C1 is the total cost paid by the energy storage system for frequency regulation; FG,t 、c FE,t 、c HE,t They are respectively the frequency regulation subsidy price of thermal power units, the frequency regulation subsidy price of energy storage and the inertia support subsidy price of energy storage predicted at time t in the power market; is the frequency modulation output of the i-th thermal power unit at time t; is the frequency regulation power demand of the entire energy storage power station at time t; is the virtual inertia requirement of the entire energy storage power station at time t;i,FR P is the upper limit constraint of the frequency regulation power of thermal power units; i,max is the installed capacity of the i-th thermal power unit; f0 is the frequency of the energy storage system; H i is the synchronous inertia of the i-th thermal power unit; ΔP loss,t is the maximum disturbance power of the system at time t; g The time required for the thermal power unit to reach a given frequency modulation power; t en The time required for the energy storage to reach a given frequency modulation power; Δf max It is the maximum frequency deviation allowed by the system.
[0026] Preferably, the step S21 is specifically as follows:
[0027] S211: Establish the dynamic life decay function of different energy storage devices as follows:
[0028]
[0029] In the formula, Ф n (δ n,k ) is the dynamic life decay function of the nth energy storage device in the energy storage power station; k is the serial number of the charge and discharge cycle; κ n,1 is the first shape parameter of the nth energy storage device; κ n,2 is the second shape parameter of the nth energy storage device; δ n,k is the cycle depth of the kth cycle during the operation of the nth energy storage device.
[0030] S212: Establish a fixed cost function for different energy storage devices expressed as:
[0031]
[0032] In the formula, C n,fix , C n,inv , C n,om They are the fixed cost, fixed daily average investment cost, and fixed daily maintenance cost of the nth energy storage device; are the unit power and capacity costs of the nth energy storage device respectively; P n 、E n are the rated power and capacity of the nth energy storage device respectively; r is the investment discount rate calculated at an annual interest rate; T n,es is the investment payback period of the nth energy storage device; c n,om The maintenance cost of the nth energy storage device.
[0033] Preferably, the step S22 specifically includes: dividing the capacity of the nth energy storage device into M segments, and linearizing the dynamic life decay function to obtain a unit life decay factor expressed as:
[0034]
[0035] In the formula, c n,m is the unit life attenuation factor of the mth segment of the nth energy storage device; R n is the replacement cost of the nth energy storage device; E n is the rated capacity of the nth energy storage device; η n,d is the discharge efficiency of the nth energy storage device; m∈M is the mth capacity of the energy storage device.
[0036] Preferably, step S23 is specifically:
[0037] S231: The dynamic cost function of the nth energy storage device is calculated according to the unit life attenuation factor of different energy storage devices and is expressed as:
[0038]
[0039] In the formula, C n,dym is the dynamic cost of the nth energy storage device; They are the dynamic cost of electric energy, dynamic cost of frequency regulation and dynamic cost of inertia support of the nth energy storage device; are the energy balance, frequency response, and discharge power of the inertial support of the nth energy storage device at the mth segment at time t; π n,H , π n,FR are the probabilities of calling the nth energy storage device to participate in inertia support and primary frequency regulation respectively.
[0040] S232: A cost quantification model for the nth energy storage device is established based on the fixed cost function and the dynamic cost function, which is expressed as:
[0041] C n =C n,fix +C n,dyn
[0042] In the formula, C n It is the cost quantification model of the nth energy storage device.
[0043] Preferably, the power optimization model of the energy storage device includes an objective function and constraint conditions.
[0044] The objective function is expressed as:
[0045]
[0046]
[0047]
[0048]
[0049] Where, f is the overall operation objective function of each energy storage device; R n,E R is the energy reward index of the nth energy storage device; n,H R is the reward index for the inertia support response of the nth energy storage device; n,FR is the frequency response reward index of the nth energy storage device; T is the total number of optimization hours; c E,t is the settlement price of the day-ahead market at time t to meet the electricity demand; c FE,t 、c HE,t are the energy storage frequency regulation subsidy price and energy storage inertia support subsidy price predicted at time t in the power market; P n,d,t P is the charging power of the nth energy storage device at time t to meet the energy demand; n,c,t is the discharge power of the nth energy storage device at time t to meet the electric energy demand; Δt is the scheduling duration; The frequency modulation power provided by the nth energy storage device at time t; The virtual inertia provided by the nth energy storage device at time t.
[0050] Preferably, the constraint conditions include: power balance constraint of energy storage power station, virtual inertia constraint provided by energy storage equipment, frequency modulation power constraint provided by energy storage equipment, energy storage equipment operation constraint and piecewise linearization constraint.
[0051] The power balance constraint of the energy storage power station is expressed as:
[0052] P En,t =Σ n (P n,d,t -P n,c,t )
[0053] Where P En,t is the electric energy demand of the entire energy storage power station at time t.
[0054] The virtual inertia constraint provided by the energy storage device is expressed as:
[0055]
[0056] In the formula, is the virtual inertia requirement of the entire energy storage power station at time t; The maximum inertia support power in the process of providing virtual inertia for the nth energy storage device at time t; f RoCoF,max is the maximum frequency change rate allowed by the energy storage system; f0 is the frequency of the energy storage system.
[0057] The frequency modulation power constraint provided by the energy storage device is expressed as:
[0058]
[0059] In the formula, λ es,PFR It is the upper limit constraint of energy storage frequency regulation power; is the frequency regulation power demand of the entire energy storage power station at time t.
[0060] The energy storage device operation constraints are expressed as:
[0061]
[0062] In the formula, e n,t is the SOC of the nth energy storage device at time t; e n,t-1 is the SOC of the nth energy storage device at time t-1; η n,c is the charging efficiency of the nth energy storage device; η n,d is the discharge efficiency of the nth energy storage device; Δt FR is the duration of frequency modulation of the energy storage device; t0 is the initial time; Δf max is the maximum frequency deviation allowed by the energy storage system; n,T is the SOC of the nth energy storage device at time T; is the SOC of the nth energy storage device at the initial time t0.
