Array type high-altitude wind power generation maximum scheduling method based on DDPG
By adopting an array dispatching method based on DDPG in the high-altitude wind power generation system, using dual network architecture and real-time monitoring system, the problem of insufficient efficiency and stability of high-altitude wind power generation is solved, and efficient wind power generation and system stability are improved.
Patent Information
- Application Number
- CN202410894613.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-04
- Publication Date
- 2024-10-22
AI Technical Summary
Existing technology makes it difficult to fully utilize wind energy in high-altitude environments and improve the efficiency and stability of high-altitude wind power generation. Advanced control algorithms and a large amount of computing resources are required to ensure system stability and maximize power output.
An array-type high-altitude wind power generation maximization scheduling method based on DDPG is used to simulate the operating environment of the high-altitude wind power generation system, establish a system environment model, define the state space and action space, design the reward function, and build a dual network architecture and improved depth The deterministic policy gradient algorithm is used for model training, and the real-time monitoring system is used to optimize model parameters to achieve intelligent scheduling and optimization.
It significantly improves the power generation efficiency and system stability, solves the shortcomings of traditional high-altitude wind power generation systems in dispatch optimization, system stability and energy efficiency optimization, and achieves efficient wind power generation, which has broad application prospects and economic value.
Smart Images

Figure CN118826164A_ABST
Abstract
Description
Technical Field
[0001] The present invention mainly relates to the technical field of wind power generation, and in particular to a DDPG-based array high-altitude wind power generation maximization scheduling method. Background Art
[0002] With the development of wind power generation technology, people are looking for more efficient and stable ways to utilize wind energy. High-altitude wind energy has gradually attracted attention due to its characteristics of fast wind speed and good stability. High-altitude wind power generation technology has greater potential for power generation, which is mainly attributed to three factors: first, with the increase in altitude, the wind speed increases significantly, increasing the potential for power generation; second, the wind flow at high altitude has better stability and continuity, so that wind power generation is no longer affected by ground wind speed fluctuations, thereby achieving more stable power generation; third, because high-altitude wind power generation is not affected by terrain, it is suitable for various complex terrains and marine environments.
[0003] However, how to make full use of wind energy in high-altitude environments and improve the efficiency and stability of high-altitude wind power generation is still a problem that needs to be solved. In order to achieve efficient scheduling of wind power generation systems, deep reinforcement learning (DRL) technology has received widespread attention in recent years. DRL simulates the interaction between the agent and the environment and learns the optimal control strategy to achieve efficient decision-making in a complex dynamic environment. This strategy maximizes the use of wind energy and requires comprehensive consideration of various factors, such as wind speed, wind direction, energy requirements of the aircraft, and other factors that may affect the efficiency of power transmission. Currently, these complex tasks require advanced control algorithms and a large amount of computing resources to ensure the stability of the system and maximize power output. Summary of the invention
[0004] In view of the technical problems existing in the prior art, the present invention provides a DDPG-based array high-altitude wind power generation maximization scheduling method for improving power generation efficiency and power output stability.
[0005] In order to solve the above technical problems, the technical solution proposed by the present invention is:
[0006] A method for maximizing the generation of wind power in an array based on DDPG, comprising the following steps:
[0007] Simulate the operating environment of the high-altitude wind power generation system, establish the system environment model, define the state space and action space, and design the reward function;
[0008] Construct a dual network architecture and an improved deep deterministic policy gradient algorithm to train the model, and obtain the final system environment model to be applied to the intelligent scheduling of wind power generation in high-altitude wind farms;
[0009] The specific process of building a dual network architecture and an improved deep deterministic policy gradient algorithm to train the model is as follows:
[0010] Construct a dual network, namely the main network and the target network; the main network is used to generate the current strategy and value evaluation; the target network is used to copy the parameters from the main network through a soft update strategy;
[0011] Storing and utilizing historical data through the experience replay mechanism to optimize the target strategy network and target value network;
[0012] Use the monitoring system of the high-altitude wind power generation system to monitor the working status and environmental changes of the high-altitude wind power generation system, and continuously optimize the model parameters.
