Design method and system of through type radial suspender arrangement tied-arch bridge
Through the optimization of the finite element calculation model, the power value, tension force and support position are adjusted to solve the problem of large bending stress in the bottom-bearing radial suspension arch bridge, generate a reasonable arch axis, and ensure that the main arch mainly bears the axial direction under load. stress, reducing the risk of bending stress and improving structural stability.
Patent Information
- Application Number
- CN202410803735.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-20
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2044-06-20
AI Technical Summary
It is difficult to find a reasonable arch axis for a tied arch bridge with a down-bearing radial hanger arrangement, resulting in large bending stress in the main arch under load, which may lead to cracking or damage.
By establishing a finite element calculation model of the arch bridge, adjusting the power value, the tension of the side hangers and the moving distance of the supports, the axial stress and bending stress of the main arch are optimized, and reasonable arch axis equations and construction drawings are generated to ensure that the main arch Mainly bear axial stress and reduce bending stress.
Effectively control the bending stress of the main arch, reduce the risk of damage, ensure that the arch bridge mainly bears axial stress under load, and improve the stability and safety of the structure.
Smart Images

Figure CN118821272A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of bridge structures, and in particular to a design method and system for a bottom-supported radial hanger-arranged tied arch bridge. Background Art
[0002] At present, the hangers of the bottom-supported tied arch bridges in bridge engineering mainly adopt vertical hanger system, mesh hanger system, Nelson system and inclined hanger system, among which the vertical hanger system is the most common. In recent years, with the rapid development of urban construction, urban bridges need to consider the aesthetics and landscape creativity more and more. Therefore, there are more and more arch bridges with various special-shaped structural systems. The bottom-supported radial hanger arrangement tied arch bridge belongs to the special-shaped structural system arch bridge, which has outstanding landscape shape and good landscape creativity.
[0003] In the prior art, the reasonable arch axis directly affects the bending stress of the arch bridge. The reasonable arch axis means that when the main arch of the arch bridge satisfies a certain curve equation, the arch bridge only bears axial stress under load, without bending stress or very small bending stress. The reasonable arch axis of a vertical suspender arch bridge is a quadratic parabola, the reasonable arch axis of a stone arch bridge is generally a catenary, and the reasonable arch axis of a jade belt arch bridge is generally a circular curve.
[0004] However, since the hangers of the radial hanger arch bridge are arranged radially, the main arch is subjected to uneven force, making it difficult to find a reasonable arch axis. In addition, while the main arch is under pressure, it also has a large bending stress, which can cause the main arch to crack or be damaged. Summary of the invention
[0005] In view of the defects existing in the prior art, the present application provides a design method and system for a tie-arch bridge with a bottom-supported radial hanger arrangement, which can solve the technical problems in the prior art that it is difficult to find a reasonable arch axis for the tie-arch bridge with a bottom-supported radial hanger arrangement and the bending stress of the main arch is very large.
[0006] In a first aspect, an embodiment of the present application provides a design method for a bottom-supported radial hanger-arranged tied arch bridge, which comprises the following steps:
[0007] Based on the geometric shape, design type and preset power value of the arch bridge, the arch axis equation of the arch bridge is established;
[0008] Based on the arch axis equation, the preset tension force of each side hanger and the moving distance of each support, an initial finite element calculation model of the arch bridge is established, and the axial stress and bending stress of the main arch, as well as the axial stress and bending stress of the tie beam are output;
[0009] By continuously adjusting the power value, a first finite element calculation model corresponding to when the difference between the axial stress of the main arch and the bending stress of the main arch is less than or equal to a preset first threshold is obtained;
[0010] Based on the first finite element calculation model, by continuously adjusting the preset tension force of the hangers on each side, a second finite element calculation model corresponding to the sum of the axial stress of the tie beam and the bending stress of the tie beam is less than or equal to a preset second threshold value is obtained;
[0011] Based on the second finite element calculation model, the construction drawing of the bottom-supported radial hanger arrangement tied arch bridge is generated.
[0012] In combination with the first aspect, in one implementation, after the second finite element calculation model is calculated, the method further includes:
[0013] Based on the second finite element calculation model, by continuously adjusting the moving distance of each support, a third finite element calculation model corresponding to the minimum value of the output bending stress of the main arch is found;
[0014] Based on the third finite element calculation model, a construction drawing of a bottom-supported radial hanger arrangement tied arch bridge is generated.
