Site planning method and device, terminal equipment and storage medium
By analyzing and weighting the positioning data of user equipment at 5G base station sites, and combining coverage and value characteristics, a site planning grid network is generated, which solves the limitations of site planning evaluation in the existing technology and achieves a more comprehensive site location planning.
Patent Information
- Application Number
- CN202410216966.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-27
- Publication Date
- 2024-10-22
AI Technical Summary
Existing technology cannot effectively evaluate the value of 5G base station sites in the dual dimensions of coverage and traffic, resulting in limitations and one-sidedness in site planning evaluation.
By obtaining user equipment positioning data, a device location raster network is generated, and each raster is analyzed for coverage characteristics and value characteristics. Weighted summary is performed to generate a site planning raster network, and planning is carried out by combining the two dimensions of coverage and value.
It achieves a more comprehensive planning of site locations, solves the limitations of existing methods for site planning assessment, and provides a more accurate 5G base station site value assessment.
Smart Images

Figure CN118828531A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of data analysis, and in particular to a site planning method, device, terminal equipment and storage medium. Background Art
[0002] With the progress and development of society, 5G technology, as an innovation engine in the field of communications, is profoundly changing people's lives and working methods. 5G base stations, as the basic modules for building 5G networks, play a vital role in the field of mobile communications. These base stations not only carry the wireless communication and data transmission needs of the majority of users, but also provide support for a variety of functions such as leisure and entertainment. With the gradual advancement of 5G network construction, China has gradually realized a two-layer network architecture that combines the breadth coverage of low-frequency networks with the capacity coverage of medium-frequency networks. However, after the 5G network has taken shape, the traditional simple and crude scattered site construction method is no longer applicable. Instead, it is replaced by the flag-planting 5G base station site planning and evaluation of value-added network construction.
[0003] At present, the value planning schemes for sites are mainly based on grid aggregation schemes, high-traffic group expansion schemes, and network complaints and test-driven schemes. However, the above methods cannot complete the value assessment of 5G base station sites under the dual-dimensional fusion of coverage and traffic, and have certain limitations and one-sidedness. Summary of the invention
[0004] The main purpose of the present invention is to provide a site planning method, apparatus, terminal equipment and storage medium, which can solve the limitation problem of site planning evaluation.
[0005] To achieve the above object, the present invention provides a site planning method, the method comprising:
[0006] Obtaining location data of several user devices;
[0007] Processing a pre-generated initial grid network according to the plurality of user equipment positioning data to obtain a device location grid network, wherein the device location grid network includes a plurality of grids;
[0008] Analyzing the network coverage characteristics of the plurality of grids to generate a coverage characteristic grid network;
[0009] Analyzing the network value characteristics of the plurality of grids to generate a value characteristic grid network;
[0010] The coverage characteristic grid network and the value characteristic grid network are weighted and aggregated to obtain a site planning grid network.
[0011] Optionally, the step of acquiring positioning data of a plurality of user equipments includes:
[0012] Obtaining several user equipment measurement reports;
[0013] Extracting cell beam information according to the plurality of user equipment measurement reports, where the cell beam information includes a beam identification number and a beam receiving power;
[0014] Calculate signal energy according to the beam identification number and the beam receiving power, determine the target beam, and obtain the user equipment arrival angle according to the preset cell working parameters and the beam pattern of the target beam;
[0015] The device position is located according to the arrival angle of the user equipment to obtain user equipment positioning data.
[0016] Optionally, the step of locating the device position according to the arrival angle of the user equipment to obtain user equipment positioning data includes:
[0017] Calculate the distance between the device and the site according to the delay information and the path delay information to obtain a calculation result, wherein the delay information and the path delay information are included in the user equipment measurement report;
[0018] Performing single-cell positioning on the device position according to the calculation result and the arrival angle of the user equipment to obtain a single-cell positioning result;
[0019] The single cell positioning result is corrected by using a preset regression model to obtain user equipment positioning data.
[0020] Optionally, the step of analyzing the network coverage characteristics of the plurality of grids to generate a coverage characteristic grid network includes:
[0021] Determine the network type of the user equipment and obtain a determination result;
[0022] Acquire, by a preset measurement rule, level data reported by the user equipment according to the judgment result, the level data including a level value and a level type residence ratio;
[0023] The coverage characteristics of the plurality of grids are determined according to the level values and the level type residence ratios, and coverage characteristics are assigned to the plurality of grids according to the coverage characteristics of the plurality of grids to obtain a coverage characteristic grid network.
[0024] Optionally, the step of analyzing the network value characteristics of the plurality of grids to generate a value characteristic grid network includes:
[0025] Detect the traffic and code stream of several grids to obtain the traffic code stream information of several grids;
[0026] Classifying the traffic code flow information of the plurality of grids according to a preset traffic code flow value table to obtain a classification result;
[0027] A value characteristic grid network is generated according to a preset value scoring table and the classification results.
[0028] Optionally, the step of weighting and aggregating the coverage characteristic grid network and the value characteristic grid network to obtain a site planning grid network includes:
[0029] Obtaining weighting factors through preset weighting rules;
[0030] The coverage characteristic grid network and the value characteristic grid network are weighted and summarized according to the weighting factor to obtain a weighted result;
[0031] The weighted results are scored to obtain a site planning grid network.
[0032] Optionally, after the step of weighting and aggregating the coverage characteristic grid network and the value characteristic grid network to obtain the site planning grid network, the step includes:
[0033] Sorting the site scores according to the site planning grid network to obtain a score sorting result;
[0034] The score sorting result is judged by a preset score threshold to obtain a judgment result, and the score sorting result is processed according to the judgment result.
[0035] The present application also provides a site planning device, the site planning device comprising:
[0036] A grid processing module, used to obtain positioning data of several user devices;
[0037] A signal acquisition module processes a pre-generated initial grid network according to the plurality of user equipment positioning data to obtain a device location grid network, wherein the device location grid network includes a plurality of grids;
[0038] A coverage characteristic analysis module, used to analyze the network coverage characteristics of the plurality of grids and generate a coverage characteristic grid network;
[0039] A value characteristic analysis module, used to analyze the network value characteristics of the plurality of grids and generate a value characteristic grid network;
[0040] The weighted aggregation module is used to perform weighted aggregation on the coverage characteristic grid network and the value characteristic grid network to obtain a site planning grid network.
[0041] An embodiment of the present application further proposes a terminal device, which includes a memory, a processor, and a site planning program stored in the memory and executable on the processor, wherein the site planning program implements the steps of the site planning method described above when executed by the processor.
[0042] The embodiment of the present application further provides a computer-readable storage medium, on which a site planning program is stored. When the site planning program is executed by a processor, the steps of the site planning method described above are implemented.
[0043] The embodiment of the present application further provides a computer program product, on which a site planning program is stored. When the site planning program is executed by a processor, the steps of the site planning method described above are implemented.