[0013] Preferably, the state space S includes the wind speed v w 、wind directionθ w 、Airship position p b , mooring rope tension T, pod angle θ c Wind channel status f c ;
[0014] S=[v w ,θ w ,p b ,θ c ,f c ,T] (1).
[0015] Preferably, the action space a includes adjusting the heading angle α of the airship b 、Floating platform position p f and wind turbine operating status e;
[0016] e=[T g ,Beta,P] (2)
[0017] a=[α b ,P f ,e] (3)
[0018] The working state e of the wind turbine group includes the rotation speed T g , pitch angle Beta and generator power P.
[0019] Preferably, the reward function is based on the instantaneous power output P of the wind power generation system. output Calculations are performed with the goal of maximizing total power output;
[0020] The reward function R is divided into the power output term P output and the system stability penalty term S output , specifically:
[0021]
[0022] Among them, λ T is the mooring rope tension penalty coefficient, T is the current mooring rope tension, T max It is the maximum tension allowed in the mooring rope.
[0023] Preferably, during the model training process, an experience replay buffer is used to store the experience of the agent's interaction with the environment, and a small batch of data is randomly sampled from the experience replay buffer for training. The target value is calculated as follows:
[0024]
[0025] Among them, r is the immediate reward, γ is the discount factor, s′ is the state of the next time step, Q target is the target value network, is the current learnable parameter of the target value network, π target is the target policy network; the update of the value network is as follows:
[0026]
[0027] where y i is the target Q value, which is the weighted value of the immediate reward and the future reward, N is the size of the small batch data, Q primary is the main value network, s i and a i They are the current state and action respectively.
[0028] Preferably, the parameters θ of the main value network are updated by a gradient descent algorithm Q , the gradient update process is as follows:
[0029]
[0030] where α Q is the learning rate of the current value network, is the gradient of the joint loss function calculated by the current value network.
[0031] Preferably, the process of updating the target policy network by copying from the primary value network via the soft update policy is:
[0032] θ target -τ·θ primary +(1-τ)θ target (8)
[0033] where τ∈(0,1) is the soft update rate parameter.
[0034] The present invention also discloses a computer program product, comprising a computer program, wherein the computer program executes the steps of the method described above when executed by a processor.
[0035] The present invention further discloses a computer-readable storage medium on which a computer program is stored. When the computer program is executed by a processor, the steps of the method described above are executed.
[0036] The present invention also discloses a computer device, comprising a memory and a processor connected to each other, wherein a computer program is stored in the memory, and when the computer program is run by the processor, the steps of the method described above are executed.
[0037] Compared with the prior art, the advantages of the present invention are:
[0038] The power maximization scheduling method of the array high-altitude wind power generation system based on tethered airships of the present invention realizes intelligent scheduling and optimization through an improved deep deterministic policy gradient (DDPG) algorithm, combined with a dual network architecture and a real-time monitoring system; specifically includes system environment modeling, defining a comprehensive state and action space; designing a comprehensive reward function, taking into account both power output maximization and system stability; constructing a main network and a target network, and improving training stability through a soft update mechanism; using real-time monitoring to dynamically adjust model parameters to ensure that the system operates efficiently under different environmental conditions; and optimizing control variables through experience replay and batch learning to achieve intelligent scheduling. This method effectively solves the deficiencies of traditional high-altitude wind power generation systems in scheduling optimization, system stability, and energy efficiency optimization, significantly improves power generation efficiency and system stability, and has broad application prospects and economic value. BRIEF DESCRIPTION OF THE DRAWINGS
[0039] Figure 1 This is a multi-layer array layout diagram of the high-altitude wind power generation system in the present invention.
[0040] Figure 2 Schematic diagram of the interaction between the intelligent agent and the high-altitude wind farm in the present invention; (a) is a diagram of the interaction process between the intelligent agent and the environment; (b) is a diagram of the specific application of the intelligent agent in the high-altitude wind farm. DETAILED DESCRIPTION
[0041] The present invention is further described below in conjunction with the accompanying drawings and specific embodiments.
