Waterproof coiled material laying method for inclined roof

Through the laying method of sloped roof waterproofing membrane, the laying direction and connection method are selected according to the roof slope, which solves the problems of hollows and gaps in the sloped roof waterproofing construction, ensuring the stability of the waterproofing membrane and the waterproof performance of the roof. Through flushing and The water soak test verified the waterproof effect.

CN118815097AInactive Publication Date: 2024-10-22BEIJING URBAN CONSTR GROUP
View PDF 7 Cites 0 Cited by

Patent Information

Application Number
CN202411204423.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-30
Publication Date
2024-10-22
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The existing technology lacks effective waterproofing construction methods for modified asphalt on sloping roofs, resulting in uneven paving effects and prone to problems such as hollows, gaps and poor durability. It is especially difficult to meet waterproofing requirements under complex roof designs.

Method used

Provides a method for laying waterproofing membranes on sloped roofs, including cleaning the roof, measuring the roof slope to determine the laying direction, laying waterproofing membranes from the edge of the roof to the center and connecting them by overlapping, and separately melting and bonding, paying special attention to the edges and corners of the roof. Bonded, and passed flush test and water soak test to ensure waterproof effect.

Benefits of technology

By selecting the appropriate laying direction and connection method according to the roof slope, the stability and sealing of the waterproof membrane are ensured, the waterproof performance of the roof is improved, and waterproof stability can be maintained under simulated heavy rain and water accumulation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118815097A_ABST
    Figure CN118815097A_ABST
Patent Text Reader

Abstract

A waterproof roll laying method for an inclined roof comprises the following steps that the roof is cleaned, and particulate matter, attachments and various connecting protrusions on the roof are swept away; the slope of the roof is measured, and the laying direction of the waterproof roll is determined according to the slope of the roof; waterproof coiled materials are sequentially laid from the edge of the roof to the center of the roof, the adjacent coiled materials are connected in a lap joint mode after laying, but the non-lap-joint portions are bonded with the roof; independently melting and bonding the lap joint parts of the adjacent coiled materials; the joints, with the corner angles, of the roof are independently bonded; performing a flushing test and a soaking test on the roof; the paving direction of the waterproof coiled materials is selected according to the actual roof gradient, so that different roofs have proper paving modes, the adjacent waterproof coiled materials are connected in a lap joint mode, the stability of connection of the positions directly making contact with rainwater is guaranteed, and the service life of the waterproof coiled materials is prolonged. And finally, performing a water flushing test and a water soaking test to ensure the waterproof stability of the roof.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of building construction, and in particular to a method for laying a waterproofing membrane on an inclined roof. Background Art

[0002] Building waterproofing is one of the key aspects that the construction industry needs to consider. The materials, construction methods and maintenance measures used in building waterproofing construction all affect the waterproof performance of the entire building.

[0003] In the prior art, the roof is the part of the building that is most directly in contact with rainwater. The waterproof performance of the roof has the greatest impact on the waterproof performance of the entire building. At the same time, for the aesthetics of the building, the roof design is becoming more and more complicated. The more common way of existing roof waterproofing is to lay waterproof materials on the roof, including metal materials, synthetic polymer membranes, waterproof coatings, etc., but these waterproof materials are expensive, and the cost performance is low when used on large-area roofs. Modified asphalt membranes are low in cost, can be cut arbitrarily, and are suitable for a variety of construction scenes and are therefore popular among builders. However, during the construction of modified asphalt membranes, the effects of laying the membranes vary due to the different construction levels of the workers. The laid modified asphalt waterproof membranes are prone to hollowing, gaps, poor durability, and other conditions. Especially when waterproofing is performed on inclined roofs, the situation that does not meet the requirements is even worse. There is a lack of a complete set of modified asphalt waterproofing construction methods for inclined roofs.

[0004] Therefore, it is necessary for the inventor to design a new method for laying inclined roof waterproofing membrane to overcome the above problems. Summary of the invention

[0005] The main purpose of the present application is to provide a method for laying sloped roof waterproofing membranes to solve the problem of the lack of methods for sloped roof modified asphalt waterproofing construction in the related art.