[0063] The piecewise linearization constraint is expressed as:
[0064]
[0065] In the formula, is the SOC corresponding to the nth energy storage device at the time 0 of the mth dynamic life decay function segment; is the SOC upper limit of the nth energy storage device in the mth dynamic life decay function segment; is the SOC corresponding to the nth energy storage device at the time 0 of the ζth dynamic life decay function segment; is the SOC corresponding to the nth energy storage device at the mth dynamic life decay function segment t-1; is the SOC corresponding to the nth energy storage device at the mth dynamic life decay function segment at time t; is the charge and discharge power corresponding to the nth energy storage device at the mth dynamic life decay function segment t for meeting the electric energy demand; is the charge and discharge power of the nth energy storage device corresponding to the ζth dynamic life decay function segment t to meet the electric energy demand; is the discharge power corresponding to the nth energy storage device at the mth dynamic life decay function segment t to meet the frequency modulation demand and the virtual inertia demand; is the discharge power corresponding to the nth energy storage device at the ζth dynamic life decay function segment t to meet the frequency modulation demand and virtual inertia demand; is the discharge power of the nth energy storage device at time t used to meet the frequency regulation demand.
[0066] Preferably, the step S4 is specifically:
[0067] S41: According to the generated operation scenario, combined with the electric energy reward index, virtual inertia support reward index, and frequency response reward index predicted by the power market, the power distribution of each energy storage device in the energy storage power station is solved.
[0068] The discharge capacity of the energy storage device allocated for electric energy balance is expressed as:
[0069]
[0070] In the formula, The discharge capacity of the nth energy storage device at time t for the next period of time electric energy balance; P n,d,t+1 It is the charging power of the nth energy storage device used to meet the electric energy demand at time t+1.
[0071] The charging capacity of the energy storage device allocated for electric energy balancing is expressed as:
[0072]
[0073] In the formula, The charging capacity allocated to the nth energy storage device at time t for the next period of time for electric energy balance; P n,c,t+1 It is the discharge power of the nth energy storage device used to meet the electric energy demand at time t+1.
[0074] The discharge capacity of energy storage equipment allocated for frequency regulation is expressed as:
[0075]
[0076] In the formula, Allocate the discharge capacity for frequency modulation in the next period to the nth energy storage device at time t; It is the frequency modulation power provided by the nth energy storage device at time t+1.
[0077] The discharge capacity of the energy storage device allocated for inertia support is expressed as:
[0078]
[0079] In the formula, Allocate the discharge capacity of the nth energy storage device for inertia support in the next period at time t; is the virtual inertia provided by the nth energy storage device at time t+1; f0 is the frequency of the energy storage system.
[0080] The reserve discharge capacity allocated to smooth out the sudden drop in renewable energy output and the surge in load in the next period is expressed as:
[0081]
[0082] In the formula, The size of the standby discharge capacity allocated to the nth energy storage device at time t to smooth out the sudden drop in new energy output and the surge in load in the next period; It is a 0-1 variable that represents whether the nth energy storage device is discharged at time t.
[0083] The reserve discharge capacity allocated to smooth out the surge in renewable energy output and the sudden drop in load in the next period is expressed as:
[0084]
[0085] In the formula, The size of the standby charging capacity allocated to the nth energy storage device at time t to smooth out the decrease in new energy output and the surge in load in the next period; It is a 0-1 variable that represents whether the nth energy storage device is charged at time t.
[0086] S42: Summarize the capacity allocation results at each moment to form a cross-time allocation plan for energy storage capacity.
[0087] On the other hand, the present invention also provides a device for allocating energy storage capacity across time periods taking into account dynamic life characteristics, the device comprising: a memory, a processor, and a computer program stored on the memory and executable on the processor, the processor implementing a method for allocating energy storage capacity across time periods taking into account dynamic life characteristics as described in any embodiment of the present invention when executing the computer program.
[0088] On the other hand, the present invention further provides a computer-readable storage medium having a computer program stored thereon, which, when executed by a processor, implements the method for allocating energy storage capacity across time periods taking into account dynamic life characteristics as described in any embodiment of the present invention.
[0089] Compared with the prior art, the present invention has the following technical effects:
[0090] 1. The method for allocating energy storage capacity across time periods taking into account dynamic life characteristics provided by the present invention can better avoid the significant impact of new energy and load fluctuations on the capacity allocation plan based on the system's previous scheduling plan and forecast data. It can not only consider the instantaneous power demand of the system at each moment, but also take the electric energy transfer across time periods into consideration, and reserve sufficient capacity for the system frequency response, which is conducive to ensuring the safe and stable operation of the new power system.
[0091] 2. In the process of capacity allocation, the differences in capacity, power, and life characteristics of different energy storage equipment are taken into account, which can maximize the overall benefits of the entire energy storage power station, effectively avoid the serious differentiation of equipment life and frequent replacement of some equipment caused by average capacity allocation, further extend the overall service life of the energy storage power station, and help guide the reasonable operation and decision-making of grid-side energy storage aggregators and energy storage power stations. At the same time, a part of the capacity is reserved to cope with real-time new energy and load fluctuations. The relevant operating entities can use this part of the capacity to further obtain relevant benefits in the spot market and ancillary service market, which is conducive to further expanding the overall benefits of the energy storage power station and achieving the effect of guiding reasonable investment in energy storage and promoting the high-quality development of new power systems.