[0044] The site planning method, apparatus, terminal device and storage medium proposed in the embodiments of the present application obtain positioning data of several user devices; process the pre-generated initial grid network according to the positioning data of the several user devices to obtain a device location grid network, wherein the device location grid network includes several grids; analyze the network coverage characteristics of the several grids to generate a coverage characteristic grid network; analyze the network value characteristics of the several grids to generate a value characteristic grid network; perform weighted aggregation of the coverage characteristic grid network and the value characteristic grid network to obtain a site planning grid network, since user devices can connect to the network through the base station site at any location within the radiation range of the site signal, and when When a user connects to the network through a base station site, the site can obtain the user equipment positioning data within the site signal radiation range. Therefore, after generating the initial grid network, the user equipment location grid network can be obtained through the obtained user equipment positioning data. The grid network includes several grids. By analyzing the network coverage characteristics and network value characteristics of several grids in the grid network, a coverage characteristic grid network and a value characteristic grid network can be generated respectively. Finally, the above two networks are weighted and summarized to obtain a site planning grid network. The site planning grid network obtained by this method combines the two dimensions of coverage and value at the same time, and can plan the site location more comprehensively, solving the limitation problem of existing methods for site planning evaluation. BRIEF DESCRIPTION OF THE DRAWINGS
[0045] Figure 1 This is a schematic diagram of the functional modules of the terminal equipment to which the site planning device of this application belongs;
[0046] Figure 2 A flowchart of a first exemplary embodiment of a site planning method of the present application;
[0047] Figure 3A flowchart of a second exemplary embodiment of a site planning method of the present application;
[0048] Figure 4 A schematic diagram of a third exemplary embodiment of a site planning method of the present application;
[0049] Figure 5 A flowchart of a fourth exemplary embodiment of a site planning method of the present application;
[0050] Figure 6 This is a schematic diagram of the measurement rules for the coverage characteristics of the site planning method of this application;
[0051] Figure 7 This is a schematic diagram of weighted merging of coverage characteristics for the site planning method of this application;
[0052] Figure 8 A schematic diagram of a grid network covering the characteristics of the site planning method for this application;
[0053] Fig. 9 A flowchart of a fifth exemplary embodiment of a site planning method of the present application;
[0054] Fig.10 This is the traffic and bitstream two-dimensional nine-square relationship diagram of the site planning method for this application;
[0055] Fig.11 This is a schematic diagram of the value characteristic grid network of the site planning method for this application;
[0056] Fig.12 A flowchart of a sixth exemplary embodiment of the site planning method of the present application;
[0057] Fig.13 This is a weighted schematic diagram of a dual grid network for the site planning method of this application;
[0058] Fig.14 A flowchart of a seventh exemplary embodiment of the site planning method of the present application;
[0059] Fig.15 This is a schematic diagram of the site value and site score ranking of the site planning method for this application;
[0060] Fig.16 This is a schematic diagram of the overall process of the site planning method for this application.
[0061] The realization of the purpose, functional features and advantages of the present invention will be further explained in conjunction with embodiments and with reference to the accompanying drawings. DETAILED DESCRIPTION
[0062] It should be understood that the specific embodiments described herein are only used to explain the present invention, and are not used to limit the present invention.
[0063] The main solution of the embodiment of the present application is: by obtaining a number of user equipment positioning data; processing the pre-generated initial grid network according to the said number of user equipment positioning data to obtain a device location grid network, wherein the device location grid network includes a number of grids; analyzing the network coverage characteristics of the said number of grids to generate a coverage characteristic grid network; analyzing the network value characteristics of the said number of grids to generate a value characteristic grid network; weighted summarizing the said coverage characteristic grid network and the said value characteristic grid network to obtain a site planning grid network, since the user equipment can connect to the network through the base station site at any location within the radiation range of the site signal, and when the user passes the base station site When making a network connection, the site can obtain the user equipment positioning data within the site signal radiation range. Therefore, after generating the initial grid network, the user equipment location grid network can be obtained through the obtained user equipment positioning data. The grid network includes several grids. By analyzing the network coverage characteristics and network value characteristics of several grids in the grid network, a coverage characteristic grid network and a value characteristic grid network can be generated respectively. Finally, the above two networks are weighted and summarized to obtain a site planning grid network. The site planning grid network obtained by this method combines the two dimensions of coverage and value at the same time, which can plan the site location more comprehensively and solve the limitations of existing methods for site planning evaluation.
[0064] This embodiment takes into account that with the development and progress of society, 5G technology, as an innovation engine in the field of communications, is profoundly changing people's lives and working methods. 5G base station sites, as the basic modules for building 5G networks, play a vital role in the field of mobile communications. However, after the 5G network has taken shape, the traditional simple and crude scattered site construction method is no longer applicable. Instead, it is replaced by the flag-planting 5G base station site planning and evaluation of value-added network construction. The current value planning scheme for sites is mainly based on grid aggregation schemes, high-traffic group expansion schemes, and network complaints and test-driven schemes. However, the above method cannot complete the value evaluation of 5G base station sites under the dual-dimensional fusion of coverage and traffic, and has certain limitations and one-sidedness.
[0065] Based on this, an embodiment of the present application proposes a solution. After generating the initial grid network, the user device location grid network can be obtained through the acquired positioning data of the user device, and the grid network includes several grids. Therefore, by analyzing the network coverage characteristics and network value characteristics of each grid in the grid network, a coverage characteristic grid network and a value characteristic grid network can be generated respectively, and the grid network finally used for site planning can be obtained by weighted aggregation of the above two grid networks. Therefore, the site planning grid network obtained by this method combines the two dimensions of coverage and value at the same time, and can plan the site location more comprehensively, solving the limitations of existing methods for site planning evaluation.
[0066] Specifically, refer to Figure 1 , Figure 1 This is a functional module diagram of the terminal device to which the site planning device of the present application belongs. The site planning device can be a device that is independent of the terminal device and can perform data processing, or it can be carried on the terminal device in the form of hardware or software.
[0067] In this embodiment, the terminal device to which the site planning apparatus belongs includes at least an output module 110 , a processor 120 , a memory 130 and a communication module 140 .
[0068] The memory 130 stores an operating system and a site planning program, obtains several user equipment positioning data; processes the pre-generated initial grid network according to the several user equipment positioning data to obtain a device location grid network, the device location grid network includes several grids; analyzes the network coverage characteristics of the several grids to generate a coverage characteristic grid network; analyzes the network value characteristics of the several grids to generate a value characteristic grid network; performs weighted aggregation of the coverage characteristic grid network and the value characteristic grid network to obtain a site planning grid network, and the site planning grid network is stored in the memory 130. The output module 110 can be a display screen, a speaker, etc. The communication module 140 can include a WIFI module, a mobile communication module, a Bluetooth module, etc., and communicates with an external device or a server through the communication module 140.
[0069] When the site planning program in the memory 130 is executed by the processor, the following steps are implemented:
[0070] Obtaining location data of several user devices;
[0071] Processing a pre-generated initial grid network according to the plurality of user equipment positioning data to obtain a device location grid network, wherein the device location grid network includes a plurality of grids;
[0072] Analyzing the network coverage characteristics of the plurality of grids to generate a coverage characteristic grid network;
[0073] Analyzing the network value characteristics of the plurality of grids to generate a value characteristic grid network;
[0074] The coverage characteristic grid network and the value characteristic grid network are weighted and aggregated to obtain a site planning grid network.
[0075] Furthermore, when the site planning program in the memory 130 is executed by the processor, the following steps are also implemented:
[0076] Obtaining several user equipment measurement reports;
[0077] Extracting cell beam information according to the plurality of user equipment measurement reports, where the cell beam information includes a beam identification number and a beam receiving power;
[0078] Calculate signal energy according to the beam identification number and the beam receiving power, determine the target beam, and obtain the user equipment arrival angle according to the preset cell working parameters and the beam pattern of the target beam;
[0079] The device position is located according to the arrival angle of the user equipment to obtain user equipment positioning data.
[0080] Furthermore, when the site planning program in the memory 130 is executed by the processor, the following steps are also implemented:
[0081] Calculate the distance between the device and the site according to the delay information and the path delay information to obtain a calculation result, wherein the delay information and the path delay information are included in the user equipment measurement report;
[0082] Performing single-cell positioning on the device position according to the calculation result and the arrival angle of the user equipment to obtain a single-cell positioning result;
[0083] The single cell positioning result is corrected by using a preset regression model to obtain user equipment positioning data.
