AI Technical Summary
In the existing multi-carrier co-extrusion cable production process, polymer materials are easy to solidify, resulting in low production efficiency and scrapped steel strips. When the wire reel is replaced, the material is still and solidifies, causing extrusion defects.
A hot melt device is used to generate hot air flow through pressure heating to keep the polymer material in a molten state and prevent solidification. The speed of the extruder and the carrier is matched to improve production efficiency.
Effectively prevent polymer materials from solidifying, reduce steel strip scrapping, and improve production efficiency and material utilization.
Smart Images

Figure CN118809997A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of traction belt production, and in particular to an elevator traction belt production device and a production transition method thereof. Background Art
[0002] In the prior art, the production of co-extruded cables with multiple carriers often requires continuous production. When continuous production is required, the wire reel is a reel with a fixed length. When the wire reel is replaced, the bypass of the extruder flow channel is open, and the polymer material flows out from the bypass. At this time, the polymer material is stationary in the flow channel from the bypass to the die, and it is easy to solidify at the outlet. There is also stationary material that solidifies in the flow channel and is discharged irregularly, causing extrusion defects. In addition, there is a speed-up process for the steel belt. During the speed-up process of matching the steel belt and the polymer material, nearly 200 meters to 500 meters of the steel belt cannot meet the quality requirements and can only be scrapped, which increases the cost of the steel belt and greatly limits the production efficiency.
[0003] For example, the Chinese patent with publication number CN111716781A discloses a production device, a process and an elevator traction belt produced by the production device. Although the application involves the production device and process of the elevator traction belt, it still has the problem that the polymer material is prone to solidification at the outlet due to its stillness, and it is easy to cause scrapping, thereby reducing production efficiency. Summary of the invention
[0004] The present invention solves the problem that polymer materials are prone to solidification during the production process of existing co-extruded cables with multiple carriers, and proposes an elevator traction belt production device and process method. A hot melt device generates a hot air flow to put the polymer material in a hot melt state to prevent the polymer material from solidifying; and the speed matching of the carrier and the polymer material can be quickly achieved, thereby improving production efficiency.
[0005] In order to achieve the above-mentioned purpose, the present invention adopts the following technical scheme: an elevator traction belt production equipment, including an extruder, the extruder includes a head, the head includes a die, an extrusion flow channel is arranged in the head, the elevator traction belt includes a carrier and a coating layer arranged on the outside of the carrier, the die and / or the head are provided with a first channel for the carrier to pass through and a second channel connected to the extrusion flow channel, the first channel and the second channel are conductive, when the carrier passes through the first channel, the molten polymer material in the extruder flows through the extrusion flow channel and the second channel to the surface of the carrier to form a coating layer, the elevator traction belt production equipment also includes a hot melt device, the hot melt device provides a hot air flow to the die to keep the polymer material at the outlet of the first channel in a molten state.
[0006] In the present technical solution, a hot melt device is arranged on one side of the die, and the hot melt device heats the compressed air to generate a hot air flow. The hot air can be blown toward the polymer material, so that the polymer material can always remain in a hot melt state and will not solidify. The carrier passes through the first channel, and the extruder extrude the internal molten polymer material through the extrusion flow channel and the second channel to the surface of the carrier, so that the polymer material is evenly coated on the carrier; and the speed matching of the carrier and the polymer material can be quickly achieved, thereby improving production efficiency.
[0007] The present invention is further configured as follows: the hot melt device comprises a pressurizing unit and a heating unit, and the pressurizing unit forms an airflow which is heated by the heating unit and then flows to the die.
[0008] In the present technical solution, the hot melt device mainly includes a pressurizing unit and a heating unit. The pressurizing unit can pressurize the air, and the heating unit can heat the compressed air. After the pressurization and heating are completed, a corresponding hot air flow is generated. The hot air flow can be blown toward the polymer material, so that the polymer material remains in a hot melt state and prevents extrusion defects.
