Microclimate-combined power distribution network accident prediction method, device, system, equipment and medium

By using micro-meteorological data and digital twin scene technology to predict distribution network accidents, the problems of low prediction accuracy and poor timeliness in the existing technology are solved, and higher-precision and timely fault warnings are achieved.

CN118858801APending Publication Date: 2024-10-29GUANGDONG POWER GRID CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410899740.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-05
Publication Date
2024-10-29

AI Technical Summary

Technical Problem

Existing technologies have low accuracy and poor timeliness when predicting distribution network faults, making it difficult to meet the demand for accident prediction. The main reason is that environmental changes cause equipment operating data fluctuations and faults to occur at the same time, resulting in deviations and delays in prediction results.

Method used

Combined with micro-meteorological data, by extracting meteorological parameters such as temperature, humidity and wind speed, use a preset meteorological model to perform prediction calculations, calculate meteorological change data, and input it into the digital twin scenario for accident prediction, and adjust environmental parameters to determine equipment data changing values ​​to predict accident occurrences.

Benefits of technology

It improves the accuracy and timeliness of accident prediction, can more accurately fit the actual situation of the distribution network, promptly reminds and reduces delays, and meets the demand for high-precision and high-timeliness prediction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118858801A_ABST
    Figure CN118858801A_ABST
Patent Text Reader

Abstract

The invention discloses a power distribution network accident prediction method, device, system, equipment and medium in combination with microclimate, and the method comprises the steps: obtaining the microclimate data of a power distribution network, the microclimate data being the real-time weather data of the environment where the power distribution network is located; calculating meteorological change data based on the micrometeorological data, wherein the meteorological change data is a weather change value of an environment where the power distribution network is located within a preset time; the meteorological change data is input into a preset digital twinborn scene for accident prediction, a prediction result is obtained, and the preset digital twinborn scene is a scene livelihood generated after modeling is conducted through equipment of the power distribution network and surrounding environment objects. According to the method, the future weather can be predicted according to the real-time micrometeorological data, accident prediction is carried out in the digital twinborn scene according to the predicted future weather, the actual situation of the power distribution network can be fitted to improve the prediction precision, delay can be reduced, and reminding can be carried out in time to improve the prediction timeliness.
Need to check novelty before this filing date? Find Prior Art

Description

Background Art

[0002] In recent years, the urbanization process has been accelerating and the demand for electricity has been increasing. In order to meet the electricity needs of users in different regions, more and more substations with different voltage levels are being built in different places, supplying electricity to every corner of the city through the distribution network. As the scale of substations and distribution networks continues to expand and their complexity gradually increases, the grid dispatching of electricity is also facing many challenges. Accurately predicting grid failures and timely warnings are crucial to the safe operation of the grid.

[0003] In order to accurately predict power grid failures or accidents, the commonly used method is to collect the operating data of each node in the distribution network in real time, and predict whether there are accidents in various devices in the power grid based on the numerical changes in the operating data of each node.

[0004] However, the commonly used methods currently have the following technical problems: the environment in the distribution network is constantly changing, and changes in the environment will cause changes in equipment operation, and often numerical changes and accidents occur at the same time. For example, the power of a substation suddenly soars and causes a substation failure. The existing technology only predicts accidents based on the fluctuations and changes in the operation data of the nodes. Not only are the prediction results deviated from the actual situation, the prediction accuracy is low, and there is a delay, the timeliness is low, and it is difficult to meet the existing accident prediction needs. Summary of the invention

[0005] The present invention proposes a distribution network accident prediction method, device, system, equipment and medium combined with micro-meteorology, and the method.

[0006] A first aspect of an embodiment of the present invention provides a distribution network accident prediction method combined with micro-meteorology, the method comprising:

[0007] Acquire micro-meteorological data of the distribution network, wherein the micro-meteorological data is real-time weather data of the environment where the distribution network is located;

[0008] Calculate meteorological change data based on the micro-meteorological data, where the meteorological change data is the weather change value of the environment where the distribution network is located within a preset time;

[0009] The meteorological change data is input into a preset digital twin scenario to perform accident prediction and obtain a prediction result. The preset digital twin scenario is a scenario generated by modeling the equipment of the distribution network and the surrounding environment objects.

[0010] In a possible implementation of the first aspect, performing accident prediction in a digital twin scenario preset by inputting the meteorological change data to obtain a prediction result includes:

[0011] After extracting a plurality of change values ​​from the meteorological change data, a value greater than a preset change value is selected from the plurality of change values ​​to obtain a plurality of target values;

[0012] Adjusting the environmental parameters of the preset digital twin scene according to the target values, and obtaining the data change value of the device from the preset digital twin scene, wherein the data change value is the fluctuation value of the data of the distribution network equipment in the preset digital twin scene during the process of the environmental parameters changing;

[0013] The prediction result of the accident is determined according to the numerical value of the data change value.

