Steel beam deviation rectifying device used in beam falling construction process of walking type pushing bridge

By introducing the combined design of hydraulic cylinders and sliding boxes into the bridge deviation correction device, the problem of separate use of traditional devices and equipment is solved, the flexibility and stability of bridge pushing and deviation correction are achieved, equipment costs are reduced, and construction efficiency is improved.

CN118835530APending Publication Date: 2024-10-25CHINA RAILWAY CONSTR BRIDGE ENG BUREAU GRP CO LTD +2
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202411176482.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-26
Publication Date
2024-10-25

AI Technical Summary

Technical Problem

The traditional bridge correction device is used separately from the pushing equipment, which increases the number of equipment and has poor flexibility, making it difficult to meet the needs of walking-type pushing bridge beam construction.

Method used

A steel beam correction device including a correction mechanism is designed. The device is equipped with a limit plate, a mounting shell, a driving hydraulic cylinder, a sliding box, a limiting groove and a support frame on the pier column. Through the cooperation of the hydraulic cylinder and the sliding box, Achieve flexible pushing and correction of the bridge, and improve the flexibility and stability of use.

Benefits of technology

By changing the position and angle of the sliding box, the flexibility of bridge pushing and correction is improved, equipment use and transportation costs are reduced, bridge installation efficiency is increased, and structures such as limit slots, limit bars, and support frames are used to enhance the This improves the stability of the device and avoids movement during sliding and correction of the installation shell.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118835530A_ABST
    Figure CN118835530A_ABST
Patent Text Reader

Abstract

The invention relates to a steel beam deviation rectifying device used in the beam falling construction process of a walking type pushing bridge, and belongs to the technical field of bridge installation. Comprising two deviation rectifying mechanisms arranged on a pier column, the two deviation rectifying mechanisms are symmetrically arranged, each deviation rectifying mechanism comprises a limiting plate arranged on the surface of the pier column, each limiting plate is in an L shape and is buckled on the surface of the pier column, a mounting shell is arranged on the surface of each limiting plate, and a mounting base is fixedly connected to the inner wall of one side of each mounting shell; by changing the position of the sliding box, the mode of pushing or rectifying a bridge can be changed, the use flexibility is improved, the use and transportation cost of equipment is reduced, the bridge installation efficiency is improved, meanwhile, in the process of pushing the bridge, the stability of the installation shell is improved through the limiting grooves and the limiting strips, the installation shell is prevented from sliding, and the service life of the installation shell is prolonged. And in the process of correcting the deviation of the bridge, the mounting shell can be supported through the supporting frame, so that the bridge is prevented from moving during deviation correction, and the stability during deviation correction is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of bridge installation, and relates to a steel beam deviation correction device used in the process of beam dropping construction of a walking-type jacking bridge. Background Art

[0002] The walking jacking construction method is a bridge construction method in which the beam is cast or assembled in sections on the embankment behind the abutment, and a jacking device is used to push it longitudinally so that the beam is put into place through temporary sliding devices on the top of each pier. Since the bridge needs to be pushed during construction and the bridge is long, a correction device is needed to correct the movement angle of the bridge to avoid material deviation. Traditional devices are used separately from the jacking equipment, which increases the number of equipment and has poor flexibility. Therefore, we proposed a steel beam correction device for use in the construction process of walking jacking bridge beam placement to solve the above-mentioned problems. Summary of the invention

[0003] In view of this, in order to solve the problem that traditional devices are used separately from jacking equipment, which increases the number of equipment and has poor flexibility, the present invention provides a steel beam correction device for use in the process of walking-type jacking bridge beam dropping construction.