[0009] The present invention is further configured as follows: the heating unit includes a spiral air pipe and a heating ring arranged on the outer edge of the spiral air pipe, the booster unit is connected to the heating unit, and the spiral air pipe is connected to the hot air pipe connected to the die.
[0010] In the technical solution, when the compressed air passes through the spiral air pipe, the heating ring on the outer edge thereof works to heat the compressed air, and after being heated, the compressed air is transported to the die through the hot air pipe.
[0011] The present invention is further configured as follows: the die is equipped with a blowing flow channel connected to the outlet of the first channel, and the blowing flow channel includes an air flow inlet connected to the hot melt device and a fluid outlet corresponding to the lower side of the first channel.
[0012] In the technical solution, the hot air flow generated by the hot melt device can blow air toward the polymer material at the outlet of the first channel through the blowing channel, ensuring that the polymer material will not solidify at the outlet of the first channel and preventing extrusion defects.
[0013] The present invention is further configured as follows: the mouth die is fixedly connected to a blow plate, a blowing flow channel is provided in the blow plate, or a depression is provided on the side of the blow plate facing the mouth die so that a blowing flow channel is formed between the blow plate and the opposite sides of the mouth die, an access hole corresponding to the first channel is provided on the blow plate, and the carrier passes through the access hole.
[0014] In the present technical solution, the blowing flow channel on the blowing plate has multiple forms, one of which is that the blowing flow channel is entirely arranged in the blowing plate; the other is that the blowing flow channel is formed by the cooperation of the blowing plate and the mouth die, that is, a depression is opened on the blowing plate and then sealed with the mouth die to form the blowing flow channel, thereby ensuring the sealing and stability of the blowing flow channel.
[0015] The present invention is further configured such that the air pressure after being compressed by the booster unit is 0.6MPa-1.5MPa, and the air temperature after being heated by the heating unit is 180-400°C.
[0016] In the technical solution, the air is pressurized and heated to the above parameter range to ensure that the hot air flow can keep the polymer material in a molten state.
[0017] The present invention is further configured as follows: the head also includes a bypass, the bypass includes an extrusion flow channel inside the bypass and a bypass switch for controlling the extrusion flow channel to flow out from the side.
[0018] In the technical solution, the polymer material flows out from the extruder through the extrusion channel and then into the second channel.
[0019] The present invention is further configured to include a material receiving device, which is arranged corresponding to the first channel outlet and collects the polymer material flowing out of the first channel outlet.
[0020] In the technical solution, the material receiving device is specially used to collect polymer materials, and the recovered polymer materials can be crushed and reused to further improve the utilization rate of the materials.
[0021] The present invention is further configured such that: the temperature of the hot air flow is higher than the extrusion molding temperature of the polymer material and a temperature difference is formed, and the temperature difference is 5-50°C.
[0022] In the technical solution, the temperature of the hot air flow is made higher than the extrusion molding temperature of the polymer material to ensure that the polymer material can be softened and melted.
[0023] A production transition method for an elevator traction belt production device, using the above-mentioned elevator traction belt production device, when the traction belt is produced, the extruder extrude the molten polymer material at a speed v1, and the carrier moves at a speed v2, and the production transition method comprises the following steps: S1, when switching the carrier reel, turning on the hot melt device to keep the polymer material in a molten state and slowly flowing it to the first channel outlet; S2, after the carrier reel is replaced, the carrier passes through the first channel, and the extruder extrude the internal molten polymer material through the extrusion flow channel and the second channel to the surface of the carrier, and the carrier is stationary or the speed is less than v2; S3, increasing the speed of the extruder to v1; after the speed of the extruder stabilizes at v1, increasing the speed of the carrier to v2; S4, turn off the hot melt device and produce the elevator traction belt with normal process.
[0024] The above-mentioned production transition method of the present technical solution does not need to open the bypass switch when switching the carrier reel, and can make the polymer material flow out slowly from the extrusion flow channel and the second channel; and when the production speed is increased, the extruder can be quickly increased to the set speed. When the extruder has not reached the set speed, the carrier does not need to be turned on at the same time. After the extruder speed is stable, the speed-up process of the carrier is started, and the speed can be directly increased from 0 to the set speed, thereby shortening the time and improving efficiency.