[0084] Furthermore, when the site planning program in the memory 130 is executed by the processor, the following steps are also implemented:
[0085] Determine the network type of the user equipment and obtain a determination result;
[0086] Acquire, by a preset measurement rule, level data reported by the user equipment according to the judgment result, the level data including a level value and a level type residence ratio;
[0087] The coverage characteristics of the plurality of grids are determined according to the level values and the level type residence ratios, and coverage characteristics are assigned to the plurality of grids according to the coverage characteristics of the plurality of grids to obtain a coverage characteristic grid network.
[0088] Furthermore, when the site planning program in the memory 130 is executed by the processor, the following steps are also implemented:
[0089] Detect the flow and code stream of several grids respectively to obtain the flow code stream information of several grids;
[0090] Classifying the traffic code flow information of the plurality of grids according to a preset traffic code flow value table to obtain a classification result;
[0091] A value characteristic grid network is generated according to a preset value scoring table and the classification results.
[0092] Furthermore, when the site planning program in the memory 130 is executed by the processor, the following steps are also implemented:
[0093] Obtaining weighting factors through preset weighting rules;
[0094] The coverage characteristic grid network and the value characteristic grid network are weighted and summarized according to the weighting factor to obtain a weighted result;
[0095] The weighted results are scored to obtain a site planning grid network.
[0096] Furthermore, when the site planning program in the memory 130 is executed by the processor, the following steps are also implemented:
[0097] Sorting the site scores according to the site planning grid network to obtain a score sorting result;
[0098] The score sorting result is judged by a preset score threshold to obtain a judgment result, and the score sorting result is processed according to the judgment result.
[0099] This embodiment uses the above scheme to obtain a number of user equipment positioning data and process the pre-generated initial grid network according to the plurality of user equipment positioning data to obtain a device location grid network, wherein the device location grid network includes a plurality of grids; the network coverage characteristics of the plurality of grids are analyzed to generate a coverage characteristic grid network; the network value characteristics of the plurality of grids are analyzed respectively to generate a value characteristic grid network; the coverage characteristic grid network and the value characteristic grid network are weighted and summarized to obtain a site planning grid network. Since user equipment can connect to the network through a base station site at any location within the radiation range of the site signal, when the user connects to the network through the base station site, the user equipment can connect to the network through the base station site at any location within the radiation range of the site signal. When the network connection is established, the site can obtain the user equipment positioning data within the site signal radiation range. Therefore, after the initial grid network is generated, the user equipment location grid network can be obtained through the obtained user equipment positioning data. The grid network includes several grids. By analyzing the network coverage characteristics and network value characteristics of several grids in the grid network, a coverage characteristic grid network and a value characteristic grid network can be generated respectively. Finally, the above two networks are weighted and summarized to obtain a site planning grid network. The site planning grid network obtained by this method combines the two dimensions of coverage and value at the same time, which can plan the site location more comprehensively and solve the limitation problem of existing methods for site planning evaluation.
[0100] Reference Figure 2 , Figure 2 This is a flowchart of the first exemplary embodiment of the site planning method of the present application.
[0101] An embodiment of the present invention provides a site planning method, the method comprising:
[0102] Step S10, obtaining positioning data of several user equipments;
[0103] User equipment positioning data refers to data including specific location information of the user equipment, wherein the specific location information may include information such as the latitude and longitude coordinates of the user equipment, the geographical location of the user equipment, and the movement trajectory of the user equipment.
[0104] Specifically, the user equipment positioning data can be obtained through MR (Measurement Report) positioning. MR positioning refers to a technology that uses measurement report data reported by a mobile device during communication to determine the location of the device. The measurement report may include base station site information, signal strength and other data to which the device is connected. The positioning data of the user equipment can be obtained by analyzing these data. Further, the direction and position of the user equipment can be determined by beamforming. As an implementation method, the uplink / downlink coverage of a 5G cell is divided into multiple beams. Since the area covered by each beam is small and the angle covered by the beam is fixed, the uplink SRS (Sounding Reference Signal) and RSRP (Reference Signal Received Power) information of NR (New Radio) in MR is mapped to Beam information. Combined with the direction of each NR uplink Beam, the direction of the user relative to the NR site can be accurately estimated. Through this method, the positioning data of several user equipment within the site signal range can be obtained.
[0105] Step S20, processing the pre-generated initial grid network according to the plurality of user equipment positioning data to obtain a device location grid network, wherein the device location grid network includes a plurality of grids;
[0106] The initial grid network is generated according to preset conditions, wherein the preset conditions refer to the target area size and the number of grids constituting the target area set in advance in order to generate the initial grid network. The target area can be rasterized by the preset conditions, which is convenient for subsequent grid-level feature analysis and weighted aggregation.
[0107] Among them, as an implementation method, it is assumed that the preset conditions are: the target area is a square area with a side length of 10 kilometers, and 100 grids need to be set to cover the square area. Then, the side length of each grid is 1 kilometer, and the generated initial grid network includes 100 square grids with a side length of 1 kilometer. It can be understood that the square area with a side length of 10 kilometers is divided into 100 grid areas with a side length of 1 kilometer. At this time, the generated initial grid network is a grid network composed of 100 grid areas with a side length of 1 kilometer.
[0108] Furthermore, after the initial grid network is generated, several user devices are marked in the initial grid network according to several user device positioning data previously obtained, so as to obtain a device location grid network with several user device locations. Through the device location grid network, it is possible to obtain which grids have user devices that perform networking operations through sites, so as to subsequently perform characteristic analysis on the grids with user devices.
[0109] Step S30, analyzing the network coverage characteristics of the plurality of grids to generate a coverage characteristic grid network;
[0110] Since MR data relies on terminals residing on the 5G network to report data, the coverage is poor, and the 5G terminals residing on the 4G network are easily automatically filtered out, so that the restored coverage insights cannot achieve the true coverage of the existing 5G network due to the loss of some 5G users. Therefore, after obtaining the device location grid network, it is necessary to conduct a comprehensive network coverage characteristic analysis of each grid in the device location grid network to obtain the coverage characteristics of each grid, where the network coverage characteristics include explicit coverage and implicit coverage. Explicit coverage refers to 5G user devices residing on the 5G network, and implicit coverage refers to 5G user devices residing on the 4G network.
[0111] Among them, as an implementation method, the 5G base station sends periodic same-frequency measurement requirements to the 5G users of the same operator residing on the 5G network, triggering the UE (User Equipment) to periodically measure and report MR. After two-dimensional space rasterization, multiple MR points falling within a certain grid are normalized to one value (such as the average intensity value) to obtain the grid-level "explicit coverage" of the 5G network. For implicit coverage, the 4G base station sends periodic different-system measurement requirements to the 5G users of the same operator residing on the 4G network, triggering the UE to periodically measure and report MR. Similarly, after two-dimensional space rasterization, multiple MR points falling within a certain grid are normalized to one value (such as the average intensity value) to obtain the grid-level "implicit coverage" of the 5G network.
[0112] After obtaining the "explicit coverage" and "implicit coverage" of the 5G network, the coverage characteristics of the grid can be summarized to generate a coverage characteristic grid network. Specifically, the MR reported by the user equipment can reflect the real 5G level. In fact, no matter whether the terminal is in the 5G network or the 4G network, it reports the 5G level at the same period when it is in the RRC (Radio Resource Control) connection state. The weight on the 5G side is the length of time it stays in 5G, and the weight on the 4G side is the length of time it stays in 4G. Therefore, the length of residence ratio can be used for weighted merging.
