Method for improving wire bonding operation
By monitoring the wire bonding system signal, it automatically adjusts the height and time of the wire bonding tool, optimizes the wire bonding operation, solves the problem of low efficiency of the existing bonding wire operation, improves the welding efficiency and quality, and achieves automated optimization.
Patent Information
- Application Number
- CN202380024036.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Priority Date
- 2022-04-28
- Filing Date
- 2023-04-25
- Publication Date
- 2024-10-29
AI Technical Summary
Existing wire bonding operations are inefficient in semiconductor device processing and packaging, making it difficult to optimize the height and time sequence of wire bonding tools, affecting welding quality and efficiency.
By monitoring signals on the wire bonding system, such as seeking time, seeking distance, impact force and impact extrusion signals, the height and time of the wire bonding tool are automatically adjusted to optimize the performance and efficiency of the wire bonding operation and ensure welding quality and efficiency.
It improves the efficiency and quality of welding wire operations, prevents the decline in welding quality caused by non-optimal height or time, realizes automated optimization, and reduces manual intervention.
Smart Images

Figure CN118872044A_ABST
Abstract
Description
[0001] CROSS-REFERENCE TO RELATED APPLICATIONS
[0002] This application claims priority to U.S. Provisional Application No. 63 / 336,227, filed on April 28, 2022, the contents of which are incorporated herein by reference. Technical Field
[0003] The present invention relates to wire bonding operations, and more particularly to techniques for improving wire bonding operations, for example, in terms of time efficiency. Background Art
[0004] In the processing and packaging of semiconductor devices, wire bonding continues to be the primary method of providing electrical interconnection between two locations within a package (e.g., between a die pad of a semiconductor die and a lead of a lead frame). More specifically, by using a wire bonder (also known as a wire bonder), a lead arc is formed between the corresponding locations to be electrically interconnected. The primary methods of forming a lead arc are ball bonding and wedge bonding. When forming a weld between (a) the end of the lead arc and (b) a welding location (e.g., a pad, a lead, etc.), different types of welding energy may be used, including, for example, ultrasonic energy, thermosonic energy, hot pressing energy, etc., among others. Wire bonders (e.g., stud punches) are also used to form conductive bumps from portions of the leads.
[0005] In certain applications, the process of forming a wire arc includes positioning a wire bonding tool at a height above the workpiece, and then moving the wire bonding tool to contact the workpiece for the wire bonding operation. The time elapsed between (i) being positioned at the height above the workpiece and (ii) contacting the workpiece is important to the efficiency of the wire bonding operation.
[0006] Therefore, it would be desirable to provide improved wire bonding operations, including with respect to the timing and efficiency of such operations. Summary of the invention
[0007] According to an exemplary embodiment of the present invention, a method for determining a new search height for a wire bonding process is provided. The method comprises the following steps: (a) providing a search height; (b) performing a plurality of wire bonding operations using the search height; (c) monitoring a wire bonding evaluation criterion during each of the plurality of wire bonding operations in step (b); and (d) determining a new search height using the wire bonding evaluation criterion monitored during step (c).
[0008] According to another exemplary embodiment of the present invention, a method for determining a new planning time for a wire bonding process is provided. The method comprises the following steps: (a) providing a planning time, which is the time after a wire bonding tool is at a search height in a wire bonding operation but before the wire bonding tool enters a seek mode; (b) performing a plurality of wire bonding operations using the planning time; (c) monitoring a wire bonding evaluation criterion during each of the plurality of wire bonding operations during step (b); and (d) determining a new planning time using the wire bonding evaluation criterion monitored during step (c).
[0009] The method of the present invention may also be implemented as an apparatus (eg, part of the intelligence of a wire bonding machine) or as computer program instructions on a computer readable carrier (eg, a computer readable carrier including a wire bonding program for use with a wire bonding machine). BRIEF DESCRIPTION OF THE DRAWINGS
[0010] The present invention is best understood from the following detailed description when read in conjunction with the accompanying drawings. It is emphasized that, as is customary, the various features of the drawings are not drawn to scale. Instead, the dimensions of the various features are arbitrarily expanded or reduced for clarity. Included in the drawings are the following figures:
[0011] Figure 1 is a timing diagram illustrating points of interest for performing a method according to various exemplary embodiments of the present invention.
[0012] Figures 2 to 4 is a flow chart of various methods of performing determination of a new seek height for a wire bonding process according to various exemplary embodiments of the present invention.