[0042] The DDPG-based array high-altitude wind power generation maximization scheduling method of the embodiment of the present invention is applied to the array high-altitude wind power generation system of the tethered airship, such as Figure 1As shown, a multi-layer array layout of a high-altitude wind power generation system is shown. The tethered airships and wind turbines in each layer of the array are arranged at a specific spacing to maximize the use of wind energy. The wind direction is shown by the arrow, from left to right, and the wind turbines capture wind energy to generate electricity.
[0043] like Figure 2 As shown, the power maximization scheduling method of the array high-altitude wind power generation system based on the tethered airship in the embodiment of the present invention specifically includes the following steps:
[0044] First, the system environment model is established to define the state space, including factors such as wind speed, wind direction, airship position, and mooring rope tension; the action space is defined, including adjusting the airship heading angle, floating platform position and other control variables; a reward function based on power output is designed to maximize power output;
[0045] The dual network architecture and the improved Deep Deterministic Policy Gradient (DDPG) algorithm are used for model training, specifically:
[0046] Construct a dual network architecture, namely the main network and the target network; the main network is used to generate the current strategy and perform value evaluation. It is the network used by the intelligent agent when making decisions in the actual environment; it selects the optimal action (Action) according to the current state (State) and evaluates the value of this action (Value); the target network is used to copy the parameters from the main network through a soft update strategy to imitate the behavior of the main network; the target network is the network used by the intelligent agent to generate target values (Target Values), and its parameters are usually copied from the main network regularly, but the update frequency is low, which can ensure a stable target value during the update process, which is conducive to the stability of training and learning;
[0047] During the training process, historical data is stored and utilized through the experience replay mechanism, a small batch of data is sampled for training, and the target strategy network and target value network are optimized to achieve the goal of maximizing power output;
[0048] Use a real-time monitoring system to monitor the working status and environmental changes of the wind power generation system, and then combine the experience playback data to continuously optimize the parameters of the model's main network to improve power generation efficiency and power output stability; at the same time, regularly update the parameters of the main network to the target network to maintain the timeliness of the target network. The above process ensures that the intelligent agent can adapt to changing environmental conditions, and at the same time continuously improve the model parameters through experience playback and data provided by the monitoring system, thereby improving the overall efficiency and stability of the high-altitude wind power generation system.
[0049] In specific applications, such as Figure 2As shown, the high-altitude wind farm includes multiple tethered airships and wind turbines. The intelligent agent uses the control strategy generated by the deep neural network to schedule its behavior and selects the corresponding action according to the current state to optimize the power generation.
[0050] The power maximization scheduling method of the array high-altitude wind power generation system based on tethered airships of the present invention realizes intelligent scheduling and optimization through an improved deep deterministic policy gradient (DDPG) algorithm, combined with a dual network architecture and a real-time monitoring system; specifically includes system environment modeling, defining a comprehensive state and action space; designing a comprehensive reward function, taking into account both power output maximization and system stability; constructing a main network and a target network, and improving training stability through a soft update mechanism; using real-time monitoring to dynamically adjust model parameters to ensure that the system operates efficiently under different environmental conditions; and optimizing control variables through experience replay and batch learning to achieve intelligent scheduling. This method effectively solves the deficiencies of traditional high-altitude wind power generation systems in scheduling optimization, system stability, and energy efficiency optimization, significantly improves power generation efficiency and system stability, and has broad application prospects and economic value.
[0051] In order to better understand the above technical solution, the above technical solution will be described in detail below in conjunction with the accompanying drawings and specific implementation methods.
[0052] The specific steps of the array high-altitude wind power generation scheduling method based on DDPG are as follows:
[0053] 1) Establish a system environment model: simulate the operating environment of the high-altitude wind power generation system, define the state space and action space of the system, and design the reward function;
[0054] Specifically, the state space S includes the wind speed v q 、wind directionθ w 、Airship position p b , mooring rope tension T, pod angle θ c Wind channel status f c ;
[0055] S=[v w ,θ w ,p b ,θ c ,f c ,T] (1)
[0056] The action space a includes adjusting the heading angle α of the airship b 、Floating platform position p f , wind turbine working status e;
[0057] e=[T g ,Beta,P] (2)
[0058] a=[α b ,p f ,e] (3)
[0059] The working state of the wind turbine is defined as the torque T g , pitch angle Beta and generator power P.