[0004] To achieve the above-mentioned purpose, the present invention provides the following technical solutions: a steel beam correction device used in the process of beam-dropping construction of a walking-type jacking bridge, comprising a correction mechanism arranged on a pier column, the correction mechanism being two and symmetrically arranged, the correction mechanism comprising a limit plate arranged on the surface of the pier column, the limit plate being L-shaped and buckled on the surface of the pier column, a mounting shell being arranged on the surface of the limit plate, a mounting seat being fixedly connected to an inner wall of one side of the mounting shell, a driving shaft penetrating therethrough being rotatably connected between the top and bottom of the mounting seat, a driving hydraulic cylinder being fixedly connected to the circumference of the driving shaft, a sliding box being arranged on the inner wall of the bottom of the mounting shell, a second slideway being arranged on one side of the sliding box, a second slider being slidably connected in the second slideway, and one end of a piston rod of the driving hydraulic cylinder being fixed to the second slider;

[0005] The bottom inner wall of the sliding box is fixedly connected with a partition, the partition is in contact with the second sliding block, a spring is fixedly connected between the top inner wall of the partition and the second sliding block, the bottom inner wall of the sliding box is fixedly connected with a lifting hydraulic cylinder, and a group of rollers are rotatably connected on both sides of the sliding box.

[0006] In a possible design, the bottom of the sliding box is fixedly connected with a positioning column, and the bottom inner wall of the mounting shell is provided with two sliding grooves, the two sliding grooves are arranged at right angles, and a third sliding block for guiding the movement of the sliding box is slidably connected in the two sliding grooves, and the surface of the third sliding block is provided with a positioning hole for use with the positioning column.

[0007] In a possible design, a middle column is fixedly connected to the bottom inner wall of the mounting shell, and two tension springs are fixedly connected to the circumference of the middle column. The two tension springs are respectively fixed to the two third sliding blocks.

[0008] In one possible design, a mounting plate and a motor are fixedly connected to an inner wall of one side of the mounting shell, a penetrating worm is rotatably connected to one side of the mounting plate, the worm is fixed to one end of the motor output shaft, a worm wheel is fixedly connected to the circumference of the drive shaft, and the worm wheel is meshed with the worm.

[0009] In a possible design, a plurality of limiting grooves are provided on the surface of the limiting plate, and the limiting grooves are triangular in shape. A plurality of limiting bars used in conjunction with the limiting grooves are fixedly connected to the bottom of the mounting shell.

[0010] In a possible design, a rotating sleeve is rotatably connected to the outer wall of one side of the mounting shell, and a pressure rod and a push rod are fixedly connected to the circumference of the rotating sleeve. A first slideway is opened on one side of the mounting shell, and a first slider is slidably connected in the first slideway. The first slider is located above the pressure rod and cooperates with the pressure rod. A mounting shaft is fixedly connected to one side of the mounting shell, and a swing rod is rotatably connected to the circumference of the mounting shaft. One end of the swing rod is located above the push rod and cooperates with the push rod. An end of the swing rod away from the push rod is fixedly connected to a support frame for increasing friction during deviation correction, and a pressure plate used in cooperation with the first slider is fixedly connected to the outer wall of one side of the sliding box.

[0011] In a possible design, a torsion spring is fixedly connected between an outer wall of one side of the mounting shell and the swing arm.

[0012] In a possible design, a positioning block for positioning the push rod is fixedly connected to an outer wall of one side of the mounting shell.

[0013] In a possible design, a backing plate is fixedly mounted on one end of the piston rod of the lifting hydraulic cylinder.

[0014] In a possible design, both sides of the mounting shell are provided with through holes.

[0015] The beneficial effects of the present invention are:

[0016] 1. The steel beam deviation correction device used in the process of walking-type jacking bridge beam dropping construction disclosed by the present invention can be rotated by driving the hydraulic cylinder and the sliding box, so that during the use of the device, the position of the sliding box can be changed to change the way of jacking or correcting the bridge, thereby improving the flexibility of use, reducing the use and transportation costs of the equipment, and increasing the efficiency of bridge installation;

