Prestressed combined light steel bridge deck and construction method thereof

Through the technology of staggered and interspersed combination connections in the prestressed combined light steel bridge deck and hydraulic straightening of steel wire cables, the problem of fatigue cracking that is prone to occur after welding of traditional light steel bridge deck connections is solved, and the service life and safety of the bridge deck are improved. .

CN118835518APending Publication Date: 2024-10-25CHINA RAILWAY SEVENTH ENG BUREAU GRP GUANGZHOU ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411070941.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-06
Publication Date
2024-10-25

AI Technical Summary

Technical Problem

Traditional lightweight steel bridge decks are prone to fatigue cracking after connection and welding, and their own weight causes the welding seams to crack, affecting the safety and durability of the bridge.

Method used

It adopts prestressed combined light steel bridge deck, which is connected through staggered and interspersed combinations. The series connection frame and the tail end series connection frame are slidingly installed on the guide rail, combined with the steel rope series connection seat and hydraulic equipment, to form an upward force to offset the falling gravity and reduce welding. Risk of seam breakage.

Benefits of technology

It effectively reduces the risk of fracture of welding seams, increases the service life of the bridge deck, reduces the probability of fracture of welding seams, and enhances the overall safety and durability of the bridge deck structure.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118835518A_ABST
    Figure CN118835518A_ABST
Patent Text Reader

Abstract

The invention relates to a prestressed combined light steel bridge deck which comprises a plurality of mutually spliced steel bridge frames and tail end steel bridge frames located at the two ends of the steel bridge frames, and every two adjacent steel bridge frames are inserted into the tail ends of the steel bridge frames in a penetrating mode through a series connection frame. The side face of the steel bridge frame at the tail end is inserted into the adjacent steel bridge frame in a penetrating mode through the series connection frame, it can be guaranteed that one half of the series connection frame is located in the steel bridge frame on one side, and the other half of the series connection frame is located in the steel bridge frame on the other side; according to the invention, the steel bridge frame is arranged at the tail end of the steel bridge frame, then the tail end series connection frame is inserted into the steel bridge frame at the tail end for tail sealing and flushing, and then the gap is welded, and by adopting the staggered insertion combination mode, even if the steel bridge frame falls due to gravity, the support force can be applied through the series connection frame. The support is applied in the middle of the welding line compared with the traditional bridge surface face-to-face welding mode; the fracture risk is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of bridges, and in particular to a prestressed composite light steel bridge deck and a construction method thereof. Background Art

[0002] Steel bridges are particularly suitable for long-span bridges due to their light weight and high material strength. With the development of my country's infrastructure construction, more and more bridges need to cross rivers, seas, deep trenches and canyons. More and more long-span bridges will be built, and steel bridges will be used more.

[0003] Traditional light steel bridge decks are spliced ​​face to face and connected by welding. However, there are many connecting welds, which are prone to fatigue cracking under the influence of factors such as traffic loads and environmental conditions. Similarly, the weight of the steel bridge deck itself will cause the steel bridge deck to fall and pull, which will also cause cracks in the welds, seriously affecting the overall safety and durability of the steel structure bridge. Summary of the invention

[0004] In view of the deficiencies in the prior art, the present invention provides a prestressed composite light steel bridge deck and a construction method thereof, which has the advantages of staggered and interlaced composite connection and reducing the gravity of the steel bridge deck itself, thereby solving the above-mentioned problems.