[0092] 3. The use of linearization method reduces the computing resource burden in the process of calculating the dynamic life impact of different energy storage devices, and can better demonstrate the impact of different charging and discharging behaviors such as electric energy balance, rapid frequency regulation and virtual inertia support on the service life of different energy storage devices. It is more in line with the diversified positioning of energy storage in the development of future new power systems, and provides theoretical guidance for guiding the reasonable investment and effective operation of energy storage equipment. It is conducive to further expanding and clarifying the role dimensions of electrochemical energy storage and ensuring the safe and stable operation of the power system. BRIEF DESCRIPTION OF THE DRAWINGS
[0093] Figure 1 It is an overall flow chart of the method for allocating energy storage capacity across time periods taking into account dynamic life characteristics described in the present invention;
[0094] Figure 2 It is a schematic diagram of the load forecast curve and the new energy forecast output curve obtained according to the present invention;
[0095] Figure 3 It is a schematic diagram of the start and stop status of the unit in the conventional unit day-ahead scheduling plan obtained according to the present invention;
[0096] Figure 4 It is a schematic diagram of the unit output scale in the conventional unit day-ahead dispatch plan obtained according to the present invention;
[0097] Figure 5 It is a schematic diagram of the cross-time period allocation scheme of energy storage device capacity obtained in the present invention. DETAILED DESCRIPTION
[0098] In order to make the objectives, technical solutions and advantages of the present invention more clear, the technical solutions of the present invention will be clearly and completely described below in combination with specific embodiments of the present application and with reference to the accompanying drawings.
[0099] Embodiment 1
[0100] This embodiment provides a method for allocating energy storage capacity across time periods taking into account dynamic life characteristics. Figure 1 As shown, the following steps are included:
[0101] S1: Obtain energy storage system prediction data and generate optimization scenarios, specifically:
[0102] S11: Obtaining prediction data of the energy storage system, wherein the prediction data includes the day-ahead dispatch plan of conventional units including thermal power units, predicted output of new energy sources including wind power and photovoltaic power, and load prediction curve.
[0103] S12: Determine the overall electricity demand of the energy storage power station across time periods based on the predicted data of the energy storage system.
[0104] S13: Determine the overall frequency regulation and inertia cross-time requirements of the energy storage power station based on the predicted data of the energy storage system.
[0105] S14: Calculate the energy storage power requirements of the energy storage system at each future moment and generate an energy storage optimization scenario.
[0106] As a preferred implementation of this embodiment, the most basic demand of the power system is power balance, which is essentially that the power demand of the system at each moment is equal to the power supply. Although the demand and load composition are different for different systems, in general, the power demand of the domestic power system mainly comes from the load, and the power supply includes the output of thermal power units, wind power units, photovoltaic units and the power supply capacity of energy storage power stations.
[0107] It is worth noting that the power supply capacity of the energy storage power station is not always positive. The essence of this capacity is the discharge power minus the charging power. A positive value indicates that the current system lacks power and needs energy storage discharge to maintain power balance; a negative value indicates that the system has surplus power and needs energy storage charging.
[0108] Therefore, when forecasting through the dispatch plan, the prediction accuracy of the unit start and stop plan, the planned output of thermal power units, the output of new energy, and the load demand at each moment is relatively high. Subtracting other supplies from the demand is the overall power supply demand for the energy storage power station. Therefore, the overall power demand of the energy storage power station across time periods is expressed as:
[0109]
[0110] Where PEn,t is the electric energy demand of the entire energy storage power station at time t. A positive value indicates that the energy storage power station needs to discharge, and a negative value indicates that the energy storage power station needs to charge; is the load demand predicted by the system at time t; N(G) is the set of thermal power units; i∈N(G) is the i-th thermal power unit; is the predicted output of the i-th thermal power unit at time t according to the dispatch plan; is the predicted start-stop state variable of the i-th thermal power unit at time t according to the dispatch plan; N(W) is the set of wind farms; w∈N(W) is the w-th wind farm; is the output of the w-th wind farm at time t; N(S) is the set of photovoltaic power stations; s∈N(S) is the s-th photovoltaic power station; is the output of the s-th photovoltaic power station at time t.
[0111] As the basis for the safe and stable operation of the power system, the current "Guidelines for the Safety and Stability of Power Systems" mainly make requirements for the lowest frequency point and quasi-steady-state frequency in frequency disturbance events. Considering that the quasi-steady-state frequency is generally related to the system scale and the overall frequency regulation power size, and can generally be met by the frequency regulation of thermal power units, this embodiment only considers the lowest frequency point indicator.
[0112] Since the expression of frequency change during frequency disturbance is a nonlinear equation and is affected by the two variables of the overall inertia of the system and the overall frequency modulation power, the optimal inertia and frequency modulation power distribution method in the system is generally obtained through optimization problems. Considering the future operation mode of the power market, compensation fees are usually paid to thermal power units and energy storage power stations that provide inertia and frequency modulation power. Since the inertia support of thermal power units comes from their own kinetic energy, a certain part of them participates in the frequency response process, so generally only the frequency modulation fee is paid; while the virtual inertia support of energy storage power stations is decoupled from the fast frequency response, corresponding to different powers and capacities, so generally corresponding compensation fees need to be paid separately. Therefore, the overall goal in the frequency modulation power distribution process is to minimize the sum of the three compensations in order to achieve the effect of reducing the operating costs of the system.
[0113] In terms of constraints, the frequency regulation power of thermal power units is not only affected by the operating range, but also should be limited to a certain proportion of the total installed capacity to protect related mechanical and electrical components. In order to ensure that the lowest frequency point can be limited to a certain range, a linearization processing method is adopted to linearize it to reduce the calculation pressure. The frequency safety verification event usually selects a 10% increase in system load to verify whether the frequency is within the allowable range.
[0114] Therefore, the overall frequency regulation and inertia cross-period demand of the energy storage power station can be expressed as:
[0115]
[0116] Where C1 is the total cost paid by the energy storage system for frequency regulation; FG,t 、c FE,t 、c HE,t They are respectively the frequency regulation subsidy price of thermal power units, the frequency regulation subsidy price of energy storage and the inertia support subsidy price of energy storage predicted at time t in the power market; is the frequency modulation output of the i-th thermal power unit at time t; is the frequency regulation power demand of the entire energy storage power station at time t; is the virtual inertia requirement of the entire energy storage power station at time t; i,FR P is the upper limit constraint of the frequency regulation power of thermal power units; i,max is the installed capacity of the i-th thermal power unit; f0 is the frequency of the energy storage system; H i is the synchronous inertia of the i-th thermal power unit; ΔP loss,t is the maximum disturbance power of the system at time t; g The time required for the thermal power unit to reach a given frequency modulation power; t en The time required for the energy storage to reach a given frequency modulation power; Δf max It is the maximum frequency deviation allowed by the system.