[0015] In combination with the first aspect, in one implementation, the third finite element calculation model corresponding to the minimum value of the output bending stress of the main arch is found by continuously adjusting the moving distance of each support based on the second finite element calculation model, specifically including:
[0016] S61, moving each support outward by a preset distance simultaneously;
[0017] S62, each time the movement is performed, determining whether the bending stress of the main arch output this time is greater than the bending stress of the main arch output last time, if yes, proceeding to S63; if no, proceeding to S61;
[0018] S63. The second finite element calculation model corresponding to the last movement is changed to the third finite element calculation model, and the process ends.
[0019] In combination with the first aspect, in one implementation, obtaining the arch axis equation of the arch bridge based on the geometric shape, design type and preset power value of the arch bridge specifically includes:
[0020] Based on the geometry and design type of the arch bridge, the parabolic equation of the arch bridge is obtained;
[0021] Substitute the preset power value into the parabola equation of the arch bridge to obtain the arch axis equation of the arch bridge.
[0022] In combination with the first aspect, in one implementation, the preset range of the power value is less than or equal to 2.
[0023] In combination with the first aspect, in one embodiment, the process of obtaining the preset tensioning force of the side hanger includes: multiplying the initial tensioning force of the side hanger by a preset coefficient to obtain the preset tensioning force.
[0024] In combination with the first aspect, in one implementation, according to the formula Calculate the initial tension force F of the side hanger, where G is the deadweight of the beam segment and θ is the angle between the side hanger and the tie beam.
[0025] In combination with the first aspect, in one implementation, the first finite element calculation model corresponding to the difference between the axial stress of the main arch and the bending stress of the main arch obtained by continuously adjusting the power value is less than or equal to a preset first threshold value specifically includes:
[0026] S31, selecting a power value;
[0027] S32, calculating the difference between the axial stress of the main arch and the bending stress of the main arch output by the initial finite element calculation model, and judging whether the difference is less than or equal to a preset first threshold value, if yes, proceeding to S33; if no, proceeding to S34;
[0028] S33, the initial finite element calculation model at this time is the first finite element calculation model, and the process ends;
[0029] S34. After selecting another power value, go to S32.
[0030] In combination with the first aspect, in one implementation, the second finite element calculation model corresponding to the sum of the axial stress of the tie beam and the bending stress of the tie beam being less than or equal to a preset second threshold value obtained by continuously adjusting the preset tension force of each side hanger rod specifically includes:
[0031] S41, applying a preset incremental tension force to each side suspension rod simultaneously;
[0032] S42, calculating the sum of the axial stress of the tie beam and the bending stress of the tie beam output by the first finite element calculation model, and judging whether the sum is less than or equal to a preset second threshold value, if yes, proceeding to S43; if no, proceeding to S41;
[0033] S43. At this time, the first finite element calculation model is the second finite element calculation model, and the process ends.
[0034] In a second aspect, an embodiment of the present application provides a design system for a bottom-supported radial hanger-arranged tied arch bridge, comprising:
[0035] An arch axis equation establishment module, which is used to establish the arch axis equation of the arch bridge based on the geometric shape, design type and preset power value of the arch bridge;
[0036] A model management module, which is used to establish an initial finite element calculation model of the arch bridge based on the arch axis equation, the preset tension force of each side hanger and the moving distance of each support, and output the axial stress and bending stress of the main arch, and the axial stress and bending stress of the tie beam;
[0037] A power value adjustment module, which is used to continuously adjust the power value, and obtain, through the model management module, a first finite element calculation model corresponding to when the difference between the axial stress of the main arch and the bending stress of the main arch is less than or equal to a preset first threshold;
[0038] A side hanger adjustment module, which is used to continuously adjust the preset tension force of each side hanger based on the first finite element calculation model, and obtain a second finite element calculation model corresponding to the sum of the axial stress of the tie beam and the bending stress of the tie beam is less than or equal to a preset second threshold through the model management module;
[0039] A construction drawing generation module is used to generate a construction drawing of a bottom-supported radial hanger arrangement tied arch bridge based on the second finite element calculation model.
