Split-level asynchronous horizontal rotation construction method for overline double-beam bridge
Through the staggered asynchronous horizontal rotation construction method, the combination of the turntable and the bracket is used to carry out suspended casting and horizontal rotation step by step, which solves the problem of mutual influence in the construction of the double-width girder bridge, realizes the horizontal rotation construction of the double-width bridge, and ensures the passage of the road below. Safety.
Patent Information
- Application Number
- CN202411157368.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-22
- Publication Date
- 2024-10-22
AI Technical Summary
In the construction of a double-width girder bridge spanning an existing line, the existing horizontal rotation method cannot avoid the mutual influence of the two bridges, resulting in a limited construction angle and the inability to realize the horizontal rotation construction of the double-width bridge at the same time, affecting the safety of the road below.
The staggered-level asynchronous horizontal rotation construction method is adopted. By setting up turntable brackets and brackets on both sides of the existing road, the bridge body is suspended and cast and horizontally rotated step by step. Jacks are used to gradually reduce the height of the brackets to achieve independent construction and rotation of the double-width bridge. , to avoid mutual influence.
Without affecting the traffic safety of the road below, the horizontal rotation construction of the double-width bridge was successfully realized, which solved the problem of limited construction angle of the double-width bridge and ensured the smooth progress of the construction.
Smart Images

Figure CN118814652A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of bridge construction, relates to a bridge construction spanning an existing line, and specifically relates to a staggered-layer asynchronous horizontal rotation construction method for a double-span beam bridge spanning a line. Background Art
[0002] When constructing cast-in-place beams across existing trunk roads, expressways, and railways, the horizontal rotation method is often used, considering that the cantilevered casting of the existing lines above will cause safety hazards to the traffic on the lines below. The horizontal rotation method is to first cast the T-beam cantilevers on the two piers on the main span piers on both sides of the existing line in the direction deviating from the design axis of the bridge. Each T-beam is located outside the existing line during casting, so it does not affect the traffic safety of the existing line; then the two T-beams are horizontally rotated to the position of the design axis of the bridge, and then the two T-beams are joined, so that the bridge crosses the existing line in a construction method that does not affect the traffic safety of the road below. The above-mentioned horizontal rotation construction is suitable for single-span bridges. For double-span beam bridges, due to the narrow spacing between the left and right spans and the mutual influence of the pier positions of the two spans, if the two spans are horizontally rotated at the same time, the horizontal rotation angle is limited, and the T-beams of the two spans cannot avoid the top of the existing line when they are cantilevered; if one of the spans is horizontally rotated first, the latter span is affected by the position of the previous span, and horizontal rotation construction cannot be used. Summary of the invention
[0003] The purpose of the present invention is to solve the above problems and provide a staggered asynchronous horizontal rotation construction method suitable for a cross-line double-span beam bridge, so as to realize the horizontal rotation construction of the double-span bridge without affecting the traffic safety of the road below.
[0004] The technical solution of the present invention is as follows:
[0005] A method for constructing a staggered-layer asynchronous horizontal rotation of a double-span beam bridge across a line, wherein the bridge to be constructed is divided into left and right spans and crosses an existing road, and is characterized in that it comprises the following steps:
[0006] (1) Construct the main span piers and side span piers of the double-span bridge on both sides of the existing road;
[0007] (2) A turntable bracket is set up on the main span pier cap of the left bridge, and a turntable is installed on the top of the turntable bracket. The turntable is used for the horizontal rotation of the T-structure of the left bridge body;
[0008] The construction axis of the two T-structures of the left span bridge is preset. The construction axis of the cantilever casting has a certain angle with the design axis of the bridge. At this angle, the two T-structures of the left span bridge body are located outside the existing road during cantilever casting, and the pier of the right span bridge does not affect the cantilever casting of the left span bridge body.