[0006] In order to achieve the above object, the present application provides a method for laying a sloped roof waterproofing membrane, the laying method comprising the following steps:

[0007] S100, clean the roof, remove the particles, attachments and various connection protrusions on the roof;

[0008] S200, measure the slope of the roof, and determine the laying direction of the waterproof membrane according to the roof slope;

[0009] S300, laying waterproof rolls in sequence from the edge of the roof to the center of the roof, and after laying, adjacent rolls are connected in an overlapping manner, but the non-overlapping parts are first bonded to the roof, and the bonding layer on the part connected to the adjacent roll is not melted first;

[0010] S400, melting and bonding the overlapping parts with the adjacent coils separately, and pressing them while melting;

[0011] S500, bond the corners of the roof separately to ensure that there are no hollows at the nodes;

[0012] S600, conduct flushing test and soaking test on the roof to ensure the laying effect.

[0013] Preferably, the step S200 includes:

[0014] When the roof slope is less than 3%, the waterproof membrane is laid parallel to the ridge;

[0015] When the roof slope is between 3% and 15%, the waterproof membrane can be laid parallel to the ridge or perpendicular to the ridge.

[0016] When the roof slope is greater than 15%, the waterproof membrane is laid perpendicular to the ridge.

[0017] Preferably, step S300 includes:

[0018] When laying waterproof membranes in parallel with the ridge, first lay the waterproof membranes at the edge, and then lay them towards the center of the roof. When overlapping adjacent waterproof membranes, pay attention to overlapping the waterproof membranes near the center on top of the waterproof membranes near the ridge.

[0019] When the waterproof membrane is laid in the direction perpendicular to the ridge, the waterproof membrane is laid from the edge of the roof to the center of the roof.

[0020] Preferably, the step S300 further includes:

[0021] Use a high-pressure blowtorch to evenly heat the modified asphalt layer of the waterproofing membrane. The blowtorch is located at the center line of the angle between the membrane and the roof. The direction of the flame from the blowtorch is in the range of 40° to 50° with the angle between the roof.

[0022] The distance between the blowtorch and the modified asphalt layer is 250mm-350mm;

[0023] After the modified asphalt layer is melted, the waterproof membrane is rolled forward to make it adhere to the roof, and a pressure plate is used to press it to ensure sealing.

[0024] Preferably, the step S400 includes:

[0025] Use a high-pressure blowtorch to heat the modified asphalt layer at the edge of the waterproof membrane, and use a pressing plate to push forward from the back to press while heating;

[0026] When the waterproof membrane is laid in a direction perpendicular to the roof ridge, the heating direction of the overlapped edge of the waterproof membrane is from the edge to the center.

[0027] Preferably, the step S500 includes:

[0028] Pre-cast arc-shaped chamfers at the corners of the roof;

[0029] The waterproof membrane is pushed by the first push rod to roll and lay near the corners;

[0030] The entire waterproof membrane is supported and suspended in the air through an auxiliary supporting structure;

[0031] The outermost layer of the waterproof roll is then pressed toward the corner by a second push rod until it rolls over the entire arc-shaped chamfer. The radius of the second push rod is less than or equal to the radius of the arc-shaped chamfer.

[0032] Preferably, the auxiliary support assembly includes two bases, and arc-shaped plates are fixedly provided on the tops of the two bases, and the two ends of the first push rod are respectively rollingly connected to the inner walls of the two arc-shaped plates.

[0033] Preferably, the step S600 includes:

[0034] The flushing test involves flushing the overlapping joints of the waterproof membrane with water for more than 24 hours, and the flow rate of the flushing water is greater than twice the rain flow rate during the local maximum rainfall;

[0035] The water immersion test uses the waterproof membrane as the bottom surface, the water depth is greater than 200 mm, the immersion time is greater than 24 hours, and the immersion range spans the overlap of two adjacent waterproof membranes.

[0036] Preferably, the step S300 further includes: the overlap width between two adjacent waterproof membranes should be greater than 100 mm.

[0037] Preferably, the step S300 further comprises: when bonding the overlapped part between two waterproof membranes, the modified asphalt layer overflowing from the edge of the bonding part should be larger than 8 mm.