[0040] The beneficial effects brought by the technical solution provided by the embodiments of the present application include:
[0041] This application constructs a finite element calculation model of an arch bridge, inputs the arch axis equation, the preset tension force of each side hanger and the moving distance of each support, and outputs the axial stress and bending stress of the main arch, as well as the axial stress and bending stress of the tie beam. By continuously adjusting the power value, a first finite element calculation model corresponding to when the difference between the axial stress of the main arch and the bending stress of the main arch is less than or equal to a preset first threshold is obtained. Based on the first finite element calculation model, by continuously adjusting the preset tension force of each side hanger, a second finite element calculation model corresponding to when the sum of the axial stress of the tie beam and the bending stress of the tie beam is less than or equal to a preset second threshold is obtained. Based on the second finite element calculation model, a construction drawing of a tie arch bridge with a radial hanger arrangement is generated. The construction drawing obtained by this design method obtains a reasonable arch axis equation, and controls the bending stress of the main arch within a reasonable range to ensure that the main arch mainly bears the axial stress and reduces the damage to the main arch by the bending stress. BRIEF DESCRIPTION OF THE DRAWINGS
[0042] Figure 1 A schematic diagram of a design method for a tied arch bridge with radial hangers arranged under the present application;
[0043] Figure 2 This is a structural schematic diagram of a tied arch bridge with radial hangers arranged under the embodiment of the present application;
[0044] Figure 3 A schematic flow chart of a process for obtaining a first finite element calculation model in a design method according to an embodiment of the present application;
[0045] Figure 4 A schematic flow chart of a process for obtaining a second finite element calculation model in a design method according to an embodiment of the present application;
[0046] Figure 5 A schematic flow chart of a process for obtaining a third finite element calculation model in the design method of an embodiment of the present application;
[0047] Figure 6 It is a structural schematic diagram of the design system of the bottom-supported radial hanger arrangement tied arch bridge according to the embodiment of the present application.
[0048] In the figure: 1, main arch; 2, tie beam; 3, hanger; 31, side hanger; 4, support; 5, virtual radial point. DETAILED DESCRIPTION
[0049] In order to enable those skilled in the art to better understand the solution of the present application, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.
[0050] In order to make the objectives, technical solutions and advantages of the present application clearer, the implementation methods of the present application will be further described in detail below in conjunction with the accompanying drawings.
[0051] Figure 2 The structural diagram of the tied arch bridge with radial hangers is shown in Figure 1. Figure 2 As shown, the bottom-supported radial hanger arrangement tie arch bridge includes a main arch 1, a tie beam 2, a hanger 3, a side hanger 31, a support 4 and a virtual radial point 5, wherein the side hanger 31 is the outermost hanger, L is the span, h is the sagittal height, ds is the distance between two adjacent hangers, and H is the distance from the virtual radial point of the hanger to the beam surface.
[0052] In a first aspect, an embodiment of the present application provides a design method for a bottom-supported radial hanger-arranged tied arch bridge.
[0053] In one embodiment, referring to Figure 1 , Figure 1 This is a schematic diagram of the design method of a bottom-supported radial hanger arrangement tied arch bridge in this application. Figure 1 As shown, the design method of the above-mentioned bottom-supported radial hanger arrangement tied arch bridge includes:
[0054] S1. Based on the geometric shape, design type and preset power value of the arch bridge, the arch axis equation of the arch bridge is established.
[0055] S2. Based on the arch axis equation, the preset tension force of each side hanger and the moving distance of each support, the initial finite element calculation model of the arch bridge is established, and the axial stress and bending stress of the main arch, as well as the axial stress and bending stress of the tie beam are output.
[0056] S3. By continuously adjusting the power value, a first finite element calculation model corresponding to the case where the difference between the axial stress of the main arch and the bending stress of the main arch is less than or equal to a preset first threshold value is obtained.
[0057] S4. Based on the first finite element calculation model, by continuously adjusting the preset tensioning force of the hangers on each side, a second finite element calculation model corresponding to the sum of the axial stress of the tie beam and the bending stress of the tie beam is obtained to be less than or equal to a preset second threshold.
[0058] S5. Based on the second finite element calculation model, the construction drawing of the bottom-supported radial hanger arrangement tied arch bridge is generated.
[0059] In this embodiment, by constructing a finite element calculation model of an arch bridge, the arch axis equation, the preset tension force of each side hanger and the moving distance of each support are input, and the axial stress and bending stress of the main arch, as well as the axial stress and bending stress of the tie beam are output. By continuously adjusting the power value, a first finite element calculation model corresponding to the difference between the axial stress of the main arch and the bending stress of the main arch is obtained when it is less than or equal to a preset first threshold. Based on the first finite element calculation model, by continuously adjusting the preset tension force of each side hanger, a second finite element calculation model corresponding to the sum of the axial stress of the tie beam and the bending stress of the tie beam is obtained when it is less than or equal to a preset second threshold, and based on the second finite element calculation model, a construction drawing of a tie arch bridge with a radial hanger arrangement is generated. The construction drawing obtained by this design method obtains a reasonable arch axis equation, and controls the bending stress of the main arch within a reasonable range to ensure that the main arch mainly bears the axial stress and reduces the damage to the main arch by the bending stress.