[0117] S2: Considering the dynamic life characteristics of different energy storage devices in the energy storage power station, a cost quantification model for each energy storage device is established, specifically:
[0118] S21: Establish dynamic life decay functions and fixed cost functions for different energy storage devices.
[0119] S22: Convert the dynamic life decay functions of different energy storage devices into unit life decay factors.
[0120] S23: construct a dynamic cost function according to the unit life attenuation factor of different energy storage devices, and establish a cost quantification model for each energy storage device according to the fixed cost function and the dynamic cost function.
[0121] As a preferred implementation of this embodiment, step S21 is specifically as follows:
[0122] S211: Establish the dynamic life decay function of different energy storage devices as follows:
[0123]
[0124] In the formula, Ф n (δ n,k ) is the dynamic life decay function of the nth energy storage device in the energy storage power station; k is the serial number of the charge and discharge cycle; κ n,1 is the first shape parameter of the nth energy storage device; k n,2 is the second shape parameter of the nth energy storage device; δn,k is the cycle depth of the kth cycle during the operation of the nth energy storage device.
[0125] The dynamic life decay function formula is measured by electrochemical energy storage manufacturers before energy storage equipment. The shape parameter in the formula refers to the fixed parameter that characterizes the decay characteristics of the energy storage device, which is measured according to the factory experiment and marked in the relevant technical manual. Cycle depth refers to the maximum SOC change value of the energy storage during a complete charge and discharge cycle.
[0126] S212: The fixed cost of energy storage equipment refers to the cost required to install the equipment, mainly including the one-time installation cost of the equipment and the daily maintenance cost. Since the installation cost of energy storage equipment is extremely high, it only exists at the time of installation, and the ideal operating limit of energy storage equipment is generally measured in years, which far exceeds the operating evaluation time span. Therefore, referring to relevant economic theories, the overall installation cost is converted to the equivalent installation cost of each day during the operation process, so as to measure the impact of equipment investment. The maintenance cost refers to the fixed cost required to ensure the operation of the system, such as regular dust removal, manual inspection, etc. It can generally be considered as a fixed value. The fixed cost function for different energy storage devices is established as follows:
[0127]
[0128] In the formula, C n,fix , C n,nnv , C n,om They are the fixed cost, fixed daily average investment cost, and fixed daily maintenance cost of the nth energy storage device; are the unit power and capacity costs of the nth energy storage device respectively; P n 、E n are the rated power and capacity of the nth energy storage device respectively; r is the investment discount rate calculated at an annual interest rate; T n,es is the investment payback period of the nth energy storage device; c n,om The maintenance cost of the nth energy storage device.
[0129] As a preferred implementation of this embodiment, the step S22 is specifically: the capacity of the nth energy storage device is equally divided into M segments, and the unit life decay factor is obtained by linearizing the dynamic life decay function and expressed as:
[0130]
[0131] In the formula, c n,m is the unit life attenuation factor of the mth segment of the nth energy storage device; R n is the replacement cost of the nth energy storage device; E n is the rated capacity of the nth energy storage device; η n,dis the discharge efficiency of the nth energy storage device; m∈M is the mth capacity of the energy storage device.
[0132] As a preferred implementation of this embodiment, step S23 is specifically as follows:
[0133] S231: Since different charging and discharging behaviors will cause different cycle depths during the operation of the energy storage device, the dynamic cost it brings is highly related to its charging and discharging power. In this embodiment, the following aspects are considered:
[0134] In the existing energy storage operation control process, the SOC at the beginning and end is generally required to be equal to reduce the complexity of the model. Therefore, in the entire cycle, the dynamic cost caused by the charging power is the same as that caused by the discharging power. Accordingly, this embodiment uses the dynamic cost caused by the discharging power to characterize the overall dynamic cost, and hides the cost corresponding to the charging power to reduce the complexity of the model.
[0135] Among the three services described in this embodiment, electric energy balance is a service that will definitely call the energy storage power station at each moment of system operation. However, for inertia support and rapid frequency response services, since dynamic frequency safety verification is a test of the system's ability to maintain frequency safety under anticipated serious accidents, it is not a constant event. Therefore, the dynamic cost brought by its related services should be multiplied by a certain probability to represent the probability of a safety incident occurring in the system and calling the energy storage power station.
[0136] In order to accurately characterize the dynamic costs caused by different services and effectively guide the power allocation between different devices in the energy storage station, this embodiment quantifies the unitized dynamic cost under unit discharge power through the unit life attenuation factor, and uses the product of the two as the dynamic cost of the energy storage device caused by the discharge power. By introducing dynamic costs, it is possible to better measure the different discharge powers during the operation of the energy storage power station and the degree of loss of each energy storage device under different service scenarios, which is conducive to the power station operator to formulate a more reasonable market participation strategy based on the relevant costs, thereby improving the overall benefits.
[0137] In summary, the dynamic cost function of the nth energy storage device is calculated according to the unit life attenuation factor of different energy storage devices as follows:
[0138]
[0139] In the formula, C n,dym is the dynamic cost of the nth energy storage device; They are the dynamic cost of electric energy, dynamic cost of frequency regulation and dynamic cost of inertia support of the nth energy storage device; are the energy balance, frequency response, and discharge power of the inertial support of the nth energy storage device at the mth segment at time t; πn,H , π n,FR are the probabilities of calling the nth energy storage device to participate in inertia support and primary frequency regulation respectively.
[0140] S232: A cost quantification model for the nth energy storage device is established based on the fixed cost function and the dynamic cost function, which is expressed as:
[0141] C n =C n,fix +C n,dym
[0142] In the formula, C n It is the cost quantification model of the nth energy storage device.
[0143] S3: According to the cost quantification model of the energy storage device, a power optimization model of different energy storage devices is constructed to determine the energy storage power to be allocated.