[0017] 2. The steel beam deviation correction device disclosed in the present invention is used in the process of walking-type bridge beam lowering construction. By using the limit groove and the limit bar in coordination, the device can increase the stability of the installation shell through the limit groove and the limit bar during the process of bridge jacking, thereby preventing the installation shell from sliding;

[0018] 3. The steel beam correction device disclosed in the present invention for use in the construction process of the walking type jacking bridge beam drop, by installing a support frame on one side of the installation shell, enables the installation shell to be supported by the support frame during the process of correcting the bridge, thereby avoiding movement during the correction of the bridge and improving the stability during the correction;

[0019] 4. The steel beam correction device disclosed in the present invention is used in the process of walking-type jacking bridge beam dropping construction. By installing a third slider on the surface of the mounting shell, the third slider can be used to guide the sliding box during the movement of the sliding box, thereby improving the stability of the sliding box movement and avoiding angle deviation.

[0020] The present invention can change the position of the sliding box, thereby changing the way of pushing or correcting the bridge, thereby improving the flexibility of use, reducing the cost of use and transportation, and increasing the efficiency of bridge installation. At the same time, in the process of pushing the bridge, the stability of the installation shell is increased by the limit grooves and the limit bars to avoid sliding of the installation shell. In the process of correcting the deviation of the bridge, the installation shell can be supported by the support frame to avoid movement when the bridge is corrected, thereby improving the stability during correction.

[0021] Other advantages, objectives and features of the present invention will be described in the following description to some extent, and to some extent, will be obvious to those skilled in the art based on the following examination and study, or can be taught from the practice of the present invention. The objectives and other advantages of the present invention can be realized and obtained through the following description. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] In order to make the purpose, technical solutions and advantages of the present invention more clear, the present invention will be described in detail below in conjunction with the accompanying drawings, wherein:

[0023] Figure 1 It is a schematic diagram of the three-dimensional structure of the steel beam deviation correction device used in the process of the walking type jacking bridge beam dropping construction according to the present invention from a first viewing angle;

[0024] Figure 2 It is a schematic diagram of the three-dimensional structure from a second viewing angle of the steel beam correction device used in the process of walking-type jacking bridge beam dropping construction of the present invention;

[0025] Figure 3It is a schematic diagram of the installation shell structure of the steel beam correction device used in the process of the walking type jacking bridge beam dropping construction of the present invention;

[0026] Figure 4 It is a structural schematic diagram of another viewing angle of the installation shell of the steel beam deviation correction device used in the construction process of the walking type jacking bridge beam drop according to the present invention;

[0027] Figure 5 It is a schematic cross-sectional structural diagram of a sliding box of a steel beam deviation correction device used in the process of beam-dropping construction of a walking-type jacking bridge according to the present invention;

[0028] Figure 6 It is a schematic diagram of the installation structure of the driving hydraulic cylinder of the steel beam deviation correction device used in the construction process of the walking type jacking bridge beam dropping according to the present invention;

[0029] Figure 7 It is a schematic diagram of the installation structure of the third-party slider of the steel beam correction device used in the construction process of the walking-type jacking bridge beam dropping according to the present invention.

[0030] 1. Actuator 2. Drive cam 3. Lifting cam 4. Lifting cam 5. Driving cam 6. Driving cylinder 7. Driving guide 8. Driving lever 9. Driving guide 10. Driving guide box 11. Lifting cylinder 12. Backing plate 13. First slideway 14. First slider 15. Rotating sleeve 16. Pressing rod 17. Pushing rod 18. Positioning block 19. Mounting shaft 20. Swinging rod 21. Support frame 22. Torsion spring 23. Perforation 24. Partition plate 25. Second slideway 26. Second slider 27. Spring 28. Roller 29. Pressing plate 30. Positioning column 31. Worm gear 32. Motor 33. Worm 34. Mounting plate 35. Slideway 36. Third slider 37. Positioning hole 38. Intermediate column 39. Tension spring DETAILED DESCRIPTION

[0031] The following describes the embodiments of the present invention by specific examples, and those skilled in the art can easily understand other advantages and effects of the present invention from the contents disclosed in this specification. The present invention can also be implemented or applied through other different specific embodiments, and the details in this specification can also be modified or changed in various ways based on different viewpoints and applications without departing from the spirit of the present invention. It should be noted that the illustrations provided in the following embodiments only illustrate the basic concept of the present invention in a schematic manner, and the following embodiments and features in the embodiments can be combined with each other without conflict.

