Task scheduling strategy and system in cloud edge collaborative centralized control system

By improving the particle swarm algorithm to optimize the task offloading strategy, the problem of task scheduling and resource allocation in the cloud-edge collaborative centralized control system is solved, the system delay is minimized and the resource efficiency is maximized, and the operation and maintenance automation of the smart grid is improved. Intelligent level.

CN118869476AActive Publication Date: 2024-10-29HEFEI UNIV OF TECH +5

Patent Information

Application Number
CN202411324985.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-23
Publication Date
2024-10-29
Estimated Expiration
2044-09-23

AI Technical Summary

Technical Problem

In smart grids, it is difficult for the cloud-edge collaborative centralized control system to achieve efficient task scheduling and balanced resource allocation under a complex distributed architecture, resulting in uneven resource allocation and increased processing delays, which affects the safe and stable operation of the power grid.

Method used

The improved particle swarm algorithm is used to determine the optimal transmission power, network bandwidth and computing resource allocation ratio by calculating the task transmission rate, delay and energy consumption, and optimize the task offloading strategy to minimize system delay.

Benefits of technology

It maximizes the efficiency of resource use, ensures that the system responds quickly to terminal business needs, improves the automation and intelligence level of power grid operation and maintenance, reduces operation and maintenance costs, and enhances the flexibility and sustainability of the power grid.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118869476A_ABST
    Figure CN118869476A_ABST
Patent Text Reader

Abstract

The invention provides a task scheduling strategy and system in a cloud edge collaborative centralized control system, belongs to the field of Internet of Things cloud edge collaborative smart grid sites, and solves the problems of resource allocation and task processing timeliness in a dynamically changing cloud edge system centralized control system. The method mainly comprises the following steps: calculating an unloading task transmission rate, transmission time delay, calculation time delay, terminal processing energy consumption and task processing completion time delay, finally determining an objective function and constraint conditions, carrying out particle swarm optimization to solve the objective function, and outputting an optimal solution. According to the method, a group of optimal parameter configurations including the optimal transmission power, the network bandwidth allocation proportion and the computing resource allocation proportion are determined by applying the optimized particle swarm algorithm, so that the total time delay of task processing is reduced to the minimum in a cloud-side collaborative centralized control system framework.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of IoT cloud-edge collaborative smart grid sites, and specifically to a task scheduling strategy and system in a cloud-edge collaborative centralized control system. Background Art

[0002] In the context of the global energy system transformation and the deep integration of digital technology, the construction of smart grids has become the cornerstone of the modernization of power systems. Smart grid technology has greatly enhanced the automation, interactivity and flexibility of power grids by deeply integrating power and information flows. Among them, the cloud-edge collaborative centralized control system, as the key to innovation in operation and maintenance models, integrates the powerful computing power of cloud computing and the instant response capability of edge computing, realizes the immediate collection, processing, analysis and decision-making of power grid operation data, and significantly improves operation and maintenance efficiency and system reliability.

[0003] However, the expansion of the scale of smart grids and the increase in structural complexity have brought new challenges to the cloud-edge collaborative centralized control system. In particular, under the complex distributed architecture, the effective scheduling of smart inspection tasks and the balanced allocation of resources have become technical difficulties. Smart inspection covers a wide range of operation and maintenance activities, from equipment health monitoring to fault prediction and even pre-maintenance. It is data-intensive, has diverse processing requirements, and has strict real-time requirements. The traditional static scheduling mechanism is difficult to cope with this dynamically changing operation and maintenance environment, which can easily lead to problems such as uneven resource allocation and increased processing delays, which seriously threaten the safe and stable operation of the power grid.

[0004] In addition, ensuring efficient and stable transmission of the in-station communication network is another core element of intelligent operation and maintenance. The massive data generated by intelligent inspection activities needs to flow quickly between the cloud, edge, and terminals. Any communication delay or interruption may weaken the timeliness of decision-making, especially in complex electromagnetic environments, network congestion, or hardware failure scenarios. Maintaining communication quality has become a technical obstacle that needs to be overcome.

[0005] In view of this, exploring a mechanism that can adapt to large-scale distributed architecture, realize efficient scheduling and load balancing of tasks, and ensure high reliability and low latency of intra-station communication has become a core issue in smart grid technology research. Summary of the invention

[0006] The technical problem to be solved by the present invention is how to ensure uniform resource allocation and timely processing in a dynamically changing cloud-edge collaborative centralized control system.