[0113] Among them, as an implementation method, the grid-level 5G weak coverage ratio is equal to the 5G side weak coverage ratio multiplied by the 5G time residence ratio plus the 4G heterogeneous system weak coverage ratio multiplied by (1 minus the 5G time residence ratio). After the "explicit coverage" and "implicit coverage" of the 5G network are weighted and summarized according to the above formula, the grid-level weak coverage ratio of the real 5G network can be obtained. Furthermore, the results of the weighted summary of each grid coverage characteristic can be scored for subsequent secondary summary.
[0114] Step S40, analyzing the network value characteristics of the plurality of grids to generate a value characteristic grid network;
[0115] The value of a 5G base station is closely related to the total traffic in a cell. When signal coverage is weak, it will trigger automatic downshifting of OTT (Over-the-Top, maximum rate). However, the cell traffic is carried on the data stream of OTT. Therefore, when analyzing the network value characteristics within the grid, it is necessary to analyze the traffic and stream within the grid separately to obtain a relationship diagram between the traffic and stream within the grid, and assign points to the traffic and stream characteristics of each grid based on the relationship diagram in order to generate a value characteristic grid network.
[0116] As an implementation method, different scenarios in cities, counties, towns and villages can be distinguished, and the cell traffic and business code flow can be sorted to obtain a two-dimensional nine-square grid relationship diagram of business & code flow. The cell sites can be assigned values with reference to the nine-square grid relationship diagram, that is, each grid in the area is assigned a value. The higher the score, the higher the grid processing priority, and finally a value characteristic grid network is formed.
[0117] Step S50, performing weighted aggregation on the coverage characteristic grid network and the value characteristic grid network to obtain a site planning grid network;
[0118] After obtaining the coverage characteristic grid network and the value characteristic grid network, the two networks are weighted and aggregated to finally restore the two-dimensional network grid of coverage + traffic, that is, the site planning grid network. Specifically, the weighting factors can be set separately according to the region and the city, county, township and village to adapt to different regions.
[0119] As an implementation method, the summarized site planning grid network and 5G base station coverage model are imported into the simulation platform, and the three-layer weighting of the preset values of the long, medium and short distances of the 5G base station is performed at the same time, and the two-layer logic of adding stations at the same site and the new site is driven synchronously. Finally, the 5G base station planning based on coverage and traffic fusion analysis is obtained, and the priority ranking of the new 5G base station planning is output according to the sum of the site planning grid network scores under the three-layer weighting of the 5G base station coverage. According to the score priority, the sites that meet the construction standards are planned, invested and implemented.
[0120] The site planning method proposed in the embodiment of the present application obtains a plurality of user equipment positioning data; processes a pre-generated initial grid network according to the plurality of user equipment positioning data to obtain a device location grid network, wherein the device location grid network includes a plurality of grids; analyzes the network coverage characteristics of the plurality of grids to generate a coverage characteristic grid network; analyzes the network value characteristics of the plurality of grids to generate a value characteristic grid network; performs weighted aggregation of the coverage characteristic grid network and the value characteristic grid network to obtain a site planning grid network, since user equipment can connect to the network through a base station site at any location within the radiation range of the site signal, and when the user connects to the network through the base station site When the points are connected to the network, the site can obtain the user equipment positioning data within the site signal radiation range. Therefore, after the initial grid network is generated, the user equipment location grid network can be obtained through the obtained user equipment positioning data. The grid network includes several grids. By analyzing the network coverage characteristics and network value characteristics of several grids in the grid network, a coverage characteristic grid network and a value characteristic grid network can be generated respectively. Finally, the above two networks are weighted and summarized to obtain a site planning grid network. The site planning grid network obtained by this method combines the two dimensions of coverage and value at the same time, which can plan the site location more comprehensively and solve the limitation problem of existing methods for site planning evaluation.
[0121] Reference Figure 3 , Figure 3 This is a flow chart of a second exemplary embodiment of the site planning method of the present application.
[0122] Based on the first embodiment, a second embodiment of the present application is proposed. The difference between the second embodiment of the present application and the first embodiment is that:
[0123] In this embodiment, step S10 of obtaining positioning data of a plurality of user equipments is refined, wherein the refining steps may include:
[0124] Step S11, obtaining several user equipment measurement reports;
[0125] The user equipment measurement report refers to a set of information reflecting the current signal measurement status reported by a common user UE during a call.
[0126] Specifically, the user equipment measurement report may include:
[0127] Signal strength: The report provides the signal strength of the primary serving cell and possible neighboring cells measured by the user equipment.
[0128] Signal quality: The report may include the signal quality indicators of the primary serving cell measured by the user equipment, such as the signal-to-noise ratio (SNR) or the received quality indicator (RQI).
[0129] Neighboring cell information: The report may include information about neighboring cells measured by the user equipment, such as the signal strength and signal quality of the neighboring cells.
[0130] Timestamp: The report includes the timestamp when the report was generated, so that network operators can understand the time range of the measurement.
[0131] Beam identification number: The report may include the identification ID of the received site beam. By collecting the identification ID, it can be known which beam of the base station the user equipment has received.
[0132] Furthermore, the report may also include SRS (Sounding Reference Signal) and RSRP (Reference Signal Received Power). SRS is used to measure the uplink channel quality, which provides information about the channel quality between the user equipment and the base station, while RSRP is an indicator used to measure the downlink signal strength, which indicates the power level of the downlink reference signal received by the user equipment.
[0133] Step S12, extracting cell beam information according to the plurality of user equipment measurement reports, the cell beam information including a beam identification number and a beam receiving power;
[0134] Step S13, calculating signal energy according to the beam identification number and the beam receiving power, determining the target beam, and obtaining the user equipment arrival angle according to the preset cell engineering parameters and the beam pattern of the target beam;
[0135] Step S14, positioning the device according to the arrival angle of the user device to obtain user device positioning data;
[0136] After obtaining the user equipment measurement report, extract the cell beam information in the user equipment measurement report.
[0137] Specifically, as one of the implementation modes, since the uplink / downlink coverage of the 5G cell is divided into multiple beams and the area covered by each beam is small and the angle is fixed, the uplink SRSRSRP information of the NR in the user equipment measurement report can be mapped to Beam information, and the beam pointing of each Beam of the NR uplink can be combined to accurately estimate the direction of the user relative to the NR site. Specifically, the single service cell beam positioning result can be obtained first, and the steps may include:
[0138] 1. Extract the serving cell beam information from the user equipment measurement report, including Beam-ID (beam identification number) and corresponding Beam-RSRP (beam received power);
[0139] 2. Perform energy conversion based on Beam-RSRP and BeamID to determine the strongest beam. Specifically, the received power values of different beams can be compared to determine which beam has the strongest signal. The beam with the highest received power can be considered to be the main communication direction of the user equipment, that is, the strongest beam. After determining the strongest beam, the antenna beam pattern and cell engineering parameters can be combined to further calculate the user arrival angle (hAoA) in the horizontal direction, that is, the horizontal angle of the signal from the user equipment to the base station site.
[0140] 3. Position the device according to the acquired user arrival angle to obtain user device positioning data. The user device positioning data may include a horizontal angle or a vertical angle between the user device and the base station site.