[0005] In order to achieve the above-mentioned purpose of staggered interlaced combination connection and reduce the self-gravity of the steel bridge deck, the present invention provides the following technical solutions: a prestressed combined light steel bridge deck, comprising a plurality of mutually spliced ​​steel bridge frames and tail end steel bridge frames located at both ends of the steel bridge frames, the inner wall of the steel bridge frame is slidably mounted with a serial connection frame through a guide rail, the interior of the tail end steel bridge frame is slidably mounted with a tail end serial connection frame through a guide rail, a steel rope serial connection seat is fixedly mounted between the upper and lower inner walls of the serial connection frame and the tail end serial connection frame, a rope hole is opened on the surface of the steel rope serial connection seat, and the center line of the circle of each steel rope serial connection seat rope hole is connected in series to form a downwardly concave curved surface; a steel wire cable is inserted into the interior of the steel rope serial connection seat, a cable locking assembly is arranged on the side of the steel rope serial connection seat, the top and bottom of the serial connection frame and the tail end serial connection frame are both embedded with positioning assemblies, and the inner walls of both sides of the serial connection frame and the tail end serial connection frame are both provided with docking locking assemblies.

[0006] Preferably, the cable locking assembly comprises a collar, a displacement ring is slidably mounted inside the collar, four locking plates are fixedly mounted on the side of the displacement ring, and rubber rings are sleeved on the outer sides of the four locking plates.

[0007] Preferably, the collar is fixedly mounted on the side of the steel rope serial seat, the collar, displacement ring and locking plate are all sleeved on the outside of the steel wire cable, the cross-sections of the locking plate and the collar are both provided with inclined surfaces, and the two inclined surfaces are tangentially contacted with each other.

[0008] Preferably, the positioning assembly includes an installation groove, a sealing ring is fixedly installed at the groove opening of the installation groove, a push spring is arranged inside the installation groove, a limit plate is fixedly installed at one end of the push spring away from the groove bottom, and a positioning head is fixedly installed on the top of the limit plate.

[0009] Preferably, the installation grooves are respectively opened on the upper and lower surfaces of the serial connection frame and the tail end serial connection frame, the installation groove is located at the center of the surface of the tail end serial connection frame, the installation groove is located outside the center of the surface of the serial connection frame, the positioning head penetrates and extends to the outside of the sealing ring at one end away from the limiting plate, and the upper and lower inner walls of the steel bridge frame and the tail end steel bridge frame are provided with positioning grooves corresponding to the positioning heads.

[0010] Preferably, the docking locking assembly includes a lock plate A and a lock plate B, and the docking ends of the lock plate A and the lock plate B are fixedly installed with a limiting head, the surface of the lock plate A is provided with a tooth groove, the outer side of the lock plate A is sleeved with a shell, the surface of the shell is embedded with a nut, the internal thread of the nut is connected with a bolt, and the lock plate A is detachably installed in the interior of the shell by the nut and the bolt.

[0011] Preferably, a support is fixedly installed on the side of the shell, and the side of the support is rotatably connected to two swing arms, a tension spring is movably installed between the swing arms, and a pawl head corresponding to the tooth groove is fixedly installed on the end of the swing arm away from the support, the pawl head and the tooth groove are meshed with each other, and the swing arm is clamped with the lock plate A through the pawl head and the tooth groove.

[0012] Preferably, the housing is fixedly mounted on the side wall of one of the serial connection frames / tail end serial connection frames, and the lock plate B is mounted on the side wall of another adjacent serial connection frame / tail end serial connection frame, and the lock plate A and the lock plate B are locked to each other through a limiting head.

[0013] Preferably, a steel bar layer is laid on the top of the steel bridge frame, an STC casting layer is cast inside the steel bar layer, a wear layer is laid above the STC casting layer, screws are inserted between the wear layer and the steel bridge frame, the screws are fixedly welded to the steel bridge frame, and the screws are located in the gaps between the steel bar layers.

[0014] A construction method for a prestressed composite light steel bridge deck comprises the following steps:

[0015] S1: Pre-weld one end of the tandem frame to the inside of the steel bridge frame or the tail end steel bridge frame;

[0016] S2: Guide rails are used between two adjacent steel bridge frames and between a steel bridge frame and the tail steel bridge frame to insert the other end of the series frame into its own tail, and then the impact sound emitted by the positioning component is used to determine the accuracy of the insertion position between the two.