[0144] As a preferred implementation of this embodiment, the power optimization model of the energy storage device includes an objective function and constraint conditions;
[0145] The ultimate goal of power allocation is to maximize the benefits of the energy storage station as a whole, which can be achieved through two different paths: maximizing the benefits of various services and minimizing the cost of energy storage equipment. Usually, the benefits of various services come from policy compensation for charge-discharge arbitrage, virtual inertia support, and rapid frequency regulation, which is expressed as price multiplied by the power provided. However, the optimization of the above single goal often comes at the expense of another goal. It may lead to serious equipment aging in pursuit of high returns, and give up providing multiple services in pursuit of low aging. The optimization results are not in line with the actual operation of energy storage power stations in new power systems. Therefore, the present invention comprehensively considers the needs of the above two aspects and takes the maximum net profit after deducting the cost of energy storage equipment as the optimization goal, so as to find a reasonable balance between expanding benefits and reducing costs. Therefore, the objective function for the optimal overall operation goal of the energy storage station described in this embodiment is expressed as:
[0146]
[0147]
[0148] Where, f is the overall operation objective function of each energy storage device; R n,E R is the energy reward index of the nth energy storage device; n,H R is the reward index for the inertia support response of the nth energy storage device; n,FR is the frequency response reward index of the nth energy storage device; T is the total number of optimization hours; c E,t is the settlement price of the day-ahead market at time t to meet the electricity demand; c FE,t 、c HE,tare the energy storage frequency regulation subsidy price and energy storage inertia support subsidy price predicted at time t in the power market; P n,d,t P is the charging power of the nth energy storage device at time t to meet the energy demand; n,c,t is the discharge power of the nth energy storage device at time t to meet the electric energy demand; Δt is the scheduling duration; The frequency modulation power provided by the nth energy storage device at time t; The virtual inertia provided by the nth energy storage device at time t.
[0149] As a preferred implementation of this embodiment, the basic requirement for the operation of the energy storage power station is that the sum of the charging and discharging power of each energy storage device is equal to the system's demand for the energy storage power station, and at the same time, each energy storage device satisfies its own operating requirements. Therefore, for the three services provided by the power station as a whole: electric energy balance, virtual inertia support and fast frequency response, not only must the sum of the contributions of each device be equal to the system demand, but the contributions of different devices must also be limited to the allowable range. At the same time, the charging and discharging power inside each device should not exceed the limit, and the storage energy should be within the allowable range. On this basis, the method of piecewise linearization is used as a reference, the SOC is divided into M segments, and the discharge power size in the corresponding interval is calculated in segments, so as to calculate the corresponding dynamic cost. Therefore, the constraints include: power balance constraints of energy storage power stations, virtual inertia constraints provided by energy storage devices, frequency modulation power constraints provided by energy storage devices, energy storage device operation constraints, and piecewise linearization constraints.
[0150] The power balance constraint of the energy storage power station is expressed as:
[0151] P En,t =∑ n (P n,d,t -P n,c,t )
[0152] Where P En,t is the electric energy demand of the entire energy storage power station at time t.
[0153] The virtual inertia constraint provided by the energy storage device is expressed as:
[0154]
[0155] In the formula, is the virtual inertia requirement of the entire energy storage power station at time t; The maximum inertia support power in the process of providing virtual inertia for the nth energy storage device at time t; f RoCoF,max is the maximum frequency change rate allowed by the energy storage system; f0 is the frequency of the energy storage system.
[0156] The frequency modulation power constraint provided by the energy storage device is expressed as:
[0157]
[0158] In the formula, λ es,PFR It is the upper limit constraint of energy storage frequency regulation power; is the frequency regulation power demand of the entire energy storage power station at time t.
[0159] The energy storage device operation constraints are expressed as:
[0160]
[0161] In the formula, e n,t is the SOC of the nth energy storage device at time t; e n,t-1 is the SOC of the nth energy storage device at time t-1; η n,c is the charging efficiency of the nth energy storage device; η n,d is the discharge efficiency of the nth energy storage device; Δt FR is the duration of frequency modulation of the energy storage device; t0 is the initial time; Δf max is the maximum frequency deviation allowed by the energy storage system; n,T is the SOC of the nth energy storage device at time T; is the SOC of the nth energy storage device at the initial time t0.
[0162] The piecewise linearization constraint is expressed as:
[0163]
[0164] In the formula, is the SOC corresponding to the nth energy storage device at the time 0 of the mth dynamic life decay function segment; is the SOC upper limit of the nth energy storage device in the mth dynamic life decay function segment; is the SOC corresponding to the nth energy storage device at the time 0 of the ζth dynamic life decay function segment; is the SOC corresponding to the nth energy storage device at the mth dynamic life decay function segment t-1; is the SOC corresponding to the nth energy storage device at the mth dynamic life decay function segment at time t; is the charge and discharge power corresponding to the nth energy storage device at the mth dynamic life decay function segment t for meeting the electric energy demand; is the charge and discharge power of the nth energy storage device corresponding to the ζth dynamic life decay function segment t to meet the electric energy demand; is the discharge power corresponding to the nth energy storage device at the mth dynamic life decay function segment t to meet the frequency modulation demand and the virtual inertia demand; is the discharge power corresponding to the nth energy storage device at the ζth dynamic life decay function segment t to meet the frequency modulation demand and virtual inertia demand; is the discharge power of the nth energy storage device at time t used to meet the frequency regulation demand.
[0165] S4: Calculate the energy storage capacity allocation plan across time periods based on the energy storage power optimization configuration results.
[0166] As a preferred implementation of this embodiment, step S4 is specifically as follows:
[0167] S41: According to the generated operation scenario, combined with the electric energy reward index, virtual inertia support reward index, and frequency response reward index predicted by the power market, the power distribution of each energy storage device in the energy storage power station is solved.