[0141] The site planning method proposed in the embodiment of the present application obtains several user equipment measurement reports; extracts cell beam information according to the several user equipment measurement reports, wherein the cell beam information includes a beam identification number and a beam receiving power; calculates signal energy according to the beam identification number and the beam receiving power, determines a target beam, and obtains the user equipment arrival angle according to preset cell working parameters and the beam pattern of the target beam; locates the device position according to the user equipment arrival angle to obtain user equipment positioning data. Since the user equipment measurement report includes information on its current signal measurement status, the beam identification number and the beam receiving power for subsequent calculation of signal energy can be obtained by extracting the cell beam information in the user equipment measurement report. Furthermore, the user equipment arrival angle can be obtained by calculating the signal energy, the cell working parameters and the beam pattern, and the device position can be located according to the user equipment arrival angle, thereby obtaining the positioning data of the user equipment. This method can locate several user equipments, providing a data basis for subsequent grid-level data analysis.
[0142] Reference Figure 4 , Figure 4This is a flowchart of a third exemplary embodiment of the site planning method of the present application.
[0143] Based on the second embodiment, a third embodiment of the present application is proposed. The difference between the third embodiment of the present application and the second embodiment is that:
[0144] In this embodiment, in step S14, the device position is located according to the arrival angle of the user equipment, and the obtained user equipment positioning data is refined, wherein the refining step may include:
[0145] Step S141, calculating the distance between the device and the site according to the time delay information and the path delay information to obtain a calculation result, wherein the time delay information and the path delay information are included in the user equipment measurement report;
[0146] Step S142, performing single-cell positioning on the device position according to the calculation result and the arrival angle of the user equipment to obtain a single-cell positioning result;
[0147] After determining the arrival angle of the user equipment, the distance between the user equipment and the site can be calculated using the time delay information and the path delay information, and combined with the previously acquired arrival angle of the user equipment to improve the positioning data.
[0148] Specifically, as one of the implementation methods, the distance between the user equipment and the base station can be calculated by combining the delay information and the path delay information. Specifically, the measured time offset (Time Offset) and relative delay (Propagation Delay) information can be used to calculate the flight time of the signal, so as to estimate the distance between the user equipment and the base station. For example, the flight time can be converted into a distance through the speed of signal propagation (such as the speed of light) to obtain a distance calculation result. Furthermore, triangulation or other related algorithms can be used to calculate the horizontal distance between the user equipment and the base station and combine this horizontal distance with the vertical distance (i.e., the distance converted from the signal flight time) to obtain a more accurate user equipment location, i.e., a single cell positioning result.
[0149] Step S143, correcting the single cell positioning result by using a preset regression model to obtain user equipment positioning data;
[0150] After obtaining the single-cell positioning result, since the single-cell positioning result may have a certain position deviation, the obtained single-cell positioning result can be corrected through a preset regression model to obtain more accurate user equipment positioning data.
[0151] Among them, as an implementation method, the topological relationship of multiple cells in the MR data can be used, based on the spatial uniqueness principle of SSB measurement, to associate multiple single-cell positioning results, and construct an SSB (Synchronization Signal Block) regression model to correct the results of single-cell beam positioning.
[0152] The spatial uniqueness of SSB measurement specifically means that when multiple MR data have the same or similar multi-cell SSB characteristics, they should be close in space. However, due to errors in single-cell beam positioning, the above MR data are located at different locations. The single-cell positioning results can be corrected through AI model regression.
[0153] Specifically, the result of the single-cell beam positioning can be regressed and corrected by using a Tree-based Regressor to obtain the user equipment positioning data.
[0154] Furthermore, after obtaining the user equipment positioning data, AI recognition and judgment can be performed on it and the positioning accuracy can be optimized. Specifically, according to the characteristics of each group of MR call records, an AI binary classification model can be loaded for location judgment and prediction, wherein the MR call record is defined as the continuous MR data of the user in a short period of time, which can contain signal information of multiple sampling points. As an implementation method, relevant features are extracted from the MR data. These features may include signal strength, signal-to-noise ratio, timestamp, etc. These features can reflect the signal conditions of the user equipment at different locations. Then, the extracted MR features are loaded as input into the AI binary classification model. After training, the AI binary classification model can learn the relationship between the MR features and the corresponding positions and judge and predict the positions. According to the output results of the model, the position of the user equipment can be determined. In this way, the AI binary classification model can be used to judge the position of each group of MR call records. This method can automatically process a large amount of MR data and quickly and accurately predict the location information of the user equipment.
[0155] Specifically, the above model regression criteria may include:
[0156] 1. Mean square error:
[0157]
[0158]
[0159] 2. Mean absolute error:
[0160]
[0161]
[0162] Among them, Xm is the training data in node m, Nm is the number of training in node m, Yi is the training result of each child node, and Ym is the average value of the training results of each child node.
[0163] Specifically, since the AI model is a binary classification task, there are only positive examples and negative examples, and the sum of the probabilities of the two is 1, so there is no need to predict a vector, only a probability. As an implementation method, the AI model can include a loss function Loss:
[0164]
[0165] in is the probability that the model predicts that the sample is a positive example, and y is the sample label. If the sample is a positive example, the value is 1, otherwise the value is 0.
[0166] The site planning method proposed in the embodiment of the present application calculates the distance between the device and the site through delay information and path delay information to obtain a calculation result, and the delay information and the path delay information are included in the user equipment measurement report; the device position is single-cell positioned according to the calculation result and the arrival angle of the user equipment to obtain a single-cell positioning result; the single-cell positioning result is corrected through a preset regression model to obtain user equipment positioning data. In this way, the user equipment can be positioned and accurate user equipment positioning data can be obtained.
[0167] Reference Figure 5 , Figure 5 This is a flowchart of a fourth exemplary embodiment of the site planning method of the present application.
[0168] Based on the third embodiment, a fourth embodiment of the present application is proposed. The difference between the fourth embodiment of the present application and the third embodiment is that:
[0169] In this embodiment, in step S30, the network coverage characteristics of the plurality of grids are analyzed to generate a coverage characteristic grid network for refinement, wherein the refinement step may include:
[0170] Step S31, determining the network type of the user equipment and obtaining a determination result;
[0171] Since MR data relies on terminals residing on the 5G network to report data, the coverage is poor, and the 5G terminals residing on the 4G network are easily automatically filtered out, so that the restored coverage insights cannot achieve the true coverage of the existing 5G network due to the loss of some 5G users. Therefore, before obtaining the level data reported by the user equipment, it is necessary to judge the network type of the user equipment and obtain the judgment result. Furthermore, after obtaining the judgment result, a suitable measurement rule can be selected according to the judgment result to obtain the level data.
[0172] The judgment result may include that the user equipment is in a 5G network and that the user equipment is in a 4G network.
[0173] Step S32, obtaining level data reported by the user equipment according to the judgment result through a preset measurement rule, wherein the level data includes a level value and a level type residence ratio;
[0174] Reference Figure 6 , Figure 6 This is a schematic diagram of the measurement rules for the coverage characteristics of the site planning method for this application.
[0175] Depending on the judgment results, the measurement rules are also different, such as Figure 6 As shown, when the judgment result is that the user equipment is in a 5G network, the 5G base station sends a periodic same-frequency measurement request to the 5G user of the operator residing on the 5G network, triggering the UE to periodically measure and report MR. When the judgment result is that the user equipment is in a 4G network, the 4G base station sends a periodic different-system measurement request to the 5G user of the operator residing on the 4G network, triggering the UE to periodically measure and report MR. After the measurement level data is completed, multiple MR points falling within a certain grid are normalized into one value (such as the intensity average) to represent the grid-level "explicit coverage" and "implicit coverage" of the 5G network, respectively.