[0017] S3: According to S2, when the two steel bridge frames are successfully butt-jointed, the butt-jointing locking assembly will lock the sides of the two serially connected frames;

[0018] S3: The tail end serial connection frame is then slidably installed in the interior of the tail end steel bridge frame through the guide rail, and the positioning component is also used to determine the position, and the locking component is used to lock it;

[0019] S4: Then pass the steel cable through the steel cable serial seat, and use external hydraulic equipment to pull the steel cable. The cable locking assembly will lock the steel cable after each stretching to prevent the steel cable from being pulled backward by gravity. Similarly, as the steel cable is tightened, the bent steel cable is gradually straightened, which can offset the falling force of the steel bridge frame and the tail end steel bridge frame.

[0020] Compared with the prior art, the present invention provides a prestressed composite light steel bridge deck and a construction method thereof, which has the following beneficial effects:

[0021] 1. The prestressed composite light steel bridge deck and its construction method are as follows: two adjacent steel bridge frames are interspersed with a series frame inside their rear ends, and the side of the rear end steel bridge frame is interspersed with the adjacent steel bridge frame through the series frame, so that half of the series frame is located inside the steel bridge frame on one side, and the other half is located inside the steel bridge frame on the other side, and then the gap is welded, and then the rear end series frame is inserted inside the rear end steel bridge frame to seal the tail flush, and then the gap is welded. With this staggered and interspersed combination method, even if the steel bridge frame falls due to gravity, the series frame can provide support. Compared with the traditional face-to-face welding method of the bridge deck, the present application provides support in the middle of the weld to reduce the risk of fracture.

[0022] 2. The prestressed composite light steel bridge deck and its construction method are characterized by arranging a plurality of steel rope serial seats so that the steel cables are initially concave, and then utilizing external hydraulic pressure to pull the steel cables so that the steel cables can be gradually straightened. In this process, the straightened steel cables will generate an upward force, while the steel bridge frame, the tail end steel bridge frame, the serial frame, the tail end serial frame and their parts will generate a downward force. The upward force and the downward force are offset, thereby offsetting the falling gravity of the bridge deck, thereby increasing the service life of the bridge deck and reducing the probability of fracture of the weld seams. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] Figure 1 It is a schematic diagram of the three-dimensional structure of the present invention;

[0024] Figure 2 It is a schematic diagram of the cutaway structure of the present invention;

[0025] Figure 3 It is a schematic diagram of the connection structure of the steel bridge frame, the tail end steel bridge frame, the series connection frame and the tail end series connection frame of the present invention;

[0026] Figure 4 It is a schematic diagram of the connection structure between the steel bridge frame and the series connection frame of the present invention;

[0027] Figure 5 It is a schematic diagram of the structure of the serial connection frame, the tail end serial connection frame and the cable locking assembly of the present invention;

[0028] Figure 6 It is a schematic diagram of the structure of the positioning assembly and the docking locking assembly of the present invention;

[0029] Figure 7 It is a schematic diagram of the exploded structure of the cable locking assembly of the present invention;

[0030] Figure 8 It is a schematic diagram of the exploded structure of the steel wire cable and the cable locking assembly of the present invention;

[0031] Fig. 9 It is a schematic diagram of the cross-section structure of the cable locking assembly and the positioning assembly of the present invention;

[0032] Fig.10 It is a schematic diagram of the cutaway structure of the steel wire rope and the positioning assembly of the present invention;

[0033] Fig.11 This is a schematic diagram of the positioning assembly structure of the present invention;

[0034] Fig.12 This is a schematic diagram of the structure of the docking and locking assembly of the present invention;

[0035] Fig.13 This is a schematic diagram of the structure of the docking and locking assembly of the present invention;

[0036] Fig.14 This is a structural schematic diagram of the lock plate A of the present invention;

[0037] Fig.15 It is a schematic diagram of the three-dimensional structure of the present invention;

[0038] Fig.16 It is a schematic diagram of the three-dimensional structure of the present invention.