[0060] In one embodiment, in the above step S1, based on the geometric shape, design type and preset power value of the arch bridge, the arch axis equation of the arch bridge is obtained, which specifically includes:
[0061] Based on the geometry and design type of the arch bridge, the parabolic equation of the arch bridge is obtained;
[0062] Substitute the preset power value into the parabola equation of the arch bridge to obtain the arch axis equation of the arch bridge.
[0063] Specifically, the arch axis of the arch bridge is determined to be a parabola according to the geometric shape of the arch bridge. The span and sagitta of the arch bridge are determined according to the design type of the arch bridge, and the constant factor of the parabola is calculated through the span, sagitta and a preset power value. The power value and the constant factor are substituted into the parabola equation to obtain the arch axis equation of the arch bridge.
[0064] Furthermore, in the above step S1, the preset range of the above power value is less than or equal to 2.
[0065] It should be noted that the arch rib bending moment is closely related to the arch rib shape. For radial hanger arch bridges, the middle hangers have a strong radial constraint on the main arch, while the side hangers have a weak radial constraint on the main arch. Therefore, the two sides of the main arch with a power value of 2 parabola tend to bulge outward, and the main arch is subjected to greater bending stress. The shape of the parabola with a power value less than 2 is more pointed than the parabola with a power value of 2, that is, the two sides of the main arch tend to indent inward, which is exactly opposite to the displacement trend of the main arch, playing a role of offsetting, and the bending stress of the main arch will also be reduced accordingly.
[0066] Preferably, in the above step S3, the power value is continuously adjusted, specifically including: the current power value is the previous power value minus the preset value.
[0067] In this embodiment, the preset value is 0.05, the first power value is 2, the second power value is 2-0.05=1.95, and so on, and the above power values are continuously adjusted.
[0068] Specifically, Figure 3 As shown, Figure 3 The figure is a flow chart of the process of obtaining the first finite element calculation model in the design method of the embodiment of the present application. In the above step S3, by continuously adjusting the power value, the first finite element calculation model corresponding to the difference between the axial stress of the main arch and the bending stress of the main arch is obtained to be less than or equal to the preset first threshold, which specifically includes:
[0069] S31. Select a power value.
[0070] S32, calculating the difference between the axial stress of the main arch and the bending stress of the main arch output by the initial finite element calculation model, and judging whether the difference is less than or equal to a preset first threshold value, if yes, proceeding to S33; if no, proceeding to S34.
[0071] S33. The initial finite element calculation model at this time is the first finite element calculation model, and the process ends.
[0072] S34. After selecting another power value, go to S32.
[0073] It can be understood that the power value is related to the arch axis equation, and adjusting the power value means adjusting the arch axis equation.
[0074] Specifically, the preset first threshold value can be specifically set according to the actual situation, and is not limited here. Among them, the preset first threshold value can preferably be taken as 10. In the initial finite element calculation model, adjust the power value, obtain the axial stress of the main arch and the bending stress of the main arch, calculate the difference between the axial stress of the main arch and the bending stress of the main arch, and judge the size of the difference and the first preset threshold value. If the difference is less than or equal to the first preset threshold value, the initial finite element calculation model at this time is the first finite element calculation model, and the adjustment of the power value is ended. If the difference is greater than the first preset threshold value, another power value is selected until the difference between the axial stress of the main arch and the bending stress of the main arch is less than or equal to the first preset threshold value, and the adjustment of the power value is ended.
[0075] In one embodiment, in the above step S4, according to the formula Calculate the initial tension force F of the side hanger, where G is the deadweight of the beam segment and θ is the angle between the side hanger and the tie beam.
[0076] In this embodiment, the deadweight of the beam section is the deadweight of the beam section connected to the main arch by the side hanger. Substitute the deadweight G of the beam section and the angle between the side hanger and the tie beam into the formula: The initial tension force of the side hanger can be obtained.
[0077] Furthermore, the process of obtaining the preset tensioning force of the above-mentioned side hanger includes: multiplying the initial tensioning force of the side hanger by a preset coefficient to obtain the preset tensioning force.