[0060] The reward function is based on the instantaneous power output P of the wind power generation system. output Calculation is performed with the goal of maximizing the total power output; the reward function R is divided into the power output term P output and the system stability penalty term S output , specifically:
[0061]
[0062] Among them, λ T is the mooring rope tension penalty coefficient, T is the current mooring rope tension, T max is the maximum tension allowed by the mooring rope; by maximizing P output To improve power output and obtain more electrical energy benefits; through the tether tension penalty term, when the tether tension T exceeds the maximum tension T max Penalties are imposed from time to time to keep the system within a safe operating range, avoid mechanical failures and extend equipment life.
[0063] 2) Construct a dual network architecture and an improved DDPG algorithm for model training: Use the experience replay buffer to store the experience of the agent's interaction with the environment, randomly sample a small batch of data from the experience replay buffer for training, and calculate the target value as follows:
[0064]
[0065] r is the immediate reward, γ is the discount factor, s′ is the state of the next time step, Q target is the target value network, is the current learnable parameter of the target value network, π target is the target policy network, and the update of the value network is as follows:
[0066]
[0067] where y i The target Q value is the weighted value of the immediate reward and the future reward, N is the size of the small batch data, Q primary is the main value network, s i and a i They are the current state and action respectively.
[0068] Update the parameters θ of the main value network through the gradient descent algorithm Q, the gradient update process is as follows:
[0069]
[0070] where α Q is the learning rate of the current main value network, is the gradient of the joint loss function calculated by the current main value network.
[0071] The process of soft updating the target policy network is:
[0072] θ target ←τ·θ primary +(1-τ)θ arget (8)
[0073] where τ∈(0,1) is the soft update rate parameter.
[0074] 3) Real-time monitoring and optimization: Use the sensors and data acquisition devices of the high-altitude wind power generation system to monitor the working status of the wind power generation system (such as the heading angle of the airship, the position of the floating platform) and environmental changes in real time, and continuously optimize the model parameters based on the monitoring data to improve the power generation efficiency and stability;
[0075] 4) Deployment and verification: Deploy the trained model to the actual high-altitude wind power generation system to verify the effectiveness of the model and ensure stable and efficient operation of the system.
[0076] The power maximization scheduling method of the array high-altitude wind power generation system based on tethered airships of the present invention breaks through the terrain limitations of traditional wind power generation systems, fully utilizes high-altitude strong wind energy, significantly improves the efficiency and stability of wind power generation, and has broad application prospects and economic value; the method achieves the maximization of power generation by combining a dual network architecture and an improved deep deterministic policy gradient (DDPG) algorithm; through intelligent scheduling, various control variables are optimized to improve power generation efficiency and power output stability.
[0077] The present invention also discloses a computer program product, including a computer program, which executes the steps of the above method when executed by a processor. The present invention further discloses a computer-readable storage medium, which stores a computer program, which executes the steps of the above method when executed by a processor. The present invention also discloses a computer device, including a memory and a processor connected to each other, the memory storing a computer program, which executes the steps of the above method when executed by the processor. The product, medium and device of the present invention all correspond to the above method and also have the advantages described in the above method.
[0078] The present invention implements all or part of the processes in the above-mentioned embodiment method, and can also be completed by hardware related to computer program instructions. The computer program can be stored in a computer-readable storage medium, and the computer program can implement the steps of the above-mentioned method embodiment when executed by the processor. Among them, the computer program includes computer program code, and the computer program code can be in source code form, object code form, executable file or some intermediate form. Computer-readable storage media include: any entity or device that can carry computer program code, recording medium, U disk, mobile hard disk, disk, optical disk, computer memory, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), electric carrier signal, telecommunication signal and software distribution medium. The memory is used to store computer programs and / or modules, and the processor implements various functions by running or executing computer programs and / or modules stored in the memory, and calling data stored in the memory. The memory may include high-speed random access memory and may also include non-volatile memory, such as a hard disk, an internal memory, a plug-in hard disk, a smart media card (SMC), a secure digital (SD) card, a flash card (Flash Card), at least one disk storage device, a flash memory device, or other volatile solid-state storage devices.