[0168] The discharge capacity of the energy storage device allocated for electric energy balance is expressed as:
[0169]
[0170] In the formula, The discharge capacity of the nth energy storage device at time t for the next period of time electric energy balance; P n,d,t+1 It is the charging power of the nth energy storage device used to meet the electric energy demand at time t+1.
[0171] The charging capacity of the energy storage device allocated for electric energy balancing is expressed as:
[0172]
[0173] In the formula, The charging capacity allocated to the nth energy storage device at time t for the next period of time for energy balance; P n,c,t+1 It is the discharge power of the nth energy storage device used to meet the electric energy demand at time t+1.
[0174] The discharge capacity of energy storage equipment allocated for frequency regulation is expressed as:
[0175]
[0176] In the formula, Allocate the discharge capacity for frequency modulation in the next period to the nth energy storage device at time t; It is the frequency modulation power provided by the nth energy storage device at time t+1.
[0177] The discharge capacity of the energy storage device allocated for inertia support is expressed as:
[0178]
[0179] In the formula, Allocate the discharge capacity of the nth energy storage device for inertia support in the next period at time t; The virtual inertia provided by the nth energy storage device at time t+1.
[0180] The reserve discharge capacity allocated to smooth out the sudden drop in renewable energy output and the surge in load in the next period is expressed as:
[0181]
[0182] In the formula, The size of the standby discharge capacity allocated to the nth energy storage device at time t to smooth out the sudden drop in new energy output and the surge in load in the next period; It is a 0-1 variable that represents whether the nth energy storage device is discharged at time t.
[0183] The reserve discharge capacity allocated to smooth out the surge in renewable energy output and the sudden drop in load in the next period is expressed as:
[0184]
[0185] In the formula, The size of the standby charging capacity allocated to the nth energy storage device at time t to smooth out the decrease in new energy output and the surge in load in the next period; It is a 0-1 variable that represents whether the nth energy storage device is charged at time t.
[0186] S42: Summarize the capacity allocation results at each moment to form a cross-time allocation plan for energy storage capacity.
[0187] In order to verify the effectiveness and superiority of the method provided in this embodiment, some specific cases are provided below:
[0188] The test was conducted based on the IEEE-24 node system. A total of two 750MW wind farms and two photovoltaic power stations were connected to the system. The system peak load was 2000MW, and the total installed capacity of thermal power was 3325MW. The predicted output of wind farms and photovoltaic power stations and the load prediction per unit value curves are shown in the figure below. Figure 2 As shown, the unit scheduling plan is obtained as Figure 3 , Figure 4 There is a total of 1 energy storage power station in the system, which includes 4 different energy storage devices. The parameters are shown in Table 1. Calculate the system power demand, frequency regulation demand and inertia demand at each moment. Figure 5 As shown, the energy storage capacity allocation result across time periods is obtained according to the method described in this embodiment.
[0189] Table 1 Parameters of energy storage equipment in energy storage power station
[0190]
[0191] from Figure 5 It can be observed that due to the performance differences between different devices, there are great differences in capacity allocation. In order to improve the operating benefits of the energy storage power station, the control strategy tends to give priority to calling devices 3 and 4 with lower dynamic costs. Since device 1 has a large unit life attenuation factor, its SOC basically maintains a small range of fluctuations near the initial energy storage. By controlling its SOC fluctuations, the overall operating cost is reduced. At the same time, energy storage devices participate in multiple services at different times, which verifies the correctness of the method proposed in this embodiment.
[0192] Embodiment 2
[0193] Accordingly, this embodiment provides a device for allocating energy storage capacity across time periods taking into account dynamic life characteristics, the device comprising: a memory, a processor, and a computer program stored in the memory and executable on the processor, and when the processor executes the computer program, it implements the method for allocating energy storage capacity across time periods taking into account dynamic life characteristics as described in any embodiment of the present invention.
[0194] Embodiment 3
[0195] This embodiment provides a computer-readable storage medium having a computer program stored thereon. When the computer program is executed by a processor, the method for allocating energy storage capacity across time periods taking into account dynamic life characteristics as described in any embodiment of the present invention is implemented.
[0196] In the embodiments of the present application, "at least one" refers to one or more, and "more than one" refers to two or more. "And / or" describes the association relationship of associated objects, indicating that three relationships may exist. For example, A and / or B may represent the existence of A alone, the existence of A and B at the same time, and the existence of B alone. In the formula, A and B may be singular or plural. The character " / " generally indicates that the associated objects before and after are in an "or" relationship. "At least one of the following" and similar expressions refer to any combination of these items, including any combination of single or plural items. For example, at least one of a, b and c can represent: a, b, c, a and b, a and c, b and c, or a and b and c, where a, b, c can be single or multiple.
[0197] Those of ordinary skill in the art will appreciate that the various units and algorithm steps described in the embodiments disclosed herein can be implemented in a combination of electronic hardware, computer software, and electronic hardware. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution. Professional and technical personnel can use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of this application.
[0198] Those skilled in the art can clearly understand that, for the convenience and brevity of description, the specific working processes of the systems, devices and units described above can refer to the corresponding processes in the aforementioned method embodiments and will not be repeated here.
[0199] In several embodiments provided in the present application, if any function is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present application, or the part that contributes to the prior art or the part of the technical solution, can be embodied in the form of a software product, which is stored in a storage medium and includes several instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) to perform all or part of the steps of the method described in each embodiment of the present application. The aforementioned storage medium includes: U disk, mobile hard disk, read-only memory (Read-Only Memory; hereinafter referred to as: ROM), random access memory (Random Access Memory; hereinafter referred to as: RAM), disk or optical disk, and other media that can store program codes.
[0200] The above descriptions are merely embodiments of the present invention and are not intended to limit the patent scope of the present invention. Any equivalent structure or equivalent process transformation made using the contents of the present invention specification and drawings, or directly or indirectly applied in other related technical fields, are also included in the patent protection scope of the present invention.