[0009] According to the T-structure construction axis of the left span bridge, 0# brackets are respectively set up on both sides of the main span piers of the left span bridge. The top elevation of the 0# bracket and the turntable is set according to the design elevation of the bottom surface of the left span bridge body;
[0010] (3) Cast the 0# block of the left span bridge on the 0# block support and turntable. After the 0# block reaches the designed strength, remove the 0# block support and use the hanging basket construction method to cantilever cast the two T-structure segments of the left span continuous beam on both sides of the existing line;
[0011] (4) The two T-structures of the left span beam bridge are rotated around the main span pier to the design axis of the bridge, and then the cast-in-place section of the left span side span is constructed. The side span and middle span of the left span bridge are then closed in sequence to complete the construction of the left span bridge;
[0012] (5) Fig. 9 , Fig.10 As shown in the figure, the construction axis of the two T-structures of the right span bridge is preset. This axis has a certain angle with the design axis of the bridge, which can ensure that the two T-structures are located outside the existing road during the construction.
[0013] Remove the turntable and turntable bracket on the main span pier of the left span bridge, install the turntable bracket on the pedestal of the main span pier of the right span bridge and raise it, and install the turntable on the top of the raised turntable bracket; install 0# brackets on both sides of the main span pier of the right span bridge according to the construction axis of the T-structure of the right span bridge; the height of the turntable and 0# bracket is higher than the bridge deck height of the completed left span bridge;
[0014] (6) Cast the two T-structures of the right bridge in the same way as the T-structure of the left bridge, and rotate the two T-structures of the right beam bridge to the designed bridge axis. Then, use steel sections to temporarily consolidate the main span joint ends of the two T-structures of the right bridge.
[0015] (7) Install beam-dropping brackets on both sides of each main span pier of the right span bridge, install jacks on the top of the beam-dropping brackets, and carry out beam-dropping construction of the right span bridge in the following manner:
[0016] First, lift the beam with a jack to make the turntable and the bottom of the beam empty, and then remove the turntable;
[0017] Then retract the jack to drop the beam onto the turntable bracket, and the weight of the beam is borne by all the turntable brackets;
[0018] Temporarily remove the jack on the beam drop bracket, dismantle some sections of the beam drop bracket, and then place the jack on the beam drop bracket;
[0019] The jack lifts the beam again, so that the top of the turntable bracket is vacated from the bottom of the beam, and some sections of the turntable bracket are removed. The jack retracts again, so that the beam falls onto the turntable bracket again;
[0020] Repeat this operation to gradually lower the height of the turntable bracket and the beam-dropping bracket until the beam is completely dropped onto the main span pier.
[0021] Consolidate the beam body and the pier body; remove all the beam support and turntable support;
[0022] (9) Remove the steel sections that temporarily consolidate the two T-structure joint ends of the right span bridge; cast the cast-in-place section of the right span side span, and then cast the right span side span closure section and the main span closure section in sequence to complete the construction of the right span bridge.