[0032] Among them, the drawings are only used for illustrative explanations, and they only represent schematic diagrams rather than actual pictures, and should not be understood as limitations on the present invention. In order to better illustrate the embodiments of the present invention, some parts of the drawings may be omitted, enlarged or reduced, and do not represent the size of actual products. For those skilled in the art, it is understandable that some well-known structures and their descriptions in the drawings may be omitted.

[0033] The same or similar numbers in the drawings of the embodiments of the present invention correspond to the same or similar parts; in the description of the present invention, it should be understood that if the terms "upper", "lower", "left", "right", "front", "rear", etc. indicate the orientation or position relationship, they are based on the orientation or position relationship shown in the drawings, which is only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operate in a specific orientation. Therefore, the terms describing the position relationship in the drawings are only used for illustrative purposes and cannot be understood as limiting the present invention. For ordinary technicians in this field, the specific meanings of the above terms can be understood according to specific circumstances.

[0034] Embodiment 1

[0035] like Figure 1-Figure 7 As shown, a steel beam deviation correction device used in the process of walking-type jacking bridge beam dropping construction comprises a deviation correction mechanism 2 arranged on a pier 1, two deviation correction mechanisms 2 are symmetrically arranged, the deviation correction mechanism 2 comprises a limit plate 3 arranged on the surface of the pier 1, the limit plate 3 is L-shaped and buckled on the surface of the pier 1, a mounting shell 5 is arranged on the surface of the limit plate 3, a mounting seat 7 is fixedly connected to the inner wall of one side of the mounting shell 5, a driving shaft 8 is rotatably connected between the top and the bottom of the mounting seat 7, a driving hydraulic cylinder 9 is fixedly connected to the circumference of the driving shaft 8, a sliding box 10 is arranged on the inner wall of the bottom of the mounting shell 5, a second slideway 25 is opened on one side of the sliding box 10, a second slider 26 is slidably connected in the second slideway 25, and one end of the piston rod of the driving hydraulic cylinder 9 is fixed to the second slider 26;

[0036] A partition 24 is fixedly connected to the bottom inner wall of the sliding box 10, and the partition 24 contacts the second sliding block 26. A spring 27 is fixedly connected between the top inner wall of the partition 24 and the second sliding block 26. A lifting hydraulic cylinder 11 is fixedly connected to the bottom inner wall of the sliding box 10. A group of rollers 28 are rotatably connected to both sides of the sliding box 10. The driving hydraulic cylinder 9 is started, and the driving hydraulic cylinder 9 pushes the sliding box 10 to move. Under the action of the rollers 28, the bridge is pushed. During the use of the device, the position of the sliding box 10 can be changed, thereby changing the way of pushing or correcting the bridge, thereby improving the flexibility of use, reducing the use and transportation costs of equipment, and improving the efficiency of bridge installation.

[0037] Embodiment 2

[0038] Reference Figure 1-Figure 7 The present invention provides a new technical solution.

[0039] The present invention also includes that the bottom of the sliding box 10 is fixedly connected with a positioning column 30, and the bottom inner wall of the mounting shell 5 is provided with two slide grooves 35, and the two slide grooves 35 are arranged at right angles. A third slider 36 for guiding the movement of the sliding box 10 is slidably connected in the two slide grooves 35, and the surface of the third slider 36 is provided with a positioning hole 37 used in conjunction with the positioning column 30. When the sliding box 10 moves downward, it can drive the positioning column 30 to be inserted into the positioning hole 37 on the third slider 36, thereby increasing the stability of the sliding box 10 when it moves.