[0007] The present invention solves the above technical problems through the following technical means: The task scheduling strategy in the cloud-edge collaborative centralized control system includes the following steps: Step 1. Offload task transfer rate calculation: Set up The first grid station within the communication range Devices, tasks to be offloaded Uplink transmission rate sent to the edge server in the power grid site ; Step 2. Calculate the transmission delay: This includes calculating the wireless transmission delay of the terminal device transmitting the task to the edge server in the smart site. , and the wired transmission delay of the task uploaded from the smart site to the centralized control master station through wired communication ; Step 3. Calculate the computational latency: This includes the computational latency of the task being processed by the edge server in the smart site. , the computing delay of the task being processed by the centralized control master server ; Step 4. Calculate the terminal processing energy consumption: Calculate the energy consumption of the task data transmission operation initiated by the terminal device to the smart site ; Step 5. Calculate the task processing completion delay and determine the objective function and constraints: The offloading strategy for each task is given by Indicates that when When the task is offloaded to Intelligent site processing, task processing completion delay for:

[0008] when When the task is unloaded to the centralized control master station for processing, the task processing completion delay for:

[0009] Among them, the task calculation density of the terminal device is defined as , For the The edge server in the smart site is assigned to the Terminal device tasks frequency; Assigned to the first The first smart station within the communication range Terminal device tasks frequency; The processing completion delay of a single task for:

[0010] System Delay The largest processing delay among all tasks of the terminal device:

[0011] The objective function of minimizing system delay is:

[0012] The constraints of the objective function are:

[0013] In the formula, represents the power constraint; represents the bandwidth constraint, that is, the sum of the bandwidths of each channel is less than the total bandwidth of the system, where is the total system bandwidth; represents the energy consumption constraint, where is the maximum energy consumption of each terminal device; represents the computing resource constraints of the smart site edge server, where It is the largest computing resource for the smart site edge server; represents the computing resource constraints of the centralized control master station server, where: It is the maximum computing resource of the centralized control master station server; represents the processing delay constraint of each task, where For the The first smart station within the communication range The delay constraints of the tasks of the terminal equipment; Step 6. Use the improved particle swarm algorithm to solve the objective function and output the optimal transmission power, network bandwidth allocation ratio, and computing resource allocation ratio.

[0014] Furthermore, the transmission rate in step 1 is The calculation formula is as follows:

[0015] In the formula, To allocate to The first smart station within the communication range The bandwidth of the terminal device For the The first smart station within the communication range Terminal devices are assigned to tasks The transmission power, is the uplink channel gain, is the path loss exponent, is the channel Gaussian white noise, For the A smart station communicates with the The communication distance of each terminal device.

[0016] Furthermore, in step 2, the wireless transmission delay The calculation formula is as follows:

[0017] Wired transmission delay The calculation formula is as follows:

[0018] In the formula, is the propagation speed of electromagnetic waves.

[0019] Furthermore, in step 3, the process of calculating the delay is as follows: First, the task calculation density of the terminal device is defined as , that is, the number of bits required to process a bit Number of cycles; The computational latency of tasks being processed by edge servers within smart sites for:

[0020] In the formula, For the The edge server in the smart site is assigned to the Terminal device tasks frequency; The computational delay of the task being processed by the centralized control master server for:

[0021] In the formula, Assigned to the first The first smart station within the communication range Terminal device tasks frequency.

[0022] Furthermore, in step 4, the energy consumption The calculation formula is: .