[0023] The present invention casts and rotates the two bridges at different heights in sequence. The left bridge is rotated first, and the right bridge can be cast and rotated above the left bridge. After the right bridge is rotated, the beams are lowered to the designed height, thereby avoiding mutual influence between the two bridges and smoothly realizing the rotation construction of the double-span bridge across the line. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] Figure 1 It is a construction flow chart of the present invention;
[0025] Figure 2 It is a schematic diagram of the arrangement of the main span piers and side span piers of the two bridges;
[0026] Figure 3 This is the plan view of the turntable bracket, turntable and 0# block bracket at the main span pier of the left bridge;
[0027] Figure 4 This is the elevation structure diagram of the turntable bracket, turntable and 0# block bracket at the main span pier of the left bridge;
[0028] Figure 5 This is a schematic diagram of the plane state of the top 0# block of the left bridge pier when the construction is completed;
[0029] Figure 6 This is a schematic diagram of the plane state of the two T-structures of the left bridge after casting;
[0030] Figure 7 This is the plan view of the two T-structures of the left span bridge after being cast and rotated into place;
[0031] Figure 8 This is the side view along the bridge after the two T-structures of the left span are cast and rotated into place;
[0032] Fig. 9 This is the plan view of the main span and side span of the left bridge after they are connected;
[0033] Fig.10 This is the elevational structural diagram of the turntable bracket and turntable installed at the pier of the main span of the right bridge;
[0034] Fig.11 Schematic diagram of the state after the casting of the 0# block on the top of the main span pier of the right span bridge is completed;
[0035] Fig.12 This is a schematic diagram of the plane state of the two T-structures of the right bridge after casting;
[0036] Fig.13This is a schematic diagram of the plane state of the two T-structures of the right bridge after they are rotated horizontally into position;
[0037] Fig.14 This is a side view along the bridge when the two T-structures of the right span are rotated into position and ready to drop the beams;
[0038] Fig.15 yes Fig.14 Schematic diagram of the layout of the beam support on both sides of the middle main span pier;
[0039] Fig.16 This is a schematic diagram of the plane status of the double-span bridge after construction is completed. DETAILED DESCRIPTION
[0040] The method of the present invention is described below through a specific embodiment. In this embodiment, a bridge to be constructed is divided into two sections, the left and right, and the main span of the bridge crosses an operating highway. The bridge beam body is constructed by hanging basket suspended casting method, the main span and the two side spans of the bridge are first cast into two T-shaped structural beam bodies, and then the two T structures are connected. In order to avoid affecting the operational safety of the road below during the suspended casting process, the horizontal rotation method is adopted for construction, avoiding the top of the road during the suspended casting process, and rotating and closing the T structure after the casting is completed.
[0041] Figure 1 It is the construction flow chart of the present invention, and the specific construction method is as follows:
[0042] (1) Figure 2 As shown, the main span pier 11 and the side span pier 12 of the left bridge, and the main span pier 21 and the side span pier 22 of the right bridge are respectively constructed on both sides of the existing road 100 .
[0043] (2) The left bridge should be constructed first. Figure 3 , Figure 4 As shown, a turntable bracket 3 is set up on the main span pier 11 of the left bridge, and a turntable 4 is installed on the top of the turntable bracket. The turntable is used for the horizontal rotation of the T-structure of the left bridge body;
[0044] The turntable bracket 3 can be circular and erected around the pier 11 on the pier cap. To increase the stability of the turntable bracket, embedded parts can be provided on the pier body, and steel sections are welded between the turntable bracket and the embedded parts of the pier body.
[0045] The construction axis A1 of the cantilever casting of the two T-structures of the left span bridge is preset. The cantilever casting construction axis A has a certain angle with the bridge design axis B. At this angle, the two T-structures of the left span bridge body are respectively located outside the existing road during cantilever casting, and the pier of the right span bridge does not affect the cantilever casting of the left span bridge body;
[0046] According to the T-structure construction axis of the left span bridge, 0# block brackets 5 are respectively set up on both sides of the main span piers of the left span bridge. The top elevations of the 0# block brackets 5 and the turntable 3 are set according to the design elevation of the bottom surface of the left span bridge body.
[0047] (3) Figure 5 , Figure 6 As shown, the left span bridge 0# block 13 is cast on the 0# block support and the turntable. After the 0# block reaches the design strength, the 0# block support is removed, and the two T-beam bodies 14 of the left span continuous beam are cantilever cast on both sides of the existing line by using a hanging basket construction method;
[0048] (4) Figure 7 , Figure 8 , Fig. 9 As shown, the two T structures of the left span beam bridge are respectively rotated around the main span pier to the bridge design axis; then the left span side span cast-in-place section 15 is constructed, and then the side span and middle span of the left span bridge are closed in sequence to complete the construction of the left span bridge 1;
[0049] (5) Fig. 9 , Fig.10 As shown, the construction axis A2 for the two T-structures of the right span bridge is preset. This construction axis has a certain angle with the bridge design axis B, which can ensure that the two T-structures are located outside the existing road during the construction, and the left span bridge does not affect the erection of 0# brackets on both sides of the right span bridge columns and piers;
[0050] Remove the turntable and turntable bracket on the main span pier of the left span bridge, install the turntable bracket 3 on the pedestal of the main span pier 21 of the right span bridge and raise it, and install the turntable 4 on the top of the raised turntable bracket 3; install 0# block brackets 5 on both sides of the main span pier of the right span bridge according to the construction axis of the T-structure of the right span bridge; the height of the turntable, 0# block bracket 5 and turntable 4 is higher than the bridge deck height of the completed left span bridge to avoid the left span bridge affecting the suspended casting of the T-structure of the right span bridge.