[0040] In particular, a middle column 38 is fixedly connected to the bottom inner wall of the mounting shell 5 , and two tension springs 39 are fixedly connected to the circumference of the middle column 38 . The two tension springs 39 are respectively fixed to the two third sliders 36 , and the tension springs 39 are used to pull the third sliders 36 to reset.

[0041] It should be noted that a mounting plate 34 and a motor 32 are fixedly connected to the inner wall of one side of the mounting shell 5, a worm 33 is rotatably connected to one side of the mounting plate 34, the worm 33 is fixed to one end of the output shaft of the motor 32, a worm wheel 31 is fixedly connected to the circumference of the driving shaft 8, the worm wheel 31 is meshed with the worm 33, the motor 32 is started, the motor 32 drives the worm 33 to rotate, the worm 33 drives the driving hydraulic cylinder 9 to rotate through the driving shaft 8, thereby changing the angle of the sliding box 10, so as to facilitate the deviation correction of the bridge.

[0042] In the present invention, a plurality of limiting grooves 4 are arranged on the surface of the limiting plate 3, and the limiting grooves 4 are triangular in shape. A plurality of limiting bars 6 used in conjunction with the limiting grooves 4 are fixedly connected to the bottom of the mounting shell 5. The mounting shell 5 is placed on the limiting plate 3, and the stability of the mounting shell 5 is increased through the cooperation between the limiting grooves 4 and the limiting bars 6.

[0043] In particular, a rotating sleeve 15 is rotatably connected to the outer wall of one side of the mounting shell 5, and a pressure rod 16 and a push rod 17 are fixedly connected to the circumference of the rotating sleeve 15. A first slideway 13 is provided on one side of the mounting shell 5, and a first slider 14 is slidably connected in the first slideway 13. The first slider 14 is located above the pressure rod 16 and cooperates with the pressure rod 16. A mounting shaft 19 is fixedly connected to one side of the mounting shell 5, and a swing rod 20 is rotatably connected to the circumference of the mounting shaft 19. One end of the swing rod 20 is located above the push rod 17 and cooperates with the push rod 17. One end of 20 away from the top rod 17 is fixedly connected to a support frame 21 for increasing friction during correction, and one side outer wall of the sliding box 10 is fixedly connected to a pressure plate 29 used in conjunction with the first slider 14. During correction, the first slider 14 is pressed down by the pressure plate 29, and the first slider 14 presses down one end of the pressure rod 16, thereby causing the top rod 17 to rotate upward, and one end of the swing rod 20 is lifted up through the top rod 17, thereby causing the support frame 21 to descend and contact with the surface of the pier 1, thereby further stabilizing the device during the correction process.

[0044] It should be noted that a torsion spring 22 is fixedly connected between the outer wall of one side of the mounting shell 5 and the swing rod 20 , and the torsion spring 22 is used for resetting the swing rod 20 .

[0045] In the present invention, a positioning block 18 for positioning the push rod 17 is fixedly connected to an outer wall of one side of the mounting shell 5 , and the positioning block 18 maintains the angle of the push rod 17 .

[0046] In particular, a pad 12 is fixedly mounted on one end of the piston rod of the lifting hydraulic cylinder 11, and the pad 12 is protected from the bottom of the bridge.

[0047] It should be noted that both sides of the installation shell 5 are provided with through holes 23 , and the through holes 23 are convenient for hoisting the device.

[0048] The advantages of the second embodiment over the first embodiment are:

[0049] 1. By using the limiting groove 4 and the limiting strip 6 in coordination, the limiting groove 4 and the limiting strip 6 can increase the stability of the installation shell 5 during the process of pushing the bridge, thereby preventing the installation shell 5 from sliding;

[0050] Second, by installing the support frame 21 on one side of the installation shell 5, the installation shell 5 can be supported by the support frame 21 during the process of correcting the deviation of the bridge, thereby avoiding movement during the correction of the deviation of the bridge and improving the stability during the correction;

[0051] Third, by installing the third slider 36 on the surface of the mounting shell 5, the third slider 36 can be used to guide the sliding box 10 during its movement, thereby improving the stability of the movement of the sliding box 10 and avoiding angle deviation.

