Ship head steel casting mounting method and steel casting
By welding the independent hull structure on the connecting surface of the cast steel parts on the first cast steel parts of the ship to form the installation components and weld them to the ship, the problems of installation difficulty and transportation costs of cast steel parts are solved, and the effect of reducing construction and transportation difficulties is achieved. Improves structural strength and service life.
Patent Information
- Application Number
- CN202411108730.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-13
- Publication Date
- 2024-11-01
AI Technical Summary
After the first cast steel parts on the ship are constructed in sections, the installation difficulty and transportation difficulty are difficult to take into account, resulting in construction and transportation difficulties.
The first cast steel parts installation method of the ship is adopted. First weld an independent hull structure on the connecting surface of the cast steel parts to form the installation component, and then the components are welded to the ship to reduce the volume of the cast steel parts to reduce the difficulty and cost of conveying, and pass through the curved surface. Welding and smooth transition connections improve welding strength and stability.
It reduces the construction difficulty and conveying difficulty of small-volume cast steel parts, improves the structural strength and service life of the installed components, and reduces the conveying cost.
Smart Images

Figure CN118877151A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of shipbuilding, and in particular to a method for installing a ship bow steel casting and the steel casting. Background Art
[0002] Since the bow of a ship will be subject to greater impact from the water flow during navigation, and the bow column is the structure at the front end of the hull, it bears the greatest water pressure, wave impact force and external collision force. Therefore, the bow column of the ship needs to have sufficient rigidity and strength. In order to ensure good impact resistance of the bow of the ship, cast steel is generally used for the bow column of the underwater part.
[0003] Due to the huge size of the bow of the ship, it needs to be built in sections. However, the steel castings of the bow of the ship after the section construction are either small in size to meet the installation requirements of a local narrow area, but small-sized steel castings are difficult to install on the hull; or the size of the steel castings is increased to reduce the difficulty of construction, but at the same time the weight of the steel castings increases, which increases the difficulty and cost of transportation. Ultimately, it is impossible to take both the reduction of construction difficulty and the reduction of transportation difficulty and cost into consideration. Summary of the invention
[0004] The object of the present invention is to provide a method for installing a ship bow steel casting and a steel casting, which can reduce the difficulty of construction and reduce the difficulty and cost of transportation.
[0005] To achieve this object, the present invention adopts the following technical solutions:
[0006] The installation method of the bow steel casting of a ship is applied to a ship, including a partially independent hull structure and a steel casting. The installation method of the bow steel casting of the ship includes:
[0007] S1, pre-treating, casting a steel casting, wherein the steel casting has a connecting surface;
[0008] S2, welding the hull structure to the connecting surface to form a mounting assembly;
[0009] S3, welding the side of the hull structure in the installation assembly away from the connection surface to the ship.
[0010] As a further technical solution, the connection surface is configured as a curved surface, and the welding method of the hull structure to the connection surface is curved surface welding.
[0011] As a further technical solution, along the X direction, the width of the hull structure on a side away from the connecting surface is greater than or equal to 700 mm.
[0012] As a further technical solution, along the X direction, the width of the connecting surface is greater than or equal to 300 mm.
[0013] As a further technical solution, the outer wall of the hull structure is smoothly connected to the outer wall of the steel casting.
[0014] Steel castings, using the ship's bow steel casting installation method, including:
[0015] The upper end surface of the steel casting is arranged as a connection surface, and the connection surface is concave inwardly toward the direction close to the lower end surface of the steel casting.
[0016] As a further technical solution, the connecting surface includes an arc segment and two straight segments. Along the X direction, the two straight segments are respectively arranged on both sides of the arc segment and are both smoothly transitionally connected to the arc segment.
[0017] As a further technical solution, the radius of the arc segment is greater than 50 mm.
[0018] As a further technical solution, the distance from the straight line segment to the corresponding side wall on the steel casting is greater than or equal to 20 mm.
[0019] As a further technical solution, the steel castings are symmetrically arranged along the X direction.
[0020] Compared with the prior art, the ship bow steel casting installation method and the steel casting provided by the present invention have the following technical advantages:
[0021] When installing steel castings, an independent hull structure is first welded on the connection surface of the steel castings, so that the independent hull structure and the steel castings form an installation assembly, and then the installation assembly is welded to the ship. In this way, the volume of the steel castings can be reduced as much as possible during the early casting, thereby reducing the transportation difficulty and transportation cost of the steel castings; and during the later installation, the side of the hull structure in the installation assembly away from the connection surface is welded to the ship, rather than directly welding the steel castings to the hull. In this way, even if the steel castings are cast as small-volume components, with the assistance of the independent hull structure, small-sized steel castings can be installed on the hull, thereby reducing the construction difficulty of installing small-volume steel castings on the ship. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] Figure 1 It is a cross-sectional view of a steel casting provided by an embodiment of the present invention connected to a ship.
[0023] In the figure:
[0024] 10. Ships;
[0025] 100. Hull structure;
[0026] 200, connecting surface; 210, arc segment; 220, straight line segment. DETAILED DESCRIPTION
[0027] The present invention will be further described in detail below in conjunction with the accompanying drawings and embodiments. It is to be understood that the specific embodiments described herein are only used to explain the present invention, rather than to limit the present invention. It should also be noted that, for ease of description, only parts related to the present invention, rather than all structures, are shown in the accompanying drawings.