[0039] In the figure: 1. Steel bridge frame; 2. Tail end steel bridge frame; 3. Guide rail; 4. Serial connection frame; 5. Tail end serial connection frame; 6. Steel rope serial connection seat; 7. Steel wire cable; 8. Cable locking assembly; 9. Positioning assembly; 10. Docking locking assembly;

[0040] 11. STC casting layer; 12. Wear layer; 13. Screws; 14. Steel bar layer;

[0041] 81. sleeve ring; 82. displacement ring; 83. locking plate; 84. rubber ring;

[0042] 91. Mounting groove; 92. Covering ring; 93. Push spring; 94. Limiting plate; 95. Positioning head;

[0043] 101. Lock plate A; 102. Lock plate B; 103. Limiting head; 104. Tooth groove; 105. Housing; 106. Nut; 107. Bolt; 108. Support; 109. Swing arm; 110. Tension spring; 111. Ratchet head. DETAILED DESCRIPTION

[0044] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0045] See also Figure 1-6 A prestressed composite light steel bridge deck includes a plurality of mutually spliced ​​steel bridge frames 1 and tail end steel bridge frames 2 located at both ends of the steel bridge frames 1. A series connection frame 4 is slidably installed on the inner wall of the steel bridge frame 1 through a guide rail 3. A tail end series connection frame 5 is slidably installed inside the tail end steel bridge frame 2 through the guide rail 3. A steel rope series connection seat 6 is fixedly installed between the series connection frame 4 and the upper and lower inner walls of the tail end series connection frame 5. Rope holes are opened on the surface of the steel rope series connection seat 6. The center line of the circle of each rope hole of the steel rope series connection seat 6 is connected in series to form a downwardly concave curved surface; in this way, the steel wire cable 7 inserted therein can be ensured to be in a drooping shape.

[0046] See also Figure 1-6 A steel wire rope 7 is inserted into the interior of the steel rope serial seat 6, and a cable locking assembly 8 is provided on the side of the steel rope serial seat 6, which is used to prevent the steel wire rope 7 from falling back after the steel wire rope 7 is straightened; positioning assemblies 9 are embedded on the top and bottom of the serial connection frame 4 and the tail end serial connection frame 5 to ensure accurate positioning when the two are spliced; docking locking assemblies 10 are provided on the inner walls of both sides of the serial connection frame 4 and the tail end serial connection frame 5 to ensure that the two are locked to each other after splicing.

[0047] See also Figure 7-9The cable locking assembly 8 includes a collar 81, which is fixedly mounted on the side of the steel rope serial seat 6, a displacement ring 82 is slidably mounted inside the collar 81, and four locking plates 83 are fixedly mounted on the side of the displacement ring 82. The collar 81, the displacement ring 82 and the locking plates 83 are all sleeved on the outside of the steel wire rope 7, and the cross sections of the locking plates 83 and the collar 81 are both provided with inclined surfaces, and the two inclined surfaces are tangentially contacted with each other. The outer sides of the four locking plates 83 are sleeved with rubber rings 84 to prevent the four locking plates 83 from being excessively opened.

[0048] See also Figure 9-11 The positioning assembly 9 includes a mounting groove 91, which is respectively provided on the upper and lower surfaces of the serial connection frame 4 and the tail end serial connection frame 5. The mounting groove 91 is located at the center of the surface of the tail end serial connection frame 5, and the mounting groove 91 is located outside the center of the surface of the serial connection frame 4. A cover ring 92 is fixedly installed at the notch of the mounting groove 91, and a push spring 93 is arranged inside the mounting groove 91. A limit plate 94 is fixedly installed at one end of the push spring 93 away from the bottom of the groove, and a positioning head 95 is fixedly installed on the top of the limit plate 94. The upper and lower inner walls of the steel bridge frame 1 and the tail end steel bridge frame 2 are provided with positioning grooves corresponding to the positioning head 95. The end of the positioning head 95 away from the limit plate 94 passes through and extends to the outside of the cover ring 92.