[0079] The above are only preferred embodiments of the present invention, and the protection scope of the present invention is not limited to the above embodiments. All technical solutions under the concept of the present invention belong to the protection scope of the present invention. It should be pointed out that for ordinary technicians in this technical field, some improvements and modifications without departing from the principle of the present invention should be regarded as the protection scope of the present invention.
Claims
1. A method for maximizing the generation of wind power in an array based on DDPG, characterized in that: Includes steps: Simulate the operating environment of the high-altitude wind power generation system, establish the system environment model, define the state space and action space, and design the reward function; Construct a dual network architecture and an improved deep deterministic policy gradient algorithm to train the model, and obtain the final system environment model to be applied to the intelligent scheduling of wind power generation in high-altitude wind farms; The specific process of building a dual network architecture and an improved deep deterministic policy gradient algorithm to train the model is as follows: Construct a dual network, namely the main network and the target network; the main network is used to generate the current strategy and value evaluation; the target network is used to copy the parameters from the main network through a soft update strategy; Storing and utilizing historical data through the experience replay mechanism to optimize the target strategy network and target value network; Use the monitoring system of the high-altitude wind power generation system to monitor the working status and environmental changes of the high-altitude wind power generation system, and continuously optimize the model parameters.
2. The DDPG-based array high-altitude wind power generation maximization scheduling method according to claim 1 is characterized in that: The state space S includes the wind speed v w 、wind directionθ w 、Airship position p b , mooring rope tension T, pod angle θ c Wind channel status f c ; S=[v w ,the w ,p b ,the c ,f c ,T] (1).
3. The DDPG-based array high-altitude wind power generation maximization scheduling method according to claim 2 is characterized in that: The action space a includes adjusting the heading angle α of the airship b 、Floating platform position p f and wind turbine operating status e; e=[T g ,Beta,P] (2) a=[α b ,p f ,e] (3) The working state e of the wind turbine group includes the rotation speed T g , pitch angle Beta and generator power P.
4. The DDPG-based array high-altitude wind power generation maximization scheduling method according to claim 2 or 3, characterized in that: The reward function is based on the instantaneous power output P of the wind power generation system. output Calculations are performed with the goal of maximizing total power output; The reward function R is divided into the power output term P output and the system stability penalty term S output , specifically: Among them, λ T is the mooring rope tension penalty coefficient, T is the current mooring rope tension, T max It is the maximum tension allowed in the mooring rope.
5. The DDPG-based array high-altitude wind power generation maximization scheduling method according to claim 4 is characterized in that: During model training, the experience replay buffer is used to store the experience of the agent's interaction with the environment. A small batch of data is randomly sampled from the experience replay buffer for training. The target value is calculated as follows: Among them, r is the immediate reward, γ is the discount factor, s′ is the state of the next time step, Q target is the target value network, is the current learnable parameter of the target value network, π target is the target policy network; the update of the value network is as follows: where y i is the target Q value, which is the weighted value of the immediate reward and the future reward, N is the size of the small batch data, Q primary is the main value network, s i and a i They are the current state and action respectively.
6. The DDPG-based array high-altitude wind power generation maximization scheduling method according to claim 5 is characterized in that: Update the parameters θ of the main value network through the gradient descent algorithm Q , the gradient update process is as follows: where α Q is the learning rate of the current value network, is the gradient of the joint loss function calculated by the current value network.
7. The DDPG-based array high-altitude wind power generation maximization scheduling method according to claim 6 is characterized in that: The process of updating the target policy network by copying the parameters from the main value network through the soft update policy is: i target ←t·i primary +(1-τ)θ target (8) where τ∈(0,1) is the soft update rate parameter.
8. A computer program product, comprising a computer program, characterized in that When the computer program is executed by a processor, the steps of the method according to any one of claims 1 to 7 are performed.
9. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the computer program performs the steps of the method according to any one of claims 1 to 7.
10. A computer device comprising a memory and a processor connected to each other, wherein a computer program is stored in the memory, characterized in that: When the computer program is executed by a processor, the computer program performs the steps of the method according to any one of claims 1 to 7.