[0014] In a possible implementation manner of the first aspect, calculating meteorological change data based on the micrometeorological data includes:

[0015] Extracting meteorological parameters from the micro-meteorological data, wherein the meteorological parameters include temperature value, humidity value and wind speed value;

[0016] Calling a preset meteorological model to perform prediction calculation according to the meteorological parameters to obtain meteorological prediction data, wherein the preset meteorological model is a prediction model that is trained based on a Sigmoid function after collecting weather phenomenon data and climate change data of the environment where the distribution network is located;

[0017] The data difference between the meteorological forecast data and the micro-meteorological data is calculated to obtain meteorological change data.

[0018] In a possible implementation of the first aspect, constructing the preset digital twin scene includes:

[0019] Acquire device data and environment data respectively, wherein the device data is data about the structure of each device in the distribution network, and the environment data is data about the environment in which the distribution network is located and surrounding objects;

[0020] Generate a three-dimensional data model using the device data and the environment data;

[0021] Several of the data models are used to construct a simulation scenario of the distribution network during normal operation on a preset digital twin platform.

[0022] In a possible implementation of the first aspect, after the step of performing accident prediction in the digital twin scenario preset by the meteorological change data input value to obtain a prediction result, the method further includes:

[0023] If the prediction result is that an accident occurs, determining the equipment model of the accident equipment;

[0024] According to the device signal, several repair solutions are searched from the database and transmitted to the communication terminal of the technician for the technician to view.

[0025] In a possible implementation of the first aspect, after the step of performing accident prediction in the digital twin scenario preset by the meteorological change data input value to obtain a prediction result, the method further includes:

[0026] If the prediction result is that an accident occurs, the number of accident devices and the power outage duration of the distribution network are counted;

[0027] If the number of the faulty devices is greater than a preset number or the power outage duration is greater than a preset duration, an alarm prompt is triggered.

[0028] A second aspect of an embodiment of the present invention provides a distribution network accident prediction device combined with micro-meteorology, the device comprising:

[0029] An acquisition module is used to acquire micro-meteorological data of the distribution network, wherein the micro-meteorological data is real-time weather data of the environment where the distribution network is located;

[0030] A meteorological calculation module, used to calculate meteorological change data based on the micro-meteorological data, wherein the meteorological change data is a numerical value of weather change in the environment where the distribution network is located within a preset time;

[0031] The accident prediction module is used to perform accident prediction in the digital twin scenario preset by the meteorological change data input value to obtain a prediction result. The preset digital twin scenario is a scene generated by modeling the equipment of the distribution network and the surrounding environment objects.

[0032] In a possible implementation of the second aspect, performing accident prediction in a digital twin scenario preset by inputting the meteorological change data to obtain a prediction result includes:

[0033] After extracting a plurality of change values ​​from the meteorological change data, a value greater than a preset change value is selected from the plurality of change values ​​to obtain a plurality of target values;

[0034] Adjusting the environmental parameters of the preset digital twin scene according to the target values, and obtaining the data change value of the device from the preset digital twin scene, wherein the data change value is the fluctuation value of the data of the distribution network equipment in the preset digital twin scene during the process of the environmental parameters changing;

[0035] The prediction result of the accident is determined according to the numerical value of the data change value.

[0036] In a possible implementation manner of the second aspect, calculating meteorological change data based on the micro-meteorological data includes:

[0037] Extracting meteorological parameters from the micro-meteorological data, wherein the meteorological parameters include temperature value, humidity value and wind speed value;

[0038] Calling a preset meteorological model to perform prediction calculation according to the meteorological parameters to obtain meteorological prediction data, wherein the preset meteorological model is a prediction model that is trained based on a Sigmoid function after collecting weather phenomenon data and climate change data of the environment where the distribution network is located;

[0039] The data difference between the meteorological forecast data and the micro-meteorological data is calculated to obtain meteorological change data.

[0040] In a possible implementation manner of the second aspect, constructing the preset digital twin scene includes:

[0041] Acquire device data and environment data respectively, wherein the device data is data about the structure of each device in the distribution network, and the environment data is data about the environment in which the distribution network is located and surrounding objects;

[0042] Generate a three-dimensional data model using the device data and the environment data;

[0043] Several of the data models are used to construct a simulation scenario of the distribution network during normal operation on a preset digital twin platform.

[0044] In a possible implementation manner of the second aspect, the apparatus further includes:

[0045] A model determination module, used to determine the equipment model of the accident equipment if the prediction result is that an accident has occurred;

[0046] The sending solution module is used to search for several repair solutions from the database according to the device signal and transmit them to the communication terminal of the technician for the technician to view.

[0047] In a possible implementation manner of the second aspect, the apparatus further includes:

[0048] A module for counting quantity and duration, for counting the number of accident devices and the duration of power outage of the distribution network if the prediction result is an accident;

[0049] The alarm enhancement module is used to trigger an alarm prompt if the number of the accident devices is greater than a preset number value or the power outage duration is greater than a preset duration.

[0050] A third aspect of an embodiment of the present invention provides a distribution network accident prediction system combined with micro-meteorology, the system comprising: a management terminal and a plurality of technical terminals, the management terminal being applicable to the distribution network accident prediction method combined with micro-meteorology as described above;

[0051] The management terminal communicates with a plurality of technical terminals.