[0013] Figures 5 to 7 is a flow chart of various methods of performing determination of a new staging time for a wire bonding process according to various exemplary embodiments of the present invention. DETAILED DESCRIPTION
[0014] Exemplary aspects of the present invention relate to monitoring signals (e.g., seek time signals, seek distance signals, impact force signals, impact extrusion signals, etc.) on a wire bonding system as feedback to automatically adjust (and improve, and potentially optimize) the height of a wire bonding tool. By adjusting the height of the wire bonding tool (e.g., seek height), the performance and efficiency (e.g., UPH, units per hour) of the wire bonding operation can be improved. Furthermore, if the height of the wire bonding tool (e.g., seek height) is not optimal or has shifted, a communication (e.g., a warning message) can be sent to the operator. Furthermore, the monitored seek time (or seek distance) and / or impact force (or impact extrusion) can be used for closed arc adjustment of the height of the wire bonding tool (e.g., seek height). Such closed arc adjustment can be an automatic procedure (e.g., performed using software on the wire bonding system without operator intervention).
[0015] According to certain exemplary aspects of the invention, a desired (and perhaps optimal) search height may be achieved when a minimum seek time (or seek distance) meets a threshold. If the seek time (or seek distance) is too long, the UPH of the wire bonding system may be negatively impacted. If the seek time (or seek distance) is too short, the quality of the bond on the wire bonding system may be compromised.
[0016] According to certain exemplary aspects of the present invention, a desired (and perhaps optimal) impact force (and / or impact extrusion) can be achieved. If the impact force (or impact extrusion) is too high, it usually means that the seek height is too low, which may result in reduced weld quality.
[0017] According to certain exemplary aspects of the invention, various seek times (or seek distances) and impact forces (or impact extrusions) may also be analyzed for wire bond tool height optimization to monitor the health of the wire bond system.
[0018] As used herein, the term "search height" means the height of the wire bonding tool above the bonding location when transitioning from high speed to low speed. An example of a search height is the transition point between (i) descending from high speed and (ii) entering a lower constant speed (i.e., CV) mode.
[0019] As used herein, the term "seek time" means the period of time between (i) the start of seeking contact between a wire bonding tool and a bonding location and (ii) declared contact between the wire bonding tool and the bonding location. As used herein, the term "seek distance" means the distance between (i) the start of seeking contact between a wire bonding tool and a bonding location and (ii) declared contact between the wire bonding tool and the bonding location.
[0020] As used herein, the term "seek mode" means starting to seek contact between the wire bond tool and the bond site.
[0021] As used herein, the term "blockout time" means the time after a wire bonding tool is at a seek height in a wire bonding operation and before the wire bonding tool enters a seek mode. In certain applications, the blockout time may be referred to as a "seek delay."
[0022] Now please refer to the attached figure, Figure 1 It is a diagram for executing various methods according to the present invention (including Figures 2 to 7 1. The vertical axis depicts the z-axis position of wire bonding tool 100. The horizontal axis depicts the time when wire bonding tool 100 is lowered with respect to the wire bonding operation. Figure 1 The wire bonding tool 100 is shown at an initial position above a workpiece (the workpiece is not shown). This initial position refers to a position during the rapid descent of the wire bonding tool 100. At time T1, the wire bonding tool 100 reaches the search height. There is a transition from a high speed to a low speed (e.g., a lower constant speed) at this search height. The wire bonding tool 100 continues to descend between time T1 and time T2. The period between time T1 and time T2 can be referred to as the "staging time". This is the time after reaching the search height but before entering the seek mode.
[0023] At time T2, seek mode begins. Seek mode refers to the operating mode during which the system monitors contact between wire bonding tool 100 and the bonding location. Contact between wire bonding tool 100 and the bonding location is declared at time T3. Therefore, the time between time T2 (when seek mode begins) and time T3 (where contact is declared) is referred to as the "seek time" (or, if distance is monitored, the "seek distance").
[0024] Figures 2 to 4 is a flow chart illustrating an exemplary method for determining a new seek height for a wire bonding process according to the present invention. Figures 5 to 7 1 is a flowchart illustrating an exemplary method for determining a new planning time for a wire bonding process according to the present invention. As can be appreciated by those skilled in the art, certain steps included in the flowchart may be omitted; certain additional steps may be added; and the order of the steps may be changed from the order shown, all of which are within the scope of the present invention.
