Through the current detection and energy management module of the power dispatching system, the power outage duration is predicted and the power supply strategy is optimized, which solves the problem in the existing technology that the power cannot be switched off in separate ways to respond to different business loads, and extends the battery life of the base station.

CN118825944APending Publication Date: 2024-10-22CHINA MOBILE GRP GUANGDONG CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202311489345.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2023-11-09
Publication Date
2024-10-22

AI Technical Summary

Technical Problem

Existing technology cannot effectively split power off to respond to the backup power needs of base stations with different business loads, affecting the battery life of the base station.

Method used

A power dispatching system is designed, including a power module, a battery module, an energy management module and multiple load modules. Through the current detection device and the energy management module, it predicts the duration of the power outage, determines the power supply strategy, and controls the battery module to provide power to the load with priority. Turn off power to high-priority loads.

Benefits of technology

It realizes differentiated power-off management according to different load frequency bands, extends the battery life of the base station, and ensures that the site will not be down during the mains power outage.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118825944A_ABST
    Figure CN118825944A_ABST
Patent Text Reader

Abstract

The invention relates to a power supply dispatching system, a method, a device, equipment and a medium, and effectively solves the technical problem that the endurance time of a base station is influenced because the standby power requirements of different service load base stations cannot be responded in a shunt power-off manner in the prior art. The power supply dispatching system comprises a power supply module, a battery module, an energy management module and a plurality of load modules, the input end of the power supply module is connected with the battery module and the 220V standard voltage, a plurality of power distribution modules are arranged in the power supply module, and the power distribution modules are in one-to-one correspondence with the load modules through the output end of the power supply module; the battery module is used for supplying power to the power supply module; and the energy management module is used for controlling the power distribution module to disconnect the load module.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present disclosure relates to the fields of cloud platform, infrastructure, and remote control technology, and in particular to a power dispatching system, and methods, devices, equipment, and media thereof. Background Art

[0002] In the related technologies, the base station construction mode of operators in the communication industry has shifted to the CRAN minimalist site construction mode. As the remote base station RRU / AAU, it is generally powered by an outdoor small integrated DC power supply product (also called a blade power supply product), and the DC power input is AC power. When the AC power is working normally, the blade power supply converts the AC power into 48V DC power, and the DC power is provided to the corresponding load equipment and backup battery charging through DC power distribution. When the AC power is out, the backup battery is provided to the corresponding load equipment through DC power distribution, and the backup battery is in a discharged state. When the voltage of the backup battery of a general site is lower than 44V during discharge, in order to protect the battery from over-discharge damage, the working branch of the base station RRU / AAU load equipment will be disconnected. However, the existing technology cannot achieve branch power-off to respond to the backup power requirements of base stations with different business loads, which in turn affects the battery life of the base station. Summary of the invention

[0003] In order to solve the above technical problems, the present disclosure provides a power scheduling system, and its method, device, equipment and medium, which effectively solves the technical problem that the prior art cannot achieve power supply division to respond to the backup power requirements of base stations with different business loads, thereby affecting the battery life of the base station.

[0004] In a first aspect, an embodiment of the present disclosure provides a power scheduling system, the system comprising: a power module, a battery module, an energy management module and a plurality of load modules, wherein:

[0005] The input end of the power module is connected to the battery module and the 220V standard voltage. The power module has multiple distribution modules built in. Each distribution module corresponds to the load module one by one through the output end of the power module.

[0006] The battery module is used to provide backup power to the power module;

[0007] The energy management module is used to control the power distribution module to disconnect the connected load modules.

[0008] In a possible implementation, in the system provided by the embodiment of the present invention, each power distribution module is further provided with a current detection device;

[0009] The current detection device is used to detect the current value of the power distribution module and feed the current value back to the energy management module.

[0010] In a second aspect, an embodiment of the present disclosure provides a power scheduling method, the method comprising:

[0011] Obtain historical power outage record information from the power dispatch system;

[0012] Predict the duration of the next power outage based on historical power outage record information;

[0013] During the predicted power outage duration, the battery module of the power dispatching system is controlled by the energy management module to supply power to the load of the power dispatching system.