[0176] Step S33, determining the coverage characteristics of the plurality of grids according to the level value and the level type residence ratio, and assigning coverage characteristics to the plurality of grids according to the coverage characteristics of the plurality of grids to obtain a coverage characteristic grid network;
[0177] Figure 7 This is a schematic diagram of weighted merging of coverage characteristics for the site planning method of this application;
[0178] like Figure 7As shown, in order to reflect the real 5G level, no matter whether the user equipment is in a 5G network or a 4G network, when the user equipment is in an RRC connected state, the 5G level is reported at the same period. The weight on the 5G side is the length of time it stays in 5G, and the weight on the 4G side is the length of time it stays in 4G. Therefore, the length of residence ratio is used for weighted merging.
[0179] Among them, as an implementation method, the grid-level 5G weak coverage ratio is equal to the 5G side weak coverage ratio multiplied by the 5G time residence ratio plus the weak coverage ratio of the 4G heterogeneous system multiplied by (1 minus the 5G time residence ratio). After the "explicit coverage" and "implicit coverage" of the 5G network are weighted and summarized according to the above formula, the grid-level weak coverage ratio of the real 5G network can be obtained.
[0180] Percentage of MRs weaker than 105 dB Raster Coverage Raster score >30% Weak coverage 100 10%~30% Medium Coverage 60 <10% Good coverage 20
[0181] Table 1. Coverage feature assignment table
[0182] As shown in Table 1 above, after obtaining the grid-level weak coverage ratio of the real 5G network (i.e., the ratio of MRs weaker than -105dB in Table 1), the grid can be divided into three types, namely weak coverage, medium coverage and good coverage. The score of weak coverage is 100, the score of medium coverage is 60, and the score of good coverage is 20. The higher the score, the weaker the coverage of the area and the higher the priority of site planning. It should be noted that the specific score can be selected according to the actual situation and is not specifically limited here.
[0183] Figure 8 A schematic diagram of a grid network covering the characteristics of the site planning method for this application;
[0184] After assigning the coverage characteristics of each grid, we can get the following Figure 8 The diagram shows a coverage characteristic grid network diagram, where each grid displays the coverage intensity of the grid.
[0185] The site planning method proposed in the embodiment of the present application determines the type of network in which the user equipment is located to obtain a determination result; obtains level data reported by the user equipment according to the determination result through a preset measurement rule, the level data including a level value and a level type residence ratio; determines the coverage characteristics of the plurality of grids according to the level value and the level type residence ratio, and assigns coverage characteristics to the plurality of grids according to the coverage characteristics of the plurality of grids to obtain a coverage characteristic grid network. The method can select appropriate measurement rules to obtain the level data reported by the user equipment according to the type of network in which the user equipment is located. After obtaining the level data and the level type residence ratio, the coverage characteristics of the plurality of grids can be determined and assigned according to the level value and the level type residence ratio to obtain a coverage characteristic grid network, thereby achieving true coverage of the existing 5G network.
[0186] Reference Fig. 9 , Fig. 9 This is a flowchart of the fifth exemplary embodiment of the site planning method of the present application.
[0187] Based on the fourth embodiment, a fifth embodiment of the present application is proposed. The difference between the fifth embodiment of the present application and the fourth embodiment is that:
[0188] In this embodiment, in step S40, the network value characteristics of the plurality of grids are analyzed to generate a value characteristic grid network for refinement, wherein the refinement step may include:
[0189] Step S41, detecting the flow and code stream of a plurality of grids to obtain the flow code stream information of the plurality of grids;
[0190] Step S42, classifying the traffic code flow information of the plurality of grids according to a preset traffic code flow value table to obtain a classification result;
[0191] Step S43, generating a value characteristic grid network according to a preset value scoring table and the classification result;
[0192] The value of a 5G base station is closely related to the total traffic in a cell. When signal coverage is weak, it will trigger automatic downshifting of OTT (Over-the-Top, maximum rate). However, the cell traffic is carried on the data stream of OTT. Therefore, when analyzing the network value characteristics within the grid, it is necessary to analyze the traffic and stream within the grid separately to obtain a relationship diagram between the traffic and stream within the grid, and assign points to the traffic and stream characteristics of each grid based on the relationship diagram in order to generate a value characteristic grid network.
[0193] Fig.10 This is the traffic and bitstream two-dimensional nine-square relationship diagram of the site planning method for this application;
[0194] By detecting the flow and code flow in the grid, the grid flow code flow information can be obtained. Specifically, the grid can be classified according to the flow code flow information to obtain the following: Fig.10 The nine classification results shown in the figure form a two-dimensional nine-square relationship diagram of traffic and code stream, wherein, according to the traffic and code stream information obtained by detection, the cell traffic can be divided into three levels of low, medium and high, and the code stream can also be divided into three levels of low, medium and high. Therefore, the traffic and code stream can be divided into nine different combination relationships, namely the above nine classification results. The scoring relationship and value symbol of each classification result can be referred to the following Table 2.
[0195] type Community Value Value scoring High traffic & low bit rate P5 100 High traffic & medium bitrate, medium traffic & medium bitrate, medium traffic & low bitrate P4 80 Low traffic & low bitrate, low traffic & medium bitrate P3 60 High traffic & high bit rate, medium traffic & high bit rate P2 40 Low traffic & high bit rate P1 20
[0196] Table 2. Relationship between flow rate and bit rate
[0197] Fig.11 This is a schematic diagram of the value characteristic grid network of the site planning method for this application;
[0198] After assigning the value characteristics of each grid, we can get the following Fig.11 The diagram shows a coverage characteristic grid network diagram, in which each grid displays the cell value code of the grid.
[0199] As an implementation method, different scenarios of urban, county, rural and agricultural areas can be distinguished, and the cell traffic and business code flow can be sorted and the cell sites can be valued with reference to the above-mentioned nine-square grid relationship diagram, that is, each grid in the area is assigned a value. The higher the score, the higher the grid processing priority, and finally the following is formed: Fig.11 It should be noted that the specific assigned scores can be selected according to actual conditions and are not specifically limited here.
[0200] The site planning method proposed in the embodiment of the present application obtains the traffic and code flow information of several grids by detecting the traffic and code flow of several grids; classifies the traffic code flow information of the several grids according to a preset traffic code flow value table to obtain a classification result; generates a value characteristic grid network according to a preset value scoring table and the classification result. Through this method, the traffic code flow of each grid in the area can be detected and classified to generate a value characteristic grid network, providing a data basis for the subsequent weighted aggregation of the dual networks.
[0201] Reference Fig.12 , Fig.12 This is a flowchart of the sixth exemplary embodiment of the site planning method of the present application.
[0202] Based on the fifth embodiment, a sixth embodiment of the present application is proposed. The difference between the sixth embodiment of the present application and the fifth embodiment is that:
[0203] In this embodiment, in step S50, the coverage characteristic grid network and the value characteristic grid network are weighted and aggregated to obtain a site planning grid network for refinement, wherein the refinement step may include:
[0204] Step S51, obtaining a weighting factor through a preset weighting rule;
[0205] Step S52, weighting and summarizing the coverage characteristic grid network and the value characteristic grid network according to the weighting factor to obtain a weighted result;
[0206] Among them, the weighting factor refers to the coefficient used to assign different importance or influence to different factors or variables. As one of the implementation methods, the weighting coefficient of the area can be obtained according to the base station site construction rules of the area where the area is located, that is, the weighting factor can be set separately according to the relevant construction requirements of the area where the grid network is located. By adjusting the weighting factor separately, the summary weighted proportion of the coverage characteristic grid network and the value characteristic grid network can be changed, and finally a two-dimensional network grid of coverage + value is obtained.