[0038] The invention provides a method for laying a sloped roof waterproofing membrane, which has the following beneficial effects compared with the prior art:

[0039] By selecting the laying direction of the waterproof membrane according to the actual roof slope, different roofs have suitable laying methods. Adjacent waterproof membranes are connected by overlapping, and the overlapping parts are separately connected and focused to ensure the stability of the connection at the position directly in contact with rainwater, thereby ensuring the waterproof performance. Finally, flushing test and soaking test are carried out to simulate the waterproof effect of the roof under heavy rain and the waterproof effect of the roof under water accumulation, respectively, to ensure the stability of the roof waterproofing. BRIEF DESCRIPTION OF THE DRAWINGS

[0040] The drawings constituting a part of this application are used to provide a further understanding of this application, so that other features, purposes and advantages of this application become more obvious. The schematic embodiment drawings and their descriptions of this application are used to explain this application and do not constitute an improper limitation on this application. In the drawings:

[0041] Figure 1 It is the overall flow chart of the present invention;

[0042] Figure 2 is a flow chart of step S200 of the present invention;

[0043] Figure 3 is a flow chart of step S500 of the present invention;

[0044] Figure 4 This is a schematic diagram of the paving overlap of the present invention;

[0045] Figure 5 This is a structural diagram of the overlapping portion of the waterproof membrane of the present invention;

[0046] Figure 6 This is a diagram of the conventional waterproofing coiled material paving method of the present invention;

[0047] Figure 7 It is a structural diagram of the auxiliary support assembly of the present invention.

[0048] Among them: 1. arc chamfer; 2. first push rod; 3. second push rod; 4. base; 5. arc plate; 6. retaining ring. DETAILED DESCRIPTION

[0049] In order to enable those skilled in the art to better understand the solution of the present application, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present application.

[0050] It should be noted that the terms "first", "second", etc. in the specification of the present application and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequential order. It should be understood that the data used in this way can be interchanged where appropriate, so that the embodiments of the present application described here. In addition, the terms "including" and "having" and any of their variations are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device comprising a series of steps or units is not necessarily limited to those steps or units clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.

[0051] In the present application, the terms "upper", "lower", "left", "right", "front", "back", "top", "bottom", "inner", "outer", "middle", "vertical", "horizontal", "lateral", "longitudinal" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the drawings. These terms are mainly used to better describe the present application and its embodiments, and are not used to limit the indicated devices, elements or components to have a specific orientation, or to be constructed and operated in a specific orientation.

[0052] In addition, some of the above terms may be used to express other meanings in addition to indicating orientation or positional relationship. For example, the term "on" may also be used to express a certain dependency or connection relationship in some cases. For those of ordinary skill in the art, the specific meanings of these terms in this application can be understood according to specific circumstances.

[0053] In addition, the term "plurality" shall mean two or more.

[0054] It should be noted that, in the absence of conflict, the embodiments and features in the embodiments of the present application can be combined with each other. The present application will be described in detail below with reference to the accompanying drawings and in combination with the embodiments.

[0055] like Figures 1 to 3 As shown, a method for laying a sloped roof waterproofing membrane comprises the following steps:

[0056] S100. Clean the roof and remove the particles, attachments and various connecting protrusions on the roof; specifically, clean all kinds of construction waste on the roof. If the construction waste is not cleaned up, it is very easy to cause the waterproof membrane to hollow out.

[0057] S200, measuring the slope of the roof, and determining the laying direction of the waterproof membrane according to the roof slope; the step S200 includes:

[0058] When the roof slope is less than 3%, the waterproof membrane is laid parallel to the ridge;

[0059] When the roof slope is between 3% and 15%, the waterproof membrane can be laid parallel to the ridge or perpendicular to the ridge.

[0060] When the roof slope is greater than 15%, the waterproof membrane is laid perpendicular to the ridge.

[0061] Specifically, the operation method of laying waterproof membrane in the direction parallel to the ridge is relatively simple, and the construction personnel are also safer, but the edge of the waterproof membrane after laying is perpendicular to the flow direction of water. The water flow directly impacts the edge of the waterproof membrane, which is easy to cause the edge of the waterproof membrane to roll up, thereby causing the loss of waterproofness. The greater the roof slope, the greater the impact of the water flow. Therefore, when the slope is small, the waterproof membrane can be laid in the direction parallel to the ridge. When the slope is large, the laying direction of the waterproof membrane should be set to be perpendicular to the ridge, that is, parallel to the water flow direction to ensure its waterproof performance. For slopes between 3% and 15%, you can choose according to the local rainfall. If the rainfall is large, lay it perpendicular to the ridge, and if the rainfall is small, lay it parallel to the ridge.