[0014] In a possible implementation, in the method provided by the embodiment of the present invention, predicting the predicted power outage duration of the next power outage based on historical power outage record information includes:

[0015] Inputting historical power outage record information into the site mains power outage duration model to obtain the output result of the site mains power outage duration model;

[0016] The predicted duration of the next power outage is determined based on the output results.

[0017] In a possible implementation, in the method provided by the embodiment of the present invention, within the predicted power outage duration, the energy management module controls the battery module of the power dispatching system to supply power to the load of the power dispatching system, including:

[0018] Determine the power supply strategy of the power dispatch system based on the predicted power outage duration and the battery capacity of the battery module;

[0019] The load modules to be shut down are determined based on the power supply strategy, and the power supply of the shut down load modules is turned off.

[0020] In a possible implementation, in the method provided in the embodiment of the present invention, determining the power supply strategy of the power scheduling system according to the predicted power outage duration and the battery capacity of the battery module includes:

[0021] Determine the power information of each load module;

[0022] The power supply strategy of the power dispatching system is determined based on the predicted power outage duration and power information, as well as the battery capacity of the battery module.

[0023] In a second aspect, an embodiment of the present disclosure provides a power scheduling device, the device comprising:

[0024] An acquisition unit, which acquires historical power outage record information of a power dispatching system;

[0025] A prediction unit, which predicts the duration of the next power outage based on historical power outage record information;

[0026] The processing unit predicts the duration of the power outage and controls the battery module of the power dispatching system through the energy management module to supply power to the load of the power dispatching system.

[0027] In a possible implementation manner, in the device provided by the embodiment of the present invention, the prediction unit is specifically used for:

[0028] Input the historical power outage record information into the site power outage duration model to obtain the output result of the site power outage duration prediction;

[0029] The predicted duration of the next power outage is determined based on the output results.

[0030] In a possible implementation manner, in the device provided by the embodiment of the present invention, the processing unit is specifically used for:

[0031] Determine the power supply strategy of the power dispatch system based on the predicted power outage duration and the battery capacity of the battery module;

[0032] The load modules to be shut down are determined based on the power supply strategy, and the power supply of the shut down load modules is turned off.

[0033] In a possible implementation manner, in the device provided by the embodiment of the present invention, the processing unit is specifically used for:

[0034] Determine the power information of each load module;

[0035] The power supply strategy of the power dispatching system is determined based on the predicted power outage duration and power information, as well as the battery capacity of the battery module.

[0036] In a fourth aspect, an embodiment of the present disclosure provides an electronic device, including:

[0037] Memory;

[0038] Processor; and

[0039] Computer programs;

[0040] The computer program is stored in the memory and is configured to be executed by the processor to implement the power scheduling method as described above.

[0041] In a fifth aspect, an embodiment of the present disclosure provides a computer-readable storage medium having a computer program stored thereon, and when the computer program is executed by a processor, the steps of the power scheduling method as described above are implemented.

[0042] The embodiment of the present disclosure provides a power scheduling system, including a power module, a battery module, an energy management module, and multiple load modules, wherein the input end of the power module is connected to the battery module and the 220V standard voltage, the power module has multiple distribution modules built in, each distribution module corresponds to a load module one by one through the output end of the power module, the battery module is used to supply power to the power module, and the energy management module is used to control the load module to disconnect the distribution module. The system provided by the present disclosure can realize differentiated power-off function management of multi-frequency sites through the energy management module, that is, the power-off priority can be set according to different load frequency bands, and different power-off strategies can be executed according to the instructions of the network management host computer to realize independent power-off of different load frequency bands. BRIEF DESCRIPTION OF THE DRAWINGS

[0043] The accompanying drawings, which are incorporated in and constitute a part of this specification, illustrate embodiments consistent with the present disclosure and, together with the description, serve to explain the principles of the present disclosure.

[0044] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, for ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative labor.