[0028] In the description of the present invention, unless otherwise clearly specified and limited, the terms "connected", "connected", and "fixed" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0029] In the present invention, unless otherwise clearly specified and limited, a first feature being "above" or "below" a second feature may include that the first and second features are in direct contact, or may include that the first and second features are not in direct contact but are in contact through another feature between them. Moreover, a first feature being "above", "above" and "above" a second feature includes that the first feature is directly above and obliquely above the second feature, or simply indicates that the first feature is higher in level than the second feature. A first feature being "below", "below" and "below" a second feature includes that the first feature is directly below and obliquely below the second feature, or simply indicates that the first feature is lower in level than the second feature.
[0030] In the description of this embodiment, the terms "upper", "lower", "right", etc., directions or positional relationships are based on the directions or positional relationships shown in the drawings, and are only for the convenience of description and simplification of operation, rather than indicating or implying that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore cannot be understood as limiting the present invention. In addition, the terms "first" and "second" are only used to distinguish in the description and have no special meaning.
[0031] Embodiment 1
[0032] The method for installing a ship bow steel casting is applied to a ship, and includes a partially independent hull structure 100 and a steel casting. The method for installing a ship bow steel casting includes:
[0033] Step 1: pre-treatment, casting a steel casting, wherein the steel casting has a connection surface 200;
[0034] Step 2: Welding the hull structure 100 to the connecting surface 200 to form an installation assembly;
[0035] Step 3: Weld the side of the hull structure 100 in the installation assembly away from the connection surface 200 to the vessel 10 .
[0036] When installing the steel casting, the independently arranged hull structure 100 is first welded on the connection surface 200 of the steel casting, so that the independent hull structure 100 and the steel casting form an installation assembly, and then the installation assembly is welded to the ship 10. In this way, the volume of the steel casting can be reduced as much as possible during the early casting, thereby reducing the transportation difficulty and transportation cost of the steel casting; and during the later installation, the side of the hull structure 100 in the installation assembly away from the connection surface 200 is welded to the ship 10, instead of directly welding the steel casting to the hull. In this way, even if the steel casting is cast as a small-volume component, with the assistance of the independent hull structure 100, the small-sized steel casting can be installed on the hull, thereby reducing the construction difficulty when the small-volume steel casting is installed on the ship 10.
[0037] In addition, in this embodiment, during the process of welding the installation component to the ship 10, in order to further reduce the difficulty of construction, the installation component can be moved or positioned with the help of a crane, a crane, etc.
[0038] Preferably, the connection surface 200 is set as a curved surface, and the welding method of the hull structure 100 to the connection surface 200 is curved surface welding. In this way, when the hull structure 100 is welded to the connection surface 200, the welding strength and connection stability between the hull structure 100 and the cast steel part are improved, thereby improving the overall structural strength of the installation assembly, and further ensuring the structural stability and service life of the ship 10 after the installation assembly is welded to the ship 10.
[0039] Preferably, if Figure 1 As shown, along the X direction, the width of the hull structure 100 on the side away from the connecting surface 200 is greater than or equal to 700 mm.
[0040] Specifically, the width of the hull structure 100 on the side away from the connecting surface 200 can be set to 700mm, 729mm, 750mm, 781mm, 800mm, etc. according to the actual specifications of the ship 10; by such a setting, while ensuring that the volume of the cast steel parts matching the hull structure 100 is as small as possible, it is possible to avoid the appearance of a narrow space on the side of the hull structure 100 away from the connecting surface 200. Therefore, when the installation component is welded to the ship 10, a construction area that can accommodate construction personnel can be formed between the hull structure 100 and the ship 10, so that the construction personnel can weld the installation component to the ship 10.
[0041] Preferably, along the X direction, the width of the connecting surface 200 is greater than or equal to 300 mm.
[0042] Specifically, the width of the connecting surface 200 can be set to 300mm, 318mm, 330mm, 352mm, 370mm, etc. according to the actual casting process; such a setting can reduce the difficulty of welding the hull structure 100 with the casting through the connecting surface 200 while ensuring that the volume of the casting is as small as possible, thereby reducing the overall construction difficulty.
[0043] Preferably, the outer wall of the hull structure 100 is smoothly connected to the outer wall of the steel casting.
[0044] Specifically, during the navigation of the ship 10, the bow of the ship 10 will be impacted by the water flow, and by smoothly transitioning the outer wall of the hull structure 100 to the outer wall of the steel casting, it is possible to avoid an increase in the impact force at the connection between the hull structure 100 and the steel casting due to the presence of a step between the hull structure 100 and the steel casting, thereby further extending the service life of the installation components.