[0052] Compared with the prior art, the embodiments of the present invention provide a distribution network accident prediction method, device, system, equipment and medium combined with micrometeorology, and its beneficial effects are: the present invention can obtain micrometeorological data of the distribution network; calculate meteorological change data based on the micrometeorological data; and then input the meteorological change data into a preset digital twin scenario to perform accident prediction and obtain a prediction result; the present invention predicts future weather based on real-time micrometeorological data, and performs accident prediction in the digital twin scenario based on the predicted future weather, which can not only fit the actual situation of the distribution network to improve the accuracy of the prediction, but also reduce delays and provide timely reminders to improve the timeliness of the prediction. BRIEF DESCRIPTION OF THE DRAWINGS

[0053] Figure 1 It is a flow chart of a method for predicting distribution network accidents combined with micro-meteorology provided by an embodiment of the present invention;

[0054] Figure 2 It is a structural schematic diagram of a distribution network accident prediction system combined with micro-meteorology provided by an embodiment of the present invention;

[0055] Figure 3 It is a structural schematic diagram of a distribution network accident prediction device combined with micrometeorology provided by an embodiment of the present invention. DETAILED DESCRIPTION

[0056] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0057] In recent years, the urbanization process has been accelerating and the demand for electricity has been increasing. In order to meet the electricity needs of users in different regions, more and more substations with different voltage levels are being built in different places, supplying electricity to every corner of the city through the distribution network. As the scale of substations and distribution networks continues to expand and their complexity gradually increases, the grid dispatching of electricity is also facing many challenges. Accurately predicting grid failures and timely warnings are crucial to the safe operation of the grid.

[0058] In order to accurately predict power grid failures or accidents, the commonly used method is to collect the operating data of each node in the distribution network in real time, and predict whether there are accidents in various devices in the power grid based on the numerical changes in the operating data of each node.

[0059] However, the commonly used methods currently have the following technical problems: the environment in the distribution network is constantly changing, and changes in the environment will cause changes in equipment operation, and often numerical changes and accidents occur at the same time. For example, the power of a substation suddenly soars and causes a substation failure. The existing technology only predicts accidents based on the fluctuations and changes in the operation data of the nodes. Not only are the prediction results deviated from the actual situation, the prediction accuracy is low, and there is a delay, the timeliness is low, and it is difficult to meet the existing accident prediction needs.

[0060] In order to solve the above problems, a distribution network accident prediction method, device, system, equipment and medium combined with micrometeorology provided in an embodiment of the present application will be introduced and explained in detail through the following specific embodiments.

[0061] Reference Figure 1 , showing a flow chart of a distribution network accident prediction method combined with micrometeorology provided by an embodiment of the present invention.

[0062] In one embodiment, the distribution network accident prediction method combined with micrometeorology is applicable to the management system or control system of the distribution network. The management system can be set in a computer or smart terminal, and the system is used to perform real-time data detection, monitoring and management functions on the distribution network.

[0063] Wherein, as an example, the distribution network accident prediction method combined with micro-meteorology may include:

[0064] S11. Acquire micro-meteorological data of the distribution network, where the micro-meteorological data is real-time weather data of the environment where the distribution network is located.

[0065] In one embodiment, different sensors may be installed in the environment around the distribution network and in the outer walls or housings of the distribution network equipment, and real-time weather data may be collected through a plurality of different sensors to obtain micro-meteorological data.

[0066] In an actual operation mode, weather data may include basic meteorological elements, precipitation, clouds and visibility, etc., wherein the basic meteorological elements may include temperature, air pressure, air humidity, wind direction and speed, etc.

[0067] S12. Calculate meteorological change data based on the micro-meteorological data, where the meteorological change data is a numerical value of weather change in the environment where the distribution network is located within a preset time.

[0068] In one embodiment, after obtaining the above-mentioned real-time micro-meteorological data, a prediction can be made based on the micro-meteorological data to calculate the change value of each weather data in the next time period or a preset time period.

[0069] For example, predict the change in temperature, air pressure, air humidity, wind direction and speed in 10 minutes or half an hour. Assume that the current time is 10:00, and the collected micro-meteorological data include temperature, air pressure, air humidity, wind direction and speed, which are respectively temperature: 35 degrees Celsius, air pressure: 100kPa, air humidity: 60%, wind direction and speed is southwest wind, and wind speed is 30km / h.

[0070] Then we can predict the temperature, air pressure, air humidity, wind direction and speed in 10 minutes, and then calculate the difference between the predicted value and the current data to get the weather change value.

[0071] In an optional embodiment, in order to accurately predict the micrometeorological data after a preset time, and use the predicted micrometeorological data and the currently collected micrometeorological data to calculate the difference, where, as an example, the calculation of meteorological change data based on the micrometeorological data may include the following sub-steps:

[0072] S121. Extract meteorological parameters from the micro-meteorological data, wherein the meteorological parameters include temperature value, humidity value and wind speed value.

[0073] S122. Call a preset meteorological model to perform prediction calculations based on the meteorological parameters to obtain meteorological forecast data. The preset meteorological model is a binary regression prediction model that is trained based on a Sigmoid function after collecting weather phenomenon data and climate change data of the distribution network environment.

[0074] S123, calculating the data difference between the meteorological forecast data and the micro-meteorological data to obtain meteorological change data.