[0052] Working principle: when in use, place the limit plate 3 on the pier 1, and then place the installation shell 5 on the limit plate 3, and increase the stability of the installation shell 5 through the cooperation of the limit groove 4 and the limit bar 6. When the bridge needs to be pushed, first start the lifting hydraulic cylinder 11, and the lifting hydraulic cylinder 11 will push the bridge upward. During the rising process of the lifting hydraulic cylinder 11, the pad 12 contacts the bottom of the bridge, and the sliding box 10 moves downward, thereby driving the positioning column 30 to be inserted into the positioning hole 37 on the third sliding block 36, thereby increasing the stability of the sliding box 10 when moving. Then start the driving hydraulic cylinder 9, and the driving hydraulic cylinder 9 pushes the sliding box 10 to move. Under the action of the roller 28, the bridge is pushed. After the pushing is completed, the driving hydraulic cylinder 9 and the lifting hydraulic cylinder 11 are reset. After resetting, the sliding box 10 moves upward under the action of the spring 27, thereby causing the positioning column 30 to be disengaged from the insertion with the positioning hole 37;

[0053] When the bridge moves and tilts, it needs to be corrected. During the correction, the motor 32 is started, and the motor 32 drives the worm 33 to rotate. The worm 33 drives the hydraulic cylinder 9 to rotate through the drive shaft 8, thereby changing the angle of the sliding box 10. Similarly, the bridge is lifted up again. During the process of the sliding box 10 descending again, the first slider 14 is pressed down by the pressure plate 29. The first slider 14 presses down one end of the pressure rod 16, thereby causing the push rod 17 to rotate upward, and one end of the swing rod 20 is lifted up by the push rod 17, thereby causing the support frame 21 to descend and contact with the surface of the pier 1, thereby further stabilizing the device during the correction process. After the correction is completed, the device can be reset in the same way.

[0054] However, as is well known to those skilled in the art, the working principles and wiring methods of the driving hydraulic cylinder 9, the lifting hydraulic cylinder 11 and the motor 32 are commonplace, and are conventional means or common knowledge, and will not be elaborated here. Those skilled in the art may make any optional selections according to their needs or convenience.

[0055] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical solution of the present invention can be modified or replaced by equivalents without departing from the purpose and scope of the technical solution, which should be included in the scope of the claims of the present invention.

Claims

1. A steel beam correction device used in the process of walking type jacking bridge beam dropping construction, comprising a correction mechanism (2) arranged on a pier (1), characterized in that: The deviation correction mechanism (2) is two and symmetrically arranged. The deviation correction mechanism (2) comprises a limit plate (3) arranged on the surface of the pier column (1). The limit plate (3) is L-shaped and buckled on the surface of the pier column (1). A mounting shell (5) is arranged on the surface of the limit plate (3). A mounting seat (7) is fixedly connected to the inner wall of one side of the mounting shell (5). A driving shaft (8) is rotatably connected between the top and the bottom of the mounting seat (7). A driving hydraulic cylinder (9) is fixedly connected to the circumference of the driving shaft (8). A sliding box (10) is arranged on the inner wall of the bottom of the mounting shell (5). A second slideway (25) is opened on one side of the sliding box (10). A second slider (26) is slidably connected in the second slideway (25). One end of the piston rod of the driving hydraulic cylinder (9) is fixed to the second slider (26). The bottom inner wall of the sliding box (10) is fixedly connected with a partition (24), the partition (24) is in contact with the second sliding block (26), a spring (27) is fixedly connected between the top inner wall of the partition (24) and the second sliding block (26), the bottom inner wall of the sliding box (10) is fixedly connected with a lifting hydraulic cylinder (11), and a group of rollers (28) are rotatably connected on both sides of the sliding box (10).

