Virtual power plant cooperative game benefit distribution method considering reputation value correction
By introducing a credit value evaluation mechanism and a modified Shapley value method income distribution plan into the virtual power plant, the problem that performance is not considered in the income distribution mechanism of the virtual power plant is solved, the efficiency and credit level of power market transactions are improved, and income distribution is achieved fairness.
Patent Information
- Application Number
- CN202410898559.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-05
- Publication Date
- 2024-10-29
AI Technical Summary
The revenue distribution mechanism of virtual power plants in the power market lacks a clear mechanism and does not fully consider the historical performance of transaction entities, resulting in high transaction default rates and affecting grid security and market efficiency.
Based on cooperative game theory and cost-maximizing economic dispatch, we construct a credit value evaluation mechanism for virtual power plants, modify the income distribution plan of the Shapley value method, and adjust the risk and income distribution of transaction entities through the credit value to ensure fair distribution of high and low credit value entities.
It improves the efficiency and quality of electricity market transactions, reduces transaction default rates, strengthens the market credit system, and achieves fairness in income distribution and healthy market development.
Smart Images

Figure CN118864099A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of power systems, and in particular to a method for allocating benefits of a virtual power plant cooperative game taking into account credit value correction. Background Art
[0002] As a supporting industry for my country's economic development, the power industry faces the requirements and challenges of a high proportion of new energy entities access and high-quality power operation. Faced with challenges, my country continues to promote the construction of power spot market transactions and accelerate the construction of a market mechanism for new entities to participate in power market transactions. As an emerging technology that effectively aggregates multiple entities to participate in the power market, although virtual power plants have been used in a few regions to coordinate the participation of new energy entities in power auxiliary services, there is still a lack of a clear mechanism for this technology in the power market; at the same time, in the research related to the aggregation of multiple subject profit distribution mechanisms, virtual power plants generally use wind power uncertainty, output deviation and risk fluctuations as points for adjusting profit distribution improvements, and rarely consider the historical performance of transaction entities. As a new energy entity participating in power market transactions, new energy has the characteristics of output uncertainty, low entry threshold for entity operation and strong individual profit-seeking. If a transaction default occurs during the transaction, it will not only cause economic damage to both the power purchaser and the power seller, but may also have a negative impact on the safe operation of the power grid. In order to reduce the default rate, the existing technology proposes to match and lock the transaction order of the power market entities with the transaction users, and should consider the historical contract completion rate of the entity, the distance between the entity and the declared price and other information. It is also proposed to evaluate the contract completion of the power market transaction entity based on the authoritative proof algorithm, formulate credit scoring standards, and establish a credit reward and punishment mechanism for the transaction entity based on the node credit situation and transaction performance to encourage the entity to improve the transaction fulfillment rate. It can be seen from the survey that establishing a subject credit evaluation mechanism is one of the feasible means to encourage the subject to improve the transaction fulfillment rate, but there is currently little research on the virtual power plant profit distribution mechanism in China. Therefore, the present invention proposes a virtual power plant cooperative game profit distribution method that takes into account the credit value correction. Summary of the invention
[0003] The purpose of the present invention is to provide a virtual power plant cooperative game benefit distribution method taking into account the reputation value correction. Based on the cooperative game theory and economic dispatch based on cost maximization, the output function and profit function of photovoltaic, wind power and coal-fired units are analyzed, and a model of virtual power plants aggregating multiple subjects to participate in electricity trading is constructed; secondly, a reputation value evaluation mechanism based on the completion of transaction contract fulfillment is established; finally, the reputation value is used to correct the profit distribution plan of the initial Shapley value method. By correcting the profit distribution, the risks borne by subjects with high and low reputation values are reasonably transferred, making the profit distribution more fair.
[0004] To achieve the above object, the present invention provides the following solutions:
[0005] The virtual power plant cooperative game benefit allocation method considering the reputation value correction is applied to the power transaction in which multiple entities participate in the virtual power plant aggregation, including:
[0006] Determine the power parameters and corresponding reputation values of each trading entity in the cooperative alliance, and check whether the reputation value meets the preset access threshold. If so, determine the output power of the trading entity based on the power parameters; if not, eliminate the trading entity;
[0007] Allocate power generation tasks to the trading entities based on the output power, and calculate alliance benefits;
[0008] The alliance income is distributed to the transaction entities based on the Shapley value method improved by the reputation value and marginal contribution.
[0009] Optionally, the transaction entities in the cooperative alliance include wind power, photovoltaics and several coal-fired units.
[0010] Optionally, the method for determining the reputation value of each transaction subject in the cooperative alliance is:
[0011]
[0012] Where: C i is the updated reputation value of transaction subject i after the last power transaction; ΔP is the total deviation power; ΔP i is the deviation power of trading subject i; Plan output power for trading subject i; is the actual output power of transaction subject i.