[0075] Specifically, the temperature value, humidity value and wind speed value can be extracted from the micro-meteorological data. The temperature value is the outdoor temperature value of the distribution network, the humidity value is the outdoor humidity value of the distribution network, and the wind speed value is the outdoor wind speed value of the distribution network. In order to accurately predict the impact of various meteorological conditions on the distribution network, the rainfall value, air pressure value, etc. can also be extracted from the micro-meteorological data. The specific extracted values ​​can be adjusted according to actual needs.

[0076] Next, the preset meteorological model can be called to perform prediction calculations based on meteorological parameters to obtain meteorological forecast data. For example, the temperature value, humidity value and wind speed value are input into the preset meteorological model. The preset meteorological model can predict the temperature value, humidity value and wind speed value 10 minutes later based on the current temperature value, humidity value and wind speed value, and can also predict the temperature value, humidity value and wind speed value half an hour later, and can also predict the temperature value, humidity value and wind speed value one hour later. The predicted time can be adjusted according to actual needs.

[0077] Finally, the data difference between the meteorological forecast data and the micro-meteorological data can be calculated to obtain the meteorological change data.

[0078] In one embodiment, the preset meteorological model is a prediction model that is trained based on the Sigmoid function after collecting weather phenomenon data and climate change data of the environment in which the distribution network is located.

[0079] Specifically, the preset meteorological model can be constructed as follows:

[0080] The first step is to obtain weather phenomenon indicators and climate change indicators.

[0081] In one embodiment, the weather phenomenon index is obtained by:

[0082] For example, in summer, the average temperature of the environment or region where the distribution network is located is extracted, and the months with higher temperatures than the average temperature are marked as 1, and the rest of the months are marked as 0 as weather phenomenon indicators. For another example, in winter, the daily temperature of the environment or region where the distribution network is located is extracted, and the months with lower average temperatures than the daily temperature are marked as 1, and the rest of the months are marked as 0 as weather phenomenon indicators. It is also possible to use the day as a unit, mark the date with higher temperatures than the average temperature as 1, and mark the rest of the dates as 0 as weather phenomenon indicators. Different regions can be adjusted according to actual needs. If the distribution network is at the seaside or coastal areas, rainfall can also be used as an indicator, and the date with higher daily rainfall than the average rainfall can be marked as 1, and the rest of the dates can be marked as 0, as a weather phenomenon indicator. Similarly, if the distribution network is in a mid-mountain area, wind speed can also be used as an indicator, and the date with higher wind speed than the average wind speed can be marked as 1, and the rest of the dates can be marked as 0, as a weather phenomenon indicator.

[0083] In a specific embodiment, the monthly average temperature sample data of a representative base station in a local area is analyzed, and the temperature of 15°C is the average daily temperature of the quarter. The months with the monthly average temperature below 15°C in the area are marked as 1, and the remaining months are marked as 0, as weather phenomenon indicators.

[0084] In one embodiment, the climate change indicator is obtained by:

[0085] Two periods of global temperature data of the same length can be extracted and the corresponding average temperatures can be calculated. The difference in the average temperatures can then be calculated. The average temperatures corresponding to the two periods of global temperature data of the same length can be compared. If the average temperature increases, it is marked as 1. If the average temperature decreases or remains unchanged, it is marked as 0, which can be used as a climate change indicator.

[0086] We can also compare the average temperatures of two periods of 30 years. If the average temperature of the first 30 years is higher than the average temperature of the first 30-60 years, it is marked as 1. If the average temperature of the first 30 years is lower than the average temperature of the first 30-60 years or the average temperature remains unchanged, it is marked as 0, and the climate change index that characterizes the long-term weather characteristics is obtained. Similarly, parameters such as wind speed, rainfall and humidity can all be constructed with the same method to construct climate change indicators.

[0087] The second step is to construct an information gain model. Specifically, the temperature data set is obtained by dividing it into weather phenomenon indicators and climate change indicators, and the degree of confusion of the temperature data set is calculated to further obtain the information gain of the temperature data set.

[0088] The calculation formula of the degree of chaos is as follows:

[0089]

[0090] In the above formula, X represents the temperature dataset, p(x i ) represents the sample x i The probability of occurrence, H(X) represents the degree of confusion of the temperature data set.

[0091] The information gain is calculated as follows:

[0092] Gain(X,A)=H(X)-H(XA)

[0093]

[0094] In the above formula, X and A both represent atmospheric data, H(X / A) is the uncertainty of the random variable X under the condition of known random variable A, H(X) represents the degree of confusion of the temperature dataset, and Gain(X, A) represents the information gain of data A to data X.

[0095] It should be noted that the information gain model can measure the uncertainty between weather phenomenon indicators and climate change indicators, so as to further find the relationship between the two, measure the degree of mutual influence between weather phenomenon indicators and climate change indicators, and thus determine the gain changes of various data values ​​according to the degree of their mutual influence.

[0096] It should be noted that in the information gain model, the more information a feature brings to the system, the more important this feature is. For a feature, the difference in the amount of information when the system has this feature and when it does not have this feature is the amount of information that this feature can bring to the system. The larger the difference, the more information this feature can bring to the system.