[0023] The present invention also provides a task scheduling system in a cloud-edge collaborative centralized control system, including: Offload task transfer rate calculation module: Set up The first grid station within the communication range Devices, tasks to be offloaded Uplink transmission rate sent to the edge server in the power grid site ; Calculation of transmission delay module: including calculation of wireless transmission delay of terminal equipment transmitting tasks to edge servers in smart sites , and the wired transmission delay of the task uploaded from the smart site to the centralized control master station through wired communication ; Module for calculating computational delay: including the computational delay of tasks processed by edge servers in smart sites , the computing delay of the task being processed by the centralized control master server ; Calculation terminal processing energy consumption module: Calculate the energy consumption of the task data transmission operation initiated by the terminal device to the smart site ; Objective function and constraint calculation module, calculates the task processing completion delay and determines the objective function and constraint conditions: The offloading strategy for each task is given by Indicates that when When the task is offloaded to Intelligent site processing, task processing completion delay for:

[0024] when When the task is unloaded to the centralized control master station for processing, the task processing completion delay for:

[0025] Among them, the task calculation density of the terminal device is defined as , For the The edge server in the smart site is assigned to the Terminal device tasks frequency; Assigned to the first The first smart station within the communication range Terminal device tasks frequency; The processing completion delay of a single task for:

[0026] System Delay The largest processing delay among all tasks of the terminal device:

[0027] The objective function of minimizing system delay is:

[0028] The constraints of the objective function are:

[0029] In the formula, represents the power constraint; represents the bandwidth constraint, that is, the sum of the bandwidths of each channel is less than the total bandwidth of the system, where is the total system bandwidth; represents the energy consumption constraint, where is the maximum energy consumption of each terminal device; represents the computing resource constraints of the smart site edge server, where It is the largest computing resource for the smart site edge server; represents the computing resource constraints of the centralized control master station server, where: It is the maximum computing resource of the centralized control master station server; represents the processing delay constraint of each task, where For the The first smart station within the communication range The delay constraints of the tasks of the terminal equipment; The optimization module is used to solve the objective function using the improved particle swarm algorithm and output the optimal transmission power, network bandwidth allocation ratio and computing resource allocation ratio.

[0030] Furthermore, the transmission rate in the offload task transmission rate calculation module is The calculation formula is as follows:

[0031] In the formula, To allocate to The first smart station within the communication range The bandwidth of the terminal device For the The first smart station within the communication range Terminal devices are assigned to tasks The transmission power, is the uplink channel gain, is the path loss exponent, is the channel Gaussian white noise, For the A smart station communicates with the The communication distance of each terminal device.

[0032] Furthermore, in the transmission delay calculation module, the wireless transmission delay The calculation formula is as follows:

[0033] Wired transmission delay The calculation formula is as follows:

[0034] In the formula, is the propagation speed of electromagnetic waves.

[0035] Furthermore, in the module for calculating the calculation delay, the process of calculating the calculation delay is as follows: First, the task calculation density of the terminal device is defined as , that is, the number of bits required to process a bit Number of cycles; The computational latency of tasks being processed by edge servers within smart sites for:

[0036] In the formula, For the The edge server in the smart site is assigned to the Terminal device tasks frequency; The computational delay of the task being processed by the centralized control master server for:

[0037] In the formula, Assigned to the first The first smart station within the communication range Terminal device tasks frequency.

[0038] Furthermore, in the energy consumption module of the computing terminal, the energy consumption The calculation formula is: .

[0039] The advantages of the present invention are: The present invention determines a set of optimal parameter configurations, including the optimal transmission power, network bandwidth allocation ratio, and computing resource allocation ratio, by applying an optimized particle swarm algorithm, so as to minimize the total delay of task processing within the framework of a cloud-edge collaborative centralized control system. This strategy not only promotes the maximum efficiency of resource utilization, but also ensures that the system can respond quickly to various terminal business needs, thereby maintaining excellent operating performance and agility in a complex service environment. The breakthrough progress of this technology will not only greatly enhance the automation and intelligence level of power grid operation and maintenance, but will also effectively reduce operation and maintenance costs, enhance the resilience and sustainability of the power grid, and provide strong support for building a safer, environmentally friendly, and efficient energy Internet. BRIEF DESCRIPTION OF THE DRAWINGS

[0040] Figure 1 This is an architecture diagram of a cloud-edge collaborative centralized control system in an embodiment of the present invention; Figure 2 This is a logic diagram for executing the scheduling strategy in an embodiment of the present invention. DETAILED DESCRIPTION

[0041] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described in combination with the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0042] This embodiment provides a task scheduling strategy based on an adaptive particle swarm algorithm in a cloud-edge collaborative centralized control system. The architecture of the cloud-edge collaborative centralized control system is as follows: Figure 1 As shown: The cloud-edge collaborative centralized control system is a highly integrated smart grid management architecture that achieves efficient collaborative operations from the cloud to the terminal through multi-level resource allocation and information interaction. The system includes a cloud center control layer, edge computing layers and Terminal equipment layer.