[0207] Fig.13 This is a weighted schematic diagram of the dual grid network for the site planning method of this application.
[0208] like Fig.13 As shown, in the two grid networks mentioned in the above embodiments, the grid composition method of the grid networks in the same area is consistent, that is, the number of grids and the side length of the coverage characteristic grid network and the value characteristic grid network in the same area are the same. In the process of weighted aggregation of the grids in the area, the grids of the two networks need to correspond one to one. In other words, the objects of weighted aggregation are two grids in the same position. After weighted aggregation of each grid, the final site planning grid network is obtained.
[0209] Step S53, assigning points to the weighted results to obtain a site planning grid network;
[0210] Among them, as an implementation method, the summarized grid network and 5G base station coverage model are imported into the simulation platform, and the three-layer weighting of the preset values of the long, medium and short distances of the 5G base station is performed at the same time, and the two-layer logic of adding stations at the same site and the new site is driven synchronously, and finally the 5G base station planning based on coverage and traffic fusion analysis is obtained, and the site planning grid network is obtained according to the sum of the two-dimensional network grid scores under the three-layer weighting of the 5G base station coverage. The final site construction score of each grid can be known through the site planning grid network. According to this score, a more comprehensive data basis can be provided for the construction of base station sites.
[0211] The site planning method proposed in the embodiment of the present application obtains a weighting factor through a preset weighting rule; performs weighted aggregation of the coverage characteristic grid network and the value characteristic grid network according to the weighting factor to obtain a weighted result; scores the weighted result to obtain a site planning grid network. After obtaining the coverage characteristic grid network and the value characteristic grid network, a weighting factor for subsequent weighted aggregation of the dual grid networks can be obtained according to the weighting rule. The weighted result of the dual grid network can be obtained according to the weighting factor. Finally, each grid is scored according to the weighted result to obtain a site planning grid network. This method can plan site locations in combination with the two dimensions of coverage and value, and solves the limitation problem of existing methods for site planning evaluation.
[0212] Reference Fig.14 , Fig.14 This is a flowchart of the seventh exemplary embodiment of the site planning method of the present application.
[0213] Based on the sixth embodiment, a seventh embodiment of the present application is proposed. The difference between the seventh embodiment of the present application and the sixth embodiment is that:
[0214] In this embodiment, in step S50, after weighted aggregation of the coverage characteristic grid network and the value characteristic grid network to obtain the site planning grid network, the following further comprises:
[0215] Step S60, ranking the sites by score according to the site planning grid network to obtain a score ranking result;
[0216] After obtaining the site planning grid network, the planning priority scores of the newly built base stations are ranked according to the output of the site planning grid network, and the score ranking order of the construction of each base station is obtained. The score ranking order can be used to intuitively understand the best site selection for the construction of each base station.
[0217] Reference Fig.15 , Fig.15 This is a schematic diagram of the site value and site score ranking for the site planning method of this application.
[0218] like Fig.15 As shown in FIG. 1 , after assigning points to each grid, the base station sites can be deployed according to the scores of each grid. Specifically, the new sites can be ranked and planned using the Pareto law, as shown in FIG. Fig.15 Base station site scores shown.
[0219] Step S61, judging the score sorting result by a preset score threshold, obtaining a judging result, and processing the score sorting result according to the judging result;
[0220] According to the preset score threshold, the score of each grid in the arrangement order is determined, and relevant adjustments are made to it according to the determination result. As an implementation method, if the preset score threshold is 90 points, site construction is performed on grids with scores exceeding 90 points. In addition, the preset score threshold can also be a lower limit of the score, and grid optimization is performed on grids with scores below 90 points.
[0221] The site planning method proposed in the embodiment of the present application performs site score sorting according to the site planning grid network to obtain a score sorting result; determines the score sorting result by a preset score threshold to obtain a determination result, and processes the score sorting result according to the determination result. Through this method, site construction can be ranked and planned to achieve accurate site construction and value site construction evaluation.
[0222] Reference Fig.16 , Fig.16 This is a schematic diagram of the overall process of the site planning method for this application.
[0223] like Fig.16 As shown, the overall process of the site planning method of the present application may include the following steps:
[0224] Step 100: First, collect MR data, signaling data and call record data within a period of time, and then perform data association according to the association rules between MR data, signaling data and call record data, and extract the key fields required in the present invention for data storage.
[0225] Step 101: Accurately classify the MR data with reference to the positioning algorithm and AI model to complete the MR grid-level positioning attribution.
[0226] Step 102: Obtain the grid-level “explicit coverage” of the 5G network based on the MR coverage level and horizontal position information reported by the UE residing in the 5G network.
[0227] Step 103: Obtain the grid-level “implicit coverage” of the 5G network based on the MR coverage level and horizontal position information reported by the UE residing in the 4G network.
[0228] Step 104: The explicit coverage grid and the implicit coverage grid are weighted by the 5G residence ratio and (1-5G residence ratio) respectively to restore the grid-level real coverage of the 5G network.
[0229] Step 105: Based on the grid-level real coverage of the 5G network, classify and assign values to the MR weak coverage ratio within the grid to obtain a grid-level score based on coverage.
[0230] Step 106: Classify the cell traffic and service code stream according to different scenarios in different regions and urban, county, rural and agricultural areas, and distribute the cells in the scenarios to corresponding positions in the nine-square grid.
[0231] Step 107: According to the cell traffic and the cell service code flow, the nine-square grid cells are ranked by value, and the cells in different value areas are assigned values.
[0232] Step 108: Combined with the 5G base station coverage model, the cell score is assigned to the entire area grid to obtain a grid-level score based on traffic.
[0233] Step 109: Referring to the characteristics of the region and urban, county, rural and agricultural areas, weighting factors are set, and the coverage-based grid and the flow-based grid are weightedly fused to obtain a two-dimensional grid-level score.
[0234] Step 110: Input the two-dimensional grid-level scoring and three-layer weighted 5G base station coverage model, and output the priority ranking of the new 5G base station construction plan.
[0235] Step 111: The scoring results are judged according to a certain threshold. If the 5G base station value score meets the standard, construction is implemented; if not, construction is abandoned or postponed.
[0236] In addition, an embodiment of the present application further provides a site planning device, the site planning device comprising:
[0237] A grid processing module, used to obtain positioning data of several user devices;
[0238] A signal acquisition module, used for processing a pre-generated initial grid network according to the plurality of user equipment positioning data to obtain a device location grid network, wherein the device location grid network includes a plurality of grids;
[0239] A coverage characteristic analysis module, used to analyze the network coverage characteristics of the plurality of grids and generate a coverage characteristic grid network;
[0240] A value characteristic analysis module, used to analyze the network value characteristics of the plurality of grids and generate a value characteristic grid network;
[0241] The weighted aggregation module is used to perform weighted aggregation on the coverage characteristic grid network and the value characteristic grid network to obtain a site planning grid network.
[0242] For the principle and implementation process of implementing site planning in this embodiment, please refer to the above embodiments and will not be described in detail here.
[0243] In addition, an embodiment of the present application also proposes a terminal device, which includes a memory, a processor, and a site planning program stored in the memory and executable on the processor, and the site planning program implements the steps of the site planning method described above when executed by the processor.
[0244] Since all the technical solutions of all the aforementioned embodiments are adopted when the site planning program is executed by the processor, it has at least all the beneficial effects brought by all the technical solutions of all the aforementioned embodiments, which will not be described one by one here.