[0045] Figure 1 A schematic diagram of the structure of a power dispatching system provided as background technology;

[0046] Figure 2 A schematic diagram of the structure of a power dispatching system provided in an embodiment of the present disclosure;

[0047] Figure 3 A schematic diagram of a specific structure of a power dispatching system provided by an embodiment of the present disclosure;

[0048] Figure 4 A flowchart of a power scheduling method provided by an embodiment of the present disclosure;

[0049] Figure 5 A schematic diagram of a specific flow chart of a power scheduling method provided in an embodiment of the present disclosure

[0050] Figure 6 A schematic diagram of a power scheduling method provided by an embodiment of the present disclosure

[0051] Figure 7 A schematic diagram of the structure of a power scheduling device provided in an embodiment of the present disclosure;

[0052] Figure 8 A schematic diagram of the structure of an electronic device provided in an embodiment of the present disclosure. DETAILED DESCRIPTION

[0053] In order to more clearly understand the above-mentioned objectives, features and advantages of the present disclosure, the scheme of the present disclosure will be further described below. It should be noted that the embodiments of the present disclosure and the features in the embodiments can be combined with each other without conflict.

[0054] In the following description, many specific details are set forth to facilitate a full understanding of the present disclosure, but the present disclosure may also be implemented in other ways different from those described herein; it is obvious that the embodiments in the specification are only part of the embodiments of the present disclosure, rather than all of the embodiments.

[0055] In the related technologies, the base station construction mode of the communication industry operators has changed to the CRAN minimalist construction mode. As the remote base station RRU / AAU, it is generally powered by outdoor small integrated DC power products (also called blade power products), and the DC power input is the mains. When the mains is working normally, the blade power converts the AC power of the mains into 48V DC power, and the DC power is provided to the corresponding load equipment and backup battery charging through DC distribution.

[0056] In the prior art, when the city power outage occurs, Figure 1 As shown in the figure, the backup battery is supplied to the corresponding load equipment through DC power distribution, and the backup battery is in a discharged state. When the voltage of the backup battery of a general site is lower than 44V during discharge, in order to protect the battery from over-discharge damage, the working branch of the base station RRU / AAU load equipment will be disconnected. In this way, it is impossible to respond to the backup power requirements of base stations with different business loads by powering off the branch, which in turn affects the battery life of the base station.

[0057] Figure 2 A schematic diagram of the structure of a power scheduling system provided in an embodiment of the present disclosure includes a power module 201, a battery module 202, an energy management module 203, and multiple load modules 204, wherein:

[0058] The input end of the power module 201 is connected to the battery module 202 and the 220V standard voltage. The power module 201 has multiple power distribution modules built in. Each power distribution module corresponds to the load module 204 through the output end of the power module 202.

[0059] The battery module 202 is used to supply power to the power module 201;

[0060] The energy management module 203 is used to control the power distribution module to disconnect the connected load module 204 .

[0061] Each power distribution module is also provided with a current detection device, which is used to detect the current value of the power distribution module and feed the current value back to the energy management module.

[0062] In one example, the power module is a blade power supply, and the power scheduling system is as follows: Figure 3 As shown in the figure, the energy network management platform, i.e., the energy management module, is deployed on the cloud platform, and the blade power supply is connected to the energy network management platform deployed on the cloud. Through the current detection and switch of the blade power supply DC, the power consumption detection and power supply status control of a single RRU or AAU load can be realized. Among them, each branch of the DC power distribution is an independent branch, and each branch has current detection and switching functions, which can execute the closing and disconnection of each branch according to the instructions of the network management host computer. The blade power supply and RRU / AAU integrate signal communication through the power supply line, which can realize the correspondence between the DC distribution branch and the RRU / AAU service type, and then support the power-off control of the RRU / AAU power supply end according to the network management remote management strategy. When the AC mains power outage occurs, the base station RRU / AAU can realize the scheduling optimization of remote power-off on demand according to the business characteristics.

[0063] Figure 4 A schematic diagram of a power scheduling method provided in an embodiment of the present disclosure, specifically comprising: Figure 4 The following steps S401 to S403 are shown:

[0064] S401. Obtain historical power outage record information of the power dispatching system.

[0065] During specific implementation, the historical power outage record information can be determined through recorded historical information, and the historical power outage record information of the location of the power dispatching system can also be obtained from the outside.