[0051] When the right span turntable bracket is raised, the raised part can be made of multiple sections, and the sections are connected by flanges. The height of each section is set to be smaller than the top stroke of the jack set on the beam-dropping bracket during the subsequent beam-dropping construction, so as to facilitate the disassembly and lowering of the turntable bracket section by section during the beam-dropping construction.
[0052] (6) Fig.11 , Fig.12 , Fig.13 As shown, the 0# block 23 on the pier top of the right span bridge and the two T-structure beams 24 of the right span bridge are cast in sequence, and the two T-structures 2 of the right span bridge are rotated to the designed bridge axis respectively. The construction method is the same as that of the left span bridge. Since the height of the turntable and the 0# block bracket supporting the T-structure of the right span bridge is higher than the bridge deck of the left span bridge, the T-structure of the right span bridge is cast and rotated above the left span bridge, and the left span bridge does not affect the cast and rotation construction of the right span bridge.
[0053] like Fig.13 , 14 As shown in FIG, after the two T-structures 24 of the right span bridge are rotated into place, the main span joint ends of the two T-structures of the right span bridge are temporarily consolidated by using connecting steel 25;
[0054] (7) Since the height of the right bridge is higher than the design height at this time, it is necessary to carry out beam lowering construction on the right bridge.
[0055] like Fig.14 , Fig.15 As shown, beam-dropping brackets 6 are respectively installed on both sides of each main span pier 22 of the right span bridge, and jacks 7 are installed on the top of the beam-dropping brackets 6. The beam-dropping construction of the right span bridge is carried out in the following manner:
[0056] First, the beam body 24 is lifted by the jack 7 to make the turntable 4 and the bottom of the beam vacate and remove the turntable;
[0057] Then retract the jack 7 to drop the beam 24 onto the turntable support 3, and the weight of the beam is supported by the turntable support;
[0058] Temporarily remove the jack on the beam drop bracket, dismantle the 6 sections of the beam drop bracket, lower the height of the beam drop bracket, and then place the jack on the beam drop bracket;
[0059] The jack lifts the beam again to make the top of the turntable bracket empty from the bottom of the beam, remove the three sections of the turntable bracket, lower the height of the turntable bracket, and retract the jack again to make the beam fall onto the turntable bracket again;
[0060] The operation is repeated in this way to gradually lower the height of the turntable bracket 3 and the beam-dropping bracket 6 until the beam body 24 completely falls onto the main span pier 21, thus completing the beam-dropping construction of the right span bridge.
[0061] The beam body is consolidated with the pier body, and all the beam-dropping brackets 6 and the turntable brackets 3 are removed.
[0062] (9) Fig.16 As shown, the steel sections temporarily consolidating the two T-structure joint ends of the right span bridge are removed; the cast-in-place section of the right span side span is cast, and the right span side span closure section and the main span closure section are cast in sequence to complete the construction of the right span bridge 2.
[0063] Through the above processes, the horizontal rotation construction of the double-span bridge across the line was completed without affecting the traffic safety of the road below.