[0049] See also Figure 12-14 The docking locking assembly 10 includes a lock plate A101 and a lock plate B102, and the lock plate B102 is installed on the side wall of another adjacent serial frame 4 / tail end serial frame 5. The docking ends of the lock plates A101 and B102 are fixedly installed with a limiting head 103, and the lock plates A101 and B102 are locked to each other through the limiting head 103. The surface of the lock plate A101 is provided with a tooth groove 104, and the outer side of the lock plate A101 is provided with a sleeve 105, and the sleeve 105 is fixedly installed on the side wall of one of the serial frames 4 / tail end serial frames 5. The surface of the sleeve 105 is embedded with a nut 106, and the internal thread of the nut 106 is connected with a bolt 107. The lock plate A101 is detachably installed in the interior of the sleeve 105 through the nut 106 and the bolt 107.

[0050] See also Figure 12-14 A support 108 is fixedly installed on the side of the shell 105, and two swing arms 109 are rotatably connected to the side of the support 108. A tension spring 110 is movably installed between the swing arms 109. A pawl head 111 corresponding to the tooth groove 104 is fixedly installed on the end of the swing arm 109 away from the support 108. The pawl head 111 and the tooth groove 104 are meshed with each other, and the swing arm 109 is clamped with the lock plate A101 through the pawl head 111 and the tooth groove 104.

[0051] See also Figure 15-16A steel bar layer 10 is laid on the top of the steel bridge frame 1, and an STC casting layer 11 is cast inside the steel bar layer 10. A wear layer 12 is laid above the STC casting layer 11. Screws 13 are inserted between the wear layer 12 and the steel bridge frame 1. The screws 13 are fixedly welded to the steel bridge frame 1, and the screws 13 are located in the gaps of the steel bar layer 10.

[0052] First, screws 13 are welded on the steel plate of the steel bridge frame 1, and then the steel bar layer 10 is laid between the screws 13, and then the STC casting layer 11 is poured, and finally the asphalt concrete wearing layer 12 is laid on the STC casting layer 11. The STC casting layer 11 forms a permanent combination with the steel bridge frame 1 panel, and directly participates in the bridge deck structure that bears the force of the steel box girder. This combined structure can greatly improve the stiffness of the steel bridge deck system and significantly reduce the risk of fatigue damage of the steel box girder. At the same time, the STC casting layer 11 forms an insulating layer between the asphalt concrete wearing layer 12 and the high-temperature steel bridge deck, and can be used as a waterproof layer, avoiding the situation where the asphalt concrete slides and pushes due to the failure of the adhesive during high temperatures in summer.

[0053] See also Figure 1-14 , a construction method of a prestressed composite light steel bridge deck, comprising the following steps:

[0054] S1: pre-weld one end of the series connection frame 4 to the inside of the steel bridge frame 1 or the tail end steel bridge frame 2;

[0055] S2: A guide rail 3 is used between two adjacent steel bridge frames 1 and between a steel bridge frame 1 and a rear end steel bridge frame 2 to insert the other end of the serial connection frame 4 into its own tail, and then the collision sound emitted by the positioning component 9 is used to determine that the insertion position between the two is accurate.

[0056] S3: According to S2, when the two steel bridge frames 1 are successfully butted, the butt locking assembly 10 will lock the sides of the two serially connected frames 4;

[0057] S4: Then the tail end serial connection frame 5 is slidably installed in the interior of the tail end steel bridge frame 2 through the guide rail 3, and the positioning component 9 is also used to determine the position, and the locking component 10 is used to lock it;

[0058] S5: Then insert the steel cable 7 through the steel cable serial seat 6, and use external hydraulic equipment to pull the steel cable 7, wherein the cable locking assembly 8 will lock the steel cable 7 after each stretching to prevent the steel cable 7 from being pulled backward by gravity. Similarly, as the steel cable 7 is tightened, the bent steel cable 7 is gradually straightened, which can offset the falling force of the steel bridge frame 1 and the tail end steel bridge frame 2.