[0078] It should be noted that, in the first finite element calculation model, adjusting the preset tensioning force of the side hanger usually means applying the preset tensioning force on the basis of the initial tensioning force of the side hanger.
[0079] In this embodiment, the preset coefficient is 0.05, and 0.05 is multiplied by the initial tensioning force of the side suspension rod to obtain the preset tensioning force of the side suspension rod.
[0080] In one embodiment, if Figure 4 As shown, Figure 4 The figure is a flow chart of the process of obtaining the second finite element calculation model in the design method of the embodiment of the present application. In the above step S4, by continuously adjusting the preset tension force of each side suspension rod, the second finite element calculation model corresponding to the sum of the axial stress of the tie beam and the bending stress of the tie beam is less than or equal to the preset second threshold value is obtained, which specifically includes:
[0081] S41. Apply a preset incremental tension force to each side hanger.
[0082] S42, calculating the sum of the axial stress of the tie beam and the bending stress of the tie beam output by the first finite element calculation model, and judging whether the sum is less than or equal to a preset second threshold value, if yes, proceeding to S43; if not, proceeding to S41.
[0083] S43. At this time, the first finite element calculation model is the second finite element calculation model, and the process ends.
[0084] It should be noted that the hangers extend outward from the top or center point of the main arch, similar to the form of radial lines. There are two main arches on the bridge deck, which are symmetrically arranged on the bridge deck along the transverse direction of the bridge. There are four side hangers, which are located at both ends of the main arches. In the bottom-supported radial hanger arrangement tie arch bridge, the middle hanger has a strong radial restraint effect on the main arch, while the side hanger has a weak radial restraint effect on the main arch. In order to increase the radial restraint effect of the side hangers on the main arch and reduce the tendency of the two sides of the main arch to bulge outward, the tension force on the side hangers can be increased.
[0085] In this embodiment, a preset increment of tension is applied to each side suspension rod at the same time, that is, the same preset increment of tension is applied to each side suspension rod at the same time. The preset increment of tension is a fixed value, and the increment of tension applied each time is increased based on the increment of tension applied last time.
[0086] Specifically, the preset second threshold value can be specifically set according to the actual situation and is not limited here. In the first finite element calculation model, a preset increment of tension force is applied to each side hanger to obtain the axial stress of the tie beam and the bending stress of the tie beam, and the sum of the axial stress of the tie beam and the bending stress of the tie beam is calculated. The size of the sum and the preset second threshold value is judged. If the sum is less than or equal to the size of the preset second threshold value, the first finite element calculation model at this time is the second finite element calculation model, and the adjustment of the preset increment of tension force applied to each side hanger is terminated. If the sum is greater than the preset second threshold value, the preset increment of tension force continues to be applied to each side hanger until the sum of the axial stress of the tie beam and the bending stress of the tie beam is less than or equal to the preset second threshold value, and the preset increment of tension force applied to each side hanger is terminated.
[0087] Specifically, in the above step S5, according to the calculation results of the second finite element calculation model and in combination with the actual construction needs, the construction drawings of the bottom-supported radial hanger arrangement tie arch bridge are generated, including plan views and cross-sectional views, as well as related dimension markings, material markings, etc.
[0088] Furthermore, in some embodiments, in the above step S5, after being based on the above second finite element calculation model, it also includes:
[0089] Based on the second finite element calculation model, by continuously adjusting the moving distance of each support, the third finite element calculation model corresponding to the minimum value of the output bending stress of the main arch is found;
[0090] Based on the third finite element calculation model, the construction drawings of the bottom-supported radial hanger arrangement tied arch bridge are generated.
[0091] Specifically, Figure 5 As shown, Figure 5 The following is a flow chart of the process of obtaining the third finite element calculation model in the design method of the embodiment of the present application. Based on the above second finite element calculation model, by continuously adjusting the moving distance of each support, the third finite element calculation model corresponding to the minimum value of the output bending stress of the main arch is found; specifically, it includes:
[0092] S61, moving each support outward by a preset distance simultaneously.
[0093] S62. Each time the movement occurs, determine whether the bending stress of the main arch output this time is greater than the bending stress of the main arch output last time. If yes, proceed to S63; if not, proceed to S61.
[0094] S63. The second finite element calculation model corresponding to the last movement is the third finite element calculation model, and the process ends.