[0025] Now please refer to Figure 2 , a method for determining a new search height for a wire bonding process is depicted. In step 200, a search height is provided (e.g., Figure 12. In step 202, a plurality of wire bonding operations are performed using the search height provided from step 200. In step 204, during each of the plurality of wire bonding operations of step 202, wire bonding evaluation criteria are monitored. For example, such wire bonding evaluation criteria may include a signal monitored during step 204 and associated with at least one of the following: (i) a seek time of a wire bonding tool, (ii) a seek distance of the wire bonding tool, (iii) an impact force of the wire bonding tool, (iv) an impact extrusion of the wire bonding tool, (v) a z-axis deformation curve, (vi) a bonding force oscillation curve, (vii) an ultrasonic impedance characteristic, and (viii) a servo performance of an xyz motion system of a wire bonding machine.
[0026] At step 206, using the weld wire evaluation criteria monitored during step 204, a new seek height is determined. For example, the criteria monitored during step 204 may indicate that the seek time (or seek distance) is too long, in which case the new seek height may be lower. In another example, the criteria monitored during step 204 may indicate that the seek time (or seek distance) is too short, in which case the new seek height may be higher. In another example, a different criterion (e.g., impact force, impact extrusion, etc.) monitored during step 204 may be used in step 206 to adjust the seek height.
[0027] The new search height determined in step 206 may be the same as the previous search height (e.g., the search height provided in step 200), or it may be a different search height. According to certain exemplary embodiments of the invention, the new search height may be determined to be low enough to provide a time-efficient wire bonding process while providing an acceptable level of the wire bonding evaluation criteria monitored in step 204. In step 208, using the new search height determined in step 206, a lead time is determined for subsequent wire bonding operations.
[0028] Now please refer to Figure 3 , a method for determining a new search height for a wire bonding process is depicted. At step 300, a search height (or a new search height at step 306) is provided (e.g., Figure 1 At step 302, using the search height from step 300 (or the new search height of step 306), a plurality of wire bonding operations are performed. At step 304, during each of the plurality of wire bonding operations of step 302, wire bonding evaluation criteria (see the exemplary criteria described above with respect to step 204) are monitored. At step 306, using the wire bonding evaluation criteria monitored during step 304, a new search height is determined (see the description above with respect to step 206).
[0029] At step 308, a determination is made as to whether a predetermined criterion is met. The predetermined criterion may be any criterion as desired in a particular application. For example, the predetermined criterion may be a criterion related to that monitored in step 304 (e.g., seek time, seek distance, impact force, impact extrusion, etc.). Alternatively, the predetermined criterion from step 308 may be a different criterion, such as a minimum or maximum number of iterations that have been completed (or a maximum timeout). If the answer to the decision block of step 308 is "no," steps 300-306 are repeated with the new seek height. If the answer to the decision block of step 308 is "yes," then at step 310, confirmation of the new seek height is completed. At optional step 312, using the new seek height determined in step 306, a planning time is determined for subsequent wire bonding operations.
[0030] Now please refer to Figure 4 , a method for determining a new search height for a wire bonding process is depicted. According to the method, multiple search heights are examined to determine a desired (or possibly optimal) search height. For example, multiple search heights may be known before performing the method, and each of the known multiple search heights is examined.
[0031] At step 400, a search altitude (or another search altitude at step 408) is provided (e.g., Figure 1 4. In step 402, using the search height from step 400 (or another search height from step 408), a plurality of wire bonding operations are performed. In step 404, during each of the plurality of wire bonding operations in step 402, a wire bonding evaluation criterion is monitored (see the exemplary criterion described above with respect to step 204). In step 406, a determination is made if another search height is to be checked (i.e., all known plurality of search heights are to be checked). If the answer to the decision block of step 406 is "yes", then in step 408 another search height is provided, and steps 400-404 are repeated. If the answer to the decision block of step 406 is "no", then in step 410, determination of a new search height is completed (see the description of step 206 above, and in step 410, a new search height may be determined using the evaluation criterion monitored for each of the plurality of search heights). In optional step 412, using the new search height determined in step 410, a lead time for a subsequent wire bonding operation is determined.
[0032] Now please refer to Figure 5 , a method for determining a new schedule time for a wire bonding process is depicted. In step 500, a schedule time is provided (e.g., Figure 1At step 502, using the planned time provided from step 500, a plurality of wire bonding operations are performed. At step 504, during each of the plurality of wire bonding operations of step 502, wire bonding evaluation criteria are monitored (see the exemplary criteria described above with respect to step 204). At step 506, using the wire bonding evaluation criteria monitored during step 504, a new planned time is determined.