[0062] S300, laying waterproof rolls in sequence from the edge of the roof to the center of the roof, and connecting adjacent rolls in an overlapping manner after laying, but first bonding the non-overlapping parts to the roof, and not melting the bonding layer on the parts connected to the adjacent rolls; step S300 includes:

[0063] When laying waterproof membranes in parallel with the ridge, first lay the waterproof membranes at the edge, and then lay them towards the center of the roof. When overlapping adjacent waterproof membranes, pay attention to overlapping the waterproof membranes near the center on top of the waterproof membranes near the ridge.

[0064] When laying the waterproof membrane in the direction perpendicular to the roof ridge, push the waterproof membrane from the edge of the roof to the center of the roof;

[0065] The step S300 further includes:

[0066] Use a high-pressure blowtorch to evenly heat the modified asphalt layer of the waterproofing membrane. The blowtorch is located at the center line of the angle between the membrane and the roof. The direction of the flame from the blowtorch is in the range of 40° to 50° with the angle between the roof.

[0067] The distance between the blowtorch and the modified asphalt layer is 250mm-350mm;

[0068] After the modified asphalt layer is melted, the waterproof membrane is rolled forward to make it adhere to the roof, and a pressure plate is used to press it to ensure sealing.

[0069] Specifically, when laying parallel to the ridge, laying from the edge to the center can make the contact part of the waterproofing membrane near the center cover the contact part of the waterproofing membrane near the edge, so that the gap of the contact part is opposite to the direction of the water flow, and when the water flows downward, it is not easy for the water flow to directly impact and enter the gap of the contact part, so that the waterproof performance is better; and when laying perpendicular to the ridge direction, it is also laid from the edge to the center, so that the movement direction of the waterproofing membrane is from low to high, the propulsion speed is more controllable, and the modified asphalt layer in a molten state is not easy to flow downward, so that its bonding effect is better. When using a blowtorch for heating, the blowtorch should heat the modified asphalt layer to between 120 and 160 degrees, so that both the bonding performance and the flow performance of the modified asphalt can be guaranteed.

[0070] S400, melt-bonding the overlapped parts with the adjacent rolls separately, and pressing them while melting; the step S400 includes: heating the modified asphalt layer at the overlapped edge of the waterproof roll with a high-pressure blowtorch, and pressing and pressing the layer from the rear to the front with a pressing plate while heating;

[0071] When the waterproof membrane is laid in a direction perpendicular to the roof ridge, the heating direction of the overlapped edge of the waterproof membrane is from the edge to the center.

[0072] Specifically, Figure 4 As shown in the figure, the overlapped part is the part most susceptible to the impact of rain and warping, so the paving should be focused on, and the method of melting and pressing at the same time allows the modified asphalt layer to bond the two modified membranes at the most suitable temperature, and the bonding effect is better. When the waterproof membrane is laid in the direction perpendicular to the roof ridge, the paving method of laying from the edge to the center can reduce the overflow of the modified asphalt layer and make the bonding more stable.

[0073] S500, separately bonding the nodes with edges and corners of the roof to ensure that there are no hollows at the nodes; the step S500 includes:

[0074] Pre-cast arc-shaped chamfers at the corners of the roof 1;

[0075] The waterproofing membrane is pushed by the first push rod 2 to roll and lay near the corners;

[0076] The entire waterproof membrane is supported and suspended in the air through an auxiliary supporting structure;

[0077] The outermost layer of the waterproof membrane is then pushed toward the corner by the second push rod 3 until it rolls over the entire arc-shaped chamfer 1 . The radius of the second push rod 3 is less than or equal to the radius of the arc-shaped chamfer 1 .