[0097] The third step is to construct a prediction model using the information gain value output by the information gain model. The prediction model can be a Multi-layer Perceptron (MLP), which is a forward structure of an artificial neural network, consisting of an input layer, a hidden layer, and an output layer.

[0098] The calculation formula of the prediction model is as follows:

[0099]

[0100] In the above formula, x i The input variable is the information gain value output by the information gain model, y is the predicted value of the output, μ j is the output of the hidden layer neurons, v ij is the weight of the i-th input variable and the j-th hidden layer neuron, θ j u is the threshold of the jth neuron in the hidden layer u. f is the mapping relationship of the activation function.

[0101] In one embodiment, the activation function is a sigmoid function, and the calculation formula of the sigmoid function is as follows:

[0102]

[0103] In one embodiment, the model may have n samples and m hidden layers, so that the error between the predicted value and the true value can be minimized.

[0104] After calculating the meteorological forecast data, the data difference between the meteorological forecast data and the micro-meteorological data can be calculated to obtain the meteorological change data. For example, after calculating the predicted temperature value, the difference between the predicted temperature value and the real-time detected temperature value can be calculated to obtain the temperature change value; similarly, the difference between the predicted humidity value and the real-time detected humidity value can be calculated to obtain the humidity change value.

[0105] S13. Input the meteorological change data into a preset digital twin scenario to perform accident prediction and obtain a prediction result. The preset digital twin scenario is a scenario generated by modeling the equipment of the distribution network and the surrounding environment objects.

[0106] Next, the meteorological change data can be input into the preset digital twin scene, and the environmental parameters of the preset digital twin scene can be adjusted according to the meteorological change data. Then, the operating status of the adjusted distribution network equipment can be detected in the preset digital twin scene, and then accident prediction can be performed based on its operating data to obtain prediction results.

[0107] In one embodiment, the preset digital twin scene is a scene generated by modeling the equipment and surrounding environment objects of the distribution network, and the preset digital twin scene simulates the normal working scene of the distribution network equipment. Through the virtual simulation scene, it is determined whether the equipment has the risk of failure. If there is a risk, adjustments and alarms can be made early.

[0108] For example, meteorological change data includes rainfall, and the rainfall is 50 mm per hour. This data can be detected and input into the preset digital twin scene to detect whether the normal operation of the preset digital twin scene xx power station equipment will be affected at 50 mm per hour. If the xx power station equipment immediately reduces its power generation by 30%, the power amplifier connected to the back end of the xx power station equipment will stop working immediately, causing the entire distribution network to be disconnected from power supply. At this time, the prediction result is that an accident has occurred.

[0109] Similarly, meteorological change data includes rainfall, and the rainfall is 30 mm per hour. This data can be detected and input into the preset digital twin scene. If the rainfall is 30 mm per hour, each device will work normally, and the prediction result is that no accident will occur.

[0110] In one of the embodiments, the weather change data may contain multiple values. If each value is used for prediction processing one by one, it will increase the time consumption and reduce the efficiency.

[0111] In order to improve the processing efficiency of the prediction, as an example, the accident prediction is performed in the digital twin scenario preset by the meteorological change data input value to obtain the prediction result, which can include the following sub-steps: accident prediction.

[0112] S131. After extracting a plurality of change values ​​from the meteorological change data, a value greater than a preset change value is selected from the plurality of change values ​​to obtain a plurality of target values.

[0113] S132. Adjust the environmental parameters of the preset digital twin scene according to the several target values, and obtain the data change value of the equipment from the preset digital twin scene, wherein the data change value is the fluctuation value of the data of the distribution network equipment in the preset digital twin scene during the process of changes in the environmental parameters.

[0114] S133. Determine the prediction result of the accident according to the numerical value of the data change value.

[0115] Specifically, multiple change values ​​can be extracted from the meteorological change data, for example, the change value of temperature, the change value of rainfall, the change value of air pressure, the change value of wind speed, etc. Then, values ​​greater than the preset change value can be screened from the multiple change values ​​to obtain several target values.

[0116] For example, it can be determined whether the temperature change value is greater than a preset temperature change threshold, whether the rainfall change value is greater than a preset rainfall change threshold, whether the air pressure change value is greater than a preset air pressure change threshold, and whether the wind speed change value is greater than a preset wind speed change threshold.

[0117] Then, by screening out values ​​that are greater than their corresponding change thresholds, several target values ​​can be obtained. If the data is less than the value of its corresponding change threshold, it means that the change is not large, and this data may not affect the normal operation of the equipment, and it can not be used as a reference data for accident prediction. On the contrary, if the data is greater than the value of its corresponding change threshold, it means that the change is large, and this data may affect the normal operation of the equipment, and it can be used as a reference data for accident prediction.

[0118] Then, the environmental parameters of the preset digital twin scene can be adjusted according to the numerical value of each target value, and the data change value of the equipment can be obtained from the preset digital twin scene. The data change value is the fluctuation value of the data of the distribution network equipment in the preset digital twin scene during the change of environmental parameters.