[0013] Optionally, allocating power generation tasks to each trading entity based on the output power includes:
[0014] Obtain the total electricity demand load;
[0015] With the constraint of balancing the total load of the electricity demand and the output power and with the goal of maximizing the total profit of the cooperative alliance, power generation tasks are allocated to each trading entity.
[0016] Optionally, calculating the alliance revenue includes:
[0017] G total =G WT +G PV +G BM -G buy ,
[0018]
[0019] Where: G total is the total revenue of the alliance, G WTis the total revenue of wind power, G PV is the total photovoltaic revenue, G BM is the total revenue of coal-fired units, G buy The cost of purchasing electricity from the external network for the cooperative alliance, r t is the electricity price at time t, M WT is the wind power generation operation and maintenance coefficient, P WT,t is the wind power output power at time t, M PV is the photovoltaic power generation operation and maintenance coefficient, P PV,t is the photovoltaic output power at time t, P BM,t,l is the output power of the lth coal-fired unit at time t, F t,l is the power generation cost of the lth coal-fired unit at time t, m is the total number of coal-fired units, P lack,t is the power shortage of the cooperative alliance at time t, R t is the price of electricity purchased from the external network at time t.
[0020] Optionally, allocating the alliance income to each transaction subject based on the Shapley value method improved by the reputation value and marginal contribution includes:
[0021] Calculate the profit distribution value of each transaction subject based on the Shapley value method and marginal contribution;
[0022] The transaction weight is determined according to the reputation value, and the benefit distribution value is modified based on the transaction weight to obtain a final benefit distribution value.
[0023] Optionally, the method for determining the transaction weight according to the reputation value is:
[0024]
[0025] Where: f i is the transaction weight of transaction subject i, C i is the reputation value of transaction subject i, and n is the total number of transaction subjects.
[0026] Optionally, the profit distribution value is modified based on the transaction weight to obtain the final profit distribution value:
[0027]
[0028] Where: Δf i is the difference between the old and new transaction weights of transaction subject i, is the benefit distribution value of transaction subject i, is the corrected profit distribution value of transaction subject i, G total is the total revenue of the alliance.
[0029] The beneficial effects of the present invention are:
[0030] (1) The present invention improves the efficiency and quality of electricity market transactions: by establishing a virtual power plant, it can aggregate multiple entities to participate in electricity market transactions, thereby improving the competitiveness and efficiency of the market and promoting the healthy development of the electricity market.
[0031] (2) Reducing transaction default rates: Establishing a credit rating mechanism based on the degree of fulfillment of transaction contracts will help reduce transaction default rates and enhance the credit awareness and contract performance capabilities of market participants, thereby reducing economic losses and grid security risks caused by transaction defaults.
[0032] (3) Improving the credibility and compliance rate of trading entities: By amending the profit distribution plan and transferring part of the profits of low-credibility entities to high-credibility entities, low-credibility market participants can be encouraged to improve their transaction compliance rate, strengthen the construction of the market credit system, and further improve the operating efficiency and stability of the power market.
[0033] (4) Achieve fairness in profit distribution: By amending the profit distribution plan, the risks borne by entities with high and low credit values can be reasonably transferred to achieve fairness in profit distribution and promote cooperation and win-win results among market participants. BRIEF DESCRIPTION OF THE DRAWINGS
[0034] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0035] Figure 1 This is a flow chart of a method for allocating benefits from a cooperative game of a virtual power plant taking into account correction of reputation value according to an embodiment of the present invention. DETAILED DESCRIPTION
[0036] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0037] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the present invention is further described in detail below with reference to the accompanying drawings and specific embodiments.
[0038] This embodiment provides a virtual power plant cooperative game benefit distribution method taking into account the reputation value correction, which is applied to the power transaction in which the virtual power plant aggregates multiple entities, including:
[0039] Determine the power parameters and corresponding reputation values of each trading entity in the cooperative alliance, and check whether the reputation value meets the preset entry threshold. If it does, determine the output power of the trading entity based on the power parameters; if it does not, eliminate the trading entity;
[0040] Allocate power generation tasks to trading entities based on output power and calculate alliance benefits;
[0041] The alliance benefits are distributed to the transaction entities based on the improved Shapley value method and marginal contribution based on reputation value.
[0042] Combine the following Figure 1 The virtual power plant cooperative game profit distribution method taking into account the credit value correction proposed in this embodiment is described in detail, and specifically includes the following steps:
[0043] S1. Determine the power parameters and reputation values of each trading entity in the cooperative alliance;
[0044] In this embodiment, the model is constructed with wind power (WT), photovoltaic (PV) and two coal-fired units (BM):
[0045] (1) Wind power:
[0046] The upper and lower limit constraints of fan output are:
[0047] 0≤P WT,t ≤P WT,MAX (1)
[0048] Where: P WT,MAX It is the upper limit of wind power output.