[0043] The cloud center control layer, namely the centralized control station and the intelligent patrol station, focuses on global data integration, storage, analysis, strategy planning, task scheduling and resource optimization. Relying on advanced cloud computing capabilities, this layer can efficiently process massive amounts of data, conduct in-depth analysis, and lay a solid foundation for intelligent decision-making. Among them, the intelligent patrol station focuses on intelligent inspection tasks and data analysis to ensure full-time, all-round monitoring and immediate response of the substation environment, improving the intelligence and emergency efficiency of operation and maintenance.

[0044] The edge computing layer covers intelligent sites such as core substations, converter stations, and auxiliary control hosts. The following is an introduction to a core substation as an example. The core substation is specifically designed for sites with personnel on duty and direct intervention by the operation and maintenance team. It integrates an advanced intelligent inspection host system and a series of peripheral terminal devices, including but not limited to intelligent monitoring vision systems, ubiquitous sensor networks, etc. These configurations are close to the data generation point, perform data processing and analysis, and realize real-time monitoring and rapid response of key substation equipment, thereby alleviating the pressure of cloud computing and accelerating the decision-making cycle. The auxiliary control host of the substation is responsible for the acquisition of basic information, local operation control and data processing. As a bridge for communication between the cloud and terminal devices, the auxiliary control host system ensures the efficiency and security of data flow, and provides the necessary technical support and guarantee for autonomous operation and management at the site level.

[0045] The terminal equipment layer is directly located at the substation site, including but not limited to transformers, circuit breakers, relays, smart meters, and a variety of monitoring and control equipment. These devices establish a communication link with the edge computing layer, upload operating status, energy consumption data, and abnormal alarms in real time, and receive control instructions from superiors. The present invention assumes that these terminal devices use frequency division multiplexing access technology to communicate with the edge computing layer, allocate independent frequency bandwidths for different signals, and ensure that the signals of each channel do not interfere with each other.

[0046] When the terminal equipment in the substation faces data processing tasks during operation, it is necessary to implement a task offloading strategy, that is, to migrate the business to the edge computing node or cloud server for processing. This process is based on multi-dimensional factors such as business type, data size, business delay constraints, bandwidth, and computing resources of each server to determine the most suitable business processing location, whether to offload to the edge side for local processing or to the cloud for processing. When multiple terminal devices unload services in parallel, the system faces the dual challenges of efficient configuration of network bandwidth and optimal allocation of server computing resources. At the same time, this embodiment takes into account energy consumption constraints and introduces a transmission power control mechanism, aiming to coordinate resource management in multiple dimensions through optimization models. Therefore, an improved adaptive particle swarm optimization algorithm is used to calculate the optimal power control, bandwidth allocation ratio, and computing resource allocation ratio to minimize the total delay of business processing, achieve reasonable resource allocation, and thus improve the performance of the entire system.

[0047] like Figure 2 As shown in the figure, a task scheduling strategy based on adaptive particle swarm algorithm in cloud-edge collaborative centralized control system is implemented in the following steps: Step 1: Transfer Rate According to Shannon's theorem, The first substation within the communication range Devices, tasks to be offloaded Uplink transmission rate sent to the edge server in the substation for: (1) In the formula, To allocate to The first substation within the communication range The bandwidth of the terminal device For the The first substation within the communication range Terminal devices are assigned to tasks The transmission power, is the uplink channel gain, is the path loss exponent, is the channel Gaussian white noise, For the A substation and its communication range The communication distance of each terminal device.

[0048] Step 2: Transmission Delay Transmission delay of the terminal device transmitting the task to the edge server in the substation for: (2) The task is uploaded from the substation to the centralized control master station through wired communication, and the transmission delay for: (3) In the formula, The propagation speed of electromagnetic waves is approximately equal to the speed of light, that is, .

[0049] Step 3: Calculate latency First, the task calculation density of the terminal device is defined as , that is, the number of bits required to process a bit Number of cycles.

[0050] The computational latency of the task being processed by the edge server in the substation for: (4) In the formula, For the The edge server in the substation is assigned to the Terminal device tasks frequency.