[0066] S402: Predict the duration of the next power outage based on historical power outage record information.

[0067] In the specific implementation, the historical power outage record information is used to predict the input into the site mains power outage duration model to obtain the predicted power outage duration of the next power outage. Alternatively, the historical power outage record information can be first input into the site mains power outage duration model to obtain the output result of the site mains power outage duration prediction.

[0068] S403: During the predicted power outage duration, the energy management module controls the battery module of the power dispatching system to supply power to the load of the power dispatching system.

[0069] In specific implementation, the backup power duration of the battery is first calculated based on the predicted power outage duration and the battery capacity of the battery module, and then the power supply strategy of the power scheduling system is determined based on the backup power duration. Then, the load modules to be shut down are determined based on the power supply strategy, and the power supply of the shut down load modules is turned off. When determining the power supply strategy of the power scheduling system, the power information of each load module can be determined first, and then the backup power duration of the battery is calculated based on the predicted power outage duration and power information, as well as the battery capacity of the battery module, and then the power supply strategy of the power scheduling system is determined based on the backup power duration.

[0070] In this step, the model can be used to determine the power information of each load module.

[0071] Figure 5 A specific flow chart of a power scheduling method provided by an embodiment of the present disclosure specifically includes the following steps: Figure 5 The following steps S501 to S504 are shown:

[0072] S501. Obtain historical power outage record information of a power dispatching system.

[0073] During specific implementation, the historical power outage record information can be determined through recorded historical information, and the historical power outage record information of the location of the power dispatching system can also be obtained from the outside.

[0074] S502: Predict the duration of the next power outage based on historical power outage record information.

[0075] During the specific implementation, a site mains power outage duration model is established. The model input information includes site level, mains power quality, power outage time period, and historical power outage duration. The site level is information automatically obtained by the network management setting, and R is the site level definition (VIP site, important site, general site). Usually, the importance of mains power restoration at important sites is improved, and the corresponding power outage duration will be reduced; the mains power quality I is obtained by statistics based on historical operation information after the site is put into operation, and its default value is "medium", which is iteratively calculated and changed according to the actual power outage frequency of the site; the power outage time period t (00:00-08:00, 08:00-16:00, 16:00-00:00) is mainly considered according to the different distribution of daytime and nighttime periods, and is converted into the response time when the site power is restored; the historical power outage duration T records the power outage durations after the site is operated, and its average value is used as the prediction input information for calculation.

[0076] S=RC(I,R,t,T)

[0077] The impact coefficient of each input information is assigned according to the following table, among which the category of mains power quality is adjusted according to the statistics of the number of power outages per month.

[0078]

[0079] In an example, if an important site has experienced three power outages in its historical operation, with each outage lasting 1.2h, 1.3h, and 1.5h respectively; but the site has less than one power outage per month and is a site with priority in municipal power quality, when the next power outage occurs within the time period of 16:00-00:00, it can be predicted that the outage duration will be [(1.2h+1.3h+1.5h) / 3-0.3h]*1.2=1.24h.

[0080] S503: Determine a power supply strategy of the power dispatching system according to the predicted power outage duration and the battery capacity of the battery module.

[0081] In specific implementation, the power supply strategy of the power scheduling system can be determined based on the predicted power outage time, predicted power outage duration and battery capacity of the battery module. The power supply strategy can also be determined by referring to the power information of each load module. Specifically, a model is used to determine the power information of each load module.

[0082] In one example, a site branch load power consumption model is established, which includes the load frequency band attributes, service attributes, blade power supply branch, load power information, and battery capacity information of each site. In the site load power consumption model, the backup power duration of the site can be calculated based on the battery capacity. According to the following table, the load power of the three logical base stations at site 1 is 4390W and the battery capacity is 100AH, which can be calculated to be 1.14h. The load power is a typical power consumption value, and the scheduling will be calculated according to the real-time power value during scheduling.