[0025] The present invention can bring the following beneficial effects: 1. The present invention relates to an elevator traction belt production equipment, which generates a hot air flow by pressurizing and heating a hot melting device to put the polymer material in a hot melting state, so that it will not solidify at the die outlet, thereby preventing defects; 2. The elevator traction belt production equipment involved in the present invention can quickly achieve speed matching between the carrier and the polymer material, reduce the scrapping of the carrier and the polymer material, improve the utilization rate of production raw materials, and increase production costs. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] Figure 1 It is a structural schematic diagram of an elevator traction belt production device of the present invention.
[0027] Figure 2 It is a structural schematic diagram of an elevator traction belt production device from one perspective of the present invention.
[0028] Figure 3 The present invention is a front view of a blowing plate of an elevator traction belt production device.
[0029] Figure 4 The present invention provides a rear view and a top view of a blowing plate of an elevator traction belt production device.
[0030] Figure 5 The present invention is a schematic structural diagram of an elevator traction belt production device with the air blowing plate removed.
[0031] Reference numerals: 1. Die head 2. Extrusion flow channel 3. Bypass switch 4. Carrier 5. Blowing plate 6. Air flow inlet 7. Hot air pipe 8. Insulation cotton 9. Heating coil 10. Spiral air pipe 11. Booster pump 12. Air 13. Receiving barrel 14. Hot glue 15. Counterbore 16. Access hole 17. First flow channel 18. Second flow channel 19. Third flow channel 20. Fourth flow channel 21. Temperature sensor connector 22. Heating rod 23. Mouth die fixing plate 24. Mouth die. DETAILED DESCRIPTION
[0032] In order to make the objectives, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific implementation method described herein is only an optimal embodiment of the present invention, which is only used to explain the present invention and does not limit the scope of protection of the present invention. All other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present invention.
[0033] In the production process of co-extruded cables with multiple carriers, when the speed of carrier 4 is increased from 0 to the normal set speed, such as when the production line speed reaches 30 m / s, carrier 4 will set the speed to 0, 5, 10, 15, 20, 25, 30 in sequence, and can also be slowly increased with other values. When the bypass valve of the extruder flow channel is closed, the screw speed of the extruder will also match the increase speed accordingly, so that the polymer material is more evenly coated on the carrier. After reaching the set speed, it will stabilize for a period of time and reach the corresponding size. This process lasts for a long time, and the carrier and the coating layer will be scrapped. That is, in the process of speed matching between carrier 4 and polymer material, the time consumed is long, resulting in a large number of scrapped carriers 4 and polymer materials, which seriously reduces the utilization rate of production raw materials and has a high production cost.
[0034] At the same time, in the co-extruded cable production process of multiple carriers, especially in continuous production, after one coil of carrier 4 is used up, the next coil of wire needs to be connected. At this time, the bypass 2 flow channel is in an open state, and the polymer material flows out from the bypass. At this time, the polymer material is in a static state in the flow channel from bypass 2 to the die 1; since it takes 0.3 hours to 1.2 hours to replace the coil, the polymer needs to be discharged slowly in subsequent production, otherwise defects will occur.
[0035] Example 1 In view of the above problems, this embodiment proposes an elevator traction belt production equipment, referring to Figures 1 to 5, including an extruder, the extruder includes a head 1, the head 1 includes a die 24, an extrusion flow channel 2 is arranged in the head 1, the elevator traction belt includes a carrier 4 and a coating layer arranged on the outside of the carrier 4, the head 1 and / or the die 24 are provided with a first channel for the carrier 4 to pass through and a second channel connected to the extrusion flow channel, the first channel and the second channel are connected to each other, when the carrier 4 passes through the first channel, the molten polymer material in the extruder flows through the extrusion flow channel and the second channel to the surface of the carrier 4 to form a coating layer.