[0049] (2) Photovoltaic:
[0050] The upper and lower limits of photovoltaic output are:
[0051]
[0052] Where: P PV,MAX It is the upper limit of photovoltaic output.
[0053] (3) Coal-fired units:
[0054] The relationship between the economic cost of power generation and output power of coal-fired units is:
[0055]
[0056] Where: a l ,b l ,c l are the coefficients of the quadratic term, linear term and constant term of the power generation cost parameter of the coal-fired unit, P BM,l is the output power of the first coal-fired unit, F l(P BM,l ) is the power generation cost of the lth coal-fired unit, and m is the total number of coal-fired units.
[0057] For the actual output power P of the coal-fired unit BM,l The upper and lower limits of the unit output must be met, expressed as:
[0058] P BM,l,MIN ≤P BM,l ≤P BM,l,MAX (4)
[0059] Where: P BM,l,MAX is the upper limit of coal-fired unit output, P BM,l,MIN It is the lower limit of coal-fired unit output.
[0060] (4) Reputation management mechanism:
[0061] The degree of fulfillment of the transaction contract is used as a reputation evaluation indicator, and the reputation of the VPP aggregated transaction subject meets the entry threshold. The calculation formula is:
[0062]
[0063] Where: C i is the updated reputation value of transaction subject i after completing the power transaction; ΔP i is the deviation power of trading subject i; Plan output power for trading subject i; is the actual output power of transaction subject i.
[0064] S2. Check whether the credit value of the trading subject meets the entry threshold;
[0065] The initial credit value of all trading entities participating in energy trading is set to 100, with an upper limit of 100 and a lower limit of 60. The credit value of the entities participating in power trading must be higher than the lower limit. Before the start of power trading, it is necessary to check whether the credit value of the power trading entity is within the limit, and prohibit the trading entity with a credit value lower than the lower limit from participating in power trading.
[0066] S3. Calculate the output power of each trading entity and allocate power generation tasks;
[0067] The total electricity demand load is obtained, and the power generation tasks are allocated to each trading entity with the constraint of achieving a balance between the total electricity demand load and the output power, and the goal of maximizing the total profit of the cooperative alliance.
[0068] Specifically, each trading entity participates in the power generation alliance to jointly complete the electricity demand in the trading platform, conduct economic scheduling and allocate the output of each unit on the basis of maximizing the benefits of the cooperative alliance.
[0069] The benefits of wind power generation are:
[0070]
[0071] Where: r t Represented as the electricity price for each time period, M WT Expressed as wind power generation operation and maintenance coefficient, G WT Expressed as the total wind power revenue.
[0072] The benefits of photovoltaic power generation are:
[0073]
[0074] Where: r t Represented as the electricity price for each time period, M PV Expressed as photovoltaic power generation operation and maintenance coefficient, G PV Expressed as total photovoltaic revenue.
[0075] The power generation benefits of coal-fired units are:
[0076]
[0077] Where: G BM is the power generation efficiency of coal-fired units, P BM,t,l is the output power of the lth coal-fired unit at time t, F t,l is the power generation cost of the lth coal-fired unit at time t.
[0078] The total power demand load needs to be balanced with the output power, and the system needs to satisfy the equation constraint:
[0079]
[0080] Where: P i is the output power of the generating unit of trading subject i, P load is the total electricity demand load.
[0081] During the transaction process of the cooperative alliance, if the power generation cannot meet the load demand, electricity will be purchased from the external network. The power purchase cost expression is as follows:
[0082]
[0083] Where: G buy is the cost of the cooperative alliance purchasing electricity from the external network, P lack,t is the power shortage of the cooperative alliance at time t, R t is the price of electricity purchased from the external network at time t.
[0084] The alliance revenue expression is as follows:
[0085] maxG total =G WT +GPV +G BM1 +G BM2 -G buy (12)
[0086] Where: G total Expressed as the total benefits of participating in the cooperative alliance.
[0087] The unit output tasks are allocated based on maximizing the total revenue of the cooperative alliance.
[0088] S4. Benefit distribution based on Shapley value method and marginal contribution;
[0089] Formula (13) is used to determine the transaction weight, and formula (14) is used to determine the benefit distribution value of the participating entities.
[0090]
[0091] Where: s represents any cooperative alliance set for all transaction entities in set I, |s| represents the number of members in cooperative alliance s, is the profit distribution of transaction subject i participating in the cooperation, ω|s| is the weighting factor, and v(s)-v(s-{i}) is the marginal contribution provided by transaction subject i to the cooperative alliance.