[0059] Working principle: When in use, the serial connection frame 4 on one side of the steel bridge frame 1 is inserted into the other side of the adjacent steel bridge frame 1 in advance, wherein the push spring 93 will push the positioning head 95 into the positioning groove on the inner wall of the steel bridge frame 1, and then a "click" impact sound will be emitted, and outsiders will know that the installation is in place; then the tail end serial connection frame 5 is also inserted into the interior of the tail end steel bridge frame 2 to seal the tail flush, wherein the positioning component 9 is also used to determine the installation position;

[0060] When the two steel bridge frames 1 are interlaced and spliced, and the steel bridge frame 1 is spliced ​​with the tail end steel bridge frame 2, the serial connection frames 4 inside are relatively butted with each other, and the serial connection frames 4 are relatively butted with the tail end serial connection frames 5, wherein the lock plate A101 and the lock plate B102 in the butt locking assembly 10 are pressed against each other, and in fact, the lock plate A101 will be deformed and tilted, so that the limit head 103 at one end of the lock plate A101 and the limit head 103 at one end of the lock plate B102 are mutually locked, ensuring that the serial connection frames 4 are relatively locked with each other, and the serial connection frames 4 are relatively locked with the tail end serial connection frames 5;

[0061] The two swing arms 109 are pried to expand, and the pawl head 111 will leave the tooth groove 104 on the side of the lock plate A101. After the lock plate A101 is unlocked, the lock plate A101 can be adjusted in position in the casing 105, which is convenient for the lock plate A101 to dock with the lock plate B102, and also convenient for the expansion joint distance between the serial frame 4 and the serial frame 4. After that, the swing arm 109 is loosened, and the pawl head 111 will abut against the tooth groove 104, so that the lock plate A101 can be locked. At the same time, the bolt 107 must be twisted to make the bolt 107 press against the surface of the lock plate A101, so as to achieve re-locking of the lock plate A101 and prevent the lock plate A101 from sliding.

[0062] Then, the steel cables 7 are inserted into the interior of the multiple steel cable series seats 6. The surface of the steel cable series seats 6 is provided with rope holes. The center lines of the rope holes of each steel cable series seat 6 are connected in series to form a downward concave curved surface; this ensures that the inserted steel cables 7 are in a drooping shape. The drooping steel cables 7 are straightened by external hydraulic stretching equipment, and the steel cables 7 will form an upward force, which will reduce the gravity of the steel bridge frame 1, the tail end steel bridge frame 2, the series frame 4 and the tail end series frame 5;

[0063] When the steel wire cable 7 is straightened, the displacement ring 82 moves forward in the ring 81 following the steel wire cable 7, and the inner wall of the ring 81 in contact with the displacement ring 82 is in the shape of an inclined surface. When the displacement ring 82 moves forward, the four locking plates 83 move forward. The locking plates 83 are not restricted by the inclined surface, and the locking plates 83 will open, making it convenient for the steel wire cable 7 to move forward. When the pull on the steel wire cable 7 is released, the steel wire cable 7 will move backward with the displacement ring 82, and the four locking plates 83 will be affected by the inclined surface and hold the steel wire cable 7 tightly, thereby locking the steel wire cable 7.