[0033] The new staging time determined in step 506 may be the same as the previous staging time (e.g., the staging time provided in step 500), or it may be a different staging time. According to certain exemplary embodiments of the invention, the new staging time may be determined to be short enough to provide a time-efficient wire bonding process while providing acceptable levels of the wire bonding evaluation criteria monitored in step 504.
[0034] At optional step 508, the search height for subsequent wire bonding operations is changed based on the new plan time determined in step 506. For example, if the new plan time is longer (e.g., compared to the previous plan time), the search height may be increased; and if the new plan time is shorter (e.g., compared to the previous plan time), the search height may be decreased.
[0035] Now please refer to Figure 6 , a method for determining a new scheduled time for a wire bonding process is depicted. At step 600, a scheduled time (or a new scheduled time at step 606) is provided (e.g., Figure 1 At step 602, using the scheduled time from step 600 (or the new scheduled time from step 606), a plurality of wire bonding operations are performed. At step 604, during each of the plurality of wire bonding operations of step 602, wire bonding evaluation criteria are monitored (see the exemplary criteria described above with respect to step 204). At step 606, using the wire bonding evaluation criteria monitored during step 604, a new scheduled time is determined.
[0036] At step 608, a determination is made as to whether a certain criterion is satisfied. The predetermined criterion may be any criterion as desired in a particular application. For example, the predetermined criterion may be a criterion related to the criterion monitored in step 604 (e.g., seek time, seek distance, impact force, impact extrusion, etc.). Alternatively, the predetermined criterion from step 608 may be a different criterion, such as a minimum or maximum number of iterations that have been completed (or a maximum timeout). If the answer to the decision block of step 608 is "no," steps 600-606 are repeated with a new planning time. If the answer to the decision block of step 608 is "yes," then at step 610, the determination of the new planning time is completed. At optional step 612, based on the new planning time determined in step 606, the seek height for subsequent wire bonding operations is changed (see description of step 508 above).
[0037] Now please refer to Figure 7 , a method for determining a new schedule time for a wire bonding process is depicted. According to the method, a plurality of schedule times are examined to determine a desired (and possibly optimal) schedule time. For example, a plurality of schedule times may be known prior to performing the method, and each of the known plurality of schedule times is examined.
[0038] At step 700, a scheduled time (or another scheduled time at step 708) is provided (e.g., Figure 1 702, using the scheduled time from step 700 (or another scheduled time from step 708), a plurality of wire bonding operations are performed. At step 704, during each of the plurality of wire bonding operations of step 702, wire bonding evaluation criteria are monitored (see the exemplary criteria described above with respect to step 204). At step 706, a determination is made if another scheduled time is to be checked (i.e., all known plurality of scheduled times are to be checked). If the answer to the decision block of step 706 is "yes", then at step 708 another scheduled time is provided, and steps 700-704 are repeated. If the answer to the decision block of step 706 is "no", then at step 710, determination of a new scheduled time is completed (see the description above with respect to step 506, and at step 710, a new scheduled time may be determined using the evaluation criteria monitored for each of the plurality of scheduled times). At optional step 712 , the seek height for subsequent wire bonding operations is changed based on the new projected time determined at step 710 (see description of step 508 above).
[0039] Although the invention has been shown and described herein with reference to specific embodiments, it is not intended that the invention be limited to the details shown. Rather, various modifications may be made in the details within the scope of the claims and their equivalents and without departing from the invention.
Claims
1. A method for determining a new search height for a wire bonding process, the method comprising the following steps: (a) provide the search altitude; (b) performing a plurality of wire bonding operations using the search height; (c) monitoring a wire bonding evaluation criterion during each of the plurality of wire bonding operations of step (b); and (d) Using the bond line evaluation criteria monitored during step (c), a new search height is determined.
2. The method according to claim 1, wherein: The new search height is the height of the wire bond tool above the weld location prior to entering the constant speed mode.
3. The method according to claim 1, wherein: The wire bonding evaluation criteria include signals monitored during step (c) and correlated with at least one of: (i) a seek time of a wire bonding tool, (ii) a seek distance of the wire bonding tool, (iii) an impact force of the wire bonding tool, (iv) an impact extrusion of the wire bonding tool, (v) a z-axis deformation curve, (vi) a bonding force oscillation curve, (vii) an ultrasonic impedance characteristic, and (viii) a servo performance of an xyz motion system of a wire bonding machine.
4. The method according to claim 1, wherein: During step (d), the new search altitude is determined to be the same as the search altitude.
5. The method according to claim 1, wherein: During step (d), the new search altitude is determined to be different from the search altitude.