[0078] Specifically, Figure 6As shown in FIG. 1 , when laying waterproofing coiled material on a flat roof, the first push rod 2 is inserted into the central axis of the rolled waterproofing coiled material, and then the first push rod 2 is pushed to drive the waterproofing coiled material to roll on the roof to achieve laying. However, Figure 7 As shown in the figure, in places with edges and corners (such as the bottom of the base where a skylight or chimney is installed), the waterproof membrane cannot fit the edges and corners when rolling. The conventional operation is to cut the membrane and then lay it with a pressing plate, which will result in uneven laying and creases on the edges and corners, which are easy to be damaged and lose their waterproof ability. Figure 7 As shown, the waterproof membrane is suspended in the air through an auxiliary supporting structure, and then the second push rod 3 is used to push the outermost layer of the waterproof membrane forward, so that the rolled membrane rotates on the first push rod 2 to release the outermost layer of the waterproof membrane, so that the paving is more even and close. In addition, the circular chamfer 1 is pre-cast at the corners, and because the radius of the second push rod 3 is smaller than the radius of the circular chamfer 1, the second push rod 3 can drive the waterproof membrane to evenly roll over the circular chamfer 1 on the corners, and the waterproof membrane here does not produce creases and is not easy to be damaged, thereby ensuring good waterproof performance.

[0079] The auxiliary support assembly includes two bases 4 , and arc-shaped plates 5 are fixedly provided on the tops of the two bases 4 . The two ends of the first push rod 2 are respectively rollingly connected to the inner walls of the two arc-shaped plates 5 .

[0080] Specifically, the base 4 is placed on the roof, and the two ends of the first push rod 2 are lifted and placed on the curved plate 5. At this time, the first push rod 2 can be idling on the curved plate 5 or the rolled waterproof membrane can be idling on the first push rod 2, and then the outermost layer of the membrane can be released to complete the paving. It should be noted that due to the large inclination angle of some roofs, the supporting area of ​​the base 4 can be increased when placing the base 4 to prevent it from tipping over. In addition, if Figure 7 As shown, a retaining ring 6 can be provided on the first push rod 2 through a thread, and the retaining ring 6 prevents the waterproof membrane from sliding toward the lower side of the first push rod 2 when the inclination angle is too large, and also prevents the first push rod 2 from sliding downward relative to the arc plate 5, thereby ensuring the stability of the laying direction of the waterproof membrane.

[0081] S600, performing a flushing test and a soaking test on the roof to ensure the laying effect; the step S600 includes:

[0082] The flushing test involves flushing the overlapping joints of the waterproof membrane with water for more than 24 hours, and the flow rate of the flushing water is greater than twice the rain flow rate during the local maximum rainfall;

[0083] The water immersion test uses the waterproof membrane as the bottom surface, the water depth is greater than 200 mm, the immersion time is greater than 24 hours, and the immersion range spans the overlap of two adjacent waterproof membranes.

[0084] Specifically, the flushing test and the soaking test are used to simulate the waterproof effect of the roof under heavy rain and the waterproof effect of the roof under water accumulation, respectively, to ensure the stability of the roof waterproofing.

[0085] The step S300 also includes: the overlap width between two adjacent waterproof membranes should be greater than 100 mm; the step S300 also includes: when bonding the overlap between the two waterproof membranes, the modified asphalt layer overflowing from the edge of the bonding should be greater than 8 mm.

[0086] Specifically, Figure 5 As shown, the overlap is the part that is in direct contact with rainwater. A width greater than 100mm can ensure the stability of the bonding. The overflow of the modified asphalt layer is greater than 8mm, which can prevent rainwater from directly impacting the gap at the overlap and ensure the bonding effect.

[0087] By selecting the laying direction of the waterproof membrane according to the actual roof slope, different roofs have suitable laying methods. Adjacent waterproof membranes are connected by overlapping, and the overlapping parts are separately connected and focused to ensure the stability of the connection at the position directly in contact with rainwater, thereby ensuring the waterproof performance. Finally, flushing test and soaking test are carried out to simulate the waterproof effect of the roof under heavy rain and the waterproof effect of the roof under water accumulation, respectively, to ensure the stability of the roof waterproofing.

[0088] The above description is only the preferred embodiment of the present application and is not intended to limit the present application. For those skilled in the art, the present application may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application shall be included in the protection scope of the present application.

Claims

1. A method for laying a sloped roof waterproofing membrane, characterized in that: The laying method comprises the following steps: S100, clean the roof, remove the particles, attachments and various connection protrusions on the roof; S200, measure the slope of the roof, and determine the laying direction of the waterproof membrane according to the roof slope; S300, laying waterproof rolls in sequence from the edge of the roof to the center of the roof, and after laying, adjacent rolls are connected in an overlapping manner, but the non-overlapping parts are first bonded to the roof, and the bonding layer on the part connected to the adjacent roll is not melted first; S400, melting and bonding the overlapping parts with the adjacent coils separately, and pressing them while melting; S500, bond the corners of the roof separately to ensure that there are no hollows at the nodes; S600, conduct flushing test and soaking test on the roof to ensure the laying effect.