[0119] For example, the temperature, rainfall, air pressure and wind speed of the preset digital twin scene are adjusted according to the change values ​​of temperature, rainfall, air pressure and wind speed. Then, in this environment, the operating data of each device in the distribution network is collected, and the difference between the detected operating data and the real-time operating data is calculated to obtain the data change value.

[0120] Finally, the prediction result of the accident can be determined according to the numerical value of the data change value.

[0121] For example, the time of the predicted data can be calculated, assuming that the predicted data is the data predicted 10 minutes later. Then the ratio of the data change value to the predicted time can be calculated to obtain the change rate, and then it is determined whether the change rate is greater than the preset rate. If so, the prediction result is determined to be an accident, otherwise, the prediction result is determined to be no accident.

[0122] For another example, the maximum and minimum values ​​of the data change value may be determined. If the maximum value is greater than the corresponding maximum threshold, or the minimum value is less than the corresponding minimum threshold, the prediction result is determined to be an accident. Otherwise, the prediction result is determined to be no accident. The specific detection method may be adjusted according to actual needs.

[0123] In order to generate a virtual scene that is identical to the actual scene of the distribution network, as an example, constructing the preset digital twin scene may include the following sub-steps:

[0124] S21. Acquire device data and environment data respectively, wherein the device data is data about the structure of each device in the distribution network, and the environment data is data about the environment in which the distribution network is located and surrounding objects.

[0125] S22: Generate a three-dimensional data model using the device data and the environment data.

[0126] S23. Use several of the data models to construct a simulation scenario of the distribution network during normal operation on a preset digital twin platform.

[0127] Specifically, the equipment data and environmental data can be obtained separately. The equipment data is data about each equipment structure in the distribution network, for example, the location of substation A, the length, width, height and other size parameters of substation A; the location of amplifier B, the length, width, height and other size parameters of amplifier B. The environmental data is data about the environment and surrounding objects of the distribution network. For example, the number of trees around the distribution network, the length, width, height and other dimensions of the trees, the location of the fence and river channel around the distribution network, and the width of the river channel, etc.

[0128] The above equipment data and environmental data can be used to construct a three-dimensional data model in BIM format.

[0129] Then, on the preset digital twin platform, several data models are combined according to the location of each device to construct a simulation scenario of the distribution network. At the same time, the normal working state of each device can be simulated or the data of the normal working of each device can be input to simulate the scenario of the distribution network when it is working normally.

[0130] If an accident is predicted, it is necessary to promptly notify the technicians to carry out maintenance. As an example, after performing accident prediction in the digital twin scenario preset by the meteorological change data input value and obtaining the prediction result, the method may further include the following steps:

[0131] S31. If the prediction result is that an accident occurs, determine the equipment model of the accident equipment.

[0132] S32. Search for several repair solutions from the database according to the device signal, and transmit them to the communication terminal of the technician for the technician to view.

[0133] In one embodiment, if the prediction result is that an accident occurs, the equipment model of the accident equipment is determined.

[0134] Then, according to the device signal, several repair solutions are searched from the solution list in the database and transmitted to the technician's communication terminal for the technician to view.

[0135] In one implementation, a technician may pre-set several repair solutions for different devices, and then organize the several repair solutions into a solution list for the technician to review.

[0136] In one embodiment, the management system may be connected to the communication terminals of several technicians for communication, and then transmit the searched several repair solutions to the communication terminals of the technicians for the technicians to view.

[0137] If an accident is predicted, it is necessary to promptly notify the on-site technical personnel to pay attention. As an example, after performing accident prediction in the digital twin scene preset by inputting the meteorological change data into a value and obtaining the prediction result, the method may further include the following steps:

[0138] S41. If the prediction result is that an accident occurs, the number of accident devices and the power outage duration of the distribution network are counted.

[0139] S42: If the number of the faulty devices is greater than a preset number or the power outage duration is greater than a preset duration, an alarm is triggered.

[0140] Specifically, if the prediction result is that an accident occurs, the number of failed devices and the power outage duration of the distribution network are counted.

[0141] If the number of devices predicted to be in accidents is greater than the preset number, or if the power outage duration caused by equipment failure in the distribution network is greater than the preset duration, an alarm can be triggered immediately.

[0142] After listening to the alarm prompts, on-site technicians can carry out repairs to ensure that the distribution network can be restored in time.

[0143] In this embodiment, an embodiment of the present invention provides a distribution network accident prediction method combined with micrometeorology, and its beneficial effects are: the present invention can obtain micrometeorological data of the distribution network; calculate meteorological change data based on the micrometeorological data; and then input the meteorological change data into a preset digital twin scenario to perform accident prediction and obtain a prediction result; the present invention predicts future weather based on real-time micrometeorological data, and performs accident prediction in the digital twin scenario based on the predicted future weather, which can not only fit the actual situation of the distribution network to improve the prediction accuracy, but also reduce delays and provide timely reminders to improve the timeliness of the prediction.

[0144] The embodiment of the present invention also provides a distribution network accident prediction device combined with micro-meteorology, see Figure 2 , showing a schematic structural diagram of a distribution network accident prediction device combined with micrometeorology provided by an embodiment of the present invention.