[0245] In addition, an embodiment of the present application further proposes a computer-readable storage medium, on which a site planning program is stored. When the site planning program is executed by a processor, the steps of the site planning method described above are implemented.
[0246] Since all the technical solutions of all the aforementioned embodiments are adopted when the site planning program is executed by the processor, it has at least all the beneficial effects brought by all the technical solutions of all the aforementioned embodiments, which will not be described one by one here.
[0247] In addition, an embodiment of the present application further proposes a computer program product, on which a site planning program is stored. When the site planning program is executed by a processor, the steps of the site planning method described above are implemented.
[0248] Since all the technical solutions of all the aforementioned embodiments are adopted when the site planning program is executed by the processor, it has at least all the beneficial effects brought by all the technical solutions of all the aforementioned embodiments, which will not be described one by one here.
[0249] Compared with the prior art, the site planning method proposed in the embodiment of the present application obtains a number of user device positioning data; processes the pre-generated initial grid network according to the plurality of user device positioning data to obtain a device location grid network, wherein the device location grid network includes a plurality of grids; analyzes the network coverage characteristics of the plurality of grids to generate a coverage characteristic grid network; analyzes the network value characteristics of the plurality of grids to generate a value characteristic grid network; performs weighted aggregation of the coverage characteristic grid network and the value characteristic grid network to obtain a site planning grid network. Since user devices can connect to the network through a base station site at any location within the radiation range of the site signal, when the user connects to the network through a base station site, When a base station site is connected to the network, the site can obtain the user equipment positioning data within the site signal radiation range. Therefore, after generating the initial grid network, the user equipment location grid network can be obtained through the obtained user equipment positioning data. The grid network includes several grids. By analyzing the network coverage characteristics and network value characteristics of several grids in the grid network, a coverage characteristic grid network and a value characteristic grid network can be generated respectively. Finally, the above two networks are weighted and summarized to obtain a site planning grid network. The site planning grid network obtained by this method combines the two dimensions of coverage and value at the same time, which can plan the site location more comprehensively and solve the limitation problem of existing methods for site planning evaluation.
[0250] It should be noted that, in this article, the terms "include", "comprises" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, article or system including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or system. In the absence of further restrictions, an element defined by the sentence "comprises a ..." does not exclude the existence of other identical elements in the process, method, article or system including the element.
[0251] The serial numbers of the above embodiments of the present invention are only for description and do not represent the advantages or disadvantages of the embodiments.
[0252] Through the description of the above implementation methods, those skilled in the art can clearly understand that the above-mentioned embodiment methods can be implemented by means of software plus a necessary general hardware platform, and of course by hardware, but in many cases the former is a better implementation method. Based on such an understanding, the technical solution of the present invention is essentially or the part that contributes to the prior art can be embodied in the form of a software product, which is stored in a storage medium (such as ROM / RAM, magnetic disk, optical disk) as described above, and includes a number of instructions for a terminal device (which can be a mobile phone, a computer, a server, or a network device, etc.) to execute the methods described in each embodiment of the present invention.
[0253] The above are only preferred embodiments of the present invention, and are not intended to limit the patent scope of the present invention. Any equivalent structure or equivalent process transformation made using the contents of the present invention specification and drawings, or directly or indirectly applied in other related technical fields, are also included in the patent protection scope of the present invention.
Claims
1. A site planning method, characterized in that: The method comprises: Obtaining location data of several user devices; Processing a pre-generated initial grid network according to the plurality of user equipment positioning data to obtain a device location grid network, wherein the device location grid network includes a plurality of grids; Analyzing the network coverage characteristics of the plurality of grids to generate a coverage characteristic grid network; Analyzing the network value characteristics of the plurality of grids to generate a value characteristic grid network; The coverage characteristic grid network and the value characteristic grid network are weighted and aggregated to obtain a site planning grid network.
2. The site planning method according to claim 1, characterized in that: The step of obtaining positioning data of a plurality of user equipments comprises: Obtaining several user equipment measurement reports; Extracting cell beam information according to the plurality of user equipment measurement reports, where the cell beam information includes a beam identification number and a beam receiving power; Calculate signal energy according to the beam identification number and the beam receiving power, determine the target beam, and obtain the user equipment arrival angle according to the preset cell working parameters and the beam pattern of the target beam; The device position is located according to the arrival angle of the user equipment to obtain user equipment positioning data.
3. The site planning method according to claim 2, characterized in that: The step of locating the device position according to the arrival angle of the user equipment to obtain the user equipment positioning data comprises: Calculate the distance between the device and the site according to the delay information and the path delay information to obtain a calculation result, wherein the delay information and the path delay information are included in the user equipment measurement report; Performing single-cell positioning on the device position according to the calculation result and the arrival angle of the user equipment to obtain a single-cell positioning result; The single cell positioning result is corrected by using a preset regression model to obtain user equipment positioning data.
4. The site planning method according to claim 3, characterized in that: The step of analyzing the network coverage characteristics of the plurality of grids to generate a coverage characteristic grid network comprises: Determine the network type of the user equipment and obtain a determination result; Acquire, by a preset measurement rule, level data reported by the user equipment according to the judgment result, the level data including a level value and a level type residence ratio; The coverage characteristics of the plurality of grids are determined according to the level values and the level type residence ratios, and coverage characteristics are assigned to the plurality of grids according to the coverage characteristics of the plurality of grids to obtain a coverage characteristic grid network.
5. The site planning method according to claim 4, characterized in that: The step of analyzing the network value characteristics of the plurality of grids to generate a value characteristic grid network comprises: Detect the traffic and code stream of several grids to obtain the traffic code stream information of several grids; Classifying the traffic code flow information of the plurality of grids according to a preset traffic code flow value table to obtain a classification result; A value characteristic grid network is generated according to a preset value scoring table and the classification results.
6. The site planning method according to claim 5, characterized in that: The step of weighting and aggregating the coverage characteristic grid network and the value characteristic grid network to obtain a site planning grid network comprises: Obtaining weighting factors through preset weighting rules; The coverage characteristic grid network and the value characteristic grid network are weighted and summarized according to the weighting factor to obtain a weighted result; The weighted results are scored to obtain a site planning grid network.
7. The site planning method according to claim 6, characterized in that: After the step of weighting and aggregating the coverage characteristic grid network and the value characteristic grid network to obtain the site planning grid network, the following steps are included: Sorting the site scores according to the site planning grid network to obtain a score sorting result; The score sorting result is judged by a preset score threshold to obtain a judgment result, and the score sorting result is processed according to the judgment result.
8. A site planning device, characterized in that: The site planning device comprises: A grid processing module, used to obtain positioning data of several user devices; A signal acquisition module processes a pre-generated initial grid network according to the plurality of user equipment positioning data to obtain a device location grid network, wherein the device location grid network includes a plurality of grids; A coverage characteristic analysis module, used to analyze the network coverage characteristics of the plurality of grids and generate a coverage characteristic grid network; A value characteristic analysis module, used to analyze the network value characteristics of the plurality of grids and generate a value characteristic grid network; The weighted aggregation module is used to perform weighted aggregation on the coverage characteristic grid network and the value characteristic grid network to obtain a site planning grid network.
9. A terminal device, characterized in that: The terminal device includes a memory, a processor, and a site planning program stored in the memory and executable on the processor. When the site planning program is executed by the processor, the steps of the site planning method according to any one of claims 1 to 7 are implemented.
10. A computer program product, characterized in that The computer program product stores a site planning program, and when the site planning program is executed by a processor, the steps of the site planning method according to any one of claims 1 to 7 are implemented.