Claims
1. A method for construction of a staggered asynchronous horizontal rotation of a double-span beam bridge across a line, wherein the bridge to be constructed is divided into left and right spans and crosses an existing road, and is characterized in that: The following steps are involved: (1) Construct the main span piers and side span piers of the double-span bridge on both sides of the existing road; (2) A turntable bracket is set up on the main span pier cap of the left bridge, and a turntable is installed on the top of the turntable bracket. The turntable is used for the horizontal rotation of the T-structure of the left bridge body; The construction axis of the two T-structures of the left span bridge is preset. The construction axis of the cantilever casting has a certain angle with the design axis of the bridge. At this angle, the two T-structures of the left span bridge body are located outside the existing road during cantilever casting, and the pier of the right span bridge does not affect the cantilever casting of the left span bridge body. According to the T-structure construction axis of the left span bridge, 0# brackets are respectively set up on both sides of the main span piers of the left span bridge. The top elevation of the 0# bracket and the turntable is set according to the design elevation of the bottom surface of the left span bridge body; (3) Cast the 0# block of the left span bridge on the 0# block support and turntable. After the 0# block reaches the designed strength, remove the 0# block support and use the hanging basket construction method to cantilever cast the two T-structure segments of the left span continuous beam on both sides of the existing line; (4) The two T-structures of the left span beam bridge are rotated around the main span pier to the design axis of the bridge, and then the cast-in-place section of the left span side span is constructed. The side span and middle span of the left span bridge are then closed in sequence to complete the construction of the left span bridge; (5) As shown in Figures 9 and 10, the construction axis of the two T-structures of the right span bridge is preset. This axis has a certain angle with the design axis of the bridge, which can ensure that the two T-structures are located outside the existing road during the construction. Remove the turntable and turntable bracket on the main span pier of the left span bridge, install the turntable bracket on the pedestal of the main span pier of the right span bridge and raise it, and install the turntable on the top of the raised turntable bracket; install 0# brackets on both sides of the main span pier of the right span bridge according to the construction axis of the T-structure of the right span bridge; the height of the turntable and 0# bracket is higher than the bridge deck height of the completed left span bridge; (6) Cast the two T-structures of the right bridge in the same way as the T-structure of the left bridge, and rotate the two T-structures of the right beam bridge to the designed bridge axis. Then, use steel sections to temporarily consolidate the main span joint ends of the two T-structures of the right bridge. (7) Install beam-dropping brackets on both sides of each main span pier of the right span bridge, install jacks on the top of the beam-dropping brackets, and carry out beam-dropping construction of the right span bridge in the following manner: First, lift the beam with a jack to make the turntable and the bottom of the beam empty, and then remove the turntable; Then retract the jack to drop the beam onto the turntable bracket, and the weight of the beam is borne by all the turntable brackets; Temporarily remove the jack on the beam drop bracket, dismantle some sections of the beam drop bracket, and then place the jack on the beam drop bracket; The jack lifts the beam again, so that the top of the turntable bracket is vacated from the bottom of the beam, and some sections of the turntable bracket are removed. The jack retracts again, so that the beam falls onto the turntable bracket again; Repeat this operation to gradually lower the height of the turntable bracket and the beam-dropping bracket until the beam is completely dropped onto the main span pier. Consolidate the beam body and the pier body; remove all the beam support and turntable support; (9) Remove the steel sections that temporarily consolidate the two T-structure joint ends of the right span bridge; cast the cast-in-place section of the right span side span, and then cast the right span side span closure section and the main span closure section in sequence to complete the construction of the right span bridge.
2. The method for asynchronous horizontal rotation of a staggered-level double-width beam bridge across a line according to claim 1 is characterized in that: The turntable bracket is circular and is erected around the pier on the pier cap. In order to increase the stability of the turntable bracket, embedded parts are arranged on the pier body, and steel sections are welded between the turntable bracket and the embedded parts of the pier body.
3. The method for asynchronous horizontal rotation of a staggered-level double-width beam bridge across a line according to claim 1 is characterized in that: The elevated part of the right bridge turntable bracket adopts multiple sections, the height of each section is less than the maximum lifting stroke of the jack, and flanges are used to connect the sections.