[0095] It should be noted that the arch bridge has four supports, which are located at the junction of the two ends of the main arch and the tie beam to ensure that the vertical force is directly transmitted to the supports. According to the principle of the lever arm, the support has a bending moment at the junction of the main arch and the tie beam, and the direction of the bending moment is clockwise, so the main arch will generate a reverse bending moment, and the direction of the reverse bending moment is counterclockwise. The original bending moment of the main arch is clockwise, so the reverse bending moment of the main arch is exactly opposite to the original bending moment. The reverse bending moment of the main arch caused by the reaction force of the support can offset the original bending moment of the main arch. Since the bending stress of the main arch is proportional to the bending moment, the bending stress of the main arch is reduced.
[0096] In this embodiment, the four supports are moved outwards by a preset distance at the same time, specifically, the four supports are moved outwards by the same distance at the same time. The preset distances that the four supports move outwards are the same each time.
[0097] Specifically, as each support moves outward at the same time, the bending stress of the main arch is a curve with an opening facing upward. Each time it moves, it is determined whether the bending stress of the main arch output this time is greater than the bending stress of the main arch output last time. If so, the second finite element calculation model corresponding to the last movement is the third finite element calculation model, and the simultaneous movement of each support outward by a preset distance ends. If the bending stress of the main arch output this time is less than the bending stress of the main arch output last time, the supports continue to be moved outward by a preset distance at the same time until the third finite element calculation model corresponding to the minimum value of the bending stress of the output main arch is found, and the simultaneous movement of each support outward by a preset distance ends.
[0098] In this embodiment, in the second finite element calculation model, by adjusting the moving distance of each support, the third finite element calculation model corresponding to the minimum value of the output bending stress of the main arch is found, and based on the third finite element calculation model, the construction drawing of the bottom-supported radial hanger arrangement tie arch bridge is generated. In the construction drawing obtained by this design method, due to the outward movement of the support, the bending moment generated by the support on the intersection of the main arch and the tie beam can offset part of the original bending moment of the main arch. Since the bending stress of the main arch is proportional to the bending moment, the bending stress of the main arch is reduced.
[0099] In a second aspect, the present application provides a design system for a bottom-supported radial hanger-arranged tied-arch bridge.
[0100] In one embodiment, referring to Figure 6 , Figure 6 This is a schematic diagram of the structure of the design system of the bottom-supported radial hanger arrangement tied arch bridge in this application. Figure 6 As shown, the design system of the above-mentioned bottom-supported radial hanger arrangement tied arch bridge includes:
[0101] An arch axis equation establishment module, which is used to establish the arch axis equation of the arch bridge based on the geometric shape, design type and preset power value of the arch bridge;
[0102] A model management module, which is used to establish an initial finite element calculation model of the arch bridge based on the arch axis equation, the preset tension force of each side hanger and the movement distance of each support, and output the axial stress and bending stress of the main arch, and the axial stress and bending stress of the tie beam;
[0103] A power value adjustment module, which is used to continuously adjust the power value, and obtain, through the model management module, a first finite element calculation model corresponding to when the difference between the axial stress of the main arch and the bending stress of the main arch is less than or equal to a preset first threshold;
[0104] A side hanger adjustment module, which is used to continuously adjust the preset tension force of each side hanger based on the first finite element calculation model, and obtain a second finite element calculation model corresponding to the sum of the axial stress of the tie beam and the bending stress of the tie beam is less than or equal to a preset second threshold through the model management module;
[0105] A construction drawing generation module is used to generate a construction drawing of a bottom-supported radial hanger arrangement tied arch bridge based on the second finite element calculation model.
[0106] The design system of the bottom-supported radial hanger arrangement tie-arch bridge of this embodiment is applicable to the design method of the bottom-supported radial hanger arrangement tie-arch bridge mentioned above, obtains a reasonable arch axis equation, and controls the bending stress of the main arch within a reasonable range to ensure that the main arch mainly bears axial stress and reduces the damage to the main arch by bending stress.
[0107] A specific example is given below to facilitate understanding of the solution of the present invention.
[0108] Figure 2 The structural diagram of the tied arch bridge with radial hangers is shown in Figure 1. Figure 2 As shown, the bottom-supported radial hanger arrangement tied arch bridge includes a main arch 1, a tie beam 2, a hanger 3, a side hanger 31, a support 4 and a virtual radial point 5. Among them, the side hanger 31 is the outermost hanger, L is the span, h is the rise, ds is the distance between two adjacent hangers, and H is the distance from the virtual radial point of the hanger to the beam surface. In this embodiment, L is 255m, h is 46.3m, ds is 15m, and H is 104.8m.