[0036] refer to Figure 1 and Figure 2 The technical solution also includes a hot melt device, which can provide a hot air flow to the die 24. The hot air flow provided can keep the polymer material at the outlet of the first channel in a molten state to prevent it from solidifying and causing extrusion defects.
[0037] In this embodiment, a hot melt device is provided on one side of the die 24. The hot melt device heats the compressed air to generate a hot air flow. The hot air can be blown toward the polymer material, so that the polymer material can always remain in a hot melt state and the polymer material will not solidify. The carrier 4 passes through the first channel, and the extruder extrude the internal molten polymer material through the extrusion flow channel and the second channel to the surface of the carrier 4, so that the polymer material is evenly coated on the carrier 4. The speed matching of the carrier 4 and the polymer material can be quickly achieved to improve production efficiency.
[0038] refer to Figure 1 and Figure 2 As for the hot melt device, it mainly includes a pressurizing unit and a heating unit. The pressurizing unit can form a high-pressure airflow, and then the high-pressure airflow is heated by the heating unit and then flows to the die 24.
[0039] In this embodiment, the boosting unit can pressurize the air, and the heating unit can heat the compressed air. After the pressurization and heating are completed, a corresponding hot air flow is generated. The hot air flow can blow toward the polymer material, so that the polymer material remains in a hot melt state and prevents extrusion defects.
[0040] As one specific implementation method, refer to Figure 2 The heating unit of this embodiment mainly includes a spiral air pipe 10 and a heating ring 9 arranged on the outer edge of the spiral air pipe 10. In this embodiment, the heating unit is connected to the boosting unit. Specifically, one end of the spiral air pipe 10 is connected to the boosting outlet of the boosting unit, and the other end of the spiral air pipe 10 is connected to the hot air pipe 7 of the nozzle mold 24.
[0041] In more detail, the spiral air pipe 10 is arranged in a spiral shape so that the compressed air in the spiral air pipe 10 can be fully and evenly heated; similarly, the heating ring 9 on the outer edge of the spiral air pipe 10 is also arranged in a spiral shape, and the heating ring 9 can cover most of the spiral air pipe 10.
[0042] Preferably, reference Figure 2 The spiral air tube 10 mainly includes a head, a tail and a middle part between the head and the tail. The middle part of the spiral air tube 10 is covered by the heating coil 9, while the head and the tail of the spiral air tube 10 are not covered by the heating coil 9. In this embodiment, the length of the middle part of the spiral air tube 10 accounts for more than nine tenths of the total length of the spiral air tube 10.
[0043] In this embodiment, when the compressed air passes through the spiral air pipe 10 , the heating ring 9 on the outer edge thereof works to heat the compressed air, and after being heated, the compressed air is transported to the die 24 through the hot air pipe 7 .
[0044] A corresponding valve is also provided on the hot air pipe 7, which can control the on and off of the hot air flow, and further control the opening and closing of the hot melt device as a whole.
[0045] Optionally, the boost unit may be a mechanical supercharger or a compression supercharger.
[0046] Mechanical superchargers include hydraulic superchargers, pneumatic superchargers and mechatronic superchargers. Hydraulic superchargers use fluid liquid as the energy transfer medium to increase the gas pressure through fluid pressure. Pneumatic superchargers use ordinary compressed air or nitrogen to power the device and then pressurize the low-pressure gas. Mechatronic superchargers combine mechanical transmission with electrical automatic control by applying mechanical, electrical and control technologies.
[0047] The compression and boosting device raises the low-pressure gas to a high-pressure state after processing through a series of compressors and booster pumps.
[0048] In this embodiment, the boosting unit directly and specifically adopts a boosting pump 11, which can boost the air 12 to form compressed air.
[0049] Optionally, in addition to the spiral air pipe 10 and the heating ring 9 arranged on the outer edge of the spiral air pipe 10, the heating unit may also use other heating devices as long as the purpose of uniformly heating the gas can be achieved, which will not be elaborated here.