2. A method for laying a sloped roof waterproofing membrane as claimed in claim 1, characterized in that: The step S200 includes: When the roof slope is less than 3%, the waterproof membrane is laid parallel to the ridge; When the roof slope is between 3% and 15%, the waterproof membrane can be laid parallel to the ridge or perpendicular to the ridge. When the roof slope is greater than 15%, the waterproof membrane is laid perpendicular to the ridge.

3. A method for laying a sloped roof waterproofing membrane as claimed in claim 2, characterized in that: Step S300 includes: When laying waterproof membranes in parallel with the ridge, first lay the waterproof membranes at the edge, and then lay them towards the center of the roof. When overlapping adjacent waterproof membranes, pay attention to overlapping the waterproof membranes near the center on top of the waterproof membranes near the ridge. When the waterproof membrane is laid in the direction perpendicular to the ridge, the waterproof membrane is laid from the edge of the roof to the center of the roof.

4. A method for laying a sloped roof waterproofing membrane as claimed in claim 1, characterized in that: The step S300 further includes: Use a high-pressure blowtorch to evenly heat the modified asphalt layer of the waterproofing membrane. The blowtorch is located at the center line of the angle between the membrane and the roof. The direction of the flame from the blowtorch is in the range of 40° to 50° with the angle between the roof. The distance between the blowtorch and the modified asphalt layer is 250mm-350mm; After the modified asphalt layer is melted, the waterproof membrane is rolled forward to make it adhere to the roof, and a pressure plate is used to press it to ensure sealing.

5. A method for laying a sloped roof waterproofing membrane as claimed in claim 2, characterized in that: The step S400 includes: Use a high-pressure blowtorch to heat the modified asphalt layer at the edge of the waterproof membrane, and use a pressing plate to push forward from the back to press while heating; When the waterproof membrane is laid in a direction perpendicular to the roof ridge, the heating direction of the overlapped edge of the waterproof membrane is from the edge to the center.

6. A method for laying a sloped roof waterproofing membrane as claimed in claim 1, characterized in that: The step S500 includes: Precasting arc-shaped chamfers at the corners of the roof (1); The waterproofing coiled material is pushed by the first push rod (2) to be rolled and laid near the corners; The entire waterproof membrane is supported and suspended in the air through an auxiliary supporting structure; The outermost layer of the waterproof roll material is then pressed toward the corner by a second push rod (3) until it rolls over the entire arc-shaped chamfer (1); the radius of the second push rod (3) is less than or equal to the radius of the arc-shaped chamfer (1).

7. A method for laying a sloped roof waterproofing membrane as claimed in claim 6, characterized in that: The auxiliary support assembly comprises two bases (4), the tops of the two bases (4) are fixedly provided with arc-shaped plates (5), and the two ends of the first push rod (2) are respectively rollingly connected to the inner walls of the two arc-shaped plates (5).

8. A method for laying a sloped roof waterproofing membrane as claimed in claim 1, characterized in that: The step S600 includes: The flushing test involves flushing the overlapping joints of the waterproof membrane with water for more than 24 hours, and the flow rate of the flushing water is greater than twice the rain flow rate during the local maximum rainfall; The water immersion test uses the waterproof membrane as the bottom surface, the water depth is greater than 200 mm, the immersion time is greater than 24 hours, and the immersion range spans the overlap of two adjacent waterproof membranes.

9. A method for laying a sloped roof waterproofing membrane as claimed in claim 1, characterized in that: The step S300 also includes: the overlap width between two adjacent waterproof membranes should be greater than 100 mm.

10. A method for laying a sloped roof waterproofing membrane as claimed in claim 1, characterized in that: The step S300 also includes: when bonding the overlapped part between two waterproof membranes, the modified asphalt layer overflowing from the edge of the bonding part should be larger than 8 mm.

Citation Information

Patent Citations

  • Building waterproof roll paver

    CN111608335A

  • Hot melting construction method for SBS waterproof coiled material

    CN113738035A

  • Slope roof waterproof roll paving device and method

    CN116357024A

  • Building roof waterproof construction method

    CN116498020A

  • Waterproof roll laying device

    CN215519577U