[0109] This embodiment is designed using the above design method, and the specific data are as follows:
[0110] Combined with the geometric shape and design requirements of the arch bridge, determine the parabola equation of the arch bridge, y = ax n +b.
[0111] After calculation, the power value was determined to be 1.9.
[0112] After calculation, b was determined to be 46.3.
[0113] According to the formula Determine a to be -0.004625.
[0114] According to a, b and power values, we get the specific arch axis equation, y = -0.004625x 1.9 +46.3.
[0115] The preset tension force applied by the side hanger is 3500kN.
[0116] The moving distance of the four supports is 3.55m each.
[0117] The terms "including" and "having" and any variations thereof in the specification and claims of this application and the above-mentioned drawings are intended to cover non-exclusive inclusions. For example, a process, method, system, product or device that includes a series of steps or units is not limited to the listed steps or units, but optionally includes steps or units that are not listed, or optionally includes other steps or units inherent to these processes, methods, products or devices. The terms "first", "second" and "third" are used to distinguish different objects, etc., and do not represent a sequence, nor do they limit "first", "second" and "third" to different types.
[0118] In the description of the embodiments of the present application, "exemplary", "for example" or "for example" are used to indicate examples, illustrations or descriptions. Any embodiment or design described as "exemplary", "for example" or "for example" in the embodiments of the present application should not be interpreted as being more preferred or more advantageous than other embodiments or designs. Specifically, the use of words such as "exemplary", "for example" or "for example" is intended to present related concepts in a specific way.
[0119] In the description of the embodiments of the present application, unless otherwise specified, “ / ” means or, for example, A / B can mean A or B; the “and / or” in the text is merely a description of the association relationship of associated objects, indicating that three relationships may exist, for example, A and / or B can mean: A exists alone, A and B exist at the same time, and B exists alone. In addition, in the description of the embodiments of the present application, “multiple” refers to two or more than two.
[0120] In some processes described in the embodiments of the present application, multiple operations or steps that appear in a specific order are included, but it should be understood that these operations or steps may not be executed in the order in which they appear in the embodiments of the present application or in parallel, and the sequence number of the operation is only used to distinguish the different operations, and the sequence number itself does not represent any execution order. In addition, these processes may include more or fewer operations, and these operations or steps may be executed in sequence or in parallel, and these operations or steps may be combined.
[0121] The above are only preferred embodiments of the present application, and are not intended to limit the patent scope of the present application. Any equivalent structure or equivalent process transformation made using the contents of the present application specification and drawings, or directly or indirectly applied in other related technical fields, are also included in the patent protection scope of the present application.
Claims
1. A design method for a bottom-supported radial hanger-rod tied arch bridge, characterized in that: It includes the following steps: Based on the geometric shape, design type and preset power value of the arch bridge, the arch axis equation of the arch bridge is established; Based on the arch axis equation, the preset tension force of each side hanger and the moving distance of each support, an initial finite element calculation model of the arch bridge is established, and the axial stress and bending stress of the main arch, as well as the axial stress and bending stress of the tie beam are output; By continuously adjusting the power value, a first finite element calculation model corresponding to when the difference between the axial stress of the main arch and the bending stress of the main arch is less than or equal to a preset first threshold is obtained; Based on the first finite element calculation model, by continuously adjusting the preset tension force of the hangers on each side, a second finite element calculation model corresponding to the sum of the axial stress of the tie beam and the bending stress of the tie beam is less than or equal to a preset second threshold value is obtained; Based on the second finite element calculation model, the construction drawing of the bottom-supported radial hanger arrangement tied arch bridge is generated.
2. The design method of a bottom-through radial hanger arrangement tied arch bridge according to claim 1, characterized in that: After the calculation model is based on the second finite element, the method further includes: Based on the second finite element calculation model, by continuously adjusting the moving distance of each support, a third finite element calculation model corresponding to the minimum value of the output bending stress of the main arch is found; Based on the third finite element calculation model, a construction drawing of a bottom-supported radial hanger arrangement tied arch bridge is generated.
3. The design method of a bottom-through radial hanger arrangement tied arch bridge according to claim 2, characterized in that: The method of finding a third finite element calculation model corresponding to the minimum value of the output bending stress of the main arch based on the second finite element calculation model by continuously adjusting the moving distance of each support specifically includes: S61, moving each support outward by a preset distance simultaneously; S62, each time the movement is performed, determining whether the bending stress of the main arch output this time is greater than the bending stress of the main arch output last time, if yes, proceeding to S63; if no, proceeding to S61; S63. The second finite element calculation model corresponding to the last movement is the third finite element calculation model, and the process ends.