[0050] The die 24 is equipped with a blowing flow channel connected to the outlet of the first channel, and the blowing flow channel includes an air flow inlet 9 connected to the hot melt device and a fluid outlet corresponding to the lower side of the first channel.
[0051] In this embodiment, the hot air flow generated by the hot melt device can blow air toward the polymer material at the outlet of the first channel through the blowing channel, ensuring that the polymer material will not solidify at the outlet of the first channel, thereby preventing extrusion defects.
[0052] More specifically, the fluid outlet is arranged at the lower side of the first channel. The specific position of the fluid outlet may be directly below the first flow channel or may be arranged obliquely below the first flow channel.
[0053] For further reference, Figure 1 , Figure 2 , Figure 3 and Figure 4 The die 2 is fixedly connected to the blow plate 5, wherein a corresponding blowing channel is arranged in the blow plate 5, that is, the blowing channel is arranged in the blow plate 5 as a whole, and the blowing channel is composed of through holes opened in the blow plate 5; or the blow plate 5 is provided with a depression on the side facing the die 24 so that a blowing channel is formed between the opposite sides of the blow plate 5 and the die 24, that is, Figure 4 In the case of the above, the concave portion of the blow plate 5 is fixedly sealed with one side of the die 24 to form a corresponding blow channel.
[0054] In the above technical solution, the blowing flow channel on the blowing plate 5 has multiple forms, one of which is that the blowing flow channel is entirely arranged in the blowing plate 5; the other is that the blowing flow channel is formed by the cooperation of the blowing plate 5 and the die 24, that is, a depression is opened on the blowing plate 5 and then sealed with the die 24 to form the blowing flow channel, thereby ensuring the sealing and stability of the blowing flow channel.
[0055] In addition, the blowing flow channel can also be directly arranged in the inner part of the die 24, which can also align the hot air flow to the flow channel outlet.
[0056] refer to Figure 4 , Figure 4 a is a rear view of the blowing plate 5, Figure 4 b is a top view of the blowing plate 5, and the blowing flow channel mainly includes a first flow channel 17, a second flow channel 18, a third flow channel 19 and a fourth flow channel 20. The first flow channel 17 can be connected to the air flow inlet 6, and the extension direction of the first flow channel 17 is the same as the direction of the air flow inlet 6. The first flow channel 17 is also connected to the second flow channel 18, the second flow channel 18 is connected to the third flow channel 19, the third flow channel 19 is connected to the fourth flow channel 20, and the fourth flow channel 20 is connected to the polymer material outlet.
[0057] In this embodiment, the first flow channel 17 and the second flow channel 18 are perpendicular to each other, the second flow channel 18 and the third flow channel 19 have the same extension direction, the third flow channel 19 and the fourth flow channel 20 have the same extension direction, and the width of the fourth flow channel 20 is greater than that of the second flow channel 18. A first interface is provided on the side of the third flow channel 19 close to the second flow channel 18, and a second interface is provided on the side of the third flow channel 19 close to the fourth flow channel 20. The width of the second interface is greater than that of the first interface. Therefore, the cross-sectional width of the third flow channel 19 continuously increases from the first interface to the second interface to play a connecting role.
[0058] More importantly, since the first channel outlet is arranged at the interface of the third flow channel 19 and the fourth flow channel 20, that is, at the second interface, the cross-sectional width of the third flow channel 19 is arranged to be continuously enlarged from the first interface to the second interface, that is, Figure 4 The trapezoidal structure in the figure; after the hot air flow enters from the air flow inlet 6, the cross-section of the first flow channel 17 through which it flows is relatively narrow. After continuing to flow through the second flow channel 18, the flow direction of the hot air flow changes, that is, from a horizontal flow direction to a vertical flow direction, and then continues to flow through the third flow channel 19. The lower part of the third flow channel 19 is the first channel outlet. Since the cross-section of the third flow channel 19 is a trapezoidal structure (it can also be other structures with a small upper cross-section and a large lower cross-section), that is, the cross-section continues to widen from top to bottom, the hot air flow can be blown more evenly to the polymer material on the carrier 4, so that the coating layer formed by it is more uniform.