[0145] Wherein, as an example, the distribution network accident prediction device combined with micro-meteorology may include:

[0146] An acquisition module 201 is used to acquire micro-meteorological data of the distribution network, wherein the micro-meteorological data is real-time weather data of the environment where the distribution network is located;

[0147] A meteorological calculation module 202, configured to calculate meteorological change data based on the micro-meteorological data, wherein the meteorological change data is a numerical value of weather change in the environment where the power distribution network is located within a preset time;

[0148] The accident prediction module 203 is used to perform accident prediction in a digital twin scenario preset by inputting the meteorological change data to obtain a prediction result. The preset digital twin scenario is a scenario generated by modeling the equipment of the distribution network and the surrounding environment objects.

[0149] Optionally, the step of inputting the meteorological change data into a preset digital twin scenario to perform accident prediction and obtain a prediction result includes:

[0150] After extracting a plurality of change values ​​from the meteorological change data, a value greater than a preset change value is selected from the plurality of change values ​​to obtain a plurality of target values;

[0151] Adjusting the environmental parameters of the preset digital twin scene according to the target values, and obtaining the data change value of the device from the preset digital twin scene, wherein the data change value is the fluctuation value of the data of the distribution network equipment in the preset digital twin scene during the process of the environmental parameters changing;

[0152] The prediction result of the accident is determined according to the numerical value of the data change value.

[0153] Optionally, the calculating meteorological change data based on the micro-meteorological data includes:

[0154] Extracting meteorological parameters from the micro-meteorological data, wherein the meteorological parameters include temperature value, humidity value and wind speed value;

[0155] Calling a preset meteorological model to perform prediction calculation according to the meteorological parameters to obtain meteorological prediction data, wherein the preset meteorological model is a prediction model that is trained based on a Sigmoid function after collecting weather phenomenon data and climate change data of the environment where the distribution network is located;

[0156] The data difference between the meteorological forecast data and the micro-meteorological data is calculated to obtain meteorological change data.

[0157] Optionally, constructing the preset digital twin scene includes:

[0158] Acquire device data and environment data respectively, wherein the device data is data about the structure of each device in the distribution network, and the environment data is data about the environment in which the distribution network is located and surrounding objects;

[0159] Generate a three-dimensional data model using the device data and the environment data;

[0160] Several of the data models are used to construct a simulation scenario of the distribution network during normal operation on a preset digital twin platform.

[0161] Optionally, the device further comprises:

[0162] A model determination module, used to determine the equipment model of the accident equipment if the prediction result is that an accident has occurred;

[0163] The sending solution module is used to search for several repair solutions from the database according to the device signal and transmit them to the communication terminal of the technician for the technician to view.

[0164] Optionally, the device further comprises:

[0165] A module for counting quantity and duration, for counting the number of accident devices and the duration of power outage of the distribution network if the prediction result is an accident;

[0166] The alarm enhancement module is used to trigger an alarm prompt if the number of the accident devices is greater than a preset number value or the power outage duration is greater than a preset duration.

[0167] The embodiment of the present invention also provides a distribution network accident prediction system combined with micro-meteorology, see Figure 3 , showing a schematic structural diagram of a distribution network accident prediction system combined with micrometeorology provided by an embodiment of the present invention.

[0168] Wherein, as an example, the distribution network accident prediction system combined with micro-meteorology may include: a management terminal and multiple technical terminals, wherein the management terminal is applicable to the distribution network accident prediction method combined with micro-meteorology as described in the above embodiment;

[0169] The management terminal communicates with a plurality of technical terminals.

[0170] The management terminal may be a computer or intelligent terminal installed with a management system or control system of the distribution network.

[0171] The technical terminal may be an intelligent terminal of a distribution network technician.

[0172] Those skilled in the art can clearly understand that, for the sake of convenience and brevity of description, the specific working process of the device described above can refer to the corresponding process in the aforementioned method embodiment, and will not be repeated here.

[0173] Furthermore, an embodiment of the present application also provides an electronic device, comprising: a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein when the processor executes the program, the distribution network accident prediction method combined with micrometeorology as described in the above embodiment is implemented.

[0174] Furthermore, an embodiment of the present application also provides a computer-readable storage medium, which stores a computer-executable program, and the computer-executable program is used to enable a computer to execute the distribution network accident prediction method combined with micro-meteorology as described in the above embodiment.

[0175] It should be noted that the orientation or positional relationship indicated by the terms "upper", "lower", etc. is based on the orientation or positional relationship shown in the accompanying drawings, which is only for the convenience of describing the embodiments of the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation of the present invention. When an element such as a layer, region or substrate is referred to as being "on" or "above" another element, it can be directly on the other element, or there can also be an intermediate element. On the contrary, when an element is referred to as "directly on" or "above" another element, there is no intermediate element. It should also be understood that when an element is referred to as being "under" or "below" another element, it can be directly under or below the other element, or there can also be an intermediate element. On the contrary, when an element is referred to as being "directly under" or "below" another element, there is no intermediate element. Unless otherwise clearly specified and limited, the terms "installed", "connected" and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0176] Those skilled in the art will appreciate that the embodiments of the present application may also provide computer program products. Therefore, the present application may adopt the form of complete hardware embodiments, complete software embodiments, or embodiments in combination with software and hardware. Moreover, the present application may adopt the form of computer program products implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) that contain computer-usable program codes.