[0083]

[0084] The calculation formula for the backup time of the battery in the battery module is:

[0085]

[0086] Where, t is the battery backup time (h), C is the total battery capacity (Ah), and W is the load power (W);

[0087] 1.25 is the aging coefficient, 1.04 is the voltage coefficient, and Vr is the rated voltage of the battery pack (V) (48 for -48V system).

[0088] Then, a dynamic comparison is made based on the predicted value of the mains outage duration and the calculated value of the site backup power duration, and the optimized power-off strategy for different loads is implemented according to the following process to achieve the best backup power duration of the site. Among them, when the backup power duration is insufficient, the capacity layer base station is powered off first. When the capacity layer includes more than two logical base stations, the power is powered off in the order of NR4.9>LNR2.6>NR700>TDD FA>GL1800>GL900 according to the backup power duration difference; when only the coverage layer frequency band is working, the backup power duration is not met and the power is not turned off.

[0089] Taking the load model of site 1 as an example, the site load has three logical base stations GL900 / L1800, NR700 and NR4.9, with a total power of 4390W. Among them, the NR700 and NR4.9 bands are capacity layer loads. According to the set workflow, they are priority loads to be powered off. GL900 / L1800 is a coverage layer band with the lowest power-off priority. This site is an important site. According to the historical power outage model, the power outage duration is predicted to be 1.24h, while the site backup power duration is 1.14h. The site backup power duration is less than the predicted mains power outage duration. When the AC mains power is cut off, the power-off priority system determines that the NR4.9 band with the highest power-off priority will be set to a power-off command. After the NR4.9 band load is powered off, the site power is refreshed to 2090W. The system dynamically calculates the site backup power duration to be 1.76h. The site backup power duration is greater than the predicted mains power outage duration. The remaining NR700 band load continues to work. In the above working process, if the total power consumption of the site is less than 4036W, when the mains power outage meets the requirement that the site backup power duration is longer than the predicted mains power outage duration, the NR4.9 band load will not be powered off, and the power-off strategy will be executed based on the comparison of the dynamic changes in load power.

[0090] S504: Determine the load modules to be shut down based on the power supply strategy, and shut down the power supply of the shut down load modules.

[0091] In specific implementation, the strategy in step S503 is used to shut down the power supply of the shut down load module. Figure 6 As shown in the figure, the blade power supply can be uniformly dispatched to power off through the energy network management platform, and the predicted mains outage duration can be compared with the battery backup duration information to achieve more accurate equipment power-off management, which can extend the backup power working time of the equipment in the site coverage layer frequency band and ensure that the site does not shut down during the mains outage period. Differentiated power-off function management can be achieved for multiple frequencies of the site, that is, power-off priority can be set according to different load frequency bands, and different power-off strategies can be executed according to the instructions of the network management host computer to achieve independent power-off of different load frequency bands.

[0092] Figure 7The power scheduling device 700 provided in the embodiment of the present disclosure can execute the processing flow provided in the above power scheduling method embodiment, such as Figure 7 As shown, the power scheduling device 700 includes an acquisition unit 701, a prediction unit 702 and a processing unit 703, wherein:

[0093] An acquisition unit 701 acquires historical power outage record information of a power dispatching system;

[0094] A prediction unit 702 predicts the duration of the next power outage based on historical power outage record information;

[0095] The processing unit 703 controls the battery module of the power dispatching system through the energy management module to supply power to the load of the power dispatching system within the predicted power outage duration.

[0096] In a possible implementation manner, in the device provided by the embodiment of the present invention, the prediction unit 702 is specifically used for:

[0097] Input the historical power outage record information into the site power outage duration model to obtain the output result of the site power outage duration prediction;

[0098] The predicted duration of the next power outage is determined based on the output results.

[0099] In a possible implementation manner, in the device provided by the embodiment of the present invention, the processing unit 703 is specifically used for:

[0100] Determine the power supply strategy of the power dispatch system based on the predicted power outage duration and the battery capacity of the battery module;

[0101] The load modules to be shut down are determined based on the power supply strategy, and the power supply of the shut down load modules is turned off.

[0102] In a possible implementation manner, in the device provided by the embodiment of the present invention, the processing unit 703 is specifically used for:

[0103] Determine the power information of each load module;

[0104] The power supply strategy of the power dispatching system is determined based on the predicted power outage duration and power information, as well as the battery capacity of the battery module.