[0059] As a preferred embodiment, a die fixing plate 23 is provided between the die 24 and the blow plate 5, and the blow plate 5 is fixedly connected to the die 24 through the die fixing plate 23. A plurality of fixing holes are provided on the die fixing plate 23 to ensure its fixed connection with the die 24 and the blow plate 5.
[0060] The blow plate 5 is provided with an access hole 16 corresponding to the first channel, and the carrier 4 passes through the access hole 16 and can extend into the first channel.
[0061] The blowing plate 5 is also provided with a plurality of countersunk holes 15 , through which the blowing plate 5 is fixedly connected.
[0062] refer to Figure 1 The blowing plate 5 includes a first blowing plate and a second blowing plate. In this embodiment, the first blowing plate and the second blowing plate are symmetrically arranged, and a first groove is opened on one side of the first blowing plate. Similarly, a second groove is opened at the same position of the side opposite to the first blowing plate of the second blowing plate, and the first groove and the second groove form an access hole 16.
[0063] In this embodiment, the access hole 16 is rectangular in shape, and can accommodate a plurality of carriers 4 at the same time; the carriers 4 are inserted into the die 24 through the access hole 16 .
[0064] As a preferred embodiment, a plurality of countersunk holes 15 are arranged around one side of the blow plate 5, and the blow plate 5 is fixed to the die 24 through the countersunk holes 15 and a fixing member. More specifically, the fixing member is a fixing nut, and after aligning the countersunk hole position of the blow plate 5 with the threaded hole on the die fixing plate 23, the fixing nut is screwed in for locking. After being completely locked, due to the existence of the countersunk holes 15, the nut head of the fixing nut will not protrude from the surface of the blow plate 5, which is beneficial to the installation of the blow plate 5, and is beneficial to the sealing between the plates and can prevent interference; after the blow plate 5 and the die fixing plate 23 are fixed, the die fixing plate 23 and the die 24 are fixed in the same fixing manner to ensure the reliability of the fixing of the blow plate 5 and good sealing.
[0065] The air pressure after compression by the booster unit is set to 0.6MPa-1.5Mpa, and the air temperature after heating by the heating unit is 180-400°C. The hot melt device is filled with heated compressed air, the pressure of the compressed air is 0.6MPa-1.5MPa, and the temperature of the heated air is 180-400°C. It is set according to the production speed and product width. The generated hot air is blown to the polymer material to keep the polymer material in a hot melt state and prevent it from solidifying at the outlet.
[0066] In this embodiment, the air is pressurized and heated to the above parameter range to ensure that the hot air flow can keep the polymer material in a molten state.
[0067] The die head 1 also includes a bypass, which includes an extrusion flow channel 2 inside the die head 1 and a bypass switch 3 for controlling the extrusion flow channel 2 to flow out from the side.
[0068] In this embodiment, the polymer material flows out from the extruder through the extrusion channel 2 and then into the second channel.
[0069] In the technical solution, the temperature of the hot air flow is higher than the extrusion molding temperature of the polymer material and a temperature difference is formed, and the temperature difference ranges from 5 to 50°C.
[0070] In this embodiment, the temperature of the hot air flow is made higher than the extrusion molding temperature of the polymer material to ensure that the polymer material can be softened and melted.
[0071] The die head 1 is also provided with a temperature sensor connector 21 , which can be connected to an external temperature sensor to monitor the temperature of the first channel and the second channel in the die head 1 or the die 24 .
[0072] A heating rod 22 is also provided on one side of the die 1 , which can heat the first channel and the second channel in the die 1 or the die 24 .