[0051] The computational delay of the task being processed by the centralized control master server for: (5) In the formula, Assigned to the first The first substation within the communication range Terminal device tasks frequency.

[0052] Step 4: Terminal processing energy consumption During the task scheduling process, the terminal device initiates the transmission of task data to the substation, and the energy consumption associated with this link is for: (6) Step 5: Delay in processing each task Given that the amount of task data after processing is significantly reduced, compared to the original task size, when considering system performance indicators, it can be reasonably inferred that the delay in feedback of the results after the task is processed has little impact on the overall delay and should be ignored so that we can focus on other more critical delay components. Therefore, the delay for completing each task includes the task upload and task calculation delays.

[0053] The offloading strategy for each task is given by Indicates that when When the task is offloaded to Substation processing, task processing completion delay for: (7) when When the task is unloaded to the centralized control master station for processing, the task processing completion delay for: (8) Step 5: Determine the objective function and constraints Given the heterogeneity of the attributes of each task and its unique latency requirements, when a task is offloaded to a substation for processing but cannot meet the established latency constraints, the task needs to be strategically transferred to the central control master station to ensure that the strict latency requirements are met. for: (9) System delays due to multiple end devices processing tasks in parallel It is the largest task processing delay among all terminal devices: (10) This embodiment jointly optimizes the transmission power of the terminal device, the network bandwidth allocation, and the server computing resource allocation. The system delay minimization problem of the strategy of this embodiment is expressed as follows: (11) In the formula, represents the power constraint; represents the bandwidth constraint, that is, the sum of the bandwidths of each channel is less than the total bandwidth of the system, where is the total system bandwidth; represents the energy consumption constraint, where is the maximum energy consumption of each terminal device; represents the computing resource constraints of the substation edge server, where It is the largest computing resource for the substation edge server; represents the computing resource constraints of the centralized control master station server, where: It is the maximum computing resource of the centralized control master station server; represents the processing delay constraint of each task, where For the The first substation within the communication range The latency constraints of the tasks on the terminal devices are determined.

[0054] Step 6: Use improved particle swarm algorithm to solve Under the given constraint framework, this embodiment uses an improved adaptive particle swarm optimization algorithm to solve the objective function, aiming to discover the optimal transmission power configuration, bandwidth division ratio and computing resource allocation scheme. Compared with the traditional particle swarm optimization algorithm, this embodiment integrates an adaptive mechanism to achieve dynamic control of inertia weight, thereby enhancing the flexibility and efficiency of the algorithm. The specific steps are as follows: Initialize the position and velocity of the particles and set the algorithm parameters, including the inertia weight. , cognitive weight , social weight .

[0055] Calculate the fitness value and use the objective function shown in formula 11 in step 5 above to calculate the fitness value of each particle. .

[0056] Optimal update updates the individual optimal value of each particle and the global optimum .

[0057] Improved adaptive inertia weight dynamically adjusts the inertia weight according to the fitness distribution of the current particle swarm. The specific expression is as follows: (12) In the formula, and Respectively represent the minimum and maximum values ​​of the inertia weight, for Random numbers in the interval, is the average fitness of all particles, using the function The fitness value is converted into a weight adjustment factor to ensure that particles with high fitness within a certain range, that is, particles that exceed the average fitness of the group, are given a smaller weight to promote local search; conversely, particles with low fitness are assigned a larger weight to encourage global exploration behavior.

[0058] Update speed and position Adaptive inertia weight is used to update the speed and position of particles. Accordingly, the particle speed update formula can be adjusted as follows: (13) In the formula, Indicates Particle No. The speed of iterations, and Represent cognitive weight and social weight respectively, and Represents the The random number in the interval, the individual optimal value is , the global optimal value is , Indicates Particle No. The position of the iteration.

[0059] Iterate and repeat steps (2) to (5) above until the termination condition is met.

[0060] The result output outputs the global optimal particle position, that is, the optimal solution.

[0061] Step 7: Get the optimization result By applying the optimized particle swarm algorithm, a set of optimal parameter configurations are determined, including the optimal transmission power, network bandwidth allocation ratio, and computing resource allocation ratio, so as to minimize the total latency of task processing within the framework of the cloud-edge collaborative centralized control system. This strategy not only promotes the maximum efficiency of resource utilization, but also ensures that the system can quickly respond to various terminal business needs, thereby maintaining excellent operational performance and agility in a complex service environment.