[0045] Embodiment 2
[0046] The steel casting adopts the ship bow steel casting installation method, including: the upper end surface of the steel casting is set as a connection surface 200, and the connection surface 200 is concave in the direction close to the lower end surface of the steel casting. In this way, it can be ensured that the connection surface 200 is set as a curved surface, and because the connection surface 200 is concave, the upper end of the steel casting is a hollow structure, thereby ensuring that the weight of the steel casting is reduced to the greatest extent while ensuring that the volume of the steel casting is as small as possible, so as to further reduce the transportation difficulty and transportation cost of the steel casting.
[0047] Preferably, the connecting surface 200 includes an arc segment 210 and two straight segments 220 . Along the X direction, the two straight segments 220 are respectively arranged on both sides of the arc segment 210 and are both smoothly transitionally connected to the arc segment 210 .
[0048] Specifically, by arranging straight line segments 220 on both sides of the arc segment 210, the cross-sectional shape of the connecting surface 200 along the X direction is made to be "U"-shaped, thereby avoiding the formation of an angle on the connecting surface 200 while ensuring that the volume and weight of the steel casting are as small as possible, thereby reducing the difficulty of welding the hull structure 100 to the steel casting.
[0049] Preferably, the radius of the arc segment 210 is greater than 50 mm. The radius of the arc segment 210 can be set to 50 mm, 60 mm, 75 mm, 80 mm, etc. according to the actual casting process and the actual specifications of the hull structure 100 connected to the casting, so as to avoid forming an angle on the connecting surface 200 and further reduce the welding difficulty when the hull structure 100 is welded to the cast steel part.
[0050] Preferably, the distance from the straight section 220 to the corresponding side wall of the steel casting is greater than or equal to 20 mm.
[0051] Specifically, since the connecting surface 200 is concave toward the lower end surface of the steel casting, so that the upper end of the steel casting is a hollow structure, in order to ensure that the strength of the steel casting itself can resist the impact of water flow while minimizing the weight of the steel casting, in this embodiment, the distance from the straight line segment 220 to the corresponding side wall on the steel casting is set to be greater than or equal to 20 mm, that is, the thickness of the side wall of the upper end of the steel casting is set to be greater than or equal to 20 mm.
[0052] Preferably, the steel castings are symmetrically arranged along the X direction. Such an arrangement can ensure that the ability of both sides of the steel castings to resist the impact force of water flow is as similar as possible, thereby further improving the stability and service life of the steel castings after being installed on the ship 10.
[0053] The cross-sectional shape of the steel casting along the X direction can be adaptively adjusted according to the specifications and purpose of the target ship, and is not specifically limited in this embodiment.
[0054] Obviously, the above embodiments of the present invention are merely examples for clearly illustrating the present invention, and are not intended to limit the embodiments of the present invention. For those skilled in the art, various obvious changes, readjustments and substitutions can be made without departing from the protection scope of the present invention. It is not necessary and impossible to list all the embodiments here. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the claims of the present invention.
Claims
1. A method for installing a ship bow steel casting, characterized in that: Applied to a ship (10), comprising a partially independent hull structure (100) and a steel casting, the method for installing the bow steel casting of the ship comprises: S1, pre-processing, casting a steel casting, wherein the steel casting has a connecting surface (200); S2, welding the hull structure (100) to the connecting surface (200) to form a mounting assembly; S3, welding the side of the hull structure (100) in the installation assembly away from the connection surface (200) to the ship (10).
2. The method for installing a ship bow steel casting according to claim 1, characterized in that: The connection surface (200) is configured as a curved surface, and the welding method of the hull structure (100) to the connection surface (200) is curved surface welding.
3. The method for installing a ship bow steel casting according to claim 1, characterized in that: Along the X direction, the width of the hull structure (100) on a side facing away from the connecting surface (200) is greater than or equal to 700 mm.
4. The method for installing a ship bow steel casting according to claim 1, characterized in that: Along the X direction, the width of the connecting surface (200) is greater than or equal to 300 mm.
5. The method for installing a ship bow steel casting according to claim 1, characterized in that: The outer wall of the hull structure (100) is smoothly transitionally connected to the outer wall of the steel casting.
6. Steel casting, characterized in that: The steel casting adopts the ship bow steel casting installation method according to claim 1, comprising: The upper end surface of the steel casting is arranged as a connection surface (200), and the connection surface (200) is concave inwardly in a direction approaching the lower end surface of the steel casting.
7. The steel casting according to claim 6, characterized in that: The connecting surface (200) comprises an arc segment (210) and two straight segments (220); along the X direction, the two straight segments (220) are respectively arranged on both sides of the arc segment (210) and are both smoothly transitionally connected to the arc segment (210).
8. The steel casting according to claim 7, characterized in that: The radius of the arc segment (210) is greater than 50 mm.
9. The steel casting according to claim 7, characterized in that: The distance from the straight line segment (220) to the corresponding side wall of the steel casting is greater than or equal to 20 mm.
10. The steel casting according to claim 6, characterized in that The steel castings are symmetrically arranged along the X direction.
Citation Information
Patent Citations
Ship stem steel casting three-dimensional modeling and precision control method
CN112339930A
Manufacturing method of stem on large container ship and integral stem section
CN114179998A
High speed boat ship splashproof type ship bow
CN206501977U
Obstruction groove device of ship type ship bow
CN207737444U
Marine vessel bow part lower part block working method
JP2011046341A