[0073] Example 2 Based on Example 1, Figure 1 and Figure 2 An elevator traction belt production equipment of this embodiment also includes a corresponding material receiving device, which can collect hot glue formed by polymer materials; the material receiving device is arranged corresponding to the first channel outlet, and the material receiving device collects the polymer materials flowing out of the first channel outlet; the material receiving device specially collecting polymer materials can make the recycled polymer materials crushed and used again, and used in other occasions, further improving the utilization rate of materials.
[0074] The material receiving device is specifically a material receiving barrel 13. In this embodiment, the material receiving barrel 13 is arranged below the die 24 and can be arranged corresponding to the first channel outlet. The hot glue 14 formed by the polymer material can flow out along the first channel outlet and enter into the material receiving barrel 13.
[0075] In the technical solution, the material receiving barrel 13 is arranged at one side of the first channel outlet, and can receive the hot glue 13 flowing out from the first channel outlet.
[0076] Example 3 What is different from Example 1 is that a thermal insulation cotton 8 is arranged on the side of the spiral air pipe 10 of the hot melt device away from the boosting unit. The thermal insulation cotton 8 is specifically arranged on the hot air pipe 7 on the outlet side of the spiral air pipe 10. Since the spiral air pipe 10 has been heated by the heating coil 9, and the hot air pipe 7 has a certain length, the heated compressed air cannot be completely insulated after passing through the hot air pipe 7. Therefore, thermal insulation cotton 8 is added to the hot air pipe 7 to insulate the heated compressed air, prevent the temperature of the heated compressed air from decreasing, and achieve a good thermal insulation effect.
[0077] Example 4 Based on Example 1 or Example 2, this example further proposes a production transition method for elevator traction belt production equipment. During the production of the traction belt, the extruder extrude the molten polymer material at a speed v1, and the carrier moves at a speed v2. The production transition method includes the following steps.
[0078] Step S1, when switching the carrier reel, start the hot melt device to keep the polymer material in a molten state and slowly flow toward the first channel outlet.
[0079] Step S2, after the carrier reel is replaced, the carrier passes through the first channel, and the extruder extrude the internal molten polymer material through the extrusion flow channel and the second channel to the surface of the carrier, and the carrier is stationary or the speed is less than v2.
[0080] Step S3, increasing the speed of the extruder to v1; after the speed of the extruder is stabilized at v1, increasing the speed of the carrier to v2.
[0081] Step S4, closing the hot melt device and producing the elevator traction belt with normal process.
[0082] Exemplarily, v1 and v2 are both 30 meters per second. After the speed of the extruder is increased to 30 meters per second and stabilized at 30 meters per second, wait for 30 seconds; then start the speed-up of the carrier, which can be directly increased from 0 to the set speed of 30 meters per second; finally, turn off the hot melt device, specifically by closing the valve on the hot air pipe; the above-mentioned speeds of v1 and v2 are only examples, the two can be different, or can be other speeds; finally, the elevator traction belt is produced according to the normal process. The normal process production process is the prior art, and specific reference may be made to the Chinese patent publication number CN111716781A.
[0083] In this embodiment, the above process also applies when the extruder is started up and accelerated, that is, when the carrier reel is switched or the machine is started up and accelerated, the bypass switch is closed, and the polymer material cannot flow out from the side of the extrusion flow channel. The polymer material then flows along the extrusion flow channel to the second channel, allowing the polymer material to be slowly discharged.
[0084] When increasing the speed, the extruder can be quickly increased to the set speed. When the extruder has not reached the set speed, the carrier does not need to be turned on at the same time. When the extruder speed is stable, the speed of the carrier can be turned on, and the speed can be directly increased from 0 to the set speed to shorten the time.
[0085] The above-mentioned production transition method of the present technical solution does not need to open the bypass switch when switching the carrier reel, and can make the polymer material flow out slowly from the extrusion flow channel and the second channel; and when the production speed is increased, the extruder can be quickly increased to the set speed. When the extruder has not reached the set speed, the carrier does not need to be turned on at the same time. After the extruder speed is stable, the speed-up process of the carrier is started, and the speed can be directly increased from 0 to the set speed, thereby shortening the time and improving efficiency.