[0092] S5. Introduce reputation value to improve benefit distribution;
[0093] In the traditional Shapley value method, it is assumed that each entity shares the transaction risk equally, that is, the risk weight is: 1 / n. Introducing reputation value to improve the weight:
[0094] Suppose the new weight updated after the transaction subject i introduces the reputation value is:
[0095]
[0096] Then the difference between the new and old weights of transaction subject i can be calculated as:
[0097]
[0098] The new benefit distribution of transaction subject i can be calculated based on the difference between the old and new weights after the reputation value is improved:
[0099]
[0100] In the formula, C i is the reputation value of transaction subject i, f i is the new weight of transaction subject i, Δf i is the difference between the new and old weights of trading entity i.
[0101] The embodiments described above are only descriptions of the preferred embodiments of the present invention and are not intended to limit the scope of the present invention. Without departing from the design spirit of the present invention, various modifications and improvements made to the technical solutions of the present invention by ordinary technicians in this field should all fall within the protection scope determined by the claims of the present invention.
Claims
1. A virtual power plant cooperative game benefit allocation method considering reputation value correction is applied to power transactions involving multiple entities in virtual power plants. It is characterized in that include: Determine the power parameters and corresponding reputation values of each trading entity in the cooperative alliance, and check whether the reputation value meets the preset access threshold. If so, determine the output power of the trading entity based on the power parameters; If not, the transaction subject will be eliminated; Allocate power generation tasks to the trading entities based on the output power, and calculate alliance benefits; The alliance income is distributed to the transaction entities based on the Shapley value method improved by the reputation value and marginal contribution.
2. The virtual power plant cooperative game profit distribution method taking into account the reputation value correction according to claim 1, It is characterized in that The transaction entities in the cooperative alliance include wind power, photovoltaics and several coal-fired units.
3. The virtual power plant cooperative game profit distribution method taking into account the reputation value correction according to claim 1, It is characterized in that The method for determining the reputation value of each trading entity in the cooperative alliance is: ΔP i =P i plan -P i actual Where: C i is the updated reputation value of transaction subject i after the last power transaction; ΔP is the total deviation power; ΔP i P is the deviation power of trading subject i; i plan P is the planned output power of trading subject i; i actual is the actual output power of transaction subject i.
4. The virtual power plant cooperative game profit distribution method taking into account the reputation value correction according to claim 1, It is characterized in that Allocating power generation tasks to each trading entity based on the output power includes: Obtain the total electricity demand load; With the constraint of balancing the total load of the electricity demand and the output power and with the goal of maximizing the total profit of the cooperative alliance, power generation tasks are allocated to each trading entity.
5. The virtual power plant cooperative game profit distribution method taking into account the reputation value correction according to claim 1, It is characterized in that Calculation of the alliance benefits includes: G totaal =G WT +G PV +G BM -G buy , Where: G total is the total revenue of the alliance, G WT is the total revenue of wind power, G PV is the total photovoltaic income, G BM is the total revenue of coal-fired units, G buy The cost of purchasing electricity from the external network for the cooperative alliance, r t is the electricity price at time t, M WT is the wind power generation operation and maintenance coefficient, P WT,t is the wind power output power at time t, M PV is the photovoltaic power generation operation and maintenance coefficient, P PV,t is the photovoltaic output power at time t, P BM,t,l is the output power of the lth coal-fired unit at time t, F t,l is the power generation cost of the lth coal-fired unit at time t, m is the total number of coal-fired units, P lack,t is the power shortage of the cooperative alliance at time t, R t is the price of electricity purchased from the external network at time t.
6. The virtual power plant cooperative game profit distribution method taking into account the credit value correction according to claim 1, It is characterized in that The method of allocating the alliance income to each trading entity based on the improved Shapley value method of the reputation value and marginal contribution includes: Calculate the profit distribution value of each transaction subject based on the Shapley value method and marginal contribution; The transaction weight is determined according to the reputation value, and the benefit distribution value is modified based on the transaction weight to obtain a final benefit distribution value.
7. The virtual power plant cooperative game profit distribution method taking into account the credit value correction according to claim 6, It is characterized in that The method for determining the transaction weight according to the reputation value is: Where: f i is the transaction weight of transaction subject i, C i is the reputation value of transaction subject i, and n is the total number of transaction subjects.
8. The virtual power plant cooperative game profit distribution method taking into account the credit value correction according to claim 7, It is characterized in that The method of modifying the profit distribution value based on the transaction weight to obtain the final profit distribution value is as follows: Where: Δf i is the difference between the old and new transaction weights of transaction subject i, is the benefit distribution value of transaction subject i, is the corrected profit distribution value of transaction subject i, G total is the total revenue of the alliance.
Citation Information
Cited By
Shared energy storage and new energy coordinated regulation and control method based on income distribution strategy
CN119624054A
Emergency power supply intelligent scheduling and path planning method and system
CN121258151A
An emergency power intelligent scheduling and path planning method and system
CN121258151B