[0062] The above embodiments are only used to illustrate the technical solution of the present embodiment, rather than to limit it. Although the present embodiment is described in detail with reference to the aforementioned embodiments, a person skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features thereof may be replaced by equivalents. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.

Claims

1. Task scheduling strategy in cloud-edge collaborative centralized control system, It is characterized in that The following steps are involved: Step 1. Offload task transfer rate calculation: Set up The first grid station within the communication range Devices, tasks to be offloaded Uplink transmission rate sent to the edge server in the power grid site ; Step 2. Calculate the transmission delay: This includes calculating the wireless transmission delay of the terminal device transmitting the task to the edge server in the smart site. , and the wired transmission delay of the task uploaded from the smart site to the centralized control master station through wired communication ; Step 3. Calculate the computational latency: This includes the computational latency of the task being processed by the edge server in the smart site. , the computing delay of the task being processed by the centralized control master server ; Step 4. Calculate the terminal processing energy consumption: Calculate the energy consumption of the task data transmission operation initiated by the terminal device to the smart site ; Step 5. Calculate the task processing completion delay and determine the objective function and constraints: The offloading strategy for each task is given by Indicates that when When the task is offloaded to Intelligent site processing, task processing completion delay for: when When the task is unloaded to the centralized control master station for processing, the task processing completion delay for: Among them, the task calculation density of the terminal device is defined as , For the The edge server in the smart site is assigned to the Terminal device tasks frequency; Assigned to the first The first smart station within the communication range Terminal device tasks frequency; The processing completion delay of a single task for: System Delay The largest processing delay among all tasks of the terminal device: The objective function of minimizing system delay is: The constraints of the objective function are: In the formula, represents the power constraint; represents the bandwidth constraint, that is, the sum of the bandwidths of each channel is less than the total bandwidth of the system, where is the total system bandwidth; represents the energy consumption constraint, where is the maximum energy consumption of each terminal device; represents the computing resource constraints of the smart site edge server, where It is the largest computing resource for the smart site edge server; represents the computing resource constraints of the centralized control master station server, where: It is the maximum computing resource of the centralized control master station server; represents the processing delay constraint of each task, where For the The first smart station within the communication range The delay constraints of the tasks of the terminal equipment; Step 6. Use the improved particle swarm algorithm to solve the objective function and output the optimal transmission power, network bandwidth allocation ratio, and computing resource allocation ratio.

2. According to the task scheduling strategy in the cloud-edge collaborative centralized control system of claim 1, It is characterized in that The transmission rate in step 1 The calculation formula is as follows: In the formula, To allocate to The first smart station within the communication range The bandwidth of the terminal device For the The first smart station within the communication range Terminal devices are assigned to tasks The transmission power, is the uplink channel gain, is the path loss exponent, is the channel Gaussian white noise, For the A smart station communicates with the The communication distance of each terminal device.

3. According to the task scheduling strategy in the cloud-edge collaborative centralized control system of claim 2, It is characterized in that In step 2, the wireless transmission delay The calculation formula is as follows: Wired transmission delay The calculation formula is as follows: In the formula, is the propagation speed of electromagnetic waves.

4. According to the task scheduling strategy in the cloud-edge collaborative centralized control system of claim 3, It is characterized in that In step 3, the process of calculating the delay is as follows: First, the task calculation density of the terminal device is defined as , that is, the number of bits required to process a bit Number of cycles; The computational latency of tasks being processed by edge servers within smart sites for: In the formula, For the The edge server in the smart site is assigned to the Terminal device tasks frequency; The computational delay of the task being processed by the centralized control master server for: In the formula, Assigned to the first The first smart station within the communication range Terminal device tasks frequency.