Claims
1. An elevator traction belt production equipment, comprising an extruder, the extruder comprises a die head, the die head comprises a die, an extrusion flow channel is arranged in the die head, the elevator traction belt comprises a carrier and a coating layer arranged outside the carrier, the die and / or the die head are provided with a first channel for the carrier to pass through and a second channel connected to the extrusion flow channel, the first channel and the second channel are connected, when the carrier passes through the first channel, the molten polymer material in the extruder flows through the extrusion flow channel and the second channel to the surface of the carrier to form a coating layer, characterized in that The elevator traction belt production equipment also includes a hot melt device, which provides a hot air flow to the die to keep the polymer material at the outlet of the first channel in a molten state.
2. An elevator traction belt production equipment according to claim 1, characterized in that: The hot melt device comprises a pressurizing unit and a heating unit. The pressurizing unit forms an airflow which is heated by the heating unit and then flows to the die.
3. An elevator traction belt production equipment according to claim 2, characterized in that: The heating unit comprises a spiral air pipe and a heating ring arranged on the outer edge of the spiral air pipe, the booster unit is connected with the heating unit, and the spiral air pipe is connected with the hot air pipe connected to the die.
4. An elevator traction belt production equipment according to claim 1, characterized in that: The die is equipped with a blowing flow channel connected to the outlet of the first channel, and the blowing flow channel includes an air flow inlet connected to the hot melt device and a fluid outlet corresponding to the lower side of the first channel.
5. An elevator traction belt production equipment according to claim 4, characterized in that: The die is fixedly connected to a blow plate, a blowing channel is provided in the blow plate, or a depression is provided on the side of the blow plate facing the die so that a blowing channel is formed between the blow plate and the opposite side of the die, and an access hole corresponding to the first channel is provided on the blow plate, and the carrier passes through the access hole.
6. An elevator traction belt production equipment according to claim 2, characterized in that: The air pressure after being compressed by the booster unit is 0.6MPa-1.5MPa, and the air temperature after being heated by the heating unit is 180-400℃.
7. An elevator traction belt production equipment according to any one of claims 1 to 6, characterized in that: The die head also includes a bypass, which includes an extrusion flow channel inside the die head and a bypass switch for controlling the extrusion flow channel to flow out from the side.
8. An elevator traction belt production equipment according to any one of claims 1 to 6, characterized in that: It also includes a material receiving device, which is arranged corresponding to the first channel outlet and collects the polymer material flowing out of the first channel outlet.
9. An elevator traction belt production equipment according to any one of claims 1 to 6, characterized in that: The temperature of the hot air flow is higher than the extrusion molding temperature of the polymer material and forms a temperature difference, which is 5-50°C.
10. A production transition method for elevator traction belt production equipment, using an elevator traction belt production equipment according to any one of claims 1 to 9, wherein during the production of the traction belt, an extruder extrudes a molten polymer material at a speed v1, and a carrier moves at a speed v2, characterized in that: The production transition method includes the following steps: S1, when switching the carrier reel, turning on the hot melt device to keep the polymer material in a molten state and slowly flowing it to the first channel outlet; S2, after the carrier reel is replaced, the carrier passes through the first channel, and the extruder extrude the internal molten polymer material through the extrusion flow channel and the second channel to the surface of the carrier, and the carrier is stationary or the speed is less than v2; S3, increasing the speed of the extruder to v1; after the speed of the extruder stabilizes at v1, increasing the speed of the carrier to v2; S4, turn off the hot melt device and produce the elevator traction belt with normal process.
Citation Information
Patent Citations
Plastic section strip composite co-extrusion mold
CN102310537A
Preparation method and preparation system for ultralight composite traction belt
CN104552988A
Extruding production device and method of semi-crystalline PEEK (Polyether Ether Ketone) pipes
CN108859064A
Production equipment, process and elevator traction belt produced through production equipment
CN111716781A
Extruder die head heating device of unloading
CN207579038U