[0064] In summary, the prestressed composite light steel bridge deck and its construction method are as follows: the two adjacent steel bridge frames 1 are interlaced with the serial frame 4 inside their rear ends, and the side of the rear end steel bridge frame 2 is interlaced with the adjacent steel bridge frame 1 through the serial frame 4, so that half of the serial frame 4 is located inside the steel bridge frame 1 on one side, and the other half is located inside the steel bridge frame 1 on the other side, and then the gap is welded, and then the rear end serial frame 5 is inserted into the interior of the rear end steel bridge frame 2 to seal the tail flush, and then the gap is welded. With this staggered and interlaced combination, even if the steel bridge frame 1 falls due to gravity, the serial frame 4 can provide support. Compared with the traditional face-to-face welding method of the bridge deck, the present application provides support in the middle of the weld to reduce the risk of fracture.

[0065] The prestressed composite light steel bridge deck and its construction method, by setting a plurality of steel rope serial seats 6, make the steel wire cable 7 in a concave shape in the initial state, and then use the external hydraulic pressure to pull the steel wire cable 7, so that the steel wire cable 7 can be gradually straightened. In this process, the straightened steel wire cable 7 will form an upward force, and the steel bridge frame 1, the tail end steel bridge frame 2, the serial frame 4 and the tail end serial frame 5 and the parts thereon will form a downward force. The upward force and the downward force constitute a state of offsetting each other, and then offset the falling gravity of the bridge deck, thereby increasing the service life of the bridge deck and reducing the probability of fracture of the welding seam.

[0066] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A prestressed composite light steel bridge deck, comprising a plurality of mutually spliced ​​steel bridge frames (1) and tail steel bridge frames (2) located at both ends of the steel bridge frames (1), characterized in that: The inner wall of the steel bridge frame (1) is slidably mounted with a serial connection frame (4) via a guide rail (3); the interior of the tail end steel bridge frame (2) is slidably mounted with a tail end serial connection frame (5) via a guide rail (3); a steel rope serial connection seat (6) is fixedly mounted between the upper and lower inner walls of the serial connection frame (4) and the tail end serial connection frame (5); a rope hole is provided on the surface of the steel rope serial connection seat (6); the center line of each rope hole of the steel rope serial connection seat (6) is connected in series to form a downwardly concave curved surface; a steel wire cable (7) is inserted into the interior of the steel rope serial connection seat (6); a cable locking assembly (8) is provided on the side of the steel rope serial connection seat (6); the serial connection frame (4) is fixedly mounted with a steel wire cable (7); and the side of the steel rope serial connection seat (6) is fixedly mounted with a steel wire cable (7); and the steel wire cable (7) is fixedly mounted with a steel wire cable (7) on the upper and lower inner walls of the ... ) and the top and bottom of the tail end serial connection frame (5) are embedded with positioning components (9), and the inner walls of both sides of the serial connection frame (4) and the tail end serial connection frame (5) are provided with docking locking components (10); a steel bar layer (14) is laid on the top of the steel bridge frame (1), an STC casting layer (11) is cast inside the steel bar layer (14), a wear layer (12) is laid above the STC casting layer (11), screws (13) are inserted between the wear layer (12) and the steel bridge frame (1), the screws (13) are fixedly welded on the steel bridge frame (1), and the screws (13) are located in the gaps of the steel bar layer (14).

2. The prestressed composite light steel bridge deck according to claim 1, characterized in that: The cable locking assembly (8) comprises a sleeve (81), a displacement ring (82) is slidably mounted inside the sleeve (81), four locking plates (83) are fixedly mounted on the side of the displacement ring (82), and rubber rings (84) are sleeved on the outer sides of the four locking plates (83).

3. The prestressed composite light steel bridge deck according to claim 2 is characterized in that: The collar (81) is fixedly mounted on the side of the steel rope serial seat (6); the collar (81), the displacement ring (82) and the locking plate (83) are all sleeved on the outside of the steel wire rope (7); the cross sections of the locking plate (83) and the collar (81) are both provided with inclined surfaces, and the two inclined surfaces are tangentially contacted with each other.