[0105] Figure 8 The power scheduling device of the illustrated embodiment can be used to execute the technical solution of the above-mentioned method embodiment, and its implementation principle and technical effect are similar and will not be repeated here.

[0106] In addition, combined Figure 4-Figure 7 The power scheduling method and apparatus described in the embodiments of the present application may be implemented by an electronic device. Figure 8 A schematic diagram of the hardware structure of an electronic device provided in an embodiment of the present application is shown.

[0107] like Figure 8 As shown, the electronic device 800 may include a processing device (e.g., a central processing unit, a graphics processor, etc.) 801, which can perform various appropriate actions and processes according to a program stored in a read-only memory (ROM) 802 or a program loaded from a storage device 808 to a random access memory (RAM) 803 to implement the power scheduling method of the embodiment described in the present disclosure. In the RAM 803, various programs and data required for the operation of the electronic device 800 are also stored. The processing device 801, the ROM 802, and the RAM 803 are connected to each other via a bus 804. An input / output (I / O) interface 805 is also connected to the bus 804.

[0108] Typically, the following devices may be connected to the I / O interface 805: input devices 806 including, for example, a touch screen, a touch pad, a keyboard, a mouse, a camera, a microphone, an accelerometer, a gyroscope, etc.; output devices 807 including, for example, a liquid crystal display (LCD), a speaker, a vibrator, etc.; storage devices 808 including, for example, a magnetic tape, a hard disk, etc.; and communication devices 809. The communication device 809 may allow the electronic device 800 to communicate with other devices wirelessly or by wire to exchange data. Although Figure 8 The electronic device 800 is shown with various devices, but it should be understood that it is not required to implement or possess all the devices shown. More or fewer devices may be implemented or possessed instead.

[0109] In particular, according to an embodiment of the present disclosure, the process described above with reference to the flowchart can be implemented as a computer software program. For example, an embodiment of the present disclosure includes a computer program product, which includes a computer program carried on a non-transitory computer-readable medium, and the computer program includes a program code for executing the method shown in the flowchart, thereby implementing the voice control method as described above. In such an embodiment, the computer program can be downloaded and installed from the network through the communication device 809, or installed from the storage device 808, or installed from the ROM 802. When the computer program is executed by the processing device 801, the above-mentioned functions defined in the method of the embodiment of the present disclosure are executed.

[0110] It should be noted that the computer-readable medium disclosed above may be a computer-readable signal medium or a computer-readable storage medium or any combination of the above two. The computer-readable storage medium may be, for example, but not limited to, an electrical, magnetic, optical, electromagnetic, infrared, or semiconductor system, device or device, or any combination of the above. More specific examples of computer-readable storage media may include, but are not limited to: an electrical connection with one or more wires, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the above. In the present disclosure, a computer-readable storage medium may be any tangible medium containing or storing a program that may be used by or in combination with an instruction execution system, device or device. In the present disclosure, a computer-readable signal medium may include a data signal propagated in a baseband or as part of a carrier wave, in which a computer-readable program code is carried. This propagated data signal may take a variety of forms, including but not limited to an electromagnetic signal, an optical signal, or any suitable combination of the above. The computer readable signal medium may also be any computer readable medium other than a computer readable storage medium, which may send, propagate or transmit a program for use by or in conjunction with an instruction execution system, apparatus or device. The program code contained on the computer readable medium may be transmitted using any suitable medium, including but not limited to: wires, optical cables, RF (radio frequency), etc., or any suitable combination of the above.

[0111] In some embodiments, the client and the server may communicate using any currently known or future developed network protocol such as HTTP (HyperText Transfer Protocol), and may be interconnected with any form or medium of digital data communication (e.g., a communication network). Examples of communication networks include a local area network ("LAN"), a wide area network ("WAN"), an internet (e.g., the Internet), and a peer-to-peer network (e.g., an ad hoc peer-to-peer network), as well as any currently known or future developed network.