4. The design method of a through-type radial hanger arrangement tied arch bridge according to claim 1, characterized in that: The step of obtaining the arch axis equation of the arch bridge based on the geometric shape, design type and preset power value of the arch bridge specifically includes: Based on the geometry and design type of the arch bridge, the parabolic equation of the arch bridge is obtained; Substitute the preset power value into the parabola equation of the arch bridge to obtain the arch axis equation of the arch bridge.
5. The design method of a through-type radial hanger arrangement tied arch bridge according to claim 1, characterized in that: The preset range of the power value is less than or equal to 2.
6. The design method of a through-type radial hanger arrangement tied arch bridge according to claim 1, characterized in that: The process of obtaining the preset tension force of the side suspension rod includes: The initial tensioning force of the side hanger is multiplied by a preset coefficient to obtain a preset tensioning force.
7. The design method of a through-type radial hanger arrangement tied arch bridge according to claim 6, characterized in that: According to the formula Calculate the initial tension force F of the side hanger, where G is the deadweight of the beam segment and θ is the angle between the side hanger and the tie beam.
8. The design method of a through-type radial hanger arrangement tied arch bridge according to claim 1, characterized in that: The first finite element calculation model corresponding to the case where the difference between the axial stress of the main arch and the bending stress of the main arch is less than or equal to a preset first threshold value is obtained by continuously adjusting the power value, specifically comprising: S31, selecting a power value; S32, calculating the difference between the axial stress of the main arch and the bending stress of the main arch output by the initial finite element calculation model, and judging whether the difference is less than or equal to a preset first threshold value, if yes, proceeding to S33; if no, proceeding to S34; S33, the initial finite element calculation model at this time is the first finite element calculation model, and the process ends; S34. After selecting another power value, go to S32.
9. The design method of a through-type radial hanger arrangement tied arch bridge according to claim 1, characterized in that: The second finite element calculation model corresponding to the sum of the axial stress of the tie beam and the bending stress of the tie beam obtained by continuously adjusting the preset tension force of each side hanger rod is less than or equal to the preset second threshold value specifically includes: S41, applying a preset incremental tension force to each side suspension rod simultaneously; S42, calculating the sum of the axial stress of the tie beam and the bending stress of the tie beam output by the first finite element calculation model, and judging whether the sum is less than or equal to a preset second threshold value, if yes, proceeding to S43; if no, proceeding to S41; S43. At this time, the first finite element calculation model is the second finite element calculation model, and the process ends.
10. A design system for a bottom-supported radial hanger-rod tied arch bridge, characterized in that: include: An arch axis equation establishment module, which is used to establish the arch axis equation of the arch bridge based on the geometric shape, design type and preset power value of the arch bridge; A model management module, which is used to establish an initial finite element calculation model of the arch bridge based on the arch axis equation, the preset tension force of each side hanger and the moving distance of each support, and output the axial stress and bending stress of the main arch, and the axial stress and bending stress of the tie beam; A power value adjustment module, which is used to continuously adjust the power value, and obtain, through the model management module, a first finite element calculation model corresponding to when the difference between the axial stress of the main arch and the bending stress of the main arch is less than or equal to a preset first threshold; A side hanger adjustment module, which is used to continuously adjust the preset tension force of each side hanger based on the first finite element calculation model, and obtain a second finite element calculation model corresponding to the sum of the axial stress of the tie beam and the bending stress of the tie beam is less than or equal to a preset second threshold through the model management module; A construction drawing generation module is used to generate a construction drawing of a bottom-supported radial hanger arrangement tied arch bridge based on the second finite element calculation model.
Citation Information
Patent Citations
Method for determining and rapidly realizing bridging optimum cable forces of rigid framework-arc composite bridges
CN108446438A
Arch bridge suspender tension optimization method for rectifying deviation in construction process
CN111581714A
Optimization design method and system for arch bridge with suspender under moving load
CN114707202A
Calculation method, device and equipment for tie bar-stay bar rigid frame arch bridge and storage medium
CN115718853A
Accurate design method for unstressed state line shape and spatial position of steel truss tied arch bridge
CN116484699A
Cited By
Reticular suspender arch bridge design method based on cable membrane method
CN122634725A