[0177] The present application is described with reference to the flowcharts and / or block diagrams of the methods, devices (systems), apparatuses, and computer program products according to the embodiments of the present application. It should be understood that each process and / or block in the flowchart and / or block diagram, as well as the combination of the processes and / or blocks in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to generate a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.

[0178] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.

[0179] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 A step that specifies a function in one or more boxes.

[0180] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the technical principles of the present invention. These improvements and modifications should also be regarded as the scope of protection of the present invention.

Claims

1. A distribution network accident prediction method combined with micro-meteorology, characterized in that: The method comprises: Acquire micro-meteorological data of the distribution network, wherein the micro-meteorological data is real-time weather data of the environment where the distribution network is located; Calculate meteorological change data based on the micro-meteorological data, where the meteorological change data is the weather change value of the environment where the distribution network is located within a preset time; The meteorological change data is input into a preset digital twin scenario to perform accident prediction and obtain a prediction result. The preset digital twin scenario is a scenario generated by modeling the equipment of the distribution network and the surrounding environment objects.

2. The method for predicting distribution network accidents combined with micro-meteorology according to claim 1 is characterized in that: The step of inputting the meteorological change data into a preset digital twin scenario to perform accident prediction and obtain prediction results includes: After extracting a plurality of change values ​​from the meteorological change data, a value greater than a preset change value is selected from the plurality of change values ​​to obtain a plurality of target values; Adjusting the environmental parameters of the preset digital twin scene according to the target values, and obtaining the data change value of the device from the preset digital twin scene, wherein the data change value is the fluctuation value of the data of the distribution network equipment in the preset digital twin scene during the process of the environmental parameters changing; The prediction result of the accident is determined according to the numerical value of the data change value.

3. The method for predicting distribution network accidents combined with micro-meteorology according to claim 1 is characterized in that: The calculating of meteorological change data based on the micro-meteorological data comprises: Extracting meteorological parameters from the micro-meteorological data, wherein the meteorological parameters include temperature value, humidity value and wind speed value; Calling a preset meteorological model to perform prediction calculation according to the meteorological parameters to obtain meteorological prediction data, wherein the preset meteorological model is a prediction model that is trained based on a Sigmoid function after collecting weather phenomenon data and climate change data of the environment where the distribution network is located; The data difference between the meteorological forecast data and the micro-meteorological data is calculated to obtain meteorological change data.

4. The method for predicting distribution network accidents combined with micro-meteorology according to claim 1, characterized in that: Constructing the preset digital twin scenario includes: Acquire device data and environment data respectively, wherein the device data is data about the structure of each device in the distribution network, and the environment data is data about the environment in which the distribution network is located and surrounding objects; Generate a three-dimensional data model using the device data and the environment data; Several of the data models are used to construct a simulation scenario of the distribution network during normal operation on a preset digital twin platform.

5. The method for predicting distribution network accidents combined with micrometeorology according to any one of claims 1 to 4, characterized in that: After the step of performing accident prediction in the digital twin scenario preset by the meteorological change data input value to obtain the prediction result, the method further includes: If the prediction result is that an accident occurs, determining the equipment model of the accident equipment; According to the device signal, several repair solutions are searched from the database and transmitted to the communication terminal of the technician for the technician to view.

6. The method for predicting distribution network accidents combined with micrometeorology according to any one of claims 1 to 4, characterized in that: After the step of performing accident prediction in the digital twin scenario preset by the meteorological change data input value to obtain the prediction result, the method further includes: If the prediction result is that an accident occurs, the number of accident devices and the power outage duration of the distribution network are counted; If the number of the faulty devices is greater than a preset number or the power outage duration is greater than a preset duration, an alarm prompt is triggered.

7. A distribution network accident prediction device combined with micro-meteorology, characterized in that: The device comprises: An acquisition module is used to acquire micro-meteorological data of the distribution network, wherein the micro-meteorological data is real-time weather data of the environment where the distribution network is located; A meteorological calculation module, used to calculate meteorological change data based on the micro-meteorological data, wherein the meteorological change data is a numerical value of weather change in the environment where the distribution network is located within a preset time; The accident prediction module is used to perform accident prediction in the digital twin scenario preset by the meteorological change data input value to obtain a prediction result. The preset digital twin scenario is a scene generated by modeling the equipment of the distribution network and the surrounding environment objects.

8. A distribution network accident prediction system combined with micro-meteorology, characterized in that: The system comprises: a management terminal and a plurality of technical terminals, wherein the management terminal is applicable to the distribution network accident prediction method combined with micro-meteorology as described in any one of claims 1 to 6; The management terminal communicates with a plurality of technical terminals.

9. An electronic device, comprising: A memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor implements the distribution network accident prediction method combined with micrometeorology as described in any one of claims 1 to 6 when executing the computer program.

10. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores a computer-executable program, and the computer-executable program is used to enable a computer to execute the distribution network accident prediction method combined with micro-meteorology as described in any one of claims 1-6.