[0112] The computer-readable medium may be included in the electronic device, or may exist independently without being incorporated into the electronic device.

[0113] The computer-readable medium carries one or more programs. When the one or more programs are executed by the electronic device, the electronic device:

[0114] Obtain historical power outage record information from the power dispatch system;

[0115] Predict the duration of the next power outage based on historical power outage record information;

[0116] During the predicted power outage duration, the battery module of the power dispatching system is controlled by the energy management module to supply power to the load of the power dispatching system.

[0117] Optionally, when the above one or more programs are executed by the electronic device, the electronic device may also execute other steps described in the above embodiments.

[0118] Computer program code for performing the operations of the present disclosure may be written in one or more programming languages ​​or a combination thereof, including, but not limited to, object-oriented programming languages, such as Java, Smalltalk, C++, and conventional procedural programming languages, such as "C" or similar programming languages. The program code may be executed entirely on the user's computer, partially on the user's computer, as a separate software package, partially on the user's computer and partially on a remote computer, or entirely on a remote computer or server. In cases involving a remote computer, the remote computer may be connected to the user's computer through any type of network, including a local area network (LAN) or a wide area network (WAN), or may be connected to an external computer (e.g., through the Internet using an Internet service provider).

[0119] The flow chart and block diagram in the accompanying drawings illustrate the possible architecture, function and operation of the system, method and computer program product according to various embodiments of the present disclosure. In this regard, each square box in the flow chart or block diagram can represent a module, a program segment or a part of a code, and the module, the program segment or a part of the code contains one or more executable instructions for realizing the specified logical function. It should also be noted that in some implementations as replacements, the functions marked in the square box can also occur in a sequence different from that marked in the accompanying drawings. For example, two square boxes represented in succession can actually be executed substantially in parallel, and they can sometimes be executed in the opposite order, depending on the functions involved. It should also be noted that each square box in the block diagram and / or flow chart, and the combination of the square boxes in the block diagram and / or flow chart can be implemented with a dedicated hardware-based system that performs a specified function or operation, or can be implemented with a combination of dedicated hardware and computer instructions.

[0120] The units involved in the embodiments described in the present disclosure may be implemented by software or hardware, wherein the name of a unit does not, in some cases, limit the unit itself.

[0121] The functions described above herein may be performed at least in part by one or more hardware logic components. For example, without limitation, exemplary types of hardware logic components that may be used include: field programmable gate arrays (FPGAs), application specific integrated circuits (ASICs), application specific standard products (ASSPs), systems on chips (SOCs), complex programmable logic devices (CPLDs), and the like.

[0122] In the context of the present disclosure, a machine-readable medium may be a tangible medium that may contain or store a program for use by or in conjunction with an instruction execution system, device, or equipment. A machine-readable medium may be a machine-readable signal medium or a machine-readable storage medium. A machine-readable medium may include, but is not limited to, an electronic, magnetic, optical, electromagnetic, infrared, or semiconductor system, device, or equipment, or any suitable combination of the foregoing. A more specific example of a machine-readable storage medium may include an electrical connection based on one or more lines, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the foregoing.

[0123] The present disclosure provides a power scheduling system, including:

[0124] It includes a power module, a battery module, an energy management module, and multiple load modules, wherein the input end of the power module is connected to the battery module and the 220V standard voltage, the power module has multiple distribution modules built in, each distribution module corresponds to a load module one by one through the output end of the power module, the battery module is used to supply power to the power module, and the energy management module is used to control the distribution module to disconnect the connected load module. The system provided by the present disclosure can realize differentiated power-off function management of multi-frequency sites through the energy management module, that is, the power-off priority can be set according to different load frequency bands, and different power-off strategies can be executed according to the instructions of the network management host computer to realize independent power-off of different load frequency bands.

[0125] Those skilled in the art will appreciate that the embodiments of the present application may be provided as methods, systems, or computer program products. Therefore, the present application may adopt the form of a complete hardware embodiment, a complete software embodiment, or an embodiment in combination with software and hardware. Moreover, the present application may adopt the form of a computer program product implemented in one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) that include computer-usable program code.