4. The prestressed composite light steel bridge deck according to claim 1, characterized in that: The positioning assembly (9) comprises a mounting groove (91), a sealing ring (92) is fixedly mounted at the groove opening of the mounting groove (91), a push spring (93) is arranged inside the mounting groove (91), a limiting plate (94) is fixedly mounted at one end of the pushing spring (93) away from the groove bottom, and a positioning head (95) is fixedly mounted on the top of the limiting plate (94).

5. The prestressed composite light steel bridge deck according to claim 1, characterized in that: The installation groove (91) is respectively provided on the upper and lower surfaces of the serial connection frame (4) and the tail end serial connection frame (5); the installation groove (91) is located at the center of the surface of the tail end serial connection frame (5); the installation groove (91) is located outside the center of the surface of the serial connection frame (4); the end of the positioning head (95) away from the limiting plate (94) passes through and extends to the outside of the sealing ring (92); the upper and lower inner walls of the steel bridge frame (1) and the tail end steel bridge frame (2) are both provided with positioning grooves corresponding to the positioning head (95).

6. The prestressed composite light steel bridge deck according to claim 1, characterized in that: The docking locking assembly (10) comprises a lock plate A (101) and a lock plate B (102), the docking ends of the lock plate A (101) and the lock plate B (102) are fixedly mounted with a limiting head (103), the surface of the lock plate A (101) is provided with a tooth groove (104), the outer side of the lock plate A (101) is sleeved with a shell (105), the surface of the shell (105) is embedded with a nut (106), the inner part of the nut (106) is threadedly connected with a bolt (107), and the lock plate A (101) is detachably mounted inside the shell (105) by means of the nut (106) and the bolt (107).

7. The prestressed composite light steel bridge deck according to claim 6, characterized in that: A support (108) is fixedly installed on the side of the sleeve (105), and two swing arms (109) are rotatably connected to the side of the support (108), and a tension spring (110) is movably installed between the swing arms (109). A ratchet head (111) corresponding to the tooth groove (104) is fixedly installed at one end of the swing arm (109) away from the support (108), and the ratchet head (111) and the tooth groove (104) are meshed with each other. The swing arm (109) is mutually clamped with the lock plate A (101) through the ratchet head (111) and the tooth groove (104).

8. The prestressed composite light steel bridge deck according to claim 7, characterized in that: The casing (105) is fixedly mounted on the side wall of one of the serial connection frames (4) / the tail end serial connection frame (5), and the locking plate B (102) is mounted on the side wall of another adjacent serial connection frame (4) / the tail end serial connection frame (5), and the locking plate A (101) and the locking plate B (102) are locked to each other via a limiting head (103).

9. A construction method for a prestressed composite light steel bridge deck according to any one of claims 1 to 8, characterized in that: The following steps are involved: S1: pre-welding one end of the series connection frame (4) to the inside of the steel bridge frame (1) or the tail end steel bridge frame (2); S2: A guide rail (3) is used between two adjacent steel bridge frames (1) and between the steel bridge frame (1) and the rear end steel bridge frame (2) to insert the other end of the series connection frame (4) into the rear end of the frame, and then the collision sound emitted by the positioning component (9) is used to determine the correct insertion position between the two. S3: According to S2, when the two steel bridge frames (1) are successfully butt-jointed, the butt-jointing locking assembly (10) will lock the sides of the two serially connected frames (4); S4: The tail end serial connection frame (5) is then slidably installed in the interior of the tail end steel bridge frame (2) through the guide rail (3), and the positioning component (9) is also used to determine the position, and the locking component (10) is used to lock it; S5: The steel wire cable (7) is then inserted through the steel wire cable connection seat (6), and the steel wire cable (7) is pulled by external hydraulic equipment, wherein the cable locking assembly (8) will lock the steel wire cable (7) after each stretching to prevent the steel wire cable (7) from being pulled backward by gravity. Similarly, as the steel wire cable (7) is tightened, the bent steel wire cable (7) is gradually straightened, thereby offsetting the downward force of the steel bridge frame (1) and the tail end steel bridge frame (2).