Claims
1. A method for allocating energy storage capacity across time periods taking into account dynamic life characteristics, characterized in that: The following steps are involved: S1: Obtain energy storage system prediction data and generate optimization scenarios, specifically: S11: Obtaining prediction data of the energy storage system, wherein the prediction data includes the day-ahead dispatch plan of conventional units including thermal power units, predicted output of new energy sources including wind power and photovoltaic power, and load prediction curve; S12: Determine the overall electric energy demand of the energy storage power station across time periods based on the energy storage system forecast data; S13: Determine the overall frequency regulation and inertia cross-period demand of the energy storage power station based on the energy storage system prediction data; S14: Calculate the energy storage power requirements of the energy storage system at each moment in the future and generate an energy storage optimization scenario; S2: Considering the dynamic life characteristics of different energy storage devices in the energy storage power station, a cost quantification model for each energy storage device is established, specifically: S21: Establish dynamic life decay function and fixed cost function for different energy storage devices; S22: Convert the dynamic life decay functions of different energy storage devices into unit life decay factors; S23: constructing a dynamic cost function according to the unit life attenuation factor of different energy storage devices, and establishing a cost quantification model of each energy storage device according to the fixed cost function and the dynamic cost function; S3: constructing a power optimization model for different energy storage devices according to the cost quantification model of the energy storage device, and determining the energy storage power to be allocated; S4: Calculate the energy storage capacity allocation plan across time periods based on the energy storage power optimization configuration results.
2. The method for allocating energy storage capacity across time periods taking into account dynamic life characteristics according to claim 1, characterized in that: The overall cross-time demand of the energy storage power station is expressed as: Where P En,t is the electric energy demand of the entire energy storage power station at time t; is the load demand predicted by the system at time t; N(G) is the set of thermal power units; i∈N(G) is the i-th thermal power unit; is the predicted output of the i-th thermal power unit at time t according to the dispatch plan; is the predicted start-stop state variable of the i-th thermal power unit at time t according to the dispatch plan; N(W) is the set of wind farms; w∈N(W) is the w-th wind farm; is the output of the w-th wind farm at time t; N(S) is the set of photovoltaic power stations; s∈N(S) is the s-th photovoltaic power station; The output of the s-th photovoltaic power station at time t; The overall frequency regulation and inertia cross-period demand of the energy storage power station is expressed as: Where C1 is the total cost paid by the energy storage system for frequency regulation; c FG,t 、c FE,t 、c HE,t They are respectively the frequency regulation subsidy price of thermal power units, the frequency regulation subsidy price of energy storage and the inertia support subsidy price of energy storage predicted at time t in the power market; is the frequency modulation output of the i-th thermal power unit at time t; is the frequency regulation power demand of the entire energy storage power station at time t; is the virtual inertia requirement of the entire energy storage power station at time t; i,FR P is the upper limit constraint of the frequency regulation power of thermal power units; i,max is the installed capacity of the i-th thermal power unit; f0 is the frequency of the energy storage system; H i is the synchronous inertia of the i-th thermal power unit; ΔP loss,t is the maximum disturbance power of the system at time t; g The time required for the thermal power unit to reach a given frequency modulation power; t en The time required for the energy storage to reach a given frequency modulation power; Δf max It is the maximum frequency deviation allowed by the system.
3. The method for allocating energy storage capacity across time periods taking into account dynamic life characteristics according to claim 1, characterized in that: The step S21 is specifically as follows: S211: Establish the dynamic life decay function of different energy storage devices as follows: In the formula, Ф n (δ n,k ) is the dynamic life decay function of the nth energy storage device in the energy storage power station; k is the serial number of the charge and discharge cycle; κ n,1 is the first shape parameter of the nth energy storage device; κ n,2 is the second shape parameter of the nth energy storage device; δ n,k is the cycle depth of the kth cycle during the operation of the nth energy storage device; S212: Establish a fixed cost function for different energy storage devices expressed as: In the formula, C n,fix , C n,inv , C n,om They are the fixed cost, fixed daily average investment cost, and fixed daily maintenance cost of the nth energy storage device; are the unit power and capacity costs of the nth energy storage device respectively; P n 、E n are the rated power and capacity of the nth energy storage device respectively; r is the investment discount rate calculated at an annual interest rate; T n,es is the investment payback period of the nth energy storage device; c n,om The maintenance cost of the nth energy storage device.
4. The method for allocating energy storage capacity across time periods taking into account dynamic life characteristics according to claim 3 is characterized in that: The step S22 is specifically as follows: the capacity of the nth energy storage device is equally divided into M segments, and the unit life decay factor is obtained by linearizing the dynamic life decay function and expressed as: In the formula, c n,m is the unit life attenuation factor of the mth segment of the nth energy storage device; R n is the replacement cost of the nth energy storage device; E n is the rated capacity of the nth energy storage device; η n,d is the discharge efficiency of the nth energy storage device; m∈M is the mth capacity of the energy storage device.
5. The method for allocating energy storage capacity across time periods taking into account dynamic life characteristics according to claim 4, characterized in that: Step S23 is specifically as follows: S231: The dynamic cost function of the nth energy storage device is calculated according to the unit life attenuation factor of different energy storage devices and is expressed as: In the formula, C n,dym is the dynamic cost of the nth energy storage device; They are the dynamic cost of electric energy, dynamic cost of frequency regulation and dynamic cost of inertia support of the nth energy storage device; are the energy balance, frequency response, and discharge power of the inertial support of the nth energy storage device at the mth segment at time t; π n,H , π n,FR are the probabilities of calling the nth energy storage device to participate in inertia support and primary frequency regulation respectively; S232: A cost quantification model for the nth energy storage device is established based on the fixed cost function and the dynamic cost function, which is expressed as: C n =C n,fix +C n,dym In the formula, C n It is the cost quantification model of the nth energy storage device.