5. According to the task scheduling strategy in the cloud-edge collaborative centralized control system of claim 4, It is characterized in that In step 4, energy consumption The calculation formula is: 。 6. Task scheduling system in cloud-edge collaborative centralized control system, It is characterized in that include: Offload task transfer rate calculation module: Set up The first grid station within the communication range Devices, tasks to be offloaded Uplink transmission rate sent to the edge server in the power grid site ; Calculation of transmission delay module: including calculation of wireless transmission delay of terminal equipment transmitting tasks to edge servers in smart sites , and the wired transmission delay of the task uploaded from the intelligent site to the centralized control master station through wired communication ; Module for calculating computational delay: including the computational delay of tasks processed by edge servers in smart sites , the computing delay of the task being processed by the centralized control master server ; Calculation terminal processing energy consumption module: Calculate the energy consumption of the task data transmission operation initiated by the terminal device to the smart site ; Objective function and constraint calculation module, calculates the task processing completion delay and determines the objective function and constraint conditions: The offloading strategy for each task is given by Indicates that when When the task is offloaded to Intelligent site processing, task processing completion delay for: when When the task is unloaded to the centralized control master station for processing, the task processing completion delay for: Among them, the task calculation density of the terminal device is defined as , For the The edge server in the smart site is assigned to the Terminal device tasks frequency; Assigned to the first The first smart station within the communication range Terminal device tasks frequency; The processing completion delay of a single task for: System Delay The largest processing delay among all tasks of the terminal device: The objective function of minimizing system delay is: The constraints of the objective function are: In the formula, represents the power constraint; represents the bandwidth constraint, that is, the sum of the bandwidths of each channel is less than the total bandwidth of the system, where is the total system bandwidth; represents the energy consumption constraint, where is the maximum energy consumption of each terminal device; represents the computing resource constraints of the smart site edge server, where It is the largest computing resource for the smart site edge server; represents the computing resource constraints of the centralized control master station server, where: It is the maximum computing resource of the centralized control master station server; represents the processing delay constraint of each task, where For the The first smart station within the communication range The delay constraints of the tasks of the terminal equipment; The optimization module is used to solve the objective function using the improved particle swarm algorithm and output the optimal transmission power, network bandwidth allocation ratio and computing resource allocation ratio.

7. The task scheduling system in the cloud-edge collaborative centralized control system according to claim 6, It is characterized in that The transmission rate in the offload task transmission rate calculation module The calculation formula is as follows: In the formula, To allocate to The first smart station within the communication range The bandwidth of the terminal device For the The first smart station within the communication range Terminal devices are assigned to tasks The transmission power, is the uplink channel gain, is the path loss exponent, is the channel Gaussian white noise, For the A smart station communicates with the The communication distance of each terminal device.

8. The task scheduling system in the cloud-edge collaborative centralized control system according to claim 7, It is characterized in that In the transmission delay calculation module, the wireless transmission delay The calculation formula is as follows: Wired transmission delay The calculation formula is as follows: In the formula, is the propagation speed of electromagnetic waves.

9. The task scheduling system in the cloud-edge collaborative centralized control system according to claim 8, It is characterized in that In the calculation delay calculation module, the calculation delay calculation process is as follows: First, the task calculation density of the terminal device is defined as , that is, the number of bits required to process a bit Number of cycles; The computational latency of tasks being processed by edge servers within smart sites for: In the formula, For the The edge server in the smart site is assigned to the Terminal device tasks frequency; The computational delay of the task being processed by the centralized control master server for: In the formula, Assigned to the first The first smart station within the communication range Terminal device tasks frequency.

10. The task scheduling system in the cloud-edge collaborative centralized control system according to claim 9, It is characterized in that In the computing terminal processing energy consumption module, energy consumption The calculation formula is: 。

Citation Information

Patent Citations

  • Predictive control scheduling method for substation monitoring and edge cloud collaboration

    CN112882383A

  • Task unloading and resource allocation method for industrial hybrid network

    CN115002799A

  • Multi-target joint optimization task unloading strategy based on deep reinforcement learning in Internet of Vehicles

    CN116321298A

  • Digital twinning enabled industrial internet of things resource allocation system and method

    CN117749635A

Cited By

  • Cloud computing and edge computing collaborative system integration architecture and collaborative computing method

    CN119814787A

  • Cloud-side collaborative transformer substation intelligent inspection auxiliary control scheduling system and cloud-side collaborative transformer substation intelligent inspection auxiliary control scheduling method

    CN122247027A

  • Substation intelligent inspection auxiliary control scheduling system and method based on cloud-edge collaboration

    CN122247027B