[0126] The present application is described with reference to the flowcharts and / or block diagrams of the methods, devices (systems), and computer program products according to the embodiments of the present application. It should be understood that each process and / or box in the flowchart and / or block diagram, as well as the combination of the processes and / or boxes in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to generate a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.

[0127] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.

[0128] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.

[0129] Although the preferred embodiments of the present application have been described, those skilled in the art may make additional changes and modifications to these embodiments once they have learned the basic creative concept. Therefore, the appended claims are intended to be interpreted as including the preferred embodiments and all changes and modifications falling within the scope of the present application.

[0130] Obviously, those skilled in the art can make various changes and modifications to the present invention without departing from the spirit and scope of the present invention. Thus, if these modifications and variations of the present invention fall within the scope of the claims of the present invention and their equivalents, the present invention is also intended to include these modifications and variations.

Claims

1. A power dispatching system, characterized in that: The system includes a power module, a battery module, an energy management module and a plurality of load modules, wherein: The input end of the power module is connected to the battery module and the 220V standard voltage. The power module has multiple power distribution modules built in. Each of the power distribution modules corresponds to a load module one by one through the output end of the power module. The battery module is used to provide backup power to the power module; The energy management module is used to control the power distribution module to disconnect the connected load module.

2. The system according to claim 1, characterized in that Each of the power distribution modules is also provided with a current detection device; The current detection device is used to detect the current value of the power distribution module and feed back the current value to the energy management module.

3. A power scheduling method, characterized in that: The method comprises: Obtain historical power outage record information from the power dispatch system; Predicting the duration of the next power outage based on the historical power outage record information; During the predicted power outage duration, the battery module of the power dispatching system is controlled by the energy management module to supply power to the load of the power dispatching system.

4. The method according to claim 3, characterized in that The predicting the duration of the next power outage based on the historical power outage record information includes: Inputting the historical power outage record information into the site mains power outage duration model to obtain an output result of the site mains power outage duration model; The duration of the next power outage is determined based on the output result.

5. The method according to claim 4, characterized in that The predicting power outage duration, controlling the battery module of the power dispatching system through the energy management module to supply power to the load of the power dispatching system, includes: Determining a power supply strategy of the power scheduling system according to the predicted power outage duration and the battery capacity of the battery module; A load module to be shut down is determined based on the power supply strategy, and power supply to the shut down load module is turned off.

6. The method according to claim 5, characterized in that The step of determining the power supply strategy of the power scheduling system according to the predicted power outage duration and the battery capacity of the battery module includes: Determine the power information of each load module; The power supply strategy of the power scheduling system is determined according to the predicted power outage duration and the power information, as well as the battery capacity of the battery module.

7. A power dispatching device, characterized in that: The device comprises: An acquisition unit, which acquires historical power outage record information of a power dispatching system; A prediction unit, which predicts the predicted power outage duration of the next power outage based on the historical power outage record information; The processing unit controls the battery module of the power dispatching system through the energy management module to supply power to the load of the power dispatching system within the predicted power outage duration.

8. The device according to claim 7, characterized in that The prediction unit is specifically used for: Inputting the historical power outage record information into the site mains power outage duration model to obtain an output result of the site mains power outage duration model; The next predicted power outage duration is determined based on the output result.

9. The device according to claim 8, characterized in that The processing unit is specifically used for: Determining a power supply strategy of the power scheduling system according to the predicted power outage duration and the battery capacity of the battery module; A load module to be shut down is determined based on the power supply strategy, and power supply to the shut down load module is turned off.

10. The device according to claim 9, characterized in that The processing unit is specifically used for: Determine the power information of each load module; The power supply strategy of the power scheduling system is determined according to the predicted power outage duration and the power information, as well as the battery capacity of the battery module.

11. An electronic device, characterized in that: include: Memory; processor; as well as Computer programs; The computer program is stored in the memory and is configured to be executed by the processor to implement the power scheduling method as described in any one of claims 3 to 6.

12. A computer-readable storage medium having computer program instructions stored thereon, characterized in that: When the computer program instructions are executed by a processor, a power scheduling method as described in any one of claims 3 to 6 is implemented.