6. The method according to claim 1, wherein: The wire bond evaluation criteria include a signal related to a seek time of a wire bond tool, the seek time being a period between (i) beginning to seek for contact between the wire bond tool and a bond site and (ii) contact being declared between the wire bond tool and the bond site.
7. The method according to claim 1, wherein: Step (d) includes determining the new seek height when an acceptable level of the wire bond evaluation criteria monitored in step (c) is provided to ensure that the new seek height is low enough to provide a time efficient wire bond process.
8. The method according to claim 1, wherein: Steps (a) to (d) are repeated for a plurality of iterations, wherein the new search altitude determined in step (d) is the next search altitude used in the plurality of iterations.
9. The method according to claim 1, wherein: Steps (a) to (d) are repeated for a plurality of iterations until a predetermined criterion is met under consideration of the bond wire evaluation criteria monitored in step (c), wherein the new search height determined in step (d) is the next search height used in the plurality of iterations.
10. The method according to claim 1, wherein: Steps (a) to (c) are repeated for a plurality of search heights, and wherein step (d) comprises determining the new search height using the weld line evaluation criteria monitored during step (c) for each of the plurality of search heights.
11. The method of claim 1 , further comprising the step (e) of determining a planning time for a subsequent wire bonding operation using the new seek height determined in step (d), the planning time being a time after a wire bonding tool is at the seek height but before the wire bonding tool enters a seek mode during a wire bonding operation.
12. A method for determining a new planning time for a wire bonding process, the method comprising the steps of: (a) providing a planning time, the planning time being the time after a wire bonding tool is at a seek height during a wire bonding operation but before the wire bonding tool enters a seek mode; (b) performing a plurality of wire bonding operations using the planned time; (c) monitoring a wire bond evaluation criterion during each of the plurality of wire bond operations during step (b); and (d) Using the bond wire evaluation criteria monitored during step (c), a new lead time is determined.
13. The method of claim 12, further comprising the step of determining a new seek height for a subsequent wire bonding operation based on the new staging time determined in step (d).
14. The method according to claim 13, wherein: The step of determining the new search altitude includes increasing the search altitude if the new planning time is longer, and decreasing the search altitude if the new planning time is shorter.
15. The method according to claim 12, wherein: The search height is the height of the wire bonding tool above the weld location before entering the constant speed mode.
16. The method according to claim 12, wherein: The wire bonding evaluation criteria include signals monitored during step (c) and correlated with at least one of: (i) a seek time of the wire bonding tool, (ii) a seek distance of the wire bonding tool, (iii) an impact force of the wire bonding tool, (iv) an impact extrusion of the wire bonding tool, (v) a z-axis deformation curve, (vi) a bonding force oscillation curve, (vii) an ultrasonic impedance characteristic, and (viii) a servo performance of an xyz motion system of a wire bonding machine.
17. The method according to claim 12, wherein: The wire bond evaluation criteria include signals that are monitored during step (c) and are related to servo performance of an xyz motion system of the wire bonding machine.
18. The method according to claim 12, wherein: During step (d), the new planned time is determined to be the same as the planned time.
19. The method according to claim 12, wherein: During step (d), the new planned time is determined to be different from the planned time.
20. The method according to claim 12, wherein: Step (d) includes determining the new planning time when an acceptable level of the wire bonding evaluation criterion monitored in step (c) is provided to ensure that the new planning time is short enough to provide a time-efficient wire bonding process.
21. The method according to claim 12, wherein: Steps (a) to (d) are repeated for a plurality of iterations, wherein the new scheduled time determined in step (d) is the next scheduled time used in the plurality of iterations.
22. The method according to claim 12, wherein: Steps (a) to (d) are repeated for a plurality of iterations until a predetermined criterion is met under consideration of the bond wire evaluation criteria monitored in step (c), wherein the new schedule time determined in step (d) is the next schedule time used in the plurality of iterations.
23. The method according to claim 12, wherein: Steps (a) to (c) are repeated for a plurality of planned times, and wherein step (d) includes determining the new planned time using the bond wire evaluation criteria monitored during step (c) for each of the plurality of planned times.
24. The method according to claim 12, wherein: The staging time is at least a portion of a time that elapses after the wire bonding tool reaches the seek height but before the wire bonding tool enters the seek mode during the wire bonding operation.
25. The method of claim 12, wherein: The lead time is the time that elapses between when the wire bonding tool enters the constant speed mode and when the wire bonding tool enters the seek mode.