2. The steel beam deviation correction device used in the process of beam dropping construction of a walking type jacking bridge according to claim 1 is characterized in that: The bottom of the sliding box (10) is fixedly connected with a positioning column (30), and the bottom inner wall of the mounting shell (5) is provided with two sliding grooves (35), the two sliding grooves (35) are arranged at right angles, and the two sliding grooves (35) are slidably connected with a third sliding block (36) for guiding the movement of the sliding box (10), and the surface of the third sliding block (36) is provided with a positioning hole (37) used in conjunction with the positioning column (30).

3. The steel beam deviation correction device used in the process of beam dropping construction of a walking type jacking bridge according to claim 2 is characterized in that: An intermediate column (38) is fixedly connected to the inner wall of the bottom of the installation shell (5), and two tension springs (39) are fixedly connected to the circumference of the intermediate column (38), and the two tension springs (39) are respectively fixed to the two third sliding blocks (36).

4. The steel beam deviation correction device used in the process of beam dropping construction of a walking type jacking bridge according to claim 3 is characterized in that: A mounting plate (34) and a motor (32) are fixedly connected to an inner wall of one side of the mounting shell (5); a penetrating worm (33) is rotatably connected to one side of the mounting plate (34); the worm (33) is fixed to one end of an output shaft of the motor (32); a worm wheel (31) is fixedly connected to the circumference of the drive shaft (8); and the worm wheel (31) is meshed with the worm (33).

5. The steel beam deviation correction device used in the process of beam dropping construction of a walking type jacking bridge according to claim 1 is characterized in that: The surface of the limiting plate (3) is provided with a plurality of limiting grooves (4), the limiting grooves (4) are triangular in shape, and the bottom of the mounting shell (5) is fixedly connected with a plurality of limiting bars (6) used in conjunction with the limiting grooves (4).

6. The steel beam deviation correction device used in the process of beam dropping construction of a walking type jacking bridge according to claim 1 is characterized in that: A rotating sleeve (15) is rotatably connected to an outer wall of one side of the mounting shell (5), and a pressure rod (16) and a push rod (17) are fixedly connected to the circumference of the rotating sleeve (15). A first slideway (13) is provided on one side of the mounting shell (5), and a first slider (14) is slidably connected in the first slideway (13). The first slider (14) is located above the pressure rod (16) and is used in conjunction with the pressure rod (16). A mounting shaft (19) is fixedly connected to one side of the mounting shell (5), and a swing rod (20) is rotatably connected to the circumference of the mounting shaft (19). One end of the swing rod (20) is located above the push rod (17) and is used in conjunction with the push rod (17). One end of the swing rod (20) away from the push rod (17) is fixedly connected to a support frame (21) for increasing friction during deviation correction. A pressure plate (29) used in conjunction with the first slider (14) is fixedly connected to an outer wall of one side of the sliding box (10).

7. The steel beam deviation correction device used in the process of beam dropping construction of a walking type jacking bridge according to claim 6 is characterized in that: A torsion spring (22) is fixedly connected between an outer wall of one side of the mounting shell (5) and the swing rod (20).

8. The steel beam deviation correction device used in the process of beam dropping construction of a walking type jacking bridge according to claim 6 is characterized in that: A positioning block (18) for positioning the push rod (17) is fixedly connected to an outer wall of one side of the installation shell (5).

9. The steel beam deviation correction device used in the process of beam dropping construction of a walking type jacking bridge according to claim 1 is characterized in that: A backing plate (12) is fixedly mounted on one end of the piston rod of the lifting hydraulic cylinder (11).

10. The steel beam deviation correction device used in the process of beam dropping construction of a walking type jacking bridge according to any one of claims 1 to 9, characterized in that: Both sides of the installation shell (5) are provided with through holes (23).