6. The method for allocating energy storage capacity across time periods taking into account dynamic life characteristics according to claim 5, characterized in that: The power optimization model of the energy storage device includes an objective function and constraint conditions; The objective function is expressed as: Where, f is the overall operation objective function of each energy storage device; R n,E R is the energy reward index of the nth energy storage device; n,H R is the reward index for the inertia support response of the nth energy storage device; n,FR is the frequency response reward index of the nth energy storage device; T is the total number of optimization hours; c E,t is the settlement price of the day-ahead market at time t to meet the electricity demand; c FE,t 、c HE,t are the energy storage frequency regulation subsidy price and energy storage inertia support subsidy price predicted at time t in the power market respectively; P n,d,t P is the charging power of the nth energy storage device at time t to meet the energy demand; n,c,t is the discharge power of the nth energy storage device at time t to meet the electric energy demand; Δt is the scheduling duration; The frequency modulation power provided by the nth energy storage device at time t; The virtual inertia provided by the nth energy storage device at time t.
7. The method for allocating energy storage capacity across time periods taking into account dynamic life characteristics according to claim 6, characterized in that: The constraints include: power balance constraints of energy storage power stations, virtual inertia constraints provided by energy storage equipment, frequency modulation power constraints provided by energy storage equipment, energy storage equipment operation constraints and piecewise linearization constraints; The power balance constraint of the energy storage power station is expressed as: P En,t =∑ n (P n,d,t -P n,c,t ) Where P En,t is the electric energy demand of the entire energy storage power station at time t; The virtual inertia constraint provided by the energy storage device is expressed as: In the formula, is the virtual inertia requirement of the entire energy storage power station at time t; The maximum inertia support power in the process of providing virtual inertia for the nth energy storage device at time t; f RoCoF,max is the maximum frequency change rate allowed by the energy storage system; f0 is the frequency of the energy storage system; The frequency modulation power constraint provided by the energy storage device is expressed as: In the formula, λ es,PFR It is the upper limit constraint of energy storage frequency regulation power; is the frequency regulation power demand of the entire energy storage power station at time t; The energy storage device operation constraints are expressed as: In the formula, e n,t is the SOC of the nth energy storage device at time t; e n,t-1 is the SOC of the nth energy storage device at time t-1; η n,c is the charging efficiency of the nth energy storage device; η n,d is the discharge efficiency of the nth energy storage device; Δt FR is the duration of frequency modulation of the energy storage device; t0 is the initial time; Δf max is the maximum frequency deviation allowed by the energy storage system; n,T is the SOC of the nth energy storage device at time T; is the SOC of the nth energy storage device at the initial time t0; The piecewise linearization constraint is expressed as: In the formula, is the SOC corresponding to the nth energy storage device at the time 0 of the mth dynamic life decay function segment; is the SOC upper limit of the nth energy storage device in the mth dynamic life decay function segment; is the SOC corresponding to the nth energy storage device at the time 0 of the ζth dynamic life decay function segment; is the SOC corresponding to the nth energy storage device at the mth dynamic life decay function segment t-1; is the SOC corresponding to the nth energy storage device at the mth dynamic life decay function segment at time t; is the charge and discharge power corresponding to the nth energy storage device at the mth dynamic life decay function segment t for meeting the electric energy demand; is the charge and discharge power of the nth energy storage device corresponding to the ζth dynamic life decay function segment t to meet the electric energy demand; is the discharge power corresponding to the nth energy storage device at the mth dynamic life decay function segment t to meet the frequency modulation demand and the virtual inertia demand; is the discharge power corresponding to the nth energy storage device at the ζth dynamic life decay function segment t to meet the frequency modulation demand and virtual inertia demand; is the discharge power of the nth energy storage device at time t used to meet the frequency regulation demand.
8. The method for allocating energy storage capacity across time periods taking into account dynamic life characteristics according to claim 7, characterized in that: The step S4 is specifically as follows: S41: according to the generated operation scenario, combined with the electric energy reward index, virtual inertia support reward index, and frequency response reward index predicted by the power market, the power distribution of each energy storage device in the energy storage power station is solved; The discharge capacity of the energy storage device allocated for electric energy balance is expressed as: In the formula, The discharge capacity of the nth energy storage device at time t for the next period of time electric energy balance; P n,d,t+1 is the charging power of the nth energy storage device at time t+1 used to meet the electric energy demand; The charging capacity of the energy storage device allocated for electric energy balancing is expressed as: In the formula, The charging capacity allocated to the nth energy storage device at time t for the next period of time for electric energy balance; P n,c,t+1 is the discharge power of the nth energy storage device used to meet the electric energy demand at time t+1; The discharge capacity of energy storage equipment allocated for frequency regulation is expressed as: In the formula, Allocate the discharge capacity for frequency modulation in the next period to the nth energy storage device at time t; The frequency modulation power provided by the nth energy storage device at time t+1; The discharge capacity of the energy storage device allocated for inertia support is expressed as: In the formula, Allocate the discharge capacity of the nth energy storage device for inertia support in the next period at time t; is the virtual inertia provided by the nth energy storage device at time t+1; f0 is the frequency of the energy storage system; The reserve discharge capacity allocated to smooth out the sudden drop in renewable energy output and the surge in load in the next period is expressed as: In the formula, The size of the standby discharge capacity allocated to the nth energy storage device at time t to smooth out the sudden drop in new energy output and the surge in load in the next period; is a 0-1 variable representing whether the nth energy storage device is discharged at time t; The reserve discharge capacity allocated to smooth out the surge in renewable energy output and the sudden drop in load in the next period is expressed as: In the formula, The size of the standby charging capacity allocated to the nth energy storage device at time t to smooth out the decrease in new energy output and the surge in load in the next period; is a 0-1 variable representing whether the nth energy storage device is charged at time t; S42: Summarize the capacity allocation results at each moment to form a cross-time allocation plan for energy storage capacity.
9. A device for allocating energy storage capacity across time periods taking into account dynamic life characteristics, the device comprising: A memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor implements the method for allocating energy storage capacity across time periods taking into account dynamic life characteristics as described in any one of claims 1 to 8 when executing the computer program.
10. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the method for allocating energy storage capacity across time periods taking into account dynamic life characteristics as described in any one of claims 1 to 8 is implemented.
Citation Information
Cited By
Inertia response-based new energy grid-connected frequency modulation